Verbatim source text

001to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for all feels so long since we've been together wow uh any additions or deletions to the agenda no additions or deletion very good and no public comment Miss Andy very good all right before we go into discussion item one I'm going to go ahead and pass it over to superintendent Anam um president kudi um the reason why we're here uh talking about the capital Improvement project is because if you recall as a board on December 9th we gave you some overview and in terms of things to think about and also certain options we had a total of five options and you took some off the table but in addition

002you asked us to come back and to consider the following as well um you said you wanted to hear more in terms of the reconfiguration proposals and the rationale specifically focusing on the instructional pieces of that you also asked us to look at Transportation impact and so we did that our uh Director of Business and um Finance spoke with the transportation department and also have some of that information added to the December 9th for you and in addition you also asked us to really talk a little bit about what are thoughts regarding a District administration building because as we know we are rent in space we are leas in space and our contract will expire within 5 years and we wanted to give you some ideas of what we were thinking about depending on the

003decision that you would be making and I like the fact that you asked us to come back and give you another overview with those auditions because what we found out after that conversation is that there was an additional 2022 study that was already done that the board also looked at so it gave my myself and our director of business and finance an opportunity to look and review some of the conversation that took place at this table already back in 2022 and to take a look at the original proposals that were done so we want to let you know that we took all of that into consideration and so she will uh do some recap of that 2022 because some members of this board was not at the table in 2022 that way they can have

004a holistic picture but also throughout the presentation we are recap some of the December 9th for those who are watching and probably didn't see the previous but also making sure that we answer some of those questions and those three prongs that you wanted us to um address so with that being said that's a general recap of the December 9th I will pass the Baton on to my wonderful Cabinet member Dr Georgia Gonzalez evening everyone so as superintendent Anam had mentioned we did take a look at the redistricting study that was done from 2022 some of the main pieces that I pulled out of that report included that the target class sizes were going to be between 21 and 24 students the educational delivery was going to be more along the lines of what the state

005is now requiring which is play based learning for prek through 3rd Project based learning for 4th through 12th would include our connected community schools would have health and wellness supported learning programs and enhanced specials within the building additionally we would have program spaces that would include grade level classrooms our specials which include art music a library media center in fed would include supported learning in our self-contained classrooms health and wellness administrative and operations spaces maker space and steam learning Labs as well as Commons and multi-purpose rooms Outdoor Learning spaces such as potential Gardens literacy and book rooms school-based clinics and additional storage from there we looked at what the actual config configuration at that time looked like they were looking at having 5K through fourth grade elementary spaces that would include what we currently have

006is Stokes Gort joy and KF and Stadium support would be added as an additional K4 building in addition to that they were looking at two five through sixth grade intermediate schools which would be at the current buildings of denty and Bellamy and we would have one Peak Hay Elementary which would be what is currently Ridge Mills after looking further at our um minutes and so forth for the Board of Education we determined that on August 8th of 2022 the board did Implement and approve a K4 5678 School configur duration that's what they wanted yep that's what they voted on and approved so I just took a couple Pages out of that report I'm not going to spend a lot of time on these but I wanted to make sure that we had it in our

007documentation so that as we continue to move forward we can always look back and see what we've had um in play in the past so this just shows the square footage comparison chart of each of the buildings this was the comparison by schools for the deficiencies within those buildings currently and what we would need to add in order to have the spaces that we were looking at um in that prior summary and these are the spaces for each of those buildings and what they would be looked like at this time we're going to use these potentially as um uh designs for future implementation depending on which direction the Board of Education decides to go in this building is for the prek which is at Ridge Mills this was for for the cluff building which we

008were looking at as a uh grade K through fourth this is ganore grades K through 4 this was Stokes grades K through 4 this was Joy this was going to be denty grades five and six and this would be Bellamy this is two um spaces the one to the left is where the gymnasium is and the one to the right would be the two ends if you were looking at the building as a te and that would be Bell me for grades five and six from there I wanted to recap briefly what we went over on December 9th just so that we could refresh that in our memory um we did discuss that we had a uh flood at Staley which displaced roughly 800 students um the voters did approve a $34 million project back

009in May of 2024 out of that 34 million we also have 14 million currently that's going to be allocated to KF we are looking to complete a five-year Capital project that will be rolling so we're looking at not only what this project will look like but what future projects in the future such as the District Administrative Building we also know that currently we have um FEMA who would potentially provide us with up to 21 million after speaking with fiscal advisers they asked us to be conservative in that number for various reasons and asked us to use 15 million um in case we have to demolish daily um and for other possible contingencies that go into that so we've narrowed it down to about 15 million that they used um as we move forward for a

010capital uh funding source and as we mentioned we did offer five options which we narrowed down to three for tonight's discussion and sorry we wanted to look at these basic things as we move forward with tonight's presentation so we have um the elementary spaces that we want to look at the reconfiguration ultimately we're going to make a decision about whether we want it to be K through sixth grade or whether we're looking at a pk3 option we also know that we're going to renovate and add facilities to one of the locations that we've typ uh currently talked about for tonight we're looking at adding an additional 40 or 50 classrooms which would give a space of over 1200 students within that location and ultimately one of the decisions that have to be decided is whether

011it's going to be an intermediate school or an elementary building just real quick on the so the design that the Consultants did which I cannot remember their name right now John uh the prior consultant um just to make sure everyone knows those were all designs based on their recommendation of what a K4 56 could look like the board approved the actual configuration of K4 56256 we never approved anything from a layout perspectiv absolutely just because it was hinging on FEMA and then that would lead us to building a new building or renovation so I just want to make sure it's clear that the only thing we approved when we approved that was the actual configuration uh K4 256 configuration yep absolutely and I only have them in there so that um as we continue through

012the process if it's something that we want to look at without having to redesign everything we have that option if not we can start over perfect so one of the um things that we wanted to consider tonight after speaking to fiscal advisers as you're looking through this presentation they provided me with a lot of numbers they wanted to make sure that the Board of Education knew that these are very rough numbers we base these on a zero tax impact to all of our taxpayers so when you look at the numbers this is going to be a worst case scenario I don't want you to think CU they're kind of Staggering when you look at the numbers um but they are representative of a a zero tax base with that um they did not include 1,00

013of the Baus that would be coming from Staley because we're not sure at this point if we'll be able to use those throughout this process over the last several weeks we've actually found that the state still had Staley represented as a 79 building and therefore if we're going to uh build a new building that is for elementary whether it's k um 6 or whether it's PK to3 we're not sure that they will allow us to move those Baus to that location so we wanted to again go worst case scenario without these Baus included um they also wanted us to know that based on this information the earliest that we'd be able to do anything with SED based on our current maximum cost allowances would be January of 2027 where then we could begin um the

014summer work and have fall complete of 2028 so that would be the earliest that we'd be looking at either of these buildings being uh completed what no we just recorded and we uploaded okay so the first building that we're going to look at is the cluff Intermediate School um again we discussed the cost last time at approximately 73 million um and we still approximate that it would be 42 months in order to complete once we looked at this with fiscal advisors we determined that we would need roughly a 53 million capital reserve in order to do this with zero tax impact there's several Pros to this which would include that we would be able to move forward with the current state standards which is the PK to3 and the 46 curriculum and we would have

