Transcript

Verbatim source text

001aliance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for all standing up thank you all you got to sit out Jack yeah the first item on the the agenda tonight will be the approval of the consent agenda that includes the financials that were in your packet the converg technology bids for the Intermediate School cameras paging system and controlled access acceptance that total $272,450 7 uh the Intermediate School playground proposal as well as the proposals and movement of the other playground equipment toing $42,715 that would be equipment moving here from the Butterfield campus to spainhower um and reconditioning and replacing that equipment bringing it up to look new and to code um replacement of a playground set out

002here that's more age appropriate for the size of children that will be out here and then playground equipment that will be at the new Intermediate School uh as I said that total 42,70996 rate contract which is what we buy our servers and equipment maintenance on gives us a 80% and 90% uh discount rate on some of the equipment depending on what category we're purchasing it from also it's $117 300 excuse me $117,000 345 and then dedication plaques that would be at the new intermediate school and then also here at the Tom Butterfield uh central office side and then also on the school side therapy log in service contract and that will be all that would be a lot I move we accept did we do that we do it has been moved and accepted I'll

003second I think you page it's been moved by Mr Shephard and seconded by Miss Staley Mrs St all those in favor hi hior please say I any opposed AR OB staining some really good uh diagrams and pictures of the school equipment so uh once that gets up and out here I'm sure everybody will be great to see it uh moving along to the financials themselves uh December bills which toal 2,954 3368 and the other Financial reports which would are in our packet that also includes our payment to our construction company on the new construction for a little over $1 million so moved second it's been moved and second or any other questions or discrepancies with the billing all those in favor please say I I I you opposed staining uh next moving down to approve

004the minutes from our December 10th meeting it seems like that was so long ago so move second it's been moved by Mr Smith and seconded by Mr Shephard there any questions or revisions anyone saw to the December 10th minutes all those in favor then please say I any opposed abstaining um next we're looking to adopt the agenda for the remainder of the meeting um with no additions or Corrections so move m second I'll second AR been moved by Mr Lind and seconded by Mr Smith all those in favor of the agenda as printed and published I hi I opposed staining or accusing uh next public comments we have a large audience here this evening one of the two people in the audience will be speaking later so I'm going to move past public comments as

005I believe we have none I'm going down to reports then we will uh allow Miss Grace to move up to the podium to for her presentation on climate and culture um through our student population and also our community okay thank you for having me tonight feel weird speaking to an audience that isn't here so anyway um so we'll go through my presentation but what is coming down the table now is enrollment numbers as of January just so you can have an idea where we're at when we're talking climate and culture who took the survey who participated this kind of gives you an idea I hear you I'm sorry the paper coming down the table has enrollment numbers as of January um I just updated those just to give you a full picture of what our

006student population looks like before we dive into the climate and culture survey so the first page you see is strictly by building and by grade level the numbers and then just to kind of give you an idea where we've been through the year the second she that's in color looks at our enrollment numbers from September November and January and it's colorcoded by grade um I saw a slight drop in enrollment and you guys can see it on the sheet from September to January so just so you can see where we're at keep that in mind okay jumping into my presentation so we we sent out a Google form um to our parents our staff students and Community to look at climate and culture we were very fortunate to have 290 who responded and as you

007can see breaking it down um 28% were staff 15% were parents 56% were students and 12 community members responded so we asked our high school and middle school students to participate so if you have an elementary kiddo um they probably W aren't familiar with our survey because we did only ask our middle and high school students to participate so the first question on the survey addressed our voices heard and respected um 51% yes 41% sometimes and 8% no I'm just going to kind of read through it quickly because I feel bad to just be reading you guys graphs I know you had it ahead of time um school system provides climate and culture data reports periodic to all stakeholders so that's what we're doing tonight I'm speaking to it publicly that's why we are going

008through all of the questions and all of the slides so that information can be out there and accessible um this will be on the website with the survey data so that's available educator teams address positive classroom learning environment um this we had a 71% response rate of yes so that's good to hear um only 5% 5.2% were no slowly am I going too fast too slow that was that was good good number yeah that was a really good one um do we have a teacher evaluation model that aligns with teaching and learning to the district initiatives from our governance plan so basically how we're evaluating our teachers and looking for their impact on students does that line up with our CIP um we just got a new teacher evaluation system recently KN so we're working

009through that and we've got 59% that responded Yes how do you feel when you walk into our school buildings overwhelmingly it was positive most people said good or welcome um a few said scared and intimidated and those are always areas we can work to improve because we want everyone to feel welcome and I think um with our new buildings and signage that I've seen go up recently um it's easier if you're not familiar with the district to know where to go in and to be greeted other than finding the right door can sometimes be difficult in some of our older buildings do you feel safe in our buildings as reasonably as you could reason be from Intruders um 39% said yes 27% said no so we know that that's an area to continue to work

010on I know Mr rinky and Mr Pettit are constantly talking about that and then we have Mr wooding who's also been working on Safety and Security for us um do you think the school should consider armed security we had 49% say yes 19% say no which building in our district has the greatest need for improvement now that the old elementary buildings are closing so looking into the future knowing that Northwest Benton and Eastwood will all be closed um which buildings has the greatest need so Beaker overwhelmingly had the most with Marshall High School coming in second do feel that Administration and District practices are addressing bullying um we had 38% say yes and 36% say maybe so that's a great Foundation to BU to build on and I think that that's something that we can

