But that's a I mean that's a pretty big long range topic I don't think is going to be solved in our FY27 operating budget. So, >> you're missing one topic that I heard all over this town is the bullying um funding bullying prevention programs um K through 12. Um and they may be able to do that in title one grants but we need to make sure that we're addressing that problem. Um and that it's pervasive. is to me it doesn't restorative justice is a separate thing than addressing bullying. So, >> but would bullying go under the seal curriculum development or should it be a separate bullet? >> I think it needs to be separate because it's it's being talked about in our community as a problem. Um, class size and bullying. I feel like every door I knocked on I mean Okay. And those were the reasons parents were giving for leaving our district.
So again we gave a rough number of about 25 million. That was what NAF holds when they came to visit with us on site what it would be just their best guess not getting in deep in deep the weed so to speak. So since the bond issue failed, again, one of the things we heard is we really didn't get an idea of what a renovated elementary school would cost. So we spent a lot of time over the past six months um that number is not 25 million numbers closer to 34 million. If you were to do what needs to be done at Burlington Elementary School basically to make that space similar, you know, to a newer type facility, a newer type build 34 million and that's not bringing the fifth grade back. is not putting the belt a new belk if you will. So remember I want to go back kind of re kind of retrace when we had the $45 million bond issue in place that was a birth to grade five facility at $45 million brand spanking new remember that that bel is a 1922 building and it's been so many different things throughout the years the the history of of of the district it's been the board office it's been below shop it's been I can go down a list of probably four or five other things it's been that building's 1922.
So, we want to say thank you to them. And Ruben, did I forget anything? >> No. >> What? >> You always point something out that I missed. >> I think I'm good. >> Let me take my notes. >> You covered it. >> All right. Thanks. All right. You can play the video. Are we subtract? >> What's the word say? >> Are you ready to take away your mouth? So excited. >> I am thankful for my And the sound the water comes from that you drink enough water to the water comes from. You drink enough water to the water comes from that you drink enough water. I don't have any questionsbody. Anybody else? You good? >> Thank you, Miss. >> Good evening, President Wendia, board members, and Superintendent Diaz. Um the only thing I really have um is um thank you to um channel 13 that came to our campus to um come and help us celebrate our success and for um our very own um chairman Verlin Jose is an altruismo.
We don't take anything out of them as they go along. Uh we wait till all the funds are collected. And thank you million word challenge folks. I believe fund 536 on that page is funded completely by the admin company. So last year we spent over $4,000. You look at the beginning cash there, $1,181. The revenue $20. They will see this. They will somehow get the money together. They're amazing folks. Amazing funds. That's fun 536. Then you take a look at fund 691 and you say, "Wow, what's going on with fund 691? You've only spent 647,000. Exactly what your revenue was, 647,000." So then if you take a quick look back here at the last page and then this is just about wrap up the presentation here. The very last page is page three and it's the cash report. If you look at page three in the cash report, hopefully you can buzz down to it.
Um that last meeting um highlighted um the strategic plan connections, the annual safety and security board update as well as some breakout sessions and some guiding questions as we walked through some scenarios with staff and administration. Our next meeting is scheduled for this week. Um, and it will be a deeper dive into those safety and security audit findings and some of those things that we've been working um so diligently towards in the last month or so. >> Go ahead. >> Oh, no. I'm okay. So, one of this is the second year that we've had um Kiana Hero leading our professional learning pieces and we've had we've pivoted significantly um and she's done a phenomenal job of establishing this professional learning core team that spans across the various departments in order to ensure that the voices are all at the table and that she's not carrying this load all on her own.
They they had limited control, but they did have more control than they thought of the startup of their HVAC system. And it was being managed completely by a third party company. And so we had to go talk to that third-party company and say, "Hey, school district and with the school district in hand, we need to change the startup of this building." And they kind of pushed back and we said, we actually showed them and said, "Hey, this spike is causing the district this much dollars. We need you to make these adjustments. The customer needs you to save the money [clears throat] by making these adjustments." They did. And basically, you can see it in the graph. So essentially their actual peak if you ignore that one time spike in this graph they're peaking around 200 kow whereas when if uh you know and there like if you look at about 7 or 8 a.m.
