001it's now 6:15 we will call the February regular board meeting to order uh 1.1 roll call uh let the record reflect that everybody except for Lori Dudley is here tonight uh 1.2 recognition of visitors and guests uh thank you to everyone in the crowd for attending in tonight's meeting 1.3 would be the Pledge of Allegiance I pledge alance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for all okay one point 41 um public participation I don't believe we've had any this evening from anybody 1.42 recognition of students staff and Community um I got quite a few here actually recognition items congratulations to Heidi Meyer on being named the recipient of the Southwest Division leadership award by the

002Minnesota elementary school principals Association um congratulations to the gymnastics team on winning the section a gymnastics meet and advancing to the Minnesota State Gymnastics tournament again the following individual gymnasts qualified for individual state competition as well uh Lacy theer all around uh Marley Palms tree Vault Isabelle LA Zoo Vault Jada milber bars and beam Kennedy ther uh beam congratulations as well to Taylor Hastings as being named section 3A Jazz coach of the Year by the Minnesota Association of dance teams let's see congratulations to Hannah McNab and Isaac kinzer this year's AAA Award winners at whs uh over 30 students at worlington Middle School participated in the worlington Middle School geography B with Brayson Lan being awarded the champion and Preston Kumi second place uh thank you to the worlington noon Kias for having guest readers

003in our PR Elementary kindergarten classes congratulations to the worlington middle school math counts team they placed first place in class able a and Marshall along with earning the most improved team out of 10 schools considered for the special award Worthington middle school will be well represented at the Minnesota state Ms Honor Choir the spring with six musicians being selected we had the maximum number of students that can be selected which is also very exciting and good luck uh congratulations to alandr Leon Flores for her being awarded the top forensic scholarship at Southwest Minnesota State University of Marshall elonda has participated in many different activities at whhs including speech BPA theater musicals and more she's had a very award filled experience at whhs and will cheer her on in the bright [Music] career uh and congratulations

004to the n wh HS choral Department musicians that just returned from singing at mmea over the weekend five of the singers were named to 910 Honor Choir and four singers were named to All State choirs we'll give everybody a round of applause K 1.43 presentation on the Middle School by Tony Bartman Middle School principal I have my sidek Tessa dks with me too um as we are talking a little bit about some restorative practice that we're doing at at the middle school I want all of you to think back to when you were in middle school and what that was like um when you ask people quite honestly a lot of times their experiences aren't real great and we're trying to make that better so we are going to talk to you a little bit

005about Pride Academy this is why we started Pride Academy um it gives a sense of belonging it's an alternative suspension um it's not meaningful when we do ISS and OSS it's just putting them somewhere um this is a more proactive approach um out of school suspension is viewed as a reward sometimes sometimes our kids were found doing other things when they were put in OSS um it can be a burden on parents um there's also that lack of supervision at home when parents have to work and that kind of thing and the recidivism which is not repeating what they do is we want them to not do that so anything want to so this is our team um our social workers and our counselors are part of our team and these are the things that

006they do our paa we have a paa that runs the Pride Academy room um this is what we do as admin our resource officer and then our parents and Guardians are also part of the process with this um they come to the exit presentation as well as being an active participant throughout the two days so what is Pride Academy so in a student makes a poor decision which we all know they do um we do a two-day Pride Academy where they focus on respect responsibility and empathy um they get academic support we do some Behavior restoration um we also work on some personal development and we'll talk about some of these things in a little more detail and then we do restorative conferences with principal officer Tyler our counselors and our our pride Hera um

007one thing I'd like to add is that everyone is a little bit different so this is individualized it's more than one child in The Pride Academy um we really try to connect them and try to work through what they've done and then restore um the hurt that they caused so these are some of the topic examples of the lessons that they do while they're in Pride Academy these these are just a few of them um relationships resolving conflict vaping dangers of drugs healthy relationships is a big one um empathy tobacco use and respect so on the last day of Pride after the kids have done L um throughout that time when they're meeting with counselor their resource officer myself Tony um and that PA that helps with the Pride Academy they're putting together a presentation

