001[Music] yeah but I have to show up what ready yes sir tell you something you ain't been Park you don't know how it is I'm the old man on the board here now tell 80 years old thanks okay John you ready you heard about Hank cell you ready ready okay Mr super you ready okay okay all right ladies and gentlemen we're going to begin in just a moment the um board work session um I'm going to ask Dr kensaw at this time if he would lead us in prayer and then the Pledge of Allegiance please please stand oh gracious Heavenly Father come give thanks Lord for all until another day we your blessings all the students the parents Administration and most of all these students Lord we ask you put a l and spirit in

002your heart we ask that you uh put blessing on those fres responders those men and women who keep it from all hurt on now we ask these Your da Jesus name amen allegiance to the flag of the United States of Amer and to the it stands one nation God indivisible with this uh November 18th 2024 board work session will come to order before we get started uh Mr aeson I I needed you to sit down a second I would like to recognize Mr Lonnie Parsons Mr Parson stand a second please he's going to be the board member that's going to be taking Mr harwell's Place coming up really soon glad to have you here today Mr Parson okay uh Mr superintendent any announcements from you before we get started sir no sir Mr Hatcher uh

003no sir none for me Miss McDade yes sir time I want ask BL family very good M Dr No Sir okay um before we start the work session we're going to have a brief uh presentation by tenac uh this is uh an issue uh that has come up before the board in tenative ways uh I went to a meeting back a few weeks ago and they presented what they're proposing to do and I asked them to come today to make a brief presentation and also give the board an opportunity to ask questions about it uh Brian would you stand up please do me the favor of introducing your staff again please Miss Phillips no we we're recording this so we you know technology is a wonderful thing when it work works you know technology is

004wonderful when it works here so I apologize for that well look use your coach's voice and go ahead and introduce yourself also storiesa so Ryan we're ready to hear what you have to say about Tes and what you're proposing to us and I will to be also answer questions inter being a little I will thank you um as I mention so I'll give a quick overview of Tas the company CCs in general and then the project more specifically and I think um first kind of the so we're developing a um where we're located basically between and west of highway3 Cal basically kind justway and what right we're doing our carbon storage project we're doing about four one acre well sites but this four one acre well sites we're actually getting the subsurface rights between 8,000

005and 12,000 people to about 16,000 we secur most of those rights today it's all a lot of the old trust PL a lot of plus acre Parcels as well but also while we're here right in the middle of the 16,000 ACR we're trying to put is a 653 school parel we would love to reach an agreement where we sign up like we have everyone else we pay a royalty structure we option the land successful based on the royalty structure theary estimates anywhere from the $300,000 a year Revenue royalties that one growing and that's a function of you got this 16000 School Board owns 4% of it that royalty 4% is numbers on so kind of jumping ahead just want to get to the why at the beginning but just a quick note so umasa like

006to say the largest company no one's ever heard of we' been around gas power plants but we follow the market so we've done a lot of wind FS solar fsor car [Music] years power mindful of time but one thing that we're seeing the market really needs now and this transcends presidential administrations this is a multi- deade project interational for them it means having a car solution and it's it's not just a it's not just a stick approach because a lot of these International companies that appearing mobile they can get a premium on their products if it's somehow and and so we're really here because companies in Mobile County want us here for a lot of new businesses it's a sighting criteria just like you need water rail gas you need a port now companies need

007a carbon solution and in Mobile we've had a lot of support locally because it's it's a differentiator mobile really comes together around Economic Development and it's for like a competitor City like Savannah they don't have the ability to do this so it's it's really a competitive Advantage for for mobile and we're here because all the industries want us here is is sort of the why and um we can keep going um so CO2 it's you know it it occurs naturally it's also a byproduct of industrial processes so power plants industrial facilities as part of their emissions they'll limit CO2 so what what we're proposing is basically it gets captured transported and to a storage site which is in Northern Mobile County and stored deep deep underground of the 8,000 to 12,000 ft below L ground

008um it's really hard to describe I mean it's 2 miles deep and this is kind of really a good diagram that shows um what it looks like and we can keep going because I want to speak about why why mobile specifically but this is what they look like the above ground impacts if you could go back right go back to the picture of the wellsite so when we're talking about royalties and leases and securing thousands of Rights of acres to land that's all 8 to 12,000 ft below ground our only above ground impact will be four of these and they're about 1 acre each and that's that's the above ground impact and so it's right now all that's happening out there it's it's being used for Timber operations harvesting all the the long Leafs in

