CorpusRecord 20658

Regular Meeting of the Board of Education - February 6, 2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Belvidere School District 100
Date
2025-02-07
Location
Boone County, IL
Material
Transcript
Extent
13,063 words · about 73 min
Collected
2026-06-05

Transcript

Verbatim source text

001um hi everybody um I'm David zman I am the director of theater at Bel North High School and I know that this is a a weird time to uh talk about a show that we closed two weeks ago um because we're not here to promote anything for you um and we're also not at a real official board meeting either so this is all fun new things for all of us here but um I wanted to I'm just going to go ahead and pass out some papers here real quick and I'll explain what we're doing here um like I said we wanted to essentially uh share a little bit of this play uh that we have been working on um because we were really proud of it um but last month uh Bel North High School

002uh performed alongside beler North High School's acknowledgement of their mental Wellness month about crushing the stigma of mental illness um we performed to play every brilliant Thing by D McMillan and Johnny Dono um about exactly a year ago um I asked Jim frma for his Blessing to do this play in an emergency rooming of all places uh because not that part wasn't important but um but because I felt like this was a story that our students needed to hear um that our community needed to see um I asked because uh this play is about and discusses uh suicide and depression um which is uh much darker and more mature than we've dealt with in our theater Department in the past um but um the show at the end of the day is a show that

003is about um Joy uh we worked with the National Alliance of mental illness who came in to speak to our actors um and to watch rehearsals and we're actually available as performances to speak with people if necessary um but tonight you're going to see a small snippet of this play um from the first of what ends up being a series of actors uh playing a character um a person who's coming of age um and their experiences with depression um starting at first at 7 years old with their mother um and so at the age of seven things are easy and simple and they start to write a list of every brilliant thing worth living for um as a gift to their mom uh this this list ends up growing and developing over time um and

004so actually some of you have in front of you items from said list of every brilliant thing and so tonight you're going to see uh senior Ruth Christine perform just the beginning of this play here and so if she calls out a number on your paper you just shout out what it says back to her um at the end end of each show uh which we brought every single audience member onto the stage of the Performing Art Center with the curtain closed everything felt very homey with rugs and lamps because while the show does make us vulnerable and bring us together um like I said the show was about Joy the end of the day and so at the end of each performance the Caston crew gave out notebooks and customized every brilliant thing pens

005we got from a grant um to encourage our audience to write their own list um just like every uh all of our casting crew members did as well um and there are notebooks like these sitting outside if you care to see them but without further Ado I think I'll give it over to the list began after her first attempt a list of every brilliant thing about the world everything worth living for number one ice cream number two water fights water fights number three staying up past your bedtime and being allowed to watch TV number four the color yellow number five things with stripes number six roller coasters number seven people falling over all things that at 7 I thought were pretty great but not necessarily things I thought that Mom would agree with I started

006the list the 9th of November 2000 I've been picked up L for school and taken to the hospital which is where my mom was up until that day my only experience of death was that of my dog sherock bones sherock bones was way older than me and he's also aess part of my existence but he was getting really sick so we had to take him to the bed to get put down now in case if you don't mind I going to ask you to be my veterinarian you don't have to do much just come and stand right here it's just because you have like an immediate veterinarian [Laughter] quality okay and if you don't mind I want to ask if I can thank you so I'm me as a seven-year-old and this this here is

007sherock but you're the vet and you're also one of the parents from school and you'd say something kind and reassuring like you're doing the kind things you're doing the kind thing it's not a moment but I have no understanding what that means because I'm seven I have no concept of finality or even Mercy but you're clearly a kind woman so I trust you now I'm going to ask you have like a pen or a pencil on you thank you so this pen is a needle inside this needle is an anetic called penil barol the dose is high enough to suppress the dog's brain respiratory and circulatory system essentially make it forever now when you're ready I'm going to ask you to come here and inject sh bones in the thigh no the thigh wait wait

008I got to stop you right there there's one hard and fast role when euthanizing a child's effect is that you really mustn't laugh as you do it it totally ruins the tone of situation maybe take a breath take a moment and try to respect the semity of the situation okay whenever you're ready okay now this little head could anyone with a watch tell me when 30 seconds has passed I held sh bones who knew my entire life I held him as he died and I thought about the walk we had that evening the smell of him in our room his dried a packet of food in the kitchen his bed under the stairs his toys in the garden all things that can now be thrown away and he became lighter or heavier I don't know

009the difference that was my experience of death a loved one becoming an object being taken away forever thank you and thank you yes thank you so much thank you brought 10 but if you don't want one don't tell awesome if you you want color you can trade afterwards okay thank you have these for you thank you thank you so much have a great evening thank you so much for being here tonight thank [Applause] you all right that was um Ruth Christie um with her teacher David Zimmerman um from B&S so it's a nice way to start our meeting um it is now 6:14 p.m. we are out of closed executive session and we will reconvene the regular meeting of the Board of Education with the pledge to the American I pledge Al to the flag

010of the United States of America and to the Republic for which it stands one nation under God indivisible with liy and justice what call Mr Booker here Mr gel here Mr Herrera here Mrs H here this may here Mr Zer Mr Zer whoever that guy is okay before we start the regular meeting of the board as a reminder all board members are expected to follow our approved meeting norms and board protocol um and um just to make a brief announcement I Reed received an email from miss wickholm this morning she has resigned from the board effective immediately um we will not um need to interview to fill that spot because we are close enough to the elections that state statute does not require us to do so so we would like to thank Miss wickom

011for her um almost four years of service to District 100 to the board and we wish her well um are there any items on the agenda that any members of the board would like to amend or move hearing none do I have a motion and a second to approve the agenda of the regular meeting of the board of education on February 6 2025 as presented so move second any discussion call please Mr D hi Mr Herrera hi Mr ziker hi Mr Booker hi Mrs H hi Miss mayel hi all right next up District celebrations we've got some golden apple Foundation finalists all right Dr Sean uh we are so very excited uh to have uh not one not two but three finalists uh for the Golden Apple this year uh the golden apple Foundation announced

012the names of 20 Winnebago and Boon County teachers who will move forward in the selection process for the 2025 Golden Apple teacher Awards these talented prek through fifth grade teachers were chosen by a committee of community volunteers who had the difficult task of selecting only 20 from a large group of very worthy nominees District 100 is proud to announce three excellent teachers from our district Cali Brook from calonia elementary school Nicole sver from Lincoln Elementary School and Belinda Roberts from Washington academy uh cie is uh a teacher in our Early Childhood Program Nicole is in our special educ a k through 2 grade and Belinda Roberts are bilingual early childhood and please uh step forward to be recognized we got two we got two come on over we are so excited thank you so much

013we very much appreciate your service and we are very proud of you good luck the competition for these recognitions is truly steep uh and the accomplishments of these uh veteran uh staff members that we have with us are really worthy and we are really excited for them to be finalists and we call hope that they will be recognized uh as winners as we move forward so we are so excited for you thank you so much and thanks for coming out tonight thank you all right next up board committee reports um we had business services on January 7th and then again on February 4th do Mr her or Mr Booker have anything to add to the minutes I don't have any updates I mean there see some items in um roll call and consent agenda okay

014anyone have any questions for all right uh policy and Personnel from January 15th um Mr ziker do you have anything you would like to add no I think most of them job descriptions and such so okay anyone have any questions all right um we also have first readings for policy two col 40 board members qualifications and 890 parent organizations and booster club Mr Zer or Dr Shug um do have anything you want to highlight me these policies um no we are just bringing back that uh 240 uh which was uh previously uh not uh approved in a second read by the board uh but we do have some press uh modifications that had to be made so that's why that you are seeing that policy come through again it just has the Press modification um

015and otherwise no no new information unless Mr Zer you have anything else um ed services committee on February 5th um I don't have anything to add to the minutes I'd be happy to answer questions if anyone has any questions from that meeting all right um anyone have any questions about parent teacher advisory on February 5th all right moving on to public comments at this time members of the public and employees of District 100 may make public comments as a reminder any new person before the board is expected to address the board only at the appropriate time and follow the directives of the board for identify oneself limit comments to three minutes and conduct ones with respect and civility toward others and otherwise abide by board policy a130 um so we have one person signed up