008and the presentation go ahead Tony um includes these slides and the slides are kind of pre-done except for where the kids add um why they've been in the program so that's the first slide then they reflect on what happened and why um and then they talk about if they're ever in that situation again what could they do um different to um get out of the situation or to find someone to help them um this slide is how their words and actions have had effects on not just them but their family on the school the staff um and sometimes the other person because usually there's another person involved um with what has happened um and in this slide they reflect on what they've learned through the process um this slide becomes very um good for the

009kids because they say a lot about empathy which you know respect empathy and restoration are kind of the three parts of the Pride Academy and it's surprising how much the kids really focus on that empathy piece um this is a slide that we don't show the kids until they give the presentation it's got all positive remarks from their teachers um and other trusted adults in the school um and a lot of times this is the where we get some tears and some [Music] emotion and then we always end with what are you what are you good at um and what are what are some of your hopes for the future so that's the presentation um their entire Pride Staff is invited to that presentation we have really good um conversation and answer questions also at

010the end um at the end of the presentation we also go into our re-entry plan and the first part of the plan is for the student just um solidifying what they're going to do um to make make sure that they stay safe and others stay safe within their school within their school we talk a little bit about those non-exclusionary discipline attempts that we've done um we know that that came through the state a couple years ago so we make sure that we talk about that with kids and with parents and then if the parent is able to attend we also have them fill out um some of those agreements um that we have as we wrap up that presentation and then have them sign that they've been there um that restorative conversation that behavior contract

011um that asked for needed support and then that reassurance are all things that help them be successful as they reintegrate back into our school a little bit about the data we pulled a few numbers um just so you can kind of see so the numbers that you see in green are in blue are from this year and we're not done with the year of course so um this is our first year for Pride Academy as so far this year we've had 36 students that have been through pride and only three of those students have been back in Pride again for something different um last year we had 59 students that had ISS and this year we've only had six students in ISS 15 students repeated ISS last year we've had zero kids repeat ISS this

012year um last year we had four kids that were in out of school suspension this year we've had one student and that student has not repeated um out of school suspension and last year we had one expulsion this year we have zero do you have any questions for us this was not something something we thought of together um I was actually at a principal's conference last year and went to Rochester middle school did uh something similar to this and said here copy do what you want and um we made it our own and called it our own and um we are grateful for that cuz we feel like it's been very successful and we it's something that Tessa and I have been looking for so um we can't take credit for the program completely but

013it's a great addition to our our school any questions Mr chairman quick question Who who and how do you go through the process of finding the right path for the student if if the pride is the place for them to go or is the school suspension still the the option kids make mistakes and so um the first time is always Pride okay always so they always do Pride first thank you y anyone else what is your sense of feedback from students and parents on this program I love that question because that's kind of the next layer that we're going to um embed into the program um so is that student feedback and parent feedback um and then also we would like to be able to follow up with kids so after they've been through the

014program and everything's going well how are we still supporting them a week out two weeks out three weeks out a month out um and so on so we're developing that part of it um so really good question and we're like at the cusp of that um right now yeah anyone else it's good okay thanks Tony and Tessa thanks for your time thank you okay moving on approval of agendas first thing I'm going to ask for is we move 4.6 the service Co-op contracts to 7.0 for other business for some discussion tonight so I would need a motion to move that to other business all moved motion by an second seconded by Eric all those in favor of the motion say I I all those opposed same sign motion passes so now I need approval of

015the consent agenda and Main agenda with the modification to the consent agenda move to approve motion by Matt second second by an all those in favor of the agenda say I I I all those opposed same sign motion passes 3.0 approval of minutes from January school board meetings special school board meetings in February and committee meetings 3.1 and 3.2 need a motion it's all moved motion by an second seconded by Matt all those in favor of approval of the minutes say I I I all those opposed same sign motion passes uh then we need approval 4.0 consent agenda with the changes that were made all moved motion by an second seconded by Aaron all those in favor of the consent agenda with the changes made say I I all those opposed same sign motion passes

016okay 5.0 main agenda 5.1 monthly Financial overview and that will go to Carmen um so in front of you guys you should have the um Revenue expenditures um for the period ending January 31st um 2025 um as you'll notice on that report it has um the actual for this year and it compares to the prior year um so you can kind of determine where we're at um we are seven months into the our fiscal school year um our collected revenues are running on track to where we were um last year at this time um currently we're at 54.1 14% compared to last year's 5014 um perc our expenditures are also on track um with um last year um with our current 52.2 three this year compared to 54.99 last year at the same time um

