001e e e que TR presid Betsy Ross here Mike m here Melissa Samborski here and laano kamacho here all right please stand for the pledge un States naice okay items for discussion the capital r referendum proposal okay so the first item here has several exhibits for you to review I apologize for uh the late notice but I just got the de Tronics scoreboard proposal that includes the installation shipping um separated between the indoor and outdoor projects uh so you can see the cost of each of those uh what's not included is the electrical work we do have a great electrician that we use for all of our work so we weren't able to to get a quote from him because we needed the specs of the project and that just came in at 420 here

002um so just know that it would be slightly higher than that um what I want to bring your attention to is there are four documents they're labeled very similarly in the packet uh the first one is called Wilmont Thim SU a and and and fimm basically stands for the project list okay so fim suum a is what I presented to you at the December working session it's the the needs based referendum proposal so all the things that the board had discussed a year ago and seemed to be consensus with um you know when we discussed it in December um at that meeting there was some interest from community members from for us to explore the potential of adding Turf infields to the varsity baseball and softball diamonds and and then we added um some public

003comment opportunities at upcoming meetings and another Community member asked us to look at scoreboards and and we had looked at some detronic scoreboards in the past Mr Christensen here um had brought that to the board more than a year ago now probably two years ago now um digital scoreboards so we had Kevin come to our our last meeting and he presented updated for for that so thimm A is the needs only fimm B is that needs only list plus the baseball and softball turf INF Fields now I want what I want you to note about that is in the fim suum a there is an amount set aside for redoing all four Fields with grass and actual baseball dirt okay which should help with the drainage issues on the infields so that's taken out for

004FSM being and replaced with the tur okay fim suum C is the needs only list in the digital scoreboards and the last one fsum D is the needs only list the baseball and softball INF fields and the scoreboard so the whole package what we have discussed plus the things that were brought forth by the community members who spoke in in public comment uh within the packet there there's a new exhibit as well it's called Kei softball plus Baseball Field Report and proposal so uh Mr nelon um is uh working with the company or work with company to do an analysis of the soil in our fields and it's not the proper dirt for baseball um it may not seem like a big deal but but it really is when it comes to to drainage and

005and and just the the flow of the sport itself there's some chemistry involved there some science involved there so you can see there's a report of what's in the dirt and what it's supposed to be so Dan asked them for a proposal to redo the infields so that we you know we have a better surface and it drains better there are three levels there based on you know how much how much of that baseball dirt they use there's a best better and good the needs only project fimm a includes the best for the two Varsity Fields baseball and softball and then the good level for the two JV Fields JV baseball JV softball and then it also includes the addition of warning tracks on those fields which we don't currently have and in some ways

006you can look at that as a a safety measure helps the players to know when they're getting close to the fence okay um so I wanted to make sure that you had the detailed report here we know we need to do something and the fields don't drain uh properly there's a lot of cancellations because of that and you've got two options in front of one replacing it with new grass and baseball dirt or the turf I also have updated tax levy scenarios in here for you I believe in the last uh packet when this was discussed we had tax levy Bond values from 17 million to 23 million I asked Mr Betts to update that to 19 million to 25 million that's in the document called tax levy scenarios you please I can't open finom

007D I get an error message so when you click on that it's going to download it as an Excel file and then you have to go up to the right where your downloads are if you click on that it's probably a circle with an arrow then you'll see it well see I get an actual error message though all the others download no problem so we'll get we'll get that figured out or we can pull it up here so body can see this is the tax levy scenario document so so what you can see here is um the estimated Bond term right now that interest rate is about 4.75% again just an estimate things can change between now and you know April um what the bond value is would be the amount that the district would

008be borrowing to pay for the project um based on these it's going to range between 19 and 25 million uh the levy amount uh per year based on equalized value and how it affects the the mill rate the important thing to note here is even with doing all these projects or even with doing a project regardless of what's included we're still looking at a drop in taxes for our taxpayers and that's due to the last Bond payment on the 2004 referendum so we can do work and we can still see the taxes go down that's great news um the estimate here is based on a $300,000 home now that's kind of the median home value here in the area um so you can see the change from this year's Levy based on the bond value

