Verbatim source text

001the mission of the Pioneer School District is to educate each student to the highest levels of academic achievement and prepare students to succeed in life the vision of the Pioneer School District is high levels of learning for all every child every day up first we have requests to address the board and I understand we do have one person that would wish to address are there any others okay hi I'm mono I'm part of your facilities committee and I just kind of wanted to give you a quick little brief on some things that I know and to also let the public know and be more aware of the things that we've done that aren't coming from the district funds they're coming from Grants and things that Jeff and and his team have been able to do

002and do those things for the district one being the new district office got the uh permit to be able to be in be in there now got a few things to button up some grading and whatnot so that's nice that's a huge huge deal for the district uh we have Apollo coming in with you the small schools modernization which is our security lightning that's all done on grants so as as a public member of the the committee and seeing and talking with people in the community and then being kind of back with things as they are to just remind them that we are doing a lot as much as possible to not only improve our school but to do with with the conscientious of money being involved as in the two new electric buses and

003Chargers that went along with those those weren't paid for by taxpayer dollar so just wanted to give you that little update and just to remind people that we do do these things to help our community and keep money in their RS Sean I'd like to um thank you for your participation on the the um facilities committee as a as a citizen representative so I say the person on the committee that was representing the community three years I think awesome kept us honest you know if there's anybody else that like to join that committee it's I think it's great to have the ability to you know thr your two sense it there and you know just been really good about explaining a lot of things to us Lloyd has been phenomenal with the facilities and the

004things that he does and you know his biggest concern is is it's got to be what for the students students come first students always come first and you know so that's why he reaches out to do the grants and and as much as you possibly can do to to make sure there's money in the budget for the camps awesome thank you thank you okay uh next do we have any changes Andor additions to the agenda yeah I'd like to add um Scott Lewis from Apollo Solutions and um let's put him under presentations he's just going to give us an update I don't think he's got a formal formal presentation but just mainly updating us on the small schools modernization Grant Apollo's going to be doing the work so we'll add Scott to that excellent and

005his colleague fabulous thank you uh do I have approval of the regular meeting agenda I move that we uh ex adopt the regular agenda as written thank you do I have a second thank you it has been moved and seconded all in favor say I I no opposed that motion passes up next is approval of the consent agenda do I have a motion to approve the consent agenda approve the consent agenda thank you do I have a I second thank you it has been moved and seconded all in favor say I I oppose that motion passes as well we are into presentations with the district's highly capable program good evening Primary School Board good to see you guys good evening Mr Davis community members co-workers and everybody um I'm going to start by reading a

006small part of a letter from a student who unfortunately just left us to go to high school um so again just reading a little bit of this um regarding highcap so these are from two former highcap students you have supported me through my education at the school who help me at times that are stressful I am very grateful for your advis to the time I SP in it you have no idea how much you truly mean to me the studio has been a great experience that has repeatedly challenged me and I'm excited to hear all about it next year from my brother thank you Mrs Rock for everything you have done your favorite student Jacob sumers um so what I presenting today is our plan for highly capable looking forward um things are changing a

007little bit and I'm going to go ahead and do the overview that you have been given as well as presenting from the websites that I've created so as part of required communication with parents and community members information about our highly cual program should be made available um for anything that have look at so I have created this website then includes everything that esd113 and Washington State um request districts to provide including an overview of what our program is and what our um ideals are as well as a brief little brochure about our testing window um forms for nominating students and for um appeals are all done in both Spanish and English and are available right at the website um this is one of the areas we are going to focus on increasing next year is

008high cap highlights which will highlight what we are doing in um programs and then again all forms that are needed are also included on this website appeals processes um as well as resources for parents who both Spanish and English for the parents of high cap students who may want some more information or help with um educating their child and again that website um will be posted along with everything else on H website and will be updated by myself Mr Williams Mr Davis and our new Elementary Hightech coordinator when that person is named so I just want to go over a quick overview of the main parts of the high program that the state of Washington is um invested in making sure that we are completing um the first one is parent communication we've got a

009lot of new things added um in general but one of them is this website making sure that website is up and running and available and updated with new information um testing um we do Universal screening for all second and fifth graders um we've been doing for several years long before it had become um Les legislated to do so uh we have changed or I should say um added some additional um pieces to the testing so that our net is as wide as possible um especially for populations of students that have been traditionally underrepresented in gifted and talented programs specifically students with fours idps and English Lang language Learners have been historically un or misrepresented in high highly programs Across the Nation for many generations so um part of the change that Pioneer has done is

010to look at all students meaning the top 10% um of the coat screener and that top 10% is across the board it's the top 10% of each population so the top 10% stud I APS will will be looked at for the top 10% of ell students will be looked at for the top 10% of 504 students because there are um GI to T students within all of those areas and again historically um especially Behavior was ever an issue they've been underrepresented in the highly programs um we also have added Talent Development to this so that students who either have inconclusive evidence um or test scores that are very different or maybe they new to we don't have that much information we have added Talent Development to our Hal program this allows for those students to

011be pulled into the high program without the official designation for a year in the hopes and the idea that exposure to students who are highly capable may be just enough to push them up over that realm where we can then Factory identify them and pull them into the program um eligibility again a lot of the historic um benchmarks for eligibility have been eliminated um because they missed significant portions of our student population so we no longer have a cut score on any test um as a um criteria we also no longer asked for or required to recommendations um historically many highly capable give to students um are also behavioral issues if they are not adequately motivated educationally early on in fact a lot of kids with five fours and IMS are actually gifted and talented

