CorpusRecord 109963

Board Meeting 12/16/24

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Wiseburn USD
Date
2024-12-18
Location
Los Angeles County, CA
Material
Transcript
Extent
13,189 words · about 74 min
Collected
2026-06-20

Transcript

Verbatim source text

001good evening everyone welcome to the December 16 2024 wisor Unified School District board meeting I'm calling this meeting to orderer at 6:3 p.m this evening and uh we have a pretty special evening we will have the swearing in of two of our elected um Board of Trustees that were elected on November 5th I think 2024 Michelle and Neil so we'll have that we'll have the uh reorganization of our working groups and then we'll have a normal course of business Wendy would you please take roll call present present and Dr dugall would you please lead us in the play to the flag United States of America and to the Republic stand okay we have no action items to report from close session this evening and um do have a motion for the adoption of the agenda

002moved second thank you Neil thank you Roger all in favor fastic any um Wendy any comments from the public on non-agenda items we do okay we have Octavio Gutierrez good evening and good evening everybody uh first of all congratulations to both of you uh Miss lag gasby Mr Goldman um I have worked with you guys for a long time and um uh this evening I am going to be in my um reading intervention hat um I have many hats that I wear um but that's what I'm here so my public comment tonight is regarding um the right after school program coming into my classroom um now the what I see as a difficult thing is the fact that they're coming in while I'm still teaching so I want you to put yourselves in my shoes

003um I have a small group of students yes from two to three however when Ras comes to my class I would be the only certificated person in the room so who's going to be in charge of those students if something happens who's going to be liable that is what I want to share with you and um hopefully there will be a resolution perhaps at a time that um I am not teaching in my class um that's that's what I wanted to share with you thank you for listening to me and um I mean I I am speechless honestly thank you thank you and just a a friendly reminder um the public the the board is per public my laws the board is not I understand thank you so much and and then for any of

004the upcoming um um comments um um just re a reminder that you're limited to three minutes and that obviously that's not for you Mr guus but for anybody forthcoming but thank you Alice Davis good evening and welcome Miss Davis as one of the designated spaces for the after school program during the TK classroom construction while I understand the district's need to find temporary solutions this decision will have a significant and negative impact on my ability to fulfill my responsibilities as a teacher and a specialist currently I rely on after school hours to complete critical tasks such as preparing preparing IEP documentation organizing instructional materials and setting up my classroom for the next day's lessons these tasks are essential for delivering a high quality instruction and addressing the diverse needs of my students moreover as you

005know IEP deadlines are legally mandated and losing access to my classroom will severely impact my ability to meet those critical deadlines additionally my classroom contains confidential materials including student photographs and sensitive IEP information allowing 30 students into this space daily from 2:30 to 5 creates serious privacy concerns and risk compromis compromising the confidentiality of this sensitive information it is also important to note that I teach first and second graders who receive services from me in my classroom until 3 the loss of access to my classroom during the afternoons will make it impossible for me to test students provide interventions or work with them effectively in the space where they feel most comfortable on Wednesdays my planning Peri period is from 2: to 3: which is an essential time for organizing lessons preparing materials and addressing

006the specific needs of my students if the after school program occupies my classroom I will lose this ability to use this time productively in my designated workspace this disruption will further hinder my ability to prepare lessons and maintain an organized environment necessary for Student Success this issue is not isolated to my classroom utilizing Any teacher space for the after school program disrupts our ability to make maintain a prepared and functional learning environment teachers depend on consistent access to their classrooms to plan set up instructional tools and create spaces that meet the unique needs of their students I respectfully urge the district to consider alternative locations for the after school program that do not interfere with teacher classrooms preserving teachers ability to access their classrooms is vital to ensuring high quality instruction and meeting the needs

007of all students thank you thank you for your attention to this matter and for considering the significant challenges this decision poses for teachers students and the overall quality of education at Holly gland school thank you Natalia Jimenez good evening and welcome Mr good evening thank you um I it's not green there we go it's green um I am here tonight as a parent um and also as a member of the no de Familia um group that um a few parents have um created over the last few years uh I just wanted to piggy back off off of what the teacher said and sort of bring another perspective which is um um if you could consider how having the after school program within um the different classrooms and the pack will impact the PTA um and

008we'll also impact groups like not Familia where we do use um classrooms after hours um we use the pack for our the de MOS event and just other events where we get together um as a community and really you know have activities that kind of bring um parents and kids together um so if you could um you know um you know maybe we need to be uh creative about how we do these things but just wanted to to bring that to your attention thank you um Dr Raquel Michael Jackson I'm sorry if I I want to make sure I pronounce that right Michelle Jackson thank you okay it's green um uh good good evening uh board members Dr Silver administrators at all uh my name is Dr Rael Michel Jackson uh my child attends Holly

009Glen Elementary and participates in Ras first and foremost I want to take this opportunity to thank um teachers PA professional staff administrators and everyone who continues to create change in the lives of their students I I am eternally grateful to everyone at Holly Glenn and Raz uh recently I did receive a message on my Raz app notifying me of a change occurring in January um that text uh from Rez was uh that they were moving um not much else was really shared in that text so I had to text uh Raz and even talk to the Raz um staff to find out what this change was about what was happening um I found out that the pickup and drop off would be in the Pack building starting in January um not a lot of information

010still has been provided uh I understand that there is a committee that made a decision to renovate the RAs bace rather than build a new building which saves us thousands thousands of tax taxpayer dollars so I would have several questions um I wonder if the committee collaborated or consulted with those on the front lines on the overall impact this decision would make um number two my other question is how will events be impacted by utilizing the pack and other uh spaces uh I share a little bit of my experience where I was a bit confused because a week a few weeks earlier I had volunteered for an event in the pack building uh from 1:30 to 2 and additionally I have seen how events are held in the pack uh building during after school and

011even before and I couldn't help but wonder how this change would impact the greater School Community uh my other question is how will teacher staff and Par professionals be impacted once those rooms are utilized I have I have seen teachers remain after school to work on lesson planning set up meetings with parents for IEPs parent conferences student interventions Etc um how will this decision impact the most vulnerable population such as English language Learners math intervention and other interventions uh this really kind of creates a fear and mistrust in the lack of equity and inclusion uh most importantly what is exactly the plan like there really wasn't anything laid out except for a a text message and recently the newsletter and then how long will this change be for and then how will the remainder of

012the money be utilized uh I do have a recommendation um because I like to come with a recommendations is um to hold a holly gland town hall meeting to share the input and have the community discuss um about the use of the spaces funds and future funds 2 second okay uh rent portable classroom Bungalows to support Ras function and then this will help with trans uh transparency and collaborative input uh and I know that the measure eax highlights three points and I just want to kind of uh highlight that this decision to utilize spaces that are designed to support students seem to go against those three points um I hope you Rec consider your decision to house rise R in spaces that support students and consider the above recommendation oops sorry um can I hand

013this over to you guys just so that if you didn't capture what I said Thank you than you Denise faella good evening and welcome Denise good evening I um thank you for uh hearing me my name is Denise FAA this is my daughter Iris she is a student at Holly Glenn and has been a student of Mr G and participant in both Raz and um uh yeld and other programs at the school we also have participated with other cultural activities and social activities that make use of these classrooms such as Mr G's and the pack and we are here to ask some of the questions that um others have already made in regards to the use of our concern of the use of the classroom space of these teachers and how it will not just

014impact teachers but our own children who receive services in these classrooms from these professionals I'm highly concerned that their work and their hard quality work for my child will be impacted and compromised when they don't have adequate space and accommodation and I'm also concerned obviously for those children that will still be in um some of the classroom such as Mr G's while other children are in the area it's highly distracting um and I just wanted to um uh come here and and say that um I am supportive of all the other statements that I said and have the same concerns as other parents and professionals that have come here and I do very much care or would like for you to hear those concerns because obviously my little girl didn't want to stay home with

015her dad she wanted you to see her face and to know that this is very important not just for me as a parent but for her as a a student and a recipient of Services of those professionals thank you you you Christina jber welcome CHR hi um thank you for allowing me the opportunity to speak I have to wear my glasses um so um I talked with Neil after last week's board meeting um and he asked that I share with the board how the kids that connects TK through 8 campus might be impacted by the addition of a new practice baseball field for the wdv baseball team um for those of you who don't know can't see y'all with them M though that's the problem I put the writing big enough so I'm hoping I

