Transcript

Verbatim source text

001Hi good evening everybody it's 5 30 and we're going to begin the meeting of the Samuels CISD Board of Trustees. We're gonna start with roll call. Dr. Ariel Cruz-Vela, present. Crystal Hernandez, Israel Villarreal III, Rudy Corona, present. Frutoso Gomez, present. Orlando Lopez, present. Alex Reyna, Alfredo Perez, present. Tony Torres, now we're moving on to agenda item 1.2, Pledge of Allegiance to the United States and Texas flags. This evening we've got Lillian Eve Aguilera and Damian Rodriguez from the Collegiate Academy. Miss Lillian Eve Aguilera. Lillian Lily Eve Aguilera is a 13 year old daughter of Ernesto and Mary Julie Aguilera. She's an eighth grade student at the Collegiate Academy where her favorite subject is reading. Lily enjoys spending her free time immersed in books. In addition to her academic pursuits, Lily is a member of the

002Miller Jordan Cougarette dance team and has participated in competitive dance since the first grade, which she truly loves. She is also a part of the Samuels CISD students ambassadors. Lily's future goal is to attend the University of Texas at Austin and major in veterinary medicine. In her free time she enjoys playing with her two poodles, Charlie and Donnie, as well as her kitten Nova. Damian Rodriguez. Mr. Damian Rodriguez, son of Thaddeus Mar and Jeremiah Rodriguez, is an incoming eighth grade student at Collegiate Academy. He enjoys playing chess, working out, and serving on his church's media team. As a member of the National Junior Honor Society, Damian has demonstrated leadership by serving as student council president and a Samuels CISD ambassador. He was recently selected for the elite academic advisory council for the 2025-2026 school year.

003Damian participates in football, basketball, and track. He is also a member of the Future Farmers of America and has raised two land projects, earning fourth place in competition for two consecutive years. With a strong foundation in academics, leadership, athletics, and service, Damian continues to set high standards for himself and inspire those around him. He has a bright future ahead. Thank you for joining us and we'll begin with the Pledge of Allegiance, followed by the invocation. I pledge of allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible with liberty and justice for all. Honor the Texas flag. I pledge allegiance to the Texas, one state under God and one indivisible. May you please bow your heads. Heavenly Father, thank you for letting

004us come together today. May we approach this meeting with open hearts, clear minds, and understanding for others. May your peace be present and may we reflect unity as a group and purpose for this meeting. We ask of this in Jesus name, Amen. Thank you a few, but please step forward so we can hand you your certificates and take a picture. At this time, will the parents and the principal of the school, Ms. Kendra Turner, please stand to be recognized. Thank you. Agenda item number two, special recognition. Mr. Gonzalez. Good evening ladies and gentlemen. Board President Dr. Cruz Vela, Board of Trustees Superintendent Mr. Perez, and members of the audience, and members joining us also online as well. Bienvenidos a todos aquí, festejando ahora, hora el dia del boardroom para hoy. So today we're going to

005go ahead and present, we have one recognition, and this is the San Benito Schools Communications Department. And so we're very fortunate this year, we've submitted awards for the Texas School Public Relations Association awards, those were awarded back in February, and we also submitted awards to the National Organization, the National School Public Relations Association as well. The National School Public Relations Association, known as NSPRA, has recently announced the 2025 National School Communications Awards. San Benito Schools takes pride in announcing that the Communications Department has been honored with seven national distinctions in the Publications and Digital Media Awards category for projects submitted for the 2024-2025 academic year. NSPRA, the Publications and Digital Media Awards commend exceptional accomplishments in publications, newsletters, videos, podcasts, websites, and social media. Each submitted project is evaluated by category and judged based on

006excellence, quality, and professionalism. This year, the seven awards that were presented, we have, the district received, our department received awards for excellence in two social media categories and two video categories. They include Award of Excellence for the project entitled Leverage Reels for Engagement and Growth by Maria Guajardo, Award of Excellence on our Facebook Growth and Monetization program that we have in San Benito by Maria Guajardo. That also won a Teespr Award. We also received Award of Merit for Game Day Connections Celebrating our Greyhound fans by Maria Guajardo. In our video category, we received in-house a video category, we received Award of Excellence for our Teachers of the Year 2025 program that was done by Sergio Garcia. The Award of Excellence, known as Learn More, that was a video that we created, a marketing video during