012but their other um characteristics overshadow sometimes that ability and they're missed um and I've since I've started this position seven years ago so um we've C quite a few kids who otherwise would have been um designated and thankfully so so eligibility now is a mixture of various CL data any evidence can be used to include a child and highcap that no evidence can exclude that so Behavior grades whether or teacher likes them nothing to do with it whatsoever never should be part of that designation so uh parents can submit evidence students can submit evidence teachers can submit evidence we can look we will look at test scores we will look at all the dat we have but again the the point is to cast a wide net to recognize that not all talented and gifted

013students have those abilities recognizable sometimes those talents are hidden in school systems our jobs to bring them back another um new addition to our high program is to designate Ela math or dual enrollment again highly capable students are not highly capable in everything maybe they're just really good at math maybe they're just really great positions that doesn't exclude them from highly communicable services so we do want to designate however students who have that liability in math and science so that we can provide them advanced math classes Advanced science opportunities um and students who are advanced in La history we want to give them more writing opportunities more public speaking opportunities so that we are working in their talent area um students with dual enrollment as signation of course will get exposure to all of it

014also new um in our program is students who have been previously designated as highly capable in another District that designation will be honored when they enrolled here in previous um years they have had to test before be accepted but we will accept any designation from any school district as legitimate and we'll immediately rooll them in the program program models and services on these also some new things uh we've got clustering with high cap specific social emotional learning of e the elementary school and the middle school um this is especially important because highly capable students may have the ab ability to see academically but often it is the social side of their lives that is hard to navigate um clustering especially in those early years provides that opportunity to be with other students who think like

015that so they don't feel isolated and alone uh they're going through the trials and tribulations of growing up um common EnV with highcap specific middle school that has been happening since I've taken over the position um new that we're going to be adding on or I should say making better um our Advanced learning plans developed by high or by school level high cop coordinators with parent student input and shared with current teachers in September of dated again in January um Advanced learning plans will help our program focus on more rigor in the student work not just more work so the idea idea is that they are able to follow their interest while challenging and expanding their Horizons not necessarily just doing more of what a teacher is requesting them to do if that is not

016what interests the students student choice is really really big in the High cat program um Project based Le of choices we've been amazing at that here at the elementary school as well as the um or excuse me the middle school and the elementary school looking great with that with stem classes um band Garden to table um we've got fish lure classes coming up next year yearbook CH there are many options for all students specifically hiding table students to select electives that fit in their um relative zone of happiness and we'll hopefully challenge them in their Endeavors that they choose to in the future um a proposed addition to this um if funding and Staffing allow is to have an accelerated class in each core subject at the middle school level um right now we do

017have advanced math um available in seventh and eighth grade as well as advanced science through step program expenditures money um so no high cap funds come from taxpayer dollars again um they do not come from the general budget they are specifically and separately funded so it is not relevant on how many students were the program it would be funded the same if there was one or 100 but our goal is to cast of wi debt um and we've been doing a break up of that so here are the expenditures we've had as of just this year and what we can anticipate moving forward so the wack conference which is for the Elementary Middle School coordinators as well as a rotating um group of teachers including admin support staff um nine people attended in Seattle uh

018last fall six teachers and three admin support staff um the total for all of that including hotel rooms was $431 um the Stans for both Elementary School and Middle School coordinators a total is $467 per year again that's divided into two we spent $3,278 on Kat screeners which is the required test um to start to collect additional data so that's where we get our um local percentage rates from and other um nationalized data so that we can then from that 90% dig deeper into other data so um that is what we spent on that um we have some proposed expenditures that would benefit the entire school because differentiation should be happening in all classrooms for all students and again even though we're casting White net there are highcap students out there we've missed so we

019want to make sure that everybody has the opportunity um what I am looking into and um there's possible grant money for this as well is achieve 3,000 Literacy for ELA and history uh and science as well as Explore Learning virtual labs and gizmos for Math and Science again purchasing these programs with high cap dollars would benefit all students in the school district not just High GE for um also new we want to do more with program evaluation and collecting more data on the ethicacy of our program um not just from students returning or writing letters or sending cards which I've been getting for seven years but more from the high school teachers more from their parents more from them as they go through college I would love to start collecting data on the next 10

020years possible so adding um parent family surveys to be reviewed a minimum of once a year um as well as student surveys to be done at least twice a year training student reports and exit surveys is at the end of Fifth and eth grade to evaluate programs in both Elementary Middle School and final so as I was researching um and going through all of my literature there's just a few things I pulled that I thought were po it and worth mentioning GI to students often face isolation anxiety Board of depression and what can often be constant bullying from other kids for being different creating an environment where these students are safe and among other gifted peers is essential to their health and wellbeing a statistic for me was that 18 to 25% of students who

021drop out of high school have been identified as gifted after the fact 18 to 25% of our brightest students don't even graduate high school because they've been completely isolated from the school system for so long that they're just waiting to get M up completed government spended the most on low performing schools and very little on high and cheing students we need to invest in our future innovators we are tring challenging inspiring them to achieve greatness gifted students are the key to America's future and to maintaining our place in the global economy and finally I'm GNA leave you guys and thank you for your patience I didn't even on this long think I lost out that um this is a letter that I received from a student who just graduated this year from Shelton High School

022dear M Ro you were one of the first teachers I ever had after moving from being homeschooled to public school and I want to thank you for being a great standard for the future teachers I would have you pushed me to be part of the science bir and I want to thank you for that because my experience been 10 m state competition is one I will never forget I want to thank you for the fact that you made a space in your advisory for me and all the other students who made the amazing academic but I've struggling socially in that space I was able to find some of my closest friends and truly enjoy what probably should have been some of my worst years of my high school career sincerly Isabella class of 2024 thank

