Um, the second one, you know, we may not be able to afford the raises, but like I said, I think I've kind of hopefully drilled this point home. A salary study does not commit us to any raises. This commits us to getting the data to taking that first step to seeing where we're at in the overall marketplace. And this wouldn't just be Mckenry County. It'd be all over Illinois. They'd look at tax bases that are similar, like I said, government entities that are similar, and it would put us in that place. Um, and this last question, why can't we do this inhouse? I hear I hear it, Brian. You're awesome. why can't you just do this yourself? And that's true. Thank you for saying that. I appreciate it. Um, and the answer is honestly that we could. I mean, not tooting my own horn, but Dave and I are qualified to do this kind of thing.
We can you can do that if we're using vehicles our school vehicles for driver's education purposes. So you'll notice that if I write that dollar amount that fund line was in the 30,000 range 30 slight low 30s if you will gets decreased a little bit. Um we we have proposed to increase the resident fee uh student resident fee to 140 and the non-resident fee to 340. Again, it's still a really good deal for you don't have to travel to go to wherever to PA to ABC driver's education school or whatever. So again, we proposed to do a slight increase to those feed those fees uh for driver's education.
>> So on boarding on boarding um and >> it's almost some it's it's a >> in January there's also the uh in January we have to do the um reorganization right? Oh, that's right. >> Organization >> impossible swearing in >> Ben agenda is already >> does the um uh the board um on boarding that conference that has happened for new board members >> bolts >> in February. She can go in >> hopefully. So, I did offer it to previous. >> Let's not offer. Let's say >> you're going. >> Um, okay. What was I going to say? >> Can we reach out to ESBA and see if they have Don't Didn't they used to have like a new board member book or something? Oh, >> okay. I think with the onboarding um planning that that is we're doing right now, I think that can encourage the individual to attend the boat would be would be very helpful.
We've gone through all of them and provided this data. Like I said, over just just over 3 million square feet in total. But as Mr. Obi Femi pointed out, we're specifically we're looking at the elementary schools this year. There are 13 elementary schools or specialy schools. So we also looked at East View Academy and Brokaw and the um and it houses these these spaces house about 7600 kits. So it's a it's a lot of your student population. The methodology for um going through a survey, a student survey is professionals, licensed professionals go through your building. So we had architects and engineers uh walking all of your spaces on your roofs and uh the grounds looking for particular violations and the violations are uh categorized into three groups. Urgent is something that should be done in the next year. Uh required is something that should be done within 3 to five years of the survey and recommended items as previously discussed under um other life safety surveys.
Um, the issue would be that Dave and I run our own department. And like I said, reviewing job descriptions with the rest of the ongoing work that the HR department did took a year by itself. That's let alone digging into salary schedules, benefits, um, PTO schedules for dozens of employee groups in dozens of districts. Honestly, it's just not it would Dave and I talked about the other day, it take us years to get this done. So, I think for that financial amount of money to have the experts come in and do it, you know, they would lend us teams of consultants to to get this done and it would be objective. So then nobody would be able to say, "Well, Dave put these numbers out here, so they're X." Or, "Brian put these numbers out here, so they're Y, or CEA put these numbers out there, so they're this." I think having an objective third party is is well worth that.
Any questions that you may have? >> How much of an increase is that? I couldn't maybe it's on here but 120 and 320. Okay. Thank you. I was looking for a number 140 and 340 that's on the numbers. Sure. So it's a slight increase. It's not uh not too much but yet it helps us to rebuild some funds in that light. Motion to approve driver education fees for the summer of 2026 at $140 per resident student and $3.40 40 for non-resident students submitted program second discussion submit your movement. Motion carries summer 2026 project. Huh? >> It popped up a thing that said there was a problem recording your electronic vote. Please try again. >> So you were both you were I can see you were on there. Okay. >> It doesn't have US. >> Yeah. It just popped up like a red message that said it didn't record it.