016tonight for public comment uh Mr [Applause] Hower uh thank you name is Bob Hower live in beler Township and all these comments are in reference to the Illinois report card review for 2024 uh it shows that unfortunately we are failing to educate our children uh the three third to eth grade for English Arts show that we are only successful with about 27% of our children in math about 15% and we're not even up to the 2019 scores which is not good but a whole lot better than the 11th grade scores which show 199 for English and about 9.8 for math uh and if we continue that same Trend we will never ever get back to the 2017 scores in math because it's actually going down English will take 8 to 10 years to actually get

017back to 2017 my concern beyond the 90% failure rate is we have tried different things and the scores are still getting worse in fact uh in specifically for math uh this I think is a crisis that needs to be addressed in fixed the last time I was here A whole lot better than this one we had the pleasure of seeing some of the show Little Women unfortunately this time and I'm being somewhat silly here but I'm more inclined to say Titanic might be more appropriate the band is playing the ship is sinking and we are just strictly rearranging the deck chairs 90% failure is unacceptable we need a Herculean effort to help our kids and I do not see the crisis mentality to force a change I have to admit I'm a little confused as

018to how graduation rates can continue to improve as the scores decline but that may be a math discussion for some later meeting our kids seem to do worse the longer they are in the district which is also a problem that I feel needs to be addressed I think a mention of the good things that are happening in a school district is a definite positive but I think we also need a monthly item on how we are moving the needle not discussing or planning on how we should do it next year or the year after but specifically how we are doing it now we have had plenty of time I think to discuss and plan and that has not worked since 2017 I realize this cannot take place tomorrow but honestly are we ever going to

019fix this is there even a desire to fix it I do not see anything that looks like anyone cares enough to make a drastic change to help our kids and I will leave you with this our goal is to cultivate academic success so that our students become lifelong Learners innovators and contributors to society and I don't think we're doing enough to help them and that is all thank you thank you Mr Hower is there there anyone else who would like to address the board this evening okay hearing none we will move on to cons the consent agenda um are there any items on the consent agenda any members of the board wish to call out for separate consideration six all right number six any others okay do I have a motion and a second to

020approve consent agenda items 2 through 5 and 7 through 16 as presented so move any discussion okay before we vote I would like to acknowledge the following donations school supplies from the beler Women's Club for Lincoln Elementary School $150 from First United Methodist Church of Bader for Lincoln Elementary School clothing items from the Bader Women's Club for Lincoln Elementary school and Washington Academy $150 from First United Methodist Church of beler for Washington Academy six lunches per month February through May 2025 from Burger King for beler South Middle School and a 2010 GMC Acadia from Samuel Willison for beler high school automotive department W call please Mr Herrera hi Mrs H hi Mr Diesel Meer hi Mr Booker hi Mr zicker hi Miss May I do I have a motion and a second to approve item

021six on the consent agenda so move thank discussion yeah I I the reason I always pulled this was that as with the last time the world we live in now and Technology storage isn't an issue especially for things as minor as small as these are not that I think there's anything hidden secrets in these executive session meetings or anything like that I just think that there's no reason to there's there's not a great reason to destroy it so why not just keep it especially when it takes up some little little space I mean we don't have to keep stacks and backing the offices back there anymore and stuff like that so for me for the amount of effort it takes to keep them it's not worth destroying but that's my opinion any further discussion what

022what is the reason for wanting to destroy them they're just not it's a governmental retention policy it allows us to destroy these records after 18 months all governmental bodies have a record destruction policy that tells them when they can destroy records and typically governmental bodies destroyed those records on that B on that time frame so that they don't pile up forever we've never done that before have we in my yeah we we always yeah we've done it a since I've been here yeah it's just on the consent agenda you probably just didn't know we didn't do we didn't do it the last time the last time it didn't I say I don't I don't remember doing it but that's that just doesn't matter y any further discussion roll call please all right Mr Herrera hi

023Mrs H excuse me Mr Booker no Mr ziker no Mr dieser hi M mayel hi all right next up do I have a motion and a second to approve the revisions to existing Board of Education policies items number 1 through 20 as Pres Mr Herr Miss H any discussion or comment roll call please Mr Herrera hi Mrs H hi Mr Booker hi Mr D hi Mr Zer hi and Miss mayel hi okay next up we have have do I have a motion to approve the elementary interventionist TPI case management workload plan as so move Mr her and then miss hul discussion go call please Mr Herrera hi Mrs H hi Mr Diesel hi Mr zicker hi Mr Booker hi this is May I next item do I have a motion and a second to approve

024the student information system RFP and vendor selection as present move second discussion roll call please Mr Herrera hi Mrs help Mr D hi Mr Zer hi Mr Booker hi this may all next up we have our K5 Ela curriculum adoption do I have a motion in a second to approve this curriculum adoption as presented move second discussion we do have Dr Volant here this evening to to speak uh to this particular item as necessary uh this has been a lengthy uh project and process and Dr vant has done I think a really exceptional job of communicating with our stakeholder groups and bringing forward what we think is really a important uh impactful recommendation here uh it is our K5 Ela curriculum adoption uh Dr balant did you want to highlight anything from this proposal intended

025to but I can just simply say that we spent about a year and a half reviewing research looking at the state's comprehensive literacy plan a collective group of 21 team members in that initial discussion to talk about the pathway we wanted to follow to do a review of our current curriculum and review any other materials that team identified seven different um vendors to contact and look at their literacy program narrowing it from 7 to 5 to 3 having three presentations and then requested to Pilot to um as you know they piloted those two programs this fall with 21 teachers involved in that pilot among all six schools and those teachers provided feedback throughout that pilot process we came together in December and met and discussed that feedback and their perspective and collectively the group requested

026to present this proposal to Bo today so I'm just advocating on behalf of our teachers our interventionists our principles who are part of that process thank them for their work and consider voice I I just like to say uh we talked about it a lot uh at business sources because it's very costly um it's a it's a big expenditure and I think it's something that needed uh to be done and I appreciate and thank everybody who worked on uh going through it one of my biggest concerns even if this costs a lot and we do it and we we piloted it uh I think it's critical that we progress monitor it vigorously as we go forward because we we've been down this road before and we stayed with something far longer than we should have

027that really wasn't working for everyone uh and wasn't successful so um I think it's important that we we move in a different direction so this is good but I think it's just as important if not more important that we really progress monitor it know that it's working uh before we go year after year after year with it and and don't be afraid if it's not working to move on to something different yeah I would I would concur with that I mean I'm old enough to remember all the vigorous debates between whole language and phonics and such and for a while Lucy ckins was the next best thing since there ever was in this world and bis and panel were the best things we ever ever had and come to find out now they're both under

028the gun quite a bit and that doesn't mean this is bad I'm going to vote for this but I do agree that as we proceed forward we do need to monitor how we do with these things because sometimes things that look and sound good don't always turn out to be that way a lot of times they do a lot many many times they do but not every time and I think we need to make sure that this fits the need we have and is getting this the progress that we want to make by adopting this um series A through five just to follow up on that too you know I also agree on the monitoring piece um but just looking back at my notes from Business Services committee back on of course that was January

029the 7th uh I was glad to hear that the the 21 teachers who participated in in this in the pilot programs were more engaged as a result of this so glad to hear that um so looking forward to to to this new C curriculum so yeah I support this as well yeah and we received a couple emails too that I thought were very great to help us understand the reasoning behind it and I thank all the committee members as well all right roll call please Mr Herrera hi Mrs H hi Mr D hi Mr Zer hi Mr Booker hi Miss Mayo hi next agenda item do I have a motion and a second to approve the special education audit recommendations as presented sh move second discussion uh and this evening we have Miss Fabian here

030as well as Dr Johnson uh Dr ad and uh Mr mandera all of whom have been a part of uh putting together this uh recommendation that is before you this evening uh which is regarding uh positions that are being recommended that come directly out of the special education audit and I'm going to start with Miss favian to uh speak to some of the information that you see here before you uh these positions have also been through the policy and Personnel committee uh as you saw uh earlier in those minutes thank you so I will start by saying that um last year around this time uh the audit for special education department was published and identifi some critical components which included um the fact that special education leadership structures were under staff for the department and

