I Hi, Judy Reed. Okie dokie. Disagree. I've already taken one person to the floor. I'll take you to the floor, too. Yeah. Yeah. Got to watch you. I really destroy thing I wrote. Yeah. Heat. Heat.
Which is going to have to be accompanying any drawings we do, no matter what we choose today. You have to have geotech, right? Because we are in a flood zone. So they may make us build that pad up three or four feet, right? Depending on what they the report says because Alen Rock is in a flood zone. So every hundred years we're going to flood, they say in theory, right? We live in California so it doesn't happen. But They say it's possible. Um, so this is a permit building with a foundation. Um, so I'll show you some pictures of that next, but ideally we say, "Hey, move forward with this." We go to DSA next month. Before next month, we work with getting a design build company like you're going to see later with the different presentation. They design it. It's ready. They start building in February in their factory, right?
They don't have DSA approval, let's say, till April. The fact is they already know they're approved because they've already done these over and over and so they will go ahead and build it. The thing the DSA will will red flag is the foundation. Do you need to have grade beams or does regular footings work because of the soil? The building doesn't matter. DSA won't pair. So we can still get that started and then as soon as they say, "Oh, it's grade beam." So we know what kind of foundation to put them on because of the soil. Right. That's the only trigger that we have to find out. And so that's the delay there. >> Can I ask you a quick question? >> Absolutely. >> Um what if you went with more in on the bedrock. Would that make a difference? >> No. It once we get the geo report, it's going to tell us what we can do.
>> Okay. >> Yeah. >> Okay. So, that's kind of an option. So, here's what it could look like, right? This is a modular building. These are actually K TK and K buildings. Uh this is another site up north. And um these classrooms are 1350. They have the playground structure. It's all enclosed. They have, you know, this is what's possible. And it'd be new building. It'd be something that hopefully the parents of one would enjoy their kids coming to. And we could probably build our program bigger, better by having nine new classrooms. That were the wow factor, right? And I could I could probably build this before August 1st this style. Right here's the inside. So it's vated ceiling, lots of bright LED lights. The, you know, we'd have carpet in ours. I kind of teased this picture because the kids are sitting on high chairs.
I mean, they're all tall, right? Which is great for the middle school, but it's really not good for our TK kinder, but it's more of an obstacle course. Um, over on the right hand side, the You can't really you can't really see it, but there's a second door. So, this one, both doors come out the front and they're ground level, right? So, there's no there's no tripping hazards. There's no ramps. Being in maintenance forever, we will only fix the ramps about every other year, right? Those ramps go rotten quick. There's always skunks that get underneath those things, portables. So, this is a different solution with a better timeline. Then we have our third option which I shared with you in the one study session. Right? This is remodeling a couple of the classroom wings to be TK and K. Once you touch a building more than 40% it triggers a seismic retrofit for the entire building.
Right? Having to add bathrooms to these classrooms is very expensive because it's all concrete. I just got a saw cut from here to my office and then back over to Sanders's office and well, you know, that's cheap. No, it's not. Right. news better on grass whether it's above ground as a portable or whether it's on grade they're both better than this option this option going to DSA and I shared with the board before this is a good option and we'll have it done by August of 27 not 26 right this option is a great option but we need another year that's all the slides I have but I'm here for questions Thank you so much. Thank you. I'm sure that was a lot of work. Uh not my area of expertise, but very detailed. Um and I know that the committee met and I'm sure turned over every leaf and looked at all the different things.
Um I do have a list of questions and then as I was sitting here I'm like you know as a trustee I don't want to ever leave with you know I should have asked this or you know because when we make decisions they're impacting our children our teachers and future generations. So I'm trying to figure out which ones to start off with. So I guess and I'm just going to go down the list and then you know if you can answer them or even repeat them if you said it and I just didn't hear it. Um so the parking drop off I know that you know the prek through 8th grade um my guess would be certain timelines at different times to scatter the different number of students to then have the flow go through. Um, in regards to the parking spots, looking at the Lante one and looking at Adelante 2, does Fiser accommodate at least those total?
