Transcript

Verbatim source text

001good evening everyone and welcome to the School District Board of ch's meeting thank you all for hanging in there with us and apologies for starting a few minutes late all right a recording and or broadcast of this meeting is being made at the direction of the board which may capture images and sounds of those attending the meeting I will now take the role Brian here Vladimir pres Jim here and I shall here as well pled Allegiance do you have any students who would like to lead us in the pledge s please all United States thanks everyone right would any board members like to provide comment on tonight's agenda no then may I have a motion to approve the agenda as presented thank you Vladimir you have a second second thank you Stella motion to approve

002tonight's agenda as presented by Vlad here seconded by Stella all in favor I any oppose any extensions motion passes close session report no action was taken in CL session tonight superintendent update thank you I have a few things to share uh today was the kickoff of our monthlong stem events across all of our schools today blo hosted am I correct yes our junior high career stem events through our science classes tomorrow that is happening at Egan tomorrow night is our uh stem career night and if you haven't been in the past if you haven't been in the past we always get phenomenal speakers to talk about uh their interesting Career Development over time in the different stem and steam areas so I suggest that 7 tomorrow night at The Egan probably in the multi is

003my guest and then we have our stem Expo starting pretty much now through the month of February at across our um elementary schools I want to thank Grace Choy out of our cni office who kind of leads the charge for this and we have many many many parent volunteers who are helping across all nine campuses to make sure that our kids have a really um interesting experience uh when thinking about career and stem um it's been fabulous in the last couple of weeks we have visited um three School sites in different configurations with trustee visits so we've made it to Oak we've made it to almond to walk through classrooms thank you for those of you who were able to come along with me last week we also made it to Egan to look outside

004of classrooms at facilities and just at the campus itself Bel um I will continue to put those opportunities in um my weekly update to you so you know when you can um tag along on a visit I know teachers love to see the trusties in their classrooms and to know that you care and pay attention to what's happening across our school sites um tomorrow we have our new communications consultant lyette white coming um she'll spend the morning with us in our leadership team meeting we're going to start with a school visit with her over to Santa Rita and then I'm going spend some time with her talking about kind of the next two months what projects we have uh for her that are on to and then we're planning to have her come in March

005to a board meeting do I have the date right carry in March um that way she'll have a little bit of time to get to know our school district but we're really excited excited to be working with her and to do a better job communicating with our staff with our parent community and talking about the great programs we run for kids so that's great work and then just a reminder that I will be at the superintendent Symposium down in Monteray which is the convening of all superintendents across the state of California this Wednesday through Friday yeah and I always bring back sorry new exciting ideas that's it for now that's it that's it for thank you that's awesome thank you all right School presentation the best part of our meetings uh flock is doing a

006presentation tonight should I vage of principal also mror all right thank usually when I present the boardroom is just but good show tonight thank you everybody and thank you uh members of the school board especially welcome to Jim and Stella um with an esteemed body and really as an administrator in the district I appreciate this board and so thank you um gives me great pleasure tonight to present or introduce to you our students um as you know we've been um really focused on deeper learning throughout the district and at block uh as a staff we've kind of made making learning public that kind of subset of deeper learning kind of our exploratory um goal this year in progress start over um where's Jess I'm so sorry I think it's my it's not okay not I'll

007talk a little sof or a little away from the house um anyway we we have been taking a deeper dive into making learning public um and really exploring that as not just students presenting their work but making sure that what they're presenting is an authentic relevant task um but also then taking the time to do some reflection upon their learning um and so tonight out of our first semester architecture and interior design class Tau by Miss Patty Schwan uh We've brought in uh four students uh who worked in uh two pairs of teams um on a very special project that I'll let Miss Schwan kind of launch um let me see if I can use this just to give you a little idea the um origin of this project came from one of our um

008many as you may know principes meet with each of their teachers at the beginning of each school year to go over a professional learning plan and so when I met with Patty um and we talked about making the goal around making learning public this idea kind of germinated within our discussion let Patty kind of tell you where the where this project originally came from from and where she has adapted for her students um essentially students have a project within architecture design in which they have to design a home using shipping containers right yes um and uh this year Miss Schwan put a little spin on it to make it a little bit more relevant a little bit more authentic and make it learning public so I'm going to have Miss Schwan come up and speak

009a little bit about that and then our students present what they did um good evening everybody um I I'm Miss Sean so I first of all I just want to say how fortunate I am to be able to work uh with in LSD the school district who with so many uh talented students so um I just feel very fortunate so um anyway I'd like to talk about this particular project I don't know the actual projects are over there if you could want to take a look at it later so um so the project originate uh from uh just taking three or four shipping containers and then transform these shipping container into a house so originally originally I I had student uh just designing their own dream home taking this shipping container rearrange it they could

010cut it however wanted so and um um so after my meeting p meeting with Mr spor we kind of brainstormed how do I make this uh project even more public even I uh try to design this redesign this um this project to give the student a deeper learning experience so um I come up with like well what this will be a perfect project for uh like interviewing a teacher or a client instead of having them designing their own so so um so yeah so I had uh so I sent out a whole email to the entire school both schools and you see any teacher they will participate I was very uh surprised and very happy that I have quite a lot of teacher like to participate so they start drawing that I have the kids

011um in teams instead of just individual so also if you are architect um you're always working with another architect or in team so I want them to have have a full experience um just almost like um you know working as a real life architect so working in teams and then go out and interview a client so uh the client will be our teacher so um yeah and then we had a at the end we had um a little student showcase so I invited the school and the parents to come to see the results that's pretty much um the whole idea and the whole the whole thing that I did was this project so yeah I think I'm done our teams tonight and and this was a guess by Design uh our two teams actually uh

012I was their client so they interviewed me did you pull my name or did you choose me you got you lost the watery um and so they'll talk a little bit about that process but it did involve them arranging a time to come into my office I was interviewed by both teams um and tonight they're going to talk about their learning experience um if you want to see their homes like mwan said they're up there um but I want to introduce them the two teams are Jasmine and Ami who worked on one project and Libby and Tiffany worked on the other and they're going to go ahead and take you through the next set of slides so girls if you want to step on up to the I have to click that's we're on the

013right side okay so um some of the skills we we used one um completing this project is we had to make a skill drawing which we just drew our living room the living room of our house but we had to make it to scale which we have these rers for um we also made uh respecting drawings or uh elevations of the outside and sides of the house um which we use so it would be um scaled also to the actual dimensions of the house um we also made floor plans which is basically if you like took the house and then you looked at it from a bird side view off the road and we also constructed like a 3D um version of scin um and then the other skills we used were um other skills

014not as technical like collaboration uh we had to work together Partners yeah and like really making sure uh we were problem solving and um because we had two people and like maybe different ideas we would have to like compromise ideas or like figure out which one we would actually use we also have to work on interviewing the teachers because we actually had to go out and interview them um and we had to uh just use the things that they told us to design a home for them and kind of along the of that like um sometimes you would be able to ask like every single question or like you create questions along the way of um the process so like you have to infer and like think about what would work Chang experience kind had

015to interview the client and kind learn more about them yeah and um making it realistic like um especially with making a house um before before this project we hadn't made any houses we would just make like a drawing of a room or something but making like a house um we were restricted with like the shipping containers because they aren't like the biggest things and also um with like making a house you would obviously have to have bathrooms but like and stuff like that but you it's hard to remember those when so um we also have to personalize it to the client's needs which as Tiffany said you have to add bathroom ST which is obviously necessary but you don't really think about it and also um Mrs SP he wanted a a mountain bike room

016which we thought was going to be easy but then he wanted it to lead directly to the outside which also like really affected where like it limited where we could place it um we also had to like respond to what Mr sper wanted like with his house um like for example we um asked him if he was like an introver extrovert and he said an extrovert so me and Jasmine and I thought he wanted like bold colors and um like patterns in his house but then actually said he wanted like a very um peaceful place where he could just like relax and he had to um personalize it to what he wanted uh some obstacles that we over like had to go through it took some like determination so I was sick for week so

017um liby had to do like a good portion of the project by herself it was difficult because like uh when she came back she was like you know what maybe we shouldn't have done this thing we also had to move the couch back a little bit um in the perspective drawing because it just didn't work so um a challenge that we had to overcome was meeting the timeline cuz like we had enough time but for the floor plan we had to like redraw our second floor and R design it which kind of dragged into our model time which made it hard to meet the D day yeah we had to like reorganize um the rooms on the second floor because they weren't um like aligning to the measurements of the actual um like the building

018on the like the walls of it so uh we had to rearrange it and it was yeah it made our model have they they wanted me to pick a winner and I told them I would announce the winner at the board meeting um but again I want to thank the board here because this is the final step of making learning public and Reporting out to you notice that we didn't really show you the project instead we talked about the process of the learning which is really what we're trying to get to um the winner is both of them let me explain why okay uh am media and Jasmine's was really great because it was twostory right and really kind of fit all the different needs that I was looking for and so I really liked

019that one however I really liked Libby and Tiffany's design because based on the structure I could place it anywhere on the earth like if I wanted to to find the land so sometimes you look for the land and build the house sometimes you find the house wherever the land is so I really couldn't choose honestly they really did both win so um that that's our presentation tonight and um we welcome any questions that you might have for our group and pry mwan so thank you question were you aware that the winner would be announced here at meeting started yeah after this experience do any of you want to pursue a career or consider a career in architecture how did you learn how to do drawings I guess that like the our one of our first

020projects um in our architecture class like um it was to create a floor plan of our of our um architecture and or like room like the classroom and so um like we would have to measure everything like with the tape measure and so um missan she would show us like uh and we also use like different tools so um we had like jine said earlier like a scale ruler so like it had it as like if one foot in real life it would be a quarter inch or something like that and using like uh rulers with right angles then it would be easier toate and perspective how' you get the perspective because I saw one of the pictures there had really nice perspective um we kind of learned how to draw one point and two

021point perspectives we only use one point for the project but that's okay we did like uh like a horizon line and then a vanishing point in the center and then you had to draw all the lines pointing to the vanishing FL cool how was Mr spinor as a cent easy to work with you don't have you're always on campus you're always walking around on campus so if you needed any questions that well I think I was a great client but because they asked great questions and what was interesting is both teams interviewed me separately um I'm pretty sure mwan prepped them with some questions that they needed to know but then both teams had really good follow-up questions and started to get into like for example the whole the question of are you an introvert

022or an extrovert I was kind of thrown off by that but then I was like well that's a great question if you're designing a home for somebody you should know that and so um we had a great conversation about that so there their questions um both teams made me a stellar client that's I love this project because of all the different skills that you had to use in science social science art um my dad is a retired architect yeah so I love Architects and I've always thought that it was such a great combination of science and art in a very practical way and so um I'm very excited about this and so and I also think you know you have a housing crisis right and and they're looking at how can we use shipping containers