015potential cost Savings of consolidating Staffing there are several um cons at this point um after discussing with Transportation um we would have to add six buses because we would be transporting from the entire District not just a regional location of approximately 300,000 and we would also have approximately 450,000 in uh meance and operational cost of a new building one question on that the 320 2 4,000 is that before we get Aid that's before Aid yeah yeah because that changes from year to year and since this would not be completed for a couple more years again we wanted to give worst case scenarios so I have a question on that slide as well yes um so why does the building well it says follow state standards of pk3 to 46 curriculum why does the curriculum matter

016what building what the building looks like I mean isn't the curriculum I would think that's separate than what a building looks like like sure um I can defer that a little bit to our assistant superintendent for curriculum and instruction John so in a in uh answering your question uh for the pk3 and the 4th through six curriculum you are correct the way that the curriculum is as it is uh with the state the building right now currently what we're doing is the K through six those curriculums are are being taught in the schools when you actually have it into these um configurations it also takes into play um when you're doing professional development in that vertical and horizontal alignment it allows you to be able to be very building specific when they are in these

017Arrangements um when you go k6 it's a little bit uh different when you're doing the planning and trying to get that common planning across the curriculums of a large building um so one of those things that's a pro for that would be that vertical and that horizontal alignment would allow us to be able to address those specific needs per building uh when you're having specific um primary buildings and intermediate buildings so the state standards are the standards you are correct okay I'll just go uh the maintenance operation costs are 450 there must be some maintenance operational costs today I'm assuming for kuu so it so those costs would be an addition because of the additional correct because currently um we only have two custodial staff that are in here when you start talking 800 students

018instead of the 150 to 200 uh prek students that we have in here plus we're looking at um including another almost 20,000 square foot so square footage and the heating cost obviously will increase and um so after speaking to our facilities um and um maintenance um directors and staff that's what we've come up with for a number um intermediate schools cost a little bit more in General because there's a lot more movement of students from classroom to classroom versus those classrooms where a student would stay in a typical classroom except for specials so intermediate schools you'll notice that Trend through this they're going to be more expensive okay thanks M later on that question that you posed in terms of curriculum and instruction we have a piece that outlines that because some of the proposals

019I had at the table was if we're looking to build an elementary school building we need to reconfigure and make sure we put PK in an element buildings where the pk3 will focus on a foundational literacy like to begin to develop those foundational and mathematical skills and plus when an administrator is in a building that is focusing on pk3 it's much more intentional and we can make sure that once they leave to go then to the 46 then you build upon and strengthen those foundational skills that started early on but you will see that in a slide where we specifically talk about even all the way to 912 how we got to make sure that we building that pathway for every student and that pathway will start even at 46 where students will begin to

020explore their interests and so on and so forth so again making sure we're following State Standards but it's also good to have like a focus so that you can make sure that the foundational literacy skills are set in point because I've said this at the table before if kids are not reading by third grade you're they're going to struggle throughout their um the rest of their pk12 career so this is just a slide representing what our reconstruction or additions cost would be um as you can see uh by looking both at the left hand and the right hand side um we would be looking at approximately a 13 million versus a $36 million um reconstruction versus addition cost which is what comes up to the 53 million in total this is more just FYI but

021if you want more information on it please let me know and I can get that for you as well so then we also looked at KF as a k6 building and again we know that the price is going to be or the cost will be approximately 63 million with again roughly a 42 Monon timeline um but in this case when we work this out with fiscal advisers um we would see roughly a 29 or almost $30 million capital reserve versus the 53 million that we saw with the intermediate building this has to do with how many classrooms we would be adding and the types of classrooms that would be going into that space again one of the pros for this because it would be regionalized would be that we would have cost savings and Transportation

022uh we would have a reduction of approximately three buses which annually would be approximately 162,000 we would also be able to get all of our bus times for All Buses not just in the K region but in all of the elementary regions down to less than 1 hour again we would have operation costs of approximately 250 for maintenance and operations because we would have more students in the building and so forth sorry it just dawned on me um so both of these costs are renovating to either house intermediate or K through six neither of those would be the cost of moving the district office or would that keep the district office in cluff district office would not be inlu in either of those situations okay okay and we'll we'll have a little more discussion on

023that a little later in the presentation and again these are just the costs would be approximately 10 million in reconstruction and approximately 188 million in additions which is the difference in the cost when we're looking at the capital reserve U requirement because k6 would require a little bit different with Transportation whereas um a p A3 building would um have have all of our students uh I'm sorry an intermediate building would require us to redistrict with the entire district for transportation k6 would allow us to regionalize so this would be similar to what the transportation piece would look like and we could see that the bus riders on the left hand side would be um a lot less it's reduced from what the current rates are currently we also had a discussion briefly with um the

024assistant superintendent uh of uh instruction to determine what would be the maximum number of students for each of those buildings and that's how we were able to build that regionalization again we don't know um depending on how the the district decides they want to move this is just an estimate it's not set in stone I one question on this though so like you have gansor there with 380 as bus riders I thought the major majority of Gans for students were Walkers anyway this is with the anticipation that um superintendent insam had asked that potentially we have more of our students that are Walkers be able to ride the bus because of the winter months so if we were to reduce that space um in order to accommodate during the winter months okay so that is

025in bus riders as of I see what you're saying okay all right and's the so in these options um again it would be dependent upon the board of education but PK could be in these buildings which is part of what we've discussed or PK could end up being a separate building which was part of that original discussion in 2022 you have PK in these elementary schools and we don't get funding for busing for them right so does that mean they would all if you're in prek you're you have to walk or we wouldn't the cost of picking them up wouldn't be there because is that true so there's two ways to look at it so typically most schools that have PK that do have writers they just include them with the writers ship um which

026is what I would recommend to uh superintendent Anam then she can make that you know recommendation to you um especially if we're trying to get more students to come in we get funding for PK by how many students we actually have in here so if we have students that are not because of Transportation obviously we want to increase that participation in addition to that um when you include those numbers on your transportation piece they're not necessarily looking at how many of them are PK versus what are K through 12th grade they're looking at just how many riders you had on those specific days so we would be able to disparage that but at the same point we'd be able to include how many it's not going to require more bus numbers per se it depends

027on how we split that up but it would definitely allow us to get more students in here which ultimately would be better funding through the PK programs is an average like route per zone so like for example like the average route for all of our catchments are six routes for each elementary school so like if a Kinder or a prek class is 20ish people like really we're adding less than five potentially per route obviously you could have some kind of in the same routes but do we know that at all so if I understand your question we would have somewhere between five and nine buses for each of those catchman areas because of the number of students that are able to fit into each of those buildings we would be reducing you'd increase the number

028of buses in those katchman areas but You' reduce the number of students that are on each of those buses so that way we would have ridership of less than an hour okay does that answer your question yes okay any other questions I just that's not the recommendation it's just we want to give you the whole kitten Kaboodle you know where my recommendation stands PK 3s and 146 building but we want to give you all of the information in case I'm sorry could you repeat that 146 building is your recommendation yes okay and that is why we're saying if whatever we do whether it's RCS or um refurbishing clef we want to make sure we have enough space to accommodate the current 800 but also build enough to accommodate about 1,200 because our district will continue

029in my in my estimation continue to increase and not decrease so so in any of these options that we choose if it were to be cluff we would build this building out to house all grades four through four five and six correct so that um at fourth grade that's where all of our students no matter what building they're coming from Ridge Mill Gan ofo they become Rome City School District students rather than being attached to a specific Elementary School where sometimes they don't see themselves as Rome City Schools so the earlier that they can converge under one building the better we are Black Knights yeah yeah I think that makes sense I that was one of my questions I was going to have on in any of these options is okay well if you're deciding

