We paid about 9 cents a kilowatt hour and it was a total of two 2,200,000 well 2.2 to a little over that million. And on the right side, you'll find another chart that shows us energy use. And this is electrical as well. We paid 10 cents a kilowatt hour. And we'll find that it was a little less um in 2024 with just over $2 million. Again, if we look, this is natural gas. Um on the left side is 2016. We paid5.53 for decathm and it was a cost of4 $412,454. [Music] On the right you'll find in 2024 we paid $5.68 for a deck of them and the total was 4,022 and 4,2 422228. How about that? Um, this is the fascinating slide for me. Um, I just I can get into this one. Um, if you'll find on the left side in 2016, uh, again, this is total cost.
So, I'm excited to do that and it will result in a uh document that we we will have in our state meeting at the end of September that we will approve. Anyway, I'm excited to do that. >> Grateful to serve in that capacity have the voice specifically for Brown County. >> Yes. Yes. Happy happy to do it. I love it. >> And congratulations. >> Yes. Somebody got married. >> Yes. >> That's why she August and July. And she has a new name. For those who don't know, >> she has a new name. >> Yes, >> it's Emily Calahan. >> Congratulations. >> I forgot already. >> Congratulations. >> Yes. Congratulations. >> Okay. Can I get a motion to adjourn the meeting? >> Second. >> All in favor? >> Double. We got step to sign. beside her.
And so we have been here for 15 years. This is our last meeting as the new address is on Wheeler Road. We're excited to move into the new LEC. So, the next time you see us live, we'll be on the 18th for our first board meeting in the new LEC. So, we're excited about that. So, board, if you wouldn't mind just staying a few minutes. We're going to take a last picture here. We'll close this out, put it in the history books, and we'll turn to a new chapter in our new building. Exciting. The new LACC will be officially open on the 18th of August. Thank you, Dr. Smith. Yes, we will be meeting on the 18th at 5:30. Um, I was also reminded to refer this now, this building now as Craig and then LEC is the 5720 Wheeler Road. >> So, I don't know if Google Maps has updated it, but just letting the public know.
We probably have a million dollars of roofing and paid uh, paving probably over the next couple years to catch us up on everything. Um, so I think I'm pretty proud of where we've got to with our capital projects and making sure we have the money to keep our infrastructure and keep our buildings in good shape and safe and occupied. I think we've done a great job of that.
If you look at the red line, the red vertical line and the blue line just on top, it is total cost for that month. It represents a month for 12 for eight years. Um so the total gas and electric in 2016 was 2.6 a little over 2.6 million. Uh if you start moving right you'll find the there's a green arrow there. Um and at this time we did three projects. We did an LED lighting project and two solar projects. So you'll find at that time that the energy cost went way down. Um red line it indicates when COVID hit us at that time. We was we shut down the buildings um close the outside air and and run them in an unoccupied state most of the time. and and so the cost there went really it went down quite a bit after that when the schools opened back up.
>> We believe it's already updated, Grant. I believe we already have it updated. All the addresses have been changed. And for you historians, this is back to being Craig. Okay. As it was built in 1970, Troy. So, it's back to being correct. So, we're excited. >> Okay. At this time then, I'll entertain a motion to adjurnn. >> Seconded. >> Properly moved. Miss Pucket and seconded. Uh Dr. Mhalland. We are done. When's our office meeting?
Any questions on that? >> So, what about the rest of the track stadium? I guess we >> So, the rest of the stadium. So, phase two then if if we were going to move forward again, I think that would bring in some conversations about our is this going to be our high school forever? Then we'd be looking at there's obviously bleacher work to do. We're looking at probably over a million and a half dollars for bleacher replacement. We would swap the home side to the visitor side. new side, new press box, and then would be the conversation about turf, ticket booths, all the ancillary buildings, washrooms, and all that stuff. That's where that all that stuff is where that bigger, you know, $5 million came is if we get into all that stuff >> and we have that I kind of have that plugged in for subsequent years down the line to have that done by, you know, 2029 if we decided to go that route.
