Transcript

Verbatim source text

001e for e hi good evening everyone can everyone please stand so we can recite the Pledge of Allegiance I pledge allegiance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with libert and justice for all so I'm going to call up Mr Scott stuber and he is going to do our athletic res [Applause] recognitions once again I'd like to thank the Board of Education Dr Rogers it's been a fantastic school year for our Athletic program and our spring season CT it off and I'm really really proud to announce that 100% of our spring teams with scholar athlete teams and that makes us 100% of our teams for the entire school year with scholar athlet athlete teams pretty hard to do so congratulations

002to all the [Music] kids uh I'd like to first begin with our girls badminton team unfortunately Mr St John could not be here tonight but he did share an email with me regarding the team including his All County recipients these are his words I've been coaching badminton for 20 plus years here in saset and this was this was by far my most talented and hardest working team as a team we had nine all conference players and for the first time ever five All County girls Selena Chen Selena Selena was all County Captain first singles um who made it all the way to the quarter finals congratulations am Rita cower and Melody hoe they were all County First doubles team that was 14 and four they made it to the semifinals and placed third in Nashville

003County's doubles [Music] ellaa and nandika SRA All County second doubles team that compiled compiled a record of 40 14- six also making it to the county semi-finals and placing fourth congratulations [Applause] ladies play uh this was a very special year for us we start our first an Oro flag football team which had an excellent season led by Mr Ray Duca I'd like to introduce Mr [Applause] DeLuca probably outside this young lady up here was instrumental in starting the flag football team uh my predecessor who's a good friend of mine said I don't think we have a lot of interest for girls flag football and he lied to me and I called him seeven several times to let him know they came out and droves uh it was an amazing turnout and they had an exceptional

004Year Mr Duca good evening Ivy Matthews Ivy was uh is uh instrumental in the creation of the girls flag football team and for the team success that we had this season she's been a leader on and off the field she was unanimously voted to the all count team by the coaches in the conference and she's the first ever girls flag football all County player in salet [Applause] congratulations this team will be a force moving forward no seniors they're all coming back next up I'd like to introduce coach Dean Strom and our boys golf a golf team also the voice of sayas Athletics uh thanks for having us uh we've had three boys up here Dylan Tong on the right Sawmill toide middle Chris da on the left uh top 90 Boys in nasso County qualified

005for the uh individual Championship uh it's a two-day tournament uh day one on the blue course at Beth Page day two on the red course at Beth Page it's a serious Golf Course the red actually both are uh the top 30 make the cut and go to day two those kids are all County uh so the top 30 golfers out of every school in nass County top 30 All County it's not easy it's not easy to achieve that uh all three of these kids made it Dylan Tom sh 77 82 a two-day total of 159 finished 18th out of 90 very good Chris Dow 8179 160 19th right behind him Sawmill Center made the cut on the number 83 tough day day two which is is okay shot 176 and he finished 31st so we

006[Music] go starting to our right we go ninth grader 10th grader 10th grader so uh we're looking forward to uh next season and uh these guys did a great job three great KS thank you thank you a long time I've never even come close to those scores congratulations at this time I'd like to introduce coach John Calabria a men's lacrosse coach hi everybody thanks um I have four seniors I can't imagine where they are tonight I mean the prom was all the way on Friday I you know I I I don't know what happened uh they said they were going to be here um but I I felt like I needed to come four four of my favorites you know I was just talking to uh one of my colleagues and and you know talking

007about these four boys so I just wanted to come and mention their names just in case you hear them see them around town um they are they are they are some of the greatest Boys Alive I'm not kidding so uh Zach felin's going to the University of Texas Adam giovino another All County uh uh young man he is uh probably going to take a year of Prep School to decide where he's going to play lacrosse very a big lacrosse family and really into playing lacrosse yep Dylan Stadler Dylan's been on our team for five years uh he he actually you know with covid and then suffering a big injury didn't really get a chance to play last year came back had an all count season this year and just a phenomenal young man Dylan Stadler

008and um AJ zul AJ zuleta is going to Williams College to play lacrosse he um he's like the crown jewel of saset Lacrosse in the past decade just an outstanding young man and um along with the rest of the boys in the team they uh we we managed to to get ourselves into the big four championship for the 17th year in a row lost at hofers to Farmingdale who went to the State final and and lost just yesterday um to a very good um Baldwinsville team from upstate so that's scasa Bo lacrosse the boys I'm sure having a great time uh pring it away and um thank you very much for the [Applause] opportunity coach thanks so walking in off the field he was coaching even before he just before he got in here always

009coaching next up I'd like to introduce coach Liz Christensen and our girls lacrosse team good evening I'm proud to represent Lauren Lano Mike Mera Nina Soto um and myself as the girls across staff this year um team went to the semi-finals very young team um and lost to Farmingdale in the semis but we'll be back with our entire lineup next year I'm proud to represent present our two All County players first is Leah Coffer Leah is a junior Relentless competitor and grinder on the field she led the team in draws she's a physical and tough player throughout the game she competes on every play and continues to learn and grow as a player every time she steps on the field congrats to Leah on winning All County honors and we really looking forward to having

010her back next year for her senior season finale Caitlyn Lee is a junior who has become leader on and off the field she is committed hardworking and a determined athlete a born competitor and was recognized as one of the top 100 girls cross players in Long Island because of her outstanding defensive oneon-one skills we are so very proud of her and can't wait for her senior season as well thank you so much on behalf of the staff we appreciate all the support this year those are two of the toughest athletes I've seen in school this year they keep the athletic trainers on their toes and anyone who's hasn't seen a girls lacrosse game it it is contact they do a great job and at this time I'd like to introduce coach Mike sper and our

011girls Trek and field team thank you Board of Ed thank you community uh we had a very successful spring seon season this year girls were division champs for the third year in a row and they finished second at counties for the third year in a row as well uh the following girls here are all County recipients which means they finished top three in their event at the county Championship meet uh yui hosino was all County in the steeple chase uh we had a 4X 800 meter relay of Samantha mayor who couldn't be here tonight Ren Furukawa Juliana regosa and yui hosino uh Samantha mayor also won the Connie culic award last week uh which goes to the most outstanding female senior athlete uh Jameson O'Brien was all count in the shop put Tracy Freeman was

012all County in The discus uh those two girls will be competing this weekend at the national championship meet uh at the University of Pennsylvania and there's also Jessica Lessie who couldn't be here tonight uh she was two-time uh individual County champion in both the 1500 meter and the 3,000 M run uh and also just returned back from a state championship meet where she finished 10th overall running the third fastest time in school history uh phenomenal season for these [Applause] girls I'd like to introduce coach Dean ketti and our boys Spring Track and Field team good evening Mr Rolo members of the Board of Education Dr Rogers Administration and the scasa community um coach cafero couldn't be here tonight he's representing Jordan Alman at the news2 scholar athlete dinner and awards night the boys track and

013field team plays second this year at the county championships amongst pulling almost pulling off a major upset the boys all performed their seeds and personal best in the process it really was an incredible night for scasa track Gabriel Kim had the best Vault of his life vaulting 12 feet for the County Title in the paal Matt ratham was a runner up in the long jump an event he just started to focus on Parker Kim threw over 140 fet to play second in The discus and Jordan Alman played second in the 1600 in 423 3 hours later he won the 3200 meter race in a time of 946 and then anchored home the winning 4x8 team to win by a margin of 0.1 seconds other members of that team include John Hernandez Danny Chan and Luis

014Cruz our 4x100 team of nant naven Brenton Lee yam Furukawa and Elvis Lee have had an incredible spring season they have the fastest 4x1 time in school history and have placed first at the division championships County championships and State qualifier this past weekend they competed at the New York state championships where they placed third amongst all public schools earning them all state honors the following day they Place sixth amongst all new New York State schools earning them all Federation honors as well um this upcoming weekend the 4x1 will be competing at the national championships at the University of Pennsylvania where they will race against the best 4x1 schools in the country we also say goodbye to 22 seniors this year we are so proud of them for their perseverance and the challenges of the last

015four years and we wish them the best of luck congratulations [Applause] boys okay if you have a dark gray Lexus license plate JLG 20 151 you drive your side windows open and it's raining pretty good apologize the first next up Coach Dave Anderson and our softball [Applause] team so our softball team is very very young it mostly consists of eth and ninth graders uh we move at the conference one this year for the first time in a while and for the first time in 33 years we got to the county final so uh it's one of the big reason for that is is the two ladies that are up on the stage right now so Alexa PES Alexa is a three-year Varsity starter uh she's our captain uh she plays first base and pitches for

016us and she bats cleanup Alexa hit 459 over the course of the Season including the play playoffs had a 495 on base percentage had three home runs and 24 runs back then um Alex is already committed to play softball in college and she'd be playing at new pults after next year Taylor renie Taylor reny if you can believe this is she's an eighth grader she's played vary for two years she's been a two-year starter um Taylor is our lead off hitter and she plays center field for our team for the season Taylor hit 547 she had an onbase percentage of 589 she scored 27 runs and she led Nassau County with 27 stolen bases uh Taylor has led Nassau County as a 7th grader and as an eighth grader in stolen bases the last two

017years so both players have done a great job unfortunate they'll be back next year and we're looking forward to make another run thanks the team I'm about to introduce has had a pretty good season they're led by uh coach Shai Fisher they are Nashville County Champions they are Long Island Champions and I'm proud to say they're New York state champions [Applause] members of the Board of Education Administration Community I'm proud to talk to you tonight about some of the achievements in the boys tennis program this past spring we'll start with the two boys earning All State Rec recognition in doubles ninth grader Nikki Shaw 10th grader Devin mandro please step forward both Nikki and Devin had an excellent regular season which helped them get the number one overall seed in our Nassau County individual tournament

018they then lived up to that number one seed by winning the entire County tournament earning All State honors the boys then moved on to the individual state tournament finishing seventh in the state they're only ninth and 10th grade by the way congratulations to both Devin and Nikki once again on your All State achievements and a little sneak peek both boys were just named to the news day all Long Island team congrats to both of them we had one young man earn All State honors and singles for the second year in a row senior an Chada please step forward an has played in our County tournament for four years now with the last two years reaching the semi-finals in my 14 years as varsity coach an is the first to achieve this accomplishment more importantly are

