2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 16
be happy to answer any questions >> on the CTE have slow growth or >> um we haven't finalized that yet. It has an opportunity to to be either way. Um the lower uh or the southern portion of it we're picturing being matching the existing roof line of the existing building. So it lends itself to be flat, but it could be could be either. um and and probably uh not interfere with the existing building, but we thought that might help make the transition to the to the taller roofs and then the ultimately the pitch roof of the field house intent is still out what we're calling that big tank. >> Sure. So, the the sprinkler system will need a a wellhouse either way. Um it's possible to put the testing facility either as part of the building addition, one of one of the other two building additions, or to build it with that with that wellhouse.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 17
Um, so the discussion so far has to be has been to to combine those into a single small structure near that near that water tank, but they could be located in any of those three spots. a lot in conjunction with it. It it works pretty well out there um because we have uh the access to water in that area, power in that area. Uh anyway, uh there's pretty relatively easy access to a sanitary drain because they have a kind of a working lab for that that testing function. Um, so it does it does combine pretty well. >> The fieldhouse then is the dimensions or the size of this almost identical to >> correct. Yes. >> The support spaces move a little bit around. >> I understand the idea deleting the concessions. I just didn't know if there was something in that area for any activity in the fieldhouse or in wrestling in the field house or even the outside baseball team as it's been discussed in the meetings.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 18
I think that consensus has felt like maybe not be used if it was built there um for just from a maybe from a staffing volunteers and staff to to actually operate it. confirm that you have a question the CT building I don't know if it was explained the classroom would be this same level as the current classroom, but then it be stepped up higher for the workers those areas being utilized quite a bit. >> Tim can probably speak to more of the offerings out there, but they have different that they are doing out there that seem to be pretty popular. >> Yeah, we uh Jordan, we've got construction background. So, uh I just saw a picture they shared in their newsletter and he's built stick frame walls and they're putting electricity and plumbing in there and taking it. I mean, it's not a whole house that stuff.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 19
And so, he his his class is very popular with younger kids. Now once you get to high school, have to start making choices and stuff get smaller. But he also just won a grant. He attended a training which earned him a grant $20,000. So he just purchased a new CNC machine and 3D printer and just today they printed their first sign. They created a sign with his name on it. So I heard investment as with everything. is the first he's building up and so I guess the short answer is yeah we got some interest the long answer is how does that fit with heartland we still want kids to go building trades there but there's not enough seats for every go there what can we do there's still a lot more the heartland one is still a notch above experience but some kids might feel just as he's offering engineering junior high kind of industrial arts class that we kind of remember it's not quite like that but that kind of stuff is much more computerized that's what we all be given consideration when you decide how to equip those areas late hopefully Right.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 20
I I I would like to think those would fit in those conversations for sure as far as what we use and not use. But I think last year they built so many houses for the fire department. They do like a practice drill with fire and stuff. I'm speaking way out. I just saw pictures of it. So he's pretty active in the community. Yeah, I would imagine equipment should as far as the science of course robotics takes up a lot of space. >> Yeah. Neil from W. Yeah, I think I've met most most of you guys, but I'm Neil W. I'm a project executive. I'm working on the Northfield project. Now, Seth Boler is our project manager who's going to be working on the Southwood projects. Um, so we brought him along. He's been helping me out with some of the logistics and planning for the Southwood um sites.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 21
And we're going to go through tonight. We just really wanted to give a I'll preface it with it's an SD or schematic design level um tentative logistics plans some overall milestone schedules and then just walk through the phasing of kind of what we're planning with ECB and Dr. and the team now um along with princ the principles. So Casey and Amber have weighed in as well. So we'll start with the elementary school. So we've got two versions of the elementary school logistics. This just shows the site layout of how we would plan to kind of implement the construction space for layown parking and how we're getting in and out. So, as you can see, we've got the red space. The red rectangle is this is version one. So, we would have the red rectangle as lay down. The yellow outline is the fencing. Green up in the northwest, we would have the parking of the the contractors.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 22
