001[Music] we'll go ahead and call order uh the meeting for February 3rd 2025 uh can I get a motion to oh wait we got to take roll Sorry Miss Atkins Mrs McDaniel here Mrs Peterson Mrs Shuffle here Mr Sorenson here Mr Sturm here Mr re here feel like we all need to like ship towards you or is there something wrong with me uh okay uh can we please get a motion to approve the agenda for tonight's meeting motion to approve second vote please Mrs McDaniel yes Mrs shffle yes Mr senson yes Mr Sturm yes Mr Wright yes commendations good news uh yep so I have uh just a handful of things here um call Titan moments uh so we had eight of our 13 uh girl wrestlers qualified for State on Saturday or on Friday
002so that's that's very exciting and that's uh vea Smith Emerson Greg Cassidy fella Lindsay trer Mari mans kayin Joe Westerfield Madison Wright Katie Shrader and state is going to be this uh weekend they're also the regional Champs they uh it was pretty crazy they uh were losing to hint as far as the team score goes and I think they were down by I don't know 13 or so with about three matches left and they or two matches left and they won the two and they got to 100 so hitting at 190 points and Lis Central 187 points and then the thing about wrestling is the only the top two go to State and so the winner obviously goes and then if whoever wins the third place match if they hadn't already wrestled the person that
003was sitting in second the person that lost then they wrestle to see who gets to go to state so it's not like you have the championship match and then both of those two get to go to state it's if the second place person has an already beaten the third place person then those two wrestle off to go to state so there's usually not a lot of them there's usually you know two or three maybe four of that scenario um that happens if the second place person's already beaten the thir third place person then it's a null it's a mute point and they just give to Second Place person they go so actually we had someone that was that hadn't who had gotten third won the third fourth place match but hadn't wrestled the second place
004person so she got to wrestle the second place person she beat her at the end and which was three points and that happened to let us tie so just kind of a whole big happen stance thing it was pretty cool though so but yeah eight out of 13 qualified that's this uh this week so excited for them um so on uh Thursday they had the um the Special Olympics uh basketball was going on at Iowa Western and so we had quite a few athletes participate it was a great crowd I got there right at the very end as everybody happened to be leaving I thought it went until 2 they were done a little bit before one about 12:30ish so they got done early so I missed them but um it's always a great great
005day anytime we can get the community to come out and support our any of our athletes especially our special Olympic athletes they they really appreciate it so um so I put this up here because this is kind of cool anytime we can get our older students to go down and volunteer with the younger students that's great so this is the Middle School uh leadership group uh they went down and volunteered uh some time down at Craft um so that's awesome so we'll try to do more of those types of things um this is from the uh City du and so we won we didn't give up any more than 12 uh points anybody else so again we are City Champs the fourth grade musical did a a musical called dig it um so they from
006I can hear it it was amazing they always are um even the people that brought cookies this time brought enough for I'm laughing because teammates sponsors the the cookies out in the Commons afterwards and the very first musical uh Dr Hartman shows up to she got like two two trays of brownies and I was like not going to be enough and she's like what do you mean it's a what was it second grade no fifth grade yeah she's like a fifth grade Musical and I'm like well there will be 1,00 people here tonight and you brought you brought brownies for about 60 of them so I had to go find a knife we cut them into like little sections and I said it doesn't matter because they're going to end up taking two three four
007sections anyway and sure enough I think the first 20 people out of the out of the gates got a brownie I was home before you even came back around yeah I came by the time I was out you were gone so this time I heard there were plenty of cookies so kudos to to you for coming prepared um and then this Thursday is the third grade musical so um pretty excited about that so it's another show choir show choir continues to go out and kind of you know they really are doing well this year uh this was at the Ralston uh update um we've had a couple really outstanding individual performers obviously our our shoir Squad in general both both groups do a great job um we've had some standout performers individually as well up
008in sou Falls if I remember right um and I think uh Mrs Atkins talked about this that uh they were actually giving scholarships so we had people win scholarships up there but this particular one at Ralston uh Cammy Dam guard was listed as best performer uh Corporation um was the that's that's our our mixed group they got uh second runner up in the finals um and then they participated again how did they do at Millard West you know neither one of them were in finals they didn't make the finals that time okay so next one is in Wisconsin Madison Wisconsin Madison Wisconsin it's fun okay is that it that is it is there any other commendations good news okay we'll move forward to comments and suggestions uh this is the first section during our our
009board meeting where we allow members of the public or those observing online to share um their thoughts with the board do we have anybody that wants to speak to the board at this time no com okay then we will move forward from there to the consent agenda uh if I can get a motion to approve and do we have an is that an updated Personnel sheet yes it is an updated Personnel sheet I'd like to make a motion to approve okay vote please Mrs Shuffle yes Mr senson yes Mr stur yes Mrs McDaniel yes Mr Right yes okay reports superintendent report uh just got a couple um parent teacher conferences uh just got finished up so that's last last one for elementary for this year the middle school high school will have one more um
010in the spring one of the things you guys will be seeing is we're going to start doing start having conversations about doing some strategic planning this summer and so what that means is um Dr Hartman and our um districtwide leadership teams have been working hard to develop uh some consistent goals um and we've had goals uh we usually have quite a few goals trying to narrow those down a little bit as far as like where where do we really want to be academically like where do we want to goal suppos to be um but then also I'd like the board to take a look at like what are some other orb arching goals I know when I first got here I think we had nine goals um that I looked at um I think this