023you your time Brenda could you could you uh also talk about your Grant from the Pickering Community Club yeah um we received a very generous Grant froming club and um we were able to purchase the remaining well well all the equipment we needed for p broadcasting Studio which is a place for um students to 100% lead their own Student News production um there's places for them in front of the camera behind the camera in Graphic Arts and Music and it is truly a student vo newscast that we are working on getting better and better with um but just like them I'm learning as every box is opened and thank you to that generous donation we now have everything we need to even do live streaming morning announcements that's awesome so please look forward to additional

024um Productions from Eagle broadcasting and we do have a YouTube channel if you would like to look at our previous episodes again it is 100% student done so it is definitely not perfect but it is getting better and better awesome thank you how many kids this year left from 8th grade to the high school that were in the High cat program nine nine and we had 92 kids that moved over is that correct nine we ended up with 90 so that's so great we're promoted will you then track those kids at the high school that's what I want to figure out how to do that is what I want I would love and because of this community I actually have a chance of that having that happen having them come back after graduation again four

025years later that that's what I'm going to be focusing on the few days I'm going to continue to work the summer is how to get more quantitative data on the effective sore program because especially we're putting dollars into this we need to know that it's working and that is it's benefiting the students because that's what's great thank you that's awesome any additional questions comments um yeah you were talking about the expenditures those are from Grant funds or those come from the district no that is I grant funds purely for how cap CES for anything else yeah and then state of Washington has been very generous with that funding um recently new legislation legislature sorry has um increased that so but it is a set amount it doesn't go up or down depending on how many

026students you have so we identify one or 100 it's still the same amount of Mone okay but again we're pass right next about the kids and getting them with each other so they realize they're their uniqueness is wonderful and not weird that's awesome I appreciate that you're expanding that net I think that's really cool and I like that you are addressing the social aspect of it as well not just the educational piece so I think that's brilliant I appreciate you sharing all that any other questions yeah you were talking about the the top 10% in the different categories and I think there were four four total categories now is that 10% out of each category or is it 10% of of all each categ so for all students who are scen that have an i

027the top 10% of those students we will pull additional data for them so that should increase our numbers exactly exactly my goal is to become the hiop District of Mason Happ my goal is that parents who are looking on where to move is I Nevada was one of the first things I was looking at where can my child the education because he is highly capable and I hope that as we grow this program and as start collecting more quantitative data especially long-term studies that are in moment is going to go through the roof because everybody W county is going to want to bring their child here and our waiting list is going to grow that is my prediction my hypothesis and my plan awesome thank you thank you all right up next we have the

0282024 2025 we oh sorry you're right yes so we have Apollo sorry my printer was on the fritz this morning so can share that would be fantastic thank you very much my goal is to be brief tonight but also answer any questions you folks have uh I get really excited to talk really fast so if you need to slow me down just call me for a timeout and I will uh my name is Scott Lewis with ap solutions group we've been working with pioner school district for going on five almost six years uh started this process back in late 2018 and uh finally had some great news to share um we should have been funded two years ago I'm not mad about it but now we're here and got funding to talk about and also

029a solar project as well so uh in this presentation I kind of come up with a kind of a rehashing of how we got to this point I do have information on Apollo if you're this process um but also not to you know go too fast to say this sounds stupid to be true what's of the details all that kind of stuff so um in this got a brief agenda uh the 10,000 F you about a PA solutions group is that we are an energy service company that looks for ways to reduce energy consumption and existing buildings which means we deal with uh energy retrofits so Windows lighting hbac uh Roofing projects ET and also sold so we don't do anything with new construct at least my group doesn't but we come to the district

030with this waste of fund projects with Grant dollars um try to steer the fear of local taxpayer dollars but anything federally or Statewide that we can get will go after um so on this third page after the agenda we don't need to read every word on here unless you guys like me to uh but this uh this page just tells a little bit more about AA solutions group uh we are a division of the fifth largest mechanical contractor in the US um but we don't just give the work to Apollo as a whole so our group um is significantly less than 2700 employees that we employ Nationwide uh we have about 30 folks on our staff uh engineering and construction Under One Roof um but what we do is identify projects go take them out

031to bid have Apollo bin against local contractors anybody else we want to keep the bids honest uh but we don't just have to work to opollo so we prefer to work with local contractors just so you know that money's staying local uh but then also so uh that their pricing is reasonable and not ging anybody uh and over the last three grand rounds we've gotten over $120 Million worth of grants for our clients mostly in the K through2 uh Market they doing okay on the speed yep okay um one of the reasons why the district chose to work with Apollo is our three guarantees we guarantee the cost the Energy savings the performance uh if we say something he's going to cost $100 and it comes in 110 that's money out of Apollo's pocket if

032it comes in under uh that money stays in the district's pocket so at the end of the project um and and I'll get to the reasons why we have to get that money back or uh can't come out with our handout um but uh yeah essentially it's everything's open booked so you see all of our bids uh where the where the costs are um there's no hidden fees nothing on back end of it on the energy saving side of things we say we're going to save $10 uh per year we save you 11 awesome we've done our job if we fall short of that we have to write you a check for the difference so we don't just a project leave it to you and say good luck we're going to come back a year

033later measure and verify those results obviously we'll be keeping tabs on it monthly just to make sure that everything's operating as intended that's why we have Lloyd here he's good at holding our feet to the fire and then the performance of the system and equipment we install um again it's all about making sure you guys have a good product so if anything goes wrong want to come back and fix it because you folks have a bad experience with us you won't say nice things to your ders and we can't continue to work question com back okay next our five step process I'm going to bre through this one uh we started uh to identify projects back in 2019 uh we brought those to Opi for potential funding um we got into an investment grade audit