007the last year, and that was done by Sergio, submitted by Sergio Garcia. An Award of Merit also was given to the Spotlight of Education series, and in particular, the JROTC episode, and that was submitted by Luis Gonzalez. Publications that we also submitted were our calendars, the San Benito 2024-2025 school year calendar received an honorable mention by our public relations staff. So those are the seven awards that we received in the national competition and distinctions under NSPR awards. Other achievements that coincide with what we've been doing this past year, San Benito CISD was honored with 19 Teespr Star Awards, including five gold and four silver stars that was recognized at the February Teespr Conference in San Antonio. And board members and superintendent, you can boast a little bit about this with your colleagues from other districts,

008San Benito CISD was the only school district in Cameron County to receive both the Teespr and NSPR awards for 2024-2025. It is also one of only three districts in South Texas to achieve this distinction. San Benito CISD public relations was also highlighted on the national podcast, and their name, the organization is Mastering Social Media Through Schools, and invited guests were Luis Gonzalez discussed the San Benito CISD meta monetization incentive back in October 2024, and that program did receive Teespr and NSPR awards accordingly. The Teespr state president appointed Luis Gonzalez as the professional award selection committee member for the 2025-2026 school year. Maria Guajardo completed the Teespr artificial intelligence certification at the 2025 Teespr conference, and during the 2025-2026 school year, San Benito CISD will host the Teespr golf coast meeting, which will give us the

009opportunity to highlight San Benito CISD as we host school districts from as far as Corpus Christi to Laredo all the way down to the Rio Grande Valley. We look forward to hosting that event here in San Benito. With these notable accomplishments by the communications department team, San Benito CISD established itself as a distinguished Texas public school district through its collective achievements of Teespr Star Awards and NSPR awards during the 2024-2025 academic school year. Our department's commitment for 2025 and 2026 is to provide innovative storytelling while maintaining the tradition of excellence in publications, digital media, social media, and marketing consistent with our history of award-winning excellence. We thank the San Benito CISD community for supporting our vision, which we always follow, which is imagine, create, and deliver the gold standard at San Benito CISD. At this

010time, I want to introduce the staff from the communications department. We do have a couple of individuals who are not here with us today. In fact, we have our entire print shop team that is not here available today, but we do want to recognize them. We have in our print shop department, we have Ernest Vial, our graphic designer, Paolo Cantu, our copier specialist, Conrad Contrera, our pressman, and Joe Aguilar, our lead pressman. Not able to join us here today is Sergio Garcia, our KSBG-TV media coordinator, and also Sam Alonso, our KSBG-TV technician. Those who are here with us here today, I'll introduce, and we begin with our webmaster Dulce M. Quiroz, Maria Guajardo, our social media communications specialist, David Cortez, our KSBG-TV technician, and Evan J. Martinez, our KSBG media technician. And our department would

011not be complete without our secretary and our the hardest working person in our department, Ms. Mara Martinez. And of course, leading the department is myself, Luis Gonzalez, director of public relations. So once again, once again, thank you for supporting our endeavors. Again, we're here to tell the stories of our students and of our staff, and that's our focus for 2025-2026. Okay, Madam President and Mr. Betis, that concludes our recognitions for this month. Hope everyone has a restful remaining summer that we have. A couple of days left for a couple administrators that are coming back on Monday. And of course, we welcome back our students on the August 11th and our entire staff August 1st. So we look forward to everything that we're preparing for the new year, and so enjoy your weekend. Thank you. So

012really quickly, so really quickly while they walk off, I just want to say a few words. I've been here and I've seen what they do behind the scenes, and trust me, they're professionals. So I've been behind the camera, we have to do a couple of takes, and I'm like, that looks good. He goes, no, it doesn't. So anyway, but yeah, so it's no, it's no, it's no, it's not a surprise to us here on this board. And I just want to thank the PR Department and also, you know, of course our whole team, as far as all our administrators, our leaders of our district, to continue to promote our district in a very positive manner. And it's great to see the accomplishments and see us moving in the right direction, but we can't do without

013everybody working together. So once again, thank you all so very much for what you guys do. And I mean, this is as a team, holistically, everybody in the district and all the people that make this happen. So once again, thank you all so very much. Appreciate it. Thank you, Mr. Lopez. Going on to agenda item three, there's no public comment today, so we're going to agenda item number four, board report. Just adding to what Mr. Lopez said, summer is pretty much done, sorry. But we hope that y'all had a restful break, and we know that right now we're getting ready to welcome our students back into our classrooms, and we know that everybody's working really hard to do that, so we look forward to this new school year and getting everything prepared for our students.

