So >> uh I don't think the turfield failed by that big of a margin if I remember the counts didn't. >> So to me that's more of just public education. So I'm I'm pretty confident that the next board um you know I'll be a little bit more proactive with the public um hold some open forums with them and what I am talked about because there are um we now have what been 14 years of history with that turfield and I I was telling Mark earlier it was almost a year ago 16 years ago where I got on the board and we actually had to force a vote to get in front of town council to get it going and that was with the $500,000 grant. which was kind of free back then, right? So, but there's a lot of public um education. Now, we have 14 years of experience, cost saves, number of events held.
But if you look at the area that we are clearing these trees are you know on average much smaller than the ones along this back area where we're >> this is what this this is the exact ambiguity we had last time. I I think what would be helpful and maybe it can be done on the spot right now is literally like a a visual drawing of how much of that arborous document is coming down versus up just so that we have an understanding of rough is it a is it twothirds of this that's going down of the picture that second page that you just showed I I mean I'd be hesitant to do that I mean we can do do that but that that second page is clearly not to scale in any way, shape, or form. So, I don't want to say, "Oh, this is what it is." And have it be completely off.
So, I I I'm pretty sure the case is there. Um I think next time it's just more of a public communication, but did I did I hear you correctly that this was not one of the projects we approved? That can't happen. town council cannot put a project on referendum that they not talked about with the board about because I just assume I I was wondering about that because that was mixed in with the splash pass and high dollar number projects which probably wasn't the best time to do it. So maybe next year >> there probably fewer more educated the board be a better position but it's nothing that can't be solved this this board's more incapable. So anyway, those are my last two cents. >> Any other board members? Mr. White, >> thank you. Yeah, so sorry, Mark. Um, yeah, I you're right. We didn't The board didn't vote on it.
You know, again, this was not done by a surveyor. This was done by an arborist. So, >> why don't for next time, why don't we um you know, take the um take the area, divide it by the number of trees surveyed. Now, we have a general trees per square foot or whatever the measurement is. And then we can and you can look at the area of your site and what is being cleared. And then we have that number in an in an approximate and I think appropriate way. >> That's what literally all I expected today. >> Yeah. So, it's not going to be super accurate, but it's not going to be it's not going to be >> way off either. >> And I mean, frankly, I personally am a visual person. I don't mind if you take that second page and you draw on it so that we have a visual of what we're dealing with.
I did vote for the turf when I walked into the voting booth. Uh, at the same time, you know, 20 years ago, I was on the town council and one of the things that I kept hearing from people over and over again is you just kept forcing the pool down our throat. And I I'll say maybe take one more chomp at the apple if that's what's going to happen. But this is it's not a good situation to be in. Um, and frankly, I really I I mean, if we were asked to vote on it today, I would say no. This is uh this is not something that the voters they spoke loud and clear as far as I'm concerned. And it's a real predicament and I don't know what the answer is. Um, but it's problematic because I really don't feel like having people yell at me and say, "We already said no, so what's different this time?" It's it's just uh it's a bad situation um that frankly we shouldn't be in because this shouldn't have even gone out to referendum because we didn't ask for it in the first place.
We can all use our brains and sort of understand are we looking at a third, 2/3, 1/4. >> We can do our math ourselves. I'm just hesitant to do it on the fly here when we have other things to take care of. So, put it on the list for next time >> and that'll give us a general idea of of what those mature trees are. I'm I'm really less not concerned about all the small trees because the small trees tend not to become big trees because there's no light to get there to become big trees. Um otherwise, the whole thing would already be filled with big trees. Um, >> can I just ask clarification of what the intent is of the planning board because you know by bylaw we are meeting the regulation of what is what is requested or what is required. So I'm just I want to make sure we're answering the right question.
Um I mean I do recall the conversations with Vin. was you basically said, "Look, we can go another year or two and and then this thing went over to the council and then they sent it out to referendum without us really being too aware of it." Um, aside from that, I'm just curious if we have uh a 30 secondond elevator pitch on performance contract. We did the financing. I'm guessing we locked that in. Did we get a good rate? Anything? I thought he was in charge of performance contracts. That's why I was Yeah. Just really quick, I it's getting late and we've got more to go. So, >> well, the update is that work continues to progress. We have a um on November 22nd, we're shutting down power at the back of Cheshire High School so that we can have the electrician come in to do a review for the fuel cell at which is part of the performance contract.