016can read without them you look all blurry when I look up and um anyway for those of you who don't know I'm the parent of a child who attends connects TK through 8 I'm also a holiday Glen resident my my brother-in-law who also happens to be my nextdoor neighbor is a longtime wdv baseball coach and my nephew's name is on the wall of the wdv gym holding a wdv baseball record I've been attending games living the baseball team's field based struggle and cheering for the team for many many years I love wdv baseball I love connects TK through 8 I love this board I love Da Vinci um and I love that this board wants to create a proper practice field for our wdb baseball team I truly truly love it and I thank you

017for it I know our teams our schools our communities and our residential communities deserve it as you continue to move through the decision process for creating the new wdv baseball practice field I ask that you continue to take into consideration how the kids who attend school on that campus may be impacted I recognize that the kids will be gaining more grass space But as my son said when I asked him this morning his thoughts on if the extra grass space would make up for a loss of black top he said quote but where will we eat lunch where will the younger kids who like to play Force will play where will we get shaved when we get too hot and where will we play basketball now I know that the design aspect of the space

018is still being discussed behind the scenes I know that the leaders within Da Vinci and the weisburn district are still hard at work to ensure that this is a solution that will serve all parties and I'm certain that you'll continue to work with d Vinci staff and board to figure out all that just as you always have done and always will do I'll wrap up by saying that there are many things that I'm grateful for to this board and one of the many things I've noticed over the past year is that your thoughtfulness diligence and Leadership can create incredible outcomes for kids as a parent raising her child in this District I'm deeply grateful for that and for so much more thank you for giving me the time to speak tonight and for your continued

019thoughtfulness and diligence on behalf of our kids thank you any other any other public comments that's it thank you all right um I think that leads us to the next part of the um board meeting and a special one the administration of the oath of office Blake just make it up as you go there pleas ready sure are we doing this together one you want to go first Michelle ladies first sure right you actually have to stand in the front center all right so um please raise your right hand and repeat after me I Michelle I Michelle do solemnly swear that you solemnly swear that I will support defend the Constitution of the United States and the constitution of the State of California against all enemies foreign and domestic I will support and defend the

020Constitution of the United States and the constitution of the State of California against all enemies foreign and domestic that I will bear true faith and Allegiance to the Constitution of the United States and the constitution of the State of California that I will bear true faith and allegiance to the Constitution of the United States and the constitution of the State of California that I take this obligation freely without any mental reservation or purpose of evasion that I take this obligation freely without any mental reservation or purpose of evasion and I will well and Faithfully discharge the duties upon which I am about to enter and I will well and Faithfully discharge the duties on which I am about to in congratulations all right Michelle the way don't do not feel obligated that you have to

021stay for the public so I'm glad I I went second so you're gonna break that up for me right I was GNA say by the way we had to we had to remember all that Roger and I were just commenting on that we should let all right Dr Goldman please raise your right hand and repeat after me I Dr Neil Goldman I Dr Neil Goldman do solemnly swear that do solemnly swear that I will support and defend the Constitution of United States and the constitution of the State of California against all enemies foreign and domestic I will support and defend the Constitution of the United States and the constitution of the State of California against all enemies foreign and domestic that I will bear true faith and allegiance to the Constitution of the United States

022and the constitution of the State of California that I will bear true faith and allegiance to the Constitution of the United States and the constitution of the State of California that I take this obligation freely without any mental reservation or purpose of evasion and that I take this obligation freely without any mental reservation or purpose of evasion and I will I will well and Faithfully discharge the duties upon which I am about to enter I will well and Faithfully discharge the duties upon which I'm about to end congratulations yeah let's take a moment come on yeah my favorite person sure anytime you get a chance to take a picture with your wife [Music] more awesome three thank you're being with thank you congratulations congratulations to the both of you again I'm all [Laughter] right that

023leads us to board member reports and um I think I'm going to start with Michelle tonight um again thank you uh to the community uh for this amazing opportunity um it is like like I expressed uh after the election I just really am really humbled and excited to take on this role it is something that is so important to me and I love this community and I hope that everything that I do from here on out reflects that love and that commitment to this um to this great office and and again to be elected um by your community is something that it's a feeling that I think is is beyond I what I've ever expected to um have in my life so I am just really really grateful for that opportunity to be connected to

024um this wonderful place um that being said um I really hope everybody has a wonderful holiday and a relaxing New Year I know I am looking forward to um what a re at three and a half more days we're not counting and um and so I just want everybody to make sure that they uh slow down and um hug your families and just uh just be in the spirit of uh gratefulness and love and that's all I have mman thank you thank you to the community this will be my 11th year on the board and I'm as motivated as ever and um humbled by the experience and committed to doing what's right for kids for our teachers for our fiscal management got to put that in guys right and for our community so thank you

025and uh privilege to continue serving uh the same as Michelle also thank you to Michelle we we ran together obviously very thrilled we both won uh but it was a great education a great opportunity to to meet you get to know you and and thrilled to do it and thank you to the board for your support throughout um happy holiday everybody thank you congratulations again Neil and Michelle are really uh thrilled to keep working with both of you as we have for the last almost a year right this Michelle joined us um on the board looking forward to four more of those um I also just wanted to send my uh holiday well wishes to everyone I think it's been a a a good start to the school year or almost halfway through if we

026can believe that that um looking forward to saying goodbye to 2024 that it's ups and downs um and but I think that overall the for the school district itself it's been a very good one um and uh lots of new additions to the team um that have been we've been seeing positive changes and and the like um so just sending you and your loved ones all of our school Community um a holiday season filled with joy and laughter and hopefully some rest in relaxation and uh Rejuvenation um as we head into 2025 so thank you thank you Nelson first congratulations Neil and Michelle congratulations under your reelection to the school board it has been an absolute privilege to work with you and I look forward to many more years of working with you here on

027the board um and also thank you to our wiser Community for returning two excellent board members members uh back to to to the Das here to work with us to continue in the mission of providing uh excellent education for our students thank you thank you for returning to excellent board members uh and then last but not least I wish everybody a very happy holiday season Merry Christmas and a Happy New Year looking forward to hopefully a little bit of time off spending time with family and friends I hope you have the same with all all of your loved ones and enjoy the time as It's a Wonderful Time of the Year lots of things to be grateful for thank you thank you that's all for me Nelson thank you Roger I also um want to

028extend the congratulations to Michelle Neil it's a it's an honor to serve with the both of you and I look forward to continue to do that um I also wanted to take just a quick moment as I end my presidency I just wanted to express my deep gratitude to my colleagues here at the Das the cab the administration the cabinet uh staff and and and this really the entire School community for just the collaboration and support that we've we've had the the past two years and actually extend beyond that and I also wanted to just thank Neil the my predecessor who really set the stage uh for me and the the uh and and in the terms of the presidency and it will continue to thrive um as we pick our our next president here

029um so again just my my deep gratitude um to everybody and um um excited about what's coming because I know that one of the things about this board is we we challenge ourselves to continue to improve the student learning environment and and also the student outcome so I look forward to that and um last but not least I just want to wish everyone a Merry Christmas and a Happy New Year and a safe one as well that's all were you ready Maggie yeah thinking about dedication break thank you lots of things happening in ed services I mean reflecting on some of the conversation that you had last week about Ai and as well as surveys that have gone out to our teachers we do have an interest in that our March 7th PD day is

030in the process of being planned and thanks to Tony Ramirez we do have um someone who's going to be coming in and working with our teachers on AI and giving our teachers some choice in the professional development that they're going to be participating in so stay tuned we want to talk to our teachers about some next steps but we have um some great things happening in that Services side so excited to begin that planning um tonight it's recommended that the board approve an agreement for school mint which is our regist our our online registration system for enrollment registration I know at last week's meeting we talked about possibly looking into power school and bringing that to the board in the future just for ease of news but because we're approaching enrollment season now um we

031are hoping to use School Min to help in the transition of um eventually using power school for next year and the start of next year so that's why you see it here today even the last um we mention a different system congratulations to Michelle and Neil it's very evident that you're both very passionate about kids and the community and I just look forward to working with you both and maintaining the district's fiscal stewardship and solvency so and Happy Holidays and Merry Christmas to everyone all right just two comments uh for me today I want to um start by um addressing the the TK um situation at the at Holly Glen and and actually at delir as well we know that this is a difficult anytime you're sharing space it's a CH all I acknowledge that