>> Since we're going to do some sort of onboarding, can you ask them if they can provide anything that we should that we can utilize just just if they can? Okay. I just really don't. Yeah, I think we can do a lot better with bringing on boarding someone fellow bat. But okay, if that's it for cons um future agenda items. So I hear a motion to adjurnn. >> Motion by Miss Sylvia Hendricks. >> A second. >> All those in favor. It's >> 9:23 p.m. We are journed. Thank you all.
the district has made it the point to move recommended items to your planning to like your long long range planning. Doesn't doesn't mean they won't do them. It just simply means they're not going to register them on the IWAS system. Um it's the recommended items aren't required by the state. Um but they uh can be beneficial in many ways to your students. We presented to um Andre in this case all of the uh documentation that will be uploaded to Isby. The only document that won't be uploaded to Isby is the the schedules that are there to the left side of your screen. But those are our documentations to capture the information before it actually gets inputed into the Iowa system because it's one violation at a time. This also is a document that was reviewed with um uh Andre and he has the full list including the uh C items.
So that's that's where my brain is at for that. So then, um, on to the recommendation, which we can discuss, or I'm ready to make that recommendation now if we so if it so pleases the board. Um but I would recommend to the board an independent compensation study hosted by Arthur J. Gallagher um to align district the salary piece of comparable districts the general labor market and internal equity with the goal of ensuring we can recruit and retain high-quality staff in a fiscally responsible manner. >> Thank you for your presentation. My first question um is a very simple one, Mr. Shepard. Where does this 20 or $30,000 come from in the budget? So, if the board will recall, when we were going to make the transition to Skyward, that was going to come with a pretty hefty price. I believe it was uh uh the onetime implementation costs uh um were probably about $75,000.
>> It actually didn't even allow me to save. Um must have all glitched at the same time or something. >> Yeah. >> But it did record. >> Okay. Thank you. Well, as you know, every year we do the summer concrete projects and so there's your bids before you um for any of the concrete that we decided we need to fix or repair. >> So there was there were a number of different projects and basically project 1 through 16. You can see the breakdown. We had two biders, Burlington Construction and Kane Construction out of Fredonia. Uh their bids were very very similar in the total amounts. You know, of course, their projects vary from one project to the other, but wasn't that much difference between the two. Um, um, I again, you can see what those projects look like. A lot of them are parking lots.
So he has a list of everything in the C's, but you're required to submit each violation. So each of those line items in the schedule will be inputed individually to I was between now and your next board meeting. So you could sign those documents and then the uh floor plans for each of the buildings uh which includes site plans uh floor plans, roof plans as well. And those should be kept on file at each building and given a copy to your um fire department so that they have those as well. And then your uh safety reference document includes how close that fire department is to you, the ages and um years that your buildings were built or modified. So those are uh doc and the codes under which they need to comply. So we talked about reviewing the violations. I reviewed the items that are in bold are items that CLER does above the statute.
Uh as we move towards Skyward, um that originally was budgeted for this fiscal year. We were actually able to pay half that amount um in last fiscal year's budget. So that uh freed up um $35,000 within uh the business office budget that had been allocated for for the full implementation of Skyward. >> So the answer is out of the business department budget and the money was found because it didn't get spent for something it was year for. >> Right. Is this this is an O andM? This is not an ED fund. No, this would this would come from the the business office fund which is housed in the the ED fund. >> Okay. Okay. So, it would be coming from essentially the same pool as salaries. >> It would that money was originally earmarked for the Skyward. >> Okay. >> Software, but because we paid roughly half of that in the prior year, >> We have that extra that had already been built into the the budget.
Again, it's just parking lot work that's being done. There's a few, uh, different odds and ends type project. I work with Brian Shank, Keman, and Jared on the grounds transportation. We went through the district. Uh, we looked at areas that just seemed to need be need attention. So I would suggest until we know what we're doing with the elementary to not be doing all this concrete work on there. >> The elementary school has very very small amounts that we be looking at doing. When you look at one, two, three, is it three projects? It's 1, two, and 14. 1 2 and 14 are very very small amounts of work and we feel like >> and that's still $15,000. >> Correct. >> That's not like small to me. >> And and and we we can we can choose to not do anything at the elementary. These were some areas that we feel like that again safety was going to be you know needed to be done.