017there have been no unusual revenues or expenditures at this point um things are moving along as expected um I would say maybe our um we're still kind of right around that 50% last month we at that 50% we haven't seen a a lot of increase um some of our stuff is due to um like our expenditures aren't as High um due to like lack of snow removal which has been a good thing so um and this is all comp based on our budget numbers so based on the budget that you guys approved at the beginning of the year and it's just comparing to that okay any [Applause] questions 5.2 approve second reading of policy 213 School Board committees John so with policy 213 there were the adjustments that were made um on there and one

018other adjustment that was made was we removed um section 4G because it was duplicating from what was and creating some confusions so with that it should be ready to go that should be all the changes and we would recommend approval of policy 213 okay does anyone want to make Mr chairman I moveed to approve the second reading of policy 213 School Board committees motion by Matt I'll second seconded by Aaron all those in favor to approve Poli 2133 School Board committees say I I all those oppos same sign motion passes okay 5.3 approve first reading of policy 522 sex non-discrimination policy grievance procedure and process so this was at the instructional committee and based on a change due to Federal Court uh vacating the federal 24 final rule on title 29 msba has sent out

019model policy 522 which was the policy that was put in place in two based on the final rule of 2020 and so e MSB is recommending to approve this as a replacement to the policy that was approved a year ago based on the federal court decision so the recommendation was for approval and the model the model policy is that exactly what msba put out other than on page one where we had to put in the Title Nine coordinator and those that work with that individual was this instructional instructional yep I move to approve the policy motion by an second seconded by Matt is there any further discussion point of clarification point of clarification um Title Nine not 29 correct title 9 yes okay did I say 29 you did oh I apologize that's okay yeah

020it's policy 522 and it's based on Title Nine and this is because of a federal court ruling that we have to adjust what we were to go back to what we did were where we were at correct okay we got a motion by Matt or by an seconded by Matt all those in favor of the motion say I I I all those opposed same sign motion passes 5.4 approved Capital outlay requests so the operations committee looked at this um so the total amount of requests based on working with administrators um we had 82,8 15233 um there is long-term facility made maintenance of looking at doing $323,500 627 with that I brought up the issue of uh three items and then we had a conversation about a fourth and so the three items were um new

021band uniform which total $113,000 $3,050 the other one we talked about was the high school gymnasium sanding and resurfacing that floor which was done roughly 15 years ago that was $26,000 the high school auxiliary gym and I can't remember doing it in my time here so it was done quite a while ago to reinish sand and refinish that was $17,500 and the one that was discussed uh at the committee uh which again I don't remember the last time it was done and I'm pretty sure it was probably a number of years prior to that and since I looked into it we do have some water damage uh where boards need to replace by the door that goes out to the northeast of the Middle School gym and the quote for that is $31,000 so when

022I look at the numbers and where we're at we have roughly an extra $100,000 in capital that we could cover and then the floors actually can fall under long-term facility maintenance so we can we would be expending the entire Capital Revenue we receive and expending either on the long-term facility maintenance or Capital reserves either one so the total amount of expenditures if you looked at your sheet was 82,000 we'd be up to 98,2 um so it's a matter of if you want to do the three additional things we can cover that I can do it within the budget um and some of them really make a lot of sense at this point that allows you to keep moving forward with dealing what is not a want but a need that needs to happen at some

023point in time so if I remember correctly at the meeting last week we had asked for some more information on the use of the exil auxiliary gym here at the high school before we made a decision on that um I did not get anything yet so I can't I I know it's being used a lot it's probably being used tonight for uh a ball game um it's used for practice for the lower Varsity games I know even volleyball season so it's used a lot as the school um extra gym and probably Ed daily but as far as a schedule I don't have that and I I didn't think we were bringing it for approval yet tonight did I have that wrong Erin and Matt I thought discussion but not approval well I felt it was