032as a challenge um I also acknowledge as a necessity just because of money resources and um when we've brought to the board on several occasions facilities planning and and brought to the uh oversight committee as well as um to the facilities committee the board's facilities working group um cost of building something or even placing a portable is so significant um it's basically on tenable like we would we would not be able to do projects on on the back end of this Bond program or or even in the middle of this Bond program just because the money would all go to buildings including Portables Portables used to be relatively not inexpensive but they were more inexpensive than building um but now with with new codes and DSA and and all of these other things it's just

033become untenable to do that and that's recent like within the last you know few years really that it's that that those costs have gone up um so exponential so it puts us in a position you know puts us in this position today to have to make some difficult decisions um but you know I do and have empowered um both with resources and with uh with support from the district to provide our principal and teachers with what the best resources that we can to support our students our goal is going to always be to to to Advocate and to support our students um and so we're going to do that and we're going to put the resources where we need to to make that happen um again it's a um it's a probably about a six-month

034process um it may continue to to be an issue down the road to some degree but not to the extent that we're seeing it now I just want to bring up to one of the one of the um I guess one of the um statistics or or one of the reasons I guess that that we're in this predicament is we did make a commitment four years ago when we brought right at school on was that we wouldn't carry a weight list up until that point we had these significant weight lists um I want to say had Holly Glenn one year we had 10 you know maybe 10 or 115 kids on a weight list I could be messing that number up it was significant nonetheless and that's a a big strain on our families that

035are looking for daycare and you know you're spending a lot of money on daycare out and about Beach uh the beach babies and monu and all these other these other programs um so one of the commitments that this board asked us to look into we certainly wanted to to to Really lead in this District was providing a safe place for parents to leave their kids on our sites after school and not make that be a stressor in our family's lives um so we run into some issues you know we run into the space issues SP is always going to be an issue I just want to say that um we're going to be thoughtful about this um we're going to be caring about it we know that it's difficult um we thank those that are

036impacted by it um I certainly acknowledge the comments today um but just wanted to say that you know and sort of the interest of transparency and the interest of planning that this isn't we're not talking about a thousand dollars you know we're talking about millions of dollars in in expenditures that that would cost for us to add facility space so what we need to do is to really good job with Logistics and a really good job with um kind of identifying how we can make everything fit um and and that's the area that we're going to focus on so I will Empower our team to do that we'll support the team in doing that um I know Nish has had conversations with the team about it as well so we're going to continue this pathway

037I'm certainly try and minimize some of the impact as best we can support teachers as best we can through that thank teachers for doing this and knowing that it's a really um it's difficult you know these are it's always difficult share space um and try and minimize it as best we can as well um once the construction is done we'll have four new classrooms that are going to be very large it's going to free up other classrooms that are currently being used and and hopefully that would limit some of the impact again not saying that it will never be impactful in the future not saying that you know who knows how big if 600 kids want to be in the program at Holly Glen then we want to be able to offer that to to

038our families to be able to do it in a way that is um obviously that's not going to happen but but you know the reality is those numbers can go up those numbers can fluctuate and we just want to be responsive to those numbers so um anyway I I just want to I I wanted to share that today um as staff I can actually share um a response to comment so I I I figured it would be important to just share what our perspective is right now and and um thank you you know for comments today to the community I appreciate it um and and certainly open to working through it so thanks uh second thing I just want to say you know um this is my seventh year I'm almost finishing my seventh year

039in this position and now um have had um gosh four or five maybe presidents at this point and I just want to thank Nelson Martinez for his stewardship over two years you know he came to me a couple years ago as he was preparing for this and we met and he said he had some goals to accomplish you know one of his first goals he said was to really work on the relationship between Weis bir and da Vinci um to work on the process to work on our communication to work on on those outcomes um the second one was to really help Shepherd across the the bond program and make sure that that some of the decisions we're making um you know that the decisions that we're making are well thought out and well planned

040um and for those of you that don't know you know this is the line of work that that Nelson is in and so um you know his his guidance and his support and his willingness to be able to take calls at all hours of the day and night um over two years has been really remarkable and really helped us shape a bond program that has been a true gift to this community I'm going to outline some items today we're going to kind of review this Bond program today um kind of go over some of those projects that we've hit to date some projects that we're going to look forward in the future look forward to in the future um and a lot of that has been through conversation with with with Nelson um as he's

041LED this uh this board over the last two years um and you know I just want to say thank you for being a mentor thank for being guy you know for for your guidance um I'm going to miss you in this role really will and um I just felt I just wanted to share that so thank you Nelsa for everything that you've done for two years it's been an absolute pleasure thank you Blake it's been a pleasure to work with you and I'm gonna have Blake withdrawals so short term just short term yeah it's a thing hey why don't we all take a moment you've done a terrific job Nelson truly Blake's words are well spoken and uh your dedication you've always reached out to us between meetings always within Brown act very respectfully uh

042did great leadership great connection and thank you very much I don't like the attention so let's move on well and I I just I do want to I do want to sum it up though Nelson and just say that you know I think that the position that we're in you know we heard uh you know Christina shared you know some some comments from uh Da Vinci related to Da Vinci connect in the baseball program but those conversations um have been really instrumental um having these sitdown conversations with the 3X3 um really have been have been um you know very very impactful in our relationship um with da Vinci schools to the point where I think we're in a really great place right now to move forward so just um all in all you hit your

043goals Mr President really appreciate it and um I guess we can move on now thank you um thank you again for the kind words this happens it's it's Collective right so uh again appreciate everyone's uh support and and collaboration and let's move on all right from the uh Wendy do we have any comments from the public on agenda items this evening no okay all right um on to consent items and I think um do have a motion for 8.1 so moved thank you Roger second thank you Rebecca any comments or questions on the consent items yes 8.3 and 8.6 please any anyone else all right let's go ahead 8.3 meal um I wanted to understand the connection I think I get it but between uh care Solace and heal Hazel health and the relationship between

044them Etc sure this is 8.3 um hazel health is a a separate provider hair Solace is a company that we partner with where we can refer families to them and they help that those families find a mental health service provider in the community so they the service that they provide is helping families find their resource exactly Hazel health is a company that actually provides Mental Health Services with licensed clinicians to our students and they do so virtually so Hazel heal um sent each School an iPad and students who are subscrib to this service receive Mental Health Services virtually using that iPad on our campus or they have the option to receive mental health services at home using their own device so it's additional Mental Health Services that are provided free of charge to the district

045um and what you see on the agenda is an extension of their services for free from um January until the end of the school year in June so it's an extension of their services fantas thank quick followup question is there is there a designated space for students where they can go for this don't call it a wellness call yeah so usually it's in the counseling office so they're provided with a space that's obviously secluded and private for them some of them choose to use headphones and then they're designated people on campus like the office assistants or the counselors or interns who are um kind of certified for lack of a better word to to connect that student to their service provider and know what to do in case the service provider needs to get in

046touch with an adult at school in case of an emergency is this something we're looking at for continuing next year or will we have support for it to continue next year um we hope so so far they keep extending the free service um and then yeah we'll see um kind of if that gets extended again and then the final thing is there any assessment of the quality of the program I love it conceptually how well is it executed do we know we don't know so um it's a Service Hazel health partners with Leo and that's how um districts receive the services for free um I'm not I can find out if they survey student students to see how well the service is working um but we receive positive feedback from our families who appreciate another

047option besides typal that is I love it and metrics as you know are really important to me which takes me to 8.6 if I may Mr President absolutely which is the you're on a roll which is the um what are we calling this the the scorecard so Dr Silvers I think the question I have for you here is first of all very excited about this it's been something we've been talking about for many many years um I just don't know didn't know if you could give us any elucidation of the process that's going to happen here and that may be beyond what you know at this moment but please so we had an in-depth meeting about it to to so I have an idea more of the outcome than the actual process um Maggie you

048may be able to do you have any more clarity that you can provide to the process side of it process side is he's going to be working with our teams on like what our data points are going to be so that's something that we're going to be sharing with him um and and i2i to help to kind of develop this scorecard but what are he's really building is this dashboard for us that we won't need them so that we'll be able to and show and you know train us alongside the process of how do we continually how often should we be uploading this data to show this kind of Live scor card more or less throughout the school year and something that we hope to bring to you throughout you know our lcap process our