011work by educating our students more what is bullying I know that that's something that um Stephanie vers Works through through b what does that actually mean how can we be preventative before we um put our students in situations that things might happen do you feel that principes and superintendents are available for calls emails and meetings 71% reported yes if MPS has stagger start times for bus driver shortages which school should start first so this we divided up between Elementary and secondary um Elementary had 63% of the vote so these questions the next few questions focused on staff so you'll see that there aren't as many respondents which building has the worst parking for staff um Beaker middle school has the worst parking and last staff as an employee would preschool and all day program benefit

012you or your children so we had 55% of respondents say yes and if an additional prek classroom were added next year with payment requirement of $330 or less how many children do you know that would be interested so 67 respondents knew two or more and one res 48 respondents knew of at least one child so I don't think if we are able to move forward with that if we would have any trouble filling that classroom I think we have a great need for child care in our preschool I mean we always have a waiting list here for our three year and four yearolds in the part Day program so I think the full day program would be highly sought after achiev um lastly we want to thank everyone for their feedback um we can't improve

013if we don't know where the community's concerns are where our students concerns are staff so we appreciate the feedback this is something that we'll continue to do annually and look at where we can be better and grow does anyone have questions for me yeah off the top of your head do you know what the attendence was last year what enrollment was compared to what it is this year what it is at this current moment it is slightly up I believe I don't know that I can give you the number off my phone like I have it in a Google drive but I don't know it off the top the specific number off the top of my head okay I was just curious as how it I can get that to Mr pedet and I'm sure

014he can share with you guys can you drill down into this data as to student responses or staff responses just to look at some of those different categories I think that I can yes because one of the first questions we asked on the survey was what is your role so I can disaggregate that by the Google sheet that it presented into yes I could I was just curious some of those are kind of Staff uh staff sled questions versus Community questions so uh just making sure our staff feels safe in our buildings or some of those other things would be interesting to look at in the future besides the overall data so that's what I was asking but thank you yeah okay thank you thank you you i' I'd like to say also how proud

015I am how overwhelmingly positive our surveys have become I mean there's still room for improvement of course but compared to what has gone on in the past they are above and beyond and I'm proud of that that's right sure Jack any other comments Mr Lind I didn't think about this a while ago and it just occurred to me again in one of the in our paying out our money we paid 314,000 I think to the company that's putting the stuff on the Windows oh the film yes and they've been working here and at high school and well yes we're finally getting something there so so Mr Lind is speaking about the Safety and Security upgrades uh the Windom films that were um able to be added on in this type of weather I was kind

016of surprised they were able to do some some work in uh the way it's been here in Missouri currently and the door projects have to be built so those will be later but I was surprised I actually asked Mr pet a few minutes ago like have we started on that so the way she swung that bad at the uh window I figured that company could do almost anything yeah last year we had 233 say that how many 3338 3 what 3 38 23 38 38 m thank you Grace the there any other questions before we move on on the agenda our comments next we'll go to Mr you be by minutes all right thank you all for uh Grace thank you for your presentation I appreciate it and the number she put together um and

017I'm going to recap that in just a moment briefly but before I do I want to note that uh our Board of Education had cards of thank you on your tables tonight and we have some cake for yourself and the large crowd that's present this evening to eat so those that are wishing they were here you're missing out on cake and I know you all don't love your picture taken but I appreciate very much that we're able to with Mona's help start getting these pictures and recognize what you all do there's a lot of long days the pay is0 it probably cost you money to be a board member and C cost you time so just thank you all very much for all that you do and have done to be a part of everything

018and we really appreciate you and it's appropriate to butter you up for a very long presentation because we have a lot to discuss before new board business tonight so thank you all of you genuinely going to start with some bad news first this evening and I know that that's a little bit small to read um but the long of the short is that uh really probably just about the same time as we're having this board meeting tonight Communications going out in various formats to parents and staff but there was a cyber security breach with one of the district's vendors I'm not going to read all that it's a little small but I'm going to get hit the highlights that that U third party service is called power school and it's it's actually one of our

019newer programs that we've recently acquired I think this is year two or three with it and uh it's where we keep track of student attendance student data and we have staff and employee data in there as well we were notified somewhere on or around January the 7th that they were breached and what we know right now is that um it's not as bad as it could be although it's always scary when you find out that your your information is out there there's a more in-depth explanation that's going to be available online if people need to call and this explanation doesn't answer their questions they can reach out to central office they can email but much of what we're sharing right now uh verbally through various communication forms tonight and posting on the website tonight as

020well is that the it's in a preliminary State um we wish we knew more but we just know that the reports indicate that we're our students Social Security numbers were absolutely not gotten a hold of in part because when we onboarded this new system we did not enter student Social Security numbers so that's a very fortunate thing had it been a previous student information system just because it was probably more thoroughly filled out because it had been around a while that may or may not have been true um so that's good news for our staff data we're not as clear there we're probably a little more concerned about our staff data uh we're not as certain about what for sure was or was not uh gotten a hold of there but the big thing that

021people breach your your software systems for is a way to get money and our student information system is not correlated to the way that people pay their bills so that is an optimistic thing as well we hope that if they do come up with anything that's concerning that they will provide some sort of a like a LifeLock type system to anybody that might have been negatively impacted and we will keep communicating through our website and the the formats that we did tonight to our to our staff and to our students families that's all I know at this time but I guess in short at this moment in time it seems that we've probably dodged the worst and we hope that it's going to be all really positive it's just too early to be certain so