009the L and that can still continue so it's again it's really it's just essentially Revenue to the county to to the the land owners and the royalties with no impact to existing operations so kind of think it's kind of win-win from that perspective and then again this this technology whether it's drilling that's been around for well over a 100 years but CCS isn't new it's always been it's sort of at the the point now where it's no longer cost prohibitive to for companies to install this this capture equipment um so now you're really seeing what's just a real a real huge push where there's 50 going now 44 under construction but there's probably about 300 under permitting in the US right now and and thousands of miles of CO2 pipeline and quick note on the

010Hub um so this carbon capture you really need good geology and what that means is there's very few places that you can store this stuff underground in the world you need basically porous Rock that's deep underground but you also need multiple layers of impermeable Shale cap rock that locks it there forever that's what mobile on the Gulf Coast has that's why from Houston Corpus chrisy mobile that's why that's really I mean this is the the center for it from a geological perspect perspective keep going and then as mentioned we're securing the the the subsurface rights to about 16,000 Acres we're going to have four above ground injection Wells and a small Network a small underground pipeline Network that connects to those sources and it's really no it's not by accident that we're located right next

011to plant Berry and am ands Calbert as well and then sorry I'm really bad at cutting and pasting but um this was these are images from when we did a public um a public launch of the project um we had Mr buron from the chamber was there commissioner Hudson um representatives from the mayor's office but we've through the since this Project's conception and unveiling in 2022 um we've had formal support from the Governor from the chamber mayor Commissioners South Alabama Alabama Power I'm just reading now Southern States energy board and then the last image we went out and shot seismic out at the site we had these big like vibrating trucks that go out and shake the Earth to really confirm that the geolog is as good as we thought it is and not only

012did it confirm that it's as good as we thought it is but we think it can store even more which for purposes of signing up land owners that number I cited were that 300,000 we think it could easily be double that once customers start catching up so we really try to be conservative on that and I promise I'm almost done um just some quotes from that I want to site you can skip all these we had really nice um quotes of Praise from commissioner and and then this again we're we're on a trajectory to have a a customer ready project in 2026 the customers themselves the emitters probably will come online a couple years after that but again we're well under permitting we're we're drilling a test well next year to even further know what's

013going on 8,000 fet below ground and I would note we um we did apply for and get a department of energy award it's this project doesn't need any subsidies it doesn't need Federal funding but they were offering it to do to pay for a test well and Strat and seismic shooting and a whole lot of subsurface work so we just look at it as hey we'd be remiss and not pursuing that it's bringing tax dollars back to Mobile County and doing educational work and getting knowledge of the subsurface um and finishing up we um as part of our doe award we also partnered with the University of South Alabama they did an economic impact study um this was all based it's very aired very conservatively um but again we we think it's it's important to

014kind of quantify the benefit that the project would bring to the region and then these were the partners on the department of energy award um actually like the Geological Survey of Alabama University of South Alabama Southern States energy board um are getting some funding as well and just a great team formal support from those groups including Alabama Power at and the Chamber and and yeah I think I think I'll pause there I think one really cool thing that I would close with is since we started working on this project in 2022 we've we had over 150 individual public meetings just like this over 150 and we've received no opposition to date we're always available we you know it's it's new it's technical people don't think about this stuff and geology and and CO2 storage but

015we really would welcome those conversations but we're here saying hey you're right in the middle of the aoi we'd love to sign you up and think we have a a good benefit over the next 30 years of potential Revenue to the to the school board too any uh questions from the board sure how are they disposing of the carbon now right right now it's just vented to the atmosphere what so our potential customers say it's plant Berry say it's Amin Calbert it's just it's bended as part of the the waste the waste gas and there not that's not an issue with EPA or anything well they're EPA they've been trying to promulgate this regulation that would have required additional um limitations on all new generation and that's probably not going to to that's probably not

016going to see the light of day but um but it's really a lot of it's really those internal kind of it's voluntary so whether you're there's a lot of european-owned parent companies so they've got to comply with whatever their mandates are or with now we see for example l& exports will now probably be legal and there's a huge premium these companies could get if they have like a low carbon or a blue a blue solution and that can all happen in Mobile County so we still see a like a need for this and I hope I'm answering your question but I'll stop talking if I'm not I appreciate it yeah uh long-term testing um we this is going to so it's going to be monitored very strictly there's going to be and Ryan can speak

017to this as well there's going to be monitoring above the area in the water table below the table we're going to be able to know exactly where that plume is we're going to know exactly what's going on we're going to go in every few years and do an even further seismic shoot so we're always going to know what's going on with with the CO2 I'm I'm talking about the adverse effects is there any long-term testing that y'all have done on any of them how where's the other project how long this so this will be this will be the first one um of ours there's 50 in operation in the US I mean in the world right now but this will be the first have any of them one of the uh longterm impact results ran