023build homes like tiny homes and stuff so I don't know what you guys are doing I it sounds like a really fun project but it has some really good real world implications so thank you so much for sharing with us tonight thank you um any students want to get up and leave now you're are welcome to but you're also welcome to stick around for the rest of the meeting tot okay gonna just so you know don't feel badly thank you so much parents thank you for okay moving on to the consent calendar um would any board members like to provide is there any public comments on the cons yes Susie I'm so sorry that I'm going to picture your last name wcz a r e k i want to thank you so much for your

024time thank you so much uh for the time um I'm here actually to talk a little bit about uh an item on your consent calendar tonight uh it's item number four theou regarding inter District transfers between PUSD and LD um before I go through some of the reasons uh that we would request an extension of the current and very successful mou uh I wanted to say just as a broad picture that the extension if it is signed you agree with it um extending to include grades seven and 8 uh beyond the current sixth grade ending uh we see it as a natural evolution of a really strong partnership between PUSD and LD benefiting students and families uh while maintaining minimal financial and logistical impact for both districts and I say minimal because I believe this

025affects a very few number of students uh every year I think at Gardener buis Elementary it's around 32 uh students currently enrolled from Kindra to six that are actually using theou so a very low number of students but I think it affects those students to a great degree um so I would respectfully request uh that if signing into the consent Cal calendar today negates the opportunity to amend the uh in your District transfer to include grades seven and eight if it is possible I respectfully request that you postpone voting on that item today um as parents just as our Educators we're very involved in our children's education and well-being um I'm a parent of a sixth grade child currently at Gardener buis Elementary that is using the inner District transfer um myself as many other

026uh parents that fall into this bucket um want to extend theou uh to include grades seven and eight uh for two main reasons uh one the structural differences between PUSD and LD that um L LD ends sixth grade at elementary and PUSD has a middle school of six seven and8 so if students get to experience all those wonderful things of their final year at elementary school and all those leadership opportunities they would then have to move into PUSD while the rest of the fish are already swimming together for an entire year um so the structural differences of PUSD and LD cutting off at different grades for middle school or Junior High uh makes it a little bit more challenging for those few handful of students to move into a completely new c-port um the second

027area that is uh a bit more concerning is that puberty is a very uh important thank you thanks for your time could I reest that the speaker beow in extra minute yeah sure since we don't have any other speakers for comment do you want to wrap up up to the president we'll give you a minute to wrap up thank you so much I appreciate it but you can also email your coms to us we'll do afterwards as well thank you uh the second and I think more weighty issue is that puberty is a critical transition time for every student everywhere and students who change schools in seventh and eth grade often report higher rates of anxiety and lower levels of Engagement with their new school Community uh so three real reasons why this time is

028so challenging puberty and developmental changes that are going on with children at that time uh increased academic and social pressures from elementary to middle school as well as the importance of peer groups to provide a stable and relationship during these years uh in essence it would be say five children from this one Elementary School that are moving into an entirely new District while that district is over three um three years uh moving in so thank you and all email address my comments thank you board members would any of you like to provide comment on the consent calendar oh Amanda short you wanted to speak on agenda item F3 yes okay uh to the LA LD board I'm a parent in the district speaking on my own behalf thank you so much for all your hard

029work serving our community uh as you'll be reviewing the uh sarc reports um item F3 um we see another uh great year strong aggregated uh testing results for LD but I want to draw attention to the low performance of our special education population who have individualized educational plans or IEPs on the test for English language arts only 40% of these students met or exceeded the state standard versus the 90% of their nonap peers a 5,000 basis point difference and in math a similar result with only 46% of these students meeting or exceeding versus the 90% of their non IEP peers some schools like Santa Rita Elementary have even greater differences with only 4% of students with IEPs exceeding the LA the ELA test these gaps in testing for IEP students come at a time where

030recent or upcoming changes at the county level are deeply impacting special education advocacy oversight and the ability for collaboration to create the best special education programs for our students this year Santa Clara County implemented a new model for the community advisory committees for special education also known as CAC selus these are groups of parents and Educators that advocate for special education services for students with disabilities Santa Clara County moved from five local cac's to one CAC representing over 20 school districts and this new CAC is not addressing local concerns many local programs that help these students and their parents no longer have a home previously local cac's ran parent support groups resource fairs parent education events and allowed parents to directly address their concerns with special education administrators these CAC channels have all been stopped

031or minimized which reduces the opportunity for collaboration communication and problem solving as a parent from Santa Rita Elementary I ask that the L LD board supports the request to establish a new Bo School Board committee for special education in Santa Clair County this committee will help parents students and community members keep their voice heard for special education advocacy and oversight we want to have a place to go when there are problems before things get to a point of lawsuits we want to help solve disproportionality problems for students of color your support would show these families with IEPs and disabilities that you care about their voices and commitment to creating the best program possible to help to get the help that they need thank you so much thank you have any comment on tonight calendar one

032quick comment um follow up on our first speaker um I think personally I think it does make sense to look at whether we can extend that agreement palto I think I would say my conversation Sandra on this topic I think it's not the case that approving theou that P sent over will foreclose that effort so I'm comfortable going forward what we have to give the parents of younger kids the certainty that this program will continue but I'm certainly in favor doing the work to try anyone else um I have a motion to approve the consent calendar has presented say did you have a comment yeah sorry um I think that the second person's comments ire some sort of response from Super I hope that we would come back to us at some future time is

033there or discussion sure yeah there have been a lot of changes not only to the CAC group but to the Sela at large sure bring that item back sorry no no that's okay that's very important thank you for bringing that to our attention now may I get the motion to approve the consent calendar as presented so Vladimir make it a second I'll second thank you so motion to approve the consent calendar as presented by Vladimir seconded by Stella all in favor any opposed any exensions motion passes thank you we'll now move on to employee requests to address the board for the ass's teacher skill stent Alex schroer long time to see huh good to see all of you again thank you again for your time and um I'm going to leave leave The Talk of

034the proposal for our um contract ratification to all my uh fellow Union colleague um I'm here in fact uh to talk about a little something different um and I'd be remiss if I didn't mention this uh so I wrote it down I really did not want to mince words with this um on behalf of La I am wanting to affirm that our teachers union is at its core one that stands firmly for policies that support our students our families and the strength of the teaching profession our mission is to ensure that schools are places where both Educators and uh children can Thrive and where every individual is safe seen and valued in the current political climate we're deeply concerned that these fundamental values are not being adequately reflected or upheld at a national level as

035a union we stand unwaveringly for the rights of all members of our community including our lgbtqia plus students and staff as well as other marginalized groups we believe in fostering inclusive environments where diversity is celebrated and not censored we're also committed to academic freedom and the belief that censorship of educational materials is not only dangerous but also a disservice to our students withholding important truths from our classrooms hinders our ability to cultivate critical thinking and informed citizenry education must be rooted in honesty equity and the pursuit of knowledge that empowers students to understand and engage with the world around them therefore we respectfully ask that the school board stand with us in these efforts by reviewing and where necessary revising board policies to ensure that they align with the values of inclusivity equity and educational

036Integrity together we have the opportunity to create learning environments that truly support every child and educate in our district thank you so much for your leadership and your commitment to the shared Mission thank you do we have anyone from the California School Association Right Moving On for public comment to provide public comment on an agenda item speaker cards are to be submitted to the superintendent speaker cards will not be accepted once public comment begins your name will be announced when it is your turn to speak now we have um any comments this time is reserved for members of the public and employees to address the board on items that are not on the agenda the board is not permitted to discuss or take action on non-agenda items except to instruct the superintendent to review the

037matter further report back to the board at a subsequent meeting or place the matter on a future agenda the board may make a brief comment or ask our questions I thought we did this one okay here we go Amanda short did you okay okay no wores thank you all right I am closing uh comments on non jendiz items moving on to action and discussion items first item Financial impact of proposed collective bargaining agreement and approval of the tentative agreement between lalta school district and lalta Teachers Association Dr BOS even uh Lissa pal Chief negotiator for laa and I are here to present the tentative agreement uh with the association in the district so we wanted to start just by giving a little history because we chose to do things differently we have been a district

038that has always been um an interest spased bargaining and when Carrie and I met to set things up we really wanted to go with the idea of collaboration and so we um kind of invented our own own way of bargaining and did a collaborative model and so in order do that we got together with our team and we know you guys some of you joined us at lunch but we came up with a purpose and we really came up with why we were doing the way we were doing it and we wanted to really negotiate to create an environment that allowed all teachers to serve children best because that's why United here together is we're all here for kids we wanted to make LASD a desirable district for top quality Educators that really want to

039come and be here and be a part of the magic that we create for children so uh with our approach we set some goals and some intentions at the beginning we we did a joint Sunshine we brought that forward to the board and one of the major interests in that Sunshine statement was that we would be more competitive with our neighboring districts in terms of our compensation um but we also cared that the relationship continued to be a collaborative one and so we were hard on issues like comparability and soft on people and so tonight's um outcome we think is is built on trust but it also moves the needle on competitiveness so with that we want to thank our teams so uh for L I'd like to thank in addition to um Melissa Amanda

040quman Allison Gentile Tracy grinberg Courtney M Riley Hagen Paul Ramirez and then the CTA representative Valerie Luke and then Eric and Sandra and I were joined by Aaron green Connie colore Kate skorn and then Greg danis who is our our legal representative um so we'd like to thank them and then we'd also like to thank the board we feel um both sides feel that we've been very supportive through this entire process and we're just very grateful that you were able to hear the needs of the teachers and the needs of the students and help us continue to collaborate um we felt that this went really well we really um everyone came out feeling like it was a win on every area and we really look forward to continuing our newly formed collaborative model as we

041have negotiations in the future so your packet this evening in addition to the tentative agreement are the ab200 disclosures the approval by counties want to thank the business office for preparing those items um together with the salary schedules you can see we've really moved the needle not only on compensation for our our teachers in the district but for our recruitment efforts we've moved that starting salary um as well as the top of that salary so we we hope that that makes a difference for us this recruitment season as well but happy to take any questions otherwise thank you so much for your support thank you and I want to thank you and your teams also for going through this process LD is definitely a very special place other question on the psychologist uh schedule is

042196 days is that that's 10 more days than yes correct two more weeks I just notic that that was different any other clarifying questions okay um are there any requests for public comment no okay right would any board members like to provide comment on this agenda item right well it is an action item so may I get a motion to approve the tentative agreement with the lalos Teachers Association so move you Vladimir get a second a second thank you Stella motion to approve the tentative agreement with the Lalas Teachers Association was made by Vladimir seconded by Stella um any further board discussion okay all in favor say I I any oppose any extensions very proudly if motion passes unanimously now you dismissed the teacher had a long Monday thank you for coming tonight right we