031it didn't allow uh the department to move forward with the development of some structures that would address behavior um IP writing as well as uh academic instructional components and programming in special education and for that reason um um it was also mentioned as far as uh being able to develop and sustain uh those structures and system uh there needs to be more than one uh leadership position uh to be able to keep up with that and and have this ongoing system uh of development uh so um the positions that you see and I will start with um special education supervisor for elementary and Early Childhood Program so when I started in my position just last year um uh the very first move we had is the fact that at the secondary level uh we had

032one supervisor uh supporting middle school outplacement and high school and that definitely that wasn't adequate and um our data uh showed that because of having two positions um being able to hire someone that person was able to provide support to buildings directly um covering IP meetings uh allowing um our assistant principles to also have time for other duties in their building and it's been an effective um uh change and therefore when we're looking at elementary structure that we have currently in place we have one supervisor across six elementary schools as well as Early Childhood uh so what that entails is that when we're talking about support to buildings uh there might be overlapping IEP days uh across the building so that person is split to uh and and uh basically it what it creates is

033that sometimes both of us uh support uh buildings in different tricky situations um again covering meetings uh being able to respond to parents um and um the the part about Early Childhood is that uh identification of students in early childhood when we're talking about early interventions that's all year round so also being able to alate some of those uh meetings so for that reason uh the child find child find process especially at elementary level needs to be supported and another special education supervisor position is needed to support that any questions about that position so I'll move on to director of special education so um I mentioned that in order to uh develop a sustained systems uh in special education another leadership uh position is is needed if you um look at the the rationale that

034was also supported by the audit was that the another person would allow for being able to uh sustain Improvement Department improvements so uh what would that look like I will give a specific example so right now we have um uh work groups or committees working on uh specific Improvement that includes a behavior also FBA and bip process and being able to internally train all of our staff so that we do not rely on external agencies to provide that support and then we can do that inhouse uh we have two other work groups and in order to be able to provide that leadership and continuation so that we make uh progress uh there's another leadership position uh needed again the idea here is to be able to remove some of our our current contracts that we

035may have with different agencies to provide professional development and doing doing it internally and in house so that person would provide that support I would Envision that the director of special education could support some of the um initiatives that already started and just for continuation um um things like um 7030 process uh supporting training for Section 504 um and a variety of compliance uh things there are many cases where uh there are two administrators required uh to be in IEP meetings when we have students uh for out placement when we have some legal situations which we have been able to alleviate without uh you know any any problems uh from the state and so on continuing to work on our indicators so special education department has a report card which is defined by those indicators

036and making sure that we are uh uh in compliance but also supporting buildings directly um and and being able to uh provide uh supports to IP teams IP writing was another area identified uh and we are in the works but again we don't have enough people to be able to provide differentiated training and keep going with it for the whole entire department um and so I that probably covers that also I I think that talking about building capacity in this department and sustained improvements we are looking at program development we may have certain programs that exist currently it was mentioned in the audit that they may exist at elementary level and as we have students transitioning to middle school we don't necessarily have that type of pro programming so program development would be another component

037where more than one person would be needed to support that any questions I was going to ask but where is the uh cost for each position listed projected cost speak to that yeah so the the uh help me out if I I missed something there the so the the supervisor positions uh those would be 87,500 uh commen with experience that would be starting and then based on experience uh the director of special ed uh would be uh starting would be 110 commen with experience um and then the the mtss and SE integration administrator uh that would be somewhere around 7980 and then the special education inclusion facilitator that would be on the teacher pay scale so the total cost estimation is what as those are base as just space for all those yes okay so

038about $55,000 half a million dollars um so one I think that should have been in us but it wasn't I my I don't didn't doubt that some of these things are probably things we probably want or should have I run into trouble with we we get a study and then we want to add a bunch of people based on the study all the time but then we have another study which is our what we a Manpower study that said administratively we have plenty of administration is there ways we've looked to redirect some people into these roles within our district rather than keep hiring new people because we can't keep hiring new people and adding a half a million dollar and half a million dollars and half a million dollars in positions because a half a

039million dollars could go for a lot of interventionalists or a lot of other positions that are in direct contact with the kids that is what teachers tell me all the time that they want rather than adding more layers of administration I think You' got two studies you know working against each other is there a way to find a middle ground and do some redirecting into some of these positions so we don't have to add so many um so I'm can speak a little bit to some of that so we did do the compensation study which I think is what you're referencing in terms of looking at the administration as a whole uh so that study uh did look at you know if we were adequately staffed and did Identify some gaps and holes for us

040then this study uh further identifies where some of those gaps and Fs lie uh they looked really at the big pieces compared to some of our comparison districts if you'll recall and then again this was a deeper dive into specifically special education where we had identified we had some real uh struggle areas uh as we look at our Benchmark districts this doesn't replicate exactly what's happening at those Benchmark districts however it is considerably fewer positions than was recommended in the audit uh so a couple things that I think are important to consider here one is that we really tried to be wait be purposeful in terms of the positions that we were bringing forward as those that we felt would be most impactful as those that would create the highest level of visibility and support

041at the site level um and also uh be able to help as Alicia was saying or Miss Pavan was saying uh to reduce some of the Contracting that we currently do uh for professional development that does cost the district on an annual basis so by building some capacity within the district through these positions we think we're going to be able to better serve the sites better serve the students uh better serve the staff and hopefully at least uh balance out some of the spend that takes place I know it's always hard when we look at adding in the leadership capacity uh we know that people want uh FTE teachers in those buildings uh interventionists uh and all of those pieces are also critically important and we will be continuing to have those conversations as we

042move into February and March and we look at our enrollments and our staffing uh please know you know especially when we get into uh the next set of positions uh here with our bilingual audit uh that this is not other than the um special education inclusion facilitator that is a certified teaching position this does not account for those FTE that will be uh engaged in those teaching positions uh but certainly it's a cost uh we we knew that we were bringing forward some positions that were going to have a cost out of this audit uh and we tried to be as measured and as purposeful in that as possible and I think Miss Fab and Che uh really also tried to forward a cost effective approach but certainly your your concerns are are are heard

043and relevant if I could just add that there were four additional positions recommended through the audit and we're not moving forward with them um an example of that was a bcba position and so I would say we're not just looking at the audit and and the language of the audit we're also looking at uh the effectiveness and and what's actually happening in the district and there was a model where there there used to be a bcba in the district and teachers uh did not feel like that was a supportive model and I wasn't moving forward with recommending that uh part of the audit was um um it was involving interviews of uh certified teachers and uh the comment that was made was that there was a um frustration on the part of sta um that

044was related to lack of quality improvements and systems that would provide continuity uh for staff so that they know about different processes they feel equipped uh that they can provide uh services to students and I have not yet mentioned even the instructional supports to move us uh forward with uh some of the closing of achievement Gap and uh those positions could allow us for Progress mon for for making sure that everything we're doing with IEP writing instructional improvements is also progress monitor that was uh progress monitoring was another big area but again uh we're kind of spread very thin to be able to keep going with some of these um you know large scale improvements I I development I think when we look at this the spec ad audit was something I championed pretty hard

045for back when we weren't necessarily going to do it but we did and I'm glad we did very very glad we did spent a lot of time talking to those people on the phone um and and when I read it it it I don't want to say Vindication but it felt I felt that some of the things we'd addressed before showed up in the audit so I'm not I'm not trying to degrade that special edit audit at all because I thought it was one of the better things we've done in my time on the board so that's the last thing I want to take pot shots of on the other hand the special ed audit when they look at this stuff they look at it in a vacuum as they should they look at it

046as they were tasked with a job of looking at the special ed audit that's what they should do and that's what they did do they made numerous recommendations we in my opinion have to look at all of this in a big picture I mean we have to look at all we have this aspect tons of other aspects in the district as we look at times moving forward with things like uncertainty amounted uncertainty in the Department of Education as an example uncertainty of how that funding will go I know the Department of Education I mean it's been in my lifetime not some of yours most of you has been in existence it has been in existence in all my time of of being in school and things like that came in in 79 in the Carter

047Administration where some of you were probably born at least in the room and we're not positive some of those funding is going to stay the same as we move forward it may but again it may not we also have to look at as we move forward I mean we spent three4 of a million dollars on the maintenance stuff the last time we do this in the bilingual we're going to be up near the three4 of a million dollar range again again yet I think we also have to look at the boots on the ground kind of thing as you've alluded to too that yes people see this and they see here's another layer of bureaucracy yet we're struggling in some of these areas i' I've shared some with Dr Shug in the last couple weeks

