001[Music] [Applause] [Music] [Applause] [Music] [Applause] [Music] [Applause] [Music] n [Music] n [Music] n a [Music] n [Music] e e way Meer and uh for for a while and we got a as he said solution for your warm safe and dry um so the the yatt USG these are some of our Arkansas projects um did a couple of phases with the University of Arkansas um 67% I'm sorry 47% of our projects are multiphases so we've already done two phases with the U OFA um Pidge I'll talk a little bit more in Bonia um we always work with schools to say okay what are your unique challenges every school is different and what do you uh what are some of your goals and so some of the scope and I won't go into too much detail because
002we don't have a whole lot of time today but they this was prior to eser and they had over a 100 hbac units that were over 20 years old so um with our program we were able to replace 76 of those um we did a lot of other measures with controls because they didn't have any controls throughout their buildings um their facility director was having to come on the weekend of stuff because their systems were frozen up and so um we had a great project with lots of different energy conservations um in hbac uh building envelope and a lot of different um pieces to it um but it was a great outcome ESG has done a billion in just k312 projects for over 300 if you're just looking at k312 and Company W we've done
003over four billion but just in the k312 segment we've done a billion so um p uh ped School District was also a warm safe and dry partnership funded project and they were also building a new high school campus at the same time but they had these two existing facilities that they had submitted to the division to get uh funding for warm s Drive partnership funding for so um but kind of like your same situation it was funded a little bit later cost went up on the new construction for their space warm um partnership funded and so they didn't have the capital any longer for the two existing facilities until I came along and we can turn to page three and I just um said Keith I think we can leverage our program to fund your
004portion of the project and the division approved that and we able to do and this is just one of the two projects that we did but we they were able to do $7.4 Million worth of upgrades um to their facility uh and so we worked with do Stein who was their facility um uh their facility consultant and I think you guys have Chad Davison who's yours so we'd be happy to work with them as well as the division it's really is a true partnership between the school district and the community and your leadership team the state and your facility director to get um all this meet all the requirements of warm s and dry and get this funding and improve your school district are there any questions so far I know I'm going kind of
005fast but I don't want to take too much of your time and then this is your project laid out um that was uh get on the the division website um so these were submitted back in I guess 2019 so really the big thing on this is that you're going to get $688,000 from the state to replace those hbac units so that's awesome how how many times you get $688,000 to help your school um get much needed system upgrades any questions so far as you guys know those units years old sound like main ISS keep so anyway this will take care of it yeah I mean it's not a matter of it needs to it's a matter of time when those are all going to eventually fail um and right right now so be nice to
006have new systems in that be rely on it really places havoc on your budgeting too when you have these emergency expenditures because it's much more expensive to have to call somebody I got to get this fixed right away then planned ahead of time so um I think it'll solve a lot of headaches um for everybody involved plus get $688,000 to pay for some of it so this is a kind of a timeline that we have laid out um is uh we're going to visit with your consultant because as I said uh it's a team and so another piece of that team is the division and make sure we all understand the scope and and M forward and then um we'll develop the project with the subcontractors we'll get um several bids on the hbac and
007we'll bid each piece of it out you kind of oversee that kind of like any constru instuction manager um would do uh but so we oversee it and we're going to get you a firm fixed price so that's really key for school districts because you guys are on a budget and so um what that means um please feel free to pop in but what that means is when we give you a cost that's a cost so if if we find something later we can't come back and go oh we need a change order the only time we'll do a change order is if you guys change you want to add something that wasn't in the contract at all so a little more work upix we're not to after right we're an engineering firm um is
008a mechanical engineer so um been doing this years experience so um he's good so so another piece any questions over the presentation um so I think you wanted us to talk about yeah the PDA pleas PDA okay so yeah um the project development agreement do you guys want a copy of that or you have it up on the screen uh I don't think you copy okay it's pretty legally um so probably what you're we kind of have this in place because as Kerwin said we are getting ready to do a lot of engineering um one of the requirements of um the division what I call division that um has all the guidelines and time frames and all those re requirements that we have to have one of the requirements that they have is uh we