019his accomplishments off the court he's a two-year captain that leads by example supports each and every teammate and does everything possible for the program even through a roller coaster up and down season both from a team and a personal perspective anyone you ask whether it's teammates coaches adults opponents besides your All State status it's your allamerican level of character that shines the brightest Hollywood is looking down and will always be proud of you congratulations an Chata lastly is our our team accomplishments and if you ask anyone on the team this really started at last year's Awards night and team dinner we had lost in the county finals and through the night you could see the boys were just disappointed not happy with the result I I can look back and say that each and every

020member standing here uh of the team took it upon themselves to improve over the off season which resulted in the deepest team that we've ever had over my tenure as varsity coach 13-1 overall regular season record but as the boys would say the job wasn't finished they had only one goal in mind and that was to win a State title the boys won the first three matches in the team playoffs in convincing fashion to win the county Championship a nailbiter in the Long Island Championship over comac and some amazing wins in the semis over Williamsville East and the Finals over Scarsdale to make history the first team title for ever for Sasa tennis I feel every member of the team contributed to the team accomplishment winning important matches throughout the year some that come to

021mind Dylan Abell and Spencer Kesner over Scarsdale Evan Lee over Port Washington and comak wilch and tempson and Ethan Lee over Roslin ion meta shiv chat over comac an chat some amazing wins throughout the year and I'm sure I'm forgetting a couple but Devon mandro over Scarsdale to clinch it it was truly a team effort while winning a State title is amazing I'd be remiss if I didn't mention the tragedy that occurred to the tennis community more specifically in Roslin while we've all moved into the acceptance stage of the grieving process Roslin is still and always will be in our thoughts and prayers our boys will always learn from the game of tennis but sometimes the more important lessons I learn from The Game of Life things happen that are out of our control and

022I'm even more proud of how the boys Stay Together were resilient together overcame adversity together and as the boys came up with the slogan on the new uniforms they created after the tragedy we are all just Better Together congratulations again to all these young men and uh 2023 what a season [Laughter] I'd just like to congratulate all the athletes it's been an amazing spring season it's been an amazing athletic school year and give yourselves a round of applause thank you for your continuous [Applause] support thanks Mr stuber thanks all the coaches congratulations to all the players that are going to college and the players that are coming back now you have a great Foundation to build on the board of AD we can go up on stage e e e okay we're back um I

023just wanted to add on to our um athlete um recognition um one of the things that I thought really was outstanding was not only did they accomplish so much athletically but then that they were all scholar a athletes and that's a very difficult feat to do um but what I also love to hear from the coaches was that our students have character um so that says a lot um so just wanted to point that out okay we're going to start with our Board of Education meeting for June I'd like to also start off and congratulate our own uh Carol Chang Susan FAL Cove and Levon on their reelection to the Board of Education as everyone knows um this is um a long-term commitment from all of them they've been here for a long time they're

024all volunteers they take a lot of their time um which is greatly appreciated and they're going to take more time going forward so good luck in addition the um 2023 and 2024 budget passed um so I think that's absolutely wonderful and approval of the minutes of the meeting of May 8th May 16th May 30th may I have a motion please uh shaie uh seconded by Carol does anybody have any questions all in favor opposed any exensions Dr rufo can you please give us the treasurer's report and Foundation Aid plan uh yes I'll start with the treasures report um as indicated uh in the treasures report the cash on hand for the month and April 2023 was 82,8 39 it indicates that all Bank balances for all cash accounts were reconciled to the book balances and

025were collateralized in accordance with the district's banking agreements and investment policies i' just like to um briefly go through the district's um Foundation Aid plan um as I discussed during our budget meetings for the 2324 budget the enacted uh New York state budget included a foundation Aid increase for the District of approximately 7.9 million or 50% over the amount we received in the 2223 budgeted uh Foundation Aid um while state aid represents a fairly small proportion of our budget we're certainly pleased to have received um this allocation this substantial increase and the purpose of the increase is to bring our district up to our full Foundation Aid allocation so in accordance with um this regul uh regulation for that allowed These funds we're providing our plan for the use of these funds and all of

026these programs um all of these programs um and services that are included were discussed during the budget process but we're outlining them again as um as part of our summary plann so our planned use of the foundation Aid is focused on these four areas which I'll go into in Greater detail on the next slide so the first one is the additional Foundation Aid will allow our district to focus on those students who are struggling academically and we'll address that through a variety of means our District budget includes allocations for tutor staff to support our struggling students we have professional development for teachers to to address student learning excuse me student learning loss and academic interventions particularly in early literacy our in our budget includes allocations for instructional technology tools again to support our struggling Learners

027and to provide multiple Pathways to learning and support with additional cognitive de Developmental and academic resources for example um we're going to you know we have allocations for Chromebooks and content area subscriptions for re remediation support and enrichment we also um talked quite a bit during um the budget about additional allocations to support student health and wellness and one of um those allocations is to expand our community connections through a partnership with northwell mental health to streamline interventions for students in need as well as families um with individual ual counseling services in addition this partnership provides immediate Crisis Support for students and families as well as an array of um professional development opportunities we're very grateful to our assistant superintendent for PPS Aaron goldw um for her persistence and her determination in getting the service

028for soset given that there was a very long waiting list and we were notified just a week or so ago that her efforts were successful and that they would be partnering with us for the 23 24 school year during the budget um process we also discussed increasing our allocation for social workers and we're pleased that the additional Foundation Aid enables our each of our 10 billing buildings to have a social worker inhouse the third area is um of our foundation Aid plan is to provide enhanced resources to students with disabilities and elll students the district's budget includes allocations for instructional support staff which includes tutors teacher aids therapists as well as learning loss resources to Target specific areas of academic need we have additional allocation for contractual service to support our special education and El

029students and that includes additional support for related services such as speech and OT we also have um allocations for instructional technology tools finally we're expanding our instructional opportunities for students the additional Foundation Aid um will include an allocation for instructional resources at the secondary level to meet increased enrollment in our core courses as well as additional program offerings in science the pro the summary will be posted on the district's website in the budget section thank you thank you Dr rufo that's great news I know we were always waiting for them to get us up on our foundation Aid um is it going to stay at the current levels going forward I I certainly hope so I mean we're we always [Music] um I believe it is this a state's intent um to bring districts who

030were not at their full Foundation level up to that Foundation level and our expectation is that will continue but I do know that there are economic factors certainly that play into it but our expectation is that that that level will continue thank you that's great news does the board have any questions for Dr rufo sure okay comment do you have a comment sure yeah I mean I I would just follow up on Dr rufo's uh comment just now which is that um the level of stateid is always intended to be uh uh at the just recorded levels one thing we should probably keep in mind when we're budgeting going forward is I wouldn't write it in and in in Inc I would make sure that we keep ourselves some flexibility in case uh um of

031uh shorter term economic uh uh difficulties yes agreed anybody else have questions for Dr UFO okay if I can I would like to move up to of the items um oh we can well do we have to vote on we don't have to do anything I don't yeah we have toot okay okay can I have a motion to accept Dr rufo's um Foundation Aid uh Lynn seconded by shie does anybody have any questions all in favor opposed any extensions okay so I would like Tove move up items A7 and A8 if that's okay with everyone okay A7 is the appointment of Kelly Morgan for the elementary school principle at Willets can I have a motion please uh Su Susan secreted by Lisa any questions all in favor opposed any extensions A8 is the appointment of

032claraa Kang for the elementary school principal at bis can I have a motion please Brian seconded by shy any questions all in favor opposed any extensions so on behalf of the Board of Education we are really excited to have both of you aboard um welcome to the soset family you're going to love it here this is going to be forever home um we um one of the things that stood out for both of you um was your your passion for education and your love of children so um on behalf of all of us welcome and we're so happy to hear have you here and please do a great job [Applause] I'd just like to add a couple of comments to Mr Ras first of all Miss Morgan uh you've LED through a challenging time and

033you've impressed us all with your leadership and with your development through uh that time and uh we're confident that you going to be able to provide even more leadership uh but in your own right and in your own way as you assume the responsibilities solely for this building and you build on the wonderful Foundation uh that Mr Connelly has left for you and that you have been working on yourself and uh yes you do have a little bit of the home team Advantage here in terms of uh folks in the auditorium uh but miss Kang don't be dissuaded by the fact that she had a little bit of a home team Advantage um you have just joined the home team and we are very much looking forward to you joining our organization and becoming part

034of our family uh I will speak for the administrative staff and saying how impressed we were uh with your encyclopedic knowledge of education but also uh with how warm you were in terms of uh your conversations about the leadership uh that you've given not just to your staff but to students in the building uh that you've had the opportunity to build and Lead so uh you both have remarkable backgrounds you are both going to make us better and I am looking ve very much forward uh to working both with both of you in these new roles come the fall actually come the summer so uh you don't get any time off around here you just keep working so congratulations again to both of [Applause] you and if you were looking for your opportunity to make

035a graceful exit this would be it or you can stay all night um whatever whatever your preference please come up then oh okay no it's okay if you do no come up please please come up can she come to the podium yeah come to the podium please why not yeah sure prep [Applause] I normally make speeches this way this way come so I face you so like to face the audience but hello hello um I normally make speeches um just really without anything in front of me but I definitely would like to do it the right way so I have it here um good evening Board of Education students families uh and District staff uh my name is Clara Kang and I would like to share a little bit about myself I'm here with my

036mediate family my loving husband Aaron um my CH three children Aiden Alan Ava and my mother-in-law um who wanted to share this joyous occasion of my appointment here as next principal of bais elementary school I was born in Berlin Germany to parents both from Korea who went there for an opportunity to support their family back at home their story is a unique story and that they met there got married there had my sister and me and then decided to move to the United States to Pro provide a better opportunity for the both of us um not only did they partake in their immigrant experience once but they did it twice um when we landed in Flushing Queens I attended public schools in New York City including Bronx High School of Science I attended Northeastern University

037before I had to support my parents's family business sometimes life throws you lemons however it is what you make of it that is important call this my late Gap years it is after that I went back back to school to finish my ba and Ma as an educator teaching English in secondary schools at Hunter College and Queens College respectively I was appointed as an English teacher in the same district I attended Elementary and Middle School along my education career I've had admins who recognized leadership qualities in me and was soon there after that became that I became a literacy coach and continued as an assistant principal after six years as an assistant principal I accepted a position as a founding Elementary School principal in Bayside New York this is there why I've honed my leadership