009looking at in the table so for example that Top Line there if the bond value is1 19 million that's going to cost the average taxpayer who owns a $300,000 home $120 more per year which is a savings of6 of what they currently pay per year so how much is that reduction from what to what is 122 so the reduction without any referendum is $282 a year on a $300,000 home so with the with the tax levy okay for the capital project1 19 million would be $120 20 million be $126 21 million be $132 so approximately $6 a year for each million dollars okay it's good sell and that's every year for 20 years again approximations but this is Da of math it's usually pretty darn accurate so I feel good about it were you able

010to get that document open Mr mats um she gave me the total dollar amount I need to see everything on it uh okay I mean I know the differences between them and all so I just wanted to see the dollar amounts okay okay so the the choice I have in front of you and and certainly you you can do something different if you like but but I present a um a four Choice scenario here based on the multiple conversations that we've had here okay and I'm looking for consensus so that I can bring an action for approval at the January 15 meeting we've got a real tight uh timeline I need to know tonight so we can work with our bond attorneys on how to write those resolutions what amounts and what we're going to

011put on ballot language and then if approved on the 15th then we'll get it to um you know the uh uh the clerks um so that we can get it on the ballot for April 1 okay so the choice in front of you of four options here is a would be the needs only presented in um at the working session B would be that list plus the turf baseball and soft all INF Fields C would be that list presented plus the scoreboards and then D would be all of them other other questions the D would based on what you were mentioning correctly about $18 20 uh 24 so at the bottom of each of the fim sums there's a a total for the project itself so looking at fim sumd the total project is just

012over 23.2 million okay okay 23.2 million that's the whole package so looking at the tax levy scenario you're looking at approximately 145 to 47 Dollar on a $300,000 home for each of years and then all the other scenarios are a little less than that that's the big one that's the big one child care is included and all that yep the the daycare uh proposal is included um and that's that's what I'm really excited about I think it's going to provide a valuable service for the community and and also for our our our staff our students get people in the building yeah um and it is important to note that um yes that doesn't have to be included in the referendum you know we can Levy for that outside of that through fund 80 or we

013can include it and if the referendum does not pass you could still let be for we'll just be a little B on theine we have to wait till ail to know whether or not to handle it that way so if the board is really passionate and excited about the daycare project you can still do that regardless of what happens with a capital yes Mr Christenson or Mr Nelson is there anything you wanted to to add to that as far as the project list goes and my explanation but bottom line even if we go for the whole package your taxes you can expect to go down $131 next year the amount that the school was love for yes and that's the message that you know we really want to get out to the voters is hey

014you know we've got some things that we have to do this is the most valuable building you know in our school district we've got to maintain it we can do that and your taxes should still drop yes yes good spot again it's a good spot um good s point if if if there isn't a referendum pass this year then the message becomes very different because the taxes are going to drop and then it would be an increase right which is why the board had elected to discuss it now for the spring so so it's a timing thing a drop or an increase really same amount of money the drop is the drop is only wilm's portion Wilmont school's portion of it correct I mean uh you could have other things going up that could change

015it as well I mean and and and we do have at least one of our Center Schools who will be going for a referendum at the same time which one I don't know if it's official yet so I don't want to speak to that but good it is okay um Sil Lake okay didn't they go last year okay yeah it's hard yeah can you tell me what a c and d is again Dr FL is way far away yeah um Miss Ross if you would refer to the executive summary that I have there it's in the background in the explanation that might be the easiest way to reference it do you see that document exec summary Capital referendum proposal yeah I have it all up so I'll look at that I was just you're fine

016yep how important are the digital scoreboards very it depends on on how you define importance they're very nice you know they're they're something that would make our school stand out in some ways you know it would enhance the game experience they're also very expensive yes you know so um that's that's the consideration what yes there's also that learning piece hope like a drive-in movie almost yeah interesting because Twin Lakes has a movie thing ands people so that would be cool for us to do that can you see that from the road no to the other side would be another found of framework okay so it couldn't be used for like uh school information or anything like that it's outo work out there to actually the foundation out there that's that the indoor scoreboards we did

