001e e but he was said he did say he was going to join this morning give another moment okay good morning everybody it is 11 February I have 8:01 a.m Christina do you have the tape rolling uh it's recording so you're good to go recording okay excellent thank you uh good morning this is the Central Middle School building committee meeting special meeting on 11 February it's 8:02 am call the meeting to uh call the meeting to order if you join me please in the Pledge of Allegiance I pled allegiance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible liberty and justice for all okay Christina call roll please yep sorry I'm muted uh okay give me one second I'm working on one
002screen so it's a little bit difficult today all right we have uh Joe Rosetti present virtual president by the way this is an all virtual meeting you just took the words out of my mouth Joe uh virtual meeting uh the this uh meeting will be posted with the video after this call as well CL kill gallon is absent Christina is virtual Harry fiser present thank you uh Laura C here virtual thanks uh Tony Turner Tony's here ver uh and Josh casby here and Todd is on I'm here thank you and then tler thank you um Dennis Yi here Dan Watson uh Michael Klick Seth Coe you Seth I heard you too Lauren Raven uh Tom Healey all right Joe is back oh I'm sorry uh Rachel coven Susan Rudolph Warren silver and sorry sorry Jo
003back over to you yes St was that you or was that Susan it was sta sorry okay all right you are at 8 uh voting members Jo thank you Christina um I know some people have a hard stop uh soon so we're GNA make the meeting pass quickly thank you uh just summarizing quickly our goal this morning is we have two proposals items number three and four are on our agenda to uh discuss and potentially vote and approve item number five is a um uh an issue regards egress that came up with the building department and re in their review of our building permit uh we did have a meeting on Friday with the building department Steve Mario from slam a few others and the meeting was a positive meeting uh resulting in a slight
004change of approach with this with this issue and we will not be taking action on this uh based on the meeting results uh we will not be taking action on this this morning based on the meeting uh on Friday however we will discuss it and slam will present something at the end of the meeting here under item number five um having said that uh let's I'm gonna ask Peter Raider to briefly discuss or present item number three the storm water prevention proposal sure thanks Joe uh so good morning everyone we're seeking approval today for um an ad service for Ty and bond um who is our uh civil engineer to perform the required um Swip inspections it's part of the deep um requirements this is a weekly inspection or or um depending on rainfall events
005could be more often um and so uh it's a requirement of the project it was an exclusion within the original slam contract in terms of the ca was you know was always contemplated as an ad service so we're coming today asking for approval of the base contract one or excuse me CA at 132016 plus 5,000 rein uh $55,000 reimbursable allowance for a total of $137 and 16 so I'm happy to answer any questions anyone has Jo before we move on to the next one um we have reviewed it approved it found it to be consistent with what we are expecting for a a per visit allowance that's how we should view this it as I mentioned it's dependent on weather events and things in the field and making sure that our drainage and silt fence
006and hay bales and and site um you know storm water um you know um controlling the site is is meeting the design and requirements but uh I see I think uh Laura and then Joe uh Kelly you had questions I I did um I see that well I it's very small I think you said $132 but it's 132,000 I'm sorry yeah 137,000 016 is what we're seeking approval for and um how come it goes until um post um move in for the is that because the fields will not be done until um after the old building is demolished and and then the fields re um relocated and correct that's right okay thank you yep Joe Kelly thank you I'm just a little fuzzy on uh just a couple of matters we didn't budget for this
007did we we had not um I think originally um as I mentioned uh the slam had excluded their construction Administration I mean it's how the RFP was originally written in terms of of the tranches so we will need to be utilizing some of our contingency for this Expos I'm good with that I I understand they made an exception shouldn't we have noticed that there was an exception made maybe asked the question uh why are they accepting or excluding themselves from a charge or maybe they should have told us that could be a charge or it seems to me I guess coming late into this uh uh this uh this committee that uh maybe there should have been some knowledge that we needed this where did we go wrong I think we didn't budget it we
008never budgeted sounds like that that's that's right I think uh our predecessor and then when we took over this project we didn't understand that this was not included within the base contract and then looking at at slam's contract with um tyin Bond it was an exclusion so and again for the RFP I'm not sure why the RFP was written that way this is sort of a standard requirement on any project um so um but uh so it is like I said the cost is at Joe I understand the frustration I I agree um and I think the cost is in al line the budget can support it um but uh agreed that we we should you all you know would it would have been better to have known about it sooner so well just I
009I'll just go one more Point sorry yeah yeah certainly if we were uh at budget or over budget uh uh and not under budget uh this would be make us certainly not look good being over budget not having considered this as a potential cost it's only we're saying it's only $130,000 but still it's a uh it's it's an oversight that hopefully we don't uh don't do again uh Peter you made it clear that this you guys were not around for when the this oversight was made so uh there's nobody we could really uh uh well yeah yeah Joe but we've been on the project a while too right and so we we I think I think across the board I think you know uh we should have caught it sooner so I'm I'm not pushing