014Mr. Corona? I do want to say thank you to all of them, and congratulations on achieving, you know, this award as far as where you guys got workplace, and once again, just thank you. Gomez? Yes, good evening. Good evening. I thought we were just gone on vacation a day ago, and now we're back going back to work. Crazy. Anyway, thank you all so much. Y'all do a great job. We appreciate it. Thank you. Consent agenda. In order to promote efficient meetings, the board may act upon more than one item by single vote through the use of consent agenda. Consent items placed on the agenda shall be marked with an asterisk. Consent items are items for which no board discussion is anticipated and for which the superintendent recommends approval. Prior to the time of which approval

015of the consent agenda is had, at the request of any member of the Board of Trustees, any item on the consent agenda shall be removed and given individual consideration. Agenda item 5.1 request. Sorry. Administration is going to recommend that we do not, we do not need approval for 5.9. So we're gonna scratch agenda item 5.9. 7.1, 7.2, 7.3, and 7.4. 7.1, 7.2, 7.3, and 7.4. We're currently working on some of those things. We're waiting on some information from TASB. So we're gonna go ahead and we'll present them at the next meeting. Okay agenda item 5.1 request for approval to purchase Eduforia premium suite addition district-wide for the 2025-26 school year. Question? Consent. Request for approval of the memorandum of understanding between San Diego CISD Children's Advocacy Center for Cameron and Willisie counties for the 2025-26

016school year. Questions? Consent. Agenda item 5.3 request for approval of the memorandum of understanding between San Diego CISD and Tropical Texas Behavioral Health for the 25-26 school year. Questions? Consent. Agenda item 5.4 request for approval of the memorandum of understanding between San Diego CISD and serving children and adults in need. Scan Inc. for the 2025-2026 school year. Questions? Consent. Agenda item 5.5 request for approval of the memorandum of understanding between San Diego CISD and Cameron County District Attorney's Office for the 25-26 school year. Questions? Consent. Agenda item 5.6 request for approval of the memorandum of understanding between San Diego CISD, ACE after-school program, and Girl Scouts of Greater South Texas for the 25-26 school year. Questions? Consent. Agenda item 5.7 request for approval of the amendment of amendment to the memorandum of understanding between San

017Diego CISD and Neighbors and Native Services, Ninos Inc. for the 2025-2026 school year. Questions? Consent. Agenda item 5.8 request for approval of the charter agreement between San Diego CISD, ACE after-school program, and Texas A&M AgriLife 4-H for the 2025-2026 school year. Questions? Consent. Agenda item 5.10 request for approval of the elementary grading policy for the 25-26 school year. 5.11 request for approval of the secondary grading policy for the 2025-2026 school year. Questions? Consent. Agenda item 6.1 request for approval of cash count report for June 2025. Questions? Consent. Agenda item 6.2 request for approval of comparison of revenue and expenditures to the budget report for June 2025. Questions? Consent. Agenda item 6.3 request for approval of tax collection report for June 2025. Questions? Consent. Agenda item 6.4 request for approval of check disbursements report for June

0182025. Questions? Consent. Agenda item 6.5 request for approval of gifts request for the 25-26 school year. Questions? Consent. Agenda item 6.6 request for approval of budget amendments. Questions? Consent. Agenda item 6.7 request for approval of purchases over fifty thousand dollars. Questions? Consent. Agenda item 6.8 request for approval of quarterly investment report. Questions? Consent. Agenda item 6.9 request for approval of annual investment report. questions consent agenda item six point ten request for approval of quarterly federal funds comparison report questions consent agenda item six point eleven request for approval of brokers slash dealers for Samu CISD investment portfolio questions consent agenda item six point twelve request for approval of resolution of independent sources for investment training and designation of investment officers question consent agenda item six point thirteen request for approval of resolution of annual review of

019the investment strategies and investment policy questions and that agenda items six point fourteen request for approval of the option to extend contract RFP six to two IPM I AI PM awards incentives and printed materials questions and that agenda item seven point five request for approval of the semi to high school gym floor repairs questions and that seven point six request for approval of the Samu high school roof water drain repairs questions and that and agenda item seven point seven request for approval of board minutes for the public hearing June twenty five twenty twenty five and the regular board meeting June twenty five twenty twenty five questions and at this time I like a motion to approve all of the items from five point one to five point eight five point ten five point eleven six