009have to submit 100% um engineering drawings which we will get but that that cost money and we have to have that before the contract is signed before they will move forward with construction so um that and then we'll like I said we'll have we'll be spending a lot of time developing the project to get to that firm fixed price because we know that that's got to be our price so um we will be spending lots developing the project uh in the scope so um we do have and if you're working with an architect which we won't require this project won't require an architect because we're going to have stamp drawing so but if you were to have an architect if you're going the traditional method of of um just a regular Construction contract you would
010have to pay an engineer 6% whether project goes or not so we're not going to charge you a full 6% um and we don't charge you anything up front this is if we do all this development and then 6 months from now you come back and say or 3 months from now you come back and say you know what we're not going to go forward with the project but ESG has paid for 100% drawings we've paid for all this time and Engineering so we want to recoup little something um so we do have a separation fee of 29,000 if you guys were just to walk away and we did no work we don't want that we want to do a project you guys want a project but it is something that I wanted to visit
011with you guys about get incorporated into the final project that's basically paying for you all to go down there and it doesn't even cover 100% of the cost that we have fit at the for the school before we get to contract that covers maybe 50 75% so we're not totally on the hook for $100,000 and then you guys go we're not going to move forward then we you know just shows our commitment to you guys and to the project right right are there any questions about that I don't think so thank you thank you for thank you it was a pleasure okay we'll go on to the financial reports okay and I share some stuff with you in the board notes just looking since we're at that halfway point of the school year kind of
012where we were in our legal balance and that's funds one two and four comparing this school year to all the way back to fiscal year 21 if you can kind of see that I feel pretty comfortable where we're at I think each year we've kind of grown and and have been you know what watching where we spend and how much we spend and I know our principles look at every po so that was some information where in fiscal year 21 our legal balance was 864 right now we're a little over 1.3 million so like I said I I'm proud of that I think that we're sitting good if you look at if you'll go ahead and and go to our Revenue comparison report if there's any questions over the check registry let me know you
013see one of our last checks that for using Esser on the HVAC went through and also for a bus that we should be getting by the end of the month but period Revenue this year or this cycle got a little over a half a million year today we're at 3.1 compared to 2.8 last year expenditures this month uh was 436,000 compared to 469,000 so things are looking good and that includes our Christmas retention bonus that we paid out of operating as well any questions over financials if not I need a motion to approve the financial reports motion second all in favor say I I that's unanimous you can't beat that okay action items first action item PPC met voted approval for the 2526 school year calendar uh so that would be my recommendation again we'll
014use the instructional minutes rather than the 178 uh this year we win 175 instructional days for the 25 26 school years 174 still gives us 30 hours or 5 days built in for snow days like what we experienced a couple weeks ago anything more than five we'd have to make that up at the end uh there's also some legislative discussion about calendars there's more Focus point on a 4-day calendar calendar I don't think anything's going to happen with the AL alternate calendar but again if something does happen that our legislators say hey we're going back to the traditional then we'd have to come back to to do this as well uh also our waiver expires June 30th of 2025 the start date on this calendar is August the 13th if for some reason legislators say
015hey we can't start early we may have to come back to that but right now is just to approve the calendar that's presented to you any questions o over the calendar what was our vote on the calendar Chris do you remember when we pulled the faculty the only difference was on the parent teacher conference days this one has a teacher work day and then parent teacher conference the other one had was a student day like they would come to what two or whatever okay uh okay they've got you've got like five snow days built in right okay if they don't use snow day if they don't have snow days do they get out earlier uh what we would probably do we probably wouldn't get out earlier because our days just extended like so a traditional
