So, just with downtown, you know, we're still in the process of making those underground connections, working with Dagel Electric and Eversource. Uh I did get a good update from Diane today that um Eversource is telling us that as soon as those things are ready, those connections are made then Verizon Comcast should be ready to do their piece, start taking the wires down and then the poles will start immediately coming down. And so, uh, what I've talked to Diane about now is just kind of making sure and as we get some more fidelity as to when the date those poles are coming down are, we start timing things up so we can come in and do kind of like that final refresh after those are done because we'll have to, you know, fill back in with concrete or brick depending on where the poles are and just, you know, I'd like to do some power washing and everything just kind of spruce everything up before kind of like a final unveiling.
And I I won't I will not ask applicants. I'll say please let us know in advance as far as you can but we can't beholden them to you have to tell us by Thursday if you'll be at that meeting or not. So what we can do is we can tell you immediately as soon as we know or we can wait and discuss it on the Tuesdays and Thursdays but we need to know which direction to go in because we can't you know it can't be we're getting too many different emails we only want them on two days but then I need to know things immediately. It becomes tough. I I think it's just about um say even last night say even last night I could have sent out an email not text because I'm not doing that so much anymore but sent out an email that said hey two of these things continued but that is going to allow us to have a greater discussion about the bylaw.
So, um, that is really moving forward. So, are they all running off of the underground utilities now? >> Not all of them. Nope. No, >> some of them are. As >> some of them are. Um, and then some they're doing like testing everything and making sure that it's working. >> Do they I guess the question is do they complete it one by one or do they complete a whole group at once where they turn it on? >> I don't know. That's a good That's a good question. Um, that's a good question, >> Claudia. When you say group, do you mean different the different utilities or an area >> users? >> Okay. >> Yeah. Like a like a block, you know, almost. >> Um, >> but yeah, >> but Ever Source is done. >> Well, they're still doing the connections and then they have to take their wires down >> once all the connections are made.
So see you at 7:15. >> Yeah >> kind of thing. In that way, you could have said, "Great, I'm going to spend my time reading the bylaw and not about reading 30 Memorial Drive." Is that is that like what you're saying? >> Yeah. Just like spending time on reading that GCG report, coming prepared, and now you realize like, >> right? Wait, okay. I should have I should have read something else. >> Yeah. >> Right. Absolutely. >> That that makes sense. >> So, >> thank you. Um, feel free to poke me with a text during the day saying, "Trisha, what's what do you know about the meeting that we don't know?" Because typically I'm running around scrambling and Jen uh Jasmine is too. >> So, if you're wondering before I read all this crap, you know, maybe you can direct me to what I should be reading.
>> Okay. So, they still have not completed all their connections. >> Correct. Correct. But they they >> done, 40% done, 70% done. >> I'll get that for you. >> Okay. It would be good to know where they're at in the process. >> And then and I guess my other question sort of follow with Claudia is are we are we waiting for Eversource to finish their connections and then the other utilities will start doing their connections or as Eversource finishes then Comcast can start? It's really more my understanding is that they're really like one utility company has to finish before the other can >> other start. >> Thank you. >> So then it seems like a seems like there's a lot left to do. >> Well, you know, Diane's date is uh April. You have 2026 for the polls to come down. So, >> so >> you know that's >> so I guess right now Ever Source is working and they have to complete every every tiein before Comcast starts correct >> they go through that's my understanding >> okay so when did they start tying in >> December >> yeah just recently that was >> I at the time I thought that that was a >> turning on the lights type of deal >> process >> yeah so they make you know they make sure all the underground connections are are good and then they start taking um >> you know they start firing it up and I think they have taken some things down where it makes sense >> um and they can >> like if there's not another like utility or comm uh communications provider and um yeah I mean I think they're doing like you know three or four a day but you know there's there's still challenges as with every construction project you Especially when you got a contractor in Eversource in the town kind of trying to triangulate things.
Um, that will give me a heads up to do that. Um, and I and I actually would appreciate those those heads up cuz yeah, >> I don't know if that's an efficient process bo each one of us bothering you with text messages asking you about it. Right. >> Well, it's just it's some >> I wish there was a easier way so that we don't have to bother you about >> I can send again I can send on the day of the meeting but again we have to be you know you can't you can't tell us that we have to tell you something 500 times, right? So, we can send out meeting materials on Thursday >> and then the Thursday of or the Wednesday before I can send out an email saying this is either this has been continued or it hasn't or just leave it.