020point one through six point fourteen and seven point five through seven point seven so move I've got a motion by mr. Lopez and a second by mr. Goldman's all those in favor all of those items are approved moving on to agenda item eight action agenda eight point one discussion impossible action to authorize administration to award Bobby Morrow lighting project Bobby Morrow scoreboard replacement project and Bobby Morrow track replacement project to the cooperative approved vendors subject to satisfactory financing terms and conditions mr. Pettus yes so we've been discussing May June that we were going to need to replace the track at Bobby Morrow Stadium it's run its course it's starting to become unsafe so we needed to replace it and then we've also discussed the issues we've been having with the scoreboard and the lighting at

021going from the regular lighting that we have to LED lighting there at the stadium when we signed the agreement with the electric company they were proposing that we receive a loan from them to do these projects so we're kind of in the final stages I do have mr. one you and Sean Davis if you'd like to come up kind of give us an explanation of how how this would work we're currently we have three quotes where we have quotes for the three projects superintendent board thank you guys for having us again what we are proposing right now is to actually finance the project and will be the general contractors I know that we you guys have quotes from other vendors and as long as they're approved through next year we can go ahead and use

022them as well right now currently I know this is what you guys are really concerned about is we were able to find some outside funding through a company called government government capital is a lot cheaper than what we actually we're going to bring to the table about a hundred thousand dollars cheaper so the current payment for a 10-year loan we're able to secure a 10-year loan would be twenty four thousand one hundred five dollars and fifty four cents and a 15-year loan would be a seventeen thousand nine ninety and ninety nine cents a month that would be your monthly payment it wouldn't start till after a year so after a year after the project's complete then the the payments would start the APR that we had discussed at the beginning the APR this was actually

023came back at four four point five five it was much cheaper than than the administrative fee that the charging through us yeah go ahead just to add to that the Sean Davis I'm work for Jackson Energy Solutions so the the company that we reach out to gov cap you guys have worked with them in the past so you're already set up in the system and they their business model specifically tailored to their government entities and specifically school districts to offer like the most competitive interest rates possible so we actually went and contacted a few other companies and when we told them the rate that we were able to secure they kind of just were in shock they looked at us and we haven't seen rates like that in years and so this is a you

024know probably the best opportunity you can find in terms of financing and then that's the big difference between the going through the line item that's more of a hard money loan so you know the ministry fees a little bit more than this would be actually it's a hundred thousand more correct hundred thousand dollars more so this is cheaper because there's no interest rate on the line item but there is an administrative fee as we discussed any questions so so so really quick so you went you know for us novice here I don't really understand what's up so speaking for myself so you said so talking about the procurement process that we've already gone through I'm saying the basic going out and procuring the three bids and all that other stuff so so what we would

025do we do the same thing but you're purchasing through a cooperative and part of the case cooperative you guys join you could purchase integrated efficiency which is anything infrastructure related such as this such as the light the track and all that now we'll you guys will have final say in who the last vendor is we'll bring you guys the numbers but we want to get started with I know we're on a time crunch and a lot of stuff so you won't get started as soon as possible secure the funding and then we could bring you the list of vendors and you guys can pick that as well okay so there's a couple of different options the reason it's blank is because we're still evaluating I think I'm discussing the statement of work so one of

026the statement of works includes just the scoreboard and the other one includes the scoreboard and the lighting and so whenever you know the decisions made on you know what all you want to replace then the implementation price will be filled in and Tim Karakostas is the one that's been the contact at our company that's been negotiating guess what maybe I'm missing something so my understanding was that you guys I mean that we already had done that and given you our staffs already had gone out and picked the top three companies that they went out for way before this conversation started that's correct but we went back and there was a some discrepancies some some non-truths that we're told that we had to go back and do a lot of research and make sure everything was

027correct one of them one more point anything with the current transformer at the stadium we will power your scoreboard that was incorrect you would overload it and so there was just a lot of discrepancies that we had to go back and fix so now we okay so if there are discrepancies can you please share that with us because you know right right so it's gonna take another two months before we have this conversation again and I don't want to have this conversation again no it won't take so what I'm asking you is that we've already gone on this road before so what I'm asking you is what I'm asking is that our staff already went out and got the three bids for the lights for the track and for the scoreboard okay okay so we're