024still on the uh the Slate to be done from the way I left the meeting and quite frankly I I suggest that we do proceed with doing it or else we're going to put our eles in the same situation we are with the Middle School gym where we have neglected to upkeep that and we're in a it's in a dramatic state of repair so and this floor has not been done for most likely since it was put in 20 plus years ago so I I support doing the entire project as proposed I would dare to bet that auxiliary gym has darn near as much use as the main main gym which it's got to be close it's used a lot whether it's f it on a daily basis or a lot of activities to answer

025Darla's question I think that we we agreed that we needed to have discussion as a full board on Capital outlay I don't know that we were clear on whether or not it was going to be brought to a vote tonight Mr chairman a question on the middle school project from Mr languard would that be the the entire gymnasium floor not taking the the separator out and doing the whole entire entire thing square footing right and potentially could be more just given the potential water damage elsewhere or B based on the number and the estimate estimate he gave me cuz this was kind of quick yeah between when I visited with you I had to push to get the quote um I think he allowed for sure coverage of it based on the number cuz I

026thought it was going to be a little less than that but it wasn't and I didn't know about the damage when I first talked to or for had forgotten I don't remember um about that North east corner where before we replaced the door we had water damage in that area was that like from before the roof was replaced or how did the water damage that was before the door was replaced yep before the door was how did the water get in the building though uh it was an old door we replaced that door I want to say 7 or eight years ago and it had been leaking so that's an external door yes an external door car yeah has leadership from the Middle School weighed in on the importance or value of the Middle School

027floor project being done did they leave they're sitting right over there um I I would tell you they believe it's an important piece of their facility it's used daily um just like most the gymnasiums um and all day long so um but you could ask them I'm it's used for practices in the evenings or later as well so it's it's been used a lot um it's probably one of the gyms when what I call the community uses that's not used as much for Community use but it's used by our programming a lot so okay do we have a motion to approve the capital outlay requests I move to approve motion by Matt second seconded by an any further discussion I just want to clarify is it's just the capital outlay or the four additional items

028or one additional items the whole project as presented at 9842 y That's My M my motion okay we got a motion in a second all those in favor of the capital outlay request as presented say I I I all those opposed same sign I I one Dar two two two okay motion still passes okay 5.5 approve the 2025 26 NCC budget so again this would have been at the operations committee um the budget approval number is 1 1,156 232 and that's we're one of six districts so that's our number for our district we're approving and that would be the budget that gets submitted to the Department of Education there is a deadline to have it submitted before the end of the month month so that would require your approval tonight and the recommendation was for

029approval move to approve the 2025 2026 ncic budget motion by mat second Aaron was that you motion or seconded by Aaron is there any further discussion all those in favor of the 25 26 N cic budget say I I all those oppose same sign motion passes 5.6 approve the APAC American Indian parent and advisory committee compliance report um this is a report that is required by the state of Minnesota um it's a report that uh Mrs Hagen meets with this committee and goes through everything and it's basically a pretty simple report that um you as approve board approve and move forward so it's in one of those annual things that has to happen so the recommendation is for approval I'll move to approve the APAC report motion by Aaron second seconded by Eric is there

030any any further discussion all those in favor of the APAC compliance report say I I I all those oppos same sign motion passes 5.7 approve the new superintendent contract Carmen and I will take this I guess Carman go ahead we um negotiated with um Mr he camp uh three-year um superintendent contract um the salary for the first year is 180,000 the second year is 185,000 with a third year 190,000 um just a few other benefits to point out um we approved a 7500 District match for his 403b annually um 25 days of vacation 11 holidays and 206 days which is comparable to um our other administrative staff the 7500 was a match of what he's get match y a match to his um Tech shelter anity is 403b and the technology fee right um so

031yep he'll have a technology um actually his technology is um for his cell phone it's a cell phone reimbursement he doesn't want an actual phone he wants the reimbursement for his phone which um goes more with IRS um regulations so did you all receive the contract and okay I thought it went pretty smooth early yeah he was very reasonable negotiate with I think he kind of based his salary request on what he felt the Gap should be between him and our assistant superintendent so that was kind of hard to press him on that and that's a three-year contract obviously I move to approve the contract motion by an seconded seconded by Darla is there any further discussion all those in favor of the new super superintendent contract say I I I all those opposed same