043move on to our next agenda item initial proposals of the lalta school district and California School Employees Association chapter 103 to reopen the 202225 collective bargaining agreement laa we're excited to be at the table with our CCA um we're opening compensation we've already had one session to review our financial information but we're excited to continue the collaborative effort and look forward to bringing you a tenative agreement shortly thank you any clarifying questions from the board oh well just because we have some voice gaps in the room I was wondering if you might want to clarify some of these acronyms LA versus CA welcome our L is our L Al Speakers Association and CSA our classified SCH employees Association thank you yeah some of any other clarified questions okay um any requests request for public comment

044no what any board members like to provide comment on this agenda item okay then may I have a motion to approve the initial proposal of Los Salto School District dou thank you bu can I have a second second thank you Stella motion to approve the initial proposal of the Lala School District was made by Vladimir seconded by Stella all in favor I ask this brother board discussion okay no fur um all in favor please say I I any oppos any abstentions excellent motion passes unanimously thanks everyone all right we're going to move on to our study session our bond program update Board of Trustees will review the bond program and discuss next steps this is M so we're really uh excited to spend some time to dig in so this is by fairly unusual for

045us to have kind of a new organization we're having a a session within our regular meeting um we kind of limited the number of business items so we could get into work thank you makiko for being here our goal today is that you have um good information on understanding how the bond will be financed understanding the cash flow of how the bond works when we actually issue bonds that we perhaps get into some discussion around project priority projects um and understand to set some expectations of how long bong projects actually take to like get shovel in the ground or work being done on our campuses so it's a little bit more informal so you can stop mid presentation ask your clarifying questions so we want it to kind of flow of more of a conversation

046um yes hi Mako thank you for being here thank you for having me Mako is with icean viers and there District's financial advisor and they helped us with the last Bond issuance uh so we really excited work with M for many years uh trusted adviser has always gives great financial B could talk a little bit about measure e um and kind of what the bond program would look like and I'm turn over to me all right thank you so I put together a short presentation booklet feel free to ask me questions as we go along um so first of all congratulations meas e pass with a little over 56% of the support of the community um and there's the 75 board ballot question um the key one being the 350 million of bonds authorized so

047some of you may recall this slide from the presentation that was made last March but it is a little while Al I thought we would revisit it um when we were talking about how to size this new Bond measure we looked at various assumptions that drive the bond model um assess valuation is one of the key elements as long as well as borrowing rate and the number of bond series and the timing of bond series and if we recall because of the need um from the capital facilities perspective throughout the school district um we oped to go with something a little bit more optimistic in terms of assumptions to increase the size of the bond authorization um instead that the you know compared to the Baseline we went with a slightly higher assessed valuation growth

048a little bit of a lower borrowing rate uh than a baseline scenario and in terms of bond series you know the Baseline case usually assumes three series of bonds issued every other year um and in this case for measure e we assumed four series of bonds issued every other year 25 7 29 and 31 so why are bonds issued over multiple series actually there are a lot of different reasons um first um issuing the bonds over multiple series and over multiple years allows your assess valuation to grow over time I actually have a Graphic on this on a later slide so we'll we'll talk about it a little bit more another thing we keep um our eye on is the statutory bonding capacity uh the statutory bonding capacity isn't really a significant constraint for Los

049Alto School District but it is still something that we want to keep our eye on um the third bullet um we want to mitigate the interest rate risk to a particular market so by issuing the bonds over multiple years you um spread out that interest rate risk it's this is similar to the concept of dollar cost averaging for Investments if you're familiar with that um the fourth bullet tax law requires that the district have a reasonable expectation to spend down 85% of Bond proceeds within the first three years after some bonds are issued and so for most school districts it's not reasonable to expect that you would be able to spend out 85% of 350 million all in the first three years um and then the last bullets just conceptually right when you're borrowing money

050to buy a house you don't buy it five years ahead of time because you are incl incurring a bunch of interest when you don't need that until the moment you purchase it so in the same token I mean it it doesn't work perfectly but we want to time the bond issuance is closer to when the district needs the money um and so you don't want the taxpayers to start incurring interest expense if you're not going to need some of the funding until five years from now or six years from now all right so as promised this is the graphic it's assuming multiple series of bonds so each of the bars the colors AR as distinct here as they were on my computer screen but each series of bonds layers on top of each other the

051red bars the red line represents the projected Revenue with that $30 tax rate the $30 for $100,000 in assessed value and you can see that by layering on the series The issuing the series over multiple years we allowing the um the projected revenues to grow a question the slide um does the sort of shape of the curve for each series is that set like on day one of the bond program or is like the curve for each series kind of gets set when it's time to issue that series because this I'm assuming is the red line I think is based on sort of the 4% um property tax growth rate that was a couple of slides ago so if that goes up more steeply can the other series shape then change yes so this is

052the original plan and as time goes on we're going to have every year in July the county gives us the updated assessed value and so we'll update this model every year and so whenever there's a new Bond issuance we actually structure the bonds to match the assess value that we have at that time you know here even at in 2032 there's going to be a lot of projected AB growth um over time so there there is a lot of projection that still goes into it but yeah to the extent that um in the first eight years or so we're going to have actual a before we um issue the bonds we'll incorporate that into the model and that could allow you to accelerate the bond issuances more than the original plan or conversely if a

053grow isn't as high as what you know we anticipate it could mean a delay in issuance but that's a great question this is really the original plan well and then sorry I one question if if the a growth then goes the other way like what happens if we we're 10 years out we've issued all the bonds and then that line doesn't go up the way we expected it to and you know dips under the yeah I mean that happened um around the 2010 time frame where there were some community that saw communities that saw a significant decrease in their assess value um and for some of those school districts that have already issued their bond all their bonds there is you know not very many tools you have in order to restructure existing debt it's

054really just a refunding and if the interest rate environment or your call features on the bonds don't allow for that it just means that the tax rates will float up because the tax base has gone down okay but there's no sort of clawback or consequence or directly no not directly it doesn't you know become something where now you have to pay anything in excess of the $30 as a district you uh let's see is all right so I'll move on statutory bonding capacity that was the other um constraint that I mentioned earlier um you know here it shows that the district currently has a net bonding capacity of 312 million um which is pretty significant it still means that you wouldn't be able to issue the full measure e uh the statutory bonding capacity net

055statutory bonding capacity increases typically from year to year as your tax base grows and also um as you pay off some of your outstanding BS so I'm not concerned that about statutory bonding capacity but it is something that we want to keep around all right so history of assessed value you know we wanted to be a little bit more aggressive in terms of our assumptions than the base flying canes of three and a half% we do believe that there was a strong basis to do that this is the history of assessed value going back to 2007 and you can see on average um assessed valuation has has grown by over 6% per year so we believe that our assumptions are still fairly conservative and to trusty Johnson's point we're hoping that we'll be able to

056implement this a little bit better than the original plan so in terms of a potential a issuance schedule um this is just very preliminary um but based on the original financing schedule the serans a bonds would have a par amount of approximately 90 million to be issued in 2025 um we would be on track to um issue potentially in early July um what we'd like here is um the ability to get on the tax rule starting in year one which means that the district would be able to start repaying bonds immediately in in in the first year uh we are going to be back um in either case in the springtime as you've done in the past in terms of passing a tax rate resolution um and so that that's something that is going to

057definitely happen the rest of these um items are to be determined based on Project needs and what the board's Direction I think that might be it yeah so I'll pause there to see if there is any additional questions um a couple questions go back to slide three the last line there if I'm not mistaken that's actually not possible right because that would $362 million of bond we only authorize 350 right that's correct yeah this is that's why you have the yellow of the green outline yes yes and I wanted to kind of show the board different you know effects of U different assumptions on the total potential Total Bond proceeds um how uh how confident are you about the um estimated borrowing Ah that's a good question um you know pred this year to remind

058you yeah I mean we are experiencing quite a bit of volatility in the market um if you asked me two weeks ago I would have said yeah that is going to be pretty aggressive um over the last week and a half we've seen interest rates go down so it's going to be which interest 10 year bonds um the municipal market index yeah like today we had improvements about .7% which doesn't seem significant but that's a pretty significant you know single day move movement um over the last week or so we've probably seen a cumulative of .1% um in addition to that so a pretty significant shift down do you think it makes any difference that California is one of the favorite states of our president um you know I don't think so I I I

059well investors still have a pretty significant preference for California when you we when we price bonds We compare the borrowing rates against the national what we call the MMD index and that MMD index represents what a triaa rated issuer a state issuer uh can borrow at and what we've seen recently still especially in the first like 10 to 15 years is that California bonds are pricing through that so we're borrowing at lower rates than what the national tripa meaning that investors are still very interested in buying California bonds will that change a little bit over time I think you know there is some concern about the LA fires what kind of impact that might have on the state budget so you know the market always shifts every day so I can't promise you that you

060know this favorable this you know the investor preference will continue you know in the long term but currently we're still seeing an advantage for being California um on slide four um you talked about U different tranches different series there um are we going to need any bond anticipation notes we did not plan for any for Bond anticipation I'm not planning on right good well actually notes because I was wondering because we we did that for measure n yes but thinking back I wasn't clear whether Bond anticipation notes are something that you can do sort of above what otherwise above the $30 per 100 or whether sort of the bonds you issue plus the bond anticipation there you issue still have to stay under that $30 per 100,000 threshold so a lot of times school districts

061issue Bond anticipation notes when you are constrained either from that prop 39 tax rate perspective or from the bonding capacity perspective it is a risk because when you have to take out that band you want to make sure that you have the the ability to issue long-term bonds and so if you don't have that bonding capacity and you're just kind of hoping that things will work out five years like um you know that's obviously a risk and so when we design new Bond programs we typically do not anticipate using any uh Bond anticipation notes there is always a possibility that the district experiences a decline in assess value or some other issue where we want to consider that but at this time that's not part of us time um what is the limit on so

062we passed a a bond dou measur Val right when do we what's the latest that we could issue uh a series in that oh that's a great question the authorization actually never expired oh okay great however the purchase power I Eric is prob gonna be saying this more than I would but you know what what we always hear is that you know the more you delay at the purchase power of that money declines um if you go to go the Keiko also I mean you only want to issue the when you need the money but you don't want to wait forever because the purchasing power declines but then also um you want to pay out the debt as soon as you can to the taxpayers as well so you want to get those things going

063so it's really two things um on Slide Five um I think Brian touched on this a little bit so what happens when that that uh Red Line sort of droops down somewhat uh what is our what's our gain plan there you just delay the issuance of the bonds is that what I understood yeah there are a couple of um usually I hope we don't get to that and you know historically right it seems very unlikely but um you know I'll just go back to 2010 where we saw a lot of declines in assess value um and there were a number of options um one is to just simply delay the issuance of the bonds uh two might be to try to do some refunding to restructure existing Debt Service to the extent that you can