011last uh go round they' kind of highlighted about five or six goals um from the oversight committee so I just want to make sure that when we get really down to it that we have a strategic plan that's clearly defined that we're able to share out with everybody and that they're able to pretty articulate pretty quickly uh nine goals is a lot if we can get that number down to you know three or four really fine-tuned goals and then kind of Branch out from there that'd be great um so what that will look like is I've engaged with the Sai to provide us kind of a a guide person so somebody that's going to come um in March I'm trying I'll knock I'll lock down a date with um them this week um where they're
012going to come out and they're going to talk about the process with you and talk about like what is what goes into it you know there's some Community surveying staff surveying um it's conversations with you guys about like what are your priorities um we'll take a look at our mission state or mission statement our vision statement um and just kind of they'll kind of explain the process to you in March and then in April May we'll send out the surveys and try to get back information the surveys surveys will be kind of designed around those kind of leading topics that you guys would be interested in in in you know usually it's academic performance um culture uh communication Finance um it could be around technology it could be around you know a variety of things
013facilities and then once we have all that done and then in June we'll do more of an all day work session uh we'll find a day in June and and have them come back and then that's when you guys will take a deep dive into the data we'll talk about where we currently sit at with in in regards to each one of the kind of um topics you guys have asked them to to research on and then collaboratively you'll work through a process that will give you then give us some clarity on like what are some finalized goals you know what's our mission statement like is it good do we want to change it what's our vision like do we is it good do we want to change it you know it's just kind of
014making sure that we have that set and then that all gets kind of uh ratified and confirmed and then we'll meet with as part of that process once you guys have identified all of that I'll take that then to Sak and and kind of involve the Sak Committee in that and then at the end of that then you guys will kind of have the final say as far as like okay here's what we' talked about here your scx or contributions to it and then you'll set it and we'll be good and then that'll be put on a new website or a new page on our website that'll be all about strategic planning and then from there we've talked about making sure that we provide good T timely updates community members on a variety of things
015and so we want to make sure that website's always updated with you know here's our performance data here's our where we sit at with our budget so then it's kind of just one place where a Community member can be like I wonder what this District's about and then they go there and they see your strategic plan and they're like oh Finance let's click on this and see where we're at with Finance oh let see where we're at with school performance so that's kind of the end goal um so just kind of giving you guys a heads up there um other than that I'm going to turn it over I have far as facilities goes I do have uh Mr Wallace here who's going to give us a quick rundown of kind of where we sit
016with Bond projects she does yep uh it's the that one right there well I can't see that but I can go off memory there we go okay um so just some overall updates for you where we're at with things um not part of the bond but the HVAC project at the high school um start with that the um Ray Martin has been on site for on and off for the last month running some electrical ahead of time right now they're currently installing the gas lines across the roof um and the electricians back there right now too doing some main piping for the new electrical panels out of the switch gear that's in the back room um so they're they're well ahead of the game of just getting a lot of the infrastructure to where it
017needs to be so when the equipment comes it's all ready um updates on equipment we're looking at the chiller showing up late May uh yeah that's right late May and then the Air Handlers about two or 3 weeks behind that um not guarant guaranteeing anything at this time but that may allow us to do the chiller work early before the summer hits and the school is really demanding it and um students would still be in session but if the building's not calling for cooling that would be a good time to do it that way we don't really have that shutdown during the summer when the building's occupied and it is miserably hot so uh that's moved along pretty good uh as far as the rest of the project um the uh I'll kind of mainly
018just focus on where we're at with the bid process right now I know we've discuss the the actual projects a fair amount um but we're kind of at that point now where a lot of things are in design close to finish design we're getting ready to put things out to bid so um here in the next two weeks we should have the high school fire alarm ready to go out for bid the high school Roofing which is uh if you remember we're going to do the north twostory area of the high school this year since we found out the good news on the Middle School roof that we don't have to do that entire roof um so that would go out also here in about two weeks along with the Middle School small chunker roof
019um all here mid-February uh in March we'll be having the all the paving projects ready to go out so the high school parking lot um along with the tennis court the middle school or not the middle school I got a typo on that one um Titan Hill parking lot um with the added queuing Lane that should all be ready to go out for bid in March and then uh the last big ones that'll go out for bid this year will be the uh secure entrances CFT will be ready probably in March also to get out for bid it's a much smaller scope than the high school is becoming uh the high school is going to be a little bit more design time so I don't really have a date nailed down for that yet um
020um and then the final thing that we're kind of preparing um Titan Hill mechanical we're looking at supplementing the geothermal system up here at Titan Hill because it struggles to keep up uh we do have one design fee in at this point but we've chosen to go out and get a second design fee just kind of as a check and make sure that we're keeping people in line so we're hoping to have those ready for you with the design proposals for next board meeting um other than that they're hasn't really been any major changes to what we were looking to do that we've discussed with you previously so uh things are moving along good and kind of holding the schedule we're hoping to have to get bids out here early in the spring and and
