Um, but it was basically like the Chicago Tribune but for the school district. So I think, you know, the goal, like I said, was to have a conversation and to get the board's input. I think um speaking with um Miss Neil, Mr. Fix Simmons, Miss Dorfler, and kind of thinking about what are some ideas or or some or some strategies that we could have to get the information from the from the board meetings out to the community in a more preferred way. We can bring that as well as other alternatives to possible continuing to stream. Um and then the team can bring those back. I won't I won't have them by next Monday. So, it won't be me, but they could bring those back once they can kind of look at what are, you know, some some other districts doing as well outside of this, those that aren't doing the videotaping.
Just if you could talk a little bit about what steps we're doing to what kind of problem was it? Yeah, so it was um heating. We had a some heating issues in Sewing. Um we had basically at the high school we had to extend um the closing of school one extra day um because uh we had some failure in our heating system there um and it was very specific to SeaWing. Um so C-wing was built in 95. Um it's 30 years old at this point and um we are looking not only for the HVAC. HVAC's the number one thing that we need to get updated in there. But um it's kind of a a domino effect. Um you're looking at univvents and then if you're replacing the univvents um you need to look at the shell, you need to look at some interior things as well.
Um, what are they doing to get that information out might be a helpful next step before any final and again, this wasn't to make a final decision about we're going to stop live streaming. It was just to make you all aware of the call. So I think we did hear um Zoom may not be the be the direction or it's needed any longer but we can look at alternatives in that way as well as like for example YouTube and there's some other um tools out there as well. So when you're coming back to us can you talk about more than just the dollars? Miss Salt just asked how long it's taking Mr. Fitz Simmons to and we heard set up and tear down something I would not have thought hearing an hour on each end that was immediately a surprise to me. So if if we could hear what that investment is too, I think that's a helpful point in the conversation.
Um, I'd like to, you know, we're looking at putting a forced air system in there. So then you, it's very similar to this. So the air or the heat is spread out throughout the room instead of coming from one singular place. Um, but if you do that, um, you have to look at how your ceilings look, you have to look at your flooring, you have to look at where you're going to put all of that. So yeah and current look at that is the HVAC would not get done in a single summer um because it's just too much work to do. So we're looking at how are we going to phase that in and how are we going to phase all of the other things that need to be done in there as well. Um and there's another piece of how do you phase that in and with the cost and how do you spread that out over fiscal years.
For me, it's um you know, it's the families being able to listen to it. It's our staff for certain meetings. We have union members that sit down and watch certain parts of our meetings when they're discussing something that pertains to them. Um, and I feel like personally I feel like a summary like it it'd be like looking at our minutes that are not really in-depth. They're not really telling the whole story about all the conversation that we had during a meeting and um it's one person's perspective of who's writing that, giving their summary of the meeting um and leaving out a lot of really great conversation that we have at these meetings. And we've already paid for all of this already. We've paid for the cameras. We've paid for the speakers. We've paid for all of this already. So for me, it's like that. What do we do with that then?
Um I'm very deep into that one um as we speak right now. Um I'm hoping that we could start a phase um in the summer of 26. That is the hope. Um so we have this and we are doing some changes currently through our maintenance staff and to hopefully not have that happen again. Um but you don't want to put a lot of money into something that you're going to, you know, replace, but you also need it to run. You need heat and you need air. Well, you definitely need heat. Now, it's nice to have error, but you have to have heat. So, yes, Sewing is the next large one. Louise White is planned. It's going to roll out. I mean, we already did. We planned Storm and Louise together, but um Sewing is in the process of being planned right now. Thank you. Um just again, this is just a repeat.
Is that going to sit in a closet? But I I agree. I think bringing you back and bringing alternatives. But for Zoom, I don't think anybody loves Zoom. I mean, that's that's that to me is a go ahead, get rid of it. But perfect. Yeah. Thank you. Any other questions or comments? Uh, if not, we can go on to the next item, which is 9.7 summer construction update. Mr. Shepard and Mr. Martin, you're up. Yes. So, as as mentioned, this is Mr. Martin's inaugural uh presentation. uh he was very eager to to give the uh the board an update of of all the the happenings of this summer. And I will say that uh thus far from what I've seen when I've been uh at least at Briergate, it was amazing the transformation uh that occurred from the last day of school to literally two or three days later the the building was unrecognizable.