064do that there are you know some requirements you need to meet in order to be able to do a refunding um some may have issued um what we call capital appreciation bonds which compound interest over time so you're issuing the bonds but you you you're borrowing basically at a higher interest rate uh because you want to defer your payment as much as possible um because of the dip in the assessed value um and what was the final one oh fond anticipation notes could be something that you know uh school districts could rely on to access funds and with the hope that assessed values would recover and you be back to to long-term and then 2062 that goes to zero I'm based on this original financing plan yes um but if you do you know if

065you delay your issuance for 10 years you you could you know extend your final repayment ter investment I will be well over 100 um oh last uh I think the last question I have is on slide seven you you started 2007 why 2007 oh there was no method to yeah to the it was a little arbitary after um I think it was mainly because if I went any further I might have run out of space okay yeah wasn't anything special there where you know I I did want to include the last Market downturn however because I think that's important to see even during the last Market downturn um the assess value in the district only went by down by a percentage um I think when we saw the significant decreases in assess value were school

066districts where there were a lot of new developments and you know those um new new warehouses tend to be more impacted uh in terms of reassessments I do have a comment that on the next slide say I take that back on slide 11 which is the tax rate comparison there oh yes U some of those I I don't know which ones are probably unified school districts and so they may be they may not be was that all yeah okay all right I withdraw my com yeah we we made sure to take out the um yeah any unified or high school districts but to your point um yeah the total tax burden on any other communities could be slightly different based on the taes of the high school district or Community College all any other questions

067yes please I have a question sure to go back to bonds for dummies but in this potential series A's issue and schedule where we potentially issue $90 million and we have four dat so or is the idea we issue 90 million in each series until that last series and then whatever's left or what if we change it I mean I don't know how that happens but what if we said we wanted 100 million in the first year like what's the yeah like what how's that throw all that up off yeah so I was careful later you know in that later slide to say approximately 90 million so if Eric called and say we desperately need 92 million there would be no problem to make that adjustment um but the more we accelerate bonds the more

068we could potentially constrain Future issuances Okay um and so I do want to say that there is some flexibility um but you know if you say well I want to issue 180 million that's probably you know going to be possibility of constraining the BM program in the future so um we just think it would be um yeah to the extent that we can kind of space out the issuances a little bit more consistently that would be great I would if the district is interested in upsizing i' be I think it would be better to talk about that for series B when we have a couple more years of assessed valuation growth to say okay well we assume four% we've got 8% growth um in the last two years that's significantly higher can we upsize series

069B um so then then you know it's it's not based on we hope the AV won't grow but the AV actually grew so let's adjust your plan we also I mean I'll have a slide on cash flow but it's also based on what our needs are um we only want to issue when we need the actual money because it's hard to spend all that money in one calendar year one fiscal year um and I'll talk a little bit about kind the timing of cash flows so Eric will you talk about uh the that we have to repay in terms of cash flow and St like that the cash flow that won't impact our interest because that'll be no no but you will talk about how much we have to repay over time and the cash

070flow not on not on today's presentation but on once we do the bond issuance that's when that would be the time to bring that up um if it's it's okay um if when the District board approves um a resolution authorizing the issuance of the series A B there will be a good faith estimate in one of in the appendex that shows what the total debt service is estimated to be um so before the board approves the issuance of a series in fonds you will have an estimate of the interest I think I would have preferred if that were presented sooner than because at that time then it's either we don't issue the bonds or or you know can I ask question question so the I mean the bond issu is then paid by the taxpayers

071but there's no further direct cost to the admin agree totally but I'm a taxpayer true other questions thank you do we want to move to the cash flow slides yeah which this is a slide deck you did not receive in your packet oh yeah as I look for it y so want to give an update uh we did this a couple months ago um kind of talk about the bond program some some of the next steps that what we're working on we go to the next slide um right now we've got um right now we have request for qualifications for program Management Services um and those are due actually tomorrow so we had a lot of FedEx deliveries today um these are firms are going to help us manage the program get the programs complete

072that dialed in by the list of projects how much um we're going to spend each year on each project uh scope and Seed planting that'll all be worked out together the team will all work together we'll have a outside company help us with that and then also Architects and Engineers um and then staff has met once uh and we're going to reschedule another meeting probably for the end of next week to update our district construction standards type of carpet we should have in classroom the type of light fixtures um the roofing materials and so on all things are very common so once we hire Architects these are the district standards and then the Architects will designed of these they might have a couple different um bells and whistles to a particular building or something modernizing

073but we want the district for maintenance standards to be able to all the toilets are going to be the same all the fixtures and things and it's very easy for maintenance staffs do that yes what type of staff is making these it's going to be the maintenance staff and really the people that are responsible for maintaining so we also going to have ground standards the type of trees that are going to be planted no poison oak right things like that but those are pretty common things that the the ground staff say no we use Toro sprinkler head are Hunter so the type of graphs won't have intrigues and so on uh because it's important we want the people that are going to be maintaining it to have a say and what we're going to be

074installing the simp point for them um so we'll working so these are some things we've been working on um and Port Carol the front desk she got all these deliveries today she had like a big Dolly to bring in all these Bo and so um we'll be reviewing the request for qualifications and then if we have decide to have interviews we'll be interviewing some of these firms the next few weeks or hoping by the March meeting we'll bring a list of pool of Architects and then also we'll have somebody on on uh contract to help us manage the bond program but that's those are some things we've been working on last coup last few weeks so some organizing the bond program um as you know the 10 site is a very big decision and it

075will impact the entire Bond program including the cash flow um and so depending on when we whatever we decide the the direction is to to use the 10 site that'll impact how much we spend out there it impacts all the other decisions are made for the rest of the nine sites uh we want to do a middle school analysis of the educational capacity of EGA block to determine the scope and timing um if we move to a middle school model we have some things that we want to do the tent site decisions the Middle School model and site improvements those are the three main things we want to focus on for this program and we want to see how many extra classrooms are we going to need if we don't if we don't need a

076ton of extra classrooms can we move to that Middle School model quicker get some a couple classrooms built and not have to do a full build out depending on what's our capacity of even block um and then Elementary mization scope and sequencing how many middle or how many elementary schools can we do work at in a particular summer um uh Middle School mon or Elementary School modernization is tricky you want to do as much of the work as you can during the summer so there's no impact to Kids on Campus uh you don't want noise and things going on during the school year and then we also will have to house them and move them out to Portable which we don't want to do so the timing of elementary school work has to be very

077orchestrated very organized and so we're going to have to be very um detailed and have a very good plan in place before we could press play to do it all and then we want to have a pipeline of projects as construction is going on in certain schools we have design going on for the next phase the projects and then so on and once those projects go from design to construction now you're designing the next phase of your projects and it's a constant pipeline of projects and when we talk about cash flow which I'll talk about in a little bit is you have to have cash to pay for the projects under construction and then you got to have cash to keep the design going and then the next cash is to pay for the projects

078that are under construction because the most expensive part of the project is the actual construction the design is expensive but so the idea is always have a pipeline of projects and now you're keeping your bond program progressing and you're using your bond dollars um I don't say too quick but you're having things in design you're constructing and then you're moving through the bond program and then as you need money is when you do the issuances based on whenever you're going to need the most amount of money depending on what you could have multiple projects going on at once but you have to have it faded in um the next slide talks a little bit about what this looks like we could do a sample phase one could be Middle School side improvements we could do

079two three four elementary school modernization so modernization would be new roofs hpac lighting if we're going to replace the lighting in hpac in the classroom all this drop down ceiling would be removed they pretty much would got the entire inside of the building the bone would stay the same and we' work our way from the top put a new h heating cooling systems lights technology refresh the carpets paints do all that one time and do it over the course of several Summers um we would need to decide how many schools we can do at once can we do three schools and you hire one set of Architects that does Egan block another architect does um Covington almond Springer and so on and so you divide the work up and then you um have one architect

080or several Architects working on different projects makes it easier um not everybody can juggle a lot of balls so you want to spread the workout also to maximize efficiency um and you can get more projects done in a certain summer time zone as you can which is why I'm just going to interject that we are you're building a pool right now of Architects and Engineers so we can distribute and have multiple projects happening at one time yeah and then um the number one group we want to have on board is some of to help us get the program organized the bond program managing the program with us and then getting the Architects that's the first person that will hire Architects to start the design process there'll be other Engineers there'll be inspectors and then the

081last person that we get on board the actual contractors and we'll get some a pool of contractors on board but we have to get things moving in design first um and then the T site decisions could be part of the phase one of the bond program and it could be in any order the board decides to give us Direction on and then really we want as while all this phase one is going on we're also now getting phase two projects into design so when we when we're managing the bond program it's constant design programming schematic design construction drawings it goes to DSA for six months for riew and then while all that's going on we're getting bids and things DSA approved the project and then we execute the Project based on certain timelines um doing

082the work at elementaries want to focus the most of the work has to be done during the summer but if we decide we're going to install a new multi-purpose room that could be an 18-month project to actually physically do the tear down and rebuild it that will have to be done during the school time contractors uh in the day area have done school projects they know how to work on active campuses things will be fenced off it'll be safe um they all know how to work on campuses so I'm not super worried about that um but it is it's a it's a consideration it's loud it's noisy there also a teachable moment kids see tractors they get really excited and so I like seeing kids get excited for that you saw how excited they are

083when we did the playground out here in Covington they loved it right so um but that's a sample phase one and these are some considerations is how many projects are we going to do at Phase One and how much will each phase one projects cost thank you Boy Scouts thank you we learned a this is a sample cash flow um and this is just round numbers to make it easier to understand so we still have some remaining dollars in measure end but that's our beginning balance so we can use some of those dollars now to get the Architects and Designs going for whatever project it identified then Mako talked about the first Bond issuance that's the revenue measure e will be the first series a I wrote 2526 um and that doesn't mean we're going

084to issue 25 we could maybe not issue it till the beginning of 26 and it'll be based on when we actually need the money um and then let's say just for round numbers in 25 26 we're going to spend $15 million we'll still have an ending balance of 100 that goes to the next year we'll spend maybe 75 million of of bond dollars that leaves us up with 25 and then now I know I've got some things in design we've done some construction I'm going to need another Bond issuance because I'm going to need we're going to need more cash to start some bigger contracts like we just signed three big lease lease back contracts for to say $60 million a construction we're going to need $60 million in the next two years so we

085work with Miko and we time the next bond series series B series B we issue $85 million in bonds we're going to spend 25 the first year maybe 75 the next year and that's kind of how we're thinking structuring the bond program so we have to have our list of products kind of identified kind of what we think the timing of is and how much think they it's not going to be perfectly to the dollar but we have to have a reasonable idea of what we think we'll need each year and work very closely with our finance team and we'll schedule our series based on when we need the cash and then that's that's kind of what and I can keep going out and out but I just wanted to do the first couple years