032sign motion passes 5.8 approve and adjusted easement is this what the water shed I'm guessing correct yeah so with the Watershed they are have created a new plan based on um the DNR having issue with their L plan and so they created three Alternatives what the Watershed would like to do is alternative three in the information you received which requires a little addition of easement on the North End of the project and it edges over into the 80 acres that the board had purchased um a in discussion with the operation committee uh in overall review of IT the recommendation was to approve an easement and they would then start doing the paperwork and begin moving forward with that as the plan any signs on if this project will still take place this year they still

033have permitting issues or um once they move this forward to the DNR the likelihood of who knows where they're going to land um the DNR has been less Cooperative on this project less than cooperative and uh yeah I the timeline they kind of are still on the same timeline but um that would be a fall start and working and hopefully completed by the end of the summer of 26 and they need more of an easement to do more dirt work right that be dirt work system yeah and have access to that and regular to make sure it's working correctly need a motion for the easement I move to approve an adjusted easement to the kshine pond project alternative three motion by Aaron second seconded by Matt is there any further discussion Mr chairman one question

034for Mr languard if it and I I couldn't quite find if it is indicated here but I think it'd be beneficial if at all possible to encourage the embankments to be passable for a potential Trail if there was to be a cross country trail at some point put on the property I would certainly encourage us to be sure they're wide enough so they're but I couldn't see an actual width as presented but if you could I would encourage discussion of that so they can be longer range used for that purpose sure yeah I it's based on the drawings it's hard to tell yeah thank you we've been talking about this project for a lot of months and we had approved this project in the past but then they couldn't get clearance for the project that

035we passed to happen and now there were three alternative um projects presented to us and this alternative three option is the most like efficient and effective when it comes to like trying to achieve the goals of these ponds and reducing yuck in the lake so it seems logical to move forward with the more with the most efficient like next best alternative um and it doesn't seem like it's going to have any um you know any additional burdens to us as a school district in terms of land use what was the reason for the redo was it something about the depth was a concern of the original um no the original concern was Downstream flooding um if the dam would break um I to this day I still can't see based on the drawing DNR showed

036versus the impact that the engineer had shown I saw very little difference in the two um drawings of the impact um I don't know I either I'm missing something or I I don't know but I also understand the DNR wanted to is not happy about this project and potentially is putting up barriers for it so they would prefer to see this Meandering big ditch in there which doesn't remove enough example phosphorus to account for what they're trying to accomplish I have a whole lot to say but I probably politically probably shouldn't do that okay we have a motion by Aon seconded by Matt all those in favor of the adjusted easement say I I I all those post same sign motion passes 5.9 ltfm bonding for high school Renovations so this was talked at the

037operations committee they wanted to have a conversation with the entire board I did give you a piece of paper um that Barett had provided to me yesterday I think it was um and if you look at it it shows you the term of borrowing the estimated borrowing and then it goes right through down to the bottom of the actual potential impact on taxpayers and as you can see at least gives you an idea for residential commercial it has no um tax impact whereas for egg Homestead and egg n Homestead it actually has a decrease impact if you were to consider doing an ltfm Bond um so tonight that's only a discussion item if you want to consider and move forward with something if you remember or the operations committee uh received we have an elevator

038at the North End of the northwest that must get done this year which is part of the capital outlay but it can be moved to the ltfm um the building Renovations are listed in there as far as the metal panel and windows which is roughly 1.4 million tuck pointing S Repair of 64,000 upgrades to finishes built-ins was $2 million estimate and then Roofing replacement um the committee did talk about potentially asking another company to get put together a quote um I have not addressed that one just yet um but that's kind of where uh we were talking when we were looking at doing a a bigger project um related to the high school so it's up for discussion that's the information kind of you have the estimate that IC did IC did for construction was

039just a little over 4.4 million and then with soft cost bonds issu issuance and contingency it was at 5.8 million what was under the the $2 million update that you were just talking about um 2 Millions was upgrades to finishes and builtins so like all the univet in the classrooms would come out we'd address the flooring uh new doors so it'd be upgrading the 1960s stuff in the classroom but nothing with the outside with the windows or panels yeah it be new windows and new metal panels those metal panels I don't I can't tell you when they were that was kind of a 7s Energy Efficiency where they took windows out and put metal panels in trying to keep the heat in and they're getting to the end of their life or are at the