021get some good numbers back so that everything's ready to go in the summer like we're planning any questions as the scope went down through the drain yet nope we have not got that done yet I asked Jim to get an update from the guy and haven't heard back on it so still waiting to hear on that one all right thank you thank you thanks okay next uh I actually asked optimized systems to they did they came and did a presentation for our facilities committee um I know anytime you um spend money and we can actually show you something and that it's it's better so um what I'd like to see is a lot of times you know we we spend we we talk about this Bond money as like we're spending money which you'll never
022see but you'll feel you you know so this is one of those when you when you put a new system Backbone in for your hbac system for monitoring and changing temps and all that kind of stuff you don't really see it like your typical consumer wouldn't see it however um we can actually see this so this I thought this would be a good uh thing to have how how would you like to try to display that the room I I didn't know if we were going to be able to show have a demo tonight or not are set up yeah I think you I think you can um what I'd like to see is we'll probably have um you connect to our um Vivy so I'll probably have Dr Hartman jump off the Vivy hopefully
023people online can see the picture above us here and then I'll have you kind of would that would that work okay we might have to come back to it if it takes a while to inst that's that's fine do you want to yeah that's well we just we'll present it either way and and hopefully people can see it a little bit maybe we'll have you zoom in with the camera or something on the on the overhead are you are you just downloading it now well computer boot up here okay oh gotcha okay um I think we have a uh you can probably just hook in with HDM do you have H HDMI port you can probably just do that I'll just move this well it's it's a program it's program so yeah here HDMI yeah
024I have HDMI yeah do we have a long HDMI cord do you know Emma that one that's already there okay I'm going to move move this way back we'll do a quick technical switch they back in the flag yeah yep here [Music] off with that uh was it we originally put in the system it's Niagra supervisor we put this in over the summer time frame we brought in the high school the high school already had a component in there that allowed us to speak the same language so we're able to pick it up but the first thing that we do for all of our customers is we develop specifications and standards and guidelines for the ultimate goal of allowing open competitive bid process for all your contractors so that way you're not held to just
025one contractor to always have to be here um get too comfortable we'll call it but you get competitive pricing but they follow the same set of guidelines and standards as all other um contractors have to so there's no cut and corner so what we did just to show you real quick we have a standard um specification that we throw together this goes in the contract documents with from the design engineer so we sit down with uh Jim uh anybody else in the district contractors we go through this we outline the specification again that gets put into the contract documents then we go out out and we sit down with Jim and Facilities to talk about what is it that they want their new front end to look like operate like alarm scheduling things of that
026nature and we go through and we outline specifics on how your contractors going to actually set up Define and Implement their work and then we go in and we give them a set of Point names and tagging a lot of things within your Control Systems uh every programmer programs different every programmer names points different uh pretty soon your points become just kind of a smorgus board so again we outline these throughout all of your different HVAC equipment chillers boilers Air Handlers VAB boxes everything you might have we give them a point naming scheme and they follow that so again the goal is is when you get to the end result which I'll show you here it becomes a seamless integration that they can see from their phone tablet uh any computer that would be able
027to get onto the network so this would be uh your main District landing page no I'm sorry that is not we actually have it here it's taking me to the high school so here would be your District landing page again all we've done is just develop the template here um ultimately you're going to end up having all of your buildings in the district here show up overlaid on top of probably a map all of your master schedules District schedules uh we'll have one button push buttons for snow days hot days things like that to where you can automatically the single click shut everything down or if it's going to be below let's say 20° we go ahead and turn everything on that way it doesn't possibly freeze at night if you got some issues um
028we have alarm consoles that are set up in here again more schedules but if we go back to the high school that we do have pulled in here we can see here that we're operating per the schedules we can see what our chilled water hot water systems doing here our critical alarms are down here on the bottom it does tell us exactly what's going on from an alarm standpoint floor plan wise we can click on these it'll take us right down into into that section it'll tell us the temp in that room tell us what VAV number in this particular case what room number it also shows us the actual you see it went to a hand here but it actually overlays where that physical piece of equipment would be in the ceiling which does
029help facilities as well so they can know exactly where they need to go will it disrupt class things of that nature so when you click on it'll actually bring up that piece of equipment give you all the data within that piece of equipment if it's an alarm it'll be red if something's overridden like you see here it's purple you manually change things right here and you can tell it to be whatever you'd like um if you want to see what your temperature's been doing over a period of time you you can actually get in here and see that and it's all real time based on whatever time you determine you can see the spikes here I guarantee you that's probably when there's kids in the room temperature is going up 71 A2 down to 69
030and a half so it looks worse than what it really is but again it's quick and painless so for that map you had before with the ABCD sections yeah was each of those letters a different air handling unit no those are just areas okay most the time they come off of the mechanical drawings okay that the engineer and Architects have put out a lot of times they'll have those broken down and we follow that we take those send them out to get the 3D renderings made so that way the areas match up with the areas on the prints one thing that we do here too is we have a tab up here called build Library we can actually put the PDFs of all those construction documents in here we can put the PDFs of the
031control drawings installation instructions um some customers don't really have an asset management program for their HVAC equipment so you could actually have this you know do that to some degree obviously someone would have to data entry it but if you look at a air handling unit we'll just pull one up here hopefully so here would be an example of a air healing unit serving conditioned air to VAV boxes but we have equipment in over here on the side model number serial number we also have a tab called maintenance info you can put in here how many filters are required size of filters when was a unit installed Belt part numbers for the supply return fan whatever they might have so again we use this just as a tool for facilities to you know if the