086the first two Series so you can kind of see what we think about cash flow um um if we decide to do a very large 10 site then that will limit what we can do with the other sites and we're going to have to push things out the other way or we could frontload more work at the elementaries in middle school doesn't mean we're not going to make any decisions down the road that allows us to get some work done now at some of our current sites then as more time comes available we can push things out for the T site decision based on how big we're going to build it and so on yes does the 25 million include the PDR money it does not I what sorry question does the 25 million beginning

087balance include the TDR money no there's about 38 or 39 in there C currently but I pulled out that 10 million just just to not have it shown on the balance sheet just just for purposes why not well the TDR money is uh it's UNR it's unrestricted yeah but if it was actually Bond proceeds for measure N I wouldn't be able to do that another question um from uh on Slide your slides you had potential Su issu schedule okay um and uh April 21st and then July 2nd we actually close on does that mean that um any time of day we can call you up and two and a half months later we get money yeah it usually takes the two to three month time frame um and what's important is that we do want

088to get on the tax rule for measuring for fiscal year 2526 um and so that's why I indicated that that tax rate resolution probably will move forward and the actual issuance of the bonds will depend on yeah no so I was asking this sort of like in response to Eric yeah cash flow if we suddenly decide that we ignore Ash do are we constrained to issuing bonds only every two and a half two years or can we say go two years two years three years four years like that let's say yeah and so that chart where each of the series you know layers on top of each other um it would be helpful to have some idea when the next series of bonds will be because what we typically do is to have a lot

089of principal maturing in the first two years with the assumption that the district isn't going to issue for two years and so um if you do issue earlier we might need to do some what we call capitalized interest and stuff to make sure that we don't over $30 in that first year and so um we are not to answer your question directly we are not restricted in when we can issue but it would be really helpful to know kind of a general plan or idea um since we structure the bonds with that planning in mind I'm sure ER will be able toly so um let's say we wanted to stick to the two every twoyear plan but we needed an advance on the money would it be preferable then to issue Bond anticipation not is

090you know like because I don't really know what the Yeah of those are to the extent that we can we try to avoid Bond anticipation notes particularly because it adds another financing um and you know it's very much similar to issuing long-term bonds is that you have to go through a rating process you need to do the disclosure documents um and so you know there's no advantage to using it just I would say it's not an advantage but you know I think depending on the project needs we will'll discuss and put everything on the on the table and say okay well how would how would we best Meet The District's Capital facility needs um so I just wanted to I think the main um objective tonight was to present the original financing plan and I

091think as this plan gets more developed we can um you know see if we need to adjust the financing plan um and particularly you know two years from now four years from now as we get more information on AB will truly be able to revisit the plan with some new data since we have a couple new trustees hopefully it'll correct me if I get this wrong but as I remember when we did the bond anticipation notes that was because we were hoping to get the TDR Revenue which then would pay off the bond anticipation notes and then we could issue the rest of the bonds but the plan B which we ended up mostly in was needing to issue the bonds to pay off those Bond institions so I think that's why we structure that's

092yeah so the the interest expense on the bands did go on the tax Ru um and so you know it's an additional I mainly it's the additional interest cost I mean you know if you did Issue long-term Lunds at that time you wouldn't need to incur interest expens still so cost of isance and the timing if you're going to go through the process of doing a bond anticipation it might be more cost effective just to do a regular issue inste tax exemp bonds because it's um you're still doing through all doing bonds is a very long process even though mikiko made it very nice only three months on the L window it's actually a lot of work on on everyone's part um the financing Devon Council and all the disclosures um having the board approve

093tax rates and so it's pretty important um you try to only do it when you need the money because there a lot of work to do it you have a couple more slides there yeah so this is just a quick and then uh what we try to do is um uh show this is just a draft project list and this is not from our district but that I wanted to the board to see is when we start developing a project list we start putting a bond program together we will have list of projects the estimated construction cost and then we'll have Construction contingency miscellaneous construction cost soft cost is are your engineers your Architects inspectors and things those are soft cost F FN it's Furnitures pictures and Equipment new technology desk chairs things that might

094come up and then each project will have a project contingency and we will work on our project list to develop what is a good construction contingency 10% 5% if there's modernization and when you start tearing off ceilings you have a little bit of a higher contingency because there's like a lot of unknowns who knows how they built it 20 years ago so as you know if you've done a home renovation you're like oh I didn't know that was there and so you might have some unanticipated costs so you do want to have some project contingency to cover those uh then we would say okay what's the total number of new classrooms if it's going to be Middle School a new school uh and we would say any new program measure e on the last column

095of what we're going to be using and I might have a separate column that says measure end and remaining measure end funds I would like to spend those down first and then we would go into measuring um there's a little project type on the side and it talks about what type of project it is we have modernization part of it it could be um infrastructure what phase is it in is it in design programming where you getting feedback for the people using the facility um and then if it's in CD construction drawings and then if it's in DSA review so we'll have not only a list of projects and the estimated construction costs but we're also going to have a timeline of projects because you you have to visually see we're going to do phase

096one the first four years and then phase two might be the next four years um once we get all the projects identified and have some actual costs that are pretty close to where we think they're going to be then we'll talk to the board and come back about this the list of project we're recommending um and ask for some guidance and some direction for that and then this is um these are the estimates that were shared with the board in July and this is the scope of a um pent site project this talks about the fields and just doing the joint use Fields with with um some of the design work that been working on the design build team with block and Tex and about $33 million all in cost and that's just for the

097fields and gym and then next slide we shared like last July was if it's a 500 student School estimated cost is about $89 million plus the other $33 million and that was in July 24 estimates we would go back to the estimators and say okay what's our number this year um Bay Area construction cost are higher than any other place um so that we have to have a reasonable assumption at least 5% escalation on cost every single year um we do want to get moving on the program uh but we want to be thoughtful want to have an organized Bond program as well so these are just some quick slides just want to share kind of remind some of the things um and then as we get our project list together we will definitely um

098have more sharper costs uh what does it cost to manage a program we're going to have to hire a program manager some sort of director of bond in facilities or a bond program manager uh I like to do the ENC Accounting in house so we have to hire by accurate accounting staff all allow to use Bond dollars for that um we're not paying our administrator salaries but we're hiring staff to helpet I'm here answer any questions you have cash flow projects the project pipeline any questions about this piece of it what are we I'm sorry oh I just was wondering to um in the example you have uh modernizations at three Elementary campuses is that sort of like what you think the upper bound is for how many we could have simultaneous um I might

099just kind of use it as an example we could do two a summer and the next three Summers or four Summers we do two two elementaries and then one summer we do three or we do 332 or you know 331 or it sounds like you're not exceeding three them I think if we had um Elementary School construction going all three schools like more than three a summer that would be a lot of work and you also have to be able to manage it um and then you have to have cash so we can also can't do you know $60 million of construction and over the course of two summers if we don't have so we have to think about all those things as well so there's going to have to be a lot of planning

100uh but then once the program is kind of planned out it'll be much easier to manage we have rentals a lot of summer camps for kids so we're going to have to be um you know okay these classroom wings are are under construction fenced off and they're going to be doing their stuff and then the camp will be on the opposite side of the campus really far away so um but those are also considerations as well so the campus modernization the elementary modernizations we're talking about is that basically a gut VI model of like every building on campus is that how we should be thinking about it not every building um because some of them were portable that were renting so we wouldn't do any of those it' be mostly the Perman classrooms that we

101own those to be the number one Focus like priority and then if we know if we decide hey we're going to to remodel these 12 classrooms we'll remodel those 12 classrooms and we're going to remove a portable library install a new permanent library that might all go on at the same time or we might just do the modernization of the 12 classrooms and then the next summer we do the library or admin building or whatever we decide to do it's all based on what Mak how many choices are there for like us to make in terms of what a modernization consists of I think we would bring back a list of projects and say um and give you guys some numbers I think it'd be helpful to give you some actual dollar numbers like this

102is what we think it's going to cost us to do these five projects and then get yeah but I guess what I'm trying to ask is sort of like because on the on one of the you know slides that we've seen before in terms of the master plan budget right like the modern monetizations across all of our campuses add up to significant fraction of the money available so I guess I'm wondering to what extent there are choices that we could make to scale down get less ambitious about modernizations it's not I mean it's presented on a line by line it but it sounds like in reality you're like going in and doing everything so it's not clear to me whether to what extent we can try to re in that cost I think um when

103I look at the full facility master plan it's you know over s 00,000 700 million and um we have over $700 million of identified projects and then we also have to decide how much we're going to spend on the 10 site so those are two competing factors so we're going to have to decide um which projects are the highest priority is it going to be classroom mod we and I think we've kind of had that meeting last summer we identified some projects and we all felt that classroom modernization was probably the highest need for the district and that's really going through permanent classrooms getting rid of Portables putting in permanent classrooms modernizing our permanent buildings with new HVAC lighting um and those are that was kind of our priority in kind of marching orders but

104then we also have to decide some other you know so the more work we do on modernization and site improvements then that leaves us less money for other other things so we have to decide what's our biggest priority new constru ction modernization or kind of a BL a blend of that as well when is the board going to decide on the priority of the projects like when is that and I'm looking at the master plan budget but I would but I don't know when we when are we decide so we can start talking a little bit about that today I think you have one more of timeline one that we wanted to talk to before we get to kind of you had given us the previous board had given us buckets of priorities um so

105we can revisit those before you move on Eric I kind of wanted to follow up on Brian's question um and it's related to my previous question I just want to get a better sense of like so let's say we're doing three elementary schools One Summer are is the intention to like have them completed by the end of the summer like whatever modernizations we've selected be done by the end of that summer and then would we sort of like leave open the option to go back to that school at a later Point like let's say we said we really just want to do ageback Roofing and lighting for the first round get it done to these three schools this summer but maybe like you know 10 years down the road we'll go back and do the

106paint and the carpet or whatever is that fine because I mean it doesn't seem to me like you're better off by doing carpet and Roofing at the same time right um there's no it doesn't seem like there's Synergy there but I don't know if in your mind you're like no no no if we're like you know fencing off a campus we just want to do all of the work on that campus and be done with it all at once yeah um element you know with the if we want to minimize temporary housing if we don't want to bring in Portables and have them stacked out all over the place we would want to do as much work during the summer so like in my mind and we've done a classroom mization schools out on a

107Thursday the movers are there on Friday moving everything out you already have DSA approv like 6 months prior you have the general contractor under contract 6 months prior they've ordered all the equipment the lights the HBC equipment because it used to be sitting on shelves now they have to make it and takes longer long lead items you have all that ready to go school gets out on Thursday movers come in Friday they start demolition on Saturday and then they get that school done in 8 to nine weeks because when the kids come back in August we have to have all the open up ready to go Bells fire alarm so when we're doing a project when we have everything open up BSA is going to say Hey you have to upgrade your fire alarm so