022I wanted to get that word out you all have any questions about that no sir start with the bad news it can only get better right but not yet uh I want to talk a little bit about Christmas break snow days cold weather and old buildings uh again not going to read everything to you but I know that there's information out there I want to make sure that what's out there is accurate so first I want to talk about Benton Elementary uh Benton Elementary has had HVAC issues for some time I won't give you the long and drawn out history of that HVAC but I will tell you that we have spent over 100,00 on it in the last 3 years um trying to keep things working but we've had a unit that's completely gone

023down there that happened before break but when one unit's down your supplemental heat starts to concern you and your temperatures are as cold as they've been the last week or two so when we think about snow days we've also been thinking about Benton and how warm it will or won't be we have um for those who might say why don't you just fix it well 20 to $50,000 could fix it but it isn't certain to fix it and it's a lot more than that to just replace the unit and we all know that we're closing that building in a few months so it's a great example of why old buildings and not having a a rigid facilities operations plan can just become an absolute drain on your finances so we have added a supplemental heat

024unit just today we got that going it is quite the apparatus there's a picture on the next slide of what it looks like it looks like a spaceship or something but it's from the outside of the building it blows heat into the building we don't love it yet we've got to we've got to keep critiquing it so we got it hooked up and we shut it off at the end of the day today because it just it's stinky and and we thought maybe it's just like a new furnace that you turn on but it it's not reassuring us now we have sensors for you know carbon monoxide etc etc those aren't going off but we're going to have a technician come out and continue to critique the PSI the the how much fuel is getting

025to it from the natural gas but when it works it's going to heat that building really well on these really cold days um it's a few thousand dollar a month and it'll probably make the gas bill go way up are we renting it or did we purchase we rented it and it will go home when this is over and we'll say goodby to it and Benton in the spring um so we also have supplemental heaters in the rooms and I am just thankful for the teachers the principal Miss mopin who's a a seasoned leader they're being Troopers um and I know it's a pain in their neck too so I just wanted to share that BMS uh since the start of school the very first problem was the very first day of school at 7

026A.M we had a leak and that's related to our HVAC and plumbing that we've invested heavily in over the last four or five years and again you know this is just old buildings welcome to it uh people who have and love old homes like my wife and I know what a headache they always are but we had AB baited a couple of rooms that had flooded for those leaks at the beginning of the year over Christmas we had a couple other leaks that were related to Plumbing the maintenance department I want to thank them for all the snow removal all the heat supplemental heat late nights and Sunday work that they've been doing and they've also been laying carpet and getting those classrooms going over those snow days thank goodness we were in one of

027those rooms they the maintenance department were in one of those rooms laying the carpet and one of those pipes tried to start leaking again it was shut off the water supply was killed we really don't understand where the water is coming from but now we're capping the lines and shutting it down to absolutely ensure that it won't happen again but that is just old buildings and again for the community who wers sometimes why beaker's lacking you know uh prior to me beginning here but a good move a half a million dollars was put into that system that's still causing these issues and it's because modern systems and Century old buildings aren't just that easy uh they have problems so we're trying I just want to put that out there we're trying it's been it's been

028an ongoing process it is not perfect but we're getting by and everybody's being Troopers and we'll keep working to make it better any questions about that I think that's one thing you should have up on the wall tomorrow night yeah yeah abely yeah we will maybe we'll turn that thing back on if it's still stinky and see if yeah no it's a good point yeah as we tour at our open house I just want to recap very very briefly and there's your picture of that apparatus at Benton on the north side of the building it's it's uh it's like a industrial outside house furnace kind of looks like a torpedo heater but it functions more like a house furnace 600,000 BTU when we get it set right it will really put the heat in there

029which is hooked into our gas it's hooked into the natural gas yeah um so Mrs Durham had recapped on the climate and culture survey and talked about attendance Trends two things I want to say about that as she had also said you know part of our comprehensive School Improvement plan is that we will recap certain things and uh we do so much surveying with our community and staff and our students too we have become aware that they aren't always sure if we're telling them about our CIP so I just want to pause take a moment um and say this is our CIP and this is why we're recapping and I think if we don't occasionally stop and reflect we don't know why we're talking about what we're talking about um similar to that our attendance

030Trends are part of our CIP and looking at the data that was given to our board members tonight we can see that our numbers are better than they were preo a little better than they were last year so we've been trending upwards that's great when you look at the overall that is true and it's great when you look at our elementary grade levels and I say this for our staff particularly our elementary grade levels despite those facts are in fact smaller the overall increase has been at the high school level I'm speculating I'm not certain but you're surrounded by a lot of K8 schools that get to the high school level and they have to go somewhere that offers High School I would assume that impacts it among other things but this has implications for

031what attrition we can utilize how can we fill open positions with people we have when they come open as we're moving to the new Intermediate School grades three four and five there's going to be a lot of talk among principles teachers and in buildings in the weeks to come we've now transferred a officially tonight the last group of folks is getting transferred to that new school that includes nurses and some custodians now that we've got them all officially transferred we're going to look at with what opens and where it opens through the spring do we need to move anybody again do can we fill a spot with someone we have because it makes sense based on the numbers we have at that level um I think that's worthwhile to just recap W uh weighted average

032daily attendance first acronym of the night quiz later um last year we did a lot of movement at the end of the fiscal year in June we had gone back two prior years and adjusted uh water we had gone back two prior years at least two on transportation and made an additional uh increase to the amount allowable for a transfer and in all that movement and all that work we realized right about July 1st July 2nd that we didn't do the water transfer for uh 2023 so normally we would be doing this in June but we decided to wait until our part B came in and we had a couple adjustments to make anyway and that did come in so we're making that transfer now from fund one to fund four the maximum allowable for