032guy's out there getting a call and he's just has his phone he doesn't have to go run to a computer or have to go back to the facilities office realistically this could be use as a single point for him to or her to find everything they need to um so really it's as powerful as you want it to make it and that's what we've tailored this around just based off of how facilities is organized here um we've had some customers like Ops they're very um more operator type readon type to where they have more of just a janitor in each building that oversees it versus someone with very high technical skills to where we give them a lot less on the page and they can only modify uh room set point or schedule to we
033here they can get in and modify everything they choose to so when alarms uh are shown on the rooms does it send a notification to anybody side or do you have to be looking at the system to see no so if you're on the system if you didn't hear that horn when I first logged in it would be an annoying but uh we can set that up to email those out to anybody and then it can be even set up to escalate if we don't get a response or an acknowledgement it'll go to the next person uh that can come through as a text on your phone as well that's something that's pretty easily set up with it um so other than just the monitoring and scheduling and you know like thermost the buildings one
034of the biggest benefits is the alarming that they can do for you if it's a weekend nobody's here something happens instead of showing up Monday morning to something Frozen that needs fully replaced and floods a room out or whatever you can identify that earlier and possibly fix it before big problem and it'll also point you right to where you need to go it'll tell you what piece of equipment is one that's cusing problem not just going around yeah so within your alarm alarm console that you see here it does tell us exactly what that alarm is coming from it'll tell you too like like it's a fan that's not running or tell you like so it's not just you know if it's down you don't have to go like spend a lot of time messing
035around trying to figure out why it's down you know because the Fan's not working because yeah exactly that's the whole point of uh of this is to have a master type scheduling system uh alarm system and also trending histories so the with all the data at your fingertips you can go ahead and utilize that to help with Energy Efficiency reducing operating cost seeing if things are running you know out of control rooll then it just comes down to some programming changes and we can make that be more energy efficient as well and besides hbac what El uh pretty much anything um just going to ask about Kow meters for water yeah absolutely refrigerators yep if you have refrigerators or freezers that you want to have monitored uh so you don't lose product in there which
036can be very expensive yep absolutely it can be in there and it'll be set up as a critical alarm so if that does trip there's not even a time delay on that it instantly is going to someone's phone to hey go see if the doors left open or something let's say yep um but otherwise big benefit for something like this because especially with an escalation list where they okay you get an email and a text and then if no one answers that it goes back again and it goes down the list because I'm on one at work and so when I get the email and text and plus it um is redundant because um the person who gets at first he only got a text he didn't get the email so why did why didn't
037you get the email so you can always constantly make sure that the equipment is is monitored and and the alarm system is set up right and working yep yep yeah it's it's a very powerful Tool uh there's hundreds of different communication protocol drivers in other words a language that it can speak it's just a matter of purchasing that um license and throwing it on here and then it will go ahead and be able to discover those devices and then communicate with it uh the supervisor is all on your virtual server for the district uh the high school individual buildings would each have its own network Gateway that's going to communicate on your network that will pick that up on your virtual server so there's no security risk uh working with it here um the vpns
038that are set up are secure and whatnot so um you can still get to it remotely for service if need be which is good and that includes them too so I know there was some issues in the past and we helped worked with Chris over an it with some things and and and uh he's been very accommodating and it's been working great so it's been good and you said it also tracks like when people acknowledge alarms so does it have like a a set of like audit trails in it as well it does yep yeah if you open up an alarm you can actually come down you can see if it's been acknowledged and who um there is a audit history as well um so if anybody gets in and starts clicking and anything they
039do it will track that as well yep yeah I think that's I can think of real quick so true thank youn it one agend here them to this a good demo yeah thank you yeah you're welcome appreciate it [Music] okay so that covered our bond facility update and yep optimize prep okay yep moving right along all right so we will move on to discussion items uh 7.01 optimized systems HVAC control bid uh so this is the bid that we just talked about so so far we built they they have built the main front end which is essentially what you saw up there it includes the high school that was a priority because we wanted to make sure that with the new systems going in the high school that we're able to create zones and we're
040able to turn them off and on as needed um with more efficiency than what we had now so now that that's been created now we'd like to start moving the other uh buildings into one one platform so we can monitor and and take care of it all for one platform um it's it's obviously it's not inexpensive to do so so when you look at if you go down to the bid scroll down uh keep going just go to the price areas this is all that they're going to do the math was a little off I had them redo the math so um but yeah you'll see for instance CRA craft Primary School to build the build uh to bring that online uh Titan Hill uh the Middle School oper operations um and then educational resource
041center which is this building as well so it's a total of actually $128,000 umll uh not 166 so uh what you guys would be approving is the expenditure of 128,000 to bring all the rest of the systems online the 166 is actually what the original yeah the original with me in scho oh got you want to look back at a total investment gotcha okay okay gotcha real quick just to add you understand but the building here ERC uh the network Gateway that is installed here has been obsoleted since 2016 17 right in there um so that is a cost to update that and get that all up and functioning as well physically in here that wouldn't have been obsolet then the cost would have been less here have been able to utilize that Gateway like