That's great. Average Illinois will say average is 40 to 60. And so what this means is our students are maintaining their year-to-year growth, right? Where we want to look at this and this is where I Ready comes in. Students who are performing below grade level, we actually want to see a year and a half worth of growth, right? To help close that gap. Um but all in all, we are we are doing well. And then math, same thing. On average, students in Kerry 26 grew more than 43, sorry, 53.2% of their academically similar uh peers from across Illinois. So again, we are in that average range of student growth. So I'm going to shift over to the last parts of our school designations, which is chronic absenteeism and then the climate survey. Uh another celebration our numbers for uh students who are chronically absent which as defined by Illinois is the percentage of students who miss 10% or more of school days per year.
the high school credit to us doesn't really make a difference. It's the placement so that they can access when we're looking beyond if they're going beyond high school, I think is the critical part. >> Add one last thing. If they get their credits here, that does also take away from the experience at the high school as well, right? Because then it's like, oh, I got those credits at the junior high, but they're in high school and that's a different life experience freshman to senior year. And so you really do want them to get those credits at the high school level to experience that learning that happens freshman to senior year. So it's there's arguments on both sides, right? Pluses and minuses on both sides. I get what you're saying. It's definitely something we continue to look into doing um in a way that we can continue to enrich their learning without taking away from that high school experience.
So that'll be um that will that route uh will be established just after the Christmas holiday um and used during the um spring semester. And then within the building, we'll be building a couple of construction walls to separate off the construction, keep students out of that area and um and keep it protected, you know, from the rest of the use of this the school. And just a short summary, there's the total cost is 2,794,447 and a short desh description of the work that includes the sidewalk, the curb ramps, the board fiber optic cabling. Um, and in addition to that, um, there is an overhead line, um, that connects the SO SRO building just to the south of Middle School South. Um, we're going to replace that overhead line with an underground connection while we're doing this work, as well as replacing the fiber connection to the transportation building.
I'd like to wish all the students good luck taking their finals. It's just a tough time, you know, but good luck with that. And for the teachers have all those papers to get. I enjoyed the early childhood uh center activities you brought with Camden. I think if more people saw what going on over there might even help our ADM. You're doing a good job of promoting our school corporation and making school environment very enjoyable and fun for young kids. We met they had a Veterans Day program after our last board meeting. I'd like to say thank you for everyone that put on that Veterans Day program. That was a very interesting program and uh I think that's something we do very well is honor our vets. That was good. I have a report on Judy Bremmit. She had to go to uh she if you don't know she was a former teacher here.
[clears throat] The town has asked us to rank things in this priority system. So um this is unfamiliar to you. So I thought it would be important to to talk about it. So priority one they're calling must do projects projects that address public health or safety issues pose a threat a threat to providing essential town services or are required for immediate compliance with local, state or federal regulations. So that is priority one. Priority two, shouldd do projects being projects that address deferred action items. These projects may be a financial burden due to increased maintenance expenditures, may significantly impact service delivery, or could become unsafe. Priority three, expected to do projects that are considered preventative, routine maintenance. These projects are done in line with best practices and intended to maintain level services. These projects may be deferred if needed for a limited time without negatively impacting basic services.
Um, so would we say to support anti-bullying programs? Anything else there or >> I think that's it. It's there's a lot of >> so I would put layers >> that um in terms of order where I have it just you know roughed in was between the support the district's seal curriculum and restorative justice and then above the uh maintain and expand art and music >> just in terms of where on the sheet I >> sure >> it's not that that order matters but >> sort of goes with whatever our discipline process is because there's people who believe nobody's receiving punishment bullying. So, it's it's sort of a what are we putting in place as a framework to address the problem? What are the consequences? Um, and that I think that needs to be out there and people need to know there are consequences and what are those consequences?
It's going to need some attention time in the future. So again, we'll back birth to 8 grade 5 facility, brand new was 45 million. This here, the only addition we're talking about is a 5,000 ft² office space be on the norththeast corner by the gym. And then there'd be a 30,000 square foot, we're going to call it a music room slash storm shelter, like a FEMA storm shelter. That music room that where where the music room is currently located is right next to the cafeteria. We believe we can access some additional space with the cafeteria by maybe taking out a wall there and getting that music room space for the cafeteria to make the cafeteria larger. So that's why those are the two areas the only two additions to that this plan or to to the Burlington Elementary School called renovation the small addition that's why that those two areas are looked at we really believe that the front entrance needs to be on that north side that main entrance needs to be on that north side then you look to rework parking and site work and grounds and so on so forth.
So he is in our house and um one exciting thing that our kids well my kids the students did not know or the staff nobody knew is I put 90 a number 90 all over the campus even on the playground everywhere and they had no clue what it meant. And so for two days I had them in suspense wondering what the 90 meant. And um then on the last day I told them it was because we had 90 out of 246 students who were at grade level in reading and so they were really excited and u oh we were awarded the copper apple award. Um that was a surprise. we did not know and so and we were wondering why these extra people were here and they're oh we're just coming to visit your school. I was like okay but and then I invited them to our assembly and then they gave us the award then the kids were really excited and ready for the video.