030between prek 3 4 6 which schools are prek through 3 and which ones are 4 through six so that that helps clarify um and hopefully um help everybody make a decision tonight or as soon as possible on this thanks so you're just trying to give the information more as a whole than from what we just spoke about because last time we we did speak yes we talked about a few options correct and is where we were at y um with which I'm glad to hear all the information but I think you know we've gone through it so much yes you know I those there I'm just between a couple of options to hear more I don't know where everybody else is when I hear this I'm like wait what what is that and what so

031I know where we're moving forward not that I don't want to provide all the info but I feel like I I have that as we and and also understand that this is also for the community um because we're trying to do a recap of every everything that you we we talked about on December 9th and to incorporate some of the fiscal advisor um piece to it and in addition all of those other pieces that you had asked us about from transportation and so on and so forth so it feels like a recap for you but I think it was important that we do it again as a recap but also taking into consideration everything that you um asked us to do including talking to the fiscal advisers so another option was uh the location of

032Stadium support with that location we approximated uh 74 million for the buildout which would take approximately 42 months um in that we expect that it would be 68 million for a capital reserve from there we have some of the similar Pros that we had with an intermediate school atlu um we would have the addition of six buses of 324,000 and again uh 450,000 for maintenance and operation costs and this is the breakdown between reconstruction versus additions in this scenario the Reconstruction would only be approximately 3.5 million where we would be building additions to house those additional students of approximately 48 million with Stadium support the operational cost does that include the Stadium cost or we separated those out that would be separate okay and and then Stadium support as a k6 building again approximately 74

033million with 12 42 months um and approximately 56 million as a capital reserve we would have a reduction of 10 buses because there are a lot more walkers in that Regional area and we would still have bus ride times under 1 hour maintenance cost would be approximately 250,000 per year and the breakout between reconstruction and additions would be 3.5 versus is 36 million to get to the 56 this is what the um writers ship would look like in that area and again you can see the bus rider numbers on the le- hand side and compare that to what we have for cloth for the k6 building again we're not necessarily recommending this but we want to be able to provide that information to you then we also have had the um possibility of RCs in

034that we had approximately 59 million in costs with approximately 48 months to be able to build out in this scenario because of the additions of the Ada accessibility we are uh figuring roughly 64 million for Capital reserves that would be required again the same pros of uh State Standards between a pk3 and a 46 curriculum and the savings uh by consolidating staff we would have to add seven buses in this scenario because again it's an intermediate school so we'd be looking to transport from the entire district and approximately 450,000 in maintenance and operation costs question on the last slide and maybe this Kelly is where you were headed one more back so like in this we have Bellamy Dy Gort janoy ridgill Stadium support Stokes what happens to KF in a stadium support k6 sure

035so again it depends on what the board of Education decides to do they can part of our conversations in the past have been that PK will actually go back into the K uh six buildings and be absorbed into those spaces where there's inclusivity if we decide not to do that and we decide to go back to the 2022 studies where we would have a space specifically for them then we would be looking at that as another program but we were really looking at having them included back into the other Elementary buildings okay and that depending on the regionalization of that you may have one Peak in one building you may have two in another building so forth and so on okay and plus if we remove upk and now we had CF clef could become

036the District administration building so all of those pieces so if we we decided that uh Stadium support was going to be in play and clef is no longer that could be the spot where we reconfigure to do the District administration building totally okay SL Operation Center because we need an operation Center and again this is what the breakout would look like with approximately 30 million in reconstruction and approximately 31 almost 32 million in additions then if we had Roman Catholic as a k6 building um again we'd have the 59 million for the cost 48 months in order to be complete and roughly 30 million for the capital reserve with a reduction of seven buses with um almost 378,000 in savings and bus ridership would be under 1 hour with 250,000 in maintenance operation costs this

037would break down between reconstruction and additions of 26 million to that of a little over 2 million again we would have the additional cost of purchasing that space as well and this is what that ridership would look like for um a k6 with a uh regionalization that they had set up again depending on what we decide uh in terms of catchment areas this may change so we wanted to show you briefly what we currently have in place which is the case six configuration um by moving into a k6 configuration in any of those buildings we would have a reduction in class size which means that then we'd be able to add some of our art music classrooms for the um pk3 versus is the 46 intermediate configuration which is what we're proposing you would see

038not only a reduction in class size in addition to the art music classrooms but we'd also be able to see a fourth grade Orchestra and band um operation which currently we don't have and we'd also be able to see the four6 departmentalization and content areas which prepares them for the Middle School um then you would also see the PK I'm sorry P3 learning Continuum in the literacy best practices at this time I'm going to pass the Baton over to our assistant superintendent to be able to discuss more of the curriculum instruction pieces one question first so um with that first slide from that 2022 study I think it said uh the goal was 21 to 24 students per class I think so is that no matter which option we pick is that the class size

039that is still the goal because I know that's been a Hot Topic um class that's still our goal yes okay yep and then okay so for curriculum and instruction um in the configurations that we have the proposed primary and the intermediate uh it's in alignment with our District's commitment to rigor and Excellence the proposed configurations will prioritize the following expectations so we do the pk3 primary level this curriculum is focusing at the level at this level is to ensure that all students developed a strong foundational literacy and math skills within the child- centered supportive learning environments here we're going to continue to actually focus on the big six literacy pillars so we're going to continue to uh focusing on fluency comprehension oral language pheic awareness phonics and vocabulary we do that as well now but

040I just want to emphasize that we will continue to do that as well in the prek uh primary level uh the 46 intermediate level very similar to how Staley was set up so that there was specific um interdisciplinary with the four cores we also had the departmentalization so the teachers were able to really hone in on that math and the ELA and the science um as well as the social studies so we'll continue to have a configuration that would look like that so the students at this level will be strengthening and building upon their essential literacy and math skills through integrated and also inter inter disciplinary learning experiences additionally students will begin exploring their interest and strengths to support their academic and personal growth we're continuing to work with our Partnerships with poly Sunni we're

041also um speaking with uh businesses on the base in inovar so that we can actually bring these things uh to our students and these opportunities sooner um with the New York State Regents deciding to go with these um Pathways these pathways are starting sooner so the sooner that we're able to um gauge our students interest and start letting them see these inter interdisciplinary learning experiences the sooner the better that we can do that to be in alignment with the new uh portrait of a graduate so that is the idea between those as well as emphasizing what superintendent anal uh mentioned when you have your school building leaders as well right now currently our school building leaders especially with some of our teachers our support staff enl teachers all of them have to know that k6

042spread of curriculum and that Focus for them especially when you're talking about enl especially when you're talking about these Support Services they have to be their knowledge has to be stretched across those seven grade levels this way when you're actually a PK 346 it makes that very very um honed in on specifics for those grade levels so enl now can look at K1 2 3 and they don't have to have that 456 so many of you if you don't um know some of our enl teachers are one in a building of 600 it's only one teacher um so those are some of the things that we are definitely going to gain with that also our principles when you're looking at all of the changes that we're having in curriculum and instruction and all the things

043that they need to know especially with the addition of the computer science standards especially with your seal and the new standards that we're having with the NextGen for all of these cores that we have they have to have this knowledge of all of those pieces when you do this now you are able to take those administrators and really let them hone in on primary that focus is on primary your whole entire staff focus is on primary all of your PD opportunities are on primary the coaches that you have come in are all primary and then as well as the intermediate having all of those students in one location to be able to have that horizontal and vertical alignment in one school building this also allows them to have that foundation so that when they're getting