016week for us in minutes would be what 385 a day and so we go over our day is not the bare minimum the bare minimum is 6 hours of instructional time and so our days is a little longer and so no they wouldn't get out earlier it may lead to some early dismissals it was 60.7% of your 60.7 okay I got any questions or comments about the calendar as presented if not need a motion second motion second favor say I I okay next action item is a safety grant that we were awarded for a fencing project uh vising with Coach Campbell we're looking at fencing that area in between the a building and the cafeteria to kind of give our students a chance on a nice day to go outside and eat lunch plus if
017we ever have the possibility where we ever go down to one lunch we can kind of have a group go outside so it's going to be it's basically going to cover that whole ISS building and we'll probably look at getting picnic tables just for them to have an outside common area to and so that Grant was for 12,000 so I'm asking you to approve the purchase of fencing from dakus Fence Company in the amount of $1,380 89 motion discussion a motion second second all in favor say I I okay and then the next thing we'll talk about is that ESG contract okay the PDA agreement you know visiting I did reach out to pdge that did that with their school you know I will say that we have you know we've got thermostats in the
018elementary you know so we're not going to get as much saving as say Pidge or Bonia did but working with them I think that you know I think it'll be a good deal because we're going to have to get an engineer we're going to have to get some body so talking to Bia and Pidge so I just ask that you approve me to sign the project development agreement as presented and that's basically saying and I will wait before I sign that until we visit with our facility person but I just you know thoughts on that I'll show you here so that's basically the 29,000 and back out with that's if you back out of it you you lost 29,000 right but you're pretty much going to have to have an engineering plan regardless wherever you
019go I assume yeah no we will do that they'll give us some guidance and stuff on okay question okay so I mean I know they haven't figured you know done PR or anything yet what what is this amount talking about that's what I okay so this right here when you get funded it's B based on your wealth index and so this was done in 2019 so right and it was estimated at 1.2 that's what the state said was going to uh the Project's going to cost based on our wealth index they said that they're going to give us basically 67% of the project which equals the 688,000 and so we're responsible for that 520 okay so that's about what we're going to be well it says they know it depends that was in 2019 okay
020and so you know what I'll do is I'll visit with our facility person in ESG together to see what that cost is going to be because like everything else we're talking about six years from now that it could have I wasn't a part of when they did that project planning so I don't know how thorough they were or they just saying hey we're going to replace all the units a part of that project was also the 86 Wing that roof but if you remember my first year we took care of that so I I'm hoping it'll come under 1.2 but with inflation and everything going up I don't know I G to say it's going to go up but the the percentage they may pay of it's going to go up too I would it
021won't no the 688 stuff yeah that that's the max that's that's all they're going to give you okay in the 528 it's we're on the hook for that basically that's our share of it yes sir maybe more but I I would say since 19 it's probably went up some uh just because everything else has your big and inflationary years were 20 through 22 so I guess we're going to have to these guys that's part of it they're going to go re-evaluate all that and do a whole new scope of work to see how much that's going to cost us okay I don't know who was who did that in 2019 I know I know I I I know Dr White came in and applied and we got denied because we got denied my first year
022and then and then last year they denied us no they approved us but didn't have the funding and then they approved everybody so again we'll do another scope of work you know before we do so if the numbers change 688 so we're getting either way from the state yes sir but you know I mean I don't guess it's going to get any cheaper either way I guess it's just a matter whether we can afford it or not you know yeah and and that will be some of the other stuff that I'll talked to you about in in my report that I did reach out with beerley you know about a possible millage or second Lan Bond and so there's some options out there and uh you know but 688,000 I know since I've been here
023miss Johnston how many H HVAC units have we replaced over there I mean I know two or three oh they're getting old yeah y so we've had I mean it's a matter of time I mean so it's just a maintenance thing that has to be took care of right it's just I think he said it best about putting Band-Aids and just trying to hold on you know and but you know you get 20 years out of a unit you yeah oh yeah Eric just goes out of my house I W right back yeah immediately I'm going to ask about the cost but I'm going to figure out a way to pay for it any other discussion if not when I need a motion to give him permission to go ahead and work with them or
