001[Music] I'd like to call this uh meeting to order it's the uh budget Workshop meeting number one calling the meeting to order at 7 o'clock okay would everybody please rise for the Pledge of Allegiance it's to your right my left I pledge allegiance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for all okay moving on the agenda down to item number five which is going to be the presentation of the Bob Figaroa allamerican honor award and Mr schaer is going to come up and make a little speech about the award and its meaning and present it to the Board of Education like to thank the board for this opportunity to say a few words about this plaque

002that's being donated to the Patrick Medford School District this was the brainchild of a gentleman graduated 1969 and it was his thought that he could do something for the district in the honor of one Robert fagara Bobby who graduated 1968 as well Bobby was a track star he ran track like there's no tomorrow he would just run run run for the sake of it always in fast motion playing football as well he was a vital card to our 1967 co- championship team I would hand the ball off to him and that it I'd see the back number 22 and rear end running down the field in fact I think he still owns the record for the longest run in Pat yog Medford history of 95 yards from the line of scrimmage and we often teased

003him stating that he could probably run through the car wash and not get wet however going back 50 many years who had $2 for robo the car wash we're were out buying beer or a couple burgers or whatever but Bobby uh he s a lot of Records here at PCH hog pug Medford he anchored several relay teams he ran track like there was no tomorrow when he graduated from Pat yog in ' 68 he went on to CW post held many records there as well relay individual races and excuse the pun but he ran around the country he went to different meets California New York Northeast uh States so forth and so on and just a tremendous ball player and like the rest of us 17 18 years old he was a funloving guy en

004enjoyed fooling around a little crazy but when it came to track he was right there this plaque was put together by Bruce Meltzer class of 69 and it's named in the honor of Bobby fagara Bobby passed away 2011 so he has no idea of course what's going on here now tonight but Bruce did the research he made numerous phone calls to managers coaches administrators atic directors fellow teammates throughout history and put together this plaque it's named in honor of Bobby pagara but there are 13 other people on this plaque as well we have wrestlers a lacrosse player even a bowler a couple young ladies on the track on on the pl itself track and field cross country baseball you probably heard of Mark strowman and so forth and so on so it's it's quite the

005honor and I'm here tonight on beh of Bruce Meltzer who did all the research like I said funded it himself with any outside no outside excuse me outside material or or clubs to help them out but uh so it's it's a great honor to be here on behalf of Bruce to give this to the Patrick nied School District thank you is is Anthony here supp e e thank you again Mr schaer okay we're going to move on to item number six on our agenda and that will be the a budget workshop and that will be presented by Mr Maisy and his team good evening everyone uh thank you very much to the board Bo for this opportunity to present this budget Workshop number one thank you to the community for joining us and on this

006um what I'm going to do is uh explain a little bit about the process do that each and every year at this time to share what the budget development process is like because this District does it very different than other districts and I say it every year but it's always worth mentioning why it's so important this District does not develop a budget in a silo does not do it uh in a singular office it's done not done behind closed doors it's a very collaborative process and I share that every year because the people you see here today and the people you see over here in the audience is my operational team um which every year every year I forget to or neglect to acknowledge them for their hard work in putting this together because it

007takes great minds to put this together and you're going to hear me say this throughout the budget development process because these meetings that are taking place these conversations are meaningful so so with us this evening we have Mr Rich Roth in charge of uh technology we have Mr Irwin in charge of Food Services Mr Ahern in charge of security Mr tupes in charge of Transportation Mr Nunan in charge of plant facilities Miss Sim manelo in charge of the print shop and all the other areas that I need help with I have to to say and miss miss Lamb as well but this is the group that's put together um this first particular oneth now we break this up into workshops because as you can see on the board we have a very large budget we've

008got a lot of areas a lot of information to talk about so it's broken up over several dates you'll see them on the screen there um this first one is going to go over Central Administration areas and operational so we'll go over the general support um areas that I just mentioned and we're also going to talk a little bit about the governor's budget which was just released last week which is a large source of Revenue forms uh February 27th is the real meet of our budget because that covers our curriculum areas in general education and special education also will include a look at the Bose's budgets and also uh we'll show you or we'll share with you the property tax calculation that we've come up with for this particular budget and then report to the

009state the following day March 19th we'll go through all the Staffing benefits in fund transfers Community Schools Etc um that's the culmination and then we'll present this in toal at that point for the board's consideration and then hopeful adoption at the March 24th meeting and then as a reminder the budget hearing is on May 8th this year and that is a culmination of everything we've talked about through the process um and will be a refresher for the community prior to the vote which I believe is the 20th so we start with what some of the objectives are for the budget um in terms of development and you're to see on the screen a lot of mention of the word continue because one of the things that we've done I think particularly well we shared this

010with the community on the board the last few years and that's one thing in particular we saw like a large influx of monies from Co and I share that because it was important at the time for us to tell you we got nearly $20 million in Co M how are we going to put that to good use and then continue those things that we introduced into this District into this budget and that's what we did as soon as we got those monies we worked toward keeping them and keeping these programs in place for these students so when you see the word continue up there that's us staying uh staying the path saying we know that we still need to utilize the data to make sure that we're helping the students uh make the advancements that

011they need in their learning we need to increase Community engagement um and stakeholders and all the different inputs that we have throughout the year we want to continue the support of seal which is social emotional uh and mental health supports for our students we want to explore opport options to determine if summer is going to be offered at the same level that we've offered in the past which was completely funded by covid or do we offered in some kind in some kind of modifi it's a big that's a big number this year because um like I said that was completely funded in previous years by Co we're going to continue implementing actions to closing the achievement gap for our English language Learners and our special education students students with disabilities we're going to look to