033uh and I'm sorry that's FY 23 not fy2 24 uh from fund one to fund four this is the annual Maxim like I just said the new fund balance uh that adjusts that um reserve and that fund balance we now have in fund four four funds for the district that we spend our money out of and put it into we're at $7.1 million in fund four that's money that we can use for capital outlay for buying a uh heaters uh furnaces fixing leaks replacing carpet from leaks Etc so we've built that up pretty healthy but that's also where we make our payments for our spainhower project which pays off in 2030 and for the next 30 Years 29 years where we'll be making our payments for the new elementary school when you move to fund

034four it reduces your reserve because fund four is not reflected in your reserve so that's an exciting fact maybe the most exciting thing I've said to keep you with me tonight know but so when you if you remember that our Reserve was 32% approximately at the end of the fiscal year the reason that that's down is not because we're deficit spending it's because we just moved some money to an area it doesn't count but it's making us very healthy for any upcoming construction needs that we may have hint hint and wi win that's going to be a part of this discussion tonight uh our construction project is well Beyond 50% I don't know exact percentage where it is and its completion rate but it's beyond the halfway mark But the payments for construction is certainly

035right around the 50% not the same thing I want to make that clear we're Beyond 50% complete but we've got some big payments coming I would say in the months ahead and that's going to be part of what we need to talk about a whole lot tonight and a whole lot in February how much is left to pay on construction it's under budget I'm going to tell you and how much under budget are we certain and what big payments do we have in the next few years because we aren't a bank our job isn't to hold on that money and um count it and look at it and smile it's to spend it for our kids and our teachers and our education but fund four is one-time money it's money for construction so I'm setting

036the stage for what's to come now we're going to pinball through a lot of things we have some real estate stuff coming up um correct me if I say this wrong I'm going off memory Wednesday night tomorrow night the 15th at 5:30 Benton Elementary I believe is correct and uh we will have a community Forum that lasts one hour we are inviting the community to come out and uh give us feedback to the school and they can also scan QR codes if they cannot make it this has been in the newspaper I think it's on our website and I'm going to set it right there for the large crowd tonight to pass around um and they can go ahead and take surveys and say what they'd like to see happen with those buildings so that

037when I come to you in February with recommendations you know the communities wishes for anybody who's taken the survey or talk to us the immediate Next Step that we have to take then is what are we going to do with them and will it include selling them and I think it may well include selling at least something I'm referencing some board policy I won't read all of that to you but I am referencing it because it's important that we follow our policy on what is the appropriate way to sell that prop property and so for tonight in a first reading not in a no Motion in case we want to add more realators or anything to this discussion I have complied with the policy and I have brought you some agents uh contract agreements for

038what they would charge of commission uh they have offered details such as like they would offer uh us they would be willing to be an agent for us at said rate for up to three years I believe is one of them and those are things that next month once we decide what we're doing we have to decide who we're doing it with and I know it's only February but we really wouldn't want to wait one more minute or one more month to get moving because uh I don't want to I don't want to have to mow the grass at all those places this summer that's part of it I don't want to have to deal with whatever leaks whatever breaks and as soon as we are out of them it seems historically people will break

039into them and cause us trouble it would be better to get rid of them as soon as possible any questions about all that before we talk more about what we're required to do with Surplus them okay policy referenced on the left in case anyone in the public or board wants to read into it more deeply but the Surplus properties that we do have or potentially have and the board will need to advise me on that before tonight concludes Benton Eastwood even though we have made an agreement with the city with Eastwood we still need to follow the same parameters and when we make a motion to Surplus and do what we do with it we need to also make it officially so again with Eastwood we sort of really already have but I'd rather be

040redundant and make sure we're compliant than not Northwest this house we just bought east of Butterfield recently uh we could discuss whether or not we want to Surplus that now or later but at some point in time I believe we would be able to resell it put our same deed restrictions on it as it had before and pass it on to someone else and then the transportation department and I put that in parenthesis with a big question mark because we don't have to Surplus it tonight it might very well be premature it may be something that's not in the budget that's what we're going to talk about a lot tonight and next month but potentially in a perfect world we won't need it anymore and that will have a lot of efficiencies in how we

041operate um so that is that is a whole lot already any questions before I jump to another subject all right this one's going to wake you up this is a lot more fun we're going to play where are we in these images on the left hand side the left-and picture um there's there's a land Landmark on the left hand side of that picture that can tell you where I am it's all that's left of that Landmark is the Smoke Stack itself the rest of the Smoke Stack building is gone and on the right hand side of that picture is the new school the intermediate school so that's where we are Smoke Stack will come down soon enough I believe that I I'm not kidding I think they're bringing in a wrecking ball to hit that

042and knock it down it's the way that they're going to approach it and uh that'll be pretty neat kudos to the city for their completion of that thus far and uh all that they've done to get that completed for us timely now the direction of that road I that that car is sitting on the new road for the new intermediate school because it's going to have its own road that operates just like the street at spainhower the image on the right hand side you can see um you can see something in dark gray in the center of the page to the left of that dark gray is where the road is coming down to behind the new intermediate school and you can see the way the parking lot will take the car rider line behind

043the new Intermediate School I know that's a little hard to visualize it's the best that I was capable of um now what the dark image is is what we're going to talk about tonight which is the maintenance and shipping and receiving building I think that we've got this out there a lot that we've talked about it but you you really never know but it's getting to the point that we going to talk about it a whole lot more that is the proposed parking lot for the shipping receiving building there are two two building structures standing back there that look terrible right now they're not uh aesthetically pleasing at all and we left them standing when we were tearing things down because anytime you have that kind of square footage walls roof building Envelope as The

