001e e e all right if we could please uh call tonight's meeting to order and stand for the pledge Al to the flag of the United States of America and to the Republic it stands one nation under God indivisible with liberty and justice all right could I please get a motion for the minutes for the January 14th meeting as well as the approval of the agenda for tonight's meeting so move thanks Justin discussion all in favor I okay please get a motion for Section 2.1 which is a consent agenda for personnel so move thanks Steve second thanks Tim discussion all those in favor could I please get a motion for section three new business general which includes appointment of secondary principal appointment K12 assistant principal appointment of interim principal or interim assistant principal and approval
002of Onida County Board of Education contract so thank you Justin thanks Tim discussion all those in favor welcome aboard welcome uh moves us into our board discussion nothing to discuss just very excited about the yes welcome personel moves we've made yeah happy to have you both on board welcome thank you we're looking forward to it I think um you know one of the things I think he and I worked together for like the last year so um and what's really nice is that I think he and I compliment each other really well and I hope that we could bring the work that we've done separately you know together up here to do some really good things you know I think Waterville has a lot of strength that we can really build on you know and
003hearing things and going through the interview process you know making aware of the needs and fortunately I think the needs the district meet our strengths you know and I think so together we can bring those things in and really move water from for you know I'm really excited when I first started teaching a lot of years ago yeah uh we part you know I was a new Harford teacher we partnered a ton with water we had a whole lot of different initiatives going on through both and stuff like that it's always been a really great place strong teachers strong Foundation people really care building so thank you for the opportunity thank you Dr spring especially thank you anything no I'm really excited I mentioned in my interview um I know there's great people here um
004you know I'm from the community my kids are starting school here and I just really want to see it do well and I'm really excited to get started here and work you know work with people kind of thank you very much for the opportunity well and on behalf of um the interviewing committee and and the school district we are thrilled to have the dynamic duo the Dream Team here with us at Waterville Junior Senior High School and you know your caliber your level of experience your your proven you know track record with curriculum instruction and Leadership is just going to be a perfect match for us right now so so we're excited as well thank you anything else I me like to add for the board discussion otherwise um we will move into our public
005comments anything see anything online there was no executive session I should make a point in our Capital project meeting later probably won't have the opportunity we do have student students in attendance tonight and typically as tradition we have you introduce yourselves let us know a little bit about your future plans not to put you on the spot just name what grade you're in why you're here they're like hold on wait I didn't sign up for that this Hansen didn't tell you about [Laughter] that got this start stand right here you don't have to walk right up recently moved too for my senior year and oh had an assment for school where we had to come sit our [Music] meeting okay okay thank you perfect and you picked a good one to come to signed their
006forms earlier strategic well Mr s wanted to make sure they were going to stay he signed them early my name's I came for the Reas I just want to finish school work you're happy to be here okay perfect thank thank you very much thanks for having anything else for public comment um do we want to we go into a recess yeah so the the public hearing isn't a meeting so Al you want to have anything say anything you want to talk about you're gonna do your talking later I guess yeah all right well then can I get a motion to adjourn please so move thanks Steve discussion all in favor it's a record they for picking the right you guys did an excellent job you should get extra points just for that keep looking we'll
007start we'll start the public hearing for the capital project at 6 and that will also be recorded So we invite everyone to stay if you have other things you need to do tonight we understand that as well I I kept looking up like I got e e e all right well welcome everybody to the public hearing for the 2025 Capital project um we just ask if you've not done so there is little desk outside the door here with a sign in sheet um just please sign in before you leave tonight so we have track of who's here um aside from that I'll turn over back to spring for your presentation thank you um we're really excited about our our Capital project and we have our whole team here this evening and I would like to
008introduce them to you first our Architects from March Associates uh longtime partners with the school district we have Chris crolius Chris just take a wave um and we have Matt Lacy all right um and new to Waterville is our CNS uh construction management team we have uh Nate van we and Daman zbec so Daman is a a water Vilan so he's a familiar face here so so thank you for being here this evening and our fiscal advisors our financial analyst Andrew sherak and uh we've had um a longstanding partnership as well with fiscal advisor so so we we have a great team of of professionals working with the school district first I'll start with the project scope so the capital project um is comprehensive and it includes upgrades to Memorial Park School MPS the Junior