048I've gotten a lot of feedback the last couple weeks on mtss among other things and some of the other things in these things and I'm not saying the right wrong in between I'm just saying they at least deserve to be to looked into to to to assess to see where we're at and things like that and I think with all the uncertainty we have on some of this stuff and the fact that I think we do need to show how we're going to move some of these things forward on the boots the ground area maybe along with this here we have another up up upper echelon type of thing but nothing with the boots on the ground but we'll get to you later kind of thing and I'm not saying we won't I'm just saying

049I think we've done a lot of the one before we added another spec Ed director last year that we didn't have before so we're already one ahead if we don't do nothing of where we were before um we did the audit which we never did before so we're head on that I think and I'm not saying this stuff isn't all has validity because it does I mean if I was going to vote for anything I'll be honest with you from what I got all the feedback I got I certainly would vote for the mtss one but I have to look at this as a package because that's how it was presented was in a package so that's why I can't until we show until I can see something that we're definitively going to do something

050with the boots on the ground instead of spending another 3/4 of a million on this on top of the three4 of a million we spent a month or two ago I can't support it and it doesn't mean they're not valid a lot of these positions have validity I don't think they're bad but I think we have to make economic choices and sometimes I just I guess I just disagree with some of the economic choices we make so we had some audits done we paid for some audits they identified some gaps and some of these are the recommendations around those gaps to address those gaps um so you know speculating whether or not there's going to be this is going to continue to exist down the road or not if we have to make a decision

051today on our future and then we adjust our budget accordingly um um these are positions that are going in starting next year is that my understanding correct and so we would align our budget around that correct okay my argument would be though if we align our budget around that then we then there may not be any room for anything else once you spend it you spend it and that's the gift that keeps on giving it's not going to get any cheaper it's going to get more expensive I also would argue that when you look at this assessment that we did and I I agree with doing it I mean I I was a big p for us to do this that if we looked at academic achievement and things like that I think we could

052get a study that says we have 15 kids 10 or 15 kids in a classroom we could do significantly better too and teachers would appreciate that and add things like that and I'm not saying one necessarily trumps the other but we haven't done anything with that that I've seen to look at okay do we need more as Mr buer pointed out more interventionist smaller class sizes you know whatever I haven't heard anything from that but we're adding more upper level positions and I don't think I I think we could do studies and every study is going to give us a different answer based on what that study is about I mean spec Ed gave us a spec Ed one I think if we gave academic Improvement on the need for more interventions reading and math

053and things like that we'd probably get an answer for that too I think if I think if we said would 10 people in a classroom do better than 30 I would be surprised if the answer stayed 30 um like I said they're AC they're choices and and like I said before I've always said we always add stuff but we never subtract stuff I mean even when we did that budget with the Esser money we we subtracted a lot of stuff but then we right after we got that done we added a ton back so that's just my opinion um a couple of things I think the um the the purpose of the conf ation study and the purpose of the special ed um audit were there were two completely different purposes they didn't contradict each

054other they're just two different things um the the special education audit was very needed it was a super um in-depth involved audit um they they turned our district inside out it was um greatly appreciated um and and it was long long overdue um certainly I don't think anyone on the board thought that we would um get that audit and and Implement every single suggestion in that audit it would be prohibitively expensive um it it sort of I mean the the job of the audit is to say here's your here's your dream special education district with unlimited funds and unlimited resources and so um what we've had to do then is rely on Miss Fabian Che to come in and say okay you know I've I've come into your District I've poked around I've looked at

055the audit um you know here are the positions that I think could we could really see some bang for the buck here um and here are positions that I think you know probably could be um split among existing positions or among some of these positions we might add um I don't um consider myself any sort of expert in special education or education in general um so I have to rely on this on the audit and I have to rely on um our Administration to provide me with a good recommendation in that regard um I will note that our district since I've been on the board for 12 years um has been in the bottom 25th percentile of administrative costs for districts around the state we always are um we I I assume we will continue

056to be um even if we add these positions I do not disagree that I would love to see 10 kids in a class as opposed to 30 kids in a class um and and if we're if we're going to do that we are talking millions and millions and millions and millions and millions and millions and millions of dollars um so to you know not saying $500,000 is a small amount but but that is that is an apple and orous conversation when you're talking about sort of magnitudes of of cost um those are also um bargaining um issues you know those are that is part of our Bea contract and I am sure that will be discussed probably going forward when we negotiate um but it it's um that is that is a different discussion altogether

057and I understand there are limited resources and money that we spend on one thing can't be spent on another I I would also point out that we live in Illinois and education um funding is always um uh a a uh interesting um game every year to see how much money we're going to get and how the state's going to allocate funds and it sounds like that you know is going to be doubly true now um with the federal government going forward especially in the realm of special education um most of our a good deal of our special education funding comes from the federal government um administrative positions are not unioned they are not guaranteed if the budget suddenly does not allow for these positions um they can be discontinued as opposed to um uh staff

058positions um Union positions that's a different ball game alog together so these are less risky in that regard um I appreciate um what Miss Fabian C has done since she's been here I've heard really good things in curriculum committee we hear all the time from teachers who are desperate for um people to come into their classrooms and and be able to say I've got this child she has these behaviors I'm struggling you know can you help me out with this and and yeah we can provide professional development to teachers but there's a big difference between you know going to a seminar or or listening to a zoom presentation and actually having someone come into the classroom and be able to say Hey you know it these are some strategies you might want to try with

059this particular child because um you know it IEP stands for individual education plan these kids are you know all kids obviously are different but um that goes doubly so with with respect to our special education kids so um I'm really I'm pleased to support these positions um it doesn't mean that I would um that I would find more interventionists or smaller class sizes in um not to be valuable I think they obviously there is value there too but um I I'll be happy to vote for these I I just think that you I mean I I do know what I'm talking about in history I've done this a long time Educational Funding now for schools especially around here is better than it's ever been I mean we could argue about what the government gives us

060and what it doesn't but with evidence B evidence-based funding we we get a awful lot of money compared to what we had before and I'd argue any day that a per pupil expenditure um taking a factor in inflation is far better than it was before yeah yet as we hear from the audience member the performance level hasn't necessarily matched that there's a lot of reasons for that I mean I don't there's not a simple answer for that or am I trying to elude that there is a simple answer to that I think teachers in our district are really really good at what they do I think they work their behinds off I think the pairs do um but I do think if you a lot of them a lot of from the feedback I've recently

061gotten said in some of the areas when we talk about like identifying issues identifying problems things like that in mtss among other things we need more help and they need more help and I don't think unless I'm totally messing this up I don't think they're asking for more administrative help I don't so I we can disagree we can agree to disagree but I think when we do these things we're doing I think we need to realize we're doing it this instead of that whether we want to admit it or not I mean I think we had to at least be honest and say we're doing this instead of that maybe we'll get to that later but for now we're doing this instead of that and go and let it go with that any further discussion

062I do have a question what what drove us to seek the audit what was the driving force behind that well for me personally and I'm just speaking for myself but I don't think I'm the only one that when I got on the board and even before I got on the board I can honestly say I heard more issues about speca than I had about any one subject period And I don't think anybody I think there's more than myself that felt like that so then I think there was always discussion is there a problem isn't there a problem is it just perceived is it not perceived so we we made an effort to get an outside agency to to either verify there was or neate that there was but the the general feeling or perception was

063that there was but not everybody was convinced there was in my opinion back then then we got validation that we had these issues so I think that's from my recollection and I could be wrong CU as you remember what you want to remember but from my recollection that's what precipitated at least doing the spec at audit because there was some disagreement on how we were how we weren't I would say agree with most of that before I was even on the board when people found out I was running for the board I was approached by several people about spe get as being one of the troubled areas and I think um to be honest it was uh pointed out to me then that uh many thought it was a leadership issue and I think that's