044Architects call it there's a lot of savings if you can repurpose it but it's not going to feel like a lot of savings when we start talking about numbers next that's how that shipping and receiving building currently looks that um that front of that building is facing that parking lot okay the gray blob in the middle of that right hand picture that's the front of that building facing where that parking lot would be so I'm literally standing in where that new parking lot would be that would go with that building that adds additional parking to um the intermediate school and since the middle school will have its sport events there we're going to have spainhower parking Intermediate School parking And this parking if this comes to fruition the survey just said we need more parking

045that ought to address it for the middle school which is where they said it was the worst The Proposal that we're going to talk about is that what if we did a little addition on the front of that building and in that addition would be some office space conference room Etc and I'll tell you in just a moment what would go inside it but first a pretty picture this is what it could look like to make it match the new school that is it with a new facade exterior and that is the new addition that's jutting out it looks like we're looking at the Intermediate School right but it was the request of us to The Architects that they try to make it match um I want to go back one more time and it

046didn't come through like I thought it would but on the left hand side of that picture there's a standing building over there to the left separate from the shipping and receiving building that's the maintenance building it's just a metal building on a concrete slab foundation so it has a full basement we want to skin them both out for lack of a better turn to have the same siding that matches to the intermediate school and then what would go in here is the next question right but first before we ask what's going to go in there what would it cost because it doesn't matter what goes in there if we can't afford it and it's not responsible and that's why we're talking about this tonight is can we afford it and is it responsible I gave

047the board members tonight in hard copy uh and electronically Mr ranky has shared uh all of this as well but they they have we asked them to put it into phases we we really want to keep the buildings because it saves US money we have it in our long range facility plan if you see LR uh FP that is that is our longrange facility plan that the board approved in June it's one of our top five priorities that we'd like those buildings to not look the way that they currently look when we open the new school but we can get the outside of that shell done maybe that's all we can do but this is a Time perhaps to do it uh the alternative was to pay money to tear it down or to repurpose

048it so a great opportunity before us but is it responsible so when we asked our architectural firm to make proposals for you we asked them to do so in phases there are five phases I'm only going to talk about three of them because I don't like how much it costs um so I'm going to talk about three of them and the reason I'm talking about three is I'm looking for is it in line with our comprehensive School Improvement plan is it in line with our long range facility plan and if it isn't I'm not going to go into detail about it tonight because that isn't the priority that you all set for the district the other thing is these are preliminary numbers we won't until tomorrow sit down at the table and say that's kind

049of like a Cadillac and we're looking for a Prius we want fuel mileage and efficiency this is the Cadillac version and there's things here that for lack of a better word are fat which we could trim and that's where we need to probably start this conversation because we can only afford so much and we want to do it responsibly but remind you now how much is in our fund for which was for Capital it's $7 million this doesn't cost 7 million so if that can give you any peace of mind we'll get to what it costs in just a moment phase one costs 1.2 million which is visible there that is structure and exterior cladding of the addition in other words that gets the structure looking good from the outside gets it enclosed dried in

050and makes it match match if nothing else were done inside that's 1.2 million just the one building that would do both and that is somewhere there or the next one okay questions about phase one existing maintenance there we are yeah existing maintenance bottom section top one would it be functional if we just completed phase one if you completed phase one it would be functional in this as a surplus building so we could put Furniture and Things in it from these buildings that were closing uh it wouldn't have the electricity complete it would include Ruffin like in other words the utilities would be inside it and the addition would be built so so we would have roughed in everything the buzzes will be parked outside it does not at this point and that's a very good

051point we're going to talk about more it does not at this point include the bus barn itself we had intended with immediate regrets already we had intended for the Bus Barn to be a separate phase that came later and now we're wondering if that shouldn't have been in this first phase and we're going to get into that here in just a moment actually um that's phase one I think it does align well at 1.2 million with our goals I'll also tell you our Surplus on construction I predict will be 1.5 million unspent for what was budgeted for the new school so phase one is Within Reach well what it seems what are you thinking you said this is the Cadillac of the thing what are you thinking that the shevy might do I think that

052the whole bundle of this these all five phases are the Cadillac I think three of the five are the Chevy and then I think that we can put cheaper tires and we don't need a stereo system things like that uh and I'll try to answer that even better in the next couple slides now we got the step I'm jumping intentionally to slide or I'm sorry to stage three three stage three is site work parking lot and drives so that image I showed you of an additional parking lot that would be to me part of the building envelope building package the Aesthetics uh it we need to we need to be ready for kids to come to school and we need that campus finished so that cost and parking lots always amaze me but I can

053almost count on it anymore $852,000 is your earth work your concrete your site concrete landscaping and irrigation Cadillac versus the Chevy we don't need irrigation uh it's there right now so maybe we can drive this down a little and the last one would be that I'm going to show you in this depth is Phase five phase five is uh more parking lot and drives why does that seem wrong oh I'm looking at two different screens sorry staff gy originally when we we talked about this we had a goal that related to our comprehensive School Improvement plan was that it would be amazing for for uh Recruitment and Retention of staff that we could have a 247 access facility and when we switched insurance companies last year they gave us money to invest in employee wellness

054and we really want to do that um so this is where we parked it the numbers came back on that at $500,000 it aligns with our CIP so I've included it but I'm not sure that we should have included it I think that it may now become Cadillac Chevy discussion we could find some other place for that employee gym that we already have perhaps so so these are the ones how much was the insurance thing I don't remember uh 40,000 in the first year and that'll fluctuate to some extent yeah not enough to make a dent in that yeah it would buy the equipment I I believe it would buy the equipment probably because on here they have gymnasium equipment at 30,000 so 40,000 would buy great gym equipment into that end you could take