038qualities the most and continued my pursuit to advocate for all students I'm here six years later having built my school to completion from 3K to grade five what it has taught me the most is what amazing things can beom accomplished living by The Motto together is better it has also taught me how you cannot accomplish this without a strong family support system like I do here and extend it to my sister my parents and everyone else it was very evident through this interview process how strongly aligned the sasic core values are to mine and how much the Community Values strong family and School connections I have very big shoes to fill as a new principal at bis Elementary School however I will do my best to listen to every stake holder as we're going to

039start a new journey together uh learning alongside you and leading the school with a collaborative spirit in service of our students's success thank you so much [Applause] Kelly do you want to come up good evening Dr Rogers Board of Education I don't have anything planned I wasn't expecting to say anything I'd first like to congratulate Clara and welcome aboard to saset we are thrilled to have you and you're going to truly love it here and we're very excited to have you join our family um to everyone here I just want to thank everyone from the bottom of my heart it's been my honor and privilege to serve you for the last year and a half in the acting role I'm very happy to lose that word and to really be part of the family formally

040and I will do my very best to make everyone proud and to continue to make sure that saset is a shining example of amazing schools thank you so much thank you both that was excellent Dr Rogers do you want to give your superintendent report please yes so um one of the things that the board has been talking about uh quite a bit has been the uh growth in enrollment that we've experienced and the pressure that's put on our facilities and uh the ongoing need to keep our facilities in good shape so uh we're going to um kind of catch up a little bit on uh that work that uh we've been engaged in as uh the board realizes and uh the community will know that school districts in New York state are required to do

041what's called aild condition survey every 5 years uh when I first arrived in saset this was a new mandate and we weren't required to do it for at least a year but um knowing that this was a new Organization for me and wanting to make sure that there weren't any surprises uh we started the work a year ahead of schedule so that we could start to build a plan uh one of the things I observed about saset was uh on the one hand the buildings had uh gotten a lot of attention uh from the maintenance staff but but uh the district's infrastructure was uh mostly built in the ' 50s and was old and uh saset had not done a lot of uh Capital work bonded Capital work on maintaining its facilities it was a

042little behind the pace of what you would expect from uh comparable uh school districts with ages of facilities that were similar to ours so uh we broke the work into phase one and phase two uh knowing that we weren't going to get to everything but wanting to uh take as uh good a chunk of the work as we possibly could so uh we did a lot of work preparing um for the board at that time the building condition survey that survey essentially turned into a road map for the work that needed to be done on the buildings and then uh with the Public's approval we got to work on that and uh the work on that from phase one and phase two is almost at a close at this point and the time has come

043uh a new 5-year uh requirement from the state has occurred our Architecture Firm of h2m has uh done the work of the annual visual inspection the building condition survey and uh we're going to together present these results to the board I'm not sure who's advancing the slides but if someone could oh I guess I'm advancing the slides I wasn't sure because it was me uh so uh as we've said uh we end up having these visual inspections that are done by professionals uh we end up working on those recommendations to try and refine them and then ultimately uh we have public input both at board public board meetings and at uh focus group meetings and we get to a place where we have a plan that is ultimately presented to the public for approval okay

044I think that turns on the light so as I mentioned the facilities are uh kind of old I tried to come up with uh a visual way of representing this and so this the length of the bar the height of the bar is the amount of square footage and each cluster of bars is a decade so the cluster at the left where all the bars exist are the 1950s and you can see that since the 1950s there has been a little bit of work done in the 9s and the early 2000s uh but most of the square footage in the district was built in the 1950s and that means all of the buildings are essentially turning 70 together and uh as with any facility of this age 70 years is a long time uh for

045a facility to go especially when a lot of the uh uh Building Systems are original things like electrical systems Plumbing Systems Heating and ventilation systems are original they're they're very old they're hard to Source parts for they're inefficient and some of them are um definitely struggling uh we did a lot of work over the course of the past uh three years as a result of covid uh to work on our uh ventilation and that also necessitated a lot of electrical work uh but there's still plenty more work to be done the other piece that's context for uh where we are right now is that we're experiencing enrollment growth and I won't go in I won't belabor this because we've talked about it at two previous board meetings but uh we're seeing an enrollment bubble that

046is going to work its through way through the district that bubble is at the elementary level right now we have a couple of buildings that are particularly tight uh that as those students age out of the elementary schools that we will experience uh a bubble at the middle schools and then as they age into the high school we'll experience a bubble at the high school all of our facilities are close to capacity so there isn't a lot of excess room to accommodate uh all of that uh anticipated growth so this is not only our opportunity to fix our aging facilities but to really think strategically about where we'll put the students that we know are going to be in our secondary schools in the future so um if uh Board of Education you'll think about

047uh this presentation as really kind of a two-part presentation so the part tonight will be talking about the building uh repairs and systems and space to accommodate immediate enrollment needs and then part part two uh at a future board meeting we'll talk about the future program and enrollment growth that we're anticipating and other things that have come up as discussion items so I'm not saying that uh we're committed to recommending any of these things but I want to acknowledge that a lot of these have been suggest suggestions that have come forward from the community or from the PTA uh or from the building leadership and their discussion items that I know the board wants to uh turn over and get some feedback on so um for the first part of this presentation uh I'm going

048to turn this over now to uh Dr rufo and Mr Kevin medler from uh h2m an architecture and engineering firm that we use uh and I think I should probably give the clicker to someone else you have it there okay great I've been doing so you have okay excellent um so [Music] good evening we have Kevin medler here from h2m our firm uh our architectural firm we have Megan Bato and then we have Joe Mata also from h2m and so the first thing that um we're going to ask um Kevin to walk us through is the visual inspection and I'd like um Kevin will first talk a little bit about the process and um and then broadly um in summary form overall what was um found in the schools so you want take it away

049I'll thank you uh good evening members of the board and Community um so as stated I am Kevin medler I'm an architect uh also a New York state code enforcement official uh in what is mandated by the state is to do a visual inspection based on the schedule that the state requires or SED requires uh there's a schedule set forth for visual inspections for every school district as well as building condition surveys the visual inspections are based upon safety uh and the health of the students in the community with the actually the slide that you see in front of you uh was compiled based on what we would call a hybrid of that visual inspection and building conditions survey so the building conditions is a bit more in-depth than the visual inspection knowing that uh

050to help the board prepare moving forward we did that hybrid where we did as we did our visual inspections which was again focused on safety and health we also focused on the building conditions to to help budget some of these uh items that will be required that have been identified oh so um before before we go on I just want to um point out that clearly there's work to be done in all of the schools as you can see across all for all schools and all uh many of the major Building Systems and um going back to H our approach when we did our phase one and phase two work and we had the BCS and had a you know a a fairly large bottom line number you start to think well how can we

051phase that work how can we chunk that work out and how can we accomplish it um over time and what are the the resources that we're going to do uh look to to do that so um just based on the information that was uh presented in the visual inspection we Mr Hamilton and The Architects worked together to see if we broke it out to um into work that we could do in house as part of our annual uh budget in terms of doing a transfer to Capital or a line item in one of Greg's um budget codes those are what are presented up above and then the below is that work that would require outside contractor larger in scope that could go um perhaps into a bond or being done some other way so that

052was our first attempt to sort of what we call break out chunk out the work so I'm going to turn it back over um to Kevin to go through some of the uh highlevel projects so some of the items which are uh larger items to deal with uh we wanted to show and Visually show to the board and the community of how we came about so uh the slides that you see before you are some of the roof areas of the schools with that you'll see a legend up there uh in in red you'll see uh areas that are currently uh scheduled to be completed which already have approved funding in place you have some of the Roes in green those have been completed previously and some of rofes in blue which are to be

053completed within the next five five years or have been identified to be completed over the next 5 years the rofes that are not identified they are roofs that have been previously completed and do have a warranty still in place one of the other items that are identified or should I say uh major areas uh that are identified is masonry and uh parking SL site improvements so during our visual inspection it's not only interior and we look at the infrastructure and uh all the uh uh items of a building but we also look at the envelope so we look at the exterior the roofs the site and what we note are areas of whether they're concerns now or or shortly we feel such as uh masonry point and you'll see in the image up there which

054is obvious just one small example are cracks in the which obviously cause uh uh through the Aging of the buildings it it has to be maintained uh these buildings are roughly 70 years old masonry usually start showing its stage around 40 50 years so uh it's an ongoing maintenance issue with that we've identified a significant amount of masonry repointing repair that would be required at at a majority of the schools um also sight improvements the things that we focus on with the site and again if you refer to the image is uh anywhere that there's uh maintenance to be done we consider it whether it's a safety issue or accessibility issue so we do note those so those are line items that we do have in that report um and any structural issues if you

055if you uh uh refer to the other canopies uh they are showing their age so those are items that we've also identified within that on the next slide you'll see uh photos of the science labs we have done projects previously uh updating some of the science labs we've identified 10 that need to be renovated over uh in in the future one uh being that with the way the curriculums are going with the science programs that flexibility is important because it allows the district to use classrooms in in multiple ways so it allows uh uh the flexibility to change that program when needed and as Dr Rogers also noted before the infrastructure so again when we review these buildings the infrastructure is very important these buildings are again s years old you'll keep hearing that as

056a running theme where the infrastructure most for the most part is original that being said it does have to be looked at uh with with previous projects that we've done there have been requirements for us to upgrade some of the infrastructure for the Electrical uh uh uh services but there are still electrical infrastructure that does have to be maintained uh and which include infrastructure upgrades and also panel upgrades also Plumbing we've reviewed Plumbing uh and not just the infrastructure of the plumbing but also the bathrooms in general uh we have done some projects where we've updated the bathrooms but there are still a decent amount of bathrooms that still need to be upgraded not only again for the infrastructure but also for accessibility requirements okay so Kevin went through um some of the major Building

057Systems and areas um that were included as part of the visual inspection so in addition to that what we we have what Dr Roger had described as bucket 2 and those are projects um that potentially could address um some of our space issues and can accommodate enrollment growth and those include portable Replacements um at the elementary schools Replacements of those Portables um additional classrooms at Southwoods and potentially rehabilitating um the Woodbury school which has been brought up over time so the port re replacement and I'll let Kevin um talk about the different um approaches to Portable Replacements both using pre-engineered um or what we call Brick and Mortar so do you want to address those things so in review of the Portables uh they are typically last 10 to 15 years the Portables that are