064changed which is a good thing but I don't think that was a secret so we should have gotten better and are getting better I think just by having you here and those things um but clearly there were problems and we needed to do an audit to fix it because things were not going well and that's from my so that's almost four years ago well and I would uh just further say that we knew that we had achievement uh concerns uh that were at issue uh we had received feedback regarding um Continuum of services inclusion uh definitely when I came in there was uh a lot of feedback that special education was an area where we needed to take a deeper dive uh and the the board supported that and I think that the audit did

065help us do that deeper dive and really look into to why it was that we weren't getting the achievement data that we felt like we needed to have and why there were uh perceptions around inclusion and continu on the services uh that needed to be addressed as well I think I think even to that point I think she's she's correct is that when I look at this thing if if the discussion was and maybe eventually gets to down the road is that when I look at and and I know people hate listen to me talk about test scor so I I get that part I accept that part but when we looked at the alternative assessment on on for the kids with with cognitive um disabilities the state average was 15 across the board for

066the most part percent and we're three so I mean there's definitely an issue there and I guess if I could understand when we present these things how this is going to what's what's the concrete way this is going to make that better I'd be easierly convinced as we move forward with some of this stuff I'm not saying it won't I just haven't really heard all the time to connections how a is going to give us b c and d and it might I just think that would be more helpful for somebody in my perspective so pretty simple right there was a need we did an audit to confirm that need to identify the gaps in addition to not only identifying the gaps but also identifying process Improvement right recommendations for process Improvement and why is

067that important and why why are these recommendations important for that very very simple purpose process Improvement to get and Achieve better results so thank you Mrs faan check for what you're doing appreciate the the the recommendations you're bringing forth here today I can get behind this and I can support this I look forward to the the the results that are come that will come from this so thank you any further discussion one call please Mr Herrera hi Mrs H hi Mr Diesel hi Mr Booker no Mr zicker no and Miss mapel next up bilingual audit recommendations please all right uh bilingual audit recommendations uh are also coming forward here from Dr 80 Mr mandano and Mr mandera uh here this is also a result of our bilingual audit that we uh performed over the last

068year if you'll recall last year we came forward uh with a position to support um um a supervisor position to support our bilingual programming this is another position that we are bringing forward which is the bilingual secondary supervisor position currently we have Mr Mand duano who oversees the entire bilingual program uh he has been focused uh on Elementary duel we are transitioning into that secondary duel there is an evident need for support there in terms of looking at our achievement data and also looking at the trans transitioning into that program U Mr mandera is there anything else you would like to highlight here no it's U definitely something that our staff really wanted to have somebody in a leadership role to kind of assist at a secondary level especially with issues with things that they

069have with scheduling um problems that they might have had in the past in the way of resources that would be applicable to what they were doing they needed somebody to have that kind of vision that that Renee that has been doing for the elementary but he can't do it for Al buy K12 so this was an effort to kind of have that need met and kind of assist in that supervision role then at a secondary level to assist our DU language and bilingual students but also our administrators to assist in getting the proper resources and materials that they need to have at a 6 through this position again is really looking at direct support to our buildings um in this particular case our secondary buildings this has been an Ask uh from our uh secondary

070buildings from everyone from the Bea to the administration uh and everywhere in between knowing that we need more support there and that Mr mandano considering our Uh current El population uh is a significant increase of where it has been in the past but has continued to be staffed at the same level uh there is no doubt that there's a a need here and there's also no doubt that our performance data uh indicates the need for some additional supports as well questions about that position the cost of this one again should we have that on these when we look at them yeah yeah it would be on the supervisor level too so it would be 875 base yeah I I think this is a much needed position we've um my daughter's the she's in the original

071class of dual language students she'll be graduating from high school this year um Mr manda's daughter as well she was in 's class and um you know we as the program and I understand this is for all language learners but as duel has rolled up we've significantly increased the number of kids um in our um dual language program and we also have seen an increased number number of um kids um who are native Spanish speakers um in our district and I I think this um position really is critical to support you know I do think we have a really good handle on our K through five programs and I think this position could really kind of take our middle and and uh high school programs to the next level think it from from a a

072lay person parent perspective I can see where this position um is needed and will be will bring significant value to the district any further discussion yeah just to supplement that um you mentioned value but also quality right quality outcome um and the resources needed resources to continue with with our with our dual language bilingual programming that we have which I think is is is fairly good so to continue that quality you're going to want the re we're going to need those resources uh in the second level so I would support this too further discussion call please I don't think I have a motion to approve sorry motion to approve the bilingual audit recommendations uh so move further discussion all right Mr Herrera hi m h hi Mr ziker no Mr Booker no Mr d i

073and Miss Mayo hi next up parttime benefits clerk do I have a motion in a second to approve the part-time benefits work as presented so move second discussion I know this is going to be strange for me to say I'm gon actually go over yes for this but part of it is I hope when we do this we we don't have some of the glitches we've had in the past I hope this solves it I realize that it's a tough job it's it's strenuous as heck so maybe this will leave some of the issues we've had in the past and just just a a reminder it is a part-time position um so looking at about 20 hours a week and about $18 an hour that's what it would be any questions or further comments we'll

074call please Mr Herrera hi Mrs H hi Mr Booker hi Mr Diesel hi Mr zicker hi and Miss mayel hi okay board discussion demographic study um Mrs Armstrong y so unfortunately we had had um Marcy from MGT um to present at our last meeting that got canceled unfortunately at the last minute um so she is not able to us in person uh but she is going to present the study um virtually to uh the board and as predicted there's not a significant change um from what we saw in the original we'll continue to get those updates for the next two years for for you want us to go into the facility's next steps and try to get her on okay sure we can go on to the next agenda item we'll come back and just

075you can just interrupt does when mercy just give me a little sign and we'll we'll switch back over to her when she's on or do we have her no no okay I just can't have things on at the same I understand at okay all right we will move on to facility next steps and we'll come back to demographic study when we get Marcy on all right uh as we know the board uh in October approved the first uh three years of the master facilities plan and uh tonight we wanted to uh give you an update on the priority projects that have been identified for those years one through three and where we're at on that we wanted to talk to you a little bit about performance Contractors and how Performance Contractors may be able to

076help us uh in terms of executing some of those next steps and then also uh wanted to get your feedback on the possibility of bringing forward Master facilities plan years 4 through 10 and what those next steps might look like uh and we're just going to walk through each one of those pie pieces and we're going to start with uh performance Contractors uh Mr Nelson do you want to highlight that for us oh you're going to all right very good would you like the standard however you're most comfortable it's just fine I'll be upstairs I will join you okay so this is just a a part of our role is is to bring you the many different options for what's best for our district the approach to uh something of this scale for the $32

077million is to hire general contractor hire a rep if you like and it would be a a threeyear process now part of that three-year process there's over 110 things that we want to accomplish those years which means many visits from me to you about this RFP this RF this ITV now as we know if you have U Frost in Florida the orang is what happens orange juice goes up and one of the things that really drove this home for us was fires in California hurricanes in down south what's going to happen material pricing going so as part as part of this approach of the performance contractor is to uh we would have the performance Contractors bid on the project the project being years one through three $32 million now when you bid on this project

078typically it's geared towards Energy savings is what a Performance Contractor does so Energy savings means uh guaranteed ENT savings so when the uh when they B on this project here what they're guaranteeing us this is what their cost is going to be this is this is our timeline so I would come to you would come to you Dr sh would come to you and we'd say we went through this process these are the qualified this is the qualified contractor that we believe uh we should go with this is their price this is their time frame one and done they manage the project we e weekly I've had three different experiences three different districts working with this type of process um it really frees us to take the uh the higher view of the projects versus

079being immersed in the dayto day now when you think about it when you have $32 million with the projects this is something that is going to take up a lot of our time and how many times have we talked about economy of scale SK that's what this approach really accomplishes because they leverage their relationships they've had for decades and they they know the contractors that are going to give them the best price the best service the best quality and that's where we're not constantly coming to you and saying this HVAC person here the boilers at um I'm sorry the the HVAC work over Middle School that $7 million project we're not we're not betting up all these contractors they've already done that so um again this is one approach that we thought that we could

080U get the best B for our dollar but also um get us the best outcome because now we're going to have a guaranteed savings when it comes to the lighting projects or especially our agac project that they're going to guarantee that because we're going to give them access to our to our energy bills um they're going to guarantee that we're going to have X amount of savings per month per year any questions on there I was pretty good so if you so um everything said Sean said accurate I actually happened to give a session at the school conference this year I was on a panel session about delivery options for projects and we talked about all of them from traditional design viid Bild to construction management to design Bild to energy performance contrac so what