049you know as we're doing check-ins on on student growth and learning so it's going to be probably a six to eight month thing to build but then once it is it's ours like he's putting it into our you set a goal to have this done by the end of the school year yeah sure that's our plan for sure I mean unless some extenuating circumstances that we share with the board I was thinking before that even but yeah hearing that like yeah come on I mean we're hoping to have this so that we can present this at our how-to in J in June regardless so I mean we're hoping for sure that it's before that the ideal this is a dynamic dashboard correct such that it's updated all the time we can check it at any

050time and the this is going to give us performance indicators metrics of success across a wide spectrum of areas uh so we can be moving forward and we can update you as they come in because we I mean that could be continuous data like from the student side but as we do you know an assessment and we put it in we'll let you know this has been updated in this this capacity and and where and how it was showcased very is to that point I'm sorry I was to say is it anticipated that this will be like on the website or yes a part of yes yeah yeah I mean there's confidential information that and just stuff that maybe just too in depth but we but part of it too is like if we have

051a state of the district type event or we have uh you know the the night out when we do the the night out in June or July or whatever that is that we would have um document or our tours for instance that we have stuff also to hand out so we're also preparing that as part of this package but it will be iterative so we get you know we'll have I don't know 10 12 15 data points now and you know over the year we may say oh what about this this is a great data point that we'll be able to add these other data points as you said you know it's Dynam that's Dynamic um that we can look at that we can I mean part of it too is in a conversation I

052have with Rebecca which was how are we bringing forth our priority metrics like we have five priorities and and you know we have goals associated with lcap so now we're trying to bring those goals from lcap and from our sipsas into the priority document so that it's the one document that that that is associated with this score card dashboard thing that then so we're we're like front and center showing progress towards our our priorities is kind of bringing the full circle I guess is what I'm saying it's kind of bringing it all together so that when we do that and we're going to try I talked to Maggie recently and and Nisha when we create our board meeting presentations for next year tying in these regular updates where we'll highlight maybe once a month or

053every other month these metrics so that we're seeing how are we reaching how are we getting to our goals and and so forth so anyway exed about it 10e dream com reality and Technology enabling us to do so thank you yeah just thinky comment on what uh Dr Silver said I think when we were at the uh csba conference one of the things that I heard in the superintendent evaluation session that I went in uh was to have these regular updates on progress towards goals so I'm really excited that this dashboard will help us to be able to visualize that and to be able to to see that I think um as Dr Silver said helpfully help us see like where are we actually Meeting those goals for this year in terms of the LC

054cap in terms of we are with our special education numbers where we are with the various different um pieces of this so very excited to um see this project comp prion and as we've been building dashboards at my work I also know that they are not always straightforward yeah and to anticipate that there will it will take time to get it right um once you start visualizing data it uh there are so many ways that you could do it and it really is garbage in garbage out um so um so looking forward to to seeing it and uh godp speed uh in in figuring out getting the right getting the numbers right I have a board meeting tomorrow for work and it's we're not there thank you Rebecca all right so I have a motion

055from Roger a second from Rebecca all in favor I fantastic right I think that leads us now um to the organizational memberships um um and we'll go to item 9.1 and we have a myriad or a slew of these so to the public please bear with us take a little while Nelson so just just for uh sort of the order of business so we'll go through each of these 91 to 912 obviously individually y we'll approve them and then I think we'll have a quick recess and we actually do reorganize Within the meeting so we'll stop do we do it at the end or do we do it right after 91 9.12 so after we hit 9.2 then we'll just reorganize okay just about barring any comments or questions or anything that's well I just

056have I know there are we talked about this last week or you know at some point recently there's been some changes and stuff and I'm wondering if we need to have like a fome discuss like talk about all of them together rather than like can approve them one at a time once we have that conversation I simply suggest we move it any comments and second with comments and have a each one on each one it just seems like we might need to have a conversation about more than one like they may impact each other right if there just seem to be a lot of changes from what we discussed so if I may what we could do just for for sake of business we could move we could uh move and then and second and

057have comments for like 9.4 which kind of opens discussion and if we want to discuss other elements how that may impact others we can do that as one item to have those conversations approve 9.4 and then go down subsequently and uh do the each other each other one yeah I I I hear what you're saying right I think I'm thinking there may not be as many changes let's just take go go with them one at a time I think and and and just move I think and we'll see where we get right okay all right so 9.1 um this is um the board taking necessary action to establish the basically the um President and Vice President uh position so we'll start first with the president um and I I I would love to make the

058motion and motion my right-hand person the last two years Roger benuel as president um for the 2025 20 27 year I guess right two two your turn thank you Neil um um and I guess we got do we do the do we do the president vice president together or the president one Motion One motion one agenda okay all right so we have a motion a second for Roger all in favor I I I fantastic and now um do I have a motion for the vice president um I'd like to the motion Neil Neil Goldman or vice president of Michelle fantastic all in favor I and before we move on um I know you wanted to move on the conversation earlier Nelson but I did want to say thank you thank you for your stewardship and

059leadership as board president I know it's not not an easy feat in the sense that it it entails a tremendous amount of time and commitment and we all do it because of the the passion and love that we have for our wise friend community and all the students and community members that we serve so thank you thank you for for your two years as as as board president really appreciate it think you did a fantastic job thank you very much thank you and looking looking forward to to working with you as the president and I'm glad to pass the Baton thank you all right so president I I mov 9.2 the recom the uh certification of signatures okay I think that's an easy one thank you Neil thank you Rebecca all in favor I I

060fantastic all right next one 9.3 this is um for the county Committee of school districts this is uh Los Angeles County School trustees Association right or no so sorry sorry sorry County committee on school District reorganization um move that Roger continue in the position as theing committee Rebecca i' like to accept thank you have a sec give a second Neil thank you and and thank you Roger for continuing to do that really appreciate for the 27th year thank veteran of that one all right now we're moving on to 9.4 this is the LA County oh I already did all in favor didn't did I no no I didn't well thank you all in favor fantastic you can tell that we only do this every two years all right item item 9.4 this is uh representative

061for the Los Angeles County School trustees Association and I would love to make a motion here um [Music] for two okay fantastic I just want to make sure I got that correct for um both r and Rebecca uh to serve on that Association do I have a second did I motion that ortion it I'll motion it do have a second thank you Michelle all in favor I fantastic I know this feels per funy guys we have to do this for brown and I'm not doing a very good job here so thank you to the board for considering having two trustees I'm looking forward to to serving in the role of representing us at Lexa with Roger great thank you thank you Rebecca and thank you Roger for continuing to serve on that as well Roger

062look forward to Rebecca all right n 9.5 this is we weisburn Ed Foundation uh board representative and and I'd like to um move I've been in this position for a while okay and I'd like to invite Michelle to take over um the uh rep as a we representative so move that and I would load a second at so thank you Michelle all in favor fantastic item 9.6 I think we this is uh I we'll have a motion in a second I think we'll probably have a little bit of a conversation here this is for uh budget represent Representatives um and I would like to make a motion um on that I think I have well have yeah so let's I I'll motion it do we have a second just to approve we have second to

063to approve I think the agenda yeah to approve it I think I think there's conversation on sure why don't you so just just um for U purposes I've I've been on the budget committee um for this and I it was you Neil that uh were part of that budget committee with me so um open for conversations yeah um I know yeah know we've had some conversation Roger is interested in serving as the board president on the thing I think that makes a lot of sense we've had other conversations about whether like who else should be I think on um on that there are like three of us who have said that we would be interested in doing it so we can't all be on it but want a clarification I think uh this is the

064budget working group we're talking about correct budget working group yeah correct yes not the 3 by3 correct correct correct correct yeah um and uh this is a convers one and what conversation that Roger and I had about that that yeah um and uh so I would for my own you know learning and uh and growth on the board would love to serve um on the budget working group um just think that it would be a good a valuable thing um so that's that's sort of my pitch for why but I but I also think that that it would be valuable for the board president to be part of that um um conversation in terms of you know the the budget and I had expressed interest for the same reason for learning um but I'm happy