024whatever you just approve that project uh development agreement with them okay yeah I mean we just well because we've got a deadline with this partnership money then we can do an extension but honestly we you know they're looking at July trying to get this work done and hopefully you know by school we've got this going uh can you do can you does that all have to be done in one year can you do a plan like over two years uh honestly it's a kind of a one-year deal they're going to get that money I mean okay you know we're going to get 688 but we made that commitment that we're going to pay that 43% of what our is going to be okay need a motion second all in favor say I I I and
025then the last action item is dealing with eate and Chris if you want to talk to them about that and how much the total Project's going to be and how much will be ours and this is not payable till July of 2025 correct okay um our money that we get from the federal government cycle and the district has 31,000 um left between what they'll pay and what we pay combine um if we don't use it this year we lose it so what we did was look at replacing the fiber connection between the gym and the high school building because it's on we've got it maxed out so we can try and send more internet bandwidth down to those buildings and then also uh put battery backups in every Tech closet because right now when the
026power goes out the um main closet will stay up but all the other closets start to go down pretty quick so then our phones are down so they not those classrooms can no longer communicate with the office cell phones are heavily used teachers are having to run down hallways it's happened multiple times that the elementary would we're dismissing early because the power went out and they trying to keeps that phone up for emergency uses um so all of that the district would be out I don't have that number I think it's like $6,000 uh yeah it's yeah 6,100 6100 and then the E will pay the rest of that project of like $28,000 somewhere in that range but this just helps eliminate helps not give that money back and just let it disappear but also
027we'll bring up those um phones in those classrooms for at least an hour after some schools that we talked to they're getting two and three hours out of their so this is all in that 31,000 that you're saying if we don't use it we lose it we lose it like we'll get a new it resets every five years based on the culations from various like Po okay so we need a motion to um to approve replacing the fiber and across the district with White River for 6,192 54 so moved second all in favor say I I motion carried okay my my report I've got numbers based on uh I guess it would have been January 17th in 2324 and 25 right now we're at 557 we were funded this year for 557 .79 uh in
02823 same time we had 557 last year we had 565 and that's not count prek and so we're down from last year eight kids uh which can affect our funding which we'll know here in about six seven weeks facility report um you know don't know if you where our softball fense there was accident uh and uh I guess I can't remember when that happened we we had a way ball game it was at England but anyway we had an individual that ran in with this car and uh I think it had some other issues throughout the town but got an estimate for that it's just over 10,000 uh and miss Karen she's working with asba to get that driver's Insurance to pay for that fence so that's what we got facility wise legislative update legislators
029began work there a lot of bills coming out and uh you know hopefully by February you know nothing major that will make any changes especially to our calendar partnership funding like I said I talked to beerle last week about our options you know we talked about a millage to kind of fund that and some other projects He said if we did one new de or one one new meal for 30 years that would generate uh a little over 1.4 million a two 2 Mill increase would produce a little over 3 million for projects he did say that if we're going to do a millage that February would have to be our absolute last deadline to file the paperwork that needs to do that our other option would be a second lean bond to cover that
030a 1 million right now our bond we still got 19 more years on it a 1 million Bond would increase our annual payment of about 81,000 and currently our bond payments 2 226 and if we did a bond for 1.5 million that would increase that payment to an extra 121,000 so those are some options uh of what we've got to do like I said I think we've done a real good job saving money uh my my whole point is to build our building uh fund up and which will take time to do that uh so those are some things that we really got to act quick on a millage just to be honest with you I think our next board meeting is February the 24th and so that'll get some time if you want to
031reach out questions conversations about that but we're going to have to do one of the two to fund the project we got audit taking place right now in our office everything looks good hopefully it'll be wrapped up in the next week or so this week this week uh we did receive a PL Grant uh working with the co-op a former Su superintendent Patty Stevens she's going to come work with both our principles about literacy test so we're excited about that she's going to visit with the principes next week and and myself as well graduation rates were released uh last year we were at 84% and Coach I don't know if you seen this or not but graduation rates were 96.77% [Music] and Miss Nikki got 18 and Caleb's got three where we're working on three