012enhance curriculum resources that are always in line with our New York State learning students we're going to continue to increase our cultural competencies districtwide in order to better reach the needs of all students and a major Focus you're going to hear throughout this is sustaining the things that we put in place because introducing something and then pulling it back a year or two or three later is not helping anybody so us continuing by virtue of us just doing that is staying the course and doing what we need what proven to be a successful formula for our students and that's a major initiative of this particular budget as it has been in previous budgets so a lot of this you'll see you'll see examples of this as we go throughout um this presentation but some of

013the factors to consider we always look at this kind of you know from the internal and the external uh factors that really can have an effect on the budget this is just some of them but on the internal we've got pending contract negotiations with undetermined outcomes those need to be considered as we go through this because when we're putting this together we've got to guesstimate what we think the best what's going to happen here what's going to take place how is this going to impact the various lines of the budget um and that's happening across the the district with several progs uh we want to continue as that word again continue the supports that we put in place for our one toone Initiative for our students with electronic devices to make sure that they are

014never without their instruction instructional AIDS we're going to continue to expand our CTE program Career and Technical education that has been uh extremely successful over the past few years and we're looking it's still growing um largely driven Now by student desire to want to participate in these programs uh we've got a retirements of our existing staff that's always a big factor in anybody um and then also as I mentioned earlier the sustainability of these newly introduced programs is keeping those in place and not pulling back and I and I share this with you because you know you look at things in a microcosm you're look at what's have taking place here in our district um you don't have necessarily the basis of comparison so if you do yourself a favor and just read news day

015see what other districts are doing you'll see lots of differences you'll see districts reporting how they're pulling back on things no longer offering services that were once uh accessing of staff is a huge one meaning they don't have the affordability so we talk about things like being fiscally prudent and financially sound you know those words and those terms sound wonderful but having the ability to back that the way you measure a district is through their actions and those are some of the more significant actions I can share with you we do very well here that may fly under the radar but you'll see and I and I know because I've heard from my colleagues in other districts already they know that they can't do it without back and letting go stuff that's a big one

016you're talking about people's lives Liv and then you you know supports to your students there by change as well now on the external side there's a million things happening um uh take a look at your news feed today and you'll and you'll see two or three in particular there's a lot of unpredictability with what the new Administration is going to bring we don't know what those are going to be but what we do know is some of the things that we've seen here already is our insurance companies across the board are are showing us there are going to be significant increases in our premiums we'll talk about that more in subsequent slides but we're looking at increases to the tune of double digits like 15 to 30% it's a significant number is that we not

017we're um going to have to be very strategic in order to be able to sustain these things be able to keep these things in line with our budget we've got tax cap implications as you know the tax cap can uh is a form that the state has and we'll like I said we'll dis we'll discuss that more in detail the second budget Workshop but we're held to the lesser the lesser of 2% growth or CPI the CPI is the Consumer Price Index which is currently at 2.95 we're going to held to the lesser of those so we're going to be held at 2% but I just told you that insurance is alone are going up double digits so there and you see the you see the challenges our tax-based growth factor is barely over 1%

018it's 1.007 that's such a benign number that's not even worth mentioning uh our Rising health insurance rates once again double digits 10 to 25% in they've been increasing over the last three years alone our retirement contributions in our uh employees retirement system and our teachers retirement system which is which largely comprises all of our employees um we've been dealing with those the last number that they were telling us was probably going to be around 10% but we didn't have it in time with this presentation um and then there was the Rockefeller Institute they con you know they commissioned this study to be performed to specifically examine Foundation Aid and how and if it should be changed and even though that report just came out um the effects are not fully there yet although there's one

019that's that's being implemented looks like in the governor's proposal um we yet have yet to see those full effects on our budget uh but there's more to come with that for sure So speaking about the governor's budget I mentioned it was released uh in last week I don't know why the bullets are loading slowly not sure why but um basically they talked about total school aid in education uh will be 37365 billion that in that uh constitutes an increase of about 1.7 billion or roughly 4.7% and that's across the state for us what does this mean we got a nominal INE we got an increase that when it Nets out because a is broken down into multiple multiple categories basically we're looking at about A2 200,000 $221,000 increase just for comparison purposes we were looking

020at 600,000 last year so a market decrease so almost in Layman I'm looking at almost what would be a flat budget in terms of our Revenue support from the state aid side and then once again just caution everyone this is the governor's proposal the legislation still us the way in we typically they have to have that to us by April 1st but we're working with what we know at this point in time now there were three big things mentioned in the governor's proposal um the first is it includes about $340 million toward the funding of what's called Universal free uh School meals we're going to talk about this a little bit later um when we get to this because Mr Irwin is here I mentioned in charge of our food services and that's not part

021of the budget areas that we're covering sight that's a separate fund you're going to see the implications so I'm going to come back to this point later but that's something that already everyone in our school district qualifies for free meals breakfast and lunch the other two big proposals were uh one called the college and high school opportunity fund it's about $64.5 million for related programs it's there to provide support for economically disadvantaged students to achieve college credits and it will be for participating students in qualified programs that's a big piece of budget proposal the last one is about 13 and a. half million to Aid in the implementation of what they're calling distraction free school policies what it is is to reduce the use of smartphones in school or other internet aided devices um there's