034a few years after that once the district received a planning Grant uh that planning Grant paid for a portion of our cost to that date but we've held on to all the overhead expenditures site businesss different things like that that's all a part of the grant task uh but we didn't build the district branding beyond what you receive that planning gr uh what we're trying to do now is you have access to the remaining funds of that Grant uh we would hope to start construction we'll get under uh Construction contract over the coming months and then build this project in the spring and summer of 2025 so we want to take a little bit more time on the start of things get the design right get everything procured on its way so there's no issues

035with u any sort of short sight or shortfalls um and hopefully folks are okay with that uh first is I know it's been a long waiting for five years but it's a little bit more time and then this St five is meas verification this next page is about the Department of entprise Services which is what the district chose to to work with um and how you procured our services you either go through an RFP process and select us with our pricing or you can select the DS energy program and say all right Apollo you're on the hook for developing these costs and you have to wait until you actually have a grant to be able to go forward uh the big thing about this process is that it's easiest on the district you don't have

036to hire a project manager um and then also if you get audited on these funding F funds AFF act you just hand them de's card and they take it from there there's no additional resources necessary all of their fees are rolled into our costs and it's all our open book as well we doing good on the speed I feel like I'm slowing down I don't all right so this is a pro project status in the small rural School modernization Grant over at the elementary uh the district isign to receive $ 4,851 th000 um and what we are trying to accomplish with this is the hbac upgrade Lloyd has changed out thir uh 14 of the air handling units that were installed in 1993 we have 30 left to go so we'll change those out and

037then also tie them into a control system which is the same system as here at the middle school um we'll do change out every lighting that is not led to LED and then we'll also be uh looking at a sec security system similar to what's here at the middle school and so with that Bas of funds anything that we can come in under budget on will be used for additional projects um I want to be sensitive about gr dollars because it is it is you know the greater taxpayer dollar at hand it's not local taxpayer necessarily but I like to look at it as if OSBI is going to be giving these funds to somebody it might as well go to you and then that way you don't have to run a bond or a

038levy to to get these dos so um that's kind of the status update on that any questions on that so are you going to provide a planning timetable that lays out you know each of these uh projects the timeline that you're going to be implementing the changes absolutely so I mean that's that's one of the things I can say our district office we bought to get that and just really never aied that and it strung out it just kept stringing out and out and and it it would be nice to understand what that is so that our folks know that they're not going to walk into a big yes that obviously uh Manpower is a huge issue so we want to adjust for that to make sure that we have Manpower through the summer once

039school starts the kids are back in we don't want to be touching anything in the building so our goal is to get under contract finish the design get the long lead item equipment boarded on its way that needs to be stored by us or by the district uh for a period of a couple months that's that's something we can talk about but the goal is to start maybe on spring break and then slowly start changing things out if the district requires us to work swing shift we can come in at 3:30 every day and work until 2: am and and and do it that way um or we can just wait until the summer construction period whatever you're going to have a project engineer oversight be able to give us updates they uh construction manager

040and site superintendent are a part of this project our site superintendent will be on site anytime when there's a subcontractor on site um and so they'll be the they'll be the person to talk to on a daily basis about that uh we'll share six week look ahead schedules and anything that we can to uh you know prepare the staff for working in their rooms so you mentioned long lead material um has there been problems with proing the required material uh it's actually got it's gotten far better Co um but that was a that was a huge shake up um chillers were at 1 point 75 weeks out uh but uh fortunately for this project we don't anticipate any uh super long lead items that would C so we don't need to go for anything right

041now no sir it's just where if if we had to go for something right now to get it BL for this partless season next year uh we would have pushed to get in contract faster and maybe sped up that process but I think uh by taking our time a little bit right now maybe taking another month to get our because everything going in front of tees has to be approved uh we have to rethink everything out you know down to the te because if you miss something you can't come back district with their hand out so we're trying to take a littleit more something that help so that's the does anybody have any questions on the modation well pre-construction meeting obviously you're going to have all the players at the table at least one time

042prior to Startup um and so you know with with Sean he mentioned our facilities committee that's probably the go-to here the school or facilities committee um Lloyd May you know so yeah that'll be good for a pre-con meeting absolutely yeah and we want to incorporate as many players as we can to to update because obviously uh you know we would love the public to know what's going on too this is a big project I mean it's it's going to take the elementary school for another 30 to 40 years before you have to make any I'm not gonna say anything beond that but we're doing a lot one of the nice things about this grant that OSI and the leg lure helped us with is originally was 4.25 million from 18 and we as you see

043awarded 4 point a little over 4.8 to cover those inflationary costs it would have been really difficult to do the scope of this project with that original 4.25 so just I have a question I see on the last page that we have an up up front 30% match that will be reimbursed how will that um 30% match uh fit with our budget situation you want to address that so that you're talk on the s project right right yeah yes okay so do we you want to jump to that bu real quick that's a different project oh yeah it's a different project okay this question will be the same but so then this last page last page before the last page uh is the solar was battery backup last summer we applied for a grant and

044just if we were one point away for actually receiving the grant moving forward uh uh call said hey we actually did receive it this year um so we are ready to go uh however this pricing of one uh the budget of 1,696 374 uh is a year old so we have to go back and reprice what obbi what Department of Commerce has allowed us to do is go back and reprice things to possibly reduce the scope or to make it more budgetarily friendly for for the district um so The Upfront 30% match that was required they they're funding 70% of it we're coming up with the remainder of 8,912 what that looks like though is as soon as the project is closed out we get an operational then we 45 days later we're able to

045apply for a federal tax incentive even if the district doesn't pay taxes we still have access to this incentive so that will be reimbursed to the district what some people have done is gone through um craft three which is a nonprofit uh lending firm that uh basically their fee is 1% of the project price and they have an offer to upfront those costs and then it's an annual it's a monthly payment until you get reimbursed and then their their loan goes away so we can engage with them and start talking about what that looks like from Financial perspective but the goal is to have enough uh time and effort into this that where we get the get the array install on the roof you see the picture right here get the battery set up the