058currently in place some are 40 plus years old with with that the intent is to to replace those Portables uh again for longevity but we are reviewing uh different types of construction for not only cost but also schedule uh some of these sites are very tight where these Portables are so we don't we know that it's tight not only for enrollment but also the schedule and the intent is to try to keep it during the summer schedule with that that would mean we have to include demolition as well as construction so pre-engineered units is a likely option or the brick and morar the masonry which would be um uh masonry block with with masonry veneer uh which is your typical School construction the yes there's a cost with that there's longevity to it but there's

059also a schedule factor in that uh the other the other item that we have to really look at is the limited downtime so with pre-engineered structures we can get that quicker there is a cost associated with that as well um but there also a longevity issue so those are items that we're we're looking at and analyzing to make sure that it's the right uh uh construction and the right project with the with the schedule uh well thought out and with the enrollment that Dr Rogers just went through we know that we can't take some of these uh schools or shall spaces out of the out of the uh the mix so we need to make sure that it's up and running as as possible okay so um potential costs we mentioned um the first uh

060the first bucket is the building repairs and systems and that is first go through is 88 million and broken up into the to segments of doing work inhouse for about 23 million leaves remaining 65 um million for the larger projects when we look at potential costs um for space to accommodate the growth um Kevin went through the different approaches to the Portables in the $4 million range is the pre-engineered versus the 21 million for the bricks and mortar for those spaces they've done some preliminary cost for um adding space at Southwoods and additional classrooms in the range of a million the $6 Million number for the Woodburry school um renovation um that the Woodburry School renovating the Woodburry school not only addresses some potentially space concerns at Southwoods um back when we were doing the

061security analysis that came up as an option um just given the some of the administrative departments in the building that have frequent visitors um you know we do our bid openings here we have our registration here so there's um there's there's visitors that that come to to Southwoods for those functions so it kind of served a dual purpose of um freeing up space at Southwoods and then funneling some of those visitors to a location that doesn't have um students but again that's in the $6 million range as we as we look at developing potential costs there are there are considerations on the on the certainly putting upwards pressure um on cost is the rise in interest rates primarily due to inflation and while we see that maybe that's slowing down in in the short term

062and leveling off that that's good news but it certainly is not where it was um uh several years ago um we know that con uh construction costs have in some cases have been escalating over the last couple of years they've they're seeing some plateauing although very specific areas that are still increasing so some plateauing but no expectation that those costs are going to decrease um right now um they are still experiencing some supply chain issues for certain for certain products so those are putting upwards pressures on cost um one of of the um one of the things working in our favor is that our state aid reimbursement on projects is up to about 42% of the costs so that that will help us manage this um if there Debt Service payments and then as we

063know that building Aid that we get offsets some of those Debt Service payments and so for us that's in the 42% range so that brings us to our next steps in the process so obviously we have to um have the conversation tonight and uh this is really our chance to pick the architect's brains about the visual inspection the building condition work that they've done um then uh the board I know is going to be touring uh the facilities as you did last summer you'll do again uh this July and you'll get a chance to see a lot of uh the visual inspection work up close and uh as we start to work on the project list that we want to tackle next uh we'll start doing more public engagement and getting public feedback and at

064some point um you the board will settle on uh a final list of projects that uh you want to put out for public approval then we'll go through the process of uh seeking public approval which will involve lots of uh public meetings and forums and uh opportunities for feedback and then um assuming that the public approves the project um we don't get to put the shovel in the ground right away we have to go through a long procurement process where we have to bid the work we have to design the work that will take a lot of time uh the work is estimated now the next step is uh once it's approved the effort goes into the actual uh creation of architectural drawings once the architectural drawings are completed uh we put them out to

065bid uh we review the biders and then we go through Contracting process with the biders the biders have to agree to uh the terms in our contract sometimes that doesn't always work and then ultimately um once uh We've awarded the bid then we can start working on a construction schedule to get the work started um the other thing that will be in the way is uh every project that the school does has to first get a building permit uh but we don't get building permits from the local housing department we get building permits from the state education department in Albany and uh right now unfortunately it takes about 40 weeks uh for engineering projects to get approved from the state Ed department so there's a lot of lead time in anything that we do so

066um you know I just want to uh keep our expectations realistic for how fast we can move uh once we've made some decisions but for now we're in the decision uh we're still in the exploration phase not necessarily in the decision- making phase uh but we'll move from exploration to decisionmaking next so uh Mr Rolo at this time if uh board members have questions for myself obviously or for our facilities team uh we'd be happy to answer them okay thank you for that mistaken date on the uh on the chart or mistake thank you Len I have a couple of questions um the the first is you listed the process just now about getting approval with um architectural drawings Etc but is that for fixing things like repointing the brick and things like that or

067is that just building new projects like fixing the um we can't talk anymore but you know what I mean I understand the question uh so the all work that gets done in a school district gets approved in one way or another there's just several different mechanisms for doing the approval so work can be approved as part of the approval of the School District budget so uh that would be the mechanism and for a lot of more routine or smaller routine maintenance or smaller capital projects that's typically the mechanism that we use uh sometimes we will do what's called a transfer to Capital where we take money from the capital fund and transfer it into the budget in order to do uh if those are if the first thing I was talking about were smaller projects

068then transfer to cap would be more medium-sized projects uh but anything that is a significant project uh would require public approval and anything that is Capital Construction would require a building permit and need to go through the state so even if it's discovered as a result of the need to fix a building system uh a repair to um an air conditioning system or something like that uh even if the visual inspection is the mechanism by which it has discovered the approval process is the same so whether we were building uh buildings to replace the Portables the existing Portables or whether we're doing a capital project to improve a ventilation system uh they both have to have some approval over the funding source uh because that's ultimately what's being approved as the funding source and then

069approval over the the design which is what the state Ed department does sorry there's more um two questions I guess for I I maybe I'm not sure who but the the jobs are in two buckets and the bucket one was based on health and necessity within bucket one is there a twoyear a three year a four year an immediate um broken out so that we understand that and financially when you're doing work to buildings is it more financially responsible or um to do all the floors for all the buildings all the roofs for all the buildings or is it by building that it makes more economic sense so I'll let Mr medler talk a little bit about um how they would evaluate um that getting the right balance between uh how much work to do

070and putting in money now versus putting in more money later those kinds of considerations because they will advise us on that and then in terms of your first uh question uh I think really what you're asking for is uh a triaging of the things that are identified some are more significant obviously than others and again that's the triaging is something that h2m would work on but uh Kevin if you could give us a little more detail so the way we if when you look at that chart what we do is we have a 5-year plan the state requires that the uh each school district have a 5-year plan moving forward for the their budgets we prioritize what we feel what's required in year 1 2 3 4 understanding that we can't do all the work

071in what year one understanding we can't do all the work in year two we prioritize and spread it out where we feel that it's it it it Best Suits the the the needs that are identified uh the the highest priority we're getting done in year one highest second would be year two all the way out to year five there are other things that get identif IFI outside of the 5 years but that's discussed with the district in order to just keep an eye on it uh at that point but the the highest priorities are set Brian in the um bucket one I guess is that's building repairs right so bucket two is more about the additional space bucket one somewhere around $88 million is any of that right when you look through the the materials

072you see that there's um some of the details regarding walls and windows will any of bucket one add any space at all to the existing buildings no none of the visual inspection uh work that's just existing square footage and I should say parenthetically we have a little over a million square feet of building under management so uh the visual inspection is just for the space that we currently have and then it's the second column where uh with the numbers that are on there for the portable replacement I keep trying to go backwards with the slides but this really isn't functional so um more backwards is better um all the way to the the buckets slide back one more two more that one um the second column there space to accommodate enrollment so with the replacement

073of the Portables the numbers there for the estimate anywhere between 14 and 21 million that would presume uh replacing the existing uh Portables in kind and adding one more classro everywhere there is a portable so it would be if there's three now it would go to four but that's all in bucket too I'm I'm wondering if there's anything in bucket one right you take an existing classroom and what we'll call finish it could it expand the size of any of the classrooms in other words is any of the 88 million going to give us room for another 500 children in any of the schools so there's nothing in the visual inspection work that would do that we have one project that is is up at the state Ed Department right now awaiting approval that would

074take um a large storage room at the high school that is a corner room and I say storage room and your mind goes to closet but it's actually a very large space it's adequate for a classroom uh but because it doesn't have Windows it would not meet code for a classroom so we've designed a window project that would make that uh into a classroom so once we get approval from the state department that would add one class room at the high school there is also a space at the high school that um is being purposed right now as uh like a broadcast recording studio and if that the space is um not handsome but uh I think if we rehabilitated that space we could program it with more uh time during the day and that

075would accommodate a little bit of growth at the high school but uh Kevin checked me if I'm wrong but I don't believe anything about the visual inspections increases square footage or makes an unusable classroom suddenly usable no it's it's more for just maintenance and just to follow up on the other question uh regarding economy of scale that is factored in to these projects so obviously if we do one classroom and we're redoing the floors we'll see what we can get as much as we can but obviously there's a budget involved that we have to uh adhere to I have two questions um you gave us a chart so when I'm looking at the the first one a work as uh transfer to capital budget plan there is a list of roofing um the cost that's

076listed and then on the second chart that is for the Avi work for potential Bond there is another list of roofing that's there um what are the difference why aren't they combined in one section for example say said High School in the uh future Bond work there's a 2.25 million and then in the the transfer to Capital there is 1.5 million Roofing work that need to be done so there's like all together that's about 3.75 million work and it repeats on Southwoods and other schools too that's first question second question is for I understand the benefits of having portable um what would be the downside of having portable and uh com we get 42% right from the state aid uh will we get less if we get portable versus getting a regular uh Construction I'm

077Megan Bato I work at h2m just to answer your first question so there's a tremendous amount of roof work that needs to be done and understanding that that all of it can come from a bond and some of it needs to come to the capital reserve or Camp uh transfer to Capital so understanding that some is in bond work and some is in transfer to Capital identifying that um having the opportunity to do it in two different area so that amount of work needs to be done but knowing it can't all be done within the bond they're different yes different square footages based on those plans that were in there identifying the areas of work and about the portable do you want to answer that question or do you want me to so for Portables