044ready to go to stra and that changing of the classes and really starting to build up their confidence before they go into this trial and in seventh and eighth grade we know we have kids they get nervous about that changing in the locker so we're building those foundational skills and allowing them to be exposed to those Pathways and starting to form them from four grade so that as we go into the next section that we have when you're looking at 78 in the middle school right now that needs to make sure that we are continued to engage this is what we actually do now explore their interest and their strengths students will also have opportunities to begin exploring various Pathways um we're starting to int introduce a lot of those now and starting to pair

045up with some of our outside Partners to allow them to come in and really start looking at stem and bringing those programs in earlier not just on vacations and summer but starting to look at programs to start embedding them into their courses um and also to have access to the accelerated courses to start earning essential credits towards graduation this is the same we have algebra we have living environment we also have a business course that they're able to get um some credits right now and then in the 912 um what we see with them is they now are really starting to push those Pathways so for College and Career Success it's very important that our students are ready each student will complete a pathway aligned with their interest and strengths reflecting the districts as well

046as the state portrait of a graduate and the vision that we have so with the portrait of a graduate it's very specific to demonstrate Proficiency in each of the actual components so they need to become Innovative problem solvers they also have to have uh they have to be literate across the content areas they need cultural comp um competence social emotional competence effective communicators Global Citizens and we also want to make sure that they're critically thinking so this is the portrait of The Graduate if you are not aware we actually were just approved by the state for our Fine Arts pathway so that's going to be one of the graduation Pathways in addition to the ones that we're adding to now we also still have um we have uh brought we still have PC we have

047Propel um we were approved for the Arts Pathways we have seals of Civic Readiness and also the Seal of biliteracy uh and also our CTE component so we are well on our way of really making those Pathways but the point uh that I really want you to understand is that those Pathways just don't start in the high school that's why it's really important that we really start to get into the primary intermediate and then that middle school and high school mindset because these things have to be able to start at an earlier age and the 456 configuration will allow us to really diversify and start reaching our kids sooner so that that relevance and that pathway that they can start seeing themsel is starting to be paid earlier and not later high school it's too

048late okay any questions on curriculum or instruction okay I'm going to turn it right back over to Dr Gonzalez and the last task that you asked us to look at was actually what we would do with our District Administrative space so depending upon the decision that you make for our uh space considerations tonight um we be looking at if you chose KF as the building space then we would look at Stadium support Andor facilities the facilities building in order to convert that to a District administration and operations building if you chose to use Stadium support as that building space then we would be looking to change KF into a District Administrative space with Transportation facilities here so really um we have the spaces available we just need to make a decision on what we want

049to do in this phase one and then we can be and providing proposals on what that would look like for the district office um in administration spaces um as part of our next planning purpose one of the the biggest things on my mind and I don't think this is specific to curriculum instruction it maybe more Geared for you is you know we talked a lot about when uh the three of us did this previously about Transitions and the impact on child experience and I'm pining in my head these little fourth graders going into this massively large school how maybe can you give us a little picture of like what would a building layout look like so that these these little fish are not swallowed up in you know the big absolutely in a 456 building

050you have to create similar to how they do at the middle school right now they have color lockers and they have wings that specifically H certain grade levels and I would see that in a 456 so you would probably put the fourth grader of graders up front with a different color Locker it could be purple green whatever the school Community decide to do and then five uh grade five will have their own wing and grade six will also have their own wings um but then there's also the opportunity for fifth and sixth graders to be leaders to welcome the fourth graders at the same time so again building that leadership capacity in addition to focusing on the academics as well but I see that as wings and then is there like is there a plan

051in that where like you know I think it would be devastating for someone coming from one school to not have anyone that they know in these classes is there like in fourth grade like do you kind of cohort schools together to have familiar faces or is it really just lottery in what those classrooms would look like I would say once they leave the pk3 and come under the umbrella of a Fourth Grade that's where the transition is super crucial if you looked under a District priorities one of the things that I've asked the team to work on is a transition process even now um when students are leaving this uh PK building and going into any Elementary School um what I've asked the administrators and the the district administrators to do is to create a

052space or in a transition opportunity where even before school Clos to have them go into those buildings to get to meet staff to get to meet other students to feel acclimated and the same at each grade level so when you have sixth grade move into seventh I'm asking them to do activities where the sixth graders that get to experience what middle school feel like and look like so that they get that experience before the closure of school so what we're talking about is a transition and no matter what the configuration is it makes sense that students as they transition from one grade level to the next that they have a transition plan or when they transitioning from one building to another that we give them that experience of spending a day maybe half a day

053and that's where you can build student leaders to be a to welcome them and acclimate them into the building teaching them how to open a locker or do all of those things and and these are things that we should be doing right now it is part of our district priorities this year and I don't see that changing anything you'd like to add Jen or uh I just want to just echo on that when we actually do do the plan um one of the things too is you often can see that even with the fourth grade not to you know cause alarm but they wouldn't be changing classes right away with those they need to transition in into the building and things like that I you know foresee when we actually look at this potentially they

054would be having their single classrooms and then starting to have some of those Transitions and uh potentially some of those uh work together collaborations with the classes later on in the spring I don't want um people to get the wrong impression that the fourth graders are going to be changing classes and getting lockers right away yeah so hopefully that helps a little bit in addition to the comments that uh superintendent anal shared how many fourth grade classes do we have right now in our entire District uh so off the top of my head um just thinking about some of the buildings I will say in our district right now fourth grade is one of our um closed out capped grades across the district we don't have enough sections of them um so when we're looking

055at those for the most part there's anywhere from two in the smaller buildings um so up at Stokes they have two Johnny Joy has two um so the four Bellamy I believe has three and there might be a special ed our supported Learning Classroom um so seven at most I think we're looking at we have 12 across the district and we're short right now also when uh kids at elementary school go up to stra I mean it looks like that there's something a plan in place because it looks like they're with their friends so when they're on these teams right I mean they they don't go where there's nobody on their team from their school um however the teachers do it or however it's done it seems like it's intentional where buddies are together and

056that you're integrated with others um at least yeah I think there's a lot of car taken when students come up and they take a look at that now granted uh you know the number of teams that they have and we also made sure Equity wise that we offer all of the high school you know three sections of living environment and the three sections of algebra um honestly when I was here 10 years ago we didn't have a section for every single team so that that was like a biased with the team so that's been straightened out so that's even across the board so if you wanted to take those classes and one team didn't have it then that didn't exclude you from being on those teams with those other teachers so uh they're doing a

057really nice job but we want to enhance what we're doing um and add to it so the students will have an even um more uh their experience would be uh closer to what it's going to be like when they actually go into school and talking about actually doing a day where they don't just visit but they also go and they a buddy system uh with some of the students so that they Shadow them for the day those are some of the things that we are throwing around and looking for a transition plan uh in place for them to be able to do more than just go to the auditorium and hear about what's going to happen at stra that we do a really nice job but we want them to have a day in the

058life of a seventh or an eighth grader I just wondered um so like is a middle school traditionally now throughout like if you're building a new school right now would you make a middle school at like four to six or no um I mean what would be the configure is there is there an accepted it depends on the district everybody's different most mostly a lot of middle schools are 6 to8 um folks who have like a 78 configuration would call that a junior high school and so because here we just worked on stra not too long ago we figured do not touch stra and do not touch RFA let's really focus on the pk6 level and so that's why yeah but well uh I don't know how much I don't want to uh break up