>> On that current drawing, it does not. So, we need to add additional and I could because that fire lane would go past the classrooms over to the left hand side where we currently have a cricket field, right? We could add additional parking, right? And there's there's two extra acres there for that which we could adapt. Like I said, we're trying to look at budget. We're trying to look at what we need to move in. It would be very we need to have more parking right away. And like some of the sites, I'm adding gravel places because we don't have a plan to put an asphalt parking lots. Um but we will we will we are working on that. Um and we could add that to this and get pricing for it as well. The other thing is I I really did as I walked the site months ago, the drop off on the front really makes sense and I shared with the board that we can't have grass just school districts can't have grass in the front yards anymore as of January of 28th.
Well, that means tomorrow, right? The fact is there's a new code coming down 2028 that public buildings can't have can't maintain grass in the fronts. You can do your fields. You can do soccer fields, football fields, baseball fields, but they're shutting down water on the front for government buildings. And so when I got here, we talked about, oh, let's make the campuses paint them all and add grass and bushes and make everything beautiful out front. There's no reason to spend the money now because in two years they're dead, right? So when I'm looking at these campuses, the same thing with Shephard, we need to put I've seen drawings of a a driveway there, right? get all the traffic off of Rough and Ready and make it on our campus, which makes way more sense, right? It just costs a little money, you know, a couple million dollars.
So, as I'm looking at this site, I totally agree that would be awesome to have. There's only one PG box to miss. There's a couple things we have to get around. It's doable. >> Okay. And then the cost, I saw the the three different costs. >> Um, does that cost include the roofing and the heating? >> Does not. >> Okay. And I That's for me as I >> move towards my last question or >> I should refrain from that. So on on option three when the architect gave us that option that was built in right the roofing was built in the HVAC was built in right the fact that I don't need to go to DSA it's easier to do it without and faster. That's why I pulled it out of option one and two. Right? So those prices do not include the 2.1 or the numbers.
Um in regards to the lunch, you know, having had a daughter in Netherlande and I remember it was like eat and go, eat and go. >> Um having helped, you know, as a parent, it's like okay, eat go, you know, next one's in already. Have we considered one if the numbers the total numbers that we're looking at of students, you know, that process of the lunch and the eating and and even the space available for them to sit and eat. >> So, we haven't on this site, we haven't gone through the the lunch or the breakfast set of it. What I've thought of is because there's two large outside canopies already there, adding two more, right, which is not in this price either. It's another addition. And also one of the things we've done historically in my other district is we had outside kioses. So you serve in this corner and this corner and this corner.
So they don't all have to go to the cafeteria, right? They actually go here and they go here and you know and so you have the carts that they roll out, right? So so our CNS group would have to they're going to combine everybody, right? Because they still need them for that many kids. So they'd have people in those carts serving. Um so that's something we have to look at logistics, right? Um it's pretty easy. Um, but having a space to sit down and eat. Some could be outside under the por under the covers and we had a couple more shade covers. Um, with inclement weather, it's going to be a little challenge. Often with inclement weather, you can get those carts to the wings and they can eat inside the classroom with this pouring rain for two [snorts] days, but not ideal. Sure, build a big cafeteria.
Another $5 million. And I think um well before I get to that comment and thought um I do want to honor uh our um eighth grade teacher and area Eboard 6 through 8th director um Elvia and some of these questions that I hadn't thought of um and I think these are more for the committee and maybe superintendent you can help um answer these. The first one how was the uh consult the team formed the committee form? to see to come up with these options. >> The consolidation team was formed with uh support from the principal principles. They were given a number of um members to um reach out to and that was um a community leazison uh three staff members ideally one from a TK from a primary and then one from the middle grades and one from the middle school. uh the school counselor, three parents, and then the principles themselves and the assistant principal.
>> Okay. And that answers the rest of the questions. And I think last but not least, like I'm just looking at the costs and you know, looking at the costs that don't include HVAC and um roofing. Um, I know that when we decided as a board in December 2024 to consolidate, uh, we had a task given pretty much by our Santa Clair County Office of Education and we're we're overseeing the process and making sure that we made those decisions and we made tough decisions as a board and it was a unanimous vote and that was a part of it. Um, and I think being that the main point of making those hard decisions were to save money. um having the best interest of our children and staff and community which is tough um considering our our budget. I'm wondering because I as you're saying like I'm thinking Adelante one and Adelante two they both have HVAC correct >> correct >> I mean just maybe minimal cost and you know the bucket but a cost um and the roofing age >> roofing needs to be replaced >> needs to be at all of our sites.