017have a maintenance guy doing surgery on several controllers trying to make one or two work today out of the pile of parts that we had because it's so outdated that the company what's their life expectancy of the new ones no but the ones you're proposing buy it what is their life expectancy would they be at least a 20-y year life expect yeah are they guaranteed for that long like solar panels or anything I don't know I wouldn't expect them to last you know they're much more technologically advanced than what we have and you know just like your your computers your cell phones you know they they have a shorter life expectancy because of the complexity of thew another thing to consider with the turf is you know if the board elects to do that the

018current lifespan is8 to 10 years could be could be longer you know but but that's what you can expect it would have to be replaced but in either case we could still be paying for them after they need to be replaced or updated then if we do a 20e bond issue we would we would still be paying for them yes now there are there are ways to to pay like portions of it off earlier you know so we can do different Bond links I don't have that type of analysis you know but if we said okay that's a that's a 10 purchase we want to do a 10year bond for that we could um but but that's going to affect the tax rates um differently than what's presented just be aware that it would be

019less of a savings because there's going to be higher principes for those 10 years but if if we if we do the turf and scoreboards does that make the marketable for Revenue I mean can we oh yeah rent it out for games or yeah but it's not going to come anywhere near you know paying it off or anything like that yes we we could make some money what happens if they still flood over there with if we go with chk did someone ask the chk people so this this year we started uh with with our beautiful football field field um to do regular maintenance to our fields and they do a sanitation deep sanitation they're they're pretty much self cleaning but they do they come in and get any metal out of there and then

020they they do a deepan part of the part of the um drainage issue though that would be addressed here is in the Outfield you talk a little bit about that uh we do have some issues with drainage and a couple of the fields in the field that that would be addressed so this doesn't solve all problems just just be aware of that and if I heard correctly it's every 10 years we have to replace the sh so so they tell you it's 8 to 10 years uh Herm said that he thinks that it's longer and there's fields in the area that um have have been Place more than 10 years yeah so potentially longer than 10 um but the company will tie a to 10 and it also comes down to what's your tolerance I

021mean it's going to be wearing out but are you know are you willing to to play on a you know a surface that's not what it was when it was installed you can get more life out of it just like you do your car yeah yeah so basically if I'm hearing correctly and I apologize that I'm not in the in the meeting that if we do this Turf we're still going to have issues because the surrounding outside field is still not adequately upgraded and we still potentially could have drainages issues or flooding issues the major the major issues we have right now are the infield uh drainage um there's so much silt that when we get any sort of Rin it's more of a a bathtub it's not draining away I mean another thing that

022we need to consider is just the actual drainage underneath um there is a possibility that you know when they start to do the work you know we get into it like like anything you haven't worked on on the foundation in your house or you're having some major that you run into things um so um I'm not sure who put the proposal in for the turf if that was all considered but just to put everything on the table um it would take care it would definitely extend the plane season it definitely would make some of the um daily maintenance easier not going to solve every problem but I think it would you know would it would definitely solve the problem with the infield um you know lakes that we have April early did you have the

023chance to see the proposal I have not seen the proposal on the chur um we had the proposal from Nexus but it wasn't in full consideration because that usually happens with any construction you find stuff that comes or things that you thought were gonna be okay and they are or they are not so there's usually a percentage that give or take I don't know put some percentage in there um for a cost you know especially if we don't know if it be a couple years from now depending on how the referendum goes just for you know the costs increases and things like that um I think that there was some question in there but I'm not not sure it will all go for bid I mean it's like with anything you did the's we have

024to be pred pretty much any things so so either way we're I was just gonna say either way we're looking to U do improvements at the Panther Sports complex related to baseball and softball my original recommendation includes improvements with the grass and the dirt over there to all four Fields the question in front of you is do you want to try the the dirt solution or jump right to Turf and the turf is about $950,000 more so that's really the question in front of you go ahead Betsy or Mrs Ross no that's okay you're fine my question is if we stay with the dirt and upgrade everything there would that potentially give us an opportunity to know if there would be an issue if we wanted to look at Turf say three five years down