So with this plan, everybody would be utilizing the entrances that are currently there, which we understand presents somewhat of a challenge and doesn't give us that separation that everybody likes for safety and keeping construction separate from buses and parents and staff. So um this is version one. We would maintain the delivery access to the kitchen or or the loading dock and then in the south portion where we see that expanded parking. Um, we we'll get to that in the schedule piece, but really we would try to tackle that next summer to get that done early so that there there could be parking there and we wouldn't have to take what we would have to take on the southwest there by the by the gate where the yellow box is showing those cars would have to go away. Um, you guys, you know, Southwood Elementary, we have additional parking on the south.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 23
So, that's version one. and in SD review and talking to Tony Baker and Casey at the elementary school, we kind of heard that you guys would like to look at separating that and potentially doing a temp access road for construction near the tree line on the west off of State Road uh right there. So, Dr. P, if you go to the next page, we'll kind of show the version two. So with this comes a little bit of cost for that temp access road, but we spoke with engineering and we think that it's going to be doable um for a temp access road. So in this plan, everything relatively stays the same. Uh but allows us to have that separation of construction and traffic and deliveries and wouldn't impede the student, staff, uh parents and buses that are entering on that u southeast side. So really, it maintains all the parking there besides the fence near the new cafeteria expansion.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 24
Um, in in either case, we would really shoot to do that south expansion parking for next summer with our phase one and two that we'll get into. But, um, this is the this is the probably the version that that works best. um we just are running cost estimates and seeing what the impact is to to do it this way versus verse the the version one that we have. So, and and we've got, you know, a rough order of magnitude of, you know, the tune of six figures for an allowance that would be carried and it would be tracked to put that temp access road in, but um it would require culvert in the swale right off the road on on the north side and then the stone road. So we would drive up and pass that lift station to the left and all of our lay down would then shift to lay down part shift to the outfield of the north softball.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 25
So we walked this I walked this the other day with uh Mr. Baker and this is kind of a version after talking to engineering you know loose recommendation that would probably be acceptable from INDOT and DNR and all the authorities jurisdiction. It sounded like that temp road would probably be acceptable. And so, um, we just really, as we keep going through design phases, just need to work with with you guys and and Casey and BCB team and nail that down, finalize a a final version of the logistics that we like. So, that's the that's the elementary logistics, the two versions. Are there any comments, questions, thoughts on you'll be able to put a number together that temporary >> the temporary yes and >> and all the lay down. Yeah. So all of this all of the layown all the consumables the trailers all of that will be packaging the general conditions general requirements Kevin but we will um which which will be visible in a in a line item breakout when we get to a more detailed estimate.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 26
But yeah, we'll definitely be able to identify a harder rough order of magnitude for that road right now. Just just to give you guys an idea because we had an SD budget review a couple weeks ago. And just to give your team an idea, we would we would say for this version of the logistics, we would we would earmark probably$1red to $150,000 just to draw off of from an allowance to put that road in or increase that original SD general condition budget. by six figures. So, >> so >> that includes the removable >> includes the correct >> we kicked around the idea of could we could we chip and seal and keep it permanent to the lift station? Could we utilize that and not tear it out since we're spending the money, but not sure what that means from a from a >> endot. From an end, >> correct?
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 27
I mean, we're very close to the creek where we cross over with the guard around the bridge. So, I don't know if we, you know, we're looking into would as del we have to improve the road a certain distance. You know, that all comes with cost and and routing approvals that we'll get into this with scheduling. I keep saying that, but really we want to be set up to have shovels in the ground June 1st to be able to have any, you know, to be able to have the best chance of getting the the new cafeteria expansion complete and ready for 10 classrooms by December of 26 so we can start renovating the rest of the space. So, um, we'll keep numbers, we'll keep crunching the numbers, we'll keep presenting at our budget review meetings through the design phases, but this is really probably preferred version.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 28
It's just does it work with the budget and and is itable? I mean, if you're gonna Is there a cheaper way just to make the west entrance >> Wider >> and then create a entrance exit just for construction and follow along that west side. And >> yeah, there there a thought that a thought that we had was there's a there's a fence right there that can be removed by the softball or or by that west entrance. There's a fence right there, kind of an L-shape that could be removed. So, we might be able to we could look at widening that and using that as as a path and run up along the baseball, but um yeah, there's there's plenty of ideas and we've got this over to Casey and we've got the high school one over to Amber. We're happy for feedback from anyone. Again, it's all numbers are going to come into play.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 29