108that will all happen at the same time um they're going to look at our path of travel which is the area around the building all the concrete cannot be more than 2% crossload so they'll look at that so they'll look at Ada upgrades they'll look at fire alarm upgrades so all that work we do want to do all at the same time for sure so they answer your question yes that's the most cost effective you have to do because they say won't say no you're going to come back and do the fire alarm two years later says no you need to do the fire alarms now but that's going to be that will have to be done at same but now that's for all the buildings that are currently on campus um but to answer

109your question we would do all that at the same time carpet everything but then if there's a a library can be that can be done another summer because we might do the library remove a couple Portables and do another upgrade that summer on that campus now comington we removed some Portables this last summer comington doesn't need a ton of like other new buildings so that would be pretty much mostly modernization Bells fire alarm carpet chain HVAC lights then that's kind of how Covington would be handled and then one campus might need more ekk classroom work so every campus is going to be so different um one cl one school might have tons of Portables well we need to remove those Portables and put in permanent buildings so that's going to be the kind of the

110logic list and discussion of how we how do we decide what's the priority because every campus is different and I think it's fair to say that um the project manager person helps us see how do all of these different pieces and needs across nine schools and an eight-year Bond program and actually conceptually realistically fit together yeah so we can get things done in that pipeline kind of way but I think Shy to your point it it would be helpful to get um some direction from the board on like what are the priorities Eric renamed them from the last board it was to work on modernization you guys have talked about converting to the Middle School model there's still decisions to be made around the 10th site but understanding kind of what those priorities are will

111help us work with our new team once hired to actually bring uh a plan to you for comment another question um you said that you were going to hire a program manager um why is it not possible to do all at least seven elementary schools in one summer they're going to manage the the program so aside fromo cost well it is cost um it's all it's cost and it's also impact to the campuses and it's also just even though we will have some help people helping us manage the program it's also very impactful to have work done at all seven campuses all at the same time hi I mean somebody else is doing the management right um I'm also thinking of cash like we might not be able to manage all of it um we

112are going to be managing projects too we're gonna have somebody helping us and supporting us but the District staff will still be very involved in these projects um we have camps to worry about all the other things that happen like we might need to have one campus open so we might have to move the Athena camp and bald eagle might go to one school and then we focus on another school's Camp you know we focus on two schools at the same time so we also want to minimize the impact of the campus sites as well yeah I I um my uninformed opinion is that we should do more than two schools or three schools in the summer you know restrained by available cash sure and and we and we could do that because we could

113do two elementaries or three elementaries and work at block and in and there five schools One Summer but it doesn't mean every school is going to be completely torn up um we have to be very um uh methodical and like if we do work at Santa Rita we've got a lot of Portables over there we have to have a plan of where are we going to put all these people when we tear the Portables down because let's say we put a new building where the Portables are at we're going to have to have temporary housing for those kids well summer well if we do a new building if we build a permanent building that will take more than a summer yeah some of our schools have um multiple of our schools have additional new construction

114that is part of the facility's master plan so some of the decision- making I think that our project manager person would help us with is understand is it even worthwhile to modernize this particular School in Phase One if we know we need to also do y um a totally absurd comment uh in China Wuhan built a hospital in two months they do not have to deal with the division I have a question and I don't mean to take us on in Tangent or downal rabbit hole but when we were talking about DSA and Stella's question so and you mentioned fire alarm upgrades all the things that DSA requires so in this group one idea campus modernization so if you were to go into permanent buildings but we're fixing the fire alarm for all the buildings

115even the portable ones right okay yeah so if we get a brand new fire alarm we want all the school to have the same fire alarm system so we'll have the standardized systems everywhere um yeah DSA makes upgrade everything and so these costs or budgeted numbers are for like a fire alarm system or technology classroom technology is for the whole school even the Portables if we're doing permanent classrooms later correct okay yes okay so I had emailed you about this earlier about like oh um you know like the budget the numbers in the budget and then the numbers in this chart were not quite the same you said there's been some reduction in scope including like AV so I would like to know where we can have reduction in scope because it sounds like some

116things because they're regulated by DSA we absolutely can't reduce right so I'd like to know where we can make those reductions which is related to Brian's previous question sure um reduction in scope would be things that are like cosmetic carpet paint um small things like that DSA reviews a major things they do fire Life Safety which you can't say no to they do access compliance which is all your Ada stuff and then structural so anything structural related so if we tear roof off they want to make sure any ageback units we put on the roof are structurally sound so they're going toie structural seismic safety they'll review access compliance and fire Life Safety but they also review the energy code which is a hbac efficiency light efficiencies so there's a thing called tital 24 California

117is one of the toughest energy codes and Title 24 is very expensive so all the electricity lights hvc have to meet stet uh energy code about everything you can M so that dries up cost as well so that's going to be a driver that we can't negotiate any of that but paint and carpet minor cosmetic things BFA doesn't really look at that stuff um but when you have a classroom ripped open and it cost you more to cover and save the carpet than it would be to you know sometimes you're protecting the flooring it's like ah just rip it out right you're not going to see because they have to they have to protect the flooring and that's also a cost that they have you know they put plywood down tarps down uh so all

118that cost is something where you could maybe just rip out the carpet it's easier for them yeah and then I in this project imagining um because DSA I believe when you do a project looks for other things that you can do have we anticipated any additional costs for their extra projects in here Pro the fire alarm is the biggest one but then the the access to plance which is the the travel yeah that's where they'll really make us upgrade parking lots uh so from the parking lot to the new construction of the building it's called the path of travel and they're very strict on that and they'll really analyze that um some school districts will have to add a lot more to their budgets because you'll have to rip out the concrete all the way

119around every single building that you're doing work on to make and 2% like almost flat and so and that's because if you're in a wheelchair they don't want the wheelchair to tip over so they want the cross slope going across this way it has to be almost flat and so many schools they like having a bigger cross up because it gets water to drain away from the building so there's a problem with that but access compliance that's the code so it's just something we have to Grapple with as well and they'll be unknowns anytime DSA um we call it the the red pen they have a red pen and they mark up the drawings from the architect and then the architect says oh this is called back check and then they they hand you back

120your drawings with all these red things and then you have to correct them resubmitted at back check and then they'll say okay it's all fixed and they stamp it approved and then we could bring the contract approv yeah and that the red pen is never fun because it cost more what about um when we're working on a campus and we need to move the kids like the cost of do we need about the cost of like additional Portables or where we're going to put those kids or a camp school like how much that costs yeah and we'll have to you know that be like a contingency cost we'll have to build that into our program so there'll be a project contingency then then there's G to be a program contingency as well so we might

121set aside of the $350 million we might put $5 million in in a program for the whole Bond program and we would have to use that money for unanticipated cost we want to minimize temporary housing it's really tough to you don't want it being using temporary housing but sometimes it's inevitable based on the project and we can pay for that out of box yes you can yeah it's part of the project yeah um and then I just wanted to show a quick timeline on kind of what it looks like on a project timeline I don't know if we can make this any bigger you do have a copy this I I can't see it so that's great second zoomed in yeah probably a little bit better there we go so at the beginning of a

122project and it's not much different from a design build which is what we're doing out at the 10 site versus a normal lease lease back contract um once we issue a notice to proceed um we say okay this is the project we're going to do this project and then we're going to select the architect uh they have to look at the ha materials the geotechnical which is the soil is a soil State put a building on so question so is this true of the modernization projects as well as new construction yeah this will be same as a modernization project um we will have to do programming designing of the building now we're just doing a modernization of a building um we're not going to have a lot of programming meetings we will meet with the

123site we'll make sure all the standards are met are there anything we need to know about this building if it's a normal teacher classroom we'll get feedback on the casework how the classroom laid out we will have some distant standards already established um so it's not like we're designing a brand new building with all these user groups that are using it um that might look a little bit different but then there'll be schematic design then we'll start contractor selection I'm going to use just the kind of the one on the right um we'll do uh estimates and constructibility uh Community engagement is a if it's a big complicated project and it's a new building we might have a lot of community engagement if it's just putting in new lights and or new fire alarms and

124modernizing classrooms there's not going to be a lot of community engagement it just depends on the project um uh we'll talk about long lead item procurement that's where um if we know we're going to be doing work during the summer we want the contractor to be able to order the items seven months ahead of time because there's a thing called the master switchboard for like electrical panels and we've been hearing it takes like a year to get it so and then pg& if if you're doing like a new service connection PG says oh that's 18 months ahead of time so for new big projects it's very the lead items are very long so you have to have a lot of advanced planning uh because you can't have school starting with no power right so that's

125not a good thing um that we will have all the construction drawings done we submit them the DSA DSA could take six months to seven months to review the drawings so that's reviewing the drawings doing back check and then once the drawings are approved then we we can move forward and start the project so all that has to be done way ahead of time before we even start a shovel in the ground so there's a lot of lead time and the the top the chart on the top is the number of days Co is GNA ask yeah so that's the number of days not hours no I will hour right so so on top a normal project if it's a normal modernization a new construction new construction modernization it's about the same for GSA review

126time so you're thinking 480 days so that's before you can actually start construction so so that seems like the implication of that would seem to be that we're already too late for summer of 2026 it'd be pretty tight it'd be pretty tight to two projects so then what we would want to identify or what are some projects that we can get out the gate that will require minimal DSA review and we call those quick start projects are there any projects that are smaller get rid of some Portables maybe do a a a preat building a Folia or a a like a Tim request project that we've looked at before so it just depends on what we want to do so these are the questions Tim request be faster than G request would be faster depending

127if it's a PC if it's a pre-check building right which part does the pre-check the pre-check is where the DSA review 180 days DSA review so that's where you're going to save time on review and how much do that you say because like you're saying path of travel all the rest of it like they still have so how much the 180 do you think you save depends so so Project Specific really is did the facilities master plan committee identify any quick start projects no not no you know our number one priority I think is um just kind of letting the board is uh the bond is passed it's wonderful but there's a lot of work that has to be done to get it planned and organized and once we get the bond planned and organized

128and then we know exactly what projects we're going to press play on then we can talk about the financing the scope the sequencing because maybe um one school says you know what um we've got a big camp or something going on our school we don't we don't need the project done we're going to kind of decide that however um we want to be mindful of cash flow and how impact our B like if if if the ad um Mako kind of talked about earlier but if a is growing stronger we might be able to do more bond insurance earlier on in the program it's just going to be based on a multitude of factors um but the idea is to get um the project list kind of identified solidified to get the whole program organized