05540,000 off of that but you know you're still $400 and some odd, thousand so perhaps it should have been something that was more in line with our longrange facility plan and and we were on the phone with architects today because that idea didn't pop into our brain as soon as it should have have you have you done any survey with the staff as to what kind of participation you might have in that kind of a thing we were talking about that today and I feel like in our first year of this climate and culture survey we did which I still have um but that question just came up with Mr ranky and myself today and we didn't go look and see if it was in there um but I'm pretty sure it was I just

056need to make sure I don't want to say it and be wrong I need to check that so let's talk about the let's break it down a little bit phase one and I'm I'm rounding numbers and I I always round up unless I'm talking about what I intend to uh make in revenue and then I round down but phase one 1.2 million it is a high priority on our long range facility plan phase two which I didn't show you would be to outfit the addition that means put in the cabinets the the desk the carpet the paint the drywall the electrical finishings Etc that's $1 million for them to finish it I didn't put it there because we've got a building traits program and it would be very well in line it would take a

057while but there's options like that bring it in house have our maintenance do some of it uh to the extent their schedule allows when it's not you know pipe burst season uh phase three the parking lot it is a high priority again on our longly plan phase four which I hadn't showed you um that is the the current part of that shipping and receiving building that they get it all finished off inside pain it put epoxy floors in it polish the concrete I don't think we need polished concrete it's already there we'll just sweep it and let's move on so I kept that out um the staff gym 58,000 it is a high priority again but the total of all of this Cadillac version is 4.4 million the aligned phases the parts of it that

058I can see a correlation to our goals is 2.5 2.5 we can start talking about some possibilities there that are responsible but we have even with our construction Surplus money that I need to verify and give you absolute assurances on which I'm going to do in February we have a $1 million deficit between that price tag and what I'm at this moment saying I'm pretty comfortable with I want to make absolutely certain that we're comfortable in how much we have left at the end of construction and we need to look about four years ahead on fund for expenditures what are our payments going to be out of that fund for how much of it we do we need to keep there we're not a bank but we've got bills in the years ahead we got

059to take into account the deficit on the 4.4 or the 2.5 uh the 2.5 good question yeah so when we when the school started getting built we had uh contingencies soft costs and allowances for all the things that could happen and we are past the typical point in time in a construction project where surprises happen like when you're digging in the ground and what you're going to find um we still have $1.5 million that we did not spend out of those contingencies um soft costs and allowances so let's break it down into action steps all a lot of that I already said I'm going to come to you in in February with a lot of hard numbers a lot of projections and I'm very thankful for Miss Durham who we have in this new position

060who's going to pull her hair out over everything I'm about to say but she'll do a wonderful job helping get this landed and then we're going to be meeting with our Architects with our construction manager at risk that starts tomorrow um driving those costs lower and the conversation will be based on input you all give me tonight uh there's also some soft costs that remain soft costs are things like a kiln for the art room now it's like $3,000 they're not all super expensive but we're going to get a total on and and we're going to make U assumptions high on what those remaining soft costs are and we're going to come to you with all of that in February and I'll probably be sharing it with you a lot sooner and calling you the

061other thing we have to consider is all of these schools that we mentioned were Surplus are we selling them or are we tearing them down because that's either money in or money out it's not going to be a lot of money in it's not going to build that it's not going to build that bus barn but uh it isn't a million dollars in tear down costs so we've got to consider that um everything else I think I've said but here's what I didn't say uh as I'm going to say it again I did say it we need to consider if the bus barn could be done maybe now because if if instead of that gym we had a TW Bay Bus Barn on that end that building is big enough to hold three 40ft buses

062into to end twice it's very big it's a long building so what we're considering is keep shipping and receiving on one side which is currently quite a small Building compared to the sort of square footage they're going to have maybe we should try to get the Architects to build in two bus Bays right now that'll be a disappointment we wanted four but we currently have two but they won't be as long as this one it'll actually fit the new buses um I think that that would be a strong and good consideration because then you can Surplus the bus barn you no longer have to have it you can sell it um I think that I think that's something that we're going to ask them to see if they can do but they're that you know

063a little late in the game to be asking but we we didn't think it was going to cost $4.4 million so questions that was a whole lot does that all make sense yeah okay we aren't deciding this tonight ideally well obviously one's got to be a priority some of it's got to be a priority because construction is ahead of SC and under budget three have to be a priority one and three do five is not as big a priority and even though this is the first time we're talking numbers this isn't the first time we've talked in Project scope as a board um just for those of you all listening at home so if you feel like it's like a brand new thing for you it it is probably for you hearing it it's brand

064new for us hearing numbers it's not brand new for us hearing the ideas so unfortunately five is the lowest of the things that I would agree and also unfortunately while you while I kind of showed you that not kind of I did I showed you the savings account for capital projects we've got to protect that for upcoming payments what if a roof goes completely bad what if next year it's one of our remaining schools what if it's Beaker that the heating system goes down on and it's a $500,000 fix we need to make sure we have the $500,000 so um yeah we're going to be responsible here I think this is where at the end of a project people are excited and they want to jump at continuing and I do too but I don't

065want to regret those decisions I don't want to have buyers remorse and so unless you tell me differently the way I think I I've got numbers and bullets I'm sorry uh I was last minute finishing this I that drives me crazy but item number one and when I'm done saying these please think about it and tell me if you want to adjust my thinking I believe it would help set your mind at ease if in February I come back to you with a report on all of our final construction costs and specifics on our Surplus construction dollars uh secondly I believe that I need to present to you fund four projections probably as much as the next four years because for the next four years we have a payment both on spainhower and the new

