>> Oh, wow. >> Before that was their theory. >> Interesting. >> But we were shocked. It was But we also noticed that it was always public. Every time it rained, the water would just be there. But once we dug it, it was shock the amount of water. >> Thank you. >> All right. >> Thank you. Moving on to uh action item 10.1. Action item. Approval of bills for payment. Can I have a motion, please? I make a motion to authorize the payment of bills in the amount of $6,82,6412 as presented. >> Second.
So now it will be even more difficult to itemize this lack of funding because now it's just rolled into the overall pot. Before it was a separate line item that we accounted for. It was very clear to be able to say how much we are not being funded. Now, we'll have to do our own calculations to be able to do that. It won't be as clear from an accounting standpoint. >> Okay. Well, I figured after last year, I'm sure there were a lot of schools that were saying, you know, this isn't going to work, but they must have not taken that into account. Um the safety plans being made aware of that. Thank you for that. Um it was an informative meeting and listen and learn about what happens when schools open. And I'd like to close with two things. I had the pleasure of attending ribbon cutings all week.
I have this up here uh to point out that the the um the outfield fence of this project will actually move in about 20 ft. There's a tremendous amount of sideline grass um that we want to correct. So, the infield is going to move back, home plate will move back about 20 feet. And so we don't have to have major league baseball players actually have any chance to hit the ball over the fence at 390 ft. The outfield fence will also move in as a result of that as part of the project. This is an image of the north baseball um infield. As a reminder, it's turf only for the infield, the same as what East currently has. Uh you'll see on the on the outside there, those are uh bullpens. And that's the scope of the work there. So, no dugout work, no no work to the the pavilion, the building or um anything else for baseball.
So I want to review a little bit. Uh we have some core beliefs in the Huntington secondary academic method. One is that we passionately believe that all children will and can show growth and achieve. And we operate with this system based on the premise that all of our kids can learn at a high rate and we can remediate for those who are struggling at a different rate to show and close the gap. And so three years ago, we talked about we're going to close the gap here uh in some of our school systems. And I think you're going to like some of the data you see tonight. We also uh Lynn and her teachers um did amazing job a year ago with a well-mapped standard-based curriculum that's followed by all and is um done with um the idea that if one of us does it well, we share with the other.
Isn't that what they said when we met with here? >> Three weeks. I guess before they break ground, we might want to find out some of that fine print on who would gain control of the building or if there was a possibility that we could take over control sooner. >> I'll see what I can control. >> Oh, yeah. >> Yeah. We'll take your money and build the building and then let us run it. possible. >> Well, I wonder if that's a stipulation, too. If they can't provide, >> can they >> Are we allowed? >> Can they sell it or give it to somebody who can? >> Yeah. Does >> Chris have any access to that information? >> I don't think so. Last time I talked to him, he was want they were wanting to get a plan together and that was is that last week when we talked and he wasn't able to make it up that day.
>> Any discussion? >> Dr. Mario. >> I. >> Miss Wenmouth. >> I. >> Dr. Martin. >> I. >> Miss C. >> I. >> Dr. Pock. >> I. >> Mr. Cerrone. >> I. Motion passes. 6. Action item 10.2 two resolution providing for the issue of not to exceed 88 I'm assuming million million dollar general obligation refunding school bonds for the purpose of refunding certain outstanding bonds of the district providing for the levy of a direct annual tax sufficient to pay the principal and interest on said bonds authorizing the proposed sale of said bonds to the purchaser thereof and authorizing the execution of certain escro agreements in connection therewith. Yes. Can I have a motion, please? >> What you said? I make a motion to adopt the resolution providing for the issue of not to exceed $88 million general obligation refunding school bonds for the purpose of refunding certain outstanding bonds of the district.
And I told Dr. Windham, I said, I've never been dressed up so many times four days in a row. I felt like I was going to church on all those clothes. Uh it was exciting um that many are were built brand new or renovated. Um, it was a great honor to represent the school board and thank you. I want to boo again. I'm a baby. The new school year is off to a fantastic start and the high schools love the extra minute that they got. I asked my niece and nephew. I said, "How you doing with that extra minute?" Oh, I'm doing okay with what Mr. Shockley >> passing periods went from six minutes to seven minutes. And the kids think they've gained all kinds of time. Yes. >> Yes. And a couple more things. Thank you, Dr. Promise. Those copier machines are quite dilary and they don't like to cooperate.