059your presentation any further but um before we get into too many details about these options um I just want to see if you're just looking at cost Alone um there's quite a range here going from 59 million to 73 million how feasible is this how how do we come up with this funding how much uh I I just want to you know for my for my own knowledge and also for the community they'll be listening in where's this money coming from how are we going to afford all this you know especially it's very disappointing to hear on a side note that our 21 million from FEMA which was already disappointing is now down to 15 because we have to pay for potential Demolition and uh I wish there was more we could do on that

060front but um but yeah if you could just kind of give a general background on you know if no matter what option we choose how are we going to get to this uh large $73 million Mark sure so ultimately we be looking at what the capital reserve numbers are so you'll see that those are a lot less than that um Capital project number but they're still quite High um again those are used as um worst case scenarios so what we would be looking at over the next couple of years is building our budget our general fund budget to have that extra funding built in there so that we knew as a board that we were going to move a certain amount of that right into a capital reserve and have it planned that way so

061in the one case where there's 29 million that we need as a reserve we would start building that into the budget that we would be moving you know $3 or5 million from general fund into that Reserve each year for the next couple of years the additional piece is that we know that this is to keep a zero tax base so if we were okay with having the tax increase be 1 2 3% whatever the number may be that would reduce what we need to have in a capital reserve so those are all things that we would have to make a decision about as a team um as part of the Board of Education as we build the budgets over the next several years but that's how we would go about that's the process to do

062it um and how much we put into a reserve versus how much we put into a tax tax basis that will be a consideration for part of the finance committee that would be part of the considerations here at the Board of Education table okay so for if I if I wrote down correctly for the clu intermediate we had 53 million needed for capital reserve so we again would be starting to look at how quickly do we want to do this how much can we really pull from a general fund to put into a capital reserve um based on excess funds that we' have um in our general fund we could also start looking at options of Grants and so so forth there are things out there that we could look at this does not take

063into consideration the full amount of FEMA as you mentioned we might be able to get that a lot less for Demolition and so forth depending on where we go again we're using those as cost based that on what was given to us but we may have a buyer for daale for instance so that 3.5 would be money that we could use back from FEMA rather than demolition on that 2.5 was again just a rough number in case there's other uh contingencies out there but again that might be money that we can use from FEMA basically once we know what we want to do and what those numbers look like then we can begin putting a funding plan together um because it doesn't matter which plan we go with we're going to have to have reserves

064in place and we're going to have to put together a budget that we can stand by with the taxpayers um either as a 0% or as a increase um for several years to come to be able to fund those sources and uh I can't remember what the percentage of a increase in taxes equated to in dollars can you remind me what like a 1% increase sure so it really depends um on what area you are but without getting into too much of the nuts and bolts there approximately 1% ends up being uh between $ 15 and $20 in this District no I'm sorry a total uh how much would the district expect to see if we if we did get a 1% uh tax increase sure so um we have I'm trying to do the

065math in my head real quick um we have $157 million budget with approximately 35 million of that being from taxpayers so 1% is approximately 3.5 million okay thank you you're welcome what was the stadium support number two again I'm sorry the stadium so building on Stadium support the was 74 mhm okay yeah and then I can't remember I think it was 56 maybe for the capital reserve portion of that depending on which option you chose I think the the other question I have is obviously the state is not as wealthy as we once used to be and we see a lot less State eight and I think this district has seen enough times where we have done school closures so looking at kind of what we know going on at the state level like what

066is the level of risk in any of these options that require essentially a whole new building getting online sure um so again there's a couple things going on there um the state as long as we maintain our Baus will allow us to maintain the numbers that we have in in terms of state aid um I can't speak for what the state's going to do in the near future but based on conversations that I've been a part of over the last several years and I believe superintendent andam has as well um I don't want to say they're going to hold us harmless but as long as our numbers do not continue to decrease then we will not see a loss in state aid ultimately we know that over the next several years we're going to have

067to increase taxes whether we do it because of capital projects or otherwise and that would be part of the conversations that we start having in a finance committee and at the board um but right now I think we have to recognize that um we know we have a space issue and in order to maintain those students in our district and not have them go elsewhere for various reasons we're going to have to plan for that whether we have overcrowding in our classrooms which we currently have which from a state perspective is also not good or whether we build a building and then receive the building Aid on it which is separate from that foundational Aid that we get from the state um we know that we're going to receive part of that back so even

068though we're going to have um quite a bit that we put up front into our Reserve we will see that in the building Aid so there will not not be that continuous increase in cost later on again based on the capital reserve piece that we're talking about if we're going to have more of a tax bases that we pay on an annual basis then that Reserve amount will drastically decrease and once we have an idea of which building we want to go with then I can provide that to fiscal advisers and they can provide us with okay if you're going to have a 1% increase over the next 15 years this is what that would look like and what you would need in the capital reserve so then we can build our uh Five-Year Plan

069for our budget for our general fund thank you does that help okay um were there any other questions yeah I had a question so it sounds like there's a lot of different combinations here like you have the three buildings you have Rome Catholics Dum support and cluff and then you got the prek 3 the different configurations so you could for example have Rome Catholic be the one selected and it could be a k6 it could be a pk3 it could be a 46 and the same with all those other three buildings so it sounds like there's like a lot of different so there's really only six options and the three options are the three buildings which is RCS Stadium support and cloth and then either of those three options it's either k6 or it's a

07046 building so k6 I mean pk3 pk3 I'm sorry so like once the board decides on no we were doing a four six an intermediate and a pk6 option so it's just an elementary school which is similar to what you currently have in the district or it would be an intermediate school with a 46 configuration and that would be in any of those three options right okay so does that make does that make sense so it's really you're looking at three options in each of those two loc um I'm sorry two options in each of those three locations so that and that those was either k6 or what was the second one or or it's 46 46 so one of the new buildings would be a 46 or addition correct and then the so if

071we went with an intermediate school of 46 in the new location then all of our elementary buildings would become pk3 pk3 exactly right okay so whatever the new building is of the three that building will be the one and only for six correct if we go that world otherwise it'll be a okay thanks and that would be again let's be clear that's our proposal our proposal is to remove PK as a stand alone to move it into the the current existing Elementary buildings and turn those into grade level bands of pk3 and then whatever building we build should become the intermediate building where then the students are now transitioning together earlier at the fourth grade level rather than at the seventh grade level it sounded like from your comment earlier that so that your recommendation

072is this new model cor your recommendation is also cluff as the 46 building was that what I heard earlier or no that would be one of the the ones that I would encourage you to do for several reasons because we already have clef as part of the 2024 project that was voted on by the voters and as um Georgia had stated before uh the scope of that project was left um open so that if we wanted to do go that route we can add to it and make cleft become the intermediate schools we I know that you guys have a great interest in purchasing RCS which also makes sense to us however um we believed after are looking at the entire District that we have enough buildings in this District where if we were we're

073trying to get rid of two buildings so if we were to acquire another building is it necessary so those are the kind of things that we want you to think about where would the district office go well we would that's a good good question so let's say we use clef the district office could go to Stadium support or where currently around the area where the facilities department is is that on D Circle mhm I keep yeah where the there's a I don't know if you've ever seen that smaller brick building those are all land right we need to demolish that building and really use that space to build a District administration Operation Center so we can get rid of the facilities currently but we don't get any Aid on that because it's all non instructional

