CorpusRecord 111216

BOE Buildings & Grounds Meeting 1/15/2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / SPS BOE
Date
2025-01-16
Location
Naugatuck Valley Planning Region, CT
Material
Transcript
Extent
3,942 words · about 22 min
Collected
2026-06-17

Transcript

Verbatim source text

001okay what's this stuff okay okay Jason you are live you can begin any moment okay here we go uh welcome to the Board of Education regular meeting of the building and grounds committee uh this is virtual Wednesday January 15 2025 uh this has started at 501 can I have a roll call please Jason nevs here Anthony smarino here Jim fan is absent also in attendance Ken serenic John Calhoun Kate cach and James orzetti uh can we please stand for the Pledge of Allegiance Amy Romano oh Amy Roman yep sorry I forgot I you w I thought you weren't going to be here and I deleted you from my list no worries I pledge allegiance to the flag of the United States of America the Republic under God indivisible liberty and justice for all can I

002have a a motion for the approval of the agenda please I make a motion to approve and I will second that uh any I also need a motion for the to review the meeting minutes uh from November 6th buildings and grounds committee meeting I make a motion to um for the meeting sorry about that okay and I'll second that uh public comment this is uh this is this meeting is virtual if you'd like to submit a public comment please email to our board secretary please I didn't rece any what's that I didn't receive any so I don't anticipate any thank you okay and fast tracking to our agenda items uh facilities report John Mr Calhoun okay um thank you very much um so um like to start with the uh with the project list uh

003the mohagen elementary school roof project um been reported to me that there is going to be an emergency public building committee meeting uh that's going to be within the next week I'm not sure if we have a date or not I don't know if Mr mevs has has heard anything on a date yet uh well it's uh it's projected it's uh potentially next week um so that's that that's what I'm being told okay so we have some we have some good movement on that and um hopefully we'll get that uh get that in the pipeline and we can uh we can get the uh the roofing uh portion of it out the bid and go to the state and get all of our ducks in a row and start the uh start that process right

004away y um the next items would be the Long Hill Elementary School window replacement project and the Mohan Elementary School window replacement project I don't believe at this time there's a there has been a meeting set for that um yep there there sorry John yeah there there has not okay um so in my report it it uh it says that there'd be an emergency meeting but that um that was a typo that should only have been for the roofing project not the windows at this time uh the next next one is the uh the high school multipur uh per multi-purpose easy for me to say multi-purpose turfield um I don't have any information I don't know if Mr NS if you have anything new from uh from the building committee yeah so uh from the

005building committee uh same thing um the I was told it was in the mayor's hands for review uh I spoke to the mayor and um uh I think that kind of got Lost in Translation I'm not sure what happened but the paperwork maybe built up on his desk I'm I'm not quite sure but we uh he had me schedule a meeting um between uh myself him the sports uh the the turf uh Builders and and engineers and also with uh Kelly Bano from um that helps with the grants um so right now I got some uh potential dates for for next week I'm not sure if that works with um with the mayor um we I'll cir I'll Circle back tomorrow on that um but that's uh that's what I have for that after speaking

006to the mayor he he he really wants to push this through so um he wants to meet with these guys and meet with the uh the uh the sports the the turf field uh uh company that that the building committee narrowed it down to um to get things moving so we'll we'll go from there thank you uh the next item on the list is the high school the pre-engineered storage building as you know we're currently using that building um uh we it's been a it's been a big help as far as uh being able to secure everything in there um we still have some we still have some racking units we have to get at some point uh we're going to do a storage crib there for for to secure items um and we also

007will be uh we'll be doing a Clos circuit camera system that'll probably be later on in the uh in the spring but other than that it's uh it's been a great addition to the to the school and uh it's been very helpful uh giving H robotics group a uh a nice a nice nice new home so that's that's been a real plus any questions on any of the uh the projects at this point I I have one for um Jason as far as was there any discussion uh with the turf field as far as the the girls um softball or no oh the uh yeah the line item for the additional uh softball area yeah yeah I mentioned that to the mayor he said he'll look at that I think um I think it makes