010off blame thankfully like you said within the budget we have to support this it is a cost to the project it would have been includ whether it was excluded from our A&E teams or was included it's it would have been nice to have known that it was coming down the road um and we could have forecasted it so um I think you're right and I think uh you know we're wanting to make sure we don't have any future surprises right so Peter thank you for your honesty I'm good thank you yep yeah pet this is Todd I I moved that uh we accept Okay Todd's made a motion to approve this proposal for [Music] $137,600 customary uh procedure requirement on a job of our size it should have been in the normal course of our
011budget planning well in advance long time ago to be on on the list for our soft costs this is this would have been easily covered with our regular soft costs uh that we had prior to the uh additional savings we may have from our GMP buyout um so given that and also the uh perhaps the reason why it might be have been excluded is frequently this these services are purchased from a third party not necessarily from the design consultant team uh nevertheless we should have had it in our soft cost at line item okay we have a proposal to uh approve this proposal at 13716 and a second from from Todd and a a motion from Todd and a second from Joe Kelly chrisy could you uh call the vote Yes Joe Rosetti uh yes
012for approve um Christina posa is a yes to approve uh Harry fiser yes approve you said yes to True approve I'm sorry it cut out a little bit to approve okay thank you uh Laura C yes Tony Turner yes Josh Cy yes to Clair yes Joe Kelly yes 0000 motion passes very good thank you item number what it item number four and our agenda is the proposal for the Geotech inspection monitoring Services Peter great um so again excluded from uh um our a& team's uh um original proposal um what I'll say relative to this um uh Ty and bond is also our geotechnical engineer as you all will know recall we have a fair amount of um of structural fill on this project unsuitable soils and then coming back with structural fill that solution wasn't
013really you know arrived until we got into design so it would say relative to this scope um excluded but the scope is really wasn't defined until we got through uh partway through design and so um the level of of effort here for what this entails then and I give that context about the uh um the unsuitable soils um is is that we will require our geotechnical engineer to be on site while Turner is Excavating looking at the soil de digging down to the design elevation and then making the determination whether we need to keep digging or not based on their site observations on the soils that they're seeing in place that is also augmented by our special inspections and com compaction testing um that's all in an effort to make sure we're getting what's required
014um per the design in terms of the bearing capacity on the soil so very important a scope that's again not defined until we got through partway through design um but also an exclusion um within our construction Administration um so now that we have definition on the scope we're seeking 71,1 plus 5,000 in reimbursables for a total of $6,100 and uh happy to answer any questions anyone might have any discussion from anybody again very customary uh not customary routine required inspections but this wasn't budgeted as a line item as well or just this is just more scope that's right Todd I I think it was not budgeted as as CA was an exclusion but again and and I only bring that context about the the actual solution because you know if if we're if we're having
015rammed aggregate peers or we're having you know suitable soils it's a different scope right so yeah the The Learning lesson here Peter and and building committee is uh yes then our soft cost we should have had a line item for something like this whether it was 76,000 or 50,000 or whatever we should have had a blank line item for it and we can share that with other building committees maybe old grenwich perhaps a agreed Joe especially if the town continues to execute contracts with the a& E team sort of in phases as they have uh my experience in other projects right is you you execute an agreement for the duration of the project so I think I think releasing these uh our A&E team in packages is is a little bit of a you know
016um not not what I see with other areas but yep Harry isn't it 71,000 100 plus 10,000 uh no it's the 10,000 is split evenly between the Swip um Harry and then uh the 5,000 for um our yeah our G read it differently thank you yeah yeah yeah I think there was maybe some slight confusion here in in the in in how we presented the terminology but hopefully uh my explanation cleared it up once again this this proposal is I have a motion from Todd to approve this for seven this Geotech services for 76,1 is there a second that Harry fiser seconds thank you Harry CHR could you call a vote for Geotech services at $76,000 yeah Joe Rosetti yes Christina po as a yes Harry fiser yes Laura C yes Tony Turner yes Josh
017Cassy yes Tod Claire yes Joe Kelly yes 800 motion passes one very good uh these these two services will kind of wrap up I believe all the requirements we have to uh assist uh or to help Turner continue with the foundations and uh work on site item number five on our agenda please uh a relatively brief discussion about our exit plan and where we are with the ESS and review with the um building official I will comment that during our meeting on Friday uh the the billing Department added another item to our building permit requirements that we previously had 39 issues that needed to be addressed they added item number 40 to their list of things that need to be addressed and that is provide resol I'll read it from the foundation permit provide resolution
018of egress requirement at vestibule 1102 an egress plan for the complete egress system of the building shall be submitted to and approved by this office prior to the issues of the full building permit so we're kind of at that point right now and I'm going to if uh we can turn the the screen over to Steve maroko just to kind of give us a brief overview of where we are with with that and perhaps uh maybe a a potent perhaps a solution that we might have to proceed with a doors but I'll let Steve comment on it briefly so the the meeting went well on Friday um you know there was it was a small group that both your side our side and and certainly everybody's interests um I think it was a good conversation