040end of their life any more discussion from you guys questions thoughts so so we're we're at this point right now because we've taken out a portion of the plans a b and c that we had talked about from the referendum and all all of the high school Renovations and this sliver is improving the the north Wing um updating it making it more energy efficient um fixing things that are broken in the operation committee meeting we talked about um how there is money in the El in the ltfm for us to um take on this project but we would be tying our hands to a certain extent down the road if we take this on and it would this would take about 60% of our ltf funding available and we talked about the value of having

041our new superintendent weigh in on this project um to see if it is in alignment with his vision for how we're spending our ltfm funding in my opinion I think we do need to make those improvements to the North wi and in I feel like it's it's among the top priorities but I do think that there is value in including Mr high camp in our conversations so I feel like it would be wise to get at least one additional quote from a different company um and be able to um include him in conversations early on in his tenure and hope to have a plan in place to address these issues um sooner rather than later when does the elevator need to be done by is there a drop dead date on that I don't have

042a drop dead date but that that one I can't I need to start moving that one forward that and it's in the capital LA but it's that's got to get done this summer it absolutely has to or it'll be shut down and it won't be available and then our Second Story in the north Wing will not be accessible but we just voted for on Capital outlay to approve that right okay okay so the 160,000 comes off of here that is associated to the elevator okay okay Mr chairman I I struggle with a lot of things here too but of um a project that does not in include what our biggest space need and that is the cafeteria space you that's where I would struggle with us moving forward with a plan that didn't address that

043need as we have it right now we have so many I I appreciate the idea of having our Su new superintendent in the discussions but I also think we need to take the time to bring everything off the top shelf and all the binders and put all of our plans out on the table and look at everything that needs to be done and I think we can as a board can do prioritizing and be prepared from our perspective to involve him with that discussion but we need to be on this a page because there's a lot of things that we got to do and we're just having less money daily to accomplish those tasks so I guess I'd like to see us bring everything out and um really try to do a a forward look

044and then engage Mr Hy camp in that discussion I know there's been talks of maybe at some point a special meeting is that correct John where you can maybe we could put this on the the agenda if that's the direction you guys want to Go's discussion tonight we talked about these and I agree with Matt and and with Aaron and and I throughout the ceiling in the gym as well as being a safety hazard at this point in time if tiles are falling um that we need to look at that so we we do have a list of priorities I think we have to Force rank them and get on the same page I support getting more bids more estimates to see what we can do okay and if you guys are okay let's just

045move this to a topic on a special meeting when that date is determined but I'm guessing that's coming pretty soon so is that all right can we just make sure that everything that comes off that top shelf is ltfm eligible and not referendum items well this is what is ltfm eligible out of but if we're looking at the gym ceiling which I'm not saying that that's not appropriate I'm just saying let's just make sure when when Matt suggested we bring back other items to make sure that everything is ltfm eligible when we look at that I think the discussion is good though to look at all the options I mean I I I think it's fine to say here here's the ways we can and cannot Finance these projects yeah in my perspective if you

046know it's a discussion let's let's throw everything out out that in different ways we can do it I guess I'd rather not we just let's take a hard look at let's put everything all the needs and then assign to where the the buckets they qualify in the folks that do those estimates will also provide options there too which would be helpful I would like to see more estimates before our special meeting I didn't hear you Aon I would like to see more additional estimates before our special meeting so we have some comparison points and we might have to meet more than once then because I I think we have I think we have to find the Whittle the list down I don't I don't see the the the spending of money or the asking of

047someone to provide us estimates knowing that we can't afford to do these projects in the foreseeable future you I think we're better off off going through it all developing our priority list and then ask for a better estimate on those is my feeling prioritize which items and then look for estimates right and and then we're legitimately ready to move forward with those rather than overwhelmed with a whole list of new estimates that we aren't going to act on I don't know if we really gained a lot by getting those that energy put into that so how much is in our ltfm account now is it eight um you no no uh ltfm reserves are how how are we figuring the undesignated was the dollar amount the undesignated let me find my sheet and then I'll