046batteries as long as lead item on this on this uh uh project and then once it's off operational where you guys are getting Energy savings from the EG you have battery back up for the cooler freezer oven and cook Tu and then 45 days after that being to get you your incentive so what if the roof uh roofing material needs to be replaced or upgraded because I mean it's been on there for a while I think we've replaced some of the roofing but um you don't want to put solar aray of whole right correct and just so you know it doesn't actually sit directly on the roof it's a ballasted system so we have supports on on the hedges and then it kind of sits across um you know obviously I think May apply for

047this last year Lloyd wasn't super concerned about the roof at that time we can do a whole other analysis to see if it needs to come off don't I don't want to sign you guys up for brand new roof at that point but if we need to move it to the ground I mean we have a little bit of area back there on the south uh Southeast side of the of the southwest side of the school um if it connects the battery right outside the kitchen with that be would that be okay you but the thing that we'll have to take a look at as we get closer is maybe get a roofing contractor out and see what's the life of this roof on this building and then once we learn that then maybe get

048back and say okay they they're suggesting it'll go 15 more years it's not I mean even when the solar uh panels are installed on the roof if we had to have a new roof 15 years down the road those gr companies take those brackets off move them do it any I mean they can do that so I think we have the first thing is we have to take a look at the life left on this roof so there's a lot more homework that needs to this because we're just notified the last few weeks um so over the coming months we'll be coming back with the Energy Services proposal for the small R School Grant we also have an update on solar once we get our subcontractor down here to look at it again uh roing

049contract we take a look at the life and then we'll come back with some IDE is that works I just had a quick question so you said that you apply for a tax uh I don't remember the word to use I apologize incentive uh incentive yeah so um but does that mean that it's not guaranteed no I'm sorry I should have my phrasing is bad on that uh you you will get it so this is part of the the Biden administration's uh goal to uh invest in Renewables and I I'm surprised that we don't have lower prices on solar at this point in time because we've been trying to do this for years but so yeah thank you yes um before the solar project you were talking about the lighting and upgrading to LED and

050upgrading our AAC um all of those things do you have an idea of what the energy so it won't cost our district money at this time right but do you have an idea of what the annual Energy savings would be with those upgrades yeah I and I apologize I don't have those numbers right right now what the engineers on our team are working on is getting those accurate calculations so right now we've kind of for years rejected what those savings would be but our documentation to the Department of Enterprise Services has to be spot on um and so if I can just great me and I'll we submit our proposal I'll give you those final details right okay okay thank you anybody else have any questions I I think I went way over on my

051time totally fine one thing we the district is a level two assessment the district that applied for a grant so uh based on our documentation uh we'll submit that to obbi then the district will be getting funding back I want to say it was 50 cents a square foot or something similar to that so um that's additional dollars you can spend for whatever not with the Poli any other questions all right thank you very much I appreciate your time okay now we're up to the 2024 2025 budget hearing f okay so I'm going to talk first is not tax doll hi is a state program which state tax dollars are used um but the she is make is that it's not localy dolls it's not the the ly that our voters um are years so

052I just want to mention that going through going over our 2024 2025 budget we talked about the majority of actually all the items in this presentation last Tuesday um there's been a couple of real minor changes I'm going to point those out as we go um there's been really one minor change that that you guys see but with that I'm just going to go ahead and get started we have our enrollment our projecting enrollment next year we're projecting 714 the current year we ended at 737 and this is just a fiveyear fiveyear Renning history so you can see the the impact that um Co really had on us L kids school um and made that and next here we have our fiveyear staffing history um so our Trend you can see with Co we we

053I don't know if we laid people off I don't know the correct terminology there but we reduced staff um and then our staff numbers climbed again in 2022 2023 um 2024 we're projecting 99 on this is FTE um last week you guys or yeah last week you guys asked me to get some figures on like departmental numbers um so I went through and did that the 62 CS um certificated teachers or certificated staff members that's the Red Bar um 56 of those are teachers two of them are counselors and then there's four admin included in there and then the 37 FTE for classified that's the orange bar the middle bar um and that's actually get made up it there's more staff members than 37 uh this is full-time employees so um a regular classified staff

054member is into full if they're working a six- hour schedule um they're not the 1.0 full F so that's why the numbers here aren't going to quite match up but um the classified staff is made up stud four of Staff nine bus drivers and that includes our St bus drivers ums we have four classified four classified admin five secretaries and then 27 parent Educators that's for general fund for fund balance projecting a $1 million being balance revenues of 15,22 694 expenditures 15,21 15,000 and then that would leave our ending fund balance of 734 um that projected ending fund balance we make up 6.4% of our budgeted expenditures one of the the difference I want to point out so the revenue was 15,99 last week there is $3,000 revenues I the budget and this is based

055on after EST per review they suggested I so that balance $3,000 there the budget revenues are made up of local taxes just over 2.8 million local non tax support which is local Brands like Grant picker Community Club um entities like that donating or providing support is $7,500 our state general purpose schs are 7 76,000 State special purpose is 3, 223,000 federal general purpose is 12,000 and that's the U that's Federal Forest um tax revenues and then the federal special purpose is 1,363 2000 that's programs like Title One and title two um Food Services is a big portion of that I please raise your hand or me if you have any questions next budgeted budget expenditure program regular instruction that's just basic B 7, 63,000 Federal special purpose that's where the s bers g through next