022been a lot of talk about this um amongst lots of districts um because we're finding it more more difficult with all students having these devices so they're looking to put monies toward that to Aid in policy creation and potentially plans to Aid with assistance we've yet to see so now we're going to dive into the different budget areas that's just kind of sets a stage but now we're going to dive into the different areas that I told you about at the onset niss start with the central Administration so for those of you that are seeing this for the first time or just as a reminder um there's lots of budget codes here lots of numbers on the screen um this is is going to be available for you online soon tomorrow you can see it

023because it's impossible to go through all the data but we always provide a three years worth of data give you the we give you the budgeted numbers we give you the ex the actual expense numbers and we give you a projection of where we think this year is going to be as well as what we're proposing for the 25 26 school I always take an opportunity to to highlight uh different lines for you I try to call attention to things where we see a significant dollar or percentage in inrease or something notable that might be taking place that I think is worthwhile for your for your knowledge so on this line um I mean sorry on these areas you're going to see um at the bottom uh when you look at the total we're looking

024about $4,300 for the increase across all of these budget lines so when I call your attention back to the top you see an increase of proposed increase of just under $3,000 or 177% that's for for the travel and conference line and we've been noticing that in the past years as we have these expenses with these conferences depending on depending on upon where is that has that holds the conference can affect these expenses once again it's going to be in New York City we're cognizant of that that's why we're proposing significant increase on this line but even $3,000 constitutes only 5.66% in totality when we look at all of these different areas that include Board of Education district clerk the district meeting which is um the voting and the um superintendent codes moving on now to

025the business office codes that include auditing treasur our legal and our insurances that I mentioned earlier uh this is one of two slides the one that I've highlighted for you is our our contract Services line we had a major change over in our payroll department with two retirees two out of three people in our payroll department both retired this year so we're going to send them out for training they're going to have to make up for about 40 some odd years of experience give or take uh so we've got an outside agency that we contract with so as part of that we're looking to send them for that particular training to make sure they up to speed so that they adequately handle all the payroll claims that come in which total in the uh several

026hundreds each and every payroll um that's what you see on that line uh that's highlighted there for the $4,900 increase moving head to the second slide um we have on our uh Legal Services line our additional legal services and what we've been doing is looking at our threeyear average oh sorry thank you um well this is a part where you have to take my word for it I'm going to read to you from my script here here uh there is a slide evidently missing I'm not sure why but there is a second slide for the finance area and it includes um our our codes for the legal uh insurances memberships judgments and claims and what I've highlighted is uh we looked at our additional legal services and the more that we need to support that

027we're watching actual things that are coming in so we look at you know averages and we're proposing an increase on that line about about % in accordance with what we've seen the really the one I really wanted you to see was the ones on the insurances for our student accident our multi perel our cyber Insurance our umbrella Insurance our Schoolboard legal liabilities and our vehicles because the lowest of those numbers is a five 5 and a half% increase the highest one is about 32% increase those are the numbers that I mentioned earlier on the slide we're talking to the tomb of $293,000 in that one area alone so when you look in this at these business uh office codes in totality we're looking at about 16% increase which should be on the on the subsequent

028slide I mean I'm sorry the summary slide at the end U and I'll make sure it's in the presentation it gets posted online like I said I'm not sure why it's not here um uh but that 16% roughly is $340,000 across all of those budges so now we move to the human resources slide and I can only assume that Dr com was the one messing with my presentation because he wanted everyone to focus he wanted everyone to focus on his slide oh my gosh he's only up 2.93% yes folks that's less than 3% he is the winner so far but this is early in the presentation so much to go but no Dr Cohen did a wonderful job last year you know we we talked about the big increase to bring in that scanning system

029that's been removed from the budget there are some incidental costs on there like I said highlight them just so you can see but to the tune of $1,300 um modest increas is expected for employee evaluation absence management and the electronic personal file programs but really nothing notable to speak of here in sign well done Dr Cohen now we talk about the child care budget and um each and every year this is a zero and I share it with the community because this is our expenses for our before care and after CARE program and our summer care and our summer rec ational program and this is uh supported by the revenues that come in for the programs as well as money that we get back from cacfp which is child and adult care food program so

030because they are offset by that we just show you what we think are estimates for the programs uh for the program based on the actual numbers of attendees like I said but no budget impact there to be concerned now moving on to Mr nunan's area plant facilities this is and I hope this is slide one of two it's there okay um so the first area is the 1620 codes these are for the custodial areas and um you're going to notice uh in summation that he's got just a 1.21% I think that's less than Dr C's 2.36 but I'll have to check my numbers later um but he's he's he's he's got few yes but uh we're looking at you know potentially $330,000 as an increase proposed on the custodial supplies line so once again we're

031looking at this in terms of the history of what we've been needing we're always dealing with market price increases but as we increase our cleaning efforts and things like that this is where we see the most significant need for this budget in terms of the increase um subsequently we have a line right underneath it which is uniforms and there is a uh clause in the full-time operational contract that is um close to being ratified that would constitute the increase for more uniforms so we want to make sure that this budget reflects that need and um has that fil as opposed to the other way around so like I said um 41,000 on that particular line we're going to add that to the number here which is significantly higher for maintenance which is about an $887,000

032increase and here you'll see um you'll see some changes those first two lines I want to call your attention to you'll see a $20,000 uh proposed increase but no data to the left that's a new code that we are creating um and this is where I talk about that collaboration so Mr Nunan got together with Mr krco director of Athletics say you know if we need to put money specifically towards equipment for the purposes of Athletics why don't we do that we set it aside we broke it out so he took $155,000 you see the line underneath it under the athletic maintenance code pulled it out of that budget to put it specifically towards equipment so this could be scoreboards this could be bleachers um and this is for new equipment purchases um but it's