009Senior High School and the bus garage we are looking at upgrading HVAC systems um looking at improving drainage in on our some of our athletic fields modernizing some of our instructional spaces including science uh and fifth and sixth grade and enhancing safety and operational um efficiency so this all supports our long-term sustainability Student Success um and so it all starts with our started with our 2022 building condition survey and we work with our Architects on on that as well as our Construction managers and it's a required plan and from there we look at our highest priority items and we start the discussion so so a lot of these items are from that that 20 uh 22 building condition survey so at Memorial Park School we are looking at air conditioning so this is really exciting
010for us so the units will be replaced so we can meet the temperature requirements that are now law and that goes into effect on September 1st of this of this year we are looking at reconfiguring our parking lot and our student drop off so I have pictures of everything here so this will make more sense to you in a few minutes so we are eliminating um that Island there if you are familiar with uh coming into the student drop off in MPS and looking to add a new exit Where We Are looking to replace our fire alarm system um it's old we know that's a bad thing um so it needs to be replaced we are looking to replace uh six doors in the hardware so six of these doors in the intermediate Wing at
011MPS are original and they are not up to our expectations for safety standards they have the very very large Windows we're looking to replace lockers and you'll see some of these are are extremely Rusty they don't close well they don't open well they are original to the building you'll also see that we have some lenium floor tiles that are cracked um there are also some trip hazards so those are also on the list to be replaced um replacing ceiling tile painting the cafeteria upgrading art and music storage as those classrooms are a little crowded um we have a huge number of students who are interested in in those subject areas which is a great thing and we just want to make sure that we can um better facilitate uh the the resources for those teachers
012upgrading our water supply system um and that supports our lead Reduction Program um in the school district again I talked about flooring looking to upgrade two mid-level science rooms this will support the New York State education department uh programmatic and curricular changes in fifth and sixth grade science we're looking to replace the vestibule coiling shutter so that's part of the firewall system and that is to improve fire safety in the building so here are some pictures so you can see that is one of our old um HVAC units and that will be replaced so that there is um air conditioning uh you can see there there's an island there so that island is going to be part of the the site work the um replace there here you can see um that this here is
013one of the the entrance on this side drop kids off here and then exit over here so that's going to be the plan it will definitely help with the flow of traffic so that there isn't a lot of backup onto East Bacon Street science classrooms looking to add the demonstration tables there so that's actually one of our our junior high students you can see the lolium flooring here it's cracked there's that transition there that is a tripping Hazard so that all needs to be replaced you can see here that um next to the tazzo flooring you know the the lolium tiles are cracked and apparently this is an old entrance to what was the gym at MPS and that's raised there um so uh so that transition also is is a hazard there uh lockers
014you can see they're very very old original to the building some of them are just way too small for all of to be able to hold all the students things so that's part of the project um you can see here there's a a very large window here so these again are original to the building and now with all of our safety requirements um it's just safer if we have a different door with um a different um construction pattern there with with the window so now the Junior Senior High School um it's no secret we've had a lot of drainage issues with uh our baseball field our softball field um our modified softball field modified baseball and our practice soccer field so so those are going to um we're going to address the drainage issues there
015provide power to the baseball scoreboard which is definitely something um that is needed so that we don't have to bring a generator out there and we're looking to replace the fire alarm system again it's old it's original and um it's not a good thing if it justes if it doesn't work so it's really important to be um ahead of that replacing the erus which um stands for the energy recovery units and what that does is it brings the outside air in to the school for proper ventilation and so that needs to be replaced along with the duct modifications to support that system and the HVAC controls which are very old um so we're uh out of compliance with our region safe so we do need to upgrade that a bit um so we're looking to
016include that and then Roofing so it's an original roof we've had a lot of repairs and catching to this roof you'll see in just a minute so this is the section of the roof that um needs to be replaced we do have leakage um not currently because we have you can see here this is uh what a patching job looks like and also we've replaced the edging here on the roof those all had to be replaced so that that's a lot of the work that we've been doing to try to maintain the roof and it's just gotten to the point where it needs to be replaced so I don't know if you can see this mud here uh well that was what the softball field looked like and uh unfortunately our girls softball team wasn't