066school after four years we don't have spainhower that drops a million dollars off of that obligation so let's project for four years and make sure that we're thinking about how much will that water transfer that just happened tonight be in the upcoming years and how much will those payments be I'll present all of that to you I'm also going to ask Insight design studio and NAB Holz to come here and present in person on these ideas and then I'm going to ask you all number four not a bullet point to decide if we will or will not commit to phase 1 three or five I do believe we need to decide on at least phase one in February because they are scheduling their construction and it's either going to be time to load the dozers

067and go home or take the dozers and start the next project they are ahead of schedule and under budget which is a great problem but unfortunately it doesn't give us the benefit of time as uh Mr Jake said though this has been our longrange facility plan our discussions since long before June but June was when we made it official that this was a goal uh and lastly explore an alternative to number five um which would be instead of a staff gym maybe now is the time to add the Bays the for the bus barn put them inside that building under that roof and we don't need to build something later and we're ready to start talking about Surplus that property we'll also know how much we're going to be spending on Benton and Northwest whether

068we're talking about tear down or sell off which is going to affect the amount of free Capital we would have as well by that point that's and you're figuring and planning how much emphasis you put on the cost savings from trying to keep these old schools going how much do we gain there as far expensive that's all going to Beaker now so Mr lind's question is excellent because you know when we close Southeast and I'm going way back here in my memory branks but I believe that I made an estimation that it would save us operation costs I think I said it would be 500,000 uh in two years and we saved at least $500,000 in the very first year but to estimate what it cost to run a building a year ahead it's just

069I don't want to estimate and be wrong so to me that'll be a safe saing and if we don't calculate that savings and we assume Mr Lind and I have had a lot of conversations about this he says I I always project our revenues to be so low and I do but I you guys keep rehiring me that way so that's important to me um I I would rather not factor in what we might save and really focus in on these sort of items for the February goals to understand that but there is absolutely going to be significant Savings in our operations and in our staffing and there's been a lot of attrition just the attrition and our staffing levels alone have already been well over a million dollars also um so yes I do

070anticipate more my question would be on one and three yes sir I agree one and three are high priority so I have a kind of a suggestion for five um can we see what kind of Buy in we get from people that would use the gym and see where we're at there you know if nobody if everybody says it really doesn't matter to me then but maybe that that's a determining Factor that's absolutely we we can do that agree and I am adding what is decided next month in February there will be a recommendation it is a recommendation it's the board's decision I will make a recommendation to you based on community and staff and Forum input on those schools um I'll make some recommendations on what you might consider to do with them uh

071and then you'll have to make a decision on are we tearing them down or are we selling them or something in between and there'll probably be a little bit of all of that I'm sure we have three buildings to discuss so uh that that'll certainly play into it as well do we need to have a million dollars for tearing them all down or is there something that's going to make our community happy with us and what we choose to do that doesn't cost that much would um would it be a possib ability to pay for the membership at one of the gyms here in town for staff I will tell you for sure whe if it's possible and affordable or not I'm not sure with that $40,000 stien but it's good for local businesses uh

072can memberships 35 a month we could pay for 325 staff for 44 years or give them a discounted membership with a contribution absolutely a fair idea absolutely it's a really good idea huh yeah I mean that's 113 a year 44 a year 44 years we pay for their gym membership so and they that they assume the responsibility for the equipment to maintenance all that and the cleanliness I like that idea and then F which we could use hell of a lot more than we can a treadmill yeah and the staff can use what the facilities anyway right like they can you know don't go to the gym they can yes and no if they're not being used yeah that's the thing is if they're not being used so I don't think it's widely done because

073they don't want to be in there with the football players and and uh everything you know so um but to some extent some do yes certainly the track gets used quite a bit I think so that those are outstanding directions so if you think of more February is a little ways away uh I I from The public's perspective it might seem rushed but we've been we've been kind of after this for some time it's just time to land the plane now and that's why we did all that movement last June everything we could get into fund for because we didn't know how this construction would end but we knew we had these partial building standing there that we either had to tear down or take advantage of some some great square footage when's the last

074time we expanded the high school weight room uh I don't know but it needs it again well $40,000 how far would that go and then you got staff that's where I used to work and get you the gravel at certain I said no it's a good idea and that but that is as as we meet with the Architects and everybody tomorrow I'm going to find out some answers to a lot of things like with with these phases and I think any thinking outside the box you all have or Community input that you hear between now and before the next board packet comes your way would be amazing that is my report sorry for so much and thank you for your time yeah wow not tonight yeah not it appears Mr ped has rested his case

075for the evening so they're almost we will go back to some old business and a little chatting for me so uh the first thing that we have underneath old business is policy revisions um this is just going to be a second reading There are 16 different policies in your packet uh please send any comments thoughts or changes that you have on those policies in um candidates that filed for the April 2025 election um for some reason uh there was no one who chose to run against uh Mr Shepard and Mr Carol uh so there will not need to be an election in uh April of 2025 as there are two candidates for two vacant seats um and Mr petett tells me that keeps $10,000 in the bank because of filing and uh running an election

076so um everyone must be well pleased or too busy to assume these uh heavily paid for and sought after roles currently uh the next thing is the student I thought we were get a big pay raise that's why I was gonna ask where my WT was didn't you think we get Mr Jake said it's double your salary so I'm going to budget it in thank you that is where we were going so uh student services director is the next thing we do need a motion on this um this is a a position a newly created position that will uh help with 504s test coordination um help with our counselors there's also a part part of our U media our um um help me if I'm losing this marketing plan website management that is rolled into