033advantageous for us to have it because you cannot put money into an equipment code uh you can you can do budget transfers among your other codes and you can pull money out of an equipment code but law dictates that you cannot put money into a code so if you have money available at the end of the year you can't just take money put it into that for those purchases so it's really uh advantageous for us to do it this way um specifically for those needs but it wasn't just $20,000 of new monies I wanted to show that we were taking from another area specifically for that intent um on the maintenance supplies um we're looking at increases um in this line because we're seeing more and more and more of our own maintenance staff doing

034in-house repairs of various items we've got um Master Tradesman in the areas of Plumbing electric HV carpentry so instead of farming these things out to outside vendors we're trying to pull more and more in house similar to what we've done with bringing students back from bosis and doing things inh house for instance in rcd program so it's very advantageous to do that if you've got skilled staff that can perform these duties and um the ability to like I said do it yourself so um like I said overall the increase is as Dr Co stly pointed out much higher in terms of dollars about $120,000 but an increase percentage wise of 2.26% well done Mr nun now moving on to security and Mr Ahern is overseeing this so you might remember that I called your attention

035to some of the things that we're doing those goals at the beginning that that continued focus on safety one of the things he'd like to do is introduce a third roing vehicle to our district right now we currently have two but you know we've got a big bu we've got a big district and we've got 12 buildings running district office so the addition of a third gives us the ability to respond to crisises on a faster basis um so that's where the proposed increase that's largely what that $15,000 is for that you see on the first line for equipment uh the other line that I wanted to call your attention to is a $31,000 increase which is really the majority of the increase in this code that's on our contractual services and I mentioned to

036you earlier about some of those covid monies we used a large part of those covid Monies to bring in secureity and safety enhancements one of them was to bring in additional cameras into our buildings throughout the district to the tune of about 200 cameras installed in our buildings districtwide they all come with licenses that are required uh with our Contracting agency that's where you see that large number that's why you see that jumping now that those cameras have now all been purchased with covid monies we need now to pick up the recurring cost that you going to see here overall we're looking at just under $50,000 increase in the security budget area an increase of about [Music] 32% now uh Mr SEL this is the print shop area that I mentioned earlier couple things that

037we wanted to call your attention to bless you uh the first is a decrease on the commercial printing side because one of the things that she has been working on is the ability to have our in-house printers print our envelopes and receipt books so what that means is by doing stuff in house once again here's another great example dropping that line $55,000 as a result by doing things in house on the equipment rental side though you will see a $14,000 increase we brought three new copers into our machines and if you tie this into some of the things that we've talked about in subsequent years where we increase Staffing by you know over 100 people this is one of those supports you want to put in place to make sure that everyone's needs are being

038met um and what we decided is um that we would need three copiers to do that for next year there's the increase that's associated with that overall though we're talking about what was the number we likeed to over the summation it was a three 3.34% increase of just under $15,000 across the budget area well uh now technology this is one of two slides um and this is one that we've had a lot of talk about over the past few years because there was a lot of money coming in with Co that we put towards uh our technology those costs um we're now been slowly bringing back and we're doing a lot of In-House examination one of the things that's very important to remind everyone is is the continuation that the children don't suffer that we

039Contin to make sure that they have their electronic devices that they need so if the monies do evaporate on the covid side then we're not just pulling those back so we are working Mr richro and I with Miss ketti on the instructional side to make sure that they have what they need whether they're in school or if we need to go to remote learning that we're always adequately prepared um but you start you start off and um Mr richworth really wanted me to highlight this first line I can't imagine why it's a $211,000 decrease because he was able to complete the switch project that we had done with eate just last year that was the big increase that we proposed at the time you'll notice that that's no longer necessary in this budget and that's

040why we're going to direct of our money you'll see subsequently to the devices on the data processing software though the number of iPads that we brought in has increased there's a management program um that's associated with um the iPads as that increases the number of iPads increase the number of um how I say this licenses increases in accordance with that and that's why you see that increase on that line of nearly $24,000 for that data processing software and then then on the audiovisual side once again related to our AR monies one of the things that we did with our our our AR funding was to upgrade the public address systems in every single building the district with that comes the necessary licenses as well uh right because that's license based also I believe Swit Rock

041right that's also license based um subscription based I apologize um but the call cost to that go with it like I said this is now the maintenance cost that go with to support the system not the cost for the equipment itself which was paid for by by those Grant monies that's what the uh $660,000 is for on that particular line for the contract services this is the second slot I mentioned but here's where you see the $325,000 increase um which is the most significant part of this budget but once again the most necessary to make sure sure that we are continuing with the life cycle replacement of our devices for our students so that we have this done twice throughout their educational career so that they will be you know K through six and then

042again 7 through 12 that they'll have these devices in place um but that money that was not there last year now coming back into this budget because we utilized Grant sources we've used smart fund monies things that did not have an effect on the general fund budget now we need to make sure that they're rolled into uh the budget for that purpose but then when you go down you'll see two lines highlighted one on top of the other one of $40,000 decrease and one of $40,000 increase which is which is essentially a wash but one of the things that um miss kedy Mr richar and I sat down to do is to kind of examine the licenses that go with the software as well all these different programs to determine the necessity of them and

043which ones um should be uh our answer grade at this point should be removed from the budget this isn't ongoing process this is that collaborative process taking place as we speak she's commissioned all the directors to examine the usage of them in the classroom and determine where the real needs are so we can see if there's ways to even change this by the time the final budget is about but in all we're looking at an 8% increase across all the technology codes uh just over $200,000 and now we end with uh transportation the last budget area that we'll be talking about this evening the first line is the $160,000 increase for the purchase of a bus we talked about this last year we always examine the age of our buses the mileage readings on our