081what Sean is basically describing is not unlike a CM process except that they have a little more skin in the game in the CM because they are going to guarantee some Energy savings for you and if you look at the facility assessment many of those items are HVAC items Andor energy related items so I think that's why the district could lean towards a Performance Contractor filling that type of a overall manager role for the project as opposed to a traditional CM that isn't necessarily going to guarantee some Energy savings bonus um performance Contracting in the state of Illinois has been up and down there are PR contractors out there and there are some others that are maybe not as reputable um the organizations that at least we've talked about have a solid reputation have professionals

082on staff licensed certified uh individuals Engineers um we would still be doing your architecture they would be doing kind of the overall program management and like a CM would do uh managing that process that time frame and the benefit of that Energy savings we would work together as a team just like we would with a construction manager team in a district and every Everybody stays in their Lane it's a very effective process so um knowing the amount of work that has to get done in the one to three time frame and if you choose to go down the road of Bo attend at some point um some type of relationship with a with a either Performance Contractor filling this role or construction manager probably this is this Performance Contractor uh some body who is is

083like the construction manager for a company I mean would like you talk about hbac off brought it up might future son-in-law works for HB company does a lot of schools not maybe around here Alpha in Rockford that means they run just third part or they run more than just third part well you can I mean just as an example I'm not you can write the contract wherever you want I think the intent is that they would kind of be overarching on the entire process of project so that you're not tying up all of your sta because there's a number of just regular maintenance items that done on a regular basis as well so uh they would be kind of driving that part of the of the overall process when we're in construction and they would

084be participating in some of the mechanical and engineering design as well and so and I'm sorry to I was just going to say so what we would do as a next step if the board wanted to move forward with this as a possibility would be on March 13th which is our upcoming special board meeting uh we would give the board the opportunity to interview two different Performance Contractors uh that we've moved through the process at this point that we think might be a good match at that point you'd have the opportunity to interview them and decide if this was a pathway you did in fact want to pursue or not uh and really drill into those questions so that we were sure we were getting exactly what it was that the board wanted to make

085uh this master facilities plan years one through three again the best bang we could get for our buck uh and allow us to also accomplish it within the time frame that we have we have established what's the what's I mean is how's that going to work what we did that for the sake of our that's a month a little over a month away let's say we either do it or let's just say we don't how far behind are we then I mean school's going to be out and I've I don't want to say I have I have um bad dreams about the track and tennis courts and stuff like that I saw how that went and and I don't want this to go anywhere near that same way so I know I didn't think you

086did I don't think but that's what I'm looking at on the time frame if we do this we wait till March and we decide do that how are we are we behind the eightball even more then so to speak I think jump in here I think there's two different tiers here so we have projects that are already in process and and one that's going out to B next week well no the track the track and the tennis courts went today today um they were published out they are on schedule as we anticipated they'll be coming in March for the board approval of hopefully awarding a contract and those are all set for happening this summer so the projects that we already have planned for this summer are not these big HVAC at South and at

087Washington they're not these Mega Million projects that we're talking going but the the track project to me seems like a big project to do all that I mean I hope we're going to have it teed up in time that it's it's done by the ball Sports because otherwise that's going to be a mess for the track yes y substantial completion is uh second of August I believe it's g to close that's going to be really close close anyway um so it is this something where we have submitted like rfps or this is just they would they would submit information and you would go through interview process with them just like you would with a CM yes okay this is projects for years one two and three of the plan which is okay is there I

088guess I have absolutely no expertise in this is is there a is there a advantage to using a construction manager as opposed to so the other delivery methods construction managers very similar to this without the energy okay performance piece of it it's very similar type of a role okay if the other option is design build which I I wouldn't recommend in when you're doing so many mov Parts it's better for like a brand new facility typically um and then the other is traditional design vid build we design it bid ta contractor's been on it lowest responsive qualified bidder gets to work so every year could be a different person doing the work there's a little lack of consistency that's one of the benefits also when you're bidding to a general contractor they're giving you a

089total price so this the work for this particular building is $2.5 million and you get we get a breakdown of generally where the trades are but you don't really know what agreements that contractor has with each of those subs he picks the subs and it's pretty much whoever's going to work with them or cheapest for him right or her uh CM typically when they're doing that bid in that in that scenario that's a what they call an open transparent bid so they're bidding each package and you or your group leadership group sees each package as they go here's all the Masons that here's the one we're recommending in why here's all the steel guys or the HBC guys or electricians or whatever that's pretty much open book that's usually that CM works so that's more

090more Visual and able to you know see what's happening you have a little more control over and it also tends to benefit local contractors too that are Subs so that they it isn't just a general that's bringing somebody from L the local have better shot at everyone sees what their number numbers are not that it makes any difference because I mean I don't know if it would it would does this dick are they going to be in more of a driving force and what gets done first and what it gets done afterwards in the order of these priority projects just just as an example I'm just throwing aside no the district would still have setting the timelines and saying these are the projects that we want in year one these are two these are three

091which we identified in those priority projects so we say okay these are the projects coming but they can look at it and say they have years one and two and maybe we can do this process of we know we are giving you this much this year this much this year what's our bulk you know what are we going to do when we bundle this stuff together and you're going to have guaranteed work yeah I mean I I I was just alluding to things like you know the AGS and you know whether they South versus Washington you know whatever plus I was also looking at I've just thought thoughts poping my mind when I said her too long is that um we're we're about a year away from from the Parry thing from deciding we're going

092to do something with that people are going to want to know what we're going to do on that pretty pretty soon because it's already been a year or almost a year yeah and that's identified as a year three project there's little things I think that we were doing yeah everything year two and year three um because we got to start with the roofing before you start doing all the other things um so those were identified in what those years were I'm GNA interrupt real quick I think we have Marcy um on the horn so we will come back to you guys in just a moment we're going to flip back to our um agenda item demographic study hi Marcy can you hear us thanks for joining us tonight we appreciate you um your understanding with

093respect to cancelling on you Marcy actually flew up here from Florida for our January meeting um we didn't have a inperson quorum because of illness and other issues um so we we apologize for that but we appreciate appreciate you joining us tonight oh I'm sorry yes I can't he anything we gotta just a second we're gonna adjust our our we have a little sound issue on our end try with the REM the computer computer yes but maybe not okay can you stay it sounds like it's coming out of that TV maybe like your TV but not that one yeah one more time all right it's a little better thanks [Music] Marcy right yes so first student analysis we also and [Music] Anis School talk [Music] going [Music] C and [Music] l [Music] variety of there

094so for example your them in El [Music] because number antip as levels are your have [Music] and [Music] is St [Music] num is [Music] in [Music] any questions for Marcy I did want to share with everyone that they this report does have the updated capacities so I was working with Steve and U Cunningham from that needs assessment they took the rooms as they are right now with our class siiz um rules that we say this is what can be in a classroom and we took that by the number of classrooms as they're utilized now and created that capacity so the capacity numbers are different from last um uh report which we think those numbers came from 70 something um but we did update it and that was the basis in which we updated because we

095haven't made any significant change uh we took classrooms as they were with our Max class size and said this is what determines Your Capacity so if for instance if we have a special education room right now that has a max class size of I don't know 10 yeah 10 15 students that is the capacity we use for that room okay which which building do we have now is at the highest capacity percentage wise oh is that in your report um Mercy this highest utilization or the utilization the highest utilization reason I'm asking is quite frankly is that I I keep getting reports from one of the schools of classes out in the hallways and stuff like that and a school we had 300 400 more kids than a few years ago and kids are meeting

096in Commons areas and not in a regular classroom so that's why I'm asking about the actual utilization versus the you could put 30 kids in every room kind of capacity so by the report Perry has the highest utilization because they have the smallest number of rooms Perry Perry yeah where's Central falling at Central is falling at a utilization of about 76% so having Roes out in the hallway shouldn't be I mean no offense but with 25% capacity that doesn't make any sense and I think that's where you're seeing classrooms not being at class size okay yeah or I think you know teachers don't want to be on carts for instance so there are classrooms that are empty for a particular period so that teachers can have their own classrooms things like that factor in as