>> Yeah. >> How about for 10 to 60 main? >> Right. So they're they've they have an underground connection right now for each of those buildings and the connection will have to stay underground, right? >> Okay. >> Yeah. >> And how many? There's Eversource, Comcast, who else that has it? Verizon >> Verizon >> um and then I want to say like um like an RCN. I think they use like a Comcast or Verizon's wires. >> Oh, >> and then we also have our fiber our fiber wire downtown, >> right? >> Yep. >> So potentially April F come down. >> Yeah. >> Seems like a lot to happen. So what's interesting is in Hopkin it like happened like that like all of a sudden you saw you heard that things were happening and then the polls were gone. >> Yeah. It it is like one of those it almost feels sometimes like legal things where there's no activity, no update, nothing.
But if something has been continued, I can tell you the Wednesday before that's better and still give out the materials on the Tuesdays and Thursdays and just send one general email to the planning board. >> Tuesday and Thursday was a follow from the last time when we >> Thursday was sending meeting materials. Tuesday was just in case things came in. Reports from GCG. Anything else that would get one last push through of meeting materials that had come through between th that Thursday that we posted the meeting and the Thursday of the actual meeting. Give you time to get those additional materials. And Wednesday, we could send just an email if things have been continued. Just saying XYZ has been continued for tonight. Nothing else. No other information on that email. Just if something's been continued, we can make it a point to say one, two, or three have been continued >> on Wednesday.
Nothing nothing. And then there's a flurry, you know, and that happens. >> Flurry. >> Flurries. Yes. >> No kind. Um, and then Pawn Street, uh, there's I think I notified you that they had found that there was basically some substandard concrete that was used on one of the sidewalks and they're going to have to redo that in the spring. But there's a few other things. Um, some, you know, utility pole work remaining, old street lights, signs, manholes, adjustments. Um, >> Michael, while you're on that, while you're on that subject, I'm going to interrupt you on that. Mhm. >> Um we got a letter uh from one of the residents that live off of uh Pawn Street who's responsible for the uh snow plowing of the sidewalks down there because that wasn't um that wasn't addressed and they're still covered with a lot of snow and people want to use the new sidewalks.
>> All right. So, um All right. So, let's just continue these off. I don't think we need to discuss anything at this time. So, [snorts] going to public hearings. Um 30 Memorial Drive. I am going to make a motion to continue 30 Memorial Drive YMCA public hearing until January 22nd. Is there a second? >> Second. >> And roll call vote >> Paul Montino I. >> And Trisha Kendall I. Um so that is continued. 55 Tilton Avenue special permit and site plan review. Um I will make a motion to continue that to February oh to February 12th in that case to February 12th. they asked for. Um, so is there a second on that? >> Second that. >> And a roll call vote >> and I, >> Angel Cazadian I. >> All right, that is continued to February 2nd. And then um 240 to 260 Pleasant Street site plan review and design plan review and site alteration special permit.
They can't because they're covered with snow. >> Yeah. So the state is we have been when we can going in there and doing it you know because trying to pick up the slack. >> So >> but the state is actually responsible >> responsible for it >> and we build them back if we go in and do them. >> Um we can yeah we can definitely send them an invoice. >> I mean if they're not doing it and they need to be done and we do them worth trying. I I um you you can't get it if you don't ask. >> Exactly. >> So, >> good point. >> So, with a couple projects that uh are completed, let's see, the middle school field lighting project that was completed. Um a lot of the traffic calming measures that we had planned uh on some of the streets, those street signs, uh those have been completed.
Um, that are that's the Metro West soccer fields. We're continuing that until January 22nd. Um, do I have a second on that? >> I second it. >> Paul Montino. I >> and Trisha Kendai. So, those are all continued. >> Um, we will be sending Oh, maybe it's already got sent around. I kind of updated well I was updating this planning board task list at the same time u Melissa un unbeknownst to me was also adding to the adding information to the task lists not items based on what she heard and saw in the meeting minutes. So, they will even be combined more, but I think it's getting more kind of more streamlined and more organized. But we're not going to discuss that tonight because we've already been talking a long time. What's that? >> Oh, I guess [laughter] so. Planning board processes. I'm just going to put a [clears throat] house.
Uh the uh sidewalk for high so Cedar Street the design's been completed >> for what? >> Um a sidewalk I'm sorry >> On Cedar Street. Yeah. >> All of Cedar Street. >> No. So section from Captain to um >> East Union. >> Okay. >> And then um High Street >> and then High Street as well. Um Do these have a time frame for when they're going to start work or >> No. Um >> these these are just the the planning designs. >> Yeah. Do we have an estimated cost? I mean, do we as far as like what what we would need to budget for those? >> I think we do for Cedar Street, Brandy. I don't know it off the top of my head. I don't have it here. But um we don't for High Street yet, but I think we do for >> What side are we putting it on?