042we did in the high school okay any discussion questions okay moving forward to 7.02 secure entrance design bid bcdm so all you pull up the design bits which one's that so let's we'll look at craft first so this is for two two design bids um one is we're looking at a if you scroll all the way down to the drawing you'll see kind of what the plan is at craft is to install so the first two doorways are there right now you enter you have a window uh but then there's nothing separating if we we say yep come into the office for stopping them from go just wherever they want in the building so this would actually just be installing a glass wall it' be a similar a system very similar to what you see
043at Titan Hill uh almost identical so they would have to come in through the door and then we would have to buzz them back out of the office so that the door that then goes from the office out to the hallway at the top would have a buzzer system as well so in order for them to enter the rest of the building they'd have to go through a buzzer system so but at least that makes them have to come face to face with uh people before they are able to kind of go the rest of building obviously in the morning the doors are going to be open for arrival going to be open at the end of the day for dismissal outside of that they'll have to come through the office so um if you
044look the the craft uh planning is about $5,000 because it is a vertical structure we do have to have an architect stamp on it um but the plant but the the architect fee for that is about 5,000 it's tying it into the structure of the of the building so it's not just anybody can just put the glass up but do a codev on the exi and everything there buttons buz and there's also some hbac Rie that needs to be done to make sure that now that we're boxing off that best fuel that the syst you'll see it's $5,000 that's relatively small compared to the high school so I'm going to have you switch to the high school um so when you look at the high school if you scroll all the way down this one
045this one gets a little bit more intense so essentially we looked at several options uh one of the options was to basically if you keep going down a little bit basically take oh too far too far right a little farther right there stop so basically take the the corridor the whole Corridor space there and turn it into an additional office area the problem is is it removes moves kind of our flow uh opportunity for so like if you like where you come in the doors like a regular doors if you were to take all that space clear back to the office and that hallway and turn it on the office space um that would that would really restrict kind of some of the flow maybe not necessarily right now but as our district grows um
046we talked about making sure that we leave those hallways available so then the next option really wasn't that big of a cost savings anyway um so then the next option was to look and look at an external um additions now if you scroll up a little bit so the dark blue would be an external addition you'll see um essentially what we've done with that office area is added a a covered V or a a vestibule that they would have to enter in through um we're going to redo the pavement out in front anyway as part of the parking lock project so it'll be kind of steering everybody towards that that entrance um once you're inside you would go through kind of that quarter right there we we just visited Westside they made a good recommendation
047actually split that little Corridor into a two put a little mini wall up there so then people who are leaving go down one side people entering go down another um so this isn't this is just a initial concept we still got to vet things out as far as like what during the design phase what exactly are they going to put in there um but they have to know as far as for a fee structure approximate square footage approximate square footage of the area going to be affected what they're going to looking to do Etc so um the addition then the first office in the blue the first office off of the vestibule the dark blue that actually is moving our security guy from the back of the back of the uh um office um to
048the front where they can see the parking lot where they can see um the people entering the building um have them available front and center the next base is uh an office for one of the assistant principls and the X base is office for the other assistant princip principal and then our principal right there right now all the principls are kind of scattered around throughout the uh throughout the main office area there um this kind of Center locates everybody for just availability and and issues that arise from the front of the building um you'll see the rest of the blue so then that that front area the blue the light blue that would all have to be there's a wall right there that kind of runs through those two spaces that's offices right now that
049would have to be blown out and then kind of turn into like an area where the some of the um um administrative assistants sit right now that and then that would allow that that right there that that area to be expanded right now it's much it's about half that half that wide and so we need to be able to widen it out so by removing those offices allows us to move that desk back uh make that area wider for kids coming and going um and then and then in the initial is the nurse's office is that part of the initial um the initi put it this way kind of Orange Box that's cled around there that's in the alter so the number that's okay so there so there there is expanding the nurses I mean
050as far as adding a doorway and yeah adding a doorway and a shower to the nurse's office being part of the base bit as well everything on the outside of that in that Orange Box is a is a if we wanted to reconfigure all the whole office area which we don't we're not recommending that we're just recommending the base bid of putting the addition on the front of the building and then adding that kind of light blue area essentially what would this would do is ever all the kids even though they come in in a group in the morning and they leave as a group in the afternoon from essentially 7:30 on anybody that's rolling in late or coming in between 7:30 and 245 and we dismiss would have to come through that office area
051there so uh we went and we toured Westside schools who did something very similar um and it was I mean kids kids are usually pretty easy you know they get the hang of it pretty quickly and I would say that it was it was comforting to know at least for me to know that every student that came in the door outside of Ral and dismissal every visitor that came through the door every like was greeted by somebody face to face that they had to have permission to enter that they had a permission to go to the rest of the building I mean it's it's significantly different than kind of what we have right now and so um obviously things can happen at any time for any reason but this would this would help mitigate what