056year at zero special education instruction to9 2, 329,000 vocational education instruction and this could change if we're approved for CTE we would need to come back a extension and add some in C but vocational education instruction at the moment zero Skill Center instruction that's only for high school districts zero compens education instruction that's 1, 278,000 other instructional programs is 2,810 Community Services 3,000 and support services is 3,979 can you remind me what the community services these with yeah so the the $3,000 there is um there's money set aside in there for the for the garden um that's a portion and then the other portion is the high Community cids the we created that budget C this last year thank you budget expend by activities so teaching activities 1 million or sorry 9, 15,000 teaching support

057is 1,5 30,000 other support activities is 2738 building admin is 410,000 and the District administration is 1,433 objects certificated salaries make up to 6 236,000 classified salaries make up 228,000 employe benefits make up 3, 210,000 all in all that's about 75% of our budget there um and then we have supplies instructional resources of non- capitalized materials 792 purchase services 2,749 and there's a lot of well there's a few contracted employees in there such as a psychologist a physical therapist an SLP and maybe one more school nurse um but but those costs are included in the purchase Services category there travel with and capital out is 15,000 this next slide is this is just a um so a couple of years ago legislature um started requiring District to disclose their head Soxs costs um this is

058where I just I I look at what our funding for mofs are Material supplies and other costs um non staff cost basically non um non salary benefit costs um but our mof revenue for the year is 1, 94,000 our projected M Soo expenditures is 2,100,000 um this this kind of goes to show part of the problem in the state funding um in that equation and um you know the majority of our costs M Stock's costs are not high that's uh just over 600,000 and then we have utilities costs um and the amount that the amount of funding that legislature provides to districts across the board is not enough to pay for those for services so this the state wanted to start seeing some some visuals here's our visual we are in the red on our

059M Sox by over a million dollars Chris can you can you remind me again about program one and program 97 yes so program 01 um and that's basic education so that's yeah that's just the normal classes um not your not your title programs or anything like that that's basic a it's your sixth grade teachers your seventh grade teachers um your class class fa Educators stuff like that well sorry I'm talking about s but it's class associated with just the sixth grade classroom classroom not the high person um with thir class that's associated with the in student or in inperson learning um program 97 that's Support Services is Support Services support services so that's um that's where our utili um payment comes from that's where our Insurance costs where those come from things like that can

060you remind me again um what our nonh high fees were and what they just increased to right did they just almost double so for the year we've paid just under $600,000 for this current year last last year's budget for the current year um we only budgeted 400,000 so this year we're budgeting and and um is calculated out to per student estimate um I want to say that the the figure is 630 in this current and we hope it stays that way what I don't understand is how we don't find out what the what the feat per student is until later in the year yeah I would think that Shelton in doing their their revenue projections would have to know that with the time they do their budget yes I know but I personally would all

061on somebody else's projection to to project plan on then the reason for it is they have to see how many students are actually enrolled and then they build all the amount of students actually enrolled um you can't you can't we can't they can't take the number of of our students that live in our district um they they might drop out so it's unfortunate but yeah that's that's the way they do you by any chance know how they come up with um their amount that they charge us for it's based on Global Tax ly rate and your per student figure um I believe it's the lower of the the serving districts so let let's just use Shelton Shelton school district for example Shelton School District's local ly rate per student is $1,900 I'm using round figures

062our lcal Lev rate per student is $22,100 so we pay $1,900 per student um that is enrolled there per ft that is enrolled and then we get build um see December is a December is a true up of the previous year is the final billing of the previous year and then the the main payment that's the one where um where really I made L stake in my budget last year why we were so far under um that's where we find out the current year and without reaching out saying hey how many how many of our students are rolled um earlier in the year I it's hard to project that um did that answer your question yes um part of that which just um kind of bothers me that we lose our funding person it that

063they get our funding for student and then also charge us to have our students go there so they get like double funded when we send our students there and we're losing y it really yeah that was the that's that's the whole basis behind the the land purchase and trying to get a trying to get a bom on the ballot to build a high school on ASP next um we have these revenues down by um I guess Club category General SM body we have revenues of 4,950 Athletics of 2000 clubs of 2250 and the clubs is it's yearbook and then the student store um they opened that up the second half of this year by a b um and then expenditures general student body it would be 24712 um Athletics 6,250 clubs 1,800 and private monies

06413,430 the reason the expenditures are so so much High values is because we' been carrying and is balance a good portion of that is for the elementary school which you guys are wearing last week um we haven't been able to find the Constitution so we haven't been spending that money so pass that Constitution that frees up another I want to say it's 12 $14,000 for the elementary school um that they can use on ASDF um so that's a big plus for them the other thing I wanted to mention is the private monies um that is things like the lukemia Society um pains for patients um and the big chunk of funds that are sitting there now are at risk at risk funds so when when we have atrisk students um they can apply for ASD

065money ASD assistance basically and I can go through the the ASD they'll go through vote on we haven't done but they will go through and vote on um how much do I guess give to those families that apply um in summary our beginning fund balance is 45,000 um Reven for the HP is 9,200 expenditures be 46192 and then the anying fund balance be 8,4 the service fund there's not very much activity here at all um revenues we have our our bonds that we passed in4 14 and have been collecting on I 20 year bone so 2034 2035 somewhere around there beend this one we did bring up the possibility of refunding because of because of outstanding or because of rates and the health of our de service fund um so that more information come in

066the future on that but local property taxes 1, 620,000 um locals local support Bond tax which is just interest revenues is about 30,000 our bond payment next year is 630,000 the interest payment will be 940,000 and that's split up into two pieces um half the interest is paid in May after this PID in December and then $5,000 uh the beginning fund balance for the Deb service fund is 874 with the revenues of 650 expenditures of 1,575 that bring na fund balance to 93,000 project F Which Scott talk about a little bit this will be the activity the beginning fund balance there's 32,000 revenues and other financing sources 10,1 140,000 expenditures 10,138 th000 ending fund balance 3979 the reason the reason we budged all of the revenues all the expenditures um even though the last project