044buses and the usage of our buses because those are the big three come into play when we talk about whether or not we need new bus last year we talked about it and you're going to hear us talk about this more is the they talked about the new electric bus mandate and just to remind everyone there are two important things with this electric bus mandate that any purchases of diesel buses or non-electric buses can only happen up to 2027 your entire fleet must be fully electrified or non alternative abuse buses by 2030 so Mr tupes seon and myself have been working with some outside agencies to start that process in terms of what this could look like because it's not just the purchase of the buses it's also the infrastructure that's necessary to support them

045but we've had some very good preliminary meetings with them in terms of getting some good support identifying alternate U funding sources but what's still going to be necessary between now and then is to replace two of our buses in our Fleet we have a fleet of nine and we have two that are pretty much near the end of their life and that will not make it but between this year's budget and then next year budget we can replace those two that will time out almost perfectly with us getting through to the 2035 year which point in time we'll have the plan in place and we'll have it in place before then this is what it would look like with the electric buses which um you know if we were to start buying those now you're

046talking about maybe three times the cost so you see why it's advantageous for us to do this now as opposed to um going with electric C that we can't we can support in terms of charging at this point the equipment repair that goes hand in in in glove with what I'm talking about as your fleet Fleet ages out you need more and more repairs we're estimating that we need maybe another $10,000 for the in-house repairs that we've been doing and the external repairs that we're performing that we can't be doing inhouse and lastly our contract Transportation line um in accordance with the contracts that we have so we have our in-house buses I mentioned we9 uh we use five on any given day sometimes six uh but we we contract out for our large buses

047great mon bus and we contract out with our small buses with uh town bus these the increase that's proposed here is in accordance with those multi-year contracts and that's why you see that increase of nearly 10% on that line overall grand total you're looking at about uh $978,000 an 11% increase and this is that summation slide that I mentioned to you earlier um this gives you just a snapshot of everything that we've talked about this evening the grand total what we're talking about in in totality for all these budget areas is just about 21 A5 million do for the budget an increase of about 1.7 million which constitutes an 8.67% increase so you hear a lot of numbers but sometimes it's sometimes it's very important to back out a little and see how this looks

048from about 30,000 feet up and that's the number that I want you to see because you're talking about a $241 million budget this would be approximately 9% of that budget but I wanted to end quickly and I thought the board would would appreciate this when we talk about the operational areas and the effects on budget and some of the things that we have been talking about this evening is with the goals with these objectives what does that mean well Mr Irwin Miss Lam and myself sat down over the summer because we uh you heard me mention earlier the universal free meals book we talk a little bit about the community eligibility provision which provides all of our students free uh lunch and free breakfast we qualified for that last year specifically last December when they

049changed the parameters slightly and we were eligible and since then we've seen an increase in our sales reimbursable meals that comes back from the state and from the federal government and that has helped us tremendously now the Food Service program is a self-sustaining program that's why that budget's not included here but they bring it up because of its implications because if I take you back to just two years ago there was there's a budget line where we were supporting the program because it didn't have the ability to keep up with the demands and the wear and tear on specifically like the equipment is where we re seeing it and the desire to want to provide the best best program possible for our students is in line with the equipment that you have and the tools

050you have to work with in your program so there was a line in there called the inter fund transfer to Food Services as soon as this program C went in and we qualified we removed that from the budget and that was a great code what we didn't realize is how much it was going to swing in the other direction in our favor by virtue of these free meals and we've seen more students taking place we had they just put some quick numbers up there for you about 2.2 million in our excess fund balance and S says that well you can carry up to three months of your expenses in this fund bance and when you H what happens is when you've exceeded that number you have excess fund balance and you have to have a

051spending we share that with the board how we're going to share how we're going to spend that down we did this uh two years ago correctly I think was 2022 we had to do this and we prepared a plan of how we would do this what upgrades we could introduce they then changed it over the summer to say no you can carry up to six months which would actually put us in the negative by almost 300,000 but instead of just holding on to those monies the three of us sat down and said what can we do to implement upgrades into this program that are going to have sign significant effect because we had every reason to believe that this year is going to be better than last year by virtue of the the program running

05210 months as opposed to six and that that's the kind of forward thinking that I think that that's important to share with the district when you say these things have crossover things I highlighted on the left the superintendent goals just the things that tie in directly that I saw by virtue of having an improved uh Food Service program I'm going to show you some of the ideas that we have in there but if you humor me for a second um the governor in her State of the State said numerous Studies have confirmed that providing Universal free meals supports uh supports learning boosts test scores improves attendance and class Behavior reduces food in security and promotes better mental and physical health that ties into five of the goals the very things that I talked about at

053the onset of this meeting so if we can take the monies put it back into the program and find ways to improve the outcome for our students we think that's a winning formula so let's see if we're right we put together a three- tiered action plan for these Food Service upgrades number one improving the meal offerings number two introducing new equipment to assist us that in that regard number three by addressing staff concerns these are the very things I talked to you about at the beginning we talk about involving all our stakeholders that means students voice that means our employees voice that means the board's voice the board challenged us about three or four years ago said how can we serve students faster how can we improve the meals that we're serving to them this