052happens you know for people that are you know during the school day making sure separately we're still going to have all the work done as far as with the cameras and the um buzzer system on on the doors and those types of things so that way and alarms on the doors so that way if a door's open during the day when it's not supposed to be opened if it's propped open if it's you know whatever it is um there will be audible alarms and we'll know the kids are not using the the doorway as it as it was intended so um and we'll be able to quickly mitigate those situations as well now if you scroll up can I clarify though yes the nurse's office the shower looks like it's inside that so where are
053we at that's that's not that's not real right now we will make sure the basement the nurs office get address yeah I'll I'll show you real quick that's this is actually not real like they've already done the drawing of what they think it should be okay they've been meeting with Joe High School quite a few times just to it was more the cost and if it's incl so the Nur office is really truly it's it starts right here at the corner and it works down right here this is the nurse's office right now this office does not exist this office does not exist this conference room does not exist none of this exists it's all this is actually where the work room is right now yep and then so the nurse's office is just a
054long skinny nurse's office with one door on the back end here so we would like to we're going to add a doorway over here and then add a little a little shower in there for the kids okay so yeah and yeah just clarifying it it is in the base bit then so okay thank you but that's not included in this right now the shower the shower and the doorway is for the nurse's office the rest of that is not that's all conceptual that we're not going to that's included in the alternate bid we don't need the alternate bid we're just going to do the base bid and what is the design cost for this yep so scroll up ande within this cost it's not just the AR there's a civil engineer a structural engineer a
055mechanical engineer an electrical engineer so this is total design okay so then when we're voting on this it would be for the 141 correct and 5,000 for corre and 5,000 for C tip so 146 250 and just for timeline the I the idea is that they're going to have um these bids done in like early June and then we would send it out to bid hopefully we can get the external building done in the fall of of 25 and then we probably just put a halt on it because once we get the external building done we don't want to disrupt I mean that would be a major disruption for how our office currently functions so we'll get the external building put on first and then in the and then this in the summer late spring
056early summer when school's out then we'll demo the internal office and get it all done so this will be done then for the 26 27 school year well you'd about have the exterior building done right exterior building will be done by probably yeah by about Christmas I think you you can build it it pretty much EX right right yeah you'd have to demo the office to tie in we talked about putting off construction completely until like spring of 26 but the problem is is is if something goes wrong with the external building portion of it that gives us less time for the internal we potentially not start the school year in 25 26 27 with it all done versus if you do the exterior in the spring or or the spring in the fall SL
057winter you got quite a bit of cushion there if something goes wrong for you to continue to get all that done and then all you got to do is the tie in in the internal renovation so almost I'm mean knock on wood almost guarantee seeing us having it open 26 27 so just so it's clear in my head we have the exterior and then we have the concrete outside which one's going to be done first concrete and then exterior will be finished after concrete would be done first but we'll make accommodations for this we're not going to put something down to tear it back up that was kind of where I was we'll either leave the existing until this goes and then once this is buil sidewalk up okays but again this is just the
058design for this phase any additional comments questions okay we'll move to 7.03 parking lot light design albine engineering yeah so uh albine engineering they did send us um an estimate on that we did have it um albine Aline so they did send us an updated one we for parking lots sorry hold CL T scroll down please okay so this is the AL this is the now this is just for lights so essentially what we're looking to do is have them um we got to have electricity engineered because we're switching out the electricity component of the parking lot lights um and we're going to do a continuous was that what they call it continuous running electrical so we can put cameras up well so what this is while we have the parking lots up cameras everything
059we're going to upgrade your lighting system to possibly reorient them a little bit to to make it easier to snowplow and everything in there that's the discussion but U so we have to change the piping and wire for the new lights but then while we're we have everything apart and putting new pole bases in we're going to add additional conduit as P sleeves in there to be able to pull all wiring needed for the new camera system you want to put there that doesn't exist right so for the so for the high school parking lot light design or basically uh electrical design it's $122,500 doeses the I see the construction in their proposal is 12 weeks start June 2025 I'm guessing that works the 12we period with our cement like when our parking lots are
060getting done or they just matched it with what they just matched the okay yeah with what our estimation was this would have probably been in the L proposal from last go around but we got so this is kind of add on to that they will Design together okay and then if you go to the next one oh keep going uh go back up real quick that's all the bids don't worry about that so 12,500 for that yeah there it is right there that has been negotiation yeah so that's what the bid is $12,500 okay any additional questions comments then we'll look at 7.04 tennis court electrical design also by albine and Engineering so this one they did give us an updated quote I'm going to send it to um because the original one that they
061had sent us U was using uh competition lighting and after conversation with Mr dermy and the tennis coaches They Don't Really Ever compete with the need of lights and so we talked about you know is there a reason that we would put competition lighting up um you know maybe for the community you to utilize or or something along those lines but at the end of the day um that's a pretty hefty expense when you start talking competition lighting so um and I don't know that we necessarily want a whole lot of people CU where the tennis courts looking to go they're kind of in the backside of the school don't know that we need a whole bunch of people hanging out there late at night we want the community to come and use them um