>> Okay. >> I'm just wondering like is it the best decision to move there? And I'm not, you know, I'm not one to go back on decisions, right? Like my word is my word and I keep my word. And if the end of the day is to save money for our district and make the best decision with our funds, you know, um, and and I don't want to just not consider the work that you've all done, right? because I'm just in this kind of middle space of like I'm sure you've all thought about this and had these hard conversations of like >> would we save money more money if we stayed where we're at again because when we make a decision we're impacting the next generation right we're impacting the budget and so I'm sure that if Santa Clara County saw a letter I'm just saying to say we made this decision on December 2024.
This was how much we were going to save after looking at this. This is how much we're going to end up saving. If we don't do that, I'm sure they would be like, "It's okay." You know, I I we get it. Um and so I just I just want to put that out there because I don't want to leave this meeting without putting that question up. So, thank you for >> question the cost of would be paid out of bond funds. >> Correct. >> Right. So what well you know for the audience the issue bond funds are separate from uh unrestricted general fund. Right. So we're trying to save money in the unrestricted general fund using restricted dollars that cannot be used for general operations to you know to try to move forward. So basically it would not you know these so the count you know uh so thank you for the answer but I think that you know the county office of education would not take into account the use of bond fun because restricted dollars that cannot be used for any other purpose >> that's correct general obligation bonds are designed specifically for facilities um what's the uh pot of money What's what's in the amount?
What's the amount in the pot? >> What's the balance? >> We Yeah. Like this doesn't Yeah. What are we spending on if we have like a bazillion dollars, right? Versus if we only had >> Can you give us the balance before and after? >> I [laughter] didn't think so. >> So, right now we have a balance of about $48 million in the bond. >> And this could take about half by the time we did everything for one site. Sorry, a followup question. Um I don't know if this I don't think this is an air question, but maybe it is. Um do we have other um uh you know projects in the pipeline >> drawing out? Yes. >> So So one of the things the district has a master plan that they had updated in 2022 and and I have Nathan with page turn working on schematics of what that looks like for all of our sites.
Right. We have done an audit on the roofs. Most of the roofs are 25 years old in the district. Okay, they need to be replaced. It's really a deferred maintenance project that we can run through a deferred maintenance money, but you can only do a couple a year, right? Bond money, we could do more, right? The fact is, we have a lot of leaking roofs. Fortunately, since I came on board five months ago, most of our biggest problems for roof leaks are the sites that we closed. >> So, we're we made some good choices. except I have to make sure they're safe now so we don't ruin those properties. But that is those are the facts. Um but yes, we have we've done HVAC at a lot of places. We've done a lot of things. We need parking lots at six or seven sites, right?
Because we consolidated, we have parking needs most places, right? And so those are on the project list of what we need to do in the next couple years, right? So there are other projects and every time I go talk to principles, I get a list >> and I just stop going and talking to them. >> I get this list. >> But the fact is there's a lot of need. The district needs a lot of love. The buildings are old, windows are old, right? There's just the sewer systems are old. We we we have, you know, we purchased two restroom trailers that are going to be here in a couple weeks and we're going to start remodeling restrooms at all the sites, right? Those are expensive. They're needed, right? We're we are the code's changing, but we haven't changed our restrooms since about six codes ago, maybe 20.
So, there's there is a lot of expense that we have in the district. >> So, I got a couple questions. Um during our present GSA option two would be faster because um it's modular and DSA they've already had it DSA so they already seen it. We're just waiting for the geotech to on the foundation. So, one would be a longer DSA and three would be the longest. Two would be the shortest DSA type. >> Um, in the presentation that we had option one, >> it [clears throat] does help us if it was a double wide. >> So, adding the third one is going to make it challenging and so after our first meeting we started realizing we need 1350 and we could do it right and we so we started to run the numbers on that and that's why that number changed um on the front one because we TK and Kinder need to be bigger than 960 especially to put a bathroom in them now they're going to be like 900 ft right and so that was the change from the first meeting >> so um we have them we move them on site and then place Correct.