This is the softball. Again, if you overlay a softball diamond onto a baseball field is just a little bit bigger than the infield of a baseball field. So, um similarly, bullpen work there. No, no dugout work. Um, but that's a full turf softball field at Columbus North for Columbus North High School at Southside Elementary. Again, very similar to what is currently featured at Columbus East High School. A quick synopsis of uh we were asked a few questions last time we spoke of this that those were sent to you in a Friday note via email regarding some questions. Um, I'm happy to answer questions that you may have, but I do have an item on here. Um the third bullet down about our difficulty to maintain natural grass fields to the appropriate standard. The appropriate standard um would be at a professional level um that your you know obviously your major league baseball teams are going to be able to satisfy some of your large division one baseball programs at large colleges that sort of thing.
We're collaborative in nature. We meet often and we talk about kids achievement and our teaching methodology. Those things are in place at a very high level uh in our staff and I I credit our teachers um in our middle schools and high school. But Lynn Brown has done a wonderful job of that. Also, I would tell you that their best practice is system uh systemic assessment formative and Len made me say common uh when I first got here. So now we're there. we say common assessments and you'll see about checkpoints today for the board. I'll let you know the iLearn checkpoint that Mr. Peters and I uh went into this year about 84% of the school district chose that and what they are is about each term uh give or take. uh they give you an assessment and those assessments are based on backward mapping and the backward mapping means these are the standards you should have um taught and we should have mastered by this level uh of time and if you didn't do that they give us information back um and that allows us for systemic reteing it can also be systemic enhancing so if um 25% really did well and 25% % were in the middle and maybe 50% were right near the bubble of hey, we've about got it.
We've tried to communicate and and I've tried to communicate with him. It's just been trying to get schools and things. Okay. Any other questions, comments, thoughts? >> Item number 20, the library repairs at Wilson Elementary. >> Okay. So, I want to talk a little bit just about the foundation issue. So, Thrasher came out uh last week and got us a bid on the foundation around the library exterior wall and a few other places that we have water coming in as well. Uh we attached the document there for you guys to look at. Uh we are in the process we're in the process of moving certain books. They have most of the books moved over to the rooms that they're going to use for the the library to start the year off. Um to get the library room up and running again, we need to fix the foundation, replace drywall in the areas, replace the bookshelves, and then try to seal up the leaks on the roof.
Providing for the levy of a direct annual tax sufficient to pay the principal and interest on said bonds. authorizing the proposed sale of said bonds to the purchaser thereof and authorizing the execution of certain escro agreements in connection therewith as presented. >> Second.
I usually was the one that would jam them up and here comes somebody to help me lift up the top and pull it out. So, thank you for that. So, I'm done. Thank you. I don't know how to top that. Um, but no, congratulations to, you know, the beginning of the board meeting where we had the teacher of the year and also support staff. Um, we've got some great staff. Also, the strategic plan. Thank you for the updates. It's always nice to see where we're at and where we're going and what our goals are. Um, also I want to say we are off to a good school year. I actually had a kid that switched schools and he is saying it's a it's been good so far. So, lesson. So, I think and my daughter, I think it's just it's been a good school year so far.
Um, I have a note on here for an immediate need. That includes about $160,000, $170,000 of equipment. We rely currently on parks and wreck to maintain our baseball and softball fields. Um, Columbus uh parks and wreck, they are looking towards and moving towards turf fields also. And uh quite frankly, we've we they have struggled to maintain their own fields and let alone ours in the past few years. So, if we were to take that upon ourselves, that would be a substantial upfront cost. And the annual fees, that's just a rough estimation of $50,000 for um an employee and then about 30 or $40,000 for annual um material, fertilizer, that sort of thing. Turning pages a little bit, you have uh you have two items for your consideration also relative to bond issuance for calendar year 2025 budget 2026. So uh just as a reminder, the board had approved uh previously the authorization to uh provide $36 million worth of lease rental bonds for our Envision 2030 projects each year.
