CorpusRecord 208368

March 9, 2026 Westonka School Board Meeting

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Westonka Public Schools
Date
2026-03-10
Location
Hennepin County, MN
Material
Transcript
Extent
2,646 words · about 15 min
Collected
2026-06-24

Transcript

Verbatim source text

001I would like to call the Westonka School  Board meeting to order. If everybody would   please rise the pledge of allegiance. I pledge  allegiance to the flag of the United States of   America and to the republic for which it  stands, one nation under God, indivisible,   with liberty and justice for all. Thank you.  Chair moves for approval of the agenda. Is there   a second? Second. All in favor? All oppose.  Motion carries. Announcements. Uh March 18th,   facilities committee meeting, 7 a.m.  right here in this room. April 2nd,   finance committee meeting at 7:30 a.m.  April 10th, teaching and learning special   board meeting 7:30. and the um ESC conference  room A and April 13th policy committee meeting   uh 5:00 p.m. and regular school board meeting at  6 p.m. Are there any members of the public that   want to talk to

002us tonight? Nope. Um that being  said, then we move on to the student rep report,   which they are not here, so I'm assuming  everything's really good. So, or or really   bad. They're really busy. Um um and then we'll  move on to the construction report from Gary. All right. Back then work in February. Um so this last month we were  um on the phase three edition just finishing up   the fireproofing some of the mechanical  roughins um the interior framework so   all the walls have been framed up the sheetrock  is installed the roofing is done and the slabs   um are have been poured and then in the media  center um a lot of the ceiling work is completed   um the lighting uh paint carpet and  then mechanical electrical finishes.   Um installing piping in the penthouse. And  then

003what we have coming up this month,   um finishing the exterior walls, uh the finishing  the rough in painting of the um admin spaces,   um some interior brick, uh tile work, some of  the the last of the finishes, uh media center,   um finishing the ceilings, glass installation,  some of the case work, the furniture installs,   the punch lists, um and then final cleaning for  for the handover. um in the gym. One of some of   the next phases that we're jumping into, the  gym demolition begins on March 23rd. Um and   that's kind of the next the next phase that we're  moving into. Show you a couple pictures. This is   of the of the new addition. So, in construction,  we can never be happy. It's either too cold or   it's too it's too wet and marble out there.  But

004um some of the pictures of the the admin   space inside. Um you see some of the drywall  going on, the tile work going in bathrooms. This is in the penthouse. The some of  the equipment. This is the second floor   of the admin space. Some of the offices.  What do you consider the penthouse? I'm   just mechanical. Sorry. Mechanical space  where where it houses all the the units.   Sounds fancy. I know. I was wondering  the same. Yeah, we got to live there. Um, here are some some some pretty cool photos  of the media center as it's starting to finish   off. You can see the ceiling work in the  lighting is so cool. I see. It's awesome. Yeah,   it's it's amazing how that skyway of lights  it before it was dark and you you noticed it,   but it

005didn't really show itself. And now with  the new colors and some of the other lights,   it really shows itself entirely different. Yeah. Those are those door stairways. Yeah. Yeah.  Really starting to open open things up and and   uh get some light in there. Um some of the site  work. Um as you can see, we've kind of we've been   reconsolidating things on site. Um we got a new  trailer up at the front. Um we'll be starting to   demo the the tennis courts. Uh they have started  the the the stadium projects and we started to   clear the trees. That was the first thing that  happened. Um is that earlier than planned? Yeah,   we did get a we did get about a I think a week or  two jump on on that side of things. Um there is  

006like the weather's cooperating great. Um there  is like this little there's still not all the   frost isn't quite out. So it does you think like  when you see the weather like why aren't they out   there moving? It's like well because there's the  top layer is mud and then there's a frozen layer   there. So they're waiting for it all to kind of  dry out. But um we are things are looking good.   So get a jump on it. When did the the uh old  tennis courts get the demo? Um those will be   next uh I think it's a week and a half. Oh not  till the track start at the same time I saw the   big machine sitting out there. Yeah. Well, that  one the um that'll start in probably a week and a   half as well.