074that's correct that that would be that way with any District administration building that you build yeah no matter where you you have it so that is one benefit of if we went and I'm M neither here nor there but if we went with RCS we are going to get eight instructional eight on that building and kuuf is already here so we're not really incurring any additional renovation MH at the expense of taxpayers necessarily I mean obviously like the capital Improvement project was already approved for this building with the there' be some modifications to the aable unit in that but you would lose the a clo right because it's a District administration building no matter where you put the District administration building you get no Aid on it cuz it's not a school building I'm just

075thinking from a Community member it would be a lot harder to pay for an administration building in my that's my view y any other questions what other districts do for administration bases TI to transp okay so part of our plan is that if we're going to um make this the district building but we're going to include operations Transportation would be part of that so we would be able to receive Transportation Aid on it so we'd be moving away from the building Aid that you get on Baus and we'd be moving towards Transportation Aid that we'd receive entir different conversation entirely different different day yeah that is do we own the dart Circle property I believe so I would have to look into that I do not know the answer for sure believe so I believe

076so so assistant superintendent yeah I I don't have a question per se but um and I'm not sure if I'm ready to to make a determination on um the configurations yet but just looking at location space uh and geographically I think this location here kuuf and um Stadium support were more centrally located where RCS is a little bit further north so I think there are some advantages in those two spots unfortunately the cost is slightly higher um but I just wanted to share my thought on that and no action is being taken today next week you will you know I've thought a lot about this since the last time plus uh Cassie John and I have been through a lot um as far as you know a lot of plans a lot of different things

077the one thing that I'm sure about for myself is that right now I want everyone to think about if if your child you want to put your child in prek there's no busing so if you don't have a car or you can't walk here your child does not get to go to prek unless you can pay for it or they go somewhere else so it just seems like if we wanted to do anything spectacular we would take prek in the neighborhood schools and and I'm not I'm I'm way far from all these years a pre3 4 six but just knowing the last few years it just seems like the right thing to do that all kids in prek get the opportunity to go to school um and be busted or walk in their neighborhood schools

078that I I can say confidently I feel um whether it's Stadium support I could take Rome Catholic off the table I think nuron right I can't imagine us getting another building we already own buildings and don't know if we own buildings and uh we have to condense and be um intentional about it but the prek piece for me is I think that it's very important yeah and I can speak to that point as having a kid in prek in elementary now I I I agree wholeheartedly that there would certainly be an advantage there from a parent standpoint I believe to have pre uh along with the prek through3 program the busting aspect would be fabulous um and um my daughter would absolutely loved to be in the same school as her good so I guess

079um that kind of takes away my one uh that's a con to me would be the transition I think Cassie point on from three to four but I guess you're kind of removing one transition from prek to K so it's kind of a a trade-off in my mind so that helps ease it from my perspective but um yeah I love the idea of adding prek and and to all your points earlier about how it how it it would prepare the students even more so and uh and and help hopefully help the teachers out you know from just um keeping the kids progressing and keeping that communication Line open and the data that we've seen and that was presented a lot of times you know kindergarten teachers I've heard them say you know you don't know

080I mean there's brand new kids this way you you understand the families earlier and and it's really um a great way to to just know our community I had not thought about what Cassie brought up though about making this our um Administration build purchasing Rome Catholic and making this our administration building I mean to me that just brings one cost that we don't to think about then which is the where we going to put the administration building 5 years from now and centrally this is a great spot for that so I guess now that that has been brought up I certainly want to ponder that for a little bit but I certainly like the idea of a prek to three and 4 to six makes to me makes all the sense looking at what the

081changes are going to be coming forth forward and down just down the road and it's only 3 years away when they're talking about it so when we have to be in for it so I agree with k i I think this is I understand too about money and that's worrying at me how are we going to get there what's the plan but I want to think big pitcher first of what our district needs we had already talked about Stadium support it is in the middle of our city and it's a 456 and you talk about transition and think it's down the street within eyesight of our Junior High School it sits next to our stadium that we have right now that is kind of lost in our city it's just a a a place that

082sits in the middle of our city that we haven't paid enough attention to as a district I believe um so that's where I cuz I agree with you for this building too I don't want to leave I I don't I don't know if I could get behind building something for a district office and paying money for that but if we're going to do something let's try to do something great and and how are we going to get there and that's probably a new building that we had said before we were going to do except the difference was 5'6 right we already went through it now we are saying prek to 3 okay different you know different Wings how what is that going to look like and it sits in the middle of our our city

083with ey shot to our our Junior High that just makes sense one of the things that I know we've always talked about or you hear people in the community talk about is our our high school is way you know out the bossing that you know and so I think that that's something to really um think about is that site that when you go by it's just an open site right now I will I will share my leaning towards um I am fully on board with pk3 46 it's actually really exciting to me probably somewhat coming from a little bit of my background of project management having Project based learning is uh so exciting I love the thought of the orchestra the band I'd love to sneak some foreign language in there maybe who knows um

084but as far as kind of so I am fully supportive of that configuration why I am leaning towards kind of the purchase of RCs is I also see from a current issue to a longevity in my mind there's a world where like we can put sixth grade there first and we can eleviate some of the pressure and then we can renovate and get four or five in there so that could be a total pipe dream of mine but I feel like given that it's a standing building with classroom space there could be a phased renov a approach where we get some relief in our elementary buildings ahead of a full building roll out and I love that I mean there's so much land there as well that's a good point yeah let me ask now

085so the question is Georgia if we were to purchase RCS as Cassie is talking about like start with sixth grade and then transition into fourth fifth how long will that take cuz I think we looked at that too in terms of the number of years it doesn't matter where we whether we're adding on or acquire it I think if I recall correctly in our Capital Improvement project that it was going to take the same number of years it will and and I'll actually defer this a little bit to Nate because he could probably tell you from a construction manager perspective what that may change in terms of our timeline I think so the process that you have to work through I'll just the process that you have to work through of buying the building is

086what's going to add the time right so you can't renovate or approve to renovate what you don't own so you have to get voter approval to buy the building then make the purchase and then go to voter approval to make the renovations to the building so there's definitely an extra step in there with purchasing the the space which is the added complexity I don't recall what the purchase price or the asking prices of the building because that that's also something that we need to look into and then my second question is because I'm not from Rome you know I the only Stadium support like I see is when I've dropped my kid off for batting lessons for softball so I've only seen one small little area like how big is it really can it really

087house all those people or is it a bigger renovation those are my two questions and oh sorry and the dases have we still been in contact with the dases and are they still willing to work with us so the dases is still for um sale the property is still open um at this point in time um if I recall the cost was approximately 2 million that was the asking price at that time that's not to say that we can't potentially get it lower since it has been on the market for a period of time um in terms of the size and configuration if we were to move sixth grade into there we may be ble to move a portion of them if we can't move all of them at once um if I recall there's

088six classrooms I I think there might be six or or 10 classroom spaces that you'd be able to utilize in there um the question would be more about being able to make sure that they get the other pieces that they need such as special ed um and um fizzed and some of those things that come along with those pieces as well we might not be able to get all of those in there so it may be um you're you're kind of dicing it up a little bit um but there is the potential that we could do some additions on one spot one area of it and move one grade and then do the other additions while those students are in there that would be part of the planning process once we got to that point

089um but again that would really depend on how long it took us to get all those pieces through SED and then I know I know that we had previously said like for grade four you needed roughly 12 to 14 classrooms right nower especially as you look at the enrollments yes but that around the same number that we would need for sixth grade if we were to piece that in uh well so it's going to be some time um but currently to give you an idea right now we have about 16 uh just uh straight jened um sixth grade classrooms so when you add the rest of those you would need probably 21 classrooms to house that grade with all of the uh additional supports and then you guys just said there's roughly six to only