You can differentiate instruction systemically in our classrooms to make sure that all kids are either being enhanced or remediated at a systemic rate. Those things are in place within our secondary schools. Um I would also tell you that based on that we have learned a lot. Number one, we knew going in that the checkpoint one and you'll hear you'll see slides, but one is the first one. OneB is the retest of kids who didn't do as well. Then you have two and 2B, three and 3B, and then there's thing at the end called the summitive. The summit is the final exam from iLearn. That's the one everybody knows about. We chose going in, the state was very open with us that the iLearn final assessment would not be as highly correlated with standardsbased checkpoints in year one. We knew that we wanted to be standardsbased.
The first step would be the foundation work. Um, you know, the foundation work does have a warranty to it the way that Thrasher is going to do it, but it just keeps coming back to the roof. And our our roofs throughout the district are known to leak, I guess, is the best way to put it in all the buildings. So, um, the companies that we've talked to throughout this year that have been up up at Wilson looking at that part of the building and none of them are going to give us a warranty on anything that we do. So, you know, the last group we talked to um talked about replacing the A brackets and covering them up on the library portion of the roof. And they estimated somewhere between a, you know, $7,000 to $10,000, but there was no warranty included in that at all.
>> Any discussion? >> Who says therewith? It's my only question. >> Well, this is, you know, let's let's hope that um it comes to fruition. We save the full $4.5 million in present value um if not more. Um but uh I think I'm good. We can go to the vote. >> Dr. Martin >> I. >> Miss Wmmouth >> I. >> Mr. Cerone >> I. >> Dr. Pock >> I. >> Miss C. >> I. >> Dr. Mario >> I. >> Motion passes 60. >> Therewith. Moving on to action item 10.3. Approval of water billing repayment agreement. Can I have a motion please? I make a motion to approve the water billing repayment intergovernmental agreement with the village of Asiggo as discussed and presented. >> Second.
They're both thriving and excited. So, I think >> um I wanted to thank the community partners that donated for the staff back to school event. I saw that list and that was awesome and thanks for allowing us to be part of it. It was very entertaining with your little co-host. Um, and then of course the speech student who I'm blanking on her name >> I know we put that speech out I believe um for everyone to listen to and if you haven't I encourage you to. Um and then just want to thank all staff that worked hard I'm sure to the final minute to get the buildings ready to go. Um, as Jennifer stated, I think the anticipation of the the realignment and changing schools definitely gave a lot of anxiety to students and parents, and I think as we look back, hopefully they're adjusting.
Uh there's one action that the board uh would have consideration. We had done that in 2024. The $44 million that you see that was authorized from 2024. Those are the projects that they went to and that they're going towards. A couple of notes on that. If you add up that column, you will not get to $44 million. It's actually a little bit more than that because we receive bond premium on top of that um that we roll into the projects. The 2025 bond is $72 million. Again, this is with this is all within the 306 in total. And the if you look um across across, you know, pick a building, North Side Middle School. Um that is a reminder that's a $50 million project. So the completion I don't have the math in front of me and I'm not going to try to do it um and mess it up, but so we will in the 2026 bond issuance for your consideration.
We want the kids to master standards. It's in our strategic plan. So, we assumed that Checkpoint after reteing would continue to climb at Huntington. But we also understood that their final exam might be slightly different than the first three checkpoints systemically. That was the case, but you're going to see some really, really good numbers. Mr. Trout always challenges this district. The key is growth. So, we talk about growth. You're going to see a slide near the end that talks about uh a systemic growth rate from when Jay and his teachers and principles had them all the way through what you'll see on the end of the slide, which is a five-year trend data. And so there's some outstanding teaching going on. There's some great collaboration. And I assure you what you're about to see is year it's although year three of the system we are ready for final exam which is the summit of this year that is tied to the checkpoints and you will see tremendous growth and achievement.
So, and we could spend that and then we can turn around the next day and it could be raining again. I was up at Wilson today and just from the rain we had yesterday, it's coming in under the wall still. I mean, in those areas. So, um, the bid that they gave us for that area and a couple other areas as well to try to prevent the leaking was for $18,681.90, which was a lot cheaper than I thought it was going to be. Whenever you mention foundation, it usually kind of scares you. So, um, I thought that was really comparable. I can I can seek out a couple other bits from try to find a couple other companies that do foundation repairs to see if that's comparable. Um, but that's not only for the library. That's a couple other areas that's getting water in the door as well to put poly underneath of it to lift it back up to where the water's draining appropriately.