048I'll be able to get close cuz at the referendum weren't we talking six million how did we come to that um yeah the ltfm right now uh you have 1.6 million annually we get 1.4 and you have to remember you spent 1.7 on the Prairie Elementary roof already so between the two I have to be able to fund that roof and then in capital we have about 875,000 in reserve so um when I pi and based on improving the capital outlay ltfm that's in there we're spending another 400,000 that so we're at 2.1 million so when you talk about what's left of ltfm the number dropped pretty quick and again the original plan was to do 1.1 million of the Prairie roof and it ended up at 1.7 so I can keep track of all

049this and keep it moving and I you have the action plan that lifts out a lot of items I've given you other documents with items um some might be considered wants but I would tell you most of them are needs at this point um there's not extravagant things in there so we can break that all out it's much the same as on this list the Orange is what is covered out of what you approved in capital outweigh tonight so we're making Headway that's the good news and we're addressing what's needed the bad news is there's just not this endless pot that exists out there and some of it there is $18.5 million in a signed account and for some projects you can utilize those dollars to accommodate addressing some of the needs example which is

050already approved it was approved year and a half ago is putting Turf on the middle school it's just I put that on hold it's sitting on hold because I wanted to make sure we address the priorities that you wanted to accomplish and maybe that is the priority did we have a motion in a second to do that the Middle School Turf oh yeah yeah that was quite a while ago yeah I kind of so it just when you were working on the referendum to do classroom additions and everything um I put it on hold at that time so I haven't done anything with it but more than likely to do some of this we're going to have to look at using some of that assigned general fund um depending on what you're going to do

051I can put numbers to different projects but you're accomplishing a lot of what I'll call needs by which you approved in capital LA tonight but there are a lot of other needs and everybody's view of what's needed the priority might be different depending on who you're talking to so going to back to what Matt said let's have a meeting that take a look at those needs next prioritize those needs correct Matt just my thought and then decide what you guys want to get estimates on to see what the cost is going to be and how we going to fund those projects is everybody kind of on that page okay with that or and again I'm going to tell you my goal is to be useful to you as a board and try and get some

052of this stuff as a board ready to move forward so it's not on Mr High Camp's plate when he comes so he's not overwhelmed because that could easily happen and I want to be of assistance to you guys and Mr Hamp not try and move any of these forward just because okay so everybody okay with the plan to reevaluate okay okay moving on reports superintendent report John yeah I'll try and be relatively quick and I'm not going to go through it but I gave you a fall survey summary that msba did and really IT addresses looking at the finances the um Property and Casualty Insurance and it example it talks about the decreases or increases that occurred um long and the short it's a lot of good information it was a really good survey conducted

053by msba and they provided a lot of good information so it is it's something I wanted to make sure you had a opportunity to look at and and it's for your information to look at the second item I wanted to address is um I testified last Thursday on a bill that Senator we put forth for roughly six distri I believe maybe seven in regards to the sales tax on materials for construction projects so in our case that would be the Intermediate School the Community Education facility um the new storage building the parking lot at the middle school um it has on here construction for the high school or remodeling so if you were to do something prior to 200 28 you would be eligible not to have to pay sales tax on that if this

054passes construction of a new Ice Arena that is actually a city project so that really doesn't qualify uh installation of turfield on the middle school which would qualify that's the materials demolition of West reconstruction of Trojan field was on there and then Improvement ments to The Learning Center gymnastics facility long in the short if we could collect on pretty much what we've done you're talking over $2 million of reimbursement that would occur um some of these projects aren't done so they would qualify when you did them as long as they're done before 2028 okay um so each of the districts testified um this is a real what I call um if gets approved and whatever by the legislature which there is history where they approved this for a couple schools already so I'm crossing my

055fingers it was laid over for further consideration so good news we'll see if the funding comes through those are two items I had okay instructional committee report Lor chairman can I ask a question of Mr languard first please yeah um if you could update us on the traffic situation by the middle school and uh um your thoughts on that I don't have um a lot of updates related to it other than I do know the county has County Commissioners did approve making that an always stop which I asked for probably 10 years ago um and multiple times since then and I'm pretty excited about the fact that it's an always stop um the only issue I have with it being an always stop now is they have three lanes go coming from East going west