025the road if that was an option yes okay thank you because right now what we are debating is close to a million dollar south of a million dollar just give or take for the turf portion for the turf portion not knowing all the items that you had put up and then you're looking at so I think what M Rose is proposing is probably more S 5 37 is for the two scoreboard two scoreboard projects my calculations are right your a is 26.6 B is I don't understand that one he is with the scoreboard 271 and then doing everything is 272 roughly no that's not right um each of the fimm Excel files has a total at the bottom and and we're just looking at the immediate needs I think you might be combining the future

026needs with that okay I am those are not part of the capital uh referend proposal got it okay so it's in red yep no you're good I understand so how much better I fo would be if the fields had dirt if they had grass and if there was I don't know what the right term is but you know a mound sound doesn't sound right but when there's a crown on the field for that there are I've been on the fields you know I know I'm talking different facilities but Wrigley Field has it uh the white socks have it the Brewers have it yeah that's how they do it you know I mean it's it's you know like Badgers football field is that way you know and it I mean if we if we've got the

027right dirt's if we've got the right dirt and not the stuff that makes the silt then the water runs off of it and what I'm concerned with is you know it's hard enough to get the public to understand that we've need we've got boilers that need to be replaced we need roofs that need to be replaced you know and if we can if we can do this correctly for less money plus then we're not looking in a number of years to be redoing it you know think we've got a bit aren't we kind of showing that we're being more responsible with what we've what we're asking for you know because I mean if if we can't heat the school and if the if the ceilings are all leaking we can have the greatest baseball fields

028in the world you know here's one question too if we if we went with Turf and I don't know if anyone would know this if we went with Turf and let's say in 10 year 12 years we have to redo something to it and we can't get anything P our Fields would be nonusable correct not necessarily non-usable but could be could be less than ideal until they're replaced like you're talking about if it's starting to wear out but we don't have the money to replace them there could be there could be some issues with that um you know in a perfect world we would set aside you know $100,000 a year you know so that we have the money to replace it in 10 12 years but financially we're not able to do that right

029now I think the of the original turf was thinking what we've heard from Community is they want to be comparable Tools around us schols around us have all of their facilities football onlyf s andas Central has when you situations we have to surface be situations toet it's you know what what does the community see from all the other facili are upgraded from one our years ago yes we are how many is that I don't ORS are think I'm an old I'm an old baseball guy myself know some of the bestas played if you ask my son graduated years ago what the best Fields he played he'll tell he playing the is up inas those facilities created for them part of the problem Bas for half half the time and can we recoup keeping up I'm

030not arguing against it yeah I know me that's asking no I think uh it's it's unquestionable the the fact that if you upgrade the facility is going to look nicer comparatively to everything that is around the area and that is I don't think it's a debate what I what I understood before is that we put together a plan to upgrade to Turf and we didn't consider a lot of things not only we that is um somehow expensive about a million more um we didn't consider it's not going to be that's not going to be the end of it we have a series of things that we didn't consider so at the end of the day we are going to end up with a really nice fancy facility that once it rains it's going to be

031for what we intended it to that's what I think is a misman absolutely we we understand that you know theg bring you know better outcomes we just don't know if we consider everything here's what I'm as I'm sitting here and I'm listening to everybody and everything the problem I have and I unfortunately going back to that referendum way back on the um the other referendum we had way back in the day when we built the beautiful facility The Atrium and everything else there were additional things that had to be cut for that due to the fact that we ran into problems and we didn't have things all this is what scares me the most with these baseball field and softball fields going to tur we don't know what's underneath now that was why I asked

032the question if we go with what's listed as the needs only on that part of it we would find out what's underneath first and then potentially in years to come we could go for a referendum for upgrading that whole facility and unfortunately I don't remember every line item is the complex over on the needs only listing does that include the stuff that needs to be upgraded for the tennis court and stuff or no yeah there is um no not included sorry okay so at this point based off everything I'm hearing more than just the fields that need to be updated over there that aren't listed on a referendum yet we do have a sorry uh sorry to interrupt uh we do have a line item that was not selected by the board uh to um