028asking you is in plain and layman's terms just explain to us exactly what's going on okay and let me terms really simple right now we are discussing what projects we're gonna do right now so we like I Sean said are we doing the scoreboard the lighting and the track all in one that's our proposal right now we have them all in one we're able to go and do that's what we're discussing right now so once you guys have decided we're gonna do all three together then that then the funding issue comes so then the payment issue that's where I we have discussed the payments right so after that secured right now and then then the vendors of the simplest part we need to secure what we're doing first so we're securing this interest rate without

029having the final number of what we're gonna know this is the final number the final number is 2.25 million 2.25 million so we whenever we contacted golf cap we just when we discussed it with them we just made the assumption that all the projects we get done thinking with that thought process that if you cherry pick and go with me one or the other just go with the track just go with the scoreboard then if they approve you for everything then they would approve you as you peel it back you would still get the approval right so if you're approved at 2.25 million for the full project cost then you decide that you only want to do like the scoreboard and again I don't have the numbers right in front of me I can pull

030it up my phone but I think it's around a what half a million yeah our one million dollars for the scoreboard five hundred forty two thousand for the for the just the lighting so you're already gonna be approved for that because we've already contacted guff cap on your behalf and got the full amount question and I think questions for mr. our attorney is are we lacking something or I'm missing something or is this something that we can we should vote or not vote tonight okay is this something we need to table okay at this time should I ask for a motion to take this into executive session so we're gonna table this discussion and then bring it back after executive I did have a question though I know we're talking about these three big projects

031and then we've also discussed of adding the air conditioning to the elementary gyms that would that this would not hurt us if we decided to that's correct okay this would not hurt you that's correct that'll be something totally different so we're giving you guys different options what to come across I know first we're the scoreboard with the most important thing and then we've done the track and then the lighting up so we want to bring everything together we assume that you guys want to do all of them but you know in case you guys change your mind we want to let you guys give you a different options let's just say that this is approved or it gets approved right what are we looking at as far as time frame on starting any of these

032projects yeah we've been time frames here on the scope of work right here the three months for the school board 60 days for the track and the lights are I think 60 days as well but I'm asking what how soon would the project start because we've already been delayed what about a month yeah and then like I said that one of the big sorry it's gonna be contingent on also your your your home schedule for your football team right so like you know whenever they're playing obviously the work would be delayed on the on the game days and everything like that but would you know there we've we've kind of our engine our project engineers have looked at it and figured out timings around that to be able to still work on it throughout the

033throughout the season and to answer your question on the delays when we had the initial code you got from ABC was that was incorrect that the transformer you have currently right now would not have sufficient power for that scoreboard without replacing the lights you're gonna overload it and that was the issue so that's where we ended up having to come to the blaze we had to give it some information from AEP come back go go back forth go through ABC and then by the time we got all the information we had to come down three times better bring Tim down three times so that that was the reason for the delay we wanted to make sure do the project right I mean anybody can go put the scoreboard up and then you know you blow

034the transformer and you guys are without a power like what happened a little ago that's not a good look for the district what was the time frame on the track 60 days 60 days thank you so the track itself would take 60 days as soon as we begin we're gonna we're gonna demo it as soon as we demo the track would take 60 days that's correct that might be something we know if it's approved I mean we could have done right away I just wanted to clarify we can get started once the contract signed with a lot of the pre-work and kind of the surveying and things like that but what we're recommending is that three weeks span in October when there's not a home game we can knock out the lighting and the scoreboard

035everything like the physical actual building of it and construction of it completely understandable okay so we will discuss this in executive session and at this time we're gonna move into closed meeting it is 6 o 4 p.m. in accordance with the Texas Government Code Open Meetings Act the board so this time I'll ask for a motion to take action on agenda item 8.1 after closed session so move I got a motion by mr. Lopez and a second by mr. Goldman's all those in favor motion passed now it is 6 o 5 and we're moving into closed meeting in accordance with the Texas Government Code Open Meetings Act the board may move into closed session for the following reason section 551.071 for the purpose of a private consultation with the board's attorney on any or all

036subjects or matters authorized by law section 551.074 for the purpose of considering the appointment employment evaluation reassignment duties discipline or dismissal of a public officer or employee or to hear complaints or charges against a public officer or employee it is 6 o 5 and we are moving into closed session good evening it's 721 and we're reopening our meeting going back to agenda item 8.1 okay go ahead thank you for having us again I think a little bit of confusion of the vendors have already been selected for for each project so Musco would do the lighting ace would do the scoreboard and Hellas would do the track it's already been selected so once once the we approve you guys agree on this that would be able to start immediately we there was just a little bit