067onization gr 20222 application that one go through not a year or two um but in order to prevent losing that information first of all [Music] but it gives us capacity for those for those Grant so the small schools modernization Grant got talked about the lighting elementary school security that's budget is at 4.1 million Sol Plus Storage grant that should be7 and then we have the last small District modernization Grant which I I believe I talked about what was included in that application last time last week additional space construction or remodel Elementary Gym cafeteria um to to give a dedicated space for lunch and then and addition to the Middle School um with the St Val form 81,000 and that's that's all the activity that's Bud profits now Chris this this does not include the retention

068money from this building we have we have not received that that will go into capital projects last is the transportation fund um our beginning fund balance is $265 ,000 revenues 236,000 expenditures 400,000 anding fund balance2 209 um the only real activity that we're projecting in the transportation vehicle fund is um the appreciation revenues from the state um so bus is when Buy on 1e appreciation schedule we're paid out every year um and that's the the state helping the keep our fle new and running um the expenditure VAR is capacity if we need to purchase a bus we can if we need to purchase a couple of different short buses for the spend Department we can um but we don't need to with and what vehicles we have that's all I have was quick but short

069Point um questions thank you for um kind of revamping and for your time last week where we got to really dig into all of this I appreciate that time it's to me thank you for the cont all right thank you any questions okay so that takes us right into business operations then ready space on the charts the charts and the summary for this so I'm just going to read off question uh no we just have the big one but our aage year we aage 736 ft so in contrast we're budgeting 714 that's 22 difference that's about different we're projecting between our eight grade class that just that just promoted and our ke class next year for the general f we have revenues in May of 176,000 expenditures of 2 m 69,000 um there was a

070lot of the expenditures um those included our second the second half of an non high payment which is about $300,000 we paid for the school resource office contract which was 70,000 Elementary School roof had repair that was 50,000 and then free do our um records management project to dig digitalizing project was about 200,000 for the month uh and F the balance is $842,000 for capital projects fund we had $127,000 revenues $66,000 expenditures the any fund there is 151,000 the Deb service fund I mentioned we we made our interest payment but we had $143,000 of revenues $474,000 of expenditures that's that interest anding fund balances Chris do you have um this one just because it's hard for me to follow along in here oh that's the other one okay got it what's the oh yeah okay

071never mind sorry refund uh revenues of $751 expenditures 2052 um I believe this was a portion of their you any of state which is why the there any fund balance 4,676 and then Transportation vehicle fund we had um $342 to revenues no expenditures the ending fund balance is bus Mich I'll I'll send you guys copies of this report to it so you have the numbers in Fr you questions maybe once we see it we'll reach out if we do thank you okay superintendent support yeah you have a a copy paper copy in front of you just want to hit a couple highlights um as mentioned we are almost done transitioning into the new building we've got a few more um cabinets and desks to move in um but um hopefully you'll get an opportunity tonight

072we walk over and see the progress that's been made I think if I recollect correctly two of you have not been in it at all and three of you have been in it in different phases um so we'll take a look at that tonight um good news is that we have the Washington State extend exension office on our weather station they should be working on that this week uh that is a 32 feet by 32 feet is the um um foundational piece so it's going to be pretty substantial weather station that they will be installing um I do want to recognize Dan Deacon and Melissa carrian for the work on getting volunteers they've got a lot of volunteers that are working in the garden this summer to keep it water to pull weeds and to

073help with harvesting um so I appreciate the work they're doing um talked a little bit on in about the budget documents um kind of from our conversation last week so um that's in there um wanted to update you on our hiring uh process nothing has changed we still will be looking at August to fill those vacant teaching positions and as mentioned before we're going to hold off on the one kind Garten position until we look at what enrollment looks like I do want to publicly shout out to Lloyd and all the work he's done in this district office project he's been here since um it started I think he might be the only one that's that's still here after the thing started in February of 2021 and has followed it through he has represented the

074district um very well um he has stayed on top of it he has held the the company accountable um for a lot of the things that needed to be fixed and sometimes dragging their feet um Lloyd would talk to them about the amount of money that we're spending on that that the grant is and please do it right so again Lloyd's done just a fantastic job on this so if you get a chance again tell him thank you well we got occupancy Friday and so uh we've been moving in this week nice any questions um I don't have a question but I do want to say I think it's really cool that um a that we've got people who are working the garden over the summer but also that um you know it says in

075here that as things are ripe and ready to go they don't just sit there they're going to be you know let the community know we have them available or donate them to the food bank which I think is fantastic so I just want to say thank you for that I think that's really cool any questions questions or anything for CH who's the contact person on that for volunteering during the summer Danon okay or you can contact me and I'll get a hold of Dan because Dan's not you know obviously he's not here all the time okay up next we have discussion and action items um the first is the approval of the highly capable program do we have any I move that we uh approve the highly capable program as described this evening all right

076do we have a second yeah I'll second that thank you it's been moved and seconded all in favor of the approval of the highly capable program say I I I opposed the motion passes thank you up next we have approval of the Pioneer Elementary ASB Constitution which we were able to also look at um a couple weeks ago um are there any questions pertaining to that at this time no questions or discussion okay do I have a motion to approve the Pioneer element ASB Constitution I move to approve theary ASB constition thank you do I have a second I second thank you all in favor or it's been moved and seconded sorry all in favor say I I I no opposed the motion passes up next is approval of resolution 06 2024 lower ending fund