So are you are you looking to have >> we're looking to create a clear public record because the documentation we're given is completely ambiguous as to the number of mature trees coming down and we just >> So you're just looking for the data. >> That's right. It's literally a data question. Um, >> and I think it's a fair question because it's a very green site and there should just be no mystery or confusion about what we're doing so that when it happens, >> no one is confused and everyone knew and I frankly don't know anything right now. I thought it was 444 and I'm told could be anything. Um, so I think that would be really helpful, >> but it can't be more than the 444 >> plus hundreds of little ones, >> right? We we understand >> which which some of us are not worried about.
>> Uh we also provided some additional information on operational cost and maintenance. So, that work is progressing. You know, Jeff and I uh we've submitted the school construction grants. We did receive some push back from the state. We have a meeting scheduled for Monday. That's $6 million of the roughly uh $12 million that we're counting on to fund this energy performance contract. So, you know, we we are working through. I do expect for it to get approved, but it's not going to be approved as quickly as we wanted it to be. this month. So, still um pushing this along and I'm going to stay at this seat because I have the next item after Emily's done. >> Can I just I think one >> Tim >> followup which is you said this is moving a little slower than expected. Uh does that end up encountering any problems if we get to December 31st and the law changes?
But the point is I would like it to be a data point of clarity of this is how many mature ones are coming down and then we've got hundreds. >> I don't I mean they can give us a rough but like you don't want it to be like >> oh no I think we established we can't possibly count each one right and I think I specifically said I would be satisfied with this second page having a line drawn through it because I can use my brain and be like okay so that's like 2/3 of the 444 and I can do math >> I think we get that. I think we're going we don't we don't want to go around in circles. >> We don't want to go around in circles with this. So let's let's look at that for next time and then we'll have some hard numbers about the about the mature trees which we have categorized whatever it is on this >> and I really thought this is what we asked for last time or or whatever it was.
I'm just wondering if this is just intentionally getting slowwalked without saying that >> the impact is if we don't get it approved um by early December, meaning the construction grant acceptance because the approval will take time. We'll have to sit with the office of school construction and grant in January to review the plans. But it does jeopardize the financing that was approved through Bank of America. The rate lock >> and the commitment expires December 31st >> and the tax credits are still intact. The only thing that happens in January is there there's a provision for the entities of foreign concern. So the sourcing of the solar arrays and components has to be compliant with IRS guidelines that have not been released yet. >> Yeah. >> So you know and we're fortunate that interest rates are probably coming down. >> Sure. >> So if the rate lock did expire and we had a reset to January, it may not hurt us.
>> Um there are three more points I wanted to make. >> Okay, let's go into those. Um, obviously the connectivity issue. If we are paying for a connection by seeing trash in a generator, I for one want to be really clear. We don't want that. Just to kind of throw that out there with some clarity. Hopefully the rest of the board agrees. Um, the I think last time we talked about speaking of connection, we talked about a potential bus stop or a shelter. Um, if we could come back to that point and then just a quick kind of I'm assuming this is solar ready and all that. Just a quick discussion of whether solar was discussed for this site. The planning board certainly cannot require solar. Um, we're just more again more of as a data point so that we understand whether it was discussed whether this site is even plausible for that.
But the point is that we are trying to make sure that we push really hard to get the state to accept the grant construction grants. There's some technical issues that they're fighting us on. We think we're correct, but we have to follow the process and we we're doing that. So, I guess my my only concern is uh if the state thinks they're going to they can sloww walk this and save money, whatever it is, would it be helpful if I or anybody else here calls our state legislators, if you do, and says, "Hey, can you call them up?" I mean, >> that that is something that we're working on as well in the background. >> Got it. >> So, we could talk offline about it. That's kind of >> that's phase two. >> Yep. Which is already teed up. I just want to make sure everybody's and we didn't have this conversation before but everybody heard that because I mean there's a lot of uh there's a lot of money sitting on the table basically from my perspective and if it's available and we can take it then I think we take it.