I know I I left these in here because I know we have new board members. just some challenges and opportunities. And then um one of the success I want to talk about again and it still is is um our partnership with GSF. That's our we outsource our cleaning our um nighttime cleaning service. Um continuing to impress um really we've been with them a little more than a year now. We're going to go through our second summer of cleaning um for the summer. Summer is always very difficult because you have to get in and get every single building deep cleaned. Um they are on schedule and they can't even get into HC Storm yet because HC storm's not even at this point not close for them to get into to clean. Um some other um again just continuing with uh warm safe dry and that is it before I move on to transportation.
And you never thought you'd see a cafeteria so full with all the furniture that had to be moved from all the the classrooms. So there's been a lot of good work that's uh been going on. Uh and I will quit talking and Mr. Martin is going to take over. Hello everybody. So yeah, uh a lot of work being done this summer at all the schools, not just Brigate. They're definitely the focus this summer. So, at the Briergate Elementary, uh we're getting uh projects going, the renovations. They're building new learning areas. Uh the gym floor this past week has started to took out the old gym floor. They're going to be putting in the new one this week, this this week, and next. Uh new LED lights, new ceiling tiles, uh basically a brand new nurse's office and bathroom. Uh, a couple new faculty bathrooms. Uh, painting all the classrooms.
Anything else on facilities? I'm just gonna make a note. I want to thank Mark and Tony. There's an email to you inviting you. Um, if you'd like to tour some of the construction sites this summer, um, we've put a date out there and depending on how you reply, we'll treat it as such. I I put some notes in there on how we would handle that depending on how you reply. Okay. So, we'd love to take you around. Thanks to making time for that course. Have there been any unexpected surprises with the projects at HC Storm? No. That's the million-dollar question. Literally. Um there have been, but nothing that can't get worked through. So, yeah, there's some things that, you know, there's assumptions that were there. I mean, you don't really know until you open open up the, you know, building. Um, and it's it's mainly about like, well, the plan says that the pipe was supposed to be there and now it's not there.
Uh, brand new roof. Talk about energy savings. Uh, it was a surprise to me when we were up on the roof the other day. 12 in of uh, insulation foam goes in on top of like the substrate. So, that was amazing that I saw. I was like, "What? 12 in?" I was like, "All right." And uh so that's definitely going to save us a lot of energy, you know, like uh with that brand new roof on there. Uh fixing up the HVAC, you know, like uh optimizing it and improving it. Uh the security upgrades, you know, the cameras are going in. Uh card readers and all the doors. Uh we're going to do new interior signage. Uh so like, you know, for the room numbers and um and areas, that's all going to get updated. Windows are coming at the end of August. Uh and uh the audio enhancements uh to help with the learning.
So then you have to adjust and you know, so it's supposed to be a 4 inch pipe and it's a 3inch pipe and you know, things like that. But um, yeah, there's there's change orders and things like that, but that's why you have contingency budgets and we are well within the contingency um, plans that we had um, allowances. Um, so yeah, nothing like some interesting paint colors I would say. It's like, huh, they just left the, you know, left the brick the way it is, but just painted some lines and didn't paint the whole wall. So, some of that kind of stuff, but plenty of those pictures and try to save all those. Now, the nice thing about this is you can take the notes because really Louise White is almost identical for next summer. So, hopefully we'll be a little bit of ahead. Um, we have some some delays in some equipment that I'm a little concerned about.
Um that's coming in over the summer as well. And everybody's like, uh working very well together, collaborating to make sure they get everything done. Uh we've been taking a lot of pictures and uh we are working with u just Neil to get that onto uh our website like under the operations tab. We're going to have a new uh area called the summer projects and we're starting with this summer you know using the referendum money. So, um, the Brier Gate's definitely going to have most of the pictures on there. And, uh, we put out a nice big banner to thank you to for the community, uh, for, you know, believing in us and getting these, uh, buildings fixed up and renovated. And, uh, we put that out the other day as a big thank you like for for the support. And I I will just add that that banner is uh, generic enough that next year you'll see it out in front of Deer Path.