097well well I wouldn't argue that I mean I just I just for me personally I I mean I I went through that I know what it's like to actually I'm probably the only one here that actually knows what it's like to do that I agree it's much more convenient to have with the other way 100% agree but I also think if it's that versus kids out in the hallway what's your choice I mean what's your choice then so I if that's the choice we want to make that's fine but I just I just struggle with that one I guess any other questions for the demographer all right thanks for joining us tonight Marcy I appreciate it thank you thank you okay part two so is there any other feedback on the performance Contractors do we

098want to go ahead and move forward with that March 13th date to uh interview um those performance Contractors and see if that's a pathway the board would like to pursue and if so we would also invite the um long range planning uh the facilities longrange planning committee uh to attend that meeting as well so they'd be able to hear those interviews I guess I guess my only quick question is not against it is is there any negative to doing it any negatives to doing to doing it that way I I mean to do it in March is there any are we screwing up any are we potentially screwing up any timeline thing okay that's all that's that's all I was that's all I was asking no that's about the time we're we're going to start

099U getting into the design process for all that and earlier that the CM or the performance Contracting program managers on board the more value they have yeah that's that's all I so I'm down F thank you all right so we will plan to move forward then on March 13th with that M sounds good thank you fantastic uh the next piece here is an update on the priority projects for years 1 through three Mrs Armstrong and Mr Winters uh and you have that here in your um in board docks as well to reference did you want to highlight where we're at there yeah so uh five of the projects that were already identified have already been completed um projects um that include the Seth Whitman fencing in the playground uh the water heaters at Central Middle

100School the South um inspection and repair of their cooling tower and um the boilers at Everest um and the Ops replacement of the rooftop cooler unit so um we have actually um been working on these projects uh and right now we took the cost that was in the needs assessment for these projects and took what we've actually spent and some of those projects as we anticipated were higher some of them were lower we are actually um over they've come out over $5,000 is all we're over on getting those completes I think we're in pretty good shape um with where those are going and uh Sean with Winters and his team have been working really hard on trying to take some of these items off this list so that people see the progress so our anticipation

101is that we will continue to update this and provide you U updates and what the estimated cost was and what we actually realized and how we're fairing through that process nice job on estimating costs that's pretty darn yeah we have uh a roing project the maintenance Grant which we'll be bringing to you for approval uh next month and that's another $140,000 so really we're we be up to about 365 big ones off the so it just feels good and and like it or not you're all part of the process and this is a this is a team win so appreciate you and that matching Grant will take $50,000 off of that $140,000 cost so that's saving us in in that aspect where we're trying to take advantage of those grants and those opportunities to lessen

102this burden on all of our own resources and bond great thank you and then if you want to click into that uh January board meeting presentation I'm just going to walk through this very quickly it's mostly a review of sort of a recap of where we've been uh which is our facility needs assessment and we know we identified those priority projects uh which you can see there in slide three on the initial scope uh and then we looked at the additional projects which included Perry uh Everest and the clinic you can see then on the following slide what the board actually uh decided to go forward with which was Perry uh those priority projects Everest and the clinic and then you can see a little bit more about what that Perry tier 2 looks like

103and then if you go all the way to the last slide there you'll see that years 1 through three uh spelled out there again here you have the Perry Everest the clinic and the tier one pieces and the next parts of those projects are years 4 through 10 and this is uh according to the potential funding that we have available uh is how those pieces could be played out so we could look at doing An Early Childhood Center uh beginning in year four or year five uh depending on one if the board wanted to move forward with one of those options and then you can also see us moving to tier 2 on those other projects again that's spaced out according to when funding becomes available and then also running along the bottom are those

104facility needs assessment projects uh that we will be continuing to work on as we move through this important to not that that tier 2 piece is going to be combined with some of those facility assessment needs uh so really parsing that out as we go forward with those tier 2 projects we'll be talking to each one of those buildings and figuring out what that overlap is and what that actual cost and outl will be uh what I'm really asking today is as we prepare for that March 13th meeting what is it uh that you would like us to bring forward to you uh so that we can continue to sort of move forward on this are there questions um pieces of information that would be helpful uh as we look to take next steps on

105those years 4 through 10 I don't I don't want to sound funny on this one but the one it would be nice to see how partially one through three go for one two this board very potentially is going to be very different in four months at least half different at the very very least so I'm not sure that majority of us ought to make a decision that 3 months away may be a group of different people I do know there's some ramp up time I do get that I mean I do get there's some learning process but four years away or even three years away that gives you a lot of time to learn in the meantime so I guess I'm just reluctant to make decisions for another group of people that we may or

106may not have to he will have to live with his taxpayers because I don't think any of us are moving that I know of and so but I mean I think that you the people that actually are going to be dealing with this probably more than some of us are should have a right to weigh in and make substantive decisions on that too and I appreciate and I know they can always change their mind I get that part but if it wasn't three months away I wouldn't it was 18 months away I'd look at it differently than 3 months away yeah well and certainly no matter what we do at that March 13th board meeting uh we will not uh I do not anticipate approving a master facilities plan for years 4 through 10 uh

107until we do in fact have that new board seated so whatever we were doing uh in March Andor in April I think would just be setting the stage for that new board but we can certainly push that out until uh we have the new board seated as well so whatever whatever you would like us to do we will do you thoughts or comments well just just being new and you know not not had been involved in a lot of those discussions it would help me to to kind of connect the needs you know what's driving um what's proposed there in years four through six and why are those you know more important than the ones that were showing out in8 n and 10 or it just some context I think would would be helpful for

108me so clarification on um why 1 through3 versus 4 through1 and why the priorities as they're La out okay yeah I'm sure some of that's probably due to age of things and you know costs and all that kind of stuff but uh it would just help context would help me I think absolutely we can absolutely do that and then I think you know we had our you know our big um committee that that presented a proposal of the board which has been kind of Ed at this point I do think um probably and the next board obviously can decide what they want to do um but I do think it would be important for that board to hear from the community again um certainly we had the benefit of hearing from that community group with

109the sort of diverse array of community members and teachers and staff and board members um but that um quite a bit of time has passed since then and this board has made some decisions since then that sort of changed what what the final product of that committee um was going forward so I I hope the next board thinks about you know when when we're talking about spending this sort of money and whether to go out for a referendum or whether not to um it is important to get community input and I I know know for my 12 years on the board how hard it is to get community input before a decision is made once the board makes a decision um everyone loves to pipe up and give input on the decision the board makes

110I I I don't know what magic people can work to get that input beforehand but I I do think that's going to be really important when you're looking at projects of this magnitude to hopefully get some buyin um before a decision is made that very very good all right so I um based on what I'm hearing we will at that March 13th meeting uh have the interviews with the performance Contractors and we will provide maybe some context and overview of where we've been and where we're going um but I think maybe not a ton of depth either because with the new board coming in we'll probably need do some repeat of some of that as well so we'll give some of those broad brush Strokes in March and then set up for uh the new

111board uh and do a facilities meeting when we have that new board seated does that sound like the will of the board all right sounds good all right very good thank you very much all right next item student board members um I just wanted to quickly um point out and as board members we get the um Illinois School Board Journal um in the most recent Edition there was a really good article um there were two actually really good articles on student board members I was going to bring them tonight and of course I didn't um I'll email them out but they had some um really good ideas apparently this is sort of a trend that is happening in boards um around the state they had some really good ideas and suggestions for um welcoming um

112student board members onto the board that's something that the next board may or may not want to consider again um but I do think um I do think it is worth reconsidering so if any of you have that issue laying around home um take a look at those articles and like I said I'll I'll email those out to um but that's all I have on did did the Articles have anything because I know we talked about I think there is value like for board interaction with students in other ways like at the schools did talk about that and all no this these were specific they were specific school they good articles student board members yeah they they were really good articles and and you know nobody's nobody's come up with any better ideas in the

113meantime so I I do hope that it it is something that that we can look at because we have some really great students um who who would be very interested and I I continue to believe that the way to you know um have influence in one's community and um and to um serve your community one of the best ways is to serve on a board we have lots of boards local boards um that that have seats open all the time I'm not just talking about school boards I'm talking about zoning board of appeals and the regional planning board and the you know fire district boards and um to the extent that we can get students interested in serving their communities and being involved um I think that is well worth any time and effort that