054is that plan and action and I think it's worth mentioning to understand when you're talking about budgeting things can't happen in the Here and Now today's great idea might not being acted upon for a year or two or five but the important thing is to stay with it to not forget about it it can't be one and done so we heard that message and we sought ways to bring it to fruition it's not easy especially when you're working with a tax cap of 2% like I mentioned finding these opportunities is what this is all about that's why we have such I believe such an important budget development process and why I'm so proud of how we work collaboratively as a district so improving meal offerings uh and and Mr Irwin has been diligently working at

055this and I say working in the present tense because this is what he's done so far he's introduced whole muscle uh chicken um as opposed to the process foods that we were getting he's provided more fresh fruit and vegetable options he's added halal meals and other International food choices for the students and they transitioned to a white flour pizza crost these improvements alone will be about $150,000 so as you see that number that saw we're diving into it and using about1 15,000 toward the advancing event the next thing is to bring in new equipment to install a backup generator at the high school for our Walkin freezers and refrigerators which is where we keep 80 90% of our our food storage okay if there was a power average and those Foods went down we can

056declare that with our insurance company but then what happens you can see your premiums Rise by protecting our the Integrity of our food now to making sure that we never have to worry about that saves us on both fronts uh the purchase of two new refrigerated delivery trucks so we use two trucks to bring our meals that are prepared at the high school to our satellites which is the other 10 buildings instead of doing that with regular trucks now we have refrigerator trucks to bring to five buildings each he wants to replace all of the aluminum pots and pans districtwide at all the kitchens because it's been shown that aluminum over time can reach into food so by replacing stainless steel that's a significant upgrade to the Quality preparation of foods those improvements would be

057about $340,000 and then tier three addressing some of the staff concerns we know um years back we had to we proposed the board to reduce some of the part-time staff in our buildings because there wasn't the applications that we were receiving on the employment side and we had seen sales going down the numbers weren't there but we're just like I mentioned just because of the event of C we're seeing an exact opposite uh reaction to that we need to be able to I'm sorry an exact cause we're now reacting to that and luckily we're able to do it quickly so we're proposing bringing an additional part-timer to all the buildings to help with the additional the preparation of foods and or the serving of foods to expedite the meal service times that I mentioned earlier

058we're looking to purchase new oil resistant padded floor mats for the staff to help reduce leg pains that they may encounter throughout the day since they are typically on their feet their entire shifts and also minimize accidents that may come about as a result of spills uh and me have slips and Falls as a as a result and then you know we talked about um bringing cool units to our classrooms to our offices to our gymnasiums and our cafeterias but that doesn't apply to the kitchens and fortunately where the food prep is done where the ovens are um it's not something that's necessarily feasible not on the grand scale that would take for us to do for the community but we are looking to bring in more and more fans and have those purchased um

059by Mr Irwin through this program and then installed by our in-house technicians like we mentioned before Mr new new uh to the tune of approximately 172,000 so of that you know $900,000 number that I gave you we've already got a spending plan of about $665,000 and this is to be continued we're going to continue to watch the numbers to see if they're going to continue to escalate like we've seen uh been experiencing rather um and this slide is some evidence that we're also going to see like I said what the effect will be now that we've run the program for a full 10 months so this is the last slide I just thought I just pulled three items that he shared with me me and if you look at the sales for a comparable period

060of September of 23 to January 24 versus the St quein time for this year September through January look at some of the changes in some of these items so chicken nugget sales we did about 16,500 portions we're up to about 16,800 the chicken patties which is Mr IR is that that the one they refer to as the Chick-fil-A the kids refer to as Chick-fil-A if they tell you they're eating Chick-fil-A they're not eating Chick-fil-A but this is what they they they assume it uh it tastes like they love it and it's not just they love it look at the numbers 20,000 uh portions versus 25,000 portions in the same period of time that's that's impressive um and then if you look at the pizza by transitioning to um the new pizzas this is on the

061large 16 16inch ones uh this is at the high school only the students at the elementary and middle still use the uh the square ones right but the high school alone the portions went from 22,000 to 40,000 significant significant increases the students are advocating by virtue of showing it with their purchases you know and they're doing these purchases as I mentioned free of charge so it's really good to see and this is just through the first five months as the word continues to go out there we're hopeful to see even more and more results so we'll report out back at this to the board again throughout the year probably at the end of the year I'm imagining and certainly at this time next year which I hope to share even uh more impressively members all

062right in some in summation um the next budget Workshop as I mentioned is for February 27th it will be at Saxton's Middle School auditorium 7M and I did Cover the budget categories that we'll be discussing which is all the instructional areas and I'm happy this time to take any questions yes yeah we we uh shared the information uh I think you know we shared that out with the board already uh is not something that requires an approval it's not part of the budget so we are head long into moving forward with those plans the right but the like right yes and the the actual the Staffing one will be on the February agenda for your approval just to make sure and then like I said then the posting will go out and then like I

063said we've been fortunate that that's been on the uptick that more and more people have been applying for our for our part-time food service positions actually our part-time positions overall so it's actually one yeah you with the vehicles because I can't answer that on the on the on the employee side it's a hypp um you can get him a cake how old are the vehicles um Stan do you know the age of the vehicles e MH no I think it's it's for credits my understand is it's for credits not for exams may it may cover exam yeah anyone else so Frank again starting from the end so the overview that increase was just for the budget code to discuss tonight that's correct obviously it's not the overall that would not total amount the nice number

064um so you know one of the things I think maybe you could comment on is you know where Patrick Medford is as far as Financial Health as was reported by the state because we you know we we've had that Run come out from the state and certain districts are in you know bad financial position maybe you could just talk a little bit about you know what we got back from the state on the controller yeah there was um the report was the um was the fiscal Integrity report that just came out U two weeks ago and once again we we seem to perform very well in all these reports that we get and um while they're not quite specific really the ones you we share with our finance committee and our order committee or how