I get to the 4th of July and I get a little more concerned because that's in my book when summer's over. I know that nobody likes to hear that, but that's my my reality. Um, but we're working to kind of figure out how to, you know, get those pieces and you need certain pieces in place for other trades to start working and we're starting to get there. But, um, and it does not really help when you're tuck pointing and roofing a building and it's 97 degrees and heat indices of 110. That's very difficult um on all of those contractors. We're working through that. Transportation update. Again, our department is um very small. It's basically myself overseeing it and D our transportation coordinator. And yes, we outsource our busing um so we don't need um the personnel. Here's just some metrics um where we're at. um basically 193 routes.
Uh it's just going to travel around as we continue to renovate our buildings because we want to thank the community uh for the support that they've they've given us. And we like your savings, too. Yeah. And living in the Briergate neighborhood, I can tell you that that was a very nice step uh and appreciated by the residents both with kids that go there and without or that do not. So, thank you. So, Kerry Junior High School, like uh not too much uh going on here besides a lot of preventive maintenance, so we don't have those uh huge outlays for uh emergency situations. Uh we're going to be uh redoing a bunch of the spots in the parking lot out front um that have been worn out and uneven. Patching, striping in the gym. like it's been a while since the stage curtains have been fixed, cleaned or certified for fire safety.
That's how many buses, that's how many drivers. Um 54% of our students um take the bus. And it's just shy of 400,000 miles traveled to and from school. So that's for the year. And there was eight total accidents this year. I'll get into these a little bit later. Um here are our goals. uh increase on-time performance to 99% by the end of the school year and we did that. So how we know this is um basically every school has access to this metric to put in any type of you know if the bus is late if it's late to school if it's late to a bus stop um and if a parent calls in we record it all in one spot. So, all eight schools um have this. And does that say 99.3? I can't read it. Yeah, I know. All right. Good. My memory serves.
So, that's coming up as well. So, besides, you know, the normal like day-to-days, uh making sure everything runs smoothly here, um Carrie Jr. again is scheduled to get those big improvements in two summers, so 27 and 28. And deer path, we just went alphabetically here. So, Deer Path is uh coming up next summer. Uh but this summer uh we are doing um like bunch of the landscaping enhancements we took care of before the end of the year to make it look nicer. Uh we put some interior card readers in their vestibule. You have those two sets of double doors and the um the administration in there, they had to buzz people into that second set of doors all the time. and uh through another grant through Title One funds, we're able to get that paid for as far as like a security upgrade for them.
So, yes, we did definitely achieve this. Um decrease the number of routes. Uh we are literally working with this right now. So, we look at routes over the summers. We tweak during the year, but we try to do any of the bigger changes over the summer. At this point, it looks like we can go down two routes. Now, that doesn't mean that it's entire, you know, bus that's going to be done. It might be in a tier that could be changed a little bit. So, you either have a single tier. That means there's one bus that runs either the high school back and forth or you could have a double tier or a triple tier. Triple tier is what you want. So, then that same bus is taking high school kids and then it's taking middle school kids and then it's taking elementary students. That is the most efficient you can be.
Um, so their referendum improvements, you know, 26 27 school year and uh in the next few months we're going to do a detailed walkthrough of deer path to make sure we've got everything uh listed out correctly and then uh get going on those uh bids like in October, November so we get the best pricing and best contractors versus waiting till like uh uh later on in the year. Uh the planned upgrades uh right now we got the fire alarm panel that needs to be upgraded. They're going to get the audio enhancements epic system HVAC again and uh the security cameras. So next summer on to Oakn Null and our kindergarteners. So uh right now they're uh getting wiring done for like the security upgrades, all the cameras. Um, again, the audio enhancements, uh, that's, uh, scheduled to come in at the end of July. And same thing, crack filling and striping to make the the lot parking lot look better.
If we had more than one bridge, we'd probably be even more efficient, but we have some limitations. Um, and then the other one is achieve less than one accident per 100,000 miles. We did not do that, but I go to any accident that has students involved. So, I'm there as a district um person. And really, we had three of those. So some of these accidents are well could be a bus hitting another bus like running in the back of them or a car backing into a bus. Any type of accident you have to report. So I can say that there was three accidents that had students involved and no injuries, nothing major at all. And then just some things that basically some of these projects they're always in progress. route efficiency. You're always trying to make the routes as efficient as they can be. Um, communication with Illinois Central.