0906 10 classrooms that would be available now then so we would be less than half of what we would need to move the class over just the the from a timeline perspective the voters have already authorized you to spend money to Ren well right to do renovations right with the intention of it being cloth so you with Direction like if the board decides hey cloth is the building and we want to start to move in that direction there's already a bucket of money there that could start to phase in those renovations so from a timing perspective cloth may be the fastest right but understand we've made decisions based on the fastest before and you're trying to think long term so I'm not trying to talk you out of RCs I just we've already um we

091already have approval to sort of move in the direction of clock so it's just something to think about the other thing I will say is you really have that option with any of the buildings right MH with the exception of RCs and you can't build additions so the referendum language says improvements and renovations to all districtwide facilities so you could theoretically start the process at any of the district owned buildings as long as it's not additions with the 2024 Capital Improvement project that's something to think about as well and then um with the I like the thought of possibly transitioning a few over at a time to alleviate some of the space what would that look like for KF if we were to put people in here like timeline like obviously there's classrooms that are

092usable um and then same thing with Stadium support because again Stadium support I only know of the gym yeah it's not a it's not a school it was knocked down it's just a it's a gym over there so we talk about St and support build a new school okay for reconfiguration purposes because what we're really talking about with the pk3 and 46 reconfiguration it's probably best rather to do it pecem mail to just move forward renovate a building build it like we want it for an intermediate school and peel the layers because it's going to take us two years so once you make a decision and we start working with the construction team to build what you said you want the reality is the rest of us our team we have to start talking with

093all of the players in involve Transportation um you know Food Service uh instruction to really reconfigure the district and also give parents options right and so that's a two-year process is in it of itself while the building is being built so I rather do all a nothing at the same time um at first uh because the situation of the space issue was looking at us in the face I thought that we could acquire RCS right away and use it as School building once we found out that we couldn't and there's a lot of renovation and SD would not allow us to put students in there I moved away from that and I I really feel like if we're going to do this let's do it right and let's do it all at once and let's

094take the time to do it well so for me I I'll just say my my currently I agree with the PK through three that whole configuration but I also think that clu is the best option right now in my personal opinion yeah I just want to say um to your point I initially RCS seemed like well if there's an open school available in the area and we can get kids in there sooner than later let's do that but as it's come you know as Nate mentioned it could take some time to purchase it and then come to find out we need Renovations even to get any kids in there to start that kind of deterred me and I I think logistically it makes sense just to build what we need and transition all at once

095but yeah um I guess my next question is so I'm kind of in between K and Stadium support as Kelly mentioned uh samum supports an ey shot of uh stra um kuu is pretty close to um the high school right down the road and it's and they're both very centrally located or as close as you could get with what what options we have but um so how much space do the district offices need and I don't know how much land we have here and probably not enough at Stadium support but would it be feasible to if we're going to build this building can we build an extra office spaces I know it wouldn't be aidable through the transportation but is that even an option or or not really well what I started looking at is

096really the op I don't know if you guys have ever been to the facilities um office it it's Fallen apart right so the reality is we need a space not only for District administration but also for the Operation Center so I figure since that space is Fallen apart we can really knock down some of the buildings that we we have we own buildings on these lands that I mean they told me right now they're being used as storage space and honestly I think they need to be knocked down and and for us to build a a District administration SL Operation Center because if you've ever walked in that space it feels like it's about to fall apart and and so that's why it's like let let's do both of them together and let's have one

097building that can accommodate the operation folks and also all of the district folks yeah in the next 5 years within the next 5 years because that's when our lease expires does this building would this house the would it house everything that you're no I was hoping that we would build it around where the current facilities department is I passed by those buildings several times so I've posed a couple of questions and they told me that those buildings belong to us they're just sitting there and they we don't need to have them sitting there when we can get rid of them and use the land to build whatever we want and then once we build it we can get rid of the facilities um Nate you want to say something just from a without doing the

098Seeker analysis yeah when you talk Transportation Center that's the ideal location for that is dark circle mhm where you have easy access right to though that infrastructure if you go through seeker and you say we're going to run what how many of our buses through this neighborhood or the neighborhood at RCS Seeker is it's I don't know that it won't move forward but the environmental impact that's going to come out of that is not going to be favorable would be my opinion just sort of standing here today and again there um laella would do seeker and bound Council will participate in Seekers so they are the real experts but standing here today um I think you're going to have real challenges with with that for either of those either this or RCS yeah yeah I

099think that that definitely makes sense um what's our current Transportation location or is that what you're referring to as op facer the facility App Center that's where it's not too far from the high school you ever see where the buses are it's right across from UCP yeah you know if you've ever been to UCP so right there dark you turn into Dark Circle the facilities building is right there then there's another small building that we own it's a brick building where um the folks from trans um facilities they just store stuff in there and then there's the bus in okay so we would so from what you guys have collectively said we we could potentially build that in the future and use Transportation pable dollars it wouldn't just be out of pocket cool well that's

100one potential path forward that other districts do is you right because it all the if you think back to the earlier in the presentation with the building Aid unit slides right and the the cost there's no teaching spaces with any of that that's right so you have to figure out another Aid source to offset the cost and what a lot of districts do is they combine Transportation um transportation with operation and maintenance if you want a great example of a potential facility if you're ever um like in the balv area and you drive over um what is that West Entry Road um there's a brand new Transportation Operation Center um over there that is it's like state-of-the-art it's beautiful facility and all of their District Operations and transportation or hous in one location okay thanks

101I have um one more question it might be for like a different meeting but do we know the number of vacant buildings we have and what it's costing us to have all these buildings and what it's costing our taxpayers and that's a concern there are there are other options that we're going to talk about um not for public consumption at this point but and Stadium support is part of that as well okay so and then is are we done with RCS like is that off the table for us or if it's not because like if it's if it's not then I would want to know if that is an option of purchasing RCS then are we going to have an additional vacant building sitting around that's my other two cents so given time and I

102think conversation is anyone sitting at this table not in support of pk3 Intermediate Middle High School configuration and we knock that one off the list of having a decision I just wondered if there was some type of compromise it is so convenient with busting to have them all if there's a way to separate the building in two halves or get another principle or somehow to keep everybody together with families it just logistically I think it would be easier but I can see what you're saying I just wonder if there's a way to do it without building a separate if I were now yeah so you like the concept of configuration concept but I think it would be much the busing is the worst things for kids to go through and the less movement we have

103the better okay je the wind blows two pk3 PK are you yeah I'm somewhat on the fence like Jeff I I can see the advant manages both ways I um from our conversations a couple years ago you know like I mentioned earlier I was I'm I was against the transitioning I but I I I also see the advantages of it so I wouldn't I wouldn't necessarily be against it I guess what I'm saying if you had to vote on it what would your vote be didn't have to vote today just to prepare lean PK 346 configuration is that what you're saying yeah okay well what if you know just for conversation cuz we've already gone through this if you built another school and it was 56 could you fit PK if could you fit prek

104into those buildings and I only say that but because we've already done this and we already everyone had said okay five I mean let's go back we all had said and agreed on 56 at Stadium support that is where we ended if you look back where we ended the last time where we said if we had the money now we've already done the study we've talked to the teachers we've done 56 at Stadium support so I'm not in the goal is to reduce transition because here's here's what you're looking at if you want to do a pk4 you're talking about five years in a building and now students are transitioning for two years and then two years later they transition again to 78 and then two years again they transition to 912 it's too many