129and then we will and then you will always um uh you will always have more projects and you have funding available and I haven't included anything about State funding uh we are from State modernization grant funding and for some new construction funding um that's not part of our Revenue model yet but I will bring that back to us later on you know we're eligible for maybe an additional $10 million but $10 million that could be an extra project right so and then um the way State funding goes is you get in line for eligibility and you might not get the money until later on so you'd be basically paying back the bond program later on and you might have money come in five or six years from now for projects that you already completed in

130your three-year Bond program and so that's additional Revenue source as well another question Sandra yeah are you comfortable that Eric has between his time now and the program managers that he is going to hire that he will have enough band to do what normally has to happen during the year plus managing this Construction Plus managing the program managers fa I think we need to build a team right he talked about it an accountant a program manager perhaps there's another director of program like we're looking at what that means for us internally temporary positions right to get us through it's a it's a lot of work it's a huge entertaining we only ask the best people to do that thank you the salaries for the team that Eric is going to be building does that get

131paid out of the bond or is that our general b out of the B yeah can we look at well if you have other questions about timeline cash flow Bond and then I thought we would look at the last um attachment which kind of goes back to those priority projects that we okay question yeah yes that one um so my question here is as you've been talking um I'm getting the impression that these groupings are going to change completely well I don't think the first one will change completely no I me let's go back to the previous page okay sorry I just had mercy put it on this page sorry yeah so there we have four different groups right sure and um my impression is that a lot of them are going to move around

132yeah yeah and I think um and I want to remind um and Brent did a pretty good job is the master plan is a is a living document it will change but this these are all the lists of the entire master plan projects of the entire District at all nine sites so we have work going to have to decide what's our biggest priority and then we will put together okay well maybe we don't this school doesn't need a TK room it might be on the list but we would say no I don't think we need a TK at that room or this school library is perfect or they don't need a coun center or they don't need this or that so we will have to put that list together but these are all the identified

133needs at all nine schools needs and wants and then we have to make a decision what's priority program going to look like because we know that number on the bottom of over 700 million we only have $350 million to work with a little bit of remaining measure um uh measure n and on this list there's nothing about the 10id B and there's nothing on this about Middle School yeah there is yeah there is inal are places well that leads in my comment which is that in my mind prioritization of what fits into the bond program and sequencing are two different discussion agree and so I think we came to pre prior board came to a broad consensus around prioritization one two three in terms of what's most important next important to fit in yes but

134to me that doesn't mean that priority group one which is all the modernizations have to be done first correct yep and in fact but that if hearing that those priorities are still the top three priorities the modernization of classrooms the moving to middle school and my brain just and figuring out well that's not the three groups like the three groups here were modernization new projects plus renovation and then slightly less important new projects plus renovation correct because we're going to run out of money somewhere between groups two and three as presented in do correct and didn't talk about 10 second y and including some decisions on the 10th site I think our job is to come back and figure out once our team is assembled what is a reasonable uh starting point and kind of

135build that pipeline to bring back to you for some feedback and some discussion I mean if we land on and our expert and between time and resource availability and all of that says that we can do two or three school modernizations I think there will be an opinion about which schools get modernized just in that modernization portion first based on what else is on the plan for those particular schools right so to bring back kind of some um nitty-gritty to you I think will be helpful well what I'm hearing I mean given that moving sixth grades the junior highest is on our road map yes and hearing sort of comments around if you touch building you got to touch the whole building and kind of if you touch a campus you're better off if you

136touch the whole campus I mean that suggests to me that we should be looking at the middle schools first like the both the sixth grade changes and the modernizations there which personally I think has the additional benefit of every kid who goes through our district then we'll see at least some benefit because me otherwise we have you know we have second and third graders who depending on which Elementary School they go to aren't going to see any benefit out of this if we don't touch the Junior highs as quickly as possible needs that well I mean when I think of the master plan there's so many needs that's the biggest thing is prioritizing what's where the greatest needs we we know our buildings have been touched in 25 years so they all need roofs they

137all need HVAC they all need lights uh starting January 1st uh State of California another Ury cut thing you cannot buy these compact for us anymore so as these light pictures fail in all of our classrooms we've been slowly fixing them we have done a little bit of retrofits on some of them but um all of our schools have we have limited resources and unlimited needs so we're going to have to really yeah kind of put the pen to the paper and decide what's the priority so Sandra do you want us to fill through the items on the next page and talk about like and break them in some way or what well I'm trying to decide if that would be helpful um at this juncture simply because you all don't have the technical details

138um you know you may say that um see without my glasses on uh the multi-purpose rooms you know are a priority but then our expert may say frankly I believe that you should do the modernizations of these campuses in the first phase and the building of the multi in the second phase so I don't know I'm a little hesitant I think hearing from you some priorities like middle school and thinking about all of the Middle School needs or would you want us to bring to you a conversion to sixth grade middle school plan and a full Block in Ean modernization and sixth grade plan to kind of see the difference and the timeline and the cost of those things would that be helpful go ahead I mean it would be I think it would be

139helpful I mean at least for me I think prioritizing our programming is priority like moving to the to the middle School model but um yeah U I'm sympathetic to br's suggestion that we do the schools first before we do that s Sure we could can we allocate funds to the middle schools right without knowing what's going to happen with the T site I mean it seems reasonable to think we have some idea of um you know at most what spent on the T site so we could it seems like um at least you know based on the estimates here the Middle School both locker room and sixth grade classrooms it's under $40 million see I would be comfortable saying let's allocate those 40 million to the middle school and like it's not like we can

140still decide you know about to sure and the that 40 million would not be required in the first two years of the process is that correct likely maybe maybe not I'm thinking of your timeline and your you know 480 days I I wouldn't be able to spend $40 million in one year like on one like on those two projects it might be over the tour sorry that's not including the soft costs yeah um yeah but I think irrespective of what we decide about the 10th site we can still move to seems right but there's a there's a right and if we if the other hand we put more then we have to work well I we do different work because to me I'm thinking I want to prioritize our our Academic Program sure right more

141than I want to prioritize that's yeah I'm with you it seems to me that the getting the middle school as Brian said getting the middle schools done allows more students to benefit from that right now I doubt that the seventh graders Curr the school start to LA in fact they we get disrupted totally because of this so getting that done I I I think right now is at a high level and then oh and I misspoke earlier so I want to correct myself for the record that with the soft cost the Middle School conversion would um and the music room it would be like 63 million well that's what I'm saying like I would like to prioritize the the Middle School model program not necessarily everything that needs to be done with the middle schools

142right so like I know for example even needs a new middle Music School sorry music room but that to me is a separate issue from moving to the sixth grade model I think that's that's what we need to understand right is that what are the two we have high level conceptual ideas of what the changes to the campuses would be correct but you know Eric's point right like if we end up building new buildings in the back corner of Egan then I could see then you know the consultant might come and say well if you're going to do that because DSA and the concrete and everything else we might as well just do all of these modernizations and maybe we can leave off the music room for phase two but like that's what we need

143to understand I think to be able to do the sequence correct agree Stella can I ask you a question what items did you pick up for your 63 $63 million uh yeah that's sixth grade classrooms locker rooms music room at both Egan and block and then so where do they show up from here um so if you go down the block and Egan columns you'll see music and then new classrooms and then Lo uh no you'll look in group three new construction new construction yeah they're all under new construction oh I see okay all right yeah and then I had to divide by0 65 to get the hard and soft cost so that's estimated last spring right based on those yeah yeah which is not nothing I mean they need to reild 30,000 houses in

144La we don't know what they're do right right yeah availability of materials and materal given Administration fortunately is yeah the other the other issue is um we're not the only District going up for bonds right and so you're going to have uh they'll be competing labor every other District that's nearby that's going after for Bond Santa Clair Valley has how many districts pass bonds oh I don't have that I'm gon say probably 10 I'm say billion copertino pass another one so so there there will be comp there will be um a little bit of pressure on wages as always so um they'll be competing for all the same contractors and subcontractors um so that's just something we' be my so there are there will be some cost escalation for sure also DSA right back yeah

145DSA has more projects in the pipeline it takes them there's a thing called the bin time it sits in the bin for three months before they even look at it right so when it sits in the bin um sometimes they have to send drawings down to San Diego the San Diego office will have to redo things because the Oakland office gets too too uh too busy that's another thing about DSA review time so I'm actually less concerned about like getting the breakdown of like oh if we do this combo how much does it cost I can figure it out but what I would like to know is what are the quick start projects what are the what quick start projects I would like to know which projects we can't get to for a while you

146know because there's no point in saying it's a priority or I mean that alone is not going to get it done quicker right I just I want to know like logistically what can we actually start sooner and are there any like you know small inexpensive projects that could be just started sooner because they have very little on classrooms for example or outdoor shade yeah do you know what I mean where it's like adding something new to the campus and it's not anywhere near the classroom and it's only 3.4 million in hard cost um I think shade structures is a good example um if you have a permanent shade structure that's DSA approved it's PC pre-checked so the review time is over the counter you go in submit it uh DSA is trying to make those

147a little bit easier and not make you do all these other upgrad grades at the same time and we do have a lot of shade structures at our schools so that's another good example but we want to review it first so there's no applications as well yeah that's I think that's the easiest slow hanging one that you could do um because these tents that we have up are not permanent um they're not going to last forever and so if you can get a permanent structure to and that's and that when we did the tours and a lot of stakeholder input from parents that was one thing is sh is a very important thing for families um yeah we have to I actually like the new outdoor shade over even the lunch canopy because we do

148have makeshift canopies right so the new outdoor shade is also the cheapest but it's also possible that those currently installed canopies will have to be removed correct when when we go into work y yeah will not not not the stage structure itself but I want to make sure that if we're going to do quick start projects we're not just picking whatever is cheapest but I want it to be something that we really want to do like well okay so I already did some quick back of the envelope calculations right and um you know if these numbers are accurate then we could do the campus modernization with the scope reductions and the Middle School conversion and still have a little and build out the 10th site and still have a little left over to like you

149know but not for not for everything but you could Pi a few oh yeah yeah yeah and not all once but that's why the timing matters like what could we start now that's not gonna that's why I think Sandra's idea to come back with Middle School a priority here's the details of that because I think we also need to consider what we're going to decide to do with the T site because I think that will affect how much of this we can actually do right so I would like to see what you proposed her it's something like I mean something like M canopies even that would be a summer project yeah so I mean basically like in my mind we've got you know sort of a deadline of the end of this school year to

150try to make decisions so that we can get a shovel in the ground for 2020 Summer of 27 and then we've got you know a little bit more time to get in the ground for summer of 26 for like the quick stuff and like that's the timelin and that's and if we decide we're going to do one schools uh like if we're going to build new classrooms let's say we decide we need to build four new classrooms at block and four new classrooms with Deegan that doesn't need to wait until summer because that project might take more than a summer which it will so you would want you could do that project anytime the campus is operating it'll be noisy they would fence it off we know what area construction is going to happen and