032as well but we'll get it taken care of and last thing January Schoolboard recog recognition month and I just want to tell you I appreciate what you do I know this is a thing that you volunteer your time and you get a lot of phone calls and so you sacrifice you sacrifice time away from your family and loved ones for our students and our staff and I appreciate you helping me lead this district and so I thank all of you and then we got some dates right there of things that are coming up and I'll go ahead and turn it over to miss Johnston my enrollment uh 317 and k6 then well actually 18 in prek um Chris got a thing post today on Facebook we do have two spots open and that application link
033is on on the Facebook page or anybody can call the elementary office um upcoming events we've got the 100th day of school is on Wednesday um so kids are know said dress up as a person who's 100 years old so I'm excited to see what some of them come dressed as U February 6 proog report grades are going to be due and also on that day kindergarten is taking a trip to the post office um to kind of learn about the mail system and how all that works February 10th is going to be par teacher conferences then the 11th through the 21st is our 36 Atlas interims um K2 they said we're not doing interims we'll just do the summative in the spring um but 36 is going to do those those interims during that
034time so we'll get the data from that with academics uh grade level meetings continuing monthly I really want to focus this semester on our um you know Central standards and making sure that our curriculum and what we're doing in the classroom aligns with those with those state standards that are going to be tested I met with our Alexia rep on the 23rd um she reported our usage all looks good we talked about a few different things um how to better use it within the classroom um so that was a good meeting and then I'm thinking about doing she we have a couple of professional learning opportunities that we can do so I'm thinking about how we can best use those for our teachers and the K3 literacy tutoring Grant uh we sent out letters for
035that last week that's something that's through the department of Ed had a couple parents call and talk to me about that um getting their kids signed up for it and so that's something that the state's doing but any of the parents that got that letter highly encourage them to use that what did we have 42 I think 42 I think was the number yes so qualified or that were that qualified so yes 42 that qualified and there's just an application process you have to go through but I think it's pretty instant the parents I talked to and so they've already got the email that they've been approved they're just waiting on the money to come through and then getting set up with whatever program they're going to use so it's a it's a great great
036program so I hope hope all those parents will take advantage of it so is this something that they will do um like from home like on the computer is this something that we have to no it's we don't have to do anything we just had to pass out the letters but there's um a whole list of approved companies that offer the tutoring um it can be oneon-one there's some that offer groups of up to four it just kind of depends some are in person not sure about our area necessarily I know one one person last year used somebody here locally so I'm going to find out who that is and and but then lots of companies that you can do like even six or 7:00 at night you can have a twoing session so as
037long as you have internet access and then with behavior um OSS 32 has been assigned 32 times ISS 34 and lunch detention 42 top three um issues disrespect inappropriate language and fiscal aggression um our vx3 team met on the 23rd so that's all about discipline and how to have those schoolwide systems and so we're process of planning right now is still Gathering info from teachers um it's going to include a discipline flowchart major and minor behaviors definitions of behaviors interventions that classroom teachers can use and so I'm really excited about that but we're we're still in that planning process um hopefully we'll have that ready to roll out in uh August for the beginning of the new school year high school enrollments 241 and we've had a couple kids um come in so could be
038off by a couple kids but U that's where we are right now academic wise Jag time is off to a great start if you remember we placed the kids by the score results um from the previous test and I believe today they started their second rotation because they stay now in Jag time whatever teacher they're with they stay for three weeks where last year we did two but last year was it by test scores and stuff it was like pick where you want to go where you need help so now how their scores were is where they are so I'm excited to see where that goes I think the kids enjoy that I visited with Miss height about that so for like the English part of it they have to finish like three different steps