065to uh turn that over to you and and let you take lead on that and um just as long as you know we continue have conversations and allow my learning to continue absolutely yeah and uh and I think that oh sorry I was just going to add I know one thing I've talked to Sean about is is probably need to do we do not probably we need to do a better job of providing maybe Workshop opportunities for the board entire board as agendize items related to the budget so I think that we are going to plan in presentation to hold some some special meetings to be able to have budget specific to budget workshopping um separate from this that we'd run through the budget committee first but then everybody would have access to that information

066to be able to follow along so just saying that as well is is if that has any impact on on any the decisions so one thing oh no please just one one comment um I think it's incredibly important for all of our trustees our members to have um direct access into the different uh uh the different working groups and the Committees one the one of the reasons i' expressed interest in the budget is just for overall solvency in the next two years or decision making with Blake as president of the board um but given that I would be I would like to come off of the facilities committee and allow another one of our board members opportunity to be involved with facilities I mean for those that know that's what I do for for a

067living as well however we would still have uh great consistency and Leadership and support there because I believe Nelson would like to remain we haven't gotten to that item yet on facilities but then that way both members don't come off but we also have an opportunity to add a new member to to that committee as well if someone would like some interest in in facilities you I think you got a um virtually every decision we make is a financial decision or has a financial impact so uh I think Roger your comment that we all need to be audite as to the budget very knowledgeable and um I do think we can probably with your help Sean uh do more to bring us all in um it's been a passion of mine I'm happy to step

068off so we more can learn um I think that's great and I have so much to learn still so I tend to agree with all the comments here um I think that there is an importance to the budget particularly the budget working group that the the the president have U has a seat in that in that group I I think it's important but I also agree that I think it's important to give an opportunity to to others to to um to to learn for sure and I think uh Blake what you just mentioned I think is um I certainly welcome that is given an opportunity for more budget workshops so for so for those of us here that may not be as as as involved obviously um we have those opportunities so with that I

069guess perhaps as a as a as I can make a motion here I would motion um that we consider uh for the budget rep Representatives um um uh Rebecca and Roger um and I don't know if's willing to second that second and all in favor fantastic thank you thank you thank you oh yes and and Michelle you're right you've brought those and I think um with with da Vinci I'd like to even have a conversation in the future we used to have some different committees under DCI that maybe we can have a conversation about something that you would really love to be involved in that that perhaps we can set up set up a working group so I think you you brought some great points at the last meeting all right U next item facilities

070technology representative um this is the one I think Roger you are stepping away from right yes I don't the working group take a vote I have the motion in the second but on budget oh thought we okay did we not have a mo you did a motion in a second I thought I motioned it who did who did a second Neil okay all in favor we'll do that one twice thank you for keep I think we did it really really really want me to do this flag yeah all right recording I think let let's move to facility let's move to facilities and it's facilities and Technology now do I have a motion I will move uh that uh Michelle and Nelson are the representatives on the facilities and Technology committee thank you Rebecca sorry working

071group whatever what are we calling them they're not committees working groups right working group I'd like to Second thank you Roger all in favor I I all right let's go now to the local classroom funding Authority do I have a motion should be um I'll move that Roger be come the lcfa is that what we is this this is the one I've been serving on forever would you like to cons serve on that one oh so typically the lcfa has been the board president I know we've made some some con it doesn't matter it's just that that's been the I think that's what typically has been the model for all the districts involved this is the whole five district jpa um as part of measure CL just for clarity um I've been on that for

072four years and none of the bodies have changed true I think that was the original intent I I just want to say thank you for serving during my a nice connection so what we heard would you like to stay on that motion for Neil all right I got a motion for Neil Neil you have a second thank you Rebecca we're we're voting for that quickly all favor know although I did get to sit in on it it was it was very quick the lsfa oh was different one the other one the next one okay the next one so that leaves us to the next one local more guys hang in local public school funding Authority um do have a motion okay this is the two districts this is simply uh sentinella Valley and weisburn for

073Bond authorization and this this one I think H has this one been president and vice president in the past it was and I think we've changed it's probably been pretty uh this is a this is a once if not twice a year meeting maximum yeah yeah so I would I would say that would make sense to have the president vice okay all right move Roger and and Neil thank you Rebecca thank you Michelle all in favor I all right next one is District uh Recreation and Community working group where's the other sheat like to make a motion for Nelson and Rebecca you have a second thank you thank you Roger thank you Neil all in favor hi hi next one is um diversity equ equity and inclusion working group and I would like to uh

074motion uh Rebecca and Neil for that one do I have a second a second thank you Roger all in favor I make sure you confirm I love working with Dr Ingram so I would like to keep working with Dr Ingram yeah and and the next one is the weisburn da Vinci partner uh repres representative um and I'd like to make a a motion here um uh for Roger and Neil and I don't know if I have a second and there could be a conversation discussion here second thank you Michelle any comments or questions before we take the vote my only comment would be you know obviously expressed interest last meeting and uh same thing my intent really in the first the the infancy of my term is really just to learn as much as I

075can so I've asked uh for a little bit of um uh communication as far as uh this committee this working uh group to go just so that I can learn as much as I can absolutely thank you Michelle and these are the representatives that serve on the 2 by two or 3 by basically thank you rest of the community have been the highle conversations between the two boards yes all right all yeah all in favor I fantastic all right we got past that thank you everyone now we do a recess a quick short one I mean we don't have to officially recess but we're going to do a dance of chairs yes and and now I get to the corner byee wait I only get to adjourn the meeting is that what we're doing this

076no you got facilities items we got facilities it okay like why are we doing that Hees me conations [Laughter] all right bu I know it goes all the way to the opposite side yeah feel so far away well you know what yes this is so that's Nelson that's two years how do you think I felt for two years Nelson I used to sit in the corner too I know that weird feels strange it feels strange over here did you guys take your chairs with you no no I didn't okay I'm okay all right well thank you thank you everyone truly look forward to working with with all of you in this this new role uh for the next two years and thank you to my colleagues on the board for your trust and confidence I

077promise to be inclusive and have conversations as we move the district forward uh to achieve uh even greater goals as we move forward we've we've already had a lot of conversations really truly looking forward to working with all of you and doing their best for all of our students community staff um and all of our all of our parents teachers within the wiser Unified School District and continuing a lot of the great work really truly look forward to work with working with all of you with that said I'm going to go we're going to continue on with the agenda move on to item 10.1 which is the approval of uh reprioritization of projects for upcoming series B issuance and I'm going to turn that over to Dr Silvers and I'll turn it over to Sheree

078I'm just kidding Sheree great ready she would have done it too right ask football sure BL do that if you want like while while you set up I'm I'm going to go ahead and ask for a motion and second so that we can start the conversation because it is an action item I'll move 10.1 you have a second okay thank you all right so I just wanted to uh we had a little bit of a discussion at the last board meeting I shared at my comments um just overall reprioritization for our bond projects primarily going uh the board has asked for parody um we've talked about that throughout the process and unfortunately when costs come in um we have to make some shifts and make some adjustments pretty typical in bond program management um again

079want to thank Sheree and and Noemi for their guidance and expertise related to this but I just want to give sort of an overview of where we're at today some of the projects that we've covered as well as some of uh moving forward how we're going to take a look at this so um going on a couple things I'm going to talk about is our projects that we're currently um having progress and our planning I'm going to talk about our series B projections um and then uh because series a is basically basically expended um talk a little bit about CND potentially Bond program rep prioritization and some next steps so looking here I want to celebrate a little bit this is this is the list of projects um that are in place you look at

080our Del air roof replacement um that happened last summer Del TK con uh conversion project and Holly Glen TK TK conversion project and I want to highlight those because those initially um were separate construction we shared that a little bit separate constructions as part of the master plan um and again the the cost of that was just so high so insurmountable to create um you know new buildings that we had to make some adjustments just to make it fit so that we could do other projects and you'll see that as we look at some of the um the costs why that's the case but deler and Holly Glen TK conversion part of the legislation we are seeing increased numbers of TK it's Super H super exciting it's even more exciting when you go watch TK