065we're performing to our budget I think the the best answer I can give is what I had said earlier when we look at something like the proof is in the pudding so we got all those monies from Co how we performed with that and how we utilize those funds and I shared the story with people of what took place the first thing we said about doing was fig how to use those funds and as soon as we knew how we wanted to use them the very next day we said how are we going to make sure that we keep that going and I think that tells you everything you need to know about your planning because we are not looking at this like we're looking at a very lean budget jici here we're looking at

066scaling back on things keeping this close to us because we thought the supports um might not be there from the state level and we were we were right so far the legis legislature can come in and change things who knows um but we always are to be cognizant of that and whenever we share that you always want to plan on the conservative side in that regard and we don't we don't have these excessive needs out there I mean things that we're we're putting forth the bond is another another good example not from we didn't post something to the community that was going to be um a huge impact and we looked and and provided the strategy as to hey here's how debt Services falling off here's how we think we can bring new debt on

067I think it's the approach of how we go about our budgeting is the same way approach all these things whether it grants whether be bonds any of these funding sources and really try to utilize every one of them that's available to us so whether it's um I mention I mentioned a bunch this evening I mentioned art I mentioned Co I mentioned smart school utilizing these to make sure that we have the things that we need to provide and just how we ended with Mr Iran's you know area like that's great that that's happening food service but alleviating that pressure on the general fund budget um and maybe improving it in other areas that's a win-win right because if we're feeding our kids and that's helping on the social emotional side that's great because that's one

068of the things that we're setting out to do we might be able to scale back in another area so I think those are things but we get you know to trusty for this point we get these reports from OC and orders all the time um and really like I said getting both to more material and you know again just for the community you know we're going to ask some questions tonight but don't think that's where it stops so you know it's hard to sometimes absorb all this in just the meeting and answer questions back but I'll touch on a few of the first thoughts I had um and again you know moving things around budget codes to the proper code is very important so when you were talking about plants and Facilities aspect for the

069athletic equipment y um increasing that amount um it I felt like you said we're throwing money in that code the things that we're going to need are we going to get a list of what the what the estimate is on $20,000 of items so what I was saying is you we we used to have all the money in the athletic maintenance code the one that's right underneath it yeah and you could never use that code so if your bleachers were in need of replacement not repair but replacement or a scoreboard and those are just some examples that I had provided you couldn't actually make those purchases because they'd have to come out of an equipment code right I understand that right but are there any planed equipment purchases well at this time we don't know

070what we need okay right that's right but right in totality what I was trying to demonstrate is the numbers in totality will be roughly the same be like you know if I'm being specific it's a $5,000 increase on those two lines if this is a new code that enables us the ability to make those purchases should we need them right otherwise for instance the money will be tied up in just the maintenance code and again we know it's a mistake if you don't do that and then you get to that point and now now what are you doing now where where that funds come from um under the security the um question of adding the other Rover so we say oh it would be nice to I don't say we ni you say ni but

071adding another Rover what's the data that shows like what are the other two Rovers running into Mr Maisy said um we can get to situations faster are situations that we're not getting to and we're like oh if we had another robber we would have gotten to that situation right so obviously if you have an event going on you have coverage at that event I know the board's spoken quite a bit about making sure we have the right coverage at events um but I guess my question is where does the Rover come in you were to tell me that well um we couldn't get to this situation and then there was another situation in April we couldn't get to and then another situation in October we couldn't get to you know would makes sense that oh

072yeah sounds like we need another one here it just sounds like it would be good if we had but you don't really have any reason to say that we actually need it well can I ask a question on that John um so like the day that we had a threat at Saxton and then we had a threat at South Ocean and the other car at the same face basically within a half hour of each other and then we have the other one at the high school because we have regular high school stuff so I guess I that's the first thing that came to my mind is if two things happen simultaneously right and that's what I'm looking for or even two rses even if we had the two cars when we evacuated South Ocean and

073they all walked the bay that's a big distance to have a lot of kids walking from school to school to have the cars there that that's just what came to my mind first e for yeah um perfect I mean that's what I'm looking for when you know Mr Maisy team when you have these increases some of them are very significant and you've given some you know responses tonight but you know those are the things like just a line with an amount of money without a background to it you know Mr Irwin's information certainly had a lot of detail into and also had results showing hey this is working and this is what um what we want to do for our students uh in the area of Technology see James smiling back there you know I

074mean that's a big increase on there I think I'd like to see more information in detail into why we go from 6K to 66k you don't have to give it to me now you can you know okay and then what was the and okay so last year it was only one system yes medern right okay so you know I guess I guess my point will be we're not at the end but when we get to the end if you go okay we're under the tax cap and we need a simple majority budget to pass and everything in here is advantageous for our students and the safety of our students and all those things that I don't think you know we if we could start there and I know you can't because you build this over

075the next several months as we get to that point but I think um those are the things where we may have to look at Alternatives if we get to that point maybe we don't do all six of them in one shot maybe we spread those out as we go through um I think that's a fair point if I could jump on that yeah everybody here the reason I I mentioned we do this over the course of of two full months but the budget development process takes place over the course of like four and a half to five months for these very reasons you're not doing this overnight things are going to happen and come along and down the pike that you're G to have to make adjustments so a lot can change between now and