056and that would be a little concern of mine but um anything at this point in my view is an improvement there a timing for that I don't know the timing I haven't had any communication from the county on it uh and we haven't had a city county school college meeting for a while thank you well ask one too then how about the ice arena have you heard is are supposed to get um city council supposed to get bids on doing the curent arena soon um they are working on getting estimate of what it cost to bring the old arena up to I I won't say new condition but much better condition and uh they're working on that they did not anticipate that they would have that till end of March maybe early April the 5

057million we have set aside would not apply if they just upgrade the ex they based on the school board's motion if they refurbish the old ice arena um you would not be committed to putting any money into that it was only for a new facility and I know we put a five-year timeline on that is there any wiggle room on that if they move forward with something that doesn't require that $5 million do we have to hold that 5 million for five years that's what I'm saying no matter what okay that would that was your commitment so I'd say yes okay any other questions for John 1.2 instructional committee Lori is gone um you're on it Eric you're I think we've covered everything yeah we've covered everything okay 1.3 operations Aaron you chair that yeah

058Matt Matt chair other thing Mr chairman was the uh uh discussions happening with the city of Worthington at evaluating potential ball fields soccer fields Etc and some progress being made on a a meeting time and trying to look at a a master plan that fits all programs and we cohesively work together everything else is good then oh yeah other than the weather okay other reports anybody got anything I just want to extend gratitude to um District leadership and administration for the statement to the public that was issued today um just upholding our commitments to fostering a safe and inclusive environment for all students um so thank you to the school district for um emphasizing the importance of this and I look forward to seeing the district carrying out these pillars of um education and inclusion

059okay anything else okay 7.0 other business this is where we moved the Southwest West Central Cooperative contract to um I had talked to John last week about moving this to the March operations and then a full board agenda item in March um I think there's still some more confusion so discussion clarification on this contract is what we're looking for right now so the Southwest service clop by March one we have to provide them um notice on if we are not going to utilize uh example uh a behavior Specialist or a psychologist we have to tell them they're under the same timelines as a school district for non renewal or Ula or termination so that's the deadline for notifying them if we're going to change our services in that contract the actual contract has to be

060backed by April 1st and so what happens is in the past we may have needed some more time or we may needed to shift say a part-time back to the service cop and they've worked with us in March there has never been a conversation of a penalty um they work with us really well and all districts in the service Co-op um we actually are looking to try and hire a couple positions and if we can get that then we could lessen the cost of the service Co-op contract likewise what's not in this contract and I have to talk with them is the health and safety Management Services um we have not utilized them we've used our own contract for with a company for a very long time the company ended here about a year and

061a half ago with no notice just disappeared on us and so now we are are using a company that's under the service quap contract which is at a lesser rate than their normal rate they charge and so we'll be adding that to this as well so this contract and that's part of the reason why I sent it to all of you is not 100% accurate um and I'm trying to work out those pieces of the puzzle right now and hopefully by March 1st I'll have some of that taken care of so that we can notify them if we are not going to use a service with them so uh a couple of those Services more than likely will be in the special education area if we can hire a couple people on our own um

062we did interview a speech pathologist today and they're working on setting up another speech pathologist interview as soon as we can get it accomplished um so potentially we would need minimal support from the service cop or no support so that could go away so we're still working on a couple of those pieces to get this finalized and with that then March will be fine to approve the final of the service clop contract and we'll get that taken care of but just so you know we're going to be talking with them about some of the potential changes so they're aware of that and it will be discussed at committee March correct questions about the contract okay 8.0 future business I know we've talked about a special meeting that maybe something in March April we would consider

063doing yeah I would yeah a special meeting or a work session work session I mean the difference is that with the special meeting we can vote on things and in a work session we can't right correct yeah and it may depend on how quick you want to move things forward or even Mr High Camp's availability um of being able to connect with him and so we'll see there would be an advantage of you just having a special meeting versus a work session but you we could do it either way yeah because you're going to want to vote on a few things that we're probably going to discuss yeah probably a few special meeting anybody else got anything for future business 9.0 adjournment we are adjourned for