007But that's some of the machines just  the um the tree clearing equipment come off. They   were down in the back in the back corner. When's  a good time for us to get another two or three?   We can we can set that up for board members here.  Probably a good time would be right after spring   break and then we can give them the time to do  the work over spring break. They're going to do   a few other things. I think that'll be sometime  round or before our next meeting. Thank you. So, yeah, it's uh we have Hilltop Shirley Hills  planning for this summer. Uh we're planning on   uh moving out of some of the different spaces.  So, as we have uh the admin and the counseling   going to go in on the north end, then we

008move  things out of there because that becomes the   new nursing area. They're going to start  working on the courtyard when they start   working on the courtyard. The entrance will be on  the north end. So, we'll be switching that over.   Um there's obviously um end of year activities  that we've done quite a bit of planning on   everything from graduation to some of these  special events. So how does that work in the   phase of construction? What will graduation be a  weather? Well, we're going to have good weather.   We're going to be on headwork. I'm sorry I asked.  We'll just leave that as that. Think positive and   just go ahead with it. So Gary, is everything  pretty good on materials and stuff? Yeah, so   we've been tracking um you know, we had a little  bit of some issues

009right away on the addition,   but we we're on track with the schedule  that we that we have. So we're looking good. Thank you. All right. Thank you. It's  exciting to see each time. All right. You have a preference. Yeah. He doesn't mind. Treasures report for uh February anonymous  Hilltop Primary School $40 American Heart   Association Shirley Hills Primary School $700  West Middle School PTO West Middle School   $4,495 Black Giving West High School $20 speech  boosters West Taka speech team $1,400 Ohio File   Prince, West Tanka Athletics, $15.92. LPL  Financial, West Tanka Community Theater,   $100. Butch Humber Cross Country  Scholarship, $100. LM Partners LLC,   Blue Stem Wealth Scholarship, $500.  Tyler Russell Hill Sunshine Fund of   the Minneapolis Foundation for the Tyler  Russell Hill Sunshine Scholarship, $2,000.   Spring Creek Fund of the Minneapolis Foundation  for the Spring Creek Scholarship,

010$10,500. Alan Alma's Center Hold Corporation, Alan  Alma Scholarship, $1,500. Katherine and   Jeffrey Schulty, MWanka High School, class of  1975 scholarship, $200. Blackbod Giving Fund,   Captain's Club, $40. Eco Lab, West  Tanka High School boys lacrosse,   $125. Snap Mobile, West Tanka High School  wrestling cheerleaders club, $737.50. Choir Boosters, Westa High School  choir, $16. Be like Tommy Project,   Westa High School DECA, $460.  Year-to- date total $214,45545. Thank you everyone. Thank you. Kathy starting with the um enrollment. Um and this  enrollment it shows the the light blue on the   far right hand count is our March 1st count.  And uh you can see we're reporting in six of   our our nine school months. So it means  we're twothirds through the way of this   the school year. So when I see that filling  up, that means we're getting closer to

011fiscal   year end. Um our count as of March 1st was  2452 students. We had um a couple families   move. Um so that bounced it back to our um  January count. Um but really feeling good   about our enrollment. we are um not only at but  we're above our revised um budget assumptions. Great. And then uh financial data  um through the end of February   um shows that we have um received 19,397,000 of our revised budget or 42 43.2%  and we have expended 25,889,000 or 58.2% which um both the revenue  and the expenditures are trending   um um appropriately as compared to the prior  years. Just a couple other things. Um we're   busy working on the adopted budget for next  school year. We'll be presenting that at the   June board meeting. And um as Gary mentioned,  we have um

012a board finance meeting in early   April. they'll be able to take a sneak peek  at our progress and and how our assumptions   are are trending. So, that's all I have  this evening. Any questions? Thank you. Move on to the superintendence report. The couple  couple action items that you have in your agenda   today. One is uh you'll see an updated ticketing  pricing structure. Uh we've switched to electronic   uh tickets. That's worked really well. Uh but when  uh there are some people out of convenience that   we've allowed a cash option that does require more  labor for our staff and how to handle that. And so   we are giving a further incentive that people do  the online tickets and it also speeds up in the   uh you'll notice that we're going fives and tens  instead of going with

013ones. And so the purpose of   that is we still feel like we should offer a cash  option. We don't want somebody running in the spot   that they don't feel like they can come to a game.  But we really want people to do the electronic.   It's it's better for a lot of reasons. Um but uh  hopefully this incentive just continues to drive   people that direction. Uh you'll see a Lester  building uh that is outside the scope of the bond,   but it's connected to the bond. This building is  an affordable way that we can provide storage. Our   our building by the headfield uh that's existing  is a Lester building. And so we looked at some   different options in which we could do storage  and we decided to do this one directly which   KA will help oversee that