078um you do not get eight on Portables if you do Built construction you do get Aid and on the prefabricated construction you would get eight on that right so we're not recommending replace in Portables with Portables we're recommending two different types of construction one would be CMU conrete masonary unit corre the other would be uh pre-fabricated U buildings but they're both construction so the $14 million number would be if all of it was uh built as prefabricated construction and the $21 Million number would be as if all of it was built as concrete masonary units so cinder block uh in other words so what Kevin and Megan were saying earlier is some of the sites are so tight that it would not be possible to build CMU because there's no place to put it in

079other words um you can't we can't afford to close any classrooms so we can't knock down the Portables while we take 2 years to construct a CMU building so we we it simply won't be possible to do that at some places there are other places that you know bis has a large campus it would be possible to build three new classrooms somewhere and then at the end of that project demolish the Portables but uh Barry Hill is much too tight to do uh that with so uh we'll have to have may have a combination of the two uh approaches to replacing the existing Portables with new construction and I would just say on on the roofing and why uh things are broken up between doing it as transfer to Capital or putting it in the

080bond um Dr rufo's strategy is to try and avoid interest cost wherever possible so the more work we can do without borrowing the less we pay in interest costs so if there are smaller Roofing projects that we might be able to address through the District budget and transfer to Capital we would do do them as a onetime cost and not incur any borrowing expense but the the larger projects are just too large to do that way and so we would have to borrow for those and again we're trying to shave everywhere we possibly can so even interest costs are something we're trying to [Music] avoid okay uh two questions um well thank you Dr Ru for and also h2m for the presentation um it's definitely very and also looking at the dollar amount and I

081you can see that um we are very sensitive to taxpayers money so um every dollar is uh spend um you know where it's needed so the first question is that uh so looking at just the the bucket one um the 88 million dollar um I assume it take takes into consideration of the interest rates inflation and all the different construction costs and Supply chains because we're not getting that done for at least uh two years you know 40 weeks and then the plus the one year until next May for the uh voters approval so that's number one and number two it's about the pre engineer buildings um Dr Rogers is that still subject to the 40 weeks you know approval from the state ad even though it's not being constructed outside um you know if

082it's uh sooner than that um it's going to help with the uh Al alleviating the space issues we have and also um when it comes to the uh the C it's going to save um on the cost as well so I'll let h2m defend their uh estimates because the estimates are theirs and um I'm you'll have a better sense of uh whether there's a different amount of SED lead time on pre-engineered buildings versus CMU buildings escalation is taken into consideration when doing the estimate so we were sensitive to what year that we predicted the work to be done based on the 5-year plan so that is incorporated and the cost of construction increases um and then for the S submission um it's the same lead time for pre manufactured building as it would be for

083tral construction so that doesn't change um so in your estimates to I know that um our um matching a used to be maybe like 19% that we would get actually or right what was it before 21% or 19% it was actually 16% when I got here up 9 years ago so is that is your estimate estimate estimates taken into account that now it's 42% we don't take that into account no okay so then maybe this is a Dr rufo question or Dr rogers's question so um that that's the 88,000 or whatever it is so then this based on education space I understand all that um then we would get based on we would get a reimbursement of this of that 42% tell me how that works yes so um so dur in the aid the

084way the aid is calculated um the projects go up to the state and they will give you um an estimate of your um of your state aid for a project being based on your Aid ratio and and other factors and we would work with the Architects because not every um every piece of the project is aidable and we work with the Architects and S to try to maximize our aid site work is something that is not always on itself aidable but we would try to um couple it with projects that are building based so that we could maximize our Aid right so a lot of our a lot of our um educational space that that that meets the absolutely yes that meets so the future space and any and and then you guys have heard

085me say this before which was that you know obviously we're not a construction company our our goal is um you know child safety and building for the future versus repairing we want to plan for the next 70 years not the past 70 years and again everything we're doing is how is this going to improve our education is we're doing construction is the new classroom of the future which we've had in the past how is that going to in in increase proficiency do better in math at the end of the day you know it's not just doing the construction it's how is that going to make us a better district and how the kids going to learn better than just the industrial model that's from the 1900 so just want to throw that out there um

086if I if I may Mr Rolo uh one of the things with the science rooms and the reason why uh they're on the list is because uh a lot of the rooms are turning into single purpose rooms so if the room doesn't have adequate sinks for all the students to use you really can't use it for biology if the room doesn't have uh hoods you can't use it for chemistry and then as a science room it becomes very limited in what you can use it for so uh part of the reason for wanting to rehabilitate the room not only is the case work in poor shape but it also creates uh it makes the rooms more flexible in that you can perform different kinds of instruction in the room and the more authentic science students

087are doing obviously the better they're going to understand the material so yeah we're certainly trying to to shoot past where we are right now in terms of some of that space to where and how we think it will be used next 5 years next 10 years and I know that we had went on some tours and um utilizing their current space for for multiple uses not just for one thing was actually a big cost savings with dividers and um so that was using the same space and getting more utility out of it than in the past I think you were talking about with that space we sort the high school which was pretty big space that could turn into classroom space okay um questions okay L thank you um I have two questions um one

088question is when the electrical um updates were done as far as AC units because I know we did a lot of AC HVAC work within the district during the last few years when those projects were on did we do any electrical panel upgrades was it a necessity to upgrade any of the panels at that point in time because I noticed that was one of the um one of the points you had made during your presentation there were um a significant amount of panels upgraded but still there's a significant amount to be done um along with some Main in infrastructure upgrades at um the two middle schools and wal Whitman just jotting down what you're saying and also I have a question for you on the prefab um Mr medler had mentioned about you said about

089prefab buildings that there was a difference or maybe I misunderstood you so I just want to ask you about it the difference in the longevity between prefab and brick and mortar might be different do you see that the prefabs will not are you saying the prefabs wouldn't last as long as a regular brick and mortar or what is your opinion on the difference between the two types of builds so when you when you talk about the pre-fabricated uh it does have a longevity um but nothing will be CMU uh with the masonry uh it's just more durable uh and and and takes a lot more uh abuse so although there is still a longevity with the pre-fabricated it's just masonry is the longest you you'll uh the longest life of a building and for the

090pre-air buildings what would you say the lead time is if we were to order those buildings how long would it take for those to be constructed do you think roughly so the when you do a pre-fabricated uh it's constructed off site so the intent is to demolish get everything cleared put your foundations in and then bring that structure in so it all gets planned out prior to that happening this way once it's demolished Foundation goes in and then that building is set and within a short period of time it gets uh uh up and running uh for all intense purposes so it's more of just the offsite there's a lot of planning to it and a lot of coordination with it so that time frame could still be similar to a regular constructed project but

091that's offsite and that's the that's the benefit of that is to get those in very quickly so um with regard to the bubble moving through Dr Raj that's probably for you um considering the how long everything takes even to get started are we going to be chasing this bubble or we actually uh looking at um um a possibility of completing and creating U more space in time if not for the elementary ande elementary level perhaps set southwards and also the second question would be um the timeline on the remediation of the Woodbury school and um would that be possible um to be completed in time and and would woodberry's school um accommodate all of the central office and if so would that sign would that be an immediate relief uh spacewise at Southwoods um when

092that happens I guess there three questions two and a half sorry uh all great questions so I do think that we have enough time uh to plan for and prepare for the bubble there's still some elasticity in the building here and um that gives us a little bit of time to work with I'll let uh h2m talk about what they see as the timeline on uh Rehabilitation of the wbry Woodbury school that's a project that's not for the faint of heart and then um if we were to relocate I'm imagining we would uh what we talked about um when uh I guess it was 2018 we were discussing using the Woodbury school to relocate uh some of the functions from here we were talking about relocating the business wing and that would free up um

093significant amount of space in in this building certainly I think adequate for the anticipated enrollment growth uh here at Southwoods and at the high school we have even more lead time because the bubble will need to finish moving through the middle schools first uh the projections for elementary were that we were at our uh plateau and and so far even as of this morning I always check enrollment before the board meetings uh we're still at that Plateau we haven't split any more sections uh at elementary school but we'll continue to watch that obviously very closely um sorry the timeline on the Woodbury renovation please so uh if I'll use best case scenario that if it was approved today uh just to give you some of the items I I I wouldn't give you necessarily a

094time frame uh in the sense I don't I there's a lot to it so being in the condition that it's in there's a lot of issues that have to be reviewed so not only existing conditions that are there all the evaluation of the structure environmental remediation at that time then design would happen permitting would happen and then obviously construction so there's a lot of process that goes in between uh but obviously we would do the best we could to expedite it because we know that if if if the administration's going in there it it's important to get that up and running to get the other projects moving forward as well and so one of the things we've talked about is if we did decide to move forward with this plan it may be necessary to

095have a year of rented space somewhere uh for the business W be unfortunate to have to move twice but maybe you'd rent some office space for a little while as swing space while you're waiting for uh the Woodbury School renovation to be finalized and then move into a permanent home sorry just quick um and do a free space at Southwoods here would that be classroom space straightforward classroom space or uh something else and the fun yeah what would be the functionality of the space we haven't gone that deep into design on what the space would be um at this at this point it's um if we have the appetite for creating more square footage here certainly we're going to need more classroom space uh but I think uh there' probably be some programmatic decisions that

096the building would want to make about moving some things around from their current homes in the building and finding more efficiencies locating classrooms with similar uh content areas near one another that sort of thing so that that space is in a hallway that is currently used for uh World languages and uh earth science so you know that that may be um we would have to think about whether would want to add U what kinds of classrooms would make the most sense in there given what's already in the hallway or whether some of that needed to be relocated um since we're talking about the Woodberry school I'll ask those questions first that I had on the space to accommodate growth uh you have a million dollars in Southwoods additional classrooms is that in connection with um

097renovating the Woodberry school so it's is it $6 million for the Woodberry school and then a million to reconfigure everything here yes that's correct okay and and so was that the so that $7 million to do that was the cheapest or like made the most sense as opposed to either adding a second you know adding going up or going out here that was what that was the made the most sense is that I would say that made the most sense based on the existing condition of the building and um the available space um can you add just out of curiosity a prefab um classrooms on top of a structure that already exists can you to add like a second level or is that not possible it is uh but the there's a lot of evaluation