Um, just a curiosity. Thank you. >> Yeah. >> Yes. the the building >> bus shelter. >> Yeah. So, easy easy answer first. The building is solar ready. It's required by code to be solar ready and we have initiated some conversations. Um I think that we're not ready to sign any agreements with the solar company at this point, but that is definitely not off the table at some point down the road. A lot of that will be impacted by what is available longer term for um incentives, etc. So, um, but yes, the building is designed to be solar ready. We have an idea of where, you know, where we could put panels on the roof and, uh, possibly panels in the parking lot if that was the choice. Um, bus shelter. Um, I think there's been some ambiguity for us in terms of who are we talking about for buses?
So but if somebody decides to slow walk something then it can be a problem. So that's it. Thank you. >> You're welcome. >> Any other Mr. Eki and then Mr. Gripple was next. >> I just want to follow up on the uh the turf conversation. This has been uh something that we've been talking about in planning for uh since I've been on the board the last two years. Um my experience in in the turf fields. I was I was part of the uh the original concept of of the one that we put in. You don't see fields that last 14 years. And we are rolling the dice every every year on whether that thing is going to pass. And if it doesn't pass, we have nowhere for our our athletes to participate in in inter scholastic athletics. So we this is a priority and it's something that needs to needs to get done.
Are we talking about um, an independent, you know, kind of Metro West bus route? And if so, does that want to be at the street or does it want to be at the front door? Or are we talking about students that may be coming off of a school bus for afterchool programs or um seniors who may be coming off of some type of um you know, public transportation uh bus. Um we have not proposed a shelter. We do have a designated pickup drop off area that is sized for busing. Um, but we did not get a clear answer when we asked that the last time. What we're trying to solve with the bus. And so what we've done in the meantime is have uh a pickup drop off area right at the front door, whether that's a bus, a delivery, um, or even a parent doing a drop off just so that it's convenient and it's um, accessible to the front door.
>> Thank you, >> Mr. Gripple. >> Um I just wanted to say uh I guess I guess I'll be a member of the public at your next uh budget meetings, but I would like to request the board. I know that we have an account set up, but I think it should be a priority for the board that assuming we are to get a new turf passed that we uh the town should perhaps never again have to pay that kind of money to have a replace. We have an account. We could have been saving money for it all this time if it's my recollection that we have only about $50,000 in that account right now or we could have been redirecting gate receipts and stuff like that. Um, so I think it should be should be a priority for the board and for the town to once we do get this turf passed that we should be saving for the next one.
Um, and I I thought we talked about this at the last time where the way this came up was the comprehensive plan committee as part of the comprehensive plan visualized a route, if you will, through Ashland um that in theory would go from downtown Ashland all the way in a almost like a clockwise um placement from one side of the train tracks through downtown all the way to 126 returning ing up to 135 and in theory returning to the MVTA side where the Cirrus apartments are. So to answer your question, there isn't a requirement that you put a shelter. It's more of a conversation if you have a drop off spot that could work. Um >> yeah, and that's in the site. We weren't sure if you know if if it's a public bus um should it be actually at Memorial Drive, you know, >> right?
We've been very lucky that it went 14 years and maybe we'll be that lucky again and we'll have 14 years to save for a new one. But, you know, uh, time is a very powerful thing when it comes to money and if if we do a little bit at a time, we'll have a lot when the time comes. Thanks. >> Yes, sir. I just want to address one technical uh point about the the money that was set aside through gate receipts which is about $50,000 over the last you know 14 years. There was a provision when the town council approved the turf field and um gave us the ability to charge a search charge was there was a res resolution passed that said we cannot use operating funds from the board to add funds for the turf replacement. I don't remember the exact language, but Tony, I don't know if you remember that, but it was pretty specific.
Yep. >> Yeah. Um, I would say, uh, probably not. Um, in light of the fact that, um, you already have, you're envisioning the YMCA being part of the community as far as connectivity. So, I would think any stop would be right at the Y. >> It sounds like you already have a drop off spot and that might be sufficient for this board. Um, we've seen other projects that build small shelters, if you will, for weather. I don't think we need to require it. It's just more of a something I'm throwing out there as a possibility. >> Uh for me, I think the idea of a bus coming in of whatever size, especially if it's already um sized to have a school bus pull up if if that's something the Y is trying to accommodate, which I think would be great. If it can accommodate a school bus, it can accommodate anything else that's going to come through our area.