077it um and this is a uh professional position that will be working completely across the entire district and with um all facets of principles and counselors and parents um across the district as well so this will be a large responsibility for somebody to be able to have I'll make a motion we open that this I second that it's been motion by Mr Smith and seconded by Mr Shephard does anyone have any questions about the position uh before we vote on it or any other comments call a question all those in favor of creating the student services director position is outline please say I I I oppose same sign uh next we'll be looking to uh approve the bid to move the playground equipment from Butterfield to spainhower I feel like we did that in the

078consent agenda but I guess for uh making sure that we have that correct um we will do that uh that bed to move the playground equipment from Butterfield Early Childhood to spainhower I believe was around $47,000 I believe it was 20,000 to remove it and then 20,000 to recondition it and to have it all up to code move second it's been moved and seconded by Mr Carol and someone over here to my right at the same time time Mr shepher whoever Jack and Harry all right this has been recognized by the secretary all those in favor of moving the playground equipment he opposed I'm staining um and then approved bid to install the playground equipment at Butterfield Early Childhood campus and I don't have that number in front of me anymore um I can look

079it up but I believe it was right at 100,000 if I remember correctly it was like 108 109 so moved second and when you see that the contract in your consent agenda was 400,000 that's because it's also including the playground stuff for the new school which You' already approved separately which be for the three grades question all those in favor of uh installing the playground equipment at Butterfield is outline please say I I any opposed understanding thank you next we're going to go down to new business uh Mr ped outline that we need need to uh a transfer from fisical year 23 uh a water transfer of 1,668 156 from fund one to fund two I'm sorry that should be fund four I was going to say I thought it was fund four we were

080moving it to it's four GL you call CU we'd have to move it twice now yes it is four sorry it was two in my it was two in my packet but it was four on the board and where it needs to be because it going to go to our capital projects fund which is fund four fund two is our teachers uh salary fund after years that does not mean we are not paying teachers I just I make a motion we transfer the funds from fund one to the amended fund we had that fun two and then F call a question it has been moved and seconded to move the transfer of slightly over a million dollars from fund one to fund four all those in favor please say I I hi any opposed or

081abstaining um next uh by policy we need to declare Benton Eastwood and Northwest buildings as Surplus to the district um after this school year I gladly make that motion second it was unanimous on the uh motions so we will see who got those in the minutes when we review those all those in favor of uh Surplus the three Elementary buildings as outline please say I hi anyone opposed or abstaining thank you um the next one is going to be informational as Mr ped had outlined the community forum is going to be tomorrow night at Benton at and then at Northwest uh the following night which would be Thursday and that will be at 5:30 p.m. both nights um and run for an hour I believe Insight design will be uh coming with us as well

082to uh give some outlines potentially and also to help collect some of the survey data and the next uh thing is a motion to create a crossing guard position at the Northwest Campus and that is just going to be at the new Intermediate School area and I'm assuming that will be on uh the Lincoln area and that would be Lincoln and Slater yeah yes sir that is correct and that will mean we'll have two there next year I know a lot of I keep hearing from the community I think you all have two how you going to handle that traffic it's going to take two crossing guards so we're prepping for it now yeah I move second okay it's been moved and seconded all those in favor of adding a position for safety please say

083I I all those opposed abstaining 30 for closed um next I will go down to First reading of shipping and receiving and maintenance buildings um that's the information that you had from Mr Pettit and also that he went over um we will be discussing and getting some greater information and also a first reading of realator service contracts which were also in your pack packet uh we had two uh Realtors uh give uh percentages that they would charge on sale and some terms that they would uh do to work with us if there are any other Realtors interested um and that would not have a conflict uh please feel free to reach out to the central office administration uh to discuss those items with them if there is no other information before the board tonight oh

084there are some cookies I understand from the elementary schools for the board as well so for those of us who are not diabetics yet we're well on our way we appreciate all the sweets that uh you all have uh presented with us and um hopefully uh everyone can stay warm and we can continue business as usual I Mo we move the executive session before we go that far Mr lens yes sir I have a question we are now halfway through our year six mon gone by we year we have not reviewed the budget each category should be at approximately 50% of our income and 50% of our expenses true and I recognize that some may be two weeks this side or some two weeks that side and so forth is there a report in our

085magic new system that would generate something like that for us to review you're referencing to see the funds money in money out in comparison one to the other I think what he's looking at probably is you're talking about budget lines and actual not complete actualization but expenses versus budgeted yeah is what he's talking about an income versus we can print by fund money we yes we can do that is there some I thought maybe there magic new programming that there might be something I I think for some of that like when we move money tonight when we talk about where we are with our funds our expenditures and our budgeted though we haven't looked at it by fund that's how I viewed uh some of our finan discussions uh one was in October uh kind

086of a quarterly thing and this being January I've kind of considered another quarterly thing but it was water I know that's a little unusual but we can make the next quarterly thing a buy fund comparison let's you see it that way as a board if you'd like does that sound like what you mean yeah we can do that Grace knows where to click important that we look at the budget as we go along we prepare a budget if you don't look at it you might as well not prepare a budget sure I have a motion thank yes sir you do to move to close session is there a second on that second it is moved and seconded to go to close session uh Mr Carol hi Mr L M green Mr Smith hi Mrs Staley

087hi I thank you we'll be moving to close session sorry