098to that because you're adding a whole another uh level of structure on top of an existing structure that's not meant to take that new structure so a lot of times it's a lot of modification not only to the the steel masonry walls foundation so there's a lot of work that has to be done in that existing structure that you're putting the new one on top of okay um okay and then I just on the subjects of the prefabs so when you it for time wise it would be possible to do the complete demolition and install all the preat building in the summer time frame that enough time the the intent is to schedule where we can uh it's tight but we do the best we can to try to stick that schedule most contractors that

099work on school projects understand that that's the time frame to get things done so um again the the the intent is to get everything as much as we can off site right to just come right on site install it and it's it's ready to go I just didn't know the TimeWise if it was possible to do all the demolition build the foundation and install the prefab in the summer so I just wanted to clarify and then the other thing is um on at least I asked about the longevity which was one of my questions but um what is the do you know what the difference in the longevity is you know the brick and water typically lasts however many years and then the the prefabs are good for you know it it's all generally how

100you Main maintain the buildings um and again the the masonry is a lot more durable so as you can see most of these buildings are seven years old and with maintenance they they last a long time I would say there's probably more maintenance uh for the pre-fabricated or pre-engineered uh depending on the system that's used uh but there is still longevity to it so it's not that it's in 20 years it'll be you know out the door there it's still longevity it's still 40 year-ish building that it's going to hold up so in 40 years what what happens to the pre fabricated structures it it all depends on the maintenance that's that's that's is it like that that you'd have to tear it down and rebuild it or it depends on the maintenance I I

101I would imagine it's probably no uh but this again it it's we we want to keep these buildings around as long as possible uh as you know it's discussed once once it's built nobody wants to think about it for another 70 years other than some routine maintenance right um are there any other drawbacks of the pre-fabricated aside from the longevity no uh durability is the biggest thing uh but again um it's maintenance uh the the the pro I'll say for the pre-fabricated is all the work that can be done off site to be brought on so it's schedule is the Pro for that right okay thank you hi so thank you I have a couple of sort of process questions I I want to try and understand so the it seem it seems like you've

102combined an annual visual inspection and a building condition survey in the review that we're seeing in front of us so the last time I read the the building condition survey a number of years ago it breaks out I think where we're conditions in the buildings are satisfactory unsatisfactory need to be repaired within a short time frame a long time frame how would you contrast the analysis that you've done how would I break apart things that you've done in the annual visual inspection or the build-in condition survey and does that even matter in terms of the consideration so the visual inspection is based upon safety so making sure that eagus windows are clear uh clear uh uh there signs on them um that fire doors closed that there's you know it's it's your typical operation to

103make sure that it's there there 's uh a safety Factor within the school the building conditions is more about the bones of the building and the infrastructure so it's to make sure that the building itself is in good uh condition so that's why when we say hybrid we have to walk every building when we do our visual inspection we walk every classroom walk every Corridor um and make sure that everything the safety components are in place so while we do that it it makes sense to take notes of some of the infrastructure that we see some of the components that we see uh which again knowing that uh it's an ongoing maintenance issue we the intent was to help uh set up those budgets over the next five years so there is a difference between

104the visual inspection and the building condition survey and so all of the information and the sort of the the budgetary estimates are based on the combination of those two things over the next 5year period which is normally the building condition survey sort of projection correct are there things that are not listed here where we expect over the next 3 to 5e period that those items are going to potentially fail like boilers or security alarms or fire anything like that are there other things that aren't shown here as part of that building condition survey that you're concluding we do the best we can to analyze um any of those items that we notice uh and there are items that we do note but we feel that there is still uh time outside of the 5 years

105so anything within that 5 years we felt needs to be reviewed looked at maintained in these in the next five years so do we note other items yes if we don't feel that within that five years that's another list that we have that discussion just so we know we have to keep an eye on it and is the visual inspection and the building condition survey are there draft reports that we can review other than the budgetary estimates so that we can read about sort of the the the summary of the findings that that have to go to the state before it gets sent there we do provide to the district um and I would imagine that it's a it's a ongoing process so we understand so everybody understands where what are what we've identified and

106it's a discussion so that that that always is an ongoing process when we do our inspections and then just one last thing um if I think back to the last building condition survey I I can't remember or I don't know if I ever saw there was a cost estimate that came with the conclusion of that last building condition survey and I just trying to understand how to compare that to the 80 and essentially what this reflects the most recent building condition survey the $88 million if I think back to the last one completed in 2016 do we have an idea of what that building condition survey estimated refurb uh would have been I'm going to do this off the top of my head and hopefully Dr rufo has a better memory than I do but

107I'm going to say it was like 67 million or something in that uh range Dr rufa does that sound familiar familiar okay so from 2015 off the top of my head I think it was about 67 million and uh as Dr rufo has kind of started to do with this list of projects obviously these are large numbers numb and so the First Cut Is what do we think we can add to the maintenance plan that the district is doing or things that we know would be typical for what we do as transfer to Capital work maybe we can carve 23 million of that out of uh the project and this is what we did the last time around we identified lots and lots of roof work that had to be done through the District budget

108um ultimately we um we had some money in a capital reserve that we were able to apply uh the last time around uh to a lot of the costs and then uh about $20 million I think was there and then um we had the advantage of having a bond roll off so um at the time I used the analogy of it's like having your one child graduate from college and having the second one become a freshman so it's still one tuition payment it's just for a different kid so it's like one mortgage goes away but you start a second second mortgage to take its place but from a how many tuitions am I paying perspective it's still just one tuition so uh we had that circumstance before we are going to have a smaller Bond

109rollof next year uh not nearly of the magnitude that we we had in with the 2015 BCS that will sort of blunt uh the amount of um impact that it would have to repay the debt and then the other as Mr Rolo pointed out earlier the other Advantage we have now uh is that our building Aid uh reimbursement from the state is much higher than it was uh five six years ago when we did um the first BCS so that's an advantage but unfortunately kind of um mitigated a little bit by higher interest rates right now and The Surge and construction costs that we saw during Co so um you know lots of moving Parts but I I I do remember the face value number uh from 2015 it's being in like the 67 range

11070 range so I and just so you know too and so obviously 2015 2017 when we were doing work before with uh the air condition the filtration system we started rejecting a lot of the bids um this is going back a couple of years CU we were astound and h2m was was saying hey we put these out to bid a year or two later these things were up 100 150% we were that's why we kept rejecting them but the district did a good job Mr Hamilton did a good job of kind of retrofitting some of the stuff having some of the stuff done in house um to kind of mitigate that um but the fact that that that building Aid is a big deal for us because going from 16% to 41% reimbursement on educational

111spaces is tremendous obviously taking into account inflation construction cost going up the lead time with getting this done availability of contractors there's a lot of factors that that play into this but you could ask another question I just wanted to we' they've done a good job of working through a lot of these things which were not easy sorry just to conclude the the the point that I was I was working up to and I'm I'm thinking about as I'm reviewing this right a little bit of the the estimates are sort of confusing needs with sources and uses right I think sources and uses comes after the identification of needs and the reason why I was trying to get to an understanding of what's on the building condition survey versus the visual inspection the thing that

112I don't clearly understand in a way that's separated is the stuff that needs to be done for safety first not coupled with things that seem to be potentially wish projects which may not be directly related to uh safety for example science labs or pools or things like that that are shown in the $88 million which is part of the building condition survey uh visual inspection I what would be more helpful for me is if instead of tranching sources in uses and time frame is if we took the projects and sorted them by highest need for safety and um and things that we need to address first and then wish lists second and then future growth third Etc so another way to we're going to be having these conversations for a really long period of time

113so there's going to be a lot of different ways to sort of break it up but that would help me um sort of visualize the efforts over time um and I'll say that this is uh similar to the question that Lynn was ask Miss uh Imon was asking earlier which is uh can we triage the work that's in here so what h2m does because this is the BCS uh process by law is they organize things into year 1 year two year three year four year five so I think when we look at you know $14 million worth of uh bathroom uh and plumbing work uh obviously there's uh these these bathrooms have been in existence for 70 years so they'll certainly continue for another year um it's really a question of um we don't want

114them to continue like this forever because they're in tough shape so how much do you want to take on at any given point so health and safety first of course but then of these other things that are not um imminent threats to health and safety but are nevertheless things that the district has to address how much of that do you want to to tackle and we were talking before the meeting and my question to h2m which I I think I was asking anticipating where you might go with this conversation as a board was are some bathrooms worse than others if we were to say to you can you identify the worst group you know if we did the worst group before what's the next worst group that needs to be addressed and they said that

115they could do that sort of work for the board if you wanted it um Dr rufo this may be for you and and it may be an impossible question and I apologize for that we talked before so if we look at just bucket W the 88 million is there a way to sort of ballpark what is aidable within that 88 million or is it close to 2% is it close to 98% um no not really not at this time I I would really be um sometimes we we do an estimate we say 85% or 90 but I I just don't feel um comfortable doing that at this point Dr Rogers could we sort of if we're going to trench this or how what whatever the next steps may be right could we sort of include

116that in the the formula I have question about the um the prefab building again so what is the history of the prefab building has it been around enough for us to actually have some sort of uh actual example of prefab school buildings that lasted 40 years has it been time tested we do have buildings that have been completed um whether they've been there for 40 years I I I don't have the answer to that but they are constructed uh on a on a somewhat regular basis um so it is a proven method of construction how long has it been around I don't know the answer to that uh but it's it's definitely a construction that's been around for a while like 10 years 20 years longer than that longer but again I don't I don't

117have a specific answer for you I I I don't I can I can look into that a little bit more see if I can get you bit more information right because the difference will be only $7 million between prefab and something that could last 70 years just like this buildings that's been lasting for 70 years although it need maintenance again it's the schedule and the constraints the site constraints that we have that's the reason why it's it's being looked at so that's something that has to be consideration so that that'll be a further discussion uh if if we're moving forward in that route um that would have to be looked at you thank you so much both of you we really appreciate it and Dr rufo and Mr Hamilton so I'll just conclude the superintendent's

118report um at the last board meeting uh the board took action on the mascot in response to the state's uh new regulation uh we've been working on a plan for how we'll solicit uh Community input on the uh choice of a new mascot I think uh some of the questions in my mind are you know how to make sure that we get adequate Community participation so uh we know that there will be uh student athletes who are anxious to move to a new mascot and we'll also have members of the community that want to make sure that there's plenty of opportunity for public input and feedback uh we know we certainly want to hear from our community we certainly want to hear from our students uh and we want to make sure that there's as