081students sing at the Holiday sing um event so I encourage anybody that wants to go see a wonderful event to go to one of the want see some of our babies singing um is absolutely amazing um just would recommend that wiser D Vinci soccer field project um is finished kind of we're waiting for goals I think but we're we're about as close of finish as you can be without being finished and um just a really really nice project if you had a chance to walk along you know the campus here you'll see that uh the burm is no longer the BM it's it's actually an Open soccer field it actually changes the whole the whole footprint of the school um it changes the The View changes just I got to thank the whole student and

082and staff experience having that open and accessible um the big 135th in aviation Sports Complex I'm looking to build that out in March um start building sorry in March um that's going to be a fantastic project um you all have seen that to an updates I think noi noomi did not I think noomi gave an update last week um so you were able to see some of that and even even some of the renderings uh really nice project expensive project but nice project um and you had all the Solar projects now I do want to say solar projects although it says Bond they were not a bond project per se so we didn't pay for the solar panels and the solar um you know Canal levers and so forth and construction but there are some

083soft costs half a million dollars and soft cost basically maybe three to3 to $500,000 DSA approvals certain inspectors that have to come in and do some of the work outside of what the actual project is itself so pretty pretty low low cost but we include that in here because the Project's done it is a a huge project for the district in its entirety also there's a small portion of that that gets funded from the bond just to finish the project and get the DSA approvals that we need if I may just on that sure not only is that a nice project for the Earth it is a profitable project for the district saving us money on utility costs and bringing money back into the district and again because of the IRA which at the cspa

084we're told we have confirmation but we get to see it that we've qualified for the um inflation reduction Act which will mean millions of dollars back to us this is a total win and it was financed entirely without public dollars so this is a this is a win for us thank you for that sure absolutely um and then looking down to to Future planning what you'll see is uh Aviation door access controls you see Holly Glen door access controls you see weisburn door access controls the reason why you don't see Del air is because you also see the Del air modernization so those access controls were actually folded into that Del air modernization Safety and Security as a whole so you do see uh for school TOS being uh being addressed from an access standpoint

085that was number one priority of the board was Safety and Security so you're seeing camera systems and you're seeing um access controls and that would lead me into the next project which is the n network infrastructure project it wasn't intended to be as comprehensive in the master plan as it needed to be what I mean by that is as things were unraveled and the onion was sort of peeled back it we did find that we needed to do more than what was than a rip and replace which was the which was in the initial plan and what that means is you're just pulling switch out and put a new one in the reality is with the amount of devices that we've seen on our campus with the exponential growth of devices um utility using of

086of zooms and Etc I can can't name all of the the applications but with with such a use we were finding an instable Network as I'm sure you know teachers and staff could attest to um the only fix to that was to increase the footprint of the network was to put outdoor Access Control access points sorry outside so that there we were getting a little bleed out from our internal um access points but we definitely needed to have more strong uh Stronger uh Network Outdoors as well in the future there could be or maybe currently you know you use those for Outdoor Learning as needed obviously PE classes um and so forth so just uh that project actually came in um much higher than we than we had anticipated but but much needed as well

087and then slc's Futures relocation that's sort of hand inhand with the 135th and Aviation Sports Complex when we had to remove the aviation and uh remove the buildings at 135th in aviation th those two buildings were left we had to remove those as well couple reasons a is we need to move them because they're just dilapidated and need to go at one point and we're almost there're they're literally at end of life and we had to find something to do with it anyway so thus you know we're knocking it down as part of the field project they have to be relocated so we are relocating those um to the Del air site just just adjacent to the preschool and the Delair uh VCI connect program uh small relocation but but but a much needed one

088so I wanted to share any questions about projects any comments I may stop there for a half a second just to to see no then we'll move on and so then we look at funding I want to uh talk a little bit about funding when I when I looking at the top um just going to sort of pour you through this you have your project on the left you have your bond series there on the the next column then you have your plan uh plan project and what plan project means was this in the master plan did we did we know that this was going to happen or or was it in a subse subsequent conversation and then budgeted cost should really be like projected costs it really should be like what we thought we

089were going to spend for some in some cases it was a master plan expense in other cases it was some sort of cost estimate that we received um so anyway that's that's that then when you look to to the right of that that column actual cost to the bond it's really projected cost to the bond um some of these aren't exact actuals um but for the most part these are things that that we would have to do um and then obviously you see to the right the completion date um I do want to point out the network infrastructure project is currently showing a June 2032 completion date the network infrastructure project is not officially going to the the physical Network infrastructure is actually going to is almost done I mean we're we're literally at the

090end of that we have some access control but the payment for it so we're looking at this more as a financial report we did uh finance that project to some degree or not to some degree we did finance that project so we are finishing that payment in 2032 so it's more it's off our books at that point um it was interest free fees free um funding that we were um able to take advantage of so we're able to spread we were able to to alleviate a bit of a cash flow issue and get more done now so that we could spend it over time and and get the project done that we wanted so looking there is quite a bit of red in the Delta that Delta is basically what we're um what we're running

091I do want to point out one other mistake um that I made or maybe did I take care of that mistake yet I'm sorry I didn't did I it's the 12 million I'm trying oh there sorry um if you look down it's on the 135th in aviation Sports Complex it says 2, 76461 it's really 12 million um so I apologize I was just just a couple million what a deal so we really didn't we didn't we didn't mess that projection up so much um I will I will fix that um in a future in a future meeting uh we will be talking about that so sort of disregard that large Delta there it's it's really about it's a four it's basically four million almost $5 million as a delto there um so so looking down

092uh we did have our Del roof replacement um that's completed um at B on budget pretty much it's what we were expecting deler TK conversion Holly Glen TK conversion projects all came oh Del not as much didn't come over but you do see about a million dollars in a Holly Glen and primarily that was due to some loadbearing walls that were identified after the fact at first they weren't considered low bearing walls they were and when you start touching walls inside a building you have to do seismic um studies and and DSA requirements are are higher so we had to do that to the tune of about a million dollars and the doors right adding the doors we some doors yeah that was a few hundred, that we added doors we wanted to make sure

093that the TK rooms all faced each other if you have six rooms that they could exit out and and actually interact on in the in the TK area that we're um creating also had the Wis Da Vinci soccer field you know a couple hundred almost $300,000 over the 135th in aviation Sports Complex as I said it's not 14 million but it is a$ million difference it is pretty massive um in in what that was and the problem with a field is that you there's not much scope to cut right you're putting a field down you know you have some some concrete benches that you take that's a couple hundred thousand dollars maybe um but the reality is it's field you're either cutting field or you're cutting lights or you're cutting something that's going to impact

094the actual use of that that property so there's just not much to cut there it's just expensive Fields expensive building is expensive um you know and and certainly coming in over you know $4 million more yeah just a comment on uh series ABC and D is not showing but maybe for the communities what is series ABC and D I'm sorry yeah so Series so basically you you draw a bond in a in in in series so you're not taking we had a $98 million Bond you're not taking all $98 million up front you draw x amount and you have three years to spend or encumber those funds to spend them and so and over time then you just draw the next and you have so it's it's basically a series of draws and so you'll

095see here at the bottom as you work to the bottom series a our draw was 24 almost $25 million so that's what you have to spend but if you note and then 35 million for series B but if you notice there's also about $12 million 12.5 uh million dollar that you take out for br Bond program Administration contingency um so then you're really working with much less you're working with that $46 million almost $47 million so you're taking some off the top so that's our operating budget basically is that 47 million that you see there what you're seeing with this current process progress I highlighted Del a because I didn't didn't number it budgeted or or projected cost about 7.5 million you see it's much higher than that at 13.9 almost $14 million um a

096massive uh renovation it's it's it's super significant and um you see at the bottom line with series A and B you're looking at about a five almost $6 million Delta the problem is with all of those projects on the left you can't take from anywhere but the Del air modernization right everything else is either accounted for or done completed or in progress so you really have to start looking at modernization and now that we finally have numbers over the last week and a half I mean we're bringing this to you really fresh off the press and that's why it's quick and we're doing it on a Monday at a special meeting to recognize board members is because you know now we're seeing the trending of a $14 million minor renovation or minor modernization how that's

097going to impact the other schools as well so having to take into account how are we going to plan these Bond dollars out over the next 10 years so that we're able to achieve what this board has asked from the beginning which is parody and what we want to give you know we want to make sure that all schools get something and and that we're um that we're really utilizing the funds uh effectively for um for the community and for our students and so this was alarming to us and when we laid it out over the years what you don't see here is if we had gone gone forward with this and we had made some adjustments and we're able to work work through it what you would have seen is you know um uh