062during the day but to basically entice people to come and hang out there at night we get enough people hanging out in our parking lot at night I don't know I necessarily want more so well and usually they're not there in February or January when it's like at 5 o' in the evening they'd be there during the summer which is lighter so it's not like they're going to be cut off at six o'clock at night correct yeah yeah and there will be some uh so essentially what we asked them to do is instead of focus on competition lighting they're going to focus on um more getting Outlets out there so we can plug in like the tennis machines um and basically safety lighting and cameras like that's really what we need out there there so
063um so the bids changed originally on here was a little more it came down from $24,000 it came down to $10,000 I just sent you guys an updated um so this you'll see it's 24,000 that was for competition lighting the updated one is $10,000 I just sent uh an email to all of you guys uh Dr hary you should have in your email real quick if you want pull it up excuse the cost difference in the actual lighting itself you standard convenience type lighting safety lighting versus competition I'm guessing is well over $200,000 yeah see just saved you 2, $200,000 how awesome was that but it still will be set up for competition and stuff like that that they want to they want to have excuse me right right did you not get it there
064Dr Harman I yep there it is $10,000 any additional questions comments regarding lighting okay then we will move forward to 7.05 lclc director purchase service agreement with uh the Education Foundation yep so this this will officially um they are in the process of trying to figure out when we look at let me back up a little bit when we look at how larger education foundations such as Council BL Community or Community Foundation or Education Foundation when they when we looked at them and said okay how is the Council Bluff Foundation have multiple full-time employees they're able to fund a lot more projects or able to put a lot more money back in schools their philanthropy is a lot more and then we looked at uh leis Central Education Foundation started 3 years ago when I
065got here it just they weren't even comparable I mean Council plus probably operates off of almost I don't know close to a million dollar budget a year and we operate off of a $20,000 budget a year maybe 40 you depending on the year and our donations and so um but a lot of it had to do with you know what is the function of their organization the function of council plus organizations ran a day runs a daycare they runs before and after school uh programming um and they use that as a catalyst to be able to a lot of their projects that they do in the school with the overage what the education leis Central Education Foundation funds is they fund scholarships they fund or they manage scholarship funds uh for people who want to
066donate and create uh lifelong legacies um and they do a lot of classroom grants so small classroom grants um that they that they give throughout the year and so really that's the Education Foundation is full-time employees uh or the council BL Foundation is full-time employees the Education Foundation has run off a group of just volunteers and so significantly different so we said how do we start ramping up um opportunity well you can't just go out and hire someone and be like hey go start we're going to hire you go start making money you know go start asking for donations and philanthropy you got to start with something so we talked about maybe this is a good opportunity for us to move lclc as an entity over to the Education Foundation instead of having the the
067school run it the foundation would run it they would still be operating out of our district just like Council Bluff does they would have an office here at the RC um and we would become more entwined um with the Education Foundation but they would really run the daycare the before and after school care Etc so um so when we started looking this we said well right now they have zero employees to go from zero employees to now absorbing the entire organization that's a heavy heavy lift like how would you even get there you need startup funds you need you know you need a lot of different things to be able to get there we have the program it's not as easy as just handing it off because they they don't have a single HR I
068mean they have no HR right now they have no accounts payable they have no they have um Mr Jim Watson and and a couple other people that are managing their finances and Jim's great but that's not his full-time gig and so how do we start entwining some of these so one of the things we had a our lclc director uh left us November Andre or Mrs rays and I have been kind of managing it since we talked about about what if um we just started with one employee what if it's this is the time because we're looking for a director anyway for them to hire one employee start partner with an organization like n which is the nonprofit Association of the Midlands um to help them do their HR to help them do their accounts
069payable you know basically have them with one employee then once that employee is settled after a few months then they can start taking over some more of the operations um and I said that would work great and what what the arrangement we made was they would bill us their true cost of the employee and then we would pay them and so um that helps them get their first employee off the ground helps them start to get familiar with HR and accounts payable and accounts receivable and kind of managing all that we would essentially keep the daycare we're just paying for their their one employee to come and do be our be our director and so um if you go down to I sent you that email with from M Mr nitki that is in the
070trash go to the spam I'll for it again for you okay I just forwarded it to you again so it's a really simple agreement basically just says that we're going to be contracting services for lclc director from lcf um and that we would pay an amount not to exceed $155,000 a month so we wanted to kind of put a cap on it because it's is going to cost them some money to get hr up and going to get um their accounts payable and receivable up and going um and actually that would be a cost that we would we would we would take on for them because they don't have any of that right now it doesn't matter because it's coming out of our not coming out of our general funds it's coming out of our
071daycare funds which can only be spent on daycare so so if you zoom in a little bit uh you'll see so everybody can see it so this is um and the date is the 18th of November um that actually needs to be changed to the I'll have him updated so I I I want to have you guys approve it with an amendment um to put the date as the current date which is February 3rd 2024 um so essentially the purpose of the agreement is for them to provide a DHHS certified day here um provider and then we're going to pay him an amount not to exceed uh $155,000 uh there's and then it it's right now this would expire on uh July 1st 2024 because that's the anticipated date that they're going to take over