105transition less years she's saying it will be it would be what you want is a a pk3 with four years right PK I mean some PKS three I I started looking at four years old up but you were talking about kids who are three years old who can stay in that building until they reach third grade and then when they transition they spend a good solid three years at the intermediate level then they go to Middle School spend two years and then move up to 912 when you start thinking about a 56 intermediate and so on it that there's too many choppy transition at least in my mind and I think like the important piece of like the entire next gen curriculum you're going to leave the first year of essentially the second cohort in

106a building where the the style of learning is going to be completely different yeah I like a good three years four years set oh I'm for that you know the PK through three and I will use my daughter as an example my youngest is in fifth grade and the difference between honestly third grade to fourth grade is very different and like her maturity level was very different last year and it's even more different this year and she's maturing even more so I personally think from a mother's perspective and watching my daughter go through it now I think it makes sense to me and she also started they also started switching teachers a little bit last year in her own school to get that feeling and they're doing it you know this year as well and

107again it's a maturity thing I think and you know she loves to go visit the little kids and they use her to go visit the little kids and set the example and read books and stuff like that but again it's a maturity and growth thing for me I I am for it you the only the only thing that I seeing help in the last few years is the the leadership piece that it's one for all I think that's important it's so different everywhere even you talking about okay at my school we're switching and well at my school we don't switch or you know so that piece is is now I I think that's important um you that but I am 100% prek in schools that that is what I know um but I can get

108behind like John said I'm not but I I can get behind that because I think the prek piece is is imperative before anything else um so okay so next meeting you are sounds like we have a pretty majority that we are good on configuration so the two things you need for us next week are which building we're going to prioritize for a renovation yikes okay okay yeah does anyone need any additional information going into next week I think it would be good to have if it's the three choices the three choices the costs the right side by side by side yep because I think that's one slide yep boom done please you got it yeah I think that and specifically I think we had about the same dollar amount between um kuuf and Stadium support

109but there is 13 million um already set aside for this Capital so I can't so if you could just maybe you could even talk about now we bring it to the next meeting just how the difference would be between those two properties even though there's the same dollar amount because of that existing approved $13 million correct so when you're looking at it from a cost perspective kuuf will cost almost the same amount but you're going to split it into two buckets you're going to have a bucket of 2024 that cost money is already dedicated towards that the board and the voters have already approved and then you're going to have a separate bucket that will have to be approved at some point at a later date for the Remain the remainder amount um whereas if

110we were to do Stadium support that will be one bucket of 74 million that would have to be approved all at one time but but you can still move the 13 million that you had approved for this already over can't you to a different building yeah yeah um you can yes right so cost wise it's the same thing we we would just write that into the resolution so that it was known that that was already approved so that way you would be transparent with the the taxpayers I I would have to pull up the map I'm not sure off the top of my head I apologize oh we yeah and there's there's land back there that still belongs to us there's a playground that we have cuz remember upk is on that other side all

111you see is this part here for the District administration but there's we we went through every building and we did an assessment so yeah there's room for expansion at clef and that's why it came on the table as an option are there any other questions or is there any data that I can provide to you besides the one pager okay not that I know of in this moment but I'll let you know if I Doland Nate is there anything else that we're leaving out that you think you need to clarify maybe we've made a mistake on or you know you you know this District better than we do too so from a construction perspective no I just the more that you can sort of refine the options the Tighter and the better that information will

112be right I like fiscals numbers are very conservative at this point so I think this currency's on the right Point make the decision that's best sort of long-term big picture and then say this is the option that we want to go with and then give us that direction and then let us go dive deeper into the numbers and really refine things um cuz there's probably going to be more conversations about different options even with the option that you pick there's going to be have to be additional discussions yep can I ask one one further question though because Staley according to the state was still a 79 building does that have any ramifications going forward I mean is that something that's going to take a while for him to so once we have a decision we

113will go to the state and we'll have conversations with them about the Baus and what the placement is of those students we don't want to go to the state until we have a really refined idea of what we want to do so that way we can propose that to them and give them all of the data at one time and then they'll be able to provide us with an answer back um TimeWise it could take two or three months for them to make that decision but in the meantime we could still start that design process and start the voter authorizations and so forth because my only confusion is we had a building project for that when it was turned into a 56 building so how could they not then have done something then I mean

114that's my confusion it doesn't make any logical sense so so I can't speak for the state or what happens at that level and I was not here during that time but sometimes because you already have the Baus in place rather than going back through the evaluation and the analysis of that you would leave that in order to be able to receive the Aid on it so there's reasons that it probably was done but at this time if we're going to go to the state and ask them to move those B use we're going to have to be transparent with them provide them with all the data and make sure that we have a really good plan in place so that way when they're telling us yes or no or what we can do we had

115that with Fidelity and that's going back almost 20 years I think for that 7956 conversion yeah I thought so FIS fiscal mitigated that risk right because if you earlier in the presentation Miss gal said that they did not reallocate those 1100 Baus right so they they've presented sort of the absolute worst case scenario zero tax impact and they didn't reallocate Baus that's how they protected you from that so so once we have a decision and we're able to move forward with those things then we'll refine that we'll start having those conversations with the state we'll start having conversations about if we don't want to come up with the 20 M 29 million or whatever the number is in a reserve what would that look like maybe what do we have to have in a reserve

116instead what could us as a school district and a board of education be okay with so that's the piece that once we have an answer of the building and what we think is the beginning cost then we can kind of refine that and keep uh working with you to get to a better number okay I just thought of one more question that was a concern when we originally approved the 56 at Stadium support it was how much um space is the limiting space and how much parking would be available and how that would affect the stadium so you don't I don't know if you can answer the question now but the difference between I know there's a lot of land here clu behind this building and um Stadium support you're kind of locked in between

117a few streets so is there a significant difference as far as parking getting buses in and out um even here in the morning when you when there's 150 kids getting dropped off for prek it's it's a mad house down here on Bell Road um getting getting in and out for pickup so is there one that is there a difference or or one that would you would suggest being POS potentially better situation for the traffic flow and the parking and everything else that goes on with because that because I mean we were very concerned with 56 and now now we're talking about 456 so and how would the building even fit in that space so um I'm not going to suggest but um I think I think the again you're going to have to work through

118if you decide Stadium support you're going to have to work through Seeker um I think the intersection of turn road and um it comes in on an angle heads down cro croen thank you um I think that intersection could be a challenge like right so when there was a high school there that front Loop was there um but the transportation standards are much different now than when right there was a high school there so I think you're going to have to work through that intersection um and I also think those oneway streets coming into and out of um Stadium support could potentially pose a challenge that you're going to have to work through um um conceptually in my mind if you choose Stadium support it's likely that the area where the um shot put is

119the Outfield to the baseball field um that would make the most sense to expand parking um and so you're probably losing that area would be my guess just very conceptually standing here today answering that question there are probably other options where you could where you could um right you could build a addition in that direction and then Park along turn road but again you still got to think about the buses and how you're going to get the buses in and out of there which is probably the most significant challenge thanks and so we'll put all of the three comparisons on one pager for you and then you'll be all right all right well with that Monumental uh decision that we will make in a week thank you all for uh your attendance today and I'm

120going to make a motion to go into executive session to discuss matters regarding Collective negotiations and other matters made confidential by state or federal law move by Sue second by John all in favor any opposed we will not be returning to public session thank you all