You see fund 691 has a cash balance of 797,000 unspent. The way that works is we got the revenue the 21st of November. I did this report Saturday the 29th of the month. We wrote a check for 797,000 the 3rd of December which was a Wednesday. So for two minutes or two days that extra 797,000 was sitting in that fund and once it cleared now it's the December expense. So we have to collect the revenue once we put in a claim for these contractors that are working. It usually takes about three weeks to get it funded. Sometimes four weeks it takes a week and a half to clear the county treasurer. So in the meantime, we're showing a nice fund balance. You say, well, why would we have a fund balance? Well, because we have check every Wednesday. So that's kind of a cash short fund as well.
And so um it has they've now had this steady cadence of meetings where they've been collaborating not only to support what's happening with SIP and teacher institute days but also um in our preparation for elevate ed which takes place um February 27th 2026. Um so the schools department is actually about to um launch the different subcommittees that we need in order to ensure that that is a success for February. Um s is >> oh school improvement plan. >> Thank you. >> Okay. One of our stated key next steps is to distribute distribute a district-wide wellness survey to analyze current wellness resources and identify gaps. So while all of our employees who participate in our insurance plans have access to EAP, which is our employee assistance program, there may be other identified needs among our staff. So we really want to dig deeper into what their wellness needs are.
on that plot when the sun's not out yet. That is really their true peak. They have the potential to get down to about 200 uh kilowatts. Now I'm talking about their peak was 350 kilowatt. So they were 150 kilowatts higher than they needed to be. And the rate structure there served under was I think it was a little over $10 a kilowatt. So they were a little bit fortunate. They wasn't the $ 15 or $20 a kilowatt, but that's still $1,500 a month start for that HVAC startup. So they'll be able to remove that every month $1,500 right there with just that one basically adjustment and you know so over the course of a year that's what $30,000 right um just for adjusting the startup of their HVAC in that case and reducing the peak. >> Yep. Thank you. >> Yeah. Yeah. I guess one other thing Dave uh mentioned to me and we put it in the agreement and he negotiated which was really good on his part.
Um and that's with or without a valid excuse which means 18 days on average for 180 uh school days. >> So even if you have a >> throat one of those days >> you got it. Yes ma'am. Um but we are we've noticed that we have um decreased our numbers uh of students who are showing up as chronic ab chronically absent. Um and then even in compared to the state, you know, we're we're improving. We're doing better. Obviously, there's still 13.4% of students that we want to uh not ignore, right? Um but those are case by case scenarios that we have to look at now individually uh for those reasons. if a student's out because they had strep and then got hit with COVID or then got hit with the flu like okay like we can't be hard on those families right so um we handle those on a case by case scenario five essential survey is uh actually up in comparison to last year last year the top two effective leaders and collaborative teachers we were actually in the weak area last year this year across the board it's at neutral so I I mean take it as a celebration right because we weren't you know there's glass is always half full um but in delving into the actual results I will say the fact that we have been working on um collective efficacy fits perfectly on what some of our lowest um categories in the climate survey is.
>> So it's not like they're going to have to repeat the same. >> Correct. they wouldn't have to, >> right? Because they're because they're placed in a higher one once they go to high school. It's not a repeat of what they took in junior. >> Okay. >> Whether we're talking math, whether we're talking literacy, whether we're Yes. It's I don't want to use the word tracking, but there's a track. >> Absolutely. And some students are they still need that support, right? And so some students are, hey, you need to revisit this mathematical concept or something like that. So, but they're not all placed there. I'm just looking at 155. There's alge, there's intermediate algebra, algebra 2 with trig, honors algebra 2 with trig. So, there's a bunch of different options >> for freshmen. >> And there's a lot offormational exchange that happens behind the scenes between D2, all of our elementary districts, right?
It's kind of right on the route there um, and needs to be replaced. And then a couple of other options that we had looked at which is painting this exposed structure in the tech storage room. Um and also renovating an unused concessions stand in that building. It's not utilized. It's actually used for storage, but it's not well uh it's not very good storage because there's a lot of cabinetry uh in the way of the storage space. Um, so we're going to be removing that um that unused cabinetry so that they have just have open storage within that room. >> I'll open it up for questions or comments from the board. >> Um, thank you Jerry. As always, appreciate PSI's partnership with us. So, why is the new fiber necessary? Why can't we use the existing fiber? Maybe I missed that. Yeah, there's not a fiber connection to the point, so we have to connect anyway.