077balance for the 2024 2025 fiscal year this is what our um meeting was about last week as well do we have any questions or discussion I have some discussion I know we had a meeting on it last week yes totally fine thanks change I I I just I I was having a I like that nine even 10% Reserve in our budget we we establish um our estimated costs and our estimated rence to the best of our ability I understand that and that's probably one of Jeff's biggest jobs here is to try to make budget right I mean that's that's the goal is that we we don't um sacrifice the learning of the kids to make budget but we make every attempt to to meet the bottom line right and so in having an excess amount

078of money at the end of the year on top of having our 5% um I I'm almost leaning to say hey let's go into this with this is what we budgeted to operate for the year and we're going to do that that's our goal that we don't need a cushion plus we have 9% if we stick with the 9% I I think I we were just we were just in the red just barely in the red at 9% if I remember no wor 300,000 s we were just a hair into the and that number changed so the updated number at 7% is 78,000 okay it was just like it was 2100 last week to the good now we would have to cut an additional 78,000 at 7% oh that's not in the good and then

0799% we would be cutting an additional 382,000 this 5% keeps us at 700 60,000 as policy and right now that we would not need to cut anybody and you we can use the word cushion but that money is not budgeted to spend right it's there and and hopefully a year from now we will be adding that to the ending fund balance that's obviously the goal to get there but the other two numbers have us making additional Cuts I just I thought we were closer than that but yeah we were yeah we were yes well and we didn't have the final payroll which um last month so our payroll for this Friday came out a little bit higher because we had some U time carts and we had um we had exact numbers on substitute costs

080so we will have one more adjust in payroll in July that will pick up any costs associated with the last two weeks of school in June we'll carry over into July for the payroll but it'll be significantly lower okay thank you any other questions comments discussion okay um do I have a motion to approve lowering the ending fund balance for the 2024 2025 fiscal year I move to approve lowering the fund balance to 5% for 2024 of 2025 still year yeah I'll second that okay it has been moved and seconded all in favor say I I opposed that motion passes up next is uh approval of resolution 07224 for the signature Authority we have that we have any questions or discussion regarding the signature Authority I move that we uh accept resolution 07 2024 signature

081Authority as written have have a second okay has been moved and seconded all in favor say I I I opposed that motion passes as well up next we have approval of resolution 08 2024 for the interfund transfer um and this is well can you kind of go into a little bit about what that required exactly um $100,000 Chris why don't you explain the 100,000 from transferring it from general fund to capital projects so so with this is for the district office instruction with claim indirect costs um for's Direction they said to um claim all of the indirects that you can on this grant the indirects go directly into the general fund whereas the direct expenditures go directly into the capital projects so what this is doing is basically taking some of those those dollars that

082been claim as intera and we be those projects and this this will get us through the end of the project um with our invoices that we have outstanding and well with our invoices that are to be paid at on 28th uh checks for those and then there's a couple later outstanding invoices that haven't been in but um this will get and this is going to be reimbursed through the stri the the reimburses have been coming into the general fund for the inters already so so they've already came in and this this transfer is um factored into the budget that I just predicted earlier um so with with that if if this isn't approved then the other budget would be $100,000 over but we can't make our payments so that's a nice round that's a nice

083round number that 100,000 what was the total what was the total of of funds that were reimbursement funds you're going to take 100,000 of it and move it to capital projects what was the total number I have to look I mean I just wonder how you come up with that with the 100,000 that's just a need basis yes yeah it's a need basis I don't want to pull any more from the general fund than we have to okay but there was more than that in indect yes there will be some I guess retainage is the best word from that building like we're talking about here but we've waited a few years to get this retainage once everything's finalized in that building there will be some retainage but it comes back into the cab you got

084to remember to put in for right oh we yeah was this was this an anticipated um transfer yeah I'd say it's anticipated with the guidance from ESD on the on everything there's nothing we can do in this profession without having indirects like every every facet of where our funding comes from like OSI we get grants they're going to wh withhold usually around 8% for their costs for in their indirects ESV they're going to withhold some of that funding because there's some cost at their end but then we get that in some cases back to us but never all of it and in this case you had we have to estimate to cover I think that's important most most programs most state funded programs will have will um allow you to claim indirect offices because there's

085this is those Pro that program 97 those Ms that $1 million mxs that aren funded this is the inter C go help make up that any additional questions okay thank you I appreciate that um all right so do I have a motion to approve resolution 08224 for the inter fund transfer I'll move to approve resolution number 08224 for uh transfer thank you do I have a second I'll second that thank you it has been moved and seconded all in favor say I I opposed the motion passes up next is approval of resolution 09 2024 for the adoption of the 2024 2025 budget and four-year enrollment projections I move that we adopt U we approve the resolution 09 2024 the adoption of the 2425 budget and the four-year enrollment projection thank you do I have a

086second I'll second that thank you it has been moved and seconded all in favor say I I I opposed that has been moved and seconded and motion passes uh that takes us through our action and discussion items and into any new business uh I just have one comment I don't know that it's business but board share pardon we can move to board share if nobody has um I just wanted to make for our board um to acknowledge the passing of Mike Felton who is a 25 year uh board member maybe I think the longest um you were going to check right the longest serving um School Board um board member for Pioneer School district and who did many many things for the benefit of school including um taking lead and trying to get the new

087building put together and passing um our Levy and um our our condolences to you Sean as well um anyway I I hope that we can I would I hope we'll be able to put a plaque up someplace and honor him for this years of of uh service to the school district I also want to recognize Mike for his service to our country he a Vietnam veteran 100% disabled he U he did wonders for our country yeah awesome thank you guys for sharing it's important any other board share items okay do I have a motion to adjourn I move we adjourn and a second moved and seconded all in favor say I hi hi and meeting is a thank you gather your stuff we take a j over there oh we need to sign

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.