008sense logistically for us to do that um we're already there it's just a a small extension um but you know we we'll have to lay that all out and make sure it makes sense um but and the lighting Jason don't foret to the lighting yeah that's so that's my call next thing uh first thing in the morning is to Chad who works for us um we'll uh hopefully he can help me uh find the the path of lease resistance there um you know obviously Mr C who knows um it's it's it's quite quite a way to get to that area um it's so it's it's quite a run so it's either pole polls and maybe underground from Meadow uh maybe from you know the Bus Loop area uh and and I guess our Our Last

009Resort will be the Intermediate School um which probably will probably be the best uh plane of attack but can you get from 108 even though that's private State Road say again what about 108 even it's really well I think well I think there's a I think there's a trail there right there's that trail that goes through then you have to cross be yeah you're we're probably better off just coming off right off a meadow and uh you know but uh who knows UI might might require you know maybe UI will pay uh a tree company to open up an easement um or or a path I should say for for some consec you know a series of polls coming coming in I'm not sure we have to investigate that um but we're we're starting with

010the uh the build and in The Proposal there is there is all future uh underground in in light ballasts or or footings if you would right so when we are ready to energize everything's in and we're not disturbing anything yeah at least at least get those in but you would think that if they're if they're hiring an archit well I know that it was a really a company so we're not really hiring an architect versus like a mechanical engineer would have figured that all out you know what I mean yeah well you know what you know what's nice about these they're they're a One-Stop shop right so so the so I you know I speak to the engineers and the regional salesman and yeah they they that's all in the house um you know but

011I mean I don't know if you know the electrical part of it's their fourth day but everything else is all done in-house which you know keeps everything efficient and moving quickly um and and and to just to Circle back on the uh on the uh the roof section uh the roof at this at the at the at mohagen um we're dealing with directly with the owner the the principal of the uh architectural engineering firm so he's fast-tracking things too so just want to mention that thank you very much for that information yes sir can I just say something when when you do the roofs you want you want to ask them about the extended the third layer that they put on it's minimal cost to put it on and it extends the warranty I forgot

012if it's by five or 10 years I think it might be 10 year an additional warranty that's what we did on the other two roofs and as far as as far as the electrical for the scoreboard of the field I thought that we had already determined that it would be coming off of a constitution North yeah that's uh yeah that's for the uh that's for the the scoreboard this is uh yeah we're talking this is for the turf field is that I thought that it was it was determined for the field too that that was the best way coming off of that is right now it's the uh UI was never out there to uh to investigate how we can get power out um to to that lower field no um but I but I

013could uh I I could have someone meet I could have a UI engineer meet us out there and and get that answer which I'm writing that down now yeah they just need a site plan Jason and GNA you know yeah yeah I I have a rendering so maybe I can maybe that's that yeah I have a rendering of what the field will look like with light PS um and then I have the power uh that they need so I'll put a call out to UI um and uh and we'll go from there the company though what you're saying is that company that's not really Forte is what they're you're saying for the electrical yeah I think the electrical yeah the the the electrical was was a separate line item yeah that's uh it's like almost

014like uh Jimmy or whoever or John John whoever who did we do for the lights on the other fields I know that might have been in the package but you're still gonna have to hire someone to get a price and then no we we hired for the field for the upper field lights on the originally multi-purpose field no we hired um you were in that involved in that yeah we hired um oh God what's the name of the firm they're one of the biggest firms around for lighting I have the I have it on my desk at work Gary fipo knows and then you could always maybe it's just better off Jason instead of doing leg work like that that you just give it to them and say price it and it's their problem yeah

015I could is it bazo is it is it B you got Rizzo is a big company Rizo yeah all right said here's a come out and you know a rendering site plan we need price it if you can get me a contact once you you know when you're back at work that'd be great I have all this I have all the specs on my desk so just and then let them do the leg work let them give a ballpark yeah call me call me during the week and I'll I'll get you the numbers the phone numbers appreciate it you're need price anyways forget just getting the power you know you're gonna get the power out there you but you need a price on the lights yeah yeah this they included the lights uh they included