119many opportunities for the public to be involved in that process as possible so one of the things that we've been doing is um following uh other school districts that are a little bit ahead of us in terms of having made the decision to retire a mascot and uh shamelessly stealing uh some of the best ideas that we see them have and uh taking advantage of what appears to be working well and because they have a little bit of a head start on us we're able to read the news coverage and see uh which districts are having some success with the ideas that they've uh put forward for how they're uh going through this process so I hope to have something uh for you to react to at the next board meeting uh with a little

120more specificity uh but that's uh something that we've been working on at a draft level uh internally just uh to keep you up to speed on that okay thank you Dr Rogers okay we're going to move on to um the board of V updates Lisa do you want to give that [Music] please last week the New York State School boards Association offered a webinar on um legal and policy implications of Schoolboard committee a few of us were able to attend online Jack do you want to give um just an overview for the board on on what that uh webinar was about sure um I uh I I sent uh the slides around to everybody uh so they could see the presentation I'd say really there were three main um sort of areas that they covered

121in the webinar number one were sort of the legal um and open meeting law limitations and requirements of of uh committee use uh by whichever kind of committee we would form or would be formed uh at any school district the Practical applications of um how School boards use committees and uh uh and the pluses and minuses about um some of those uses and then the last would be uh the documents that are required and the um uh the charters and things that uh we would need to adopt in resolutions to uh to form them and I mean I had you know two or three takeaways um so one of the ones that I found that was interesting was that they highlighted that uh some version of many or most uh let's say many districts use

122uh School District committees not all of them do but many did and that uh when they sent out a survey to ask how many uh school districts were using them they said um the most common number of uh committees that were being used were three or four number two um one of the interesting things that came out or that I thought was an interesting implication of using committees was that um it allows for participation for everyone on the board although um it doesn't uh committees don't end up having uh final say it's only recommendations that get sent back to the board so no different than um this conversation somebody reporting back on something that happened um that they viewed or listened to or gathered information from um so that the idea being that um it

123allows folks to dig deeper and uh spread the work but no ultimate decisions get made in those scenarios and that number three that one of the most important considerations is that if we're going to form committees that the charters um be well thought out and um and specified and uh nisba actually provided for the first time that I saw uh draft Charter um handouts which would really facilitate and the ease with which we could create committees if that was a way that we wanted to go those are three takeaways I had from the women are I'm I'm just going to interrupt for a second if anyone else is hearing the the screaming of Young Voices do not be alarmed there is a championship volleyball game going on in the gym right now and folks are

124enthusiastic so this is normal this is expected or all is well sorry Mr nope thank you very much Dr Rogers we're going to move on there are no legislative items um next is audience to the public please read the statement on the agenda to become familiar with our procedures the Sass Board of Education and the administration welcomes your attention at the Board of Education meetings audience the public affords our residents of the district the opportunity to address the board of Education the residents must enter their full name and address into the register located at the microphone before they speak each resident will have four minutes to address the Board of Education the board will not permit polling of any individual board members by speakers after each resident wishing to speak has had the opportunity to

125do so the Board of Education Andor the administration will do their best to provide responses to the res residents questions and comments after each resident has had a chance to speak the chair May recognize residents who wish to address the board of education for a second time after their initial four-minute turn no speaker is permitted to address issues concerning any individual students or any individual teachers or staff members all in audience at the board of education's public meeting must conduct themselves in a respectful manner hi hi um my name is rosem maray Rosen Bloom I live at 289 Southwood Circle in saset and I'm here with one of my neighbors actually to enlist your support and and the support of hopefully the PTA about an issue of um Traffic Safety on Thursday night last week

126we went to a town of oyer bay planning board meeting where they were discussing um the plan for a parking a truck parking facility to be constructed on the site where Village Heroes and Ralph's Isis was it's 80 Jericho Turnpike and we went there thinking it was going to be a fairly benign meeting and walked out of there incensed by the fact that um this is actually we think going to be an Amazon distribution Trucking third party trucker logistics company that is going to be housing I mean I shouldn't say housing using um this property as a active parking lot for 112 tractor trailers 42 tractor trailer cabs and 80 cars of employee truck drivers coming on and off the site every day so from 7:00 a.m. to 11:00 p.m. 7 days a week and

127so you know in thinking about the traffic nightmare that is Jericho Turnpike on a good day and coupled that with the fact that there's plenty of buses both from Jericho schools and scasd schools who use Jericho Turnpike all the time and thinking about tractor trailers trying to make left-hand turns when you go West on Jericho into this facility and trucks that are coming uh eastbound we're just a wreck about what this could potentially be in terms of traffic there was no stipulation in the potential contract that they could not use Robins Lane that they could not use Southwest de Bay Road or that there were any time restrictions on this project at all so we I think made enough noise to um convince the planning board to adjourn and within the next 30 days they

128plan to reconvene to rediscussed and so I know that um the I think the council PTA Council must have sent emails to all the units and quite a few of the units have emailed the membership with links to how to respond to the town but we're here tonight to ask you guys to step in and maybe send representation in the in of you of yourselves or of the uh Schoolboard attorney to really stand up for the community and the traffic safety issues that I mean to say nothing of the air pollution issues the emissions issues you know the impact that it's going to have on the community as a whole but mostly about the safety of the kids in school buses that are traveling that road every day thank you did you want to add

129something thank you Rosemary one for going to the um the town meeting and then for bringing it up to our attention um we appreciate that anyone else hi Board of Education my name is Lu Anu and I have two daughters who are attending saset um high school I'm here to request um the board to allow a foreign exchange student to come um from Japan to attend this saset school next year I know um Iris Franklin has been emailing the school board about allowing the student to attend and she has provided um you know like documentation and paperwork um for the board's review but she has not received a response and I note that under the school admissions policy 5150 um foreign exchange students with J1 visas are allowed to attend if they um meet certain

130criteria and I note that um there's like certain criteria that one is the foreign exchange student must be a secondary school student in his or home Home Country who has not completed more than 11 years of primary or secondary study um and Kiku the the F exchange students at issue is Kiku nakagawa oh I'm sorry um I'm sorry so the student at issue she is 15 years old and we will turn 16 she'll be entering 9th grade um this next school year okay well she's not a student yet but she's petitioning to okay but but I guess my my question is the school policy does allow for foreign exchange students to attend the um the scasa school high school if it's you know requested by a parent so I'm asking for consideration for the school

131board to um consider allowing her to attend the zasa high school next year thank you okay thank you hi good evening um oops my name is Tanya gats and I'm a resident of saset and um I am the wife of a 1976 saset High School alum and also my daughter graduated in 2021 um from saset high school and I have a freshman student at saset high school now and so one of the things um that I wanted to discuss is an issue that relates to supports addressed in the foundation plan that was presented tonight but this issue extends to students that are not visibly struggling academically or have disabilities in a June 1st 2023 opinion column published in the New York Times let smash the college admissions process David Brooks notes that research shows that

132across Industries the correlation between grades and job performance is modest in the first year after college and trivial within a handful of years Brooks then writes that we created this academic pressure cooker that further disadvantages those from the wrong kind of families and leaves even the straight A students stressed and burned out um my daughter had overall a positive experience at soset high school there's no doubt and I've discussed that in previous meetings I discussed that I saw flaws in the transition process as an auni full-time faculty member who um you know deals with students across all uh coming from all kinds of New York City high schools I have a lot of experience dealing with um adolescence especially freshmen but one of the things I noticed also at my daughter's time at shs was

133the parent portal and I was struck by the sheer number of individual grades populating the parent portal um it was so very different from my experience of high school gradu uating in 1983 and from my husband's experience here at saset high school both my husband and I felt the sheer number of grades had not improved the high school experience my husband in shs in his senior year was able to audit an AP English class taught by Miss eslinger who's still here not to get a grade but just to learn the content that's it such a thing was not even allowed at SC it in my daughter's time I know we asked so I thought of Brook's column today however when I looked at my son's fourth quarter grades in one of his core classes on

134the portal were listed eight test grades 33 homework test grades for Q4 assuming 24 students in his class that would mean that a teacher would have to input 984 grades into the portal for a single class if this teacher taught five class class this past year that would be in putting 4,920 grades across that teacher's classes and what I think that all this data entry takes away from is student teacher interaction how many of us as adults in this room remember having a parent portal during their high school years these portals only began when technology made them possible but I think this tech means students become too easily evaluated by the content of their grades rather than their characters and talents that are less easily Quantified such as creativity I loved Miss Kang's speech here

135tonight because she emphasized her parents background and her story of interrupting her college degree to work not just her academic credentials this generation of high school students all right so I lost time can I finish okay this generation of high school students has been shown to um not drive as early to not take jobs as early in high school and I would argue it's because they are so busy doing grades and the volume of grades teacher inputs is really my opinion remarkable and I would love the in the Dr Rogers you do amazing data data presentations here I'd love you to look at the data that teachers have to input across their sections all of their classes and it's right there on the portal and I think that would give you some insight perhaps into

136where teachers could find more time to do face-to-face interaction with students because it's that mentoring that is so important for faculty to students and it's what students remember I know my high school teachers I remember for what they said to me about my writing about my class discussions and and not the grades they gave me and so um yeah and I just want to end with Joanie Mitchell's um jie Mell just gave her first concert um and after a brain aneurysm and she's come back and retaught herself and she anyway I just want to um close with her some of the lines from Woodstock um which is her 1969 song well then can I walk beside you I have come to lose the smog and I feel myself a cog in something turning and maybe

137it's the time of year yes and maybe it's the time of man and I don't know who I am but life is for learning we are Stardust we are golden we are billion year old carbon and we've got to get ourselves back to the garden and metaphorically I think we could do some work on getting back to the education garden and more interpersonal connection thank you so much uh so I'll um address these out of order if you don't mind uh so first Miss Shu uh can we be sure to get your contact information I'm copied on every email that the board gets I don't recall getting an email from anyone seeking um so Mr levero from uh my team will make sure or Miss hefren will make sure to get some contact information from

138you uh so that we can be in touch with you and we'll certainly review uh the circumstances this is the first time I'm I'm aware of it I know the board's not aware of it either because I would have seen any emails that they got so but we'll certainly work with you on this and you don't leave here without giving uh some contact information to someone um so U Miss Rosen Bloom uh thanks for bringing this to my attention uh the first I had heard about it was today this was ad0 Jericho Turnpike was originally supposed to be a mixed use facility that was going to have some senior housing and some uh residential Apartments uh the school board had actually secured a mitigation payment from the developer to pay for the cost of the