017able to play on it um and so drainage issues that need to be addressed bus garage so HVAC and lighting upgrades um LED lighting so you'll see in a minute some of the old uh fluorescent lights there replacing the vehicle lift for the small Vehicles we've already replaced the one for our large buses and replacing the sofits and the lentils so you can see here there is um um water damage here um they and these do need to be replaced here this is what the lift looks like it's old um you can see one of our vehicles is there which is also old our sander which is out of commission right now not good not a good time for it to be out of commission uh but this needs to be replaced and then you
018can see the old fluorescent lights at the bus garage those also need to be replaceable so so all in um the total amount of the project is $1,600,000 so this amount also includes the technology survey that was conducted and we have prioritized items that do need to be addressed to ensure long-term sustainability and infrastructure to support our technology needs and capacity so now project five finances so the total project cost is $1,600,000 as we said we are using 700,000 uh from our capital reserve our building Aid ratio is 89.7% um and it's a 15-year payback and you can see here that the estimated additional local share for the proposed project is zero and that's really critical that everybody understands that so the debt service schedule um so again as I said it was it's a
01915-year pay payback period the project is time to align with retiring past um Capital project debt so you can see that uh that goes um on in 2027 so so the timing is perfect and what that means is that uh it's a stable payment and that payment is going to be roughly 421,000 you can see that in 2030 that we also will will be retiring other debt um and at that time we'll also come back to uh to our our community for another project so that we can continue to be proactive and maintain our buildings to really support you know a very um Rich learning experience for our students so the capital project vote um is February 11th we're holding it in the cafeteria so we're coordinating off part of the cafeteria so there will
020be direct access from where the Bus Loop is we have signs we have Flags now we just got that says they say vote here so we ordered those today and they'll be in uh so if anyone one would like an application for an absentee or early mail ballot so please contact Jen Nicholls um and they can contact you until the day bance by 5 okay all right um so if the project is approved by voters uh the design aspects for the project will begin you know right after that and then we will submit those plans to the New York State education department for approval and for issuance of the building permits so we do have a a website uh part of our website is dedicated to the project so everything's here if anyone would like
021to um go back and look at it all right here is more information and you can see this is the mailing that went home to everybody and that is right here um also explains a lot of the details so if um so once we get the state approval um and successful bidding and construction is expected to begin in the fall of 2025 and continue through September 2027 wait a minute Mike where are you hold on so at this time are there questions and we have our team of experts here to help us yes theud part of building used gymn so that's the intermediate um Wing where we have our fifth and sixth fourth grade classrooms that is the wing where the flooring is going to be replaced near the old gym kind of near where
022the old gym was at MPS but not where the new gym is the gym floor is an item the gym floor are you talking about the gym floor are you're talking about the hallway floor yeah so so we are looking to refinish um the gym floor of both buildings I'm sorry I thought you were talking about the hallways yes we're not replacing we're refinishing yes T the drainage anything once that drainage is done what else can we is there going to be artificial surf back there no no no okay and the Memorial Park parking BL why is that being redone so there is a lot of backup onto East Bacon Street and the flow of the drop off isn't very it takes a lot of time and we've got some parents here who do it
023every single day um and it's not a very efficient way to you know to get all of our students in so who should we point the finger at the architect that Drew it up actually I think what we're seeing is returning to school post pandemic we're seeing a lot more students being dropped off being driven to school and that's causing more congestion in the parking lots so rather than not be proactive we're trying to make it a safe environment for all the parents and the students at drop off and a poor design what's that it was a poor design based based on how things are right now and how things have changed yes but at the time I believe that was it met our need it was about to need some but things have changed
024no tax increase correct for the project no no tax increase yeah um I don't know Andrew if you want wanted to say a few words about it yeah the district has a really high buil ratio 89 spr so um essentially way to think about it is obviously 89 cents of the dollar you're getting back to the district um so obviously that pays for a large chunk the overwhelming majority of it um and also as Dr spring mentioned there's uh projects falling off old capital project that falling off so timing is to layer in with that so there's no additional impact above current 24 25 tax 89% that's taxpayer that's all of us that's state tax it's we're all tax we're all paying that correct I understand you have to have building Pro my next question