076when we ask the board to adopt um but that's the intent that's why these are proposed numbers we're working with estimates with what we have now we've we've made changes I think almost every year between from the first budget Workshop to the last we've always made changes we've needed to um because as we see as we see everything come to uh into Focus so it's a great Point correct and one of the things we said we wanted to do as you can see from the schedule is get into that early March time frame and give the district a chance chance to put together the information they need to go out to the the community um but it's hard because you get to the end and all of a sudden there's a big chunk and you're

077like uh I don't know if you can go out with this now we've been very lucky because we we've not only been under the tax cap but we've also come in with at or lower what the tax increases would be which is phenomenal on the r yes and I have to say that we as a board and all board members I think will say this when we go out and talk to other boards and they look at Patrick mord oh you guys have an unbelievable Finance group you know and that that is the truth um was that oh yeah um yeah we talk yeah and they they're accountants for so many other districts and um you know I don't want to say what they say Dorian lamb it's like you you have Dorian lamb oh

078my God that's great but um so James with the other you know computer hardware Aid so you're saying that was contractual subscriptions or no that's yeah correct uhhuh okay right and this is always the problem when we look at any grants that go away and we talk about sustainability yes right and you know now what do we do I mean you have a few things on here where it's like okay this went away now we have to pay for it like th even said with the cameras and the subscriptions to the cameras you know it's almost almost like somebody gives you something but then the next year you got to pay for the service for it right so we were lucky enough to not have to pay for the devices last year as Mr rich

079said I said earlier but the but the end result is then you see a large increase the subsequent year um now with any kind of luck you know I would love if we can get funding for this each year but assuming we don't you'd see that line basically you stay flat because it's going be roughly in that in that in that area borrowing any kind of significant increases I probably just Chang this sorry it's like talking about snow okay so when we jump to transportation in the bus and we've always gone through that issue of bringing on another bus and we've been fortunate in the past years to have um you know our elected officials actually you know come in with some aid for that I know I've said directly to some of our politicians

080give me a bus you know and they kind of look at me and laugh and I'm like no I'm serious you know go back and get us something you know and um so now we're in the Dilemma of the electrification and I know that when the board went up to I think it was the Rochester trip and we all walked around looked at the electric buses and was like oh how much is this oh this is a half a million dollars a bus and that doesn't include the charging stations and everything else you need oh and they want us to implement this in what period of time it's like this made no sense and I know when Bernard and back me up talking with the politicians they're not so happy about the implementation timeline as

081well so Frank with this with this one now you're saying if we purchase a bus prior to 20 we could continue to run that bus or do we hit a point where they go no that bus has to be taken out we can run up to 20035 to 35 y okay and at that point in time anything thereafter has to be done as and is that what we would consider kind of the life expectancy of the bus anyway exactly so what about the other buses we have are they going to be yeah going be timing out are we going to need another bus in that period we until 27 what do you do what right we have the two right now that we're focusing on will be this year's budget and then next year's which

082which is good for that meeting that mandate assuming it doesn't change and yes to your point you know we have the other ones in our Fleet um but Mr tubes is is examining the mileage that they're putting on U we can certainly buy an electric bus before then and we hope somewhere in I don't know 20130 I'm going guess we' have a plan to to bring one on board but right now we think that bringing on the two I told you we use five on a regular basis sometimes six MH having two new ones that's what's going to help us get to 2035 yeah because I I mean I agree putting in that infrastructure ourselves is going to be um tough and of course it's tough on the bus companies with their contracts I don't

083know if they're kind of hedging increases based on the fact that they're looking down the road and saying we need to start to put money away because we're going to have to buy all these buses and that's you know that's a big chunk I don't know what those contracts are going to look like after they you know what's their return on investment with buying how many buses do we have from Monto the Big Bus 50 they got to buy 50 buses for us at half a million dollars you know and it's 25 million that they're going to spend that's a tough business me some them some of them are going to be going out of business I think um and and again you know like I said the the tough part in this is not

084knowing we're not at the end so it's hard to say where do we end up um but you know I I really appreciate you guys um do a great job of looking at everything having been on the superintendent's finance committee way way way way back and go every single line of this budget and you know how many printers are we buying and all these crazy things as Mrs kenadi laughs because she was asking for a printer one year and he's like oh Mrs kedan needs a printer let's get everybody get a prin and it's not it's not really that it was really the fact that there are needs so budgets are very often wish lists to some degree and we have to make the decision where we can actually um fit everything in yeah I

085and that's another good point that's one of the reasons why I highlight when you see the drops because it's important to see what goes into this if you saw all lines going up that's not a budget that's that that's exactly what trusty denap saying people just rolling things over and and you know is it more uh wants versus needs and we make each budget manager go through the process of examining all their lines there's justification that they have to provide rationale lots of conversations lots of emails um we sit down as a cabinet and review it on a weekly basis starting in November my team and I do it on a daily basis we do with admin Council on a bonly basis it's extensive so but it's but it's really worthwhile because getting accurate data

086and standing before the Community you can do so um because you know what's going on thank you welcome okay we're going to move on to um item number seven on the agenda public questions and comments on the presentation first let me read ladies and gentlemen the floor is now open for questions and comments regarding tonight's budget Workshop each speaker is limited to three minutes and please note that the sharing of is not permitted Mrs deliva will be monitoring the time and will notify you when there are 30 seconds remaining on your time slot this public comment session is an opportunity for community members to ask questions about the information presented this evening we kindly ask that you remain courteous and respectful throughout your aot of time we welcome your input and look forward to hearing

087from you thank you so anybody that's wants to come to the podium ask questions this is your opportunity we need to make a motion to close first okay we need a motion to enter executive session to discuss personnel and confer with legal counsel I get a motion I'll second it trusty Jennings and trusty Smith thank you where we going