Uh we found we was instructed that um well I was instructed that I should run the schools almost 24/7 for ventilation to to get fresh air into the school. So we find that the the usage really went up there. Uh, and we also will find in that that the there was a rate spike there. The rates went up quite a bit. I seen one report where it got up to about 13 cents per kilowatt hour for electricity. Um, after that it settled back down and we got to 2024. Uh we ended up paying about 10 cents a kilowatt hour for electricity and the total was about 2.5 million. Um this is Taylor'sville. This is a picture of Taylor'sville electrical use between 2016 to 2024. We talked about one of the solar projects. One of them was put in at Taylor'sville. And you can see putting in the LED lighting and and the solar, you can see the significant drop that it made around 2020.
>> Gotcha. >> Okay. Thank you. >> Yep. Any other questions? >> Any other priorities that the board would see that's needs to be addressed? I guess that's >> there's a lot of things to be addressed obviously, but >> where did we end up with the parking lot discussion exploratory engineers on that? >> As far as what >> the discussion we had about the >> the the parking lot at CHS. Um any other news from EA with respect to >> we have we haven't expanded any any more dollars to to do that the the initial evaluation was that area is not optimal for a parking lot. The things we would have to do and the costs we'd have to put in to add those 100 parking stalls. Um it it was pretty substantial. I mean, we could expend the funds to do, you know, full evaluation, design, and all that and then try to get a budget, but the budget we had was was like a million dollars for that parking lot.
Um, again, it spiked back up, but that was because of the electric prices going back up a little bit, come back down, and we ended up paying about 10 cents a kilowatt hour. This is also um this is a picture of North Side from 2016 to 2024. Uh around 2020, we also installed LED lighting and solar in it and again the significant drop you can see and again the rise when when the price of kilowatt hour went up. But uh both those projects they you can see that they made a large difference especially in those schools and u so anyway that's not the only projects we've done in our schools you know the uh but when we install new equipment usually it's wore out usually uh it's time for it to be replaced we've been able to replace it with more efficient equipment um our boilers The old ones they are they were gas users and uh we replaced them with new boilers called condensing boilers where they will actually change the temperature of the water and by that being said we use a lot less gas when we run them.
I mean, it was crazy. >> Was that for a paved lot versus say like a gravel lot? Is there >> that was a that was a paved parking lot. There was underground detention. There was moving the drive to make it a safe cross to get across. There was a lot that went into that. >> Yeah. So th those are the kinds of things we have to talk about when we hear from the community about um parking. You know, is is this what we want to spend the district's resources on? >> Yeah. >> The tough part is I mean if we spend $5 million on a stadium and and we still have people parking alongside of a highway miles away and it's like at some point I think it needs to be part of the discussion. We can't just keep adding on to buildings and stadiums and watching the population grow and not >> The irony of that is people >> come on a come on a Friday night HPT's lot is almost empty.
So, in our shoulder months when when the temperatures are just right, you know, really between when we need real cooling and real heating, uh we can drop the the temperature of the heating water down, use a lot less gas to heat it, and still condition our buildings. Uh we put in a few chillers in this amount of time too and we we've been able to buy more efficient chillers as well and that contributed also to uh at least us staying the same or even dropping a little bit in our usage in these eight hours eight hours eight years of time.
>> Yeah. >> They're going to park on the road path of leaf resistance. They're going to park there before they utilize all the paid service we got anyway. So we're not getting away from that. >> Okay. >> You also have the high school that I mean you have juniors and seniors that can't drive. >> Yep. as a rural district, you know, the assumption that everybody's getting dropped off in buses, you know, issue. >> Then it goes back to is this going to be the high school that we're going to have for 10 years? >> Just keep paving a middle school if that's going to be. >> You have the direction you need? >> Yeah. Yep. I'm good. Do we want to proceed with Ericson and evaluating Lily Lake for CDGS or do I reach out to CDGS and see if they're interested in footing the bill?
Um any questions? I don't believe this is your first time. You did a great job taking us through that. Thank you very much. >> Thank you very much. >> What questions do we have? >> The only thing I would like to see is potential to see what we spend on water and sewer as well. That way we get a full scope picture of the whole thing. >> All right. >> Third. Um the I'll mention um I remind you that the we're in a u in a group with other large districts for our natural gas purchasing that saved us quite a bit. It's a mega you you approve the contract every couple years that it comes through. So that's so that's helped um as well. And and this this slide is just a synopsis of of all the items that we've that we've covered here. And um I appreciate Martin's Martin spends a lot of time fixing things, but he spends a lot of time planning things as well and looking out and forecasting and such.