072the daycare if or not 2024 2025 yep if after if they need more time let's say for what ever reason we roll around and and they're not ready to take on the daycare for whatever reason they they've gone through another director or whatever it is then we would just vote to probably renew this and then continue on until they get to a point where they're able to take over the the director so can or the the daycare I'm sorry if I missed it or you said it but uh will the director have benefits and will those it'll it if everything's from yep everything's from L lcf yep so lcef does everything they do the employee they do the the salary they do the benefits we are just paying them the cost for all of that
073how are they obtaining benefits for a whole employee they're going to give them a stipend okay yeah so so the benef so yeah it'll become with a a stiped amount and then so they won't actually provide them with Healthcare it will be here's they they can provide through through n they can provide a um it's called um uh what is it called I just I've sat it in all these meetings it's a it's it's like a health insurance package that cost them like $500 a year but it's essentially like tella Health okay so it is through that Dam that you okay yeah yeah so they would do do that and then that's through nams also where they would provide an opportunity for like um to pay in 403 uh 403b I think it is and
074so okay so they have some retirement benefits and that kind of stuff thank you so we are going to um because we've had the posting up we have the applicants applied to us I'm going to start making contact with the applicants tomorrow and just say you know it's going to be we are ready to do uh interviews however the employment is going to be through um the lcef we're going to purchase your services back your role essentially stay the same it's just you'll be hired by different entity which means different salary benefits Etc so some people who aren't necessarily looking for healthcare or or uh um like ipers might be more enticed to to receive a lump sum you know cash to be able to do that so um so we'll see so will we
075have a representative on the hiring committee I mean that will yep I will be a part of all that okay and then how do that work with evaluations and and that annual evaluations and supervising because I'm sure the um education Foundation won't be in the building they won't correct yep so how does that work it would work uh very similar to how like uh our other Partnerships work like with Green Hills AA like we have Green Hills AA people who are in our building all the time they're not supervised by us they are supervised by Green Hills aea they they do their evaluation with a a mix of their interactions with the employee and then our interactions with the employee so they ask Fe you would be contacted to see there's any your your input
076on this corre evaluation and and with any um I mean if all this works out as swimmingly as I believe it will as of July 1 we won't have anything to do with it anyway so other than they they will operate the daycare in our facility okay well I think that lclc pays the district so much to have be in correct yep they would pay facility so that that would continue that would continue they would have to pay a rental fee okay but then like right now we we do everything for it like we do all the accounts payable all the receivables all the employees are ours um so all the payroll I mean everything is ours all that would go over to lcf and they would then just pay us a rent payment for
077the facility use of our building so and then they would take over the payments by the parents yep all the billing they would take care of all the billing and paying the employees and that so this is just through June 30 yeah unless issues then it might continue yeah if we get the right person and the right and they learn quickly and they feel comfortable to be able to take over those responsibilities as far as because there're we're hiring them so they're still going to supervise our employees so it really the function shouldn't change much when it goes over the lcef other than we'll have to we'll have to really train the the director when they come in to work with n to be able to figure out the HR and payroll portion of it
078because that's really what they're going to be missing from us so we now manage all of that so that'll be the biggest lift were there any other additional comments questions okay then we will move to the second portion of our meeting where we open up the floor to any comments and suggestions from the public do we have any okay and we'll proceed to action items to 9.01 optimized systems HVAC control Bill Mr President I'd like to make the motion to approve the bill for HVAC controls from optimized systems for $128,000 second vote Please Mr senson yes Mr Sturm yes Mrs McDaniel yes Mrs Shuff yes Mr R yes 9.02 secure entrance design bid bcdm Mr President I'd like to make a motion to approve the design fees for the secure high school and craft entrances
079from bcdm for a total for crap in the high school 146,50 second vote Please Mr Sturm yes Mrs McDaniel yes Mrs Shuffle yes Mr senson yes Mr R yes 9.03 parking lot light design by albine engineer and it's actually Alvine I I know I just CAU that on that quote Yeah I must done text us text a right or something I don't know so Al Vine with the V do we have a motion M Mr President I'd like to make the motion to approve design bid by Alvine engineering for the parking lot like design in the amount of $112,000 or $12,500 second vote please Mrs McDaniel yes Mr Shuffle yes Mr senson yes Mr Sturm yes Mr rap yes 9.04 tennis court electrical design also by Alvine engineering Mr President yes great like the motion
080to approve design bid by Alvine engineering for the tennis court electrical design in the amount of $10,000 second I do have a question if at some point in the future we need to have competition lights will it be difficult to add that or I mean will there be conduit that we can or would it be I could tell them to design with the current lighting we will put in we wir a lot power wires conduit we could install conduit now so I don't foresee us needing it but I just want to ask that question wouldn't affect your design cost okay I think it'd be going from like a light bulb to the football stadium light right I mean you're talking a significant difference yeah wasn't that the 200,000 yeah yeah I think 250 or something
081pretty astronomical okay so we have a motion in a second can we get a vote please Mrs shffle yes Mr Sorenson yes Mr Sturm yes Mrs McDaniel yes Mr rri yes 9.05 lclc director purchase service agreement with the Lewis Central Education Foundation Mr President yes like to make the motion to approve the purchase service agreement with lcef as presented second okay vote please Mr sson yes Mr Sturm yes Mrs McDaniel yes Mrs shle yes Mr Wright yes items of Interest future board meetings our next scheduled regular board meeting will be February 17th 2025 okay and then uh we have adjournment so do I have a motion to close for the evening Jour second all in favor say I thank you