Everything that's not in bold is required by the state that they require these things to occur. Um, again, just for those of you who don't aren't familiar, the health life safety looks at the code under which the buildings were built, not today's code. So, we're looking at it in context of when it was built to see if it's still in compliance, but it does include things like uh tripping hazards as you're walking into your building, which you've addressed a lot of them, which is really nice to see at at some of your elementary schools. but it also includes wet ceiling tiles and the like. We're to about the point where um Clubber is coming tonight to to come do this is one of the statute requirements is to come to the board and present this and then you ultimately have to approve it and sign it.
When we built the budget, we weren't sure if we were going to be able to pay the entire uh we were we weren't sure if we were going to be able to pay anything towards Skyward in the last fiscal year. When it became evident that we were able to do that, uh we jumped because we knew we had the funds at that time uh and we paid half the the invoice at that time. >> Thank you that and thank you for for thinking ahead too. Uh Mr. Daru, is this purely a compensation study? >> Can you >> compensation of benefits? That's it. >> Well, no. I mean, those other pieces that we talked about in the process, so looking at job descriptions, looking at position alignment, job analysis, all those pieces would be part of it. >> So, the other things on the eight, >> oh, the eight employee wellness pieces, >> right?
they could be trip hazards, safety hazards, and so that was the minimum type areas that we felt like needed to be addressed. So, um the one the one large dollar amount, I want you guys to all be aware of that. The one number 15, that's one we are not going to look at doing, but we wanted to get a price tag on that. That is basically the concrete area inside the fence line of Wildcats at the stadium. So, we've had some issues with track that we are hopefully now resolved. One of the things that they talked to us about is concreting inside that area. A couple of things. One, concrete does hold moisture. Moisture, it helps with the retaining the moisture around the ground. Um, you know, around the track. you don't have, you know, different, you know, heavy rains, you know, uh the the the dry area, the dry times where you you got drought where your ground shifts.
We will upload that data and Mr. Dr. Dr. Profi will get a email that says he needs to approve it and then it goes to the regional office of education for them to look at in review and then it goes down to ISBY for their final review and approval as well. So just some key points from this year's or um assessment. Uh again it's the third phase that we've gone through and it's the elementary schools and special schools. Um we did not get an opportunity to review with uh buildings and grounds what work was completed from your previous assessments. Last year you might remember we came in and said oh so much of this work had been done at the high school. So in the dollars that you're seeing they probably be less than than we have because there's probably quite a bit of work that's been done by the building and ground staff.
On slide six, we're the only thing we're studying here is the financial side essentially. Yeah, correct. >> So they don't look at the other tangential programs that we have in there. >> Right. So the the emotional intelligence component is is not studied any of that those benefits that we we laid out is not studied. >> Yeah. >> So if salary was the number one, do you remember what number two was in terms of turnover? >> Yeah. So number two and that has it did flip-flop at one point. Number one has often for I think almost the entirety of the exit interview data has stayed salary. Number two is changing out of the out of the educational sector entirely. So I can't remember what we call that exactly, but it's just getting out of the education field together. >> Okay. And the reason I asked that is if we're going to spend $30,000 to look at salary, >> right?
Putting concrete next to your track will help the moisture in the ground and will also gives more support to your curving and your perimeter around your track. So again, that's that would be the start of a project to concrete inside of the Wild Wildcat athletic or wildcat stadium there inside the fence line connecting I guess the concrete to the curving around the track. >> You said you're not >> we're not going to plan on doing that cuz that's a huge dollar amount of $129,000. We really don't want to do 300 or $298,000 worth of concrete this year. So, of course, just looking back to this, I some of these seem like there's a big big sway in what the price was to get the >> house 14,000 versus 2500. >> Yeah. So, they they had to have an on-site meeting with Brian to go over all of the areas.
But we will continue to look at that and get and get um those updates because at the end of the day, Clubber is responsible to um close out these health life safety documents with the state. So our our our license goes in when we input this information to the state. Again as discussed we have uh A and B um requirements and that C is inputed into your planning by by buildings. So the findings there's approximately 1.3 million in project costs that we identified. The largest of which would be uh the roof at Long Beach and um those are identified by schools in the next couple slides. But priority A violations are just uh over it's about almost 350 30 it's 345,169 and priority B's again that's priority B the big number out of there is your Long Beach roof going to the next slide which you can see all of the buildings together and again like I said the the biggest ticket item in that U B column was your Long Beach TR roof.