>> I think why why would we foot the bill for their expansion? >> I mean, if they want >> I'm not going to say it out loud, but we've been footing the bill for a long time for all of our feeder. >> Make a note to see if they would pay for it. >> Yeah, I mean out and see what they >> I mean, I could I could reach out to them. They're a self-funded private organization that >> at least a contribution. >> Yeah. >> Right. >> Because it's mutually beneficial. >> Well, and that's that's why we're going to, you know, fee structure. I mean, we've been given for a long time. >> Yep. >> Okay. I'll reach out to them also. >> Okay. >> I'll just stay for the next item. >> Stay for the next item. Current status of the water connection in the addition.
So um the fact that we're we're spending fewer dollars um on more expensive things now than we were eight years ago is is significant. So um so thanks to both and yes, happy to answer any other questions you have. Any three of us are >> uh I I think on the chart you pointed out solar investments in 2020, but I didn't see any since then. Can you just talk about our decisions with regards to adding solar and >> Sure. >> that hasn't showed back up. >> Sure. Yeah, good question. So, the um you may recall at the time we um had decided that as our roofing systems need replaced on our schools, we would consider putting solar on top of them as the roof replaces. So, we're obviously not going to put um a solar system on a roof that's 15 years old because um the the lifespan of both those systems are about 20 or 25 years.
So um when the design and with discussion came up about putting that addition in um we looked at programming and how we could best utilize that space and what we can do to make that multiunctional and give us long-term um operational need. Um the well that we put in for when we added the Vette edition and modified those classrooms, we set up that well to allow for washrooms in that addition. That was how we sized that well. Washrooms adding water in all of those classrooms was never in our plan. The there may be some we we talked about being able to utilize some of those rooms as CTE spaces. So I don't know if that's where the confusion came in. Not all CTE spaces need washrooms. We put drywall walls in multiple of those classrooms. So those could easily be removed and make the 30x60 classroom space for CTE.
Um so, we still do that. So, we review um to answer your question a little more specifically, the the cost of solar has come up quite a bit. Um I think we paid $137 a kilowatt um on the two projects that we have done here um which we struck while the iron was hot for lack of a better term there and really have reaped the rewards and those costs have gone up um quite a bit. quite a bit since then. So, um the the new elementary most specifically, we we had the the solar conversation quite a bit back and forth and realized that geothermal would be a better investment in the the current time. So, that's what you'll see featured at at Maple Grove. >> Okay, great presentation. Thank you. >> Thank you. >> Could I >> Oh, yeah. I'm sorry. Um the first two sections of the presentation, the the glamorous projects, the 2030 projects funded with debt.
We set up the the south elevation is at ground level. The window infrastructure could be removed. We could add an overhead door to bring in large equipment, things like that to modify that space for CTE. That was the CTE directive that we had when we designed that addition. The well that's currently there functions for the washrooms that are there and for the future washrooms for the third floor. That's what that well is there to service. Adding water in all those classrooms. There was never a design that had that. Actually, even the cabinetry was added after the fact. We we weren't even going to have as many cabinets in those classrooms. That was a when we decided on kind of the direction of programming for that wing, we decided to add the cabinetry. So washrooms was or water in the classrooms was never on the docket.
Um and then the second section was capital projects. The the the debt funding comes and goes. Capital project funds we we receive or budget to spend every year. What's the size difference? How much are our capital project funds every year? >> They vary, but roughly around $2 million every year um on on the CPF side of things. So, um >> how many buildings do we take care of with two million? >> 20 23 physical buildings about two million square feet under roof. >> How much is that a square foot? >> Uh it's a it's about a dollar about a dollar a square foot. So we we will often times anytime anybody asks me um >> so if I've got a 1,200 square foot home that's the equivalent of me putting $1,200 into a project every year. >> That's the same reasoning I use. Yes. Yeah.