139additional enrollment that would be expected here uh little um you know I had anticipated that that project was going to get built obviously Co intervened and then the pro the uh project was never approved and the property was sold off but I didn't know for what and to whom so um won't hold myself out as an expert on traffic uh but what I'll certainly do is talk to our bus company and describe the scale of the project to them and see if they identify any safety concerns with it obviously we rely on them to be experts in their business and uh I'll share with the board whatever I learn from Huntington coach and then um you know the the board has uh obviously I I won't speak for the board but um you know I'll

140provide you with information you decide obviously what you want to do with that um but uh I I do know that there have been some frustrations with the Amazon uh Warehouse on Robins Lane and that some of the uh predictions for how the traffic would flow on Robins Lane have not gone as um originally planned and that has created some uh somewhat hazardous conditions particularly near the railroad tracks so uh I see both of these as kind of being of a piece in terms of uh wanting to make sure that um you know our navigation on the roads is not impeded when the buses are out so certainly thank you for bringing that to our attention and then uh lastly Miss getts I will certainly look into the parent portal I'll confess I don't spend

141lots of time on it uh but it would be I think a useful exercise for me to do a little bit of a deep dive and uh you know certainly look at it for myself but have some conversations with teachers about what they see as uh its strengths and uh opportunities for improvement so thank you for bringing it to my attention and thank you too for sharing uh poetry with us this evening so um and I guess I can speak on behalf of the board um several of our board members with through the whole process of Amazon and even before with soua Park were're very concerned about safety of the buses uh the traffic the air pollution um making left turns um these were all items that obviously we were concerned about um so um

142yes so I think anything that we can find out and you can bring to the board um obviously having some representation there um like we usually do because it concerns our children safety so thank you Susan I also I just want to say I think time is of the essence I think she said that it was is 30 that it's 30 days yeah they said within 30 days last Thursday but we don't have a date yet so that's we're down to like 23 days whatever it is 25 days um I think it's very concerning to have all those trucks back and forth on um on Jericho Turnpike for so many reasons I mean kids walk on there and that's a lot of trucks from 700 in the morning to 11: at night every single day

143so Drive they ride their bikes they all they're all over and so you know and if they're on South oy Bay Road there are kids there all the time we've had tragedies on South ler Bay Road um we don't we certainly don't need any or want any more tragedies so whatever whatever can be done I would be in favor of us doing she just wanted to add hi my name is Susan con and I had gone to the meeting with rosemary and that meeting was supposed to be like she said just kind of one two three and they were supposed to approve everything the sale has already gone through was just whether or not they had um or or what their future plan was for going along with um certain guidelines but what struck us

144most at the meeting was they're planning and they're saying that they can fit to tractor trailer trucks in a non-turning lane so if they're going westbound on Jericho Turnpike right after Underhill Boulevard that they're going to be able to cross over to Lanes of traffic going in the opposite direction and have another tractor trailer sitting there waiting on the road and we had brought up that traffic between the hours of 3 and now it's like 7 is so unbelievably bad especially in that one area because they had already approved we've got that new restaurant which is great Hilltop everyone should go however when Hilltop was approved they were approved to have a space that would only occupy um as many people house as many people as the friendlies had before it and when it was

145built it was like double that and then they went to the town for a variant and now we have a huge problem at that light and then you go to the next light which is Leal and in front of North Ritz Club the traffic does not move there was another couple there that had lived that was living in the neighborhood I'm not sure what that neighborhood is and they said that daily they sit and they listen they they can't get out of their development and the bus drivers tell them this is a nightmare it is like a horrific accident waiting to happen because they have to inch out of the neighborhood inch out into traffic to try to get the traffic to stop for them we just said to the town what could you be

146thinking you you could have never driven that part of Jericho Turnpike at those hours to have ever approved the sale so it is the other crazy part is like in terms of how they're mitigating like the traffic they want the trucks to come up Jericho Turnpike going east at 107 106 107 by the Miller in up the up ramp and you know the the lanes over there converge from three to two very quickly and then they're only going to require they're only going to allow them right turns out of the facility and they want the trucks to go back on the Lae via the 135 entrance by the Animal Hospital you know how long that okay that is where they want the trucks to go back onto the 135 to get back to the lie

147so you're talking about the entire stretch of Jericho turn bike from when you get on at the Miller in to where they would get off at 135 you know yeah it's it's kind of scary thank you thank you good night you guys it's been a late night for you all right okay we're going to move on um okay we're going to move on to new business a items is A1 through A2 can be taken together they are the approvals of staff changes for the 2022 2023 sttip in and hourly rates can I have a motion please um Lynn seconded by shaie does anybody have any questions all in favor opposed any extensions A3 is the appointment of Summer guidance counselors can I have a motion please uh Lisa secreted by Susan does anybody have any

148questions all in favor opposed any extensions A4 is the approval of the underline staff salary adjustments can I have a motion please Brian seconded by shaie does anybody have any questions all in favor opposed any extensions A5 is the approval of unineed Staff employment agreement can I have a motion please Susan secreted by Lisa does anybody have any questions all in favor opposed any extensions A6 is the approval of driers Education coordinator and instructors for the 2023 2024 school year can I have a motion please Susan seconded by Anna does anybody have any questions all in favor opposed any exemptions A7 and A8 we've already done move on to A9 is the approval of the supervision rates can I have a motion please uh Anna seconded by Lisa any questions all in favor opposed any

149extensions okay we go on to B items B1 and B2 can be taken together they're the approval of the commit on special education recommendations and the approval of the committee of preschool special education recommendations can I have a motion please Lyn second by sh does anybody have any questions all in favor opposed any extensions A3 is the acceptance of the districtwide school safety team can I have a motion please uh Susan seconded by Lisa does anybody have any questions yes Dr Rogers uh since you have now appointed the two principles for bis Elementary and uh Willet Elementary School would the board like to amend this resolution to include their names on the yes so um would you please ask for a motion uh from someone to amend the resolution pleas so may I have a

150motion to amend the districtwide school safety plan and adding okay Brian and uh Lynn any questions all in favor opposed any extensions and then now uh on the motion on the resolution itself you've amended it and now you just have to pass it okay so can I have a motion you have you do have a motion Miss Falco and miss kashia you just uh need a vote okay all in favor opposed any extensions thank you so much B4 is the acceptance of the certification of the vote can I have a motion please Shaunie seconded by Brian does anybody have any questions all in favor opposed any extensions B4 and B6 can be taken together there the appointment I'm sorry B5 and B6 can be taken together they're the appointment of the board registration for the

1512023 and 2024 and the approval of the destruction of last year's cast ballots can I have a motion please Lynn second by shy anybody have any questions all in favor opposed any extensions B7 is the second reading of the policy for acceptable use can I have a motion please Shan e seconded by Brian does anybody have any questions all in favor opposed any extensions okay we will move on to C items C1 is the authorization for the service contract can I have a motion please uh Susan SEC bayana does anybody have any questions all in favor opposed any extensions C2 is the authorization for special education and nursing contracts can I have a motion please uh Lynn seconded by Brian anybody have any questions all in favor opposed any extensions C3 is the authorization for

152Health and Welfare Services can I have a motion please uh Lisa seconded by Anna um I'm Sorry by uh Susan does anybody have any questions all in favor opposed any extensions C4 is the tax anticipation note resolution of the saset Central School District of New York can I have a motion please uh Lynn seconded by Brian okay so for this one it's a roll call so I'm going to call on you individually to um to approve uh and being in favor uh Lynn you're in favor you would just say I I I okay um Brian I shaie I Carol I Tom I uh Lisa I um Anna I Susan I and Jack motion passes motion passes okay C5 is the authorization to establish limit to fund budgetary reserves for the year ending 2023 2024 can

153I have a motion please Anna seconded by Lisa does anybody have any questions Jack uh so Dr Rogers can you just uh brief ly summarize what we're doing here for me I'd be happy to so uh every year the board authorizes a not to exceed Mount amount for us to put into the reserves and we won't know what that amount is until we get to the end of the school year and we see uh what unexpended funds remain but these will be the funds that we use to replenish the reserves I don't think that the number is going to be anywhere near 13 million uh our practice has been to calculate what the maximum amount is that uh we would be permitted to put into the reserves and then use that as the maximum authorization

154but you won't be able to replenish the reserves with anything more than what's left over at the end of the school year uh I don't want to give you an exact figure because Dr Rua and I talked about this and I don't think we have an exact figure uh but it's going to be a much lower number than this um and as we've talked about during the budget process uh we and we experien against unanticipated uh inflation during the current school year so I suspect that what we'll be able to replenish in reserves will be less than what we've typically uh been able to do to replenish so this is only a limit you'll have at some point in the future uh once Dr rufo is done with the budget and the Auditors have affirmed

155her figures then we will have an actual resolution to put the actual amount into the reserves this is just a maximum authorization which I'm confident we will not get anywhere near thank you Dr Rogers anyone else have any questions on this no all in favor opposed any extensions C6 is the authorization for insurance policies can I have a motion please Susan seconded by Anna does anybody have any questions Jack sure Dr rufo would you mind certainly there are no um substantive changes to the um to the types of insurance um the only um change that I noteworthy is the increase which we talked about um during the budget process anybody else have a question all in favor opposed any extensions C7 is the authorization for construction change directive 001 Cooper power and lighting Corp may

156I have a motion please Susan seconded by Lisa does anybody have any questions all in favor opposed any extensions CA is the acceptance of the audit report for year ending December 31st 2022 can I have a motion please Lynn seconded by Brian do anybody have any questions all in favor opposed any extensions C9 is the authorization for Grant agreement may I have a motion please Anna seconded by Lisa does anybody have any questions all in favor opposed C10 is the authorization for Award of bids may I have a motion please Aly SEC Aon does anybody have any questions all in favor opposed any extensions C11 is the acceptance of donations of a little Library decorative fence cups and a book can I have a motion please Susan SEC bayana does anybody have any questions all

157in favor opposed any extensions C12 is the authorization for the disposal of broken Surplus Andor OBS leete equipment Andor books may I have a motion please sh seconded by Carol does anybody have any questions Brian do you have a question I do not okay all in favor opposed any extensions may have a motion to adjourn yes thank you have a good night