014get implemented and so  that'll serve uh activities in community at on the   multi-use field. Uh we um you'll see again that  we are continuing to review some of our equipment   uh what should be sold and then you get into an  annual agenda item. every uh March we go through   our budget and we try to align our budget with  our staffing and so we go through the exercise   of making sure it is prioritized and as tight as  it can be and then also adheres to our budget. And   so you're going to see some uh a few additions, a  few eliminations, but overall this will help us in   meeting our goal of uh saving of 200,000 is what  our goal is this year. And so a key piece of it is   that we keep on working on

015staffing. Uh one thing  that we continue to prioritize is that we have low   class sizes and also a lot of opportunities for  our kids. And when we look at the metrics and the   comparisons of the metro, Westonka shows itself  very favorably with class sizes. So we uh we   continue to be in a very strong position uh with  that which we know both staff, parents, students   appreciate. Uh that's really what we have before  you. Otherwise, it's um it's an exciting it's   always exciting as you get spring because you're  starting to enter uh you get out of your winter   sports and you start your spring sports. So, today  I saw lacrosse players already on field three   and when it's uh this stage of March and they're  playing outside, you know, you were given a gift   even for

016one day. It was a gift that they could  do that that the fields were dry enough and they   were able to do it. But excited for those sports  to start getting and then it's really you get back   from spring break and it's a lot of different uh  events, celebrations, things that you're gearing   up for the last quarter of school. In the midst  of that is a lot of construction which as you saw   pictures of the media center, more and more spaces  get turned over to us. Uh this weekend I took   um some people through a tour of the school that  hadn't seen it. And it's it's so much fun to see   eyes on it that haven't seen anything and knowing  what it used to be and what it is now. Just the   audible gasp of

017excitement of what's happened.  And so I just would thank the board again.   uh you're the ones that made this possible that  we could bring this to the community by your vote   and leadership and uh I think it's being received  really well. So, thank you. Thank you. I just have   a quick question because I saw track out here too  today which is great. At what point will the track   be closed or I mean are they able to use it still  right now or because I've seen people out there   very minimally right now. uh that for almost every  activity we were able to work around, we could not   create an additional track. Yeah. And for us to  be able to offer track next spring, we needed to   start right away. And so uh our coaches uh have 

018been nothing short of phenomenal of looking at   alternative ways that we can help our kids. One  of the things that we will be doing is busing to a   neighboring district to get some time on when you  can only practice pole vault with the full vote.   I mean there's some things you cannot recreate  and so we're trying trying our best to make sure   that this can help those kids be competitive this  they won't have it because I mean once they start   tearing apart there they won't have they have  limited access right now and pretty soon it will   be completely out. He just said they're tearing  it apart in a week and a half. A week and a half.   Okay. Is that they were out here on the sidewalk?  Do they running up or down? Well, aren't

019you open   the track one? Yeah, I think there's right right  now um to go fully around the track with some of   the tree clearing that's been prohibitive. And  they're also using the u the whack. they can   practice handoffs and other things have the school  go to whack to yeah also again um just a huge   shout out to our coaches on trying to find a plan  that can can work I had one other question also on they're going to the state competition now oh they  completed state I haven't got the international   Okay. All right. Just curious. More  courageous when deck of bingo is good. I love the one of that. Um chair moves for approval of the consent  agenda. Is there a second? Second. All in   favor? All opposed? Move on to discussion  items. Chair moves

020for approval of action   item 8A. Approval of the updated ticketing pricing  structure. Is there a second? I can second that.   All in favor? I. All opposed. Motion carries.  Chair moves for approval of action item 8B,   approval of contract award with Lester Buildings  for the storage shed. Is there a second? Second.   All in favor? All opposed. Motion carries.  Chair moves for approval of action item 8   C. Approval of obsolete equipment to  be sold recycled. Is there a second?   Second. All in favor? All opposed? Motion  carries. Chair moves for approval of action   item 8D, approval of position um elimination,  reductions, and additions and increases for   um school year 2027. Is there a second? Second.  All in favor? All oppose? Motion carries. Chair moves for approval of action item  8E. Approval of the first reading of policy   uh

0213712 which is video surveillance other  than on buses and um policy 8100 which is   school board process and procedures.  Is there is there a second? Second.   All in favor? I all oppose. Motion carries.  Anybody else have anything else going on? If not, in spite of our best intentions, we did  really well tonight. So, well, you don't get a lot   of them that go. Yeah, we'll take that one. Yeah,  we'll take that. Bottle it. So, we got a lot ahead   of us coming up here. So, um is there any further  business? Anybody? If not, the chair moves for   uh for adjournment. Is there a second? Second.  All in favor? All oppose? Meeting is adjourned.

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.