037of confusion because we weren't sure exactly what projects were going to be done but if all three are going to be done those have already been awarded to the vendor I think the confusion also was that we were discussing a 0% and we don't know where the fees are or right right right there it was a 0% as mentioned because and like we said during our initial presentation at 0% with interest because next era it is not licensed by the SEC but there is an administrative fee as we had mentioned to you guys during our initial presentation so we were able to find outside funding that was cheaper than the administrative fee yeah so if you convert the administrative fee and they're like an equitable you know comparable percentage it's substantially higher than the 4.5

038percent so your payments would be higher if you use the on-bill option and the term would be less too it's only up to 96 months so we were to go out and get up just get a loan a low interest rate we'd still save close to a million dollars versus paying well yeah I think that's you know you could go and shop the interest rates around but I don't know if you'll find as favorable terms as this because again gov cap is specifically you know their business model is to make low interest as low as possible interest rate loans to government entities including schools well I'm saying because with that additional fee that interest rate basically jumped up no I'm sorry my understanding was always going to be a zero interest that's correct you gave

039us was always a zero interest that's correct there is there is no interest there is administrative fee though right we did discuss now the administrative fee is the one that's yeah it's got up yes what do the cost of good there different factors have come into play oh yes that's correct so what's okay so now that you have for example you just said that you already know what we're gonna go out for three projects so what's the administrative fee is it a different rate on each project or is it Tim are you still on sorry the engineers it was called in Tim are you on but the interest rate is not just for the administrative fee the interest rate is for the entire project that's correct there is no administrative fee if you decide to

040go with the the third party funding which you got there is no administrative fee at all so that would just be the interest rate and I mean like I said the if it is program will be launched tomorrow we just got the misspelled San Benito ISD so in case you are guys going out for a bond that would also help will help you guys with that as well and then if you there is no prepay penalty as we mentioned on that as well those are all different factors that came in but that this was the best opportunity for the district is a longer term so the payment is smaller monthly it would be with like I said with the seven year seven percent interest substantially higher so the two options that we looked at with

041gov cap or 10 and 15 year loan options and there's always the option to repay it early as well so like if you get a bond approval you then you can pay off the balance of the loan like as soon as you get the bond the money from the bond I do think that we need to do the we need to do our due diligence for our school district at the time so we are going to take no action on this agenda item at this time understood and then you guys can get in contact with our superintendent yeah yeah we will forward the the loan terms and all that good stuff to you they're already get started it was soon as you guys are ready to move forward they're ready to fund over so we

042just need to like I said okay and another the other project you said we're not the project but we're going to push out to the district the low the low rate the infinity program the friends and family program is complete they unfortunately on the your landing page they misspelled so he has it on his phone but you guys he can show it to you but it's it's misspelled so we'll get that fixed and tomorrow will be launched tomorrow official launch perfect and I believe the rate right now it's seven four eight so if anybody will sign up right now to be some point for eight we'll have that launch in the morning perfect all right thank you thank you okay so there will be no action on agenda item eight point one moving on to

043agenda item ten point one employment resignations retirements and terminations mr. bettas yes I said the board approved the employment resignations retirements and terminations as discussed in executive sessions do I have a motion for agenda item ten point one motion okay I've got a motion by mr. Gomez and a second by mr. Lopez all those in favor motion passes agenda item ten point two discussion possible approval of employment of Ed Downs principal mr. bettas yes I am recommending that we approve Ashley Camacho Garza as principal for Ed Downs elementary I've got a motion by mr. and a second by mr. Gomez all those in favor motion passes agenda item ten point four sorry ten point three discussion and possible approval of employment of Beth the Kavasa middle school principal yes at this time I asked that

044the board approve Daniel Garcia as the principal for Beth the Kavasa middle school to have a motion for agenda item ten point three motion I've got a motion by mr. and a second by mr. Gomez all those in favor motion passes agenda item ten point four discussion impossible approval of probationary contracts for administrators for the 2025 2026 school year yes as discussed in executive session I asked that the board approve the probationary contracts for administrators for the 2526 school year I got a motion by mr. Lopez and a second by mr. Cortana all those in favor motion passes and there will be no action on agenda item 10.5 it is 728 and is there a motion to adjourn the meeting I got a motion by mr. Lopez and a second by mr. Dana all those

045in favor meeting adjourned 728 thank you everybody have a good night