019uh in terms of it was a conversation it wasn't uh you're right I'm wrong type thing which was good it's always good when you talk about code in that way uh the 39 items that we originally uh were given for overall building permit we've responded to those items and had questions for the building department spent an additional 45 minutes after the larger meeting uh with Peter Robinson directly to just sort of talk through about nine items that we were looking for clarification on so we took away that those nine items we needed to revise some of the answers in those 39 original questions uh as it relates to the building overall egress plan uh the things that the progress that's been made the things that we've accepted and the and the modifications that are going
020to happen um at this point there's no more discussion about the additional egress out of the gymnasium that's something of you have heard about um you know the the building department feels strongly that that's the approach that needs to happen so slam is making the plan changes according accordingly so we'll be adding some doors we'll be shifting pieces of the plan around in that area the gymnasium the locker rooms uh that it relates to we're going to lose a little bit of storage within the gymnasium piece for gym equipment um and that's really the outfall of that required change by the building department uh the rest the conversation was largely about overall egress uh and the back and forth was about the way we presented it originally in the documentation uh versus the way we're
021going to represent it to them uh as we talked about you know conceptually about building egress we stressed over and over again that the the entire floor has more than double the capacity required for the number of people that could potentially occupy this building all at one time so what I mean by that is if you fully loaded the gymnasium if you fully loaded the auditorium if you fully loaded the cafeteria all as assembly spaces all with standing room only or seating within the auditorium while the entire school is still functioning as a school um that equates to a lot of people um maybe an unlikely scenario but probably not an impossible scenario uh so all those things are things that we tried to consider the first pass through as we talked with with the
022building officials and talked about how to represent that information that's where the item number 40 came from is really show us again the revised version of your life safety plan your egress plan uh and they asked us to add some additional information to that plan including exit signage that we show in our electrical package they're now asking us to add that to the life safety plan so they can sort of see it all in one spot um so we're making those accommodations our goal is to have those plans revised uh by end of business tomorrow and back to Turner to give back to the building department sort of as our conduit of the project has been working um and then our you know the remaining 40 question responses will follow shortly thereafter um I think
023everybody left that room feeling like it was a good step forward and there's probably another conversation once we submit all of that information just to close out the 40 items as well as maybe re review the information we've provided in the Life Safety plans to make sure the group is comfortable with the project approach very good Steve thank you any comments questions Joe Joe just a comment we had with the team yesterday in our conversation with um with uh Turner and and slam at our OAC um we were just talking about lessons learned in the past right and that we had as everyone is aware reviewed this previously with the town and to some degree feel like we're you know it's it was brought this issue was raised in the 11th hour and we're having
024to address it so to the responses to these 40 items that Steve's talking about um will be you I think they're composing a letter we'll have all of the responses documented to go back to the building department here's slam's responses and we're looking to close these out and getting confirmation that there're satisfied with the response again so that we don't have any any lingering questions about things that potentially could remain open or if there are further comments that are coming out after um we receive those 40 we're we're addressing those in a systematic way just wanted to let the committee know that we're wanting to make sure we we uh get absolute confirmation from the building that department that we're satisfied with this right so very good so they're going to issue a bill a
025foundation permit Joe the building that Foundation permit was issued during that meeting on Friday we have it in hand and you you have it it was uh I believe it was I think it was sent out to the committee Just for information and Jose was it I think it was out right I I have a copy I know that I think it was in a packet anyway we do have it in hand yes okay very good our next meeting is uh at 800 am on the February 18th that's uh next week and we're then we'll be trying to move into our regular every two weeks versus every week meeting um any questions or comments one comment great job with you and the team and persuading the uh the permit to be granted so uh credit
026to you well it wasn't a persuasion yeah thank you it was no there was no persuasion at all uh but yeah I think it was everybody trying to just get get good discussions going on take a pat on the back Joe take the pat on the back yeah had a boy well done you represented the team well okay uh well and I have a motion to adjourn so moved and thanks for running a quick meeting thank you Harry I saw Laura Coston seconded thank you meeting's adjourned at 80 827 and Tim if you could hang on thanks thank you all thank you very much good day bye Joe I don't know if you wna yeah Joe do you want recording stop the recording yeah think Christina has to stop it oh Christina