016the lights and the footings oh they already included the lights yeah okay but then that electrical contractor could still give us a price to hook it up and yes how to bring the power in you just need a I would just call them instead of you getting involved with UI just tell them to give away a price because then we're gonna have to still get three bids anyways yeah you know so I'm just saying I mean hey whatever just throw we're talking out we're just chatting whatever I'm just trying to say like hey don't kill your you know like get but you're going to need three prices anyways you know that maybe it's better off for you that so you don't have to call UI this and that that you just called that electrical contractor

017that we've already dealt with and said here give me one price and at least it's a start I I think Amy they already went out didn't you already you already went out for the field right for the no you're thinking of the scoreboard the scoreboard Jimmy oh you already we we talked about the field at one time correct me if I'm wrong and the and the softball field uh was requiring the lighting um and I think John John was there for that so I think you already went if you get a bid for the for the field it should be included what they do Jimmy they don't include the hookup though yeah it's correct yeah there's no they still got to hire an electrician their their price includes a 100 feet to the 100 feet

018of underground underground uh uh trenching and piping to the to to to power source anything after 100 feet is uh is extra cost yeah they you give it to John Calhoun he gets out there with a shovel and he digs the rest of it right John I'll do my best that up boy I like that answer John you're all right I try you'll figure it out Jason whatever I've just throwing that out there too though AB just maybe you just uh go around you I and let let him somebody else pray a text me unless you're really trying to do it in house and John wants to do it in house with our own electrical guys like you're saying meet him out there either way yeah I'll I'll figure that out but I will reach

019out if I need something I know that for sure I have the full schematics for the upper field on my desk I just looked I know I know you said you had a uh I have everything yeah only Jimmy isetti keeps everything with that this looks like I have a we're going to store that stuff because when we did the upper field we when we when we pulled the the fencing around we weren't going to do fencing but we had to pull a section up and when we did we got water we hit wires we couldn't find any schematic so now from now on anything that has to be done with this with this our school buildings they should be stored at the city engineering department at City Hall yeah no just keep in mind

020whatever whatever we do we'll as buil yeah they should so I have them all down at City Hall okay okay and for the record they should also we should also have electric cop electronic copies of everything so I have that I I do have the the uh the key with it John if you want to make a copy of it anytime to it it's good to have that it's easier to share files that way absolutely it's it's electronically you could you know plug it in we couldn't find it I don't know if you remember you remember John I I do yeah so that's kind of like an Unwritten rule I guess we we want to keep them in one place because Board of Education didn't have them City Hall didn't have them who's who's who's

021in charge of that kind whenever we do a project we need to store the the um the schematics for everything electrical whatever and in the one central place where they should be were as City Hall in the engineering department agree I'm surprised they're not they are not I made that rule up all right John okay we ready to go to the next page Uh current issues um the Elizabeth Shelton um Transformer um we're still looking at doing that this spring um I think we're going to again like we talked about with other projects we're going to try to do a majority of that in housee which I think would be a significant um money savings to the district um We're working directly with UI um I think we're going to have be able to bypass

022a lot of uh a lot of red tape and um and costly uh engineering contracts to to work directly with the utility on that so again that's the goal is uh hopefully during April shutdown or sometime right around then um so that's uh we want to get that taken care of so we don't have any problems going forward there um the auxiliary gym um at the high school that's everything is done we're going to we were going to paint over Christmas break but we we we opted for the shutdown so we didn't have the have the time to do it it's a pretty busy pretty busy space uh during the day for the students and in the evening for athletes so it's hard to get the time to get in there so we'll soon as

023we have some have a few uh free hours here and there we'll we'll get in there and and uh get that painted and then that project will be will be complete next thing is energy efficient upgrades I have a meeting next week we're going to start looking at the final building the high school um we're going to do an audit for energy uh upgrades there um due to the size of the school and the fact that UI only gives a certain amount of money every uh every year for projects it'll probably be done in several phases but it'll you know it'll it'll we'll be looking at LED lighting fixtures um variable speed drives pumps Motors Etc so um that again will be another another thing and once that's done all our buildings will be updated