039or modules before they can move on so if you're in there three weeks and Miss Janet's the student she's got to finish these three things before she moves to the next one so that's good can't just say well I finish well no you got steps to go through so I think that's going to be great Sports basketball's winding up we're almost I guess we just started or probably halfway through our second trip through conference uh Tristan Reed congratulations for making All Region band few things going on with various clubs Valentine dance will be uh February the 8th that'll be grade 7 through 10 at the Civic Center and that will be from 7 to 10 p.m. that is hosted by the Joselyn Bey scholarship committee $25 a couple 15 per person we even got song
040requests for a dollar um turn money into Miss bull or Miss height and any information kids need they can contact Miss Christian Ruck or Miss Lauren Baker All State FFA convention applications are due February the 14th and I thank Mr Herber has there's several other FFA things that are lined up U this spring East Conference team this will be Miss Madison o shields uh students that she'll be taking to the contest will be Campbell Lowry Lexi Kendrick clar Cole Savannah arizola Saab Cornus saer Nichols Maya bumpers and Carly Harrison we've had two or three different volunteer opportunities one was the Mard Masters championship and then Ducks Unlimited had a deal the other night the kids could volunteer to do it I know we have some things in the spring U that we host also can
041get some volunteer hours uh Tuesday January 21st the Juniors took the asbab and last week Miss uh height had our first reading Cafe where kids can come in um she sponsors of food from different people donate food and kids come in somebody gives a report on a book they read so just to get kids more interested in Reading uh discipline issues we did get to use uh our bully policy we put in that we talked about last time we started that this year I had a student that claimed they were being bullied so had different kids come in use the sheet that coach whitear came up with interviewed the kids followed the questions called all the parents talked to the parents so it wasn't bullying that I could one of the big deals were they
042was throwing snowballs at him so and I think it kind of got way out there but anyway so visited with the parents on that inform formed them the bullying you know policy and deal we were following Now read some of the questions to the parents asking was this going on did you see this have you heard this and then the kids signed a deal to where if anything leads from this then we go to the next step of the policy so that was very helpful um and the parents I think the kids were actually friends with you know how issues happen so the parents were anyway it ended well and I think the question deal they had to fill out I think that just was was really good um vaping twice so that is down
043taries are down dehw people are down so last time I said that things went up so hopefully that's not the case this time okay um I'm concerned about this next meeting not being until February the 24th if we need to do something we can do a special meeting you're talking about if we want mil yeah I'm thinking we can't wait until then we got to get uh get that ball rolling if that's what you know but I we we're going need to have special meeting what I'll do is I'll reach out to everybody this week and and kind of say because I'm with you because I told him like ours is February 24th and it's just you know we just need to either say we're all in and if it if it doesn't pass it
044doesn't pass right or we say not this year and we go a different route but we can't give up $655,000 so if we do have Mill and it doesn't pass go back and say we want that second Bond second L Bond action so what I can do is I can I'll I'll reach out to Dan and then y'all let me know there's a good time I mean even if we call a special meeting during the day during lunchtime I mean we're not going to do anything Personnel wise so it doesn't have to be after five o'clock okay um well and see I had also thought that we need to do talk about doing our walk through before y'all get in the field I agree with that because every year it seems like we put it
045off and we kind of forget about it and then we're trying to work something you know and that's that's hard for the farmers and so we could do that that' be fun and then we could meet and you know so do y'all want to look at something as early as next week I I I don't know when uh Miss Nikki is supposed to be back up is she going to be back next week didn't know she was gone she on vacation we're going to have to put her they should be back I would say they be back next week at the end of next week Nikki I think you need well what I'll do is I'll reach out to everybody tomorrow and give you a couple of dates and I'll kind of see what's going
046on in both campuses and I'll shoot you one and then like I said we could do a work session and then kind of look and say schedule meeting and everything on the same day if you yeah kill two birds one stone we can do it well that's all I've got we got anything to go in executive session motion will adjin the meeting by unanimous consent at 6