So, we we'll run the best options and let you guys kind of drive that direction. spend $150,000 on something trail, >> right? I completely get it. >> Yeah. The safety, the separating construction, all that makes sense. But what is it worth? You know, where's the where's the return on it? So, that's version that's best version for elementary. Um, I'll go into the phasing for elementary. stick with elementary. So really what we've shown is 10 phases we've got the the two critical phases or the two most important as we get towards a release of of documents and bidding the job and awarding it is really the west expansion that you see for the cafeteria. So that's that olive green. Um that's phase one and then phase two but in conjunction with phase one is all the red that you see. So you can see that we've separated this out by basically six classrooms and then non-classroom program space.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 30
So admin, the restroom, the art, the media, the rise room, the kitchen, the gym. So everything non-classroom that's blocked off has to be completed in summers. So June, you know, when school lets out in May, June, get ready and be open by August. Those are what we crunched into the summer months. And then all of the other phases that are kind of the classroom blocks are 55 to 65 durations where once that olive green first phase which is June 1 to December 15 uh 26 once that's built and we have the sixth classrooms in place we can get classrooms moved over and start going into each of those six classroom blocks and knock them out. So, that's kind of the phasing of what we're of what we're planning right now.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 31
Overall schedule puts us at uh and any questions on this? We can schedule ties right into the phasing. So, I was going to go into that and and I don't know if you'd be able to see the schedule go down, but it's going to talk about the bidding. Um we plan to get documents in March uh next year. We're going to bid in April. We'll be mobilizing by end of May. And like I said, we really to get that done and set up for the success of the schedule, the classrooms and moving over really need to have shovels in by June one to be able to get to get all that going. I mean, the most critical piece is that cafeteria to set up the temp classrooms. So, this is the site. This kind of just shows the the site improvement of when that would phasing.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 32
So really our idea would be phase one summer of next year get that green parking like we were talking about and then the blue at the end of the project we would maintain egress around the new cafeteria and the sidewalks but really we probably wouldn't improve that asphalt or that that circle drive for truck turnaround until the end of the project just to not compromise new asphalt and striping all that. So that kind of shows kind of shows the exterior site improvement phase. Um, Dr. You keep going down to the schedule. This is really too much information. Too much information, but I I kept it I kept it uh expanded just to show like just to show when we're bidding, what our plan is for opening documents and and awarding the project. So, I kind of gave the milestones there. It's really March documents, April bids, May award, and then June 1's late May 528 start um to hold the schedule for the phasing.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 33
Overall phasing for this entire elementary is June 1 to July. So it's it's roughly 25 months. So elementary and again I said this at the beginning everything we're looking at here is flexible tenative it's wan's version in in coordination collaboration with you guys with bar co we're we're getting feedback we're going through the design phase and and whatever running the cost estimates so whatever ends up being the final version um we'll have all of those parties you know takes involved and incorporated Um, questions on elementary before I let Seth take over some of these high school points. I'll give a little preamble to the high school. >> I was just going to add I think that duration once you see that speaks a little bit to the value of separating that traffic because you're going to deal with two years, a couple winners. >> It's a long Yeah, it's a long project.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 34
We just came off of a similar project. Not as I mean elementary is tough. It's a tight site. There's quite a bit of phases. It's it's the entire school, all the classrooms, but we just came off of project set was the project manager. And we feel confident in the duration we've set per six classroom turnover. It was very similar work to what we did. So, um we've looked at tightening that schedule up. I I just with all the work we have, especially the summer work of what we have to squeeze in from admin, the gym, the new robotics, the the art, the media, all of that, I I think it's a it's doable. It's a it's going to take that long. And like like uh Brian saying, it's you know, it's going to be elementary is going to live with that for two years. So maybe that does weigh in.
⚗ AI-reconstructed · cite from original above
2025-09-15 Wabash County, IN YouTube / MSD Wabash transcript source: youtube September 9, 2025 // MSD of Wabash County Work Session · passage 35
I appreciate you saying that, Brian. >> I have a concern. Maybe it's not important, but you you're on such a tight timeline there from when the bid packages go out to when you say Neil, you want shovel in the ground, >> right? >> Is that going to cause any disruption in the bidding? Um, it shouldn't. No. Uh, we've got a plan for So, this is getting into the weeds, Kevin, but it won't cause any disruption with bidding. we've got a pretty good plan and we'll get the notices out to the parties that that you know we'll put bulletins out and save the dates. So, I think we'll be okay from a bidding standpoint. Um, what's going to be important is being able to procure, you know, the MVP equipment for the cafeteria expansion to support that, the admin space to support that. So, cafeteria is getting an air handling unit.
⚗ AI-reconstructed · cite from original above