024with the latest technology until of course that changes again down the road but uh right now we're uh uh we're in very good shape with with all the other buildings um um so I just wanted to give an update again um we talk about our small Capital our small Capital um funds and the capital budget that we submit for we had originally asked for 250 it was down to 182 it was brought down to 182 for some some costs that were out there from from the year prior but again uh with that we did to Jim Flor Elizabeth Shelton um we've contracted for the HVAC um uniform in inspection and evaluation that's under evaluation by a contractor right now we got the handicap ramp in the rear central office done um we fixed the broken

025fire hydrant at the high school we fixed uh the fire department connection at Booth Hill and ironically enough we had uh water break water main breaks at both of those schools which was nothing to do with nothing to do with that but we had enough Savings in you know in the other jobs where we were able to run it through here so it didn't affect our operating budget which would have been pretty pretty big because it was it was in the um tens of thousands of dollars for both of those repairs um we did the uh the renovation of the ox gym at the high school I just talked about um uh we're in the process we've of ele necessary elevator repairs and services which are required by law and just in order to keep

026our elevators up to date um Perry Hill Intermediate in the high school some of those were done already we have a few more left to do but again some of them require the shutdown of the elevator so it's hard to do it while while school's in session so we're probably looking at the uh February uh the long weekend in February to do some of those finish up some of those repairs um of course earlier early on in the year we we we updated our alarm panel at the spa and I talked about the uh about the water main brakes another thing we did is proactively is we purchased uh 20 cylinders of r410 refrigerant for our older agac systems as as those supplies become more and more um difficult to find the price goes up

027so we locked in at a good price and we able to able to um to stock you know to stockpile those uh those cylinders so uh the last item on the report is um is the goals and objectives um so the old the automotive shop at the high school for robotics we've got that turned over we've made a few you know we've we're still working with them on a few different things they uh they um they wanted uh they purchased a couple of doors on on a door opening that was um currently uh didn't have any doors in it it was but uh that way they can lock down the the suite there and have a little more security for their for their items and we're working on doing the install there but they purchased

028the components um again we're working on the HVAC evaluation system at Sunnyside of mohagen uh again we have the Tools for Schools Pro um process we have to get moving on the threeyear asbest reinspection uh and of course the thing we're going to talk about last is our six-year Capital plan uh the up the uh updates on that um again our auxiliary gym finalized n elevators I'm kind of you know beating a dead horse here but um the domestic hot water heater we purchase that we just have to do we have to install that and again that's going to be a time when we don't have students in the building so have to shut the water down um and then uh we're going to continue to upgrade the steel storage building you know putting in

029uh putting in things I talked about earlier and then just working with um one of the things we're going to do as we talked about during my budget presentation is just to work with new vendors existing V vendors um trying to come up with innovative ways to save money on on our district uh custodial supplies and services so those are the things we're looking to do and in the process of doing so is there any questions on any of those items I got one John okay go ahead JY thank you um in the automotive shop the lifts yes what do we do with them that was uh the city took that and they brought it over to the uh to their their garage and they were very happy to have it okay I wanted to

030make sure we got them to uh yep them I know that they did ask for them in the uh chemical that that that we used I I spoke to um some people just recently about buying some kind of no-name manufacturing Brands I'll be getting you a list for uh maybe uh they'll come up and talk to you about them that' be great we'd love to evaluate they actually make they actually make you know they they sell a no-name brand but they actually make a brand of cleaning products for name brands usually only you have like one or two manufacturers that sell to a bunch of this different distributors who put their own name on it and their advertising costs are incurred by us so I'll be getting that to you shortly yeah like I said

031we're we we want to look at every every option we can we we are using a we're using a chemical product right now for our green cleaning that is it is manufactured by the company that sells it to us so there is no middle person there but again um you know we we we'd want to look at it evaluate it and see and see how uh pricing Compares and you know anything we can do is a big plus oh yeah all right so the last item is the uh six-year Capital plan we went over um we went over during the uh the budget the budget um presentation the other day um I I I did have an item that was was inadvertently left off and I'm glad I was I was emailed to to to