025will be and I don't blame this boy why did it take so long if this stuff is outdated for it to be done who can I point the figure it right so so there are no fingers I think Waterville is is very proactive and our with every five years coming to the voters with building projects how long how old are the fire alarms so the fire alarms are still working and we they're on our building condition survey and they need to be replaced we're not going to wait until they don't work anymore so and we can still get parts for them I don't know if our Architects wanted to say anything about I think the the firearm Sy specifically we anticipate a 20-year life out of each system and this is the point where it's
026getting up to that point where replacement is it's time to that 20 years um you know every as C talked about you know building conditioning surveys conducted every five years and that identifies a long list of items for potential improvements the total scope of which would exceed the amount that could be considered in a project that wouldn't have a tax impact so every five years those items are prioritized and the highest party items five five years ago were addressed by years AG go the highest priority that were the highest priority this time get addressed now and then you know the cycle will continue and if there's items that were identifi now that weren't as high priority they would be addressed at next project I agree yes P I know this always sounds backwards but could
027you just touch on how debt helps your tax um formula for the school budget yes so I'm gonna have since Andrew is here we're gonna take advantage of that absolutely so as part of the the tax cap equation it's a calculation every year um part of that equation is a quotequote local share and that's your existing debt per capital projects minus the existing a if that Capital exclusion drops off and uh and you don't have that level year in and year out then to go out for a capital project in in the future is going to artificially appear as though you're raising taxes this huge number when what really happened is it dropped from you know the 420,000 level it would drop off to some say just for argument say 200,000 to go back up
028to 400,000 is 100% increase on that Capital exclusion piece so what artificially looks like you're raising taxes this huge level it's really just to get you back to the same level that you we're at which is why the timing is so strategic and the tax cap calculation um can be a little hamstring to a district and it's very important to um kind of hit those those Tim pieces correctly baseb see fixing drain some of the major there don't necessarily deal with fi the Basin have a difference in some areas of five to six in the grass dirt are you replacing all that are you yeah say talking about it as drainage Andi explanation So the plan the field is a complete replacement ofield next and regrading it so that it has the copper kind of
029crown across everything so it's more than just drainage it is also a um sorry I sand sand dirt mix the the grass isn't being replaced except for in areas where drain is being cut in but the all the the baselines the dirt area is being fully replaced and have yes and I've seen in several other districts where they're doing just field no the um so the softball fields are at that configuration but the baseball field remain grass that add maintenance issue some concerns there um another concern is it's very windy and I didn't know that we used to have rice basically almost screen that went around the dugouts wind down T it hadn't been discussed up to this point but it's certainly something that's a good point and you know I'm time Le I don't
030do facilities here I'm open for all suggestions when I got here there was no wind street so maybe they were there and when they went away they didn't they they threw them in the garbage and that was it I think it's an excellent idea but then we can incorporate something that right in this project the ball fields are going to look like brand new now the the turf along that Baseline they're going to cut that we're going to do all the line is going to be in sharp looking diamond with the proper grounding proper thing that's what what we've got right now is we've got ding that's why it's all what it's going to be raised up the mound will be mounted off we got all the measurements and then you cut the grass and
031that'll be mounted to cut nobody loated yeah it's it's one of these you know that could be done but we I've looked at the other you know like in the the mjor Le Center Field that's a little go we look at the relocation I think talk to the coaches yeah last year the coaches didn't even use it because they didn't want to use the generator that particular the power issue was on the previous Capital project but couldn't be funded that's how long it takes to re resurrect that's one of my babies too to get that power out there start exens oh yeah no you can't do that so it's all for safety and it's all for the Athletics and it's going to be great get all done I'm looking forward to great question thank you
032about Air at the memorial is it the building yes air conditioning yes um technology you also have a technology where smart B so we still have about $700,000 remaining with our smart Bond funding um we are using that for um uh not smic bonics thank you we're using that to uh purchase vionics uh for the whole District um we have some other infrastructure needs as well um our phone system needs to be upgraded so we are utilizing the smart bone money with that nothing nothing's com in any other questions students any questions we can see Jackson You're the picture there um and that's our Greenhouse so that was our last um Capital project and we're adding a plant science um program now and strengthening our agriculture program so so that was um really really exciting
033as part of our our last project so if there aren any other questions then um we are going to officially close our public hearing I thank everyone for if you have any questions please feel free to reach out to me in the school district thank you for question thank you very much