098Furniture um equipment any type of updates to any of the other schools not even being considered in 200 or 2029 is you know maybe 2030 and then you have like $8 million and so we already know it cost $14 million to renovate a school that you know it's it's in the bones are good obviously it needs some work but the bones are good um and and you know if you start moving to our other schools it's just going to be exponentially more than $8 million now in current dollars fast forward to 2029 it's going to be massively more expensive than that so we're really just trying to reconcile some of these numbers that we just received um and and go through that so wanted to share this wanted to share the problem but I also

099want to share a solution so we we do have some some solutions that we think are um are going to work so this is number probably a little bit easier to read most of this is the same but what I want to take you down to is you see your Del air roof replacement you see your TK conversions you see your uh your WIS D Vinci soccer field the 135th Aviation Etc but then go to seven districtwide carpet flooring ceiling tile refresh you see that it's budgeted right across there at about $7 million um it is number you saw number seven we're we're we're saying the projected cost of the bond is about $7 million we think that's conservative ative well we know that's conservative we've got we have some some pretty good cost estimates

100but um it's on the high end so we think we'll have some contingency after that um it should cover all of uh and what that would be to the district is every school all four sites would very soon get new Carpets New flooring um new ceiling tiles and we would work towards Furniture um fixtures furniture and equipment for all of those schools as well as one bulk so you see that as number seven and number eight on this seven being the carpet and the ceiling tile or flooring I keep saying carpet flooring and ceiling tiles would be carpet and some lenum vinyl uh is it LOL uh what is it I'm sorry luxury vinyl tiles l or lvt um we we'll get some lvt not really luxury we're not buying luxury the record for the

101it's just it's just called that yeah yeah and can I throw in one one more thing I think it's useful for folks to we're not making these estimates we have experts making these estimates these es estimates and correct me if I'm wrong Roger and Nelson were initially made in the in facilities master plan updated since then what's happening is we're getting professionals giving us estimates and the cost escalation has become astronomical we started noticing this a number of months ago um a few of us raised some flags of hey we don't want to have decisions made for us so I'm particularly appreciative Dr Silver that we are taking a moment to step back and say all right what's realistic what can we do given this new environment so thank you for that and I just

102want folks to know appreciate that and I think part of it too was us making sure we had all the information at our hands to be able to make the best decision or recommendations possible and so that's so this is the best information in our hands right now um and and as you can see we are we are over overrun quite significantly um particularly due to that modernization and so this this actually uh take adds that parody will get into the into the um each School the goal would be to try and do that this summer where you get carpets and and flooring or flooring and uh and ceilings done this this summer um as well as some of the furniture but if you notice on line number seven while we budgeted while we think

103the budget's about7 million uh you could see that in the budgeted cost or what we would call the projected cost it says 7 million this is again line eight for district Furniture fixtures and equipment when you go to the right of that we only um put $2 million why is that because at the bottom line we have to we have to make sure it's balanced and so you see our running total we're running a deficit of about 600k that'll come out in the wash like we know 600k will account for we we've over budgeted little bit in some areas so that should wash out fine plus if we need to use some developer fees or some diff District funds that we have set aside to finish that project we could do that and so that

104number is there so we feel real good with that number we feel real good with that bottom line um but that's the 2 million that you see there is B basically us having to adjust to make sure that we're that that we're balanced at the bottom and so what what 2 million means is is um furniture will only we'll have to prioritize Furniture we'll have to have a phased in approach of furniture to get through A and B and um likely and I'll bring this to the board um I guess more formally at one point but part of that is probably prioritizing our our older kids first we'd start with our eighth eth age seven six move down to Fifth and fourth um and then the third obviously I don't need to count down all

105the numbers for you all you get it uh but the idea is that we would start running down the list and when we could do chunks we will you know if we can do a chunk of you know just Middle School at one point then we go to Upper Elementary we will and then obviously get down to our tkk um sort of at that final um push but much sooner probably hopefully than 2029 or at the very latest for those groups 2029 you know we know that three years out or four years out that we'll be able to finish some of the furniture if we can't do it before then um I noticed on here it says C or D for the fix furniture fixt and Equipment but are you planning that for B now

106we're going to plan that to B so we're going to prioritize that to B um it'll be good question thank you for catching that um it'll be b c and d basically is what it would be likely you know we may put it minute like we we're going to focus on classrooms first just for you know we're not going to upgrade you know school office furniture yet until we have a better scope of what this will cost um we're going to just make sure we're getting Furniture into the classrooms so maybe the theme of the evening um we can all see these costs again are escalating astronomically there's finite dollars I'm thrilled we're involving the teachers in the furniture decisioning my request would be as the teachers are evaluating the furniture that they have knowledge

107of the cost structure here for example if two options are very close we're testing four that we approved our last meeting if two options are very close a the one and two but that there's a significant price differentiation that would enable us to get all the classrooms for if we Pi number two I would encourage us to let the teachers put that part of the equation so people are in the not sure absolutely got that thank you sh's leading the FFN committee so I appreciate that and we do have six classrooms that were as I shared at the last meeting we do have six classrooms across the district um going to figure out times where we can have teachers that aren't in those particular sites and that have different grade levels to go out and

108see those as well so we could have that that sort of mixing and matching um but you know so and I think often times when we see red like this when we see these gaps you know it it it's disappointing in some ways and I think that um I'm I'm really looking at this glass half full and and this is an opportunity for us to provide parody at the school sites uh for us to get started on some of the we knew we were going to have to do carpet and ceiling let's get that let's get in there and do that um let's get new furniture in I mean as a parent and as a as a as a as an educator walking in and seeing a classroom with new carpet new ceiling and new

109furniture and you know Audio Visual visual support it's going to it's really a nice a nice new environment for kids and and for our teachers and families so um look at it as an opportunity for sure uh to move forward and as you see looking like a pretty well balanced budget here um you know to get through these projects obviously with the $2 million that I think could fluctuate up I'm going to say that hesitantly but I'm going to say it I do think that 2 million were really being conservative there it could end up being3 to4 million which is even better because the more money that's that falls to the bottom there the more we'll be able to do be able to push those Furniture um the furniture program down into our lower grades

110any questions with this particular uh so one one thing that it's uh very clear with the presentation first of all is thank you for the presentation um it's really Inc com upon us to look at what our options are and I think there was really no way to forecast what was going to happen in the market it's incredibly important for us to look at what happens with for example the D air modernization because tells us the need is incredibly great we don't have all of the resources to go through and do a comprehensive modernization of each of our school sites so in construction for us it's it's like having a project schedule build the schedule but it's it's the road map it's the tool from which we can make decisions as information is constantly coming

111in for a construction project oh thank you as as it's constantly coming in for construction we can make decisions with that road map so this is very um evident and as well with regards to cost and um escalations and inflation I do like this concept in the sense that it does provide for more of the parity uh amongst all of our school sites and some of our students aren't waiting four or five years down the road or something happens down the road and there isn't any money to even touch those School sites this ensures that we're able to touch each of those School sites at an appropriate time so thank you for the presentation now open it up to any comments for my colleagues here starting at the end Nelson no comments thank you for

112the presentation and I completely concur with you Roger about um I like this plan because it it does bring parity among the schools and they're not going to have to wait so I can and thank you well well well done CL and I would also add to HVAC is not on here you will see that we we there's a host of other projects that we're going to bring to the board you have asked for reprioritization as you see is pretty much expended right we're going to basically work to the last dollar um to get furniture into classrooms but then there is a series of other projects as we get to um uh series you know c and d uh 2029 and and then again I think 2032 that will pull the other uh other dollars

113out and then so we're going to have to re you know prioritize also assuming some of this cost escalation that that Roger and Nelson both shared you know how do we and so ageback I brought up ageback because that was something significant I know Michelle and Rebecca when we walked the you know the community for the bond a lot of those conversations had to do we talked about HVAC systems and so we really want to make sure that we're able to do that in the meantime the district will you know obviously assuming that not all of them you know die at the same time but we will replace them as they go so we're not going to leave a broken hbac system in a classroom we'll replace them uh with deferred maintenance and and other