114that we as board members would have to put into making that a good experience for them so um just a thought there yeah I think I think you know if you go in the future I don't disagree with using some of that stuff I mean you know we don't agree on all of it but the um I hope the future board whoever comes next will look at and I know I'm not volunteer myself well but I mean take the board president take the superintendent have people from those schools meet with them one monthly every month that's where the sausage really gets made in my opinion more than it would be in a sanitized session like this there be more in my opinion more real input and more ideas where it's a back and forth I

115think kids would find they would have more Buy in and more ownership of that than may be sitting here but that's just my opinion I I I would hope we'd at least consider doing something like that and I do think Dr Shu I think you meet do you meet with student council members or something like that I do I do meet with the uh student council advisory uh Team uh I just actually met with them today uh and we had alive Garden for lunch it was delightful uh so I do round with them um and we meet every other month uh over the course of the school year uh and I get feedback from them on what's going well what's not going well and then some of the critical issues like facilities or uh today

116we talked about uh cell phone policies and uh what their input was on that so yeah see I think I I think even on the board agenda developing would be a great having done that I mean I think that'd be a great experience for the kids to sit through something like that but that's just my opinion all right um next agenda item the Illinois Department of Transportation pathway by pass 20 so um as some of you may or may not be aware um idot has been uh they've approved a project to add Lanes resurface and reconstructing areas of by business 20 or by pass 20 um from State Street in North applon all the way to us20 and janova so that is the entire bypass it will be four lanes uh divided it will have

117um you know a lot of a lot of enhancements to it and they're looking at redoing Bridges the question is uh when OT gets these proposals they have to put in a method for alternative transportation so that can look two different ways most likely is it will look like a offset walking being in bike path or it will look like an extended shoulder um so in the uh documents that I attached you can see the path that they're looking at uh well it is a proov this is the path they're going to do um what we are being asked is as local entities Park District Conservation District the county the the city have all been asked to to take a chunk of that uh path and assume the maintenance for it we don't have to

118pay any of the the building we don't have to do any of the construction of it um and the maintenance would be significantly limited because there's no salting there's no plowing we're not driving on this um whether they don't know if it'll be concrete or asphalt um but with it not having to be plowed or salted um because it just needs to be usable in non snow covered conditions um we would not be responsible for any of that winter um in talking with the county um they are um proposing that in these conversations they would be the procurement agent for the entire path and they would be willing to uh do all of our procurement when we needed to have it resurfaced or a crack build or anything um and most likely in as they

119indicated in most situations they would be able to do the work themselves and they are willing to split that maintenance cost 5050 with the districts and we would only pay for the cost of the supplies for it um so our um contribution to that would be very limited um and that they don't think the maintenance would be required at least 15 years uh 15 to 20 years with asphalt and 30 to 40 years with concrete um and that maintenance estimate would not be more than $30,000 which of course we'd be responsible for maybe half of that um but they truly indicated that it would be most likely much less than that um all I am asking today is does the would the board support us saying we would have discussions and we're open to the

120discussion um so that they can start um looking at a intergovernmental agreement um to soate that that nothing would be obligatory until we sign this inter governmental agreement but are we okay with continuing the conversation that we would not mind um maintaining potentially this small area that runs from Lincoln School um to just before P Grove Road seems pretty reasonable right being a good citizen in the community and minimal cost and this would allow um access to Fields it would allow walking access to Lincoln School it would allow access to our bus garage for families that want to go those routes so it gives them truly a lot of opportunities for people who are not driving so is this contingent on us doing it or not doing it um well all the other because we

121canceled our meeting right now all the other entities including Rock Valley College the Conservation District the park district the city and the county have all agreed to have the conversations they're waiting just on our little portion on are we okay to have the conversation I think so yeah I'm I'm not against a conversation I just need to be convinced of if we're going to spend any money why are we spending something we don't have to I mean I get I get the good citizen part I do but I mean I I would hope they could plow some of our lot at me and I mean you know I just I understand that but I do made it very clear if they don't have this support they will just extend the shoulder and so it won't

122be a separated pth that makes a big that's more cost effective to them but they want to make it usable for the community that we want to and the Conservation District has asked um and is asking them to make um some adjustments so that they could get um tie into to their existing Trails um and that so like I said there's still negotiations to have but is it the conversation we want to have yeah I'm fine with that okay thank you okay anything in upcoming contract renewals and reports or Administration reports Dr show um I will run us through our admin reports uh quickly uh as the hour is late uh superintendent comments uh every brilliant thing you saw Ruth Christie here this evening uh and she was really spectacular I think uh so wanted

123to highlight that that uh went incredibly well and uh North also did a assembly uh for uh mental uh health awareness month and uh really uh heard today from the students that that was very much appreciated and was a fantastic event uh playing at that assembly was the buck Thunder basketball team uh here's highlighting that they had their final basketball game before regionals uh and scored the most points that they ever had in a game uh they are just a fantastic celebration all the way around we are so proud of them uh uh here we have North volleyball team reading with our Lincoln students we love that we have uh this opportunity uh for our students um to engage across levels uh we're seeing more and more of that and this is an example of

124that our South Middle School Pal's team earned second place uh super happy for them they've continued to be really successful and Emma Pearson at BHS uh broke Amanda Levan's alltime career scoring record uh she has over 2,170 points uh it's just absolutely remarkable I got the chance to see uh her play uh last night I don't know Tuesday night uh one night this week it's a blur uh but uh really really an outstanding athlete uh and then we have our golden apple finalists that we had the chance to recognize to have three Golden Apple finalists it's extraordinary so exciting and we had our Everest graduation uh where we had 27 students received their diplomas and I wanted to highlight uh the board approved the alternative diploma uh and we had students graduate with that alternative

125diploma that wouldn't have made it otherwise uh so board you are making a difference uh and that was really really really exciting to see um and we do have uh beler North cheerleaders are uh going to State this weekend uh and they are uh number one seed so that should be really really exciting to watch uh so stay tuned and hopefully we'll have a celebration on that next week as well or next month as well and that those are my superintendent comments any questions on the superintendent comments strategic plan updates uh we're going to take a deeper dive into this really uh next month we've spent some time highlighting some of our midyear uh where we're at as opposed to the beginning of the year so I'm not going to click through these uh this

126evening um but lots of great things happening I just did our goal for stock take and uh that's about uh our work our Premier Workforce lots of good things happening there and I'll let Dr ad highlight some of those things in the great place to work survey results yeah just real quick and there there is a uh a PowerPoint included in there but just a couple highlights first of all uh just uh it's nice that we achieve great place to work status again it um je feels a great uh a great recruiting tool for us as we go out and about um but on the survey we had our highest participation rate that we've ever had uh in doing the survey uh four times now in fact we had 661 employees participate which is like

127150 more than than our second highest rate uh that we had I think back in 201 18 or 19 but uh in the survey 92% of field up the districts a physically safe place to work which I think is we all agree is very important uh 91% confidence in the district's exe executive team uh 90% feel uh people celebrate special events in the district 89% have a sense of pride in what they accomplish in the district uh so overall U really good numbers and overall uh uh a rating was 86% which is which is really good compared to I think like the average the average workplace is around 57% so I'm really really happy uh with our staff and our district we got a lot of a lot of great staff obviously in the district

128and uh it's nice that they feel pride in uh in the district and what they're doing so really happy about that we are very excited and board members we're going to have some nice uh great place to work swag uh so if you want to help us celebrate the district uh stay tuned we'll have that opportunity uh the only other thing I'd highlight here in our admin reports is the cardiac response plan uh there were some legislative uh changes that asked us to have a cardiac response plan uh so you can see that highlight there that the work on that is uh taking place and that's it for edmin reports yeah just just back to the survey you know those are very impressive numbers um and hav't been in industry for a long time uh

129you struggle to get those kinds of numbers in in companies yeah so it says a lot about the culture we have really does how many people filled out the survey 661 out of how many out of 1,200 yeah but but but but now that also just so you know that also includes like our daily subs and our coaches and everything too so so it may even be more than that yeah okay was about half at best yeah about half okay all right um do I have a motion to agend so move second all those in favor say I I all those in post say same message

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.