033fill cracks install level leveling course and codings with markings on the tennis court and that's 157,500 so that could be included in the project you know if the board wanted to include it let's start with Melissa since you're on the end well Melissa thinks we should invest in the school I say go big because I'm going to at Le three more years I see this mama looking at me and she's like Melissa we need to fix this school and guess who votes for Melissa moms so I'm here for my people so go big and I'll go to Every coffee shop and talk as much as I need to wherever I got to go like a threat wherever meet raffle I'm here because we got we have to get this finished we we gota we got

034to do something because Missi don't need an umbrella over her head when she comes to work sorry Missi but we we seriously we kind of do something it makes me sad wait can I interject here before you go on sure here's the thing way back in the day when we did our uh uh survey I mean the community only told us 14 15 million that they would approved right so we are already asking way more for ABC and D I kind of I mean I'm hesitant to go with the turf just because if we run into additional problems now here's another question and this is why because if we get everything else done with the school and the turf is the last thing we could literally sit here and say we're doing chk but we

035run out of money we can't do it so we can do the 500,000 or whatever for just the dirt and upgrading all that correct Dr FL yep that's correct and I will also say you know we talked about wosia a minute ago having Turf that was not part of their referendum you I talked to Mr gendrin they had they had extra money left over so they did the turf with that so you know that's a potential option too depending on you know what the costs come in at uh the survey that you referenced we specifically asked the community if they supported Turf uh varsity and baseball and softball infields and on the survey they did not doesn't mean don't include it just you know just reference that keep in mind you know we definitely have

036some passionate people there's good Arguments for it but we're talking about convincing the entire tax bace about you know passing a referendum and that's something that they they said is not priority and here's here's and this is where I fluctuate because we're asking for 21.7 just by the need Which is higher than what people said they were going to so we're gonna have to sell this so if you go with everything and I I do believe the scoreboard I'm I'm in for the scoreboard they're going to be an assets they're going to be a draw business related you can promote and get sponsorship for so there's so much that could bring from the digital scoreboard I believe that we're not even hitting the surface with just asking for them and to sell it to the

037community and and yes it's a nicity but it's a nicity to sell to sell for people's businesses which where do people go grandmas grandpas Aunts Uncles friends you know the weekend when you have uh G IC and uh wrestling and everything else that is all going to be advertisement that's going to get out to community and help everybody um so what's really 23.2 I mean it's a lot another million 900,000 but we're already asking for way more than what we've in the past surveyed that people would be willing to pay so we have to sell this Community as a board as a you know teachers students parents that's all I got to say I think besides Herm does any no I'm not singling you out does anybody else know how we ended up being the

038second School in this state of Wisconsin to have turf on the football field it was not planned okay we tried to make a deal with the fair all right where they have the Midway we tried to get them to let us black top that fence it put lights up and use that for our parking lot so that the the parking lot on the south side of the school that was going to be where our practice fields were going to be and we could not come to an agreement with them there was one older lady that ran the fairboard and we just could not make that work so we were forced to put the the turf in uh some of the things that that were eliminated to even do that the baseball fields were alled to

039have lights so there could be you know the games could go on later if need be and whatever um that's the main thing that I remember coming out of that but it wasn't so we'd have the biggest and the shiniest that we had that we had Turf put down we had to so Marian what do you think I'm kind of in the same page as Melissa uh and and I think that if at the end of the day we end up with a really nice school and good academic performance and it's going to attract more people and it's going to be competitive in the community that's kind of the general statement I that I have about U number four uh proposal what I what I'm not exactly sure is if he's gonna pass the smelling

040test with the community at some point because I can tell right now that you brought up a series of um ideas that I'm not exactly sure if they were taken into consideration at the time of putting together the proposal uh so are we going to fall if at the end of the day somebody comes and ask those kind of questions I don't know if we have the answers and I don't know if we are going to be kind of you know robust enough to defend the proposal the main proposal the biggest proposal so having said that maybe we can go back and see if uh those uh questions were addressed at the time of putting together the proposal we don't know that and that might help um uh you know be uh or have a