032point that out to me but it's the um the HVAC upgrades um all of the all the elementary schools are included in that it got left off of my original list so that has been that has been added added to that so um if there's anything else uh anyone had any questions or concerns about on this we can discuss it but I mean it's pretty much uh I just wanted to give you an update that we did uh we did tweak that document how about the stairs at Perry Hill School front steps by the old gymnasium um we have re we've repaired those we've repaired those um again what has happened is they had metal you know they had uh metal metal plates on them treads on them and I guess probably the usage of

033certain Pro salt products over the years um we're very careful now not to use any type of products that are going to deteriorate concrete or or or the or the steel Treads but what has happened is the salt and everything got underneath the underneath the steel Treads and and started to erode them and popped them up so then the concrete started to crumble where the uh where the anchors were so as they um as as they have um had problems or failed we have been uh I have a Mason that comes in and and does the does the work on those and to keep them to keep them up to date and and safe yeah I was gonna ask same thing John I noticed uh to one of the entrances there they're roped off um

034and I was hoping that they you know that wasn't gonna that we weren't G to wait until year 26 2026 to fix that no that's that's yeah if you look at yeah if you look at that under um on the on the thing here um that's more of a I mean that's a that's a little bit of a bigger that's a little bit of a bigger process to try to really make to really you know take some of these things right down and bring them bring them back to brand new but what we're doing right now is we are we are repairing them as needed and of course you know we you know with the stuff anything that's deteriorated right now we we have to kind of rope it off and then we uh we

035we take care of it once the weather warms up a little bit and that and that comes out of our small Capital fund no that usually comes out of my operating budget um again that's again it's it's anywhere you know a few 7 $800 depending on on the scope of it um how many of that needs to be done the prices are are very reasonable um and uh again the his uh the product that he uses is has been very dependable and uh we haven't had to go back and redo anything that he's uh that he's already already fixed I did I did notice uh and I know you got a lot going on I just want to bring it to your attention in front of the main entrance of uh the intermediate school there

036was a section patched um there and there's another spoiling piece there I know it's too cold to do anything but yeah that's that's probably gonna have to be addressed soon yeah and that again that's a that's another that's another issue where again I think it's just Mis misuse of the wrong type of uh ice melt products over the years um has really you know can really as you know it can destroy concrete and uh so that's why we're real careful with what products we buy so we don't do any additional damages so um but when we have stuff like that you know obviously those are things that we we either have to Chisel out sections of it or saw cut it out and and fix it sometimes we may even have to pour a new

037a new section of a slot well this this this section is not terrible as long as it gets uh right attention yeah y yeah and we do you know we've had you know we've been we we Chase those around quite a bit and it's and I you know ironically it's Intermediate School and Perry Hill the ones with the newer newer concrete pores that we have we have more of the issues with in the older buildings yeah good I think yeah I think we were all familiar with the six-year plan last time the your our budget Workshop so appreciate that John you all set with that I am done I'm my is done yep okay all right Mr uh serich any comments Anthony can you wake him up yeah trying to unmute it wouldn't the button

038wouldn't work uh actually the only comment that I have I'm just excited to hear that we're having some movement on the Mohan roof I know that's long overdue so I'm anxious to see that project move forward otherwise I think Mr Calhoun covered everything this evening great yeah so yeah same same with same thing with me uh Mr serich happy to see some movement um this ongoing conversation of a of a a serious project um was was getting frustrated so um yeah so after speaking with the mayor he's uh he wants to move things uh quickly uh so does so does Bernie um and then the windows after speaking with um with with John um I think it's a good idea to let to tackle the uh roof now obviously because it's uh in in disarray

039uh and then go ahead and uh and and worry about the windows and then we can deal with that a section at a time um and I'm also I'd like to keep in mind that uh I will speak with when I speak with the mayor in in the building committee um I'm gonna you know I I'm gonna remind them of the efficiency that we'll get once we once we install these windows um and hopefully help us on the Utility side but um yeah just so everyone knows that we are you know I'm getting the ball rolling um things are happening so hopefully uh there'll be more to come uh by our next meeting so that's all I have for today and uh can I get a motion to adjourn please I make a motion to

040adjourn and I'll second that thank you all

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.