114routine maintenance dollars um it's just this massive overhaul of the entire HVAC system at each school it's about a 6.2 $6.3 million project that we're going to have to budget out for uh for a future bond series probably C or D so I just want to say that because I know that's a super priority well we'll see we'll bring that to the board and you all will be able to make the decision as to where where that falls in the priority list any other comments Michelle I thank you for the presentation I mean I know that um these are really tough decisions that need to be made and I appreciate um the foresight and the appreciate the the parody is huge and I think that even though we're a small District um have making sure

115that um that that there is parody among the schools I think is is a really important thing so thank you for keeping that in mind you for shared up uh I just reiterate what what Nelson and Michelle shared I'm uh grateful that we're doing this in a thought thoughtful way that is going to impact all of our schools um in a positive way in the near term um but for the long term uh and so I think that's a really critical aspect of of this and I I uh I also just think that I you know notice on here the feasibility of doing multiple schools I know we are trying to do everything we can when folks are out of the classroom and so also appreciate the idea that we're going to start with a

116couple of schools and then you know move on to others so that we are inconveniencing people as as much as possible and grateful to all of the teachers and staff and everyone who has uh had to be inconvenienced as part of these um projects but in the long run I think it really will benefit all of our current and future students um but in the near term I mean all these projects we're trying to complete in the next year and a half or so um and and that will make that will be of an even bigger impact so I appreciate that there's a a short-term pain for long-term gain um as it were um and grateful for that and to to Noemi and her team um for also continuing to keep track of those costs

117and that value engineering where we can find it thank youca I'll let you wrap up with next steps before I call a question sure and I would just say one of the one of the it should be probably under next steps but I'm just just from I think in all transparency too it could this could mean rep prioritizing even when stuff happens at Del air we've been talking a lot to the staff there and and obviously been sharing with the board about a modernization at Del air well now that we're looking at a little bit of a different process or different program if you will a couple different projects um it may mean that Del air happens later and we started aviation in the Middle School just for E of use we're going to take

118a look at the process now and make sure it's the most feasible process to get the job done quicker so it could be delir may not be be modernized or may not be the first school to get carpet and ceiling tiles it may be Aviation so I just want to put that out there we have to make the best decision based on the resources not based on um you know what we what we've shared in the past obviously we're kind of doing a timeout and a bit of a pivot here um in the right direction but making that pivot could mean that that we change some of the uh the deliverables when those deliverables and to whom those deliverables happen so I just wanted to put that out there not ready to share more detail

119on that yet we will in early no in early January I am going to be going to the Del air staff meeting on Wednesday to share that as well so uh we will go through that process um with them um but next steps here other than that is determining uh the best project delivery we want to figure out how to maximize our time and how to maximize the projects so that we can get as much done and as efficiently effectively as possible so um we'll bring that back to the board uh we're also again looking at the feasibility of completing multiple schools during the summer it could mean that we do carpet and ceiling at all four schools but only furniture at one or two or whatever during the summer could be that we do

120just two schools I mean we don't know yet and we have to kind of test the market and we'll let the market determine kind of what the feasibility actually is in terms of completing this project this summer or what we can complete this summer I should say reprioritizing as needed as I shared we will bring back a charet some sort of activity Workshop to the board uh to go over those final projects or there may be projects in your mind that you're thinking that aren't on that list that certainly you'd want to bring to that so we can add that into the mix uh but we do have a good list of projects beyond the ones that I shared uh to help support will you also look at Value engineering all those projects everything we'll

121have to yeah yeah for sure and some can and some can't you know age back it just has to be age back right but but yes absolutely where we can we would and and also like what's what's utiliz for instance um sorry you know I could talk for this for you know for days on this but if you think about the Wismer Middle School field it gets a lot of use there's been talks about tur that may be a project that has to rise to the top just for the amount of use that that Field's getting and and so but we'll have to look at that as as a process um I do know we're looking at at Holly Glen the Holly Glen field now because it's getting really muddy and dirty so we are

122going to look similar to what we did in the TK area there is is maybe digging it out figuring out where the drainage issues are there and then being able to reced it and or resot it or whatever the the right process is just so that we can start fixing some of those issues again some of that will be deferred maintenance some will be routine maintenance some will be a bond project that we'll bring back to the board but um looking for those too and then um providing an update at the January board meeting uh we'll have a good idea of what we can and can't get done by then and um probably more of a of a timeline that I won't share No will'll be back on stage to uh to do that in

123January so if there's no other questions that's all I have today related to this very none I do have a comment I just forgive me but in looking at 10.1 which is I believe the item we're talking about now right1 um when I when we look at the way it is written I'm not sure it's clear what we're voting on because it says I think it was suggesting in the middle of the item that the D air modernization project cost was 13.9 that's the old and the new is going to be the FFN at 14 but it doesn't really say that it's the districtwide flooring ceiling furniture and forgive but what I meant was it says both of them it doesn't say one's being replaced by the other just list them both so we can

124just say we are we we're we're basically I just want to amend that for clarity so we're not approving a$ 27.9 million right so we're we're basically approving swapping a Del air modernization the comprehensive modernization for what it's worth to a fullon districtwide flooring ceiling and then FF project they about match the same number of dollars we'll be able to throttle up on the furniture Throttle Down as needed so that we can can manage the excess cost I would like the WR up to we will sure sure with that in the minutes y that that comprehensive modernization is certainly being scaled down yeah but it's yes we written yeah res sculping okay with that amendment I have a motion from Rebecca second from Neil all in favor I I I thank you going go to

125item 10.2 this is amendment number two to an agreement uh with LPA for design standards to be paid for measure e bond funds is there a motion a motion second any discussion so this is the new project that we just discussed or is this the is this the The Design Services for the new FF project or for the the furniture pilot I'm GNA probably tag sh in on this one is additional Services fees for LPA we originally hired them to do design standards for a district which were inclusive of fep Standards but at that time the fee estimated was around $8,000 we were just looking for them to give us General schematic ideas for what epan would be in the classrooms since that time we have expanded upon the requested services and so they're assisting

126us with design standards for the six classrooms they're doing layouts they're providing us with finishes they're assisting with um some of the proc procurement ex um uh services so with that they did come to us and they originally submitted an ad Services fee for around $40,000 uh we worked with uh LPA revising those Services down and reducing the fee to an additional 20,000 to finalize District standards for all spaces outside of classroom so this will be inclusive of classrooms multi-purpose room admin spaces and other areas within the campus to then eventually give us what our design standards will be districtwide I guess I'm confused if we're doing the ceilings and we're doing the floor and we're doing the furniture what design standards are we needing so the design standards directly for FFN will establish what

127goes into a space so when we are designing new campuses or we're modernizing new campuses a classroom will get X number of student desk they'll get X number of student chairs they'll get a teacher desk a teacher task chair they'll get storage um so it's establishing counts and now finishes for the classroom it'll then also establish what will go into an admin office maybe an admin office gets a desk a task chair it gets um upper upper storage it gets a a return it gets a um conference table and some chairs so we are working through that process to establish what those standards will be when it comes to Fan so once those design standards or that that those layouts that LPA will be doing that that'll also be utilized to create your procurement list

128from which to purchase correct all the FFN because absent of that we don't know what's going to go into a specific classroom what'll cor get up once it the standards approved then you use that for your procurement and actually go and order and buy the furniture that is correct I had one quick question um so Sheree this fee would be districtwide District like that is correct and then the second is um will this be coordinated with whatever we're doing um in terms of modernization and what I'm referring to is outlets and stuff like that that may be associated with the new furniture that we're bringing in absolutely so once the standards are established those standards are then handed over to architectural firms as we hire them to assist us with projects and then it's their

129responsibility to do all of that coordination this is adding 20,000 not adding 105 that is correct and this creates consistency and everything right I get it correct y okay no more questions I have a motion from Neil and a second from Rebecca all those in favor I I thank you Shere item 10.3 is can we move 10 three through five since they're all for the TK conversion project we can certainly do that 10.3 10.4 and 10.5 I would love a second okay okay Mo it any any a motion from Rebecca second from Nelson um any discussion any questions hearing none all those in favor I I I think our that was our last action item or a really quick meeting this is supposed to be a 30 no I'm was just kidding that was the

130longest quick meeting ever well at least we split it up in two meetings basically do you have a motion you have a motion in a second in a second all those in favor I thank you very much everyone happy Holidays happy holidays

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.