041more defendable Proposal with the that's kind of my take see all of that was taken into consideration move forward with NI Chinese School well my take on this is uh I guess we have some very unique timing in the fact that we're going to have a $282,000 or2 82 re reduction in the referendum per $300,000 house so no matter what we do it's going to go down you know by some you know at least $130 something dollars so we got some pretty good timing to do that on it we got to make sure we make this happen um I'm a bit concerned on the turf in that again it could be a lot we could run into problems that we're not seeing so you don't know what's underneath there you know we could run into

042all kinds of issues there and and they make it even more expensive in all of that uh I think the scoreboard is good um I'd like to go with uh you know the plan C if you will uh and then maybe uh down the road look at the turf okay Betsy my first initial was plan C and look at Surf at a later date because we're going to see what's underneath there and see if we're going to run problem when you look at plan C and you're going 22.2 and then you look at Plan B and go 23.2 I get what Melissa is saying but I think I'm we're going to be split here because I I think we need to see what's underneath there see what problems we're going to run into before I

043put my name on in an Ence my name on a dted line saying yes let's go to tur field because we don't know and we're still going to have to fix stuff if we run into problems if I'm not mistaken if we put down the the dirt or whatever you want to call what we're going to put down an upgrade here so I would say sorry I find difficult to believe that the proposal was put together without consideration so there could be yes full disclosure I you know talking to Hans who's the engineer who put together these proposals they do these all go out to bid so there will be bids once you into the you know move forward with the project and they start getting the numbers get tighter so I'm my I feel

044my position is to be able to just put these things on the table and I can't I don't have my crystal ball uh you know but I think it's fair enough that that we have to consider these things and those numbers were put out there from an aerial photograph and walking in the site for one one afternoon they're putting together this is our budgetary number that if you want to do this in a couple years this is where we see this number kind of coming in so I'm almost thinking that one hour of conference meeting with them we could ask him some of these questions unfortunately we don't have that kind of time we well can't just call them right now no no I'm thinking about maybe not sure who they conted for the they

045put it as part of the whole you know much more some of the other stuff like storm Pond and uh you know type of things like that they they actually had Engineers that were like you looking in the mud and things like that the turf I think was I don't want to say was it was kind of secondary so he said hey can you you're back not not in the State anymore can you can you relook at this and put a budgetary number together if we were interested that's why we don't have that real concise inform out of curiosity if we went with something without the and let's say and this is hypothetical let's say there's things that come in left can you do one tur field at a time and change them over no

046we we we really can't because of Title Nine we could run into some issues where male and female facilities are not comparable okay okay thank you that's why they're both included okay yeah all the heavy equipment and everything okay so if I understand this right the difference between C and D is the scoreboards right turf turf turf yeah B includes the turf no scoreboard Mrs F Scott will you open up ex it's just scroll the background section there the needs can you enlar that so everybody can that's the needs plus the scoreboard and this is the needs the scoreboard and the got up there for you so it's a matter of going 225 or yeah 22.2 or 23.2 with you know so it's a million dollar roughly a million dollars for the term yeah all

047right so Mor you guys are in favor D that would be my thoughts yes yes just uh because we've had a number of parents that came and really took the time and invested the the the energy to tell us we want tur so I think that's and besides what Mike was saying before it's not going to be too much in detriment of the taxpayer so it nor seems like a win-win situation without counting the fact that it all right Betsy which one did you say I said with we've got two C's and two D's you go it's up to you bud bye thanks guys got make the job easy no Wayne what is your where were you at put the pressure on because honest go with I'm we so I went with my first gut

048instinct when I read all these proposals was D with the digital scoreboard but I mean d i mean we're going above and beyond what this community wanted to begin with any and I kind of agree with Melissa go big or go home we can got to have the right spin yes yes that's what scares me the most is because of the community and stuff so I mean c is ideally um would be fine too and she said so that's put you on the spot what's your first instinct where were you at I think you just gave me an escape rout here I mean really it's it's sixs it a difference I guess I would have to say d it's just scary what's that I can appreciate everything you guys are going through because I naturally

049am school like these kids can be out like what IED in years but it's to and whats on today like they are very lucky and the problem is it's BEC a new take into where you're going off of these they were a coup jun's l of's l of know up and I know a support grou and as suppor when you look at how the numbers out but we need to get behind this J s sitting in G now we have Junior get out them and let know we are your kids might not now but they're going be able toze nextt neb correct or it's not going to get when we talk about where the surveys are two years ago and where we've come in two years ago in the past two years we really got