151then you make it happen so that's a perfect example of where there will be some projects that can't happen during the summer but if we're going to just modernize let's say the first four wings here at comington that has to be done during the summer unless we have a plan to put kid in Portables which I would rather not do so I would like to understand the timeline of when we have to meet these decisions because like you're saying it's already summer 27 before we can break ground on some of the bigger projects and if we don't make these decisions in a timely matter it'll be summer 28 I'm trying to so when do we need to decide like what's the timeline that you need from the input from the board always say soon better

152no but specifically like seriously uh I wouldn't want to yeah I wouldn't want to wait um I think sometime this spring probably no later than April I think we want to get is moving uh it's going to take us a while just get the whole Bond program organized uh that's why we went out for the RFQ first to get that that's the number one thing to get our bond program organized uh then get Architects under contract and once we have the program organized we decide which projects we want to do and then we hire The Architects to implement those projects so for for me I always do want the sooner the better but I don't we can't do anything until we've got the program somewhat organized if we want to do it in a phase

153one phase one we want to do the these projects and if we can phase the bond program in two phases or three phases phase one are the first four years we plan on doing these these projects the first four years and then the next four to six years we're going to do these projects so I'm thinking do we need to schedule like separate study session or something probably so we need to hire the RFQ is due tomorrow tomorrow and so we need to get a person hired I do think it would be helpful to review this quickly to see if this is still accurate because for us to bring some hypothetical organized Bond program to you it would be nice to know like are we on the right track so originally the group yes we

154all know that we need to modernize our existing classroom so that was a priority but if you look at the two bucket those were prioritized as ABCD within there so a being Middle School conversion which was only the sixth grade classrooms and the locker rooms and then B went to at the time multi-purpose rooms for Santa Rita and Oak C was then the music building at Egan and D was looking at some additional Kinder in TK classrooms um that say Sanita Al o I believe um right so oh yeah thank you should I should have just clicked on my own computer um so if we think about working with the person that we're going to hire to build it's nice to just have some parameters and then the Third Kind of area was all new

155construction we don't anticipate getting to with this most likely not right um so are again this person might say you know we think we should do c before B this makes more sense but are these generally the projects that should be the priority for this round I do agree with them but I feel like within two we should do a little ranking because we probably will run out of funding somewhere in there and so um you know I also agree with Brian about if we're going into the middle schools let's just get all the middle school stuff done I would I would just throw the music building in along with the rest of it um and then uh sounds like the Kinder TK decision would kind of hinge on enrollment in at those grade learns

156um and so based on current information I may slightly prefer the multi-purpose rooms that's my ring I mean for me these buckets it's part of the old still stand stand for me um but the Middle School looking at bucket number two the Middle School model is high priority yeah I really want to see how we can make that happen um whatever that takes and then you know definitely the multi-purpose rooms for some of our elementary campuses the music building I don't really know how big a party that is for me but if we're doing all the junior high stuff together then do it together but if we're going to start running out of money in bucket two then it's I don't know it's between C and D like what I would sacrifice do I have

157a question for on this slide on that slide you have mization one is that correspond to what we call group one group one also includes this existing Wing Renovations that is not part of say that again so if you're looking at the budget it's um the last line in group one is existing Wing Renovations I think that is not part of the rest of it because those other things are called out individually in group one and then existing ring Renovations this is other thing that costs like nearly $90 million on its own but that's not part of it yeah is that right is that I was confused about that like bathrooms other auxiliary buildings things like that it's a lot of kind of catching all things yeah um again that could be Ada upgrades around

158the building building isn't specifically called out um but when we build a program we're going to put some oh yeah Eric um because you said that you guys did revise the scope of some of these is there an updated version of this that you could share that's the one that's in the master plan and then the the thermometer I think that you had that was done after the master plan was already done so we so we were we took the master plan these are the updated numbers correct that's the most up you have not the updated numbers that's the updated scope that the board decided hey these are the buckets so we took the master plan uh and then we the board we kind of had a kind of like a um I guess an

159action kind of went around and talked about these buckets what would it look like but that was based on the master plan and that's where we started reducing some scope to uh decide what what's feasible like in our little bucket our little thermometer we're going how many projects could we accomplished with $150 million it's all going to be depending on what we spend on the pite as well okay I guess I just I would really like to know what got included in the campus modernization projects that brought the cost down to 83.3 versus this budget document where it added up to I think I Wasing 96.9 is yeah I think we redu some of the technology scope and some of the work at done at Springer as well some of the technology scope and some

160of the work done we can definitely BR that back as well because I think we're well I know we're G have discussion about those buildings that needed to be done then originally building oh okay okay you were building in terms of the existing buckets here like the one thing that I'm not sure if I still agree with based on feedback that I got as I was talking to people and joining the bond campaign is that so if we don't get to 3A which is new classroom to The Gardener bu what I want to make sure what what I'm slightly concerned about is a scenario where Gardner bullets ends up being the only school with classrooms in portables for the next 15 years because most of our other campuses I mean our we have Portables on

161all of our campuses they're all getting used but given our current enrollment we could fit our current like every teacher could have a permanent classroom cor if they wanted to not AER except a gardener bullets and so that's the one thing that that's the only thing that I'm sort of inclined to maybe rethink and might result in a res shifting that doesn't seem quite right and I think you know we're still looking closely at our and we'll have hopefully current numbers as of tomorrow or by the end of this week about what what our TK registration is look like is looking like and I know this is planning much more long term than we're planning for next year but I think Statewide we're not seeing at this point in time the numbers of TK mirroring

162the Kinder numbers for whatever reason and will that come in the future possibly perhaps but does that mean that it's maybe less of a priority right now for us so we're looking at that closely too just if you wanted to shift something from two to three I have a a small knit to pick here and that's lunch ceries at Gardener Bullis this will be the fourth one in my time and this one apparently is going to cost $750,000 for seems like a lot it's goldplated beof bear prooof but that's a DSA issue no well no it is it need not be I'm sure the DS proov much c not to this point in the future yet you mean for a smaller cost there DSA approved buildings then I'm pretty sure that you can find the

163DSA approv what can oh yeah Eric indicated that we could but you were saying this will be the fourth canopy but none of them were DSA approved that is a point that I object to because did you pay for one of them we did we did pay for one that I thought was exemp USA what our campuses so the campus is listed under libraries Oak lyola San Springer those are the only four that don't have permanent building libraries in permanent building because I like I mean I don't know I I do believe in music programs I do but they kind of have a building and I and I remember when my daughter was at alond I think almond was the last campus to get a building for their for their library and I remember that

164was kind of an issue with the other think ER is wor kind has a lot of f fields to step around I know he's looking for so we will uh in hopefully in short term hire someone to help us get going in more um like real actual terms we will generally use these priorities but understand that there might be some changes to those by preference on the board or by just reality of whether it's materials labor or what have you and um work in short order to bring you some information of how we're going to get started does that feel reasonable you've done this before and just I mean I think we have the the project list identified and everybody's in agreement and then also the timing which what are our priorities and then we

165have the list of projects which ones we want to do first and then that we can get the bond program started I do I do feel like a phase one and phase two is a good approach yeah it'll help us with the cash flow as well and once we have that organized it's going to be much easier to implement well just to clarify I'm not quite sure you mean by phase one and phase two but um it seems that we probably have at least four different phases right we going to get four different chunks of money well I mean the issuance is a just timing of when we are issuing bonds for cash but I I just think of like of projects yeah like a list of projects like which ones do we want to

166if we have the bond program we say we say it's going to be an eight-year Bond program the first phase is going to be the first four years years what's our first four years of projects what's the next four years of projects that's my think of just pH like what do we want to comp does that mean that we're going to run out of money at the end because we we're gonna oh no Take that mind I guess the phases don't need to correspond with I just had a comment for Brian um just FYI the Kinder TK classrooms we going to C cost about 20 million and then uh the partner full classs also about 20 million just so you know they are interchangeable right there's still TR off make and the other comment I

167just make is I do want to make sure that we're conscious of giving the community time to react so I think that's where perhaps phase one and phase two is also helpful that we don't just list here all the projects we're going to get done but that there's an expectation that whatever it might be new classrooms are going to be in phase two um which isn't going to happen for four or five years is it possible in Phase One to touch all of our campuses because I can I can I can understand parents saying like well by like my school is in phase two and by the time you get to phase two you're gonna run out of money so we can at least touch all campus I mean I don't know I think this

168is where some of those smaller projects potentially come up Eric does this include soft costs yes yeah nor only the bottom like so you see how at the bottom it says total 474 and then there's the yellow box that says 708 708 includes the soft CS but all the individual numbers in here do not so you have to divide them all by 0 65 the the bottom number on the bottom right the 708 is hard cop and soft cost the bottom right calling except for the bottom one with noost yeah and then the a bigger more complicated project you're going to have more Architects more Engineers more inspections more soft costs be higher smaller less complicated projects less outcomes other comments do you feel you guys go give enough Direction and then board members will

169just be we'll all just plan on being very flexible we need to schedule another big study session very exciting next session we have to sort of get this done by April yes right are we are we done with this agenda let's move on to board and administration comment everybody's ping up thank you oh yeah I I do want to um I want to acknowledge leonie and at the business office Elizabeth her and I were back and forth with the county to work to get the ab200 disclosure approved by the county and then leani uh has been working really hard to update our salary schedules she'll be working on um the teachers rate will be at the end of the month at the end of February so they it'll go on their February 28th payroll check

170and then the Retro payment will be on March 10th for all the teachers going back to July 1 if every employee that the teacher has to be manually entered by viani or payroll technician so it's a lot of work she was here until 6 Plus tonight working um so I acknowledge both leani was about working really hard to get for the help the teachers salary so uh yes I really enjoyed the Almond site visit and seeing the teachers at work and the students engaged and their learning and I also attended um a new trustee training that was let by sh or one of the panels moderated by sh and I got some good ideas there and I'd be curious to hear sort of like um thoughts from the rest of the board regarding maybe like

171a board buddy system where each of us assigned maybe a couple of schools where we try to get to know that Community better um and possible like listening sessions or office hours um maybe some of you already do that but I'd kind of like to learn more about yeah how we could execute that we should share what we learned with Sandra because I I the board sorry it's not I pretty much gon Stella of their trusty orientation and the I think I've been to all the school visits that we did in the last week and I very much appreciate staff and School staff taking the time and it's been very informative um when I talked to Governor Nome last week um nothing in particular I Jesse and I have done for office hours in the

172past be happy to chat with lessons learn and I really enjoyed the Egan site visit and ditto about the new trustee training thank you so much both of you for coming speaks a lot of you that you would want to go to a training on a Saturday morning but I appreciate it and I think our school district is in good hands and with that we are J very