I know you're you're you're scary, Deepa. Okay. Um, really quickly then. >> I think [clears throat] it's a good thing. Um, I assume no one's like really eager to go into that task list tonight. We're good, right? >> I think it's fair to have other people here. >> I think so, too. Okay. So, um, we have reports, community preservation committee. That's Scott. Metro West Regional Collaborative. I assume there hasn't been another meeting in the this month. >> Yeah, I think there's one scheduled for Jan 15th. >> Okay. I was going to say I think you reported on it at the last meeting. Comprehensive plan implementation committee. That's what I had mentioned to Anna um that she was going to send that email to Yolanda. Apparently, she just did that. Um and Just one thing. I I had some other notes, but I'm going to wait for the other members to be here.
Cedar Street, >> the fire station side or the other side? >> I believe it's the fire station side. >> Okay, >> which is pretty interesting, especially around the Workman Circle camp, you know, right coming out of >> We're going to have to knowight >> the bridge. >> It's pretty tight. >> I know. >> Um let's see. Oh, the Union Street Fountain Street job. Y >> So, you know, the underground work has been completed. Uh contractors going to come in before um the 2026 Marathon >> uh to clean that up. >> When is when when is when are they going to be done over there on um Fruit and Elliot Street? Yes, >> that's something people ask me about all the time. >> People are asking me about that all the time, too. the >> the digging that they're still doing. >> I mean, Fruit Street's closed lots of days.
The one change I am going to make right away. I think everyone was in agreement with this. This is an administrative thing. Um the general email for planning board select board has selectmass.com. School committee has school committee at ashland.k12. You know the school stuff. The planning boards is Ashlin.planningboardshlandmass.com. We're going to take off that first Ashland. So, it's just planning ashland.com. We're all good, right? Yeah. >> I'm not even going to take a vote because I see lots of nods. Um, and the rest of this stuff can wait. Administrative matters. We already talked about some of these things. Is there anything new that we have to bring up right now? >> No. All right. Meeting minutes review Nove start with November 13th. My computer doesn't want to wake up. There we go. I have a couple things, but that's why I need to wait >> it.
>> I don't know. >> Yeah, we it'd be great to find out what's going on over there because I I have been pinged about that as well. >> There's a specific crossing over there. Be very happy to know that answer >> is that that's all they're ask all the time. When is it going to get done? >> Oh, they ask >> they ask all the time. When's it going to get done? How do I know? >> Yeah, >> I don't know. I don't know. >> We're still doing the >> experience like that with the flight attendant. Don't ask us. We don't know. >> We're still um in the engineering design or the state is um the engineering design phase for Cordville Road Bridge. Yeah. >> Prog progress is happening on the Warren Barn. >> Yes. um >> move to the fun stuff. Yeah, Arboritum that's that's in great shape and that's kind of in the >> it's growing, you know, it'll start, you know, going through its growing phases.
It went to sleep and now it it doesn't want to wake up. >> Not to It's done. >> Okay. Uh, November 13th. Let's see. Okay. So, um I think we need to list um that Scott Pair was absent. Usually, don't we? I think usually we we list absences, don't we? >> I have to go back and check that. >> So, um I think we usually do, but but so >> take your word for it, but you know, >> that was one note I made. And then um on line 46 um the bylaw, we continued the bylaw discussion to January 8th, 2025. It should be 2026. And was there anything else? That was it for that one. >> Okay, >> pretty easy. Did anyone else have any changes to November 13th? >> I only change >> the year. Okay. Um, let me see. So, let's moving on to we'll approve them both together.
Um Warren Barn, they've started uh if they haven't started framing yet, there's going to they're going to start framing quickly. They had to do some underpinnings on the silos. >> What kind of stuff? >> Foundation. >> That's a concrete one. >> Yep. >> Um >> do they not have the It doesn't look like it from the street. Is the um ice skating rink not going to be up this year? >> No, just because of the construction. >> I thought because of the construction. >> Yeah. Yeah. >> I had people ask about it. I'm like, "Yeah, no. With the construction, they can't do it." >> Yeah. Um the dog park is is moving along because you know that obviously they've stopped for the uh season, you know, for the for winter. You know, Beth, there was some really challenging aspects of that. It turned out to be a beach.
So, moving on to December 11th. Um, on line 161. >> 161. Oh, it it should be a 9 by8 space, not a [laughter] nine. 9 by8 is a little small even for a compact car. >> Everybody's driving minis. [laughter] >> Mini coupe. >> Yeah, it might fit. >> Um boy, I think that's it. I thought I had more, but the rest were just notes to myself. >> Okay. Um, oh, actually, um, I did have one more thing. Um, line 109 10, it says, "You reported that you anticipated the 40B hearings, two of the 40 beings, 40B hearings closing on December 22nd and December 23rd." That doesn't really make sense, does it? Because >> we did meet that Monday and Tuesday. >> Oh, you did? >> Yes, we did. >> Okay. >> Boy, that sounds fun. >> It was a blast. >> I bet. >> All the time.