050to take that time and uze and people are people that are in and out and it's not it's a lot of I app you're going I think it's a very good choice again our timing is good with the one referenda ending you know and quite honestly until I got on the board I didn't understand how any of this worked you know uh it was just a line item on my tax bill now I do understand we got to make other people understand this as well you know this is is an investment in your community you know if you've got a good high school with academics and the Athletics and stuff like that property values are going to go up correct you know and so we we got to get out and sell it yes AB

051we have to yes yes we have to you know um it makes sense to do that because otherwise people aren't going to understand vote yeah exactly but again the fact that it's going to go down $282 already helps if you know if that didn't happen and we're going to go up 151 or whatever it is uh that would be a negative but again it's it's coming down so you already got $131 savings so we just got to sell it okay so let's I've got three d's and two C's I will bring a proposal d uh up for Action next Wednesday now I do want to ask one more question not to get too far into the weeds again um but it sounds like the board wants to go for the home run here yes yes

052baseball softball reference you asked about you asked about the tennis court surface that's not included the tennis court is a major problem do we just want to leave that as is or does the board want to look at that further too well if we're gonna do things right then we need to add that well I don't know that it's GNA do things right it's going to be a well FID for a few years is what it'll be and I can't speak too much about the tennis court to be honest I don't know that much about it but I know that the tennis court is a serious uh structural um it's buil built on for soil that from my understanding correct me if I'm wrong the soil from here was brought over there there was okay

053but it's a very Sandy and we've had it I think believe 2018 was the last time that they were reped excuse consider please correct me I love I love learning after I give the wrong information by the way everything you said was wrong Dan but but it is something I know the tennis quod uh even if you're not a tennis fan uh pickle ball is the new new and uh the seniors if we provided them withle more pickle ball they would uh they would come out by the Buss we prefer vintage I'll be hon 157 400 thou $400 I say we put it in there it's it's a must need yeah y we're gonna go big okay okay so I will have a proposal um for um the whole package plus the tennis repairs up

054for up for approval next Wednesday okay okay okay yep any other questions comments concerns from the board on that proposal Three Bs proposal to V yeah well they're not really votes so that doesn't need to be included in the minutes but yes we're gonna we're GNA have a proposal if you write it up for D I'll support it sure say that again nothing okay we move on to uh the 2025 2026 school year open enrollment caps okay so this is an annual thing uh that by state law has to be approved by the board before open enrollment begins coming up here in February and there's two parts to it there are Reg education um limits and then there are special education limits so what we're really talking about here is how many students from out

055of our school zone will accept to be students at our school next year okay um we're Le we're at less than half capacity so we want we want kids to open a role here we want them all to come here you know it's good for our school it's good for um it's good for our finances there's a lot of reasons why we would want to have kids open a rooll here okay um so uh the special ed piece is a little more nuanced and I'm going to explain this and then um Mrs Drew if you want to add anything please do okay so we have we have a special program here called next steps and that's our transition our 18 to 21y old program to get kids ready for the workforce and independent living and

056there's a cap of 15 in that program we're to have 12 kids well they're adults actually at that point um 12 of our students return or be in the program next year we always keep a couple seats open for movein so we're talking about holding two seats which would would allow for up to one open enrolled student into next steps we may not get any I think we got one this year um but it doesn't happen every year not very many students qualifi for that program now this is where it gets a little bit comp um so there there are many many other students who receive special education they have IEPs and we call them cross categorical because they they they qualify under a lot of different categories and they have different needs uh many

057of these students take regular classes or they may be in some self-contained classes as it currently stands we've got almost 130 students um in that programming and we're at about very close to the max Staffing wise now Mrs Drew put together a great memo here that explains the Matrix on how we determine how many students would fall under a case load for a special education teacher and it's based on needs how intense are their needs the more intense the needs the fewer students should work with a teacher the less needs the more kids you can have working with a teacher okay we're at about the top of that so this is where it gets complicated because because if the board says you know we'll take you know all students with disabilities that want to enroll

