001welcome to the Oregon cusd220 buildings grounds and custodial board report there was extensive damage to some of the OES Center section equipment from a storm the evening of Monday July 15th repairs were scheduled including weekends so there were no disruptions for staff or students during the repairs luckily the AC was not needed during this time the three vendors that were involved in the repairs were Helm who repaired the rooftop ahu units that supplied classrooms with air conditioning always mechanical who repaired the walk-in cooler rooftop condensing unit and inside evaporator they were 100% replaced and Freeport industrial Roofing there was damage from compressor oil that was released under the roofing membrane from start to finish this project lasted approximately 5 weeks and was all covered by insurance money minus the deductible twice a year in January
002anuary and June all HVAC filters are changed all electric pump and fan motors are greased using a special non-conductive pallera grease all fan belts are checked and replaced as needed also there are 34 specific areas throughout the buildings located on rooftops and in mechanical rooms that get this preventative maintenance service this year we have 17 yards of parking lot salt and 120 bags of sidewalk salt on reserve for the winter the wooden basketball courts received a deep clean using a specialized chemical to recondition the sealant and give a pristine finish this was done prior to the beginning of the basketball season and continues to be done regularly some floors in the elementary school Jefferson Wing gym received a needed recating of wax over the Thanksgiving break the custodial Supply usage numbers are higher than anticipated
003this is in large part due to the increased cost of our regularly used supplies and the need for repairs to our ride on floor scrubbers these repairs included new batteries a new scrubber motor and general servicing he