058here we may have to add staff okay and that could cost the district money uh the Open Enrollment allotment for students with disabilities this year was about 13,500 or so okay so you figure you know we'd have to add probably six or seven to pay for the teacher we would have to and and you can do that you can absolutely do that the other option would be to say we're not going to approve any but we are going to start a waiting list and we'll see what our staffing and our enrollment looks like you know after the enrollment numbers are after The Open Enrollment uh window is closed and then we can determine how many kids from that weit list we can accept without having to add additional staff anything you want to add to

059that no just a couple we have to everybody we have the staff to address the needs of the kids so the state has really looked at what is a better outus work and this puts and then based requir so you can actually address those commun and right now we don't have that so this recomendation we're going to do for all ofs us as en able servs go through that we have to any I you know I want to just you know kind of put it out there that it feels icky it feels gross to say if you have an IEP you're going to go on a waiting list but if you don't we're going to accept you but that's the reality the law allows for that and it's and it's because of the financial piece

060of whether or not districts have to add staff to meet students needs so doesn't feel good you don't like it but at the end of the day you know we're responsible for a budget and making we can meet our students needs at the same time so I guess what I'm looking for from you is you know the recommendation would be know uh building capacity for reg you know regular Ed all intensive purposes that's unlimited because we're not probably going to get a thousand um but for special education your choices one next steps plus unlimited or building capacity or one next steps and waiting list and we'll see you know where our numbers are at when it gets closer to the end of the school year and we can decide whether or not you know we

061have enough to hire a teacher I think one in the waiting list I agree Betsy so you're saying on on this SPD open enrollment the second page your 27 projected freshman you're 35 you're 29 and 29 are what we have facilit witha to cover yes so we're we're at like the very top of our capacity right now because after the two failed operational referendums we we eliminated positions so we you know Mrs Drew and I don't feel like we could ask our teachers to take any more students onto their case loads it's just it's too much you know we' be fearful that they're not meeting their other kids needs if they did that um so we're we're we're at a point in enrollment where you know we're not necessarily comfortable saying anybody without the board

062being willing to add a position if needed got it so we can do a wait list and then we can decide after the Open Enrollment window you know what can we do we want like I said we want to accept as many students as we can um so M that's what Mr tranjo Mr mattz and Mr kamacho had had kind of all agreed on is to go with the wait list and then make the decision in the future one in the future what would that be after the referendum no well it will be but it's not related to the referendum I understand it be toward the end of school year okay initi for open enrollment us around time a April 30th is the last day of the Open Enrollment window so you know sometime in

063May early June we'll have a much better idea of you know what we can expect case load wise and we don't run into any problems with putting them on a wait list so they don't know what school they're going to yet till after that we don't run into any problem U and we do have board policy on that however students often put in for open enrollment to multiple schools and if they're on a wait list here and they're not somewhere else you know there's a good chance they're just going to go elsewhere so you know if we're their Top Choice you know they may wait it out to see um but they may not and I hate to be the person who ask all the questions but do we have a ratio how many people

064open a rooll that need assistance of some sort I don't have the current list current number is that what you're asking I do not have the exact number off the top of my head specific kids and I know it's a smaller I think it's l but don't on that I have to go through the numbers and I can get that to you that that data actually might not be incredibly useful because every cohort of kids is different every Year's different the disabilities are different the needs are different so even if we looked at the Last 5 Years 25 26 you know may not be anything like that okay and that's what I was wondering if we knew what it was and it was 12% four years ago 10% 2% last year the mute point but

065I would go with weight sorry yeah it's it's not predictive of you know what we can expect for the next couple years um because just the uniqueness of individuals and and and their disabilities so okay so what I think I'm hearing is the board would prefer to um cap the regular Ed at our building capacity and then special ed at one for next steps and zero for cross categorical we'll Implement a weight list and then we'll revisit this May June somewhere in there once we get all the applications and we have a chance to review what the needs are okay okay y okay sounds great then I will have that recommendation those two recommendations for you also for the 15th okay sounds good I make a motion to adjourn second