018I think I could draw on you I'm thinking of the ADM facility but I know there's ones going on a lot longer than that so this uh process piggybacks off of oil and gas development where uh oil Wastewater disposal Wells have been used for industrial purposes and oil and gas for the last 100 years and this is an advancement of those uh permits and um the oil and gas industry's been doing CO2 injection for oil recovery since the 80s and this is a similar process except our job isn't to get more oil out it's to get the CO2 out of the atmosphere and all the regulations are built around and designed to Pro to prevent any adverse impacts to anybody either on the land or in the area so you w't have any is that

019what you're telling me currently tanasa does not operate any of these CO2 injections I got Mr G do you have any questions no Dr Brian um I think in the presentation you showed me you and I may not be describing this correctly but you were going to have it like sealed off below the plume the uh area above it would you talk about that a second it so think of the rock underneath you like a a cake where you have per you porest areas of the cake then layers of frosting that's what we look for of sandstone and Sandstone has holes in it it's currently filled with Prim and that's where we put the carbon dioxide in those little pores of the Sandstone above that are layers of shell and that shell is imp ious

020to gas or water movement and that seals the CO2 in the formation and it's the same Dynamic that seals oil and gas in the formations or the brine water that's in there so as part of the work we're doing we're characterizing those shell layers and that Sandstone to uh figure out the storage capacity and you know how to design the wells to do it safely re yes there's multiple reasons um when you deal with these projects your biggest concern for leaks is actually old existing Wells and that specific area didn't have oil and gas drilling because it's actually on a low spot where the oil and gas went to citronel dome and that's where of the oil and gas Wells are so we located away from citronel Dome to get away from the wells we

021also located it so it's close to Industrial emitters to minimize pipelines we also located there because the rock is very thick so it has a very high storage capacity and it's also an area where there's not a lot of homes so it doesn't have a lot of impact res um it's it's the whole area the whole 16,000 Acres that we've identified that's all within the design scope of the project one so what you're saying is one the cavity underneath our property is linked to all these other cavities well and it's really not a cavity to think of it's just a layer of sandstone and it's through the area and this is was a good area to Target because of lack of the wells in the area so we have three other well sites we would

022develop those three well sites the same cost of what we have right now to develop them so and that is land that we've already leased so you don't want the other the old whales due to potential leaking correct what happens if it leaks all that thank you the um the the state of Alabama did pass legislation last year that allows a process where we could petition the state oil and gas board and say hey we've tried everything we can't can you can you say that we can pull them into the project even though we can't get this deal done and there's a process for that but it doesn't that's I appreciate no one never do that so specifically on Old whbs what we actually have to do is go identify them if they're in the

023area we have to drill them out and plug them with CO2 compatible cement and then we have to monitor them so they don't leave but what if they did leave so the way the systems designed there's multiple layers of rock underneath we monitor the just above our Zone that is also a safe area to contain CO2 and if CO2 gets into that deeper or into that shallower zone then by permit we're required to shut in and so you have you have a fail site but let me ask you again what happens if it does leave well the CO2 what's the impact it it depends on the specific situation um in most cases would just be well I'll also stress the chance of it leaking is Subzero percentage so our goal is to design that it

024doesn't happen the most likely leak is actually a pipeline hit and that's most commonly caused by third- party impact so specifically to that leak we have leak detection on the pipeline it'll be part of the one call system it will be part of uh public education and it's going to have automatic shut off valves that shuts it off and isolates it what impact does it have to the community and the Eco it has an impact to people within 600 feet of the area which what would that impact what would it be um they would have to evacuate for a short period of time while we go in and make repairs how are they omitting it into the air if it's liquid now it's going in as a gas so it's just vented as a gas

025Brian let me let me ask you this and I'm going kind of bring this to the end I talked to some of the uh geology professors at the University of South Alabama and I after meeting I had with y'all and they said that the worst case scenario if there was a leakage back to the surface is like he said is CO2 which we already we're emitting that back to the air and so forth that's the the worst thing that would happen is that correct yes why would we evacuate people because in high enough concentrations CO2 is an aient so you you go you evacuate the people and then our technicians go in with oxygen detectors and verify it's a safe atmosphere but right now we don't you don't have any developmental I mean houses or

026other things within that area that you are getting ready to develop is that correct correct I mean that's why timer tracks work really well for this kind of project is there's just not a lot of people and you said our benefit from it correct me again Brian going forward could be as much as 300,000 a year even higher as you get into full production is that correct per year and to the for this think that minimum 5 million T of CO2 a year and that makes a year one royalty of 8.5 million and that was how i% of that as one of course maybe the year one one million tons and then two or three more year three four the first year but we think it can take minimum the five it could take 10

027or 12 a year which would be 600 or 700,000 a year once you know again there projects take a long time this is we we would like to see someone online and deler my last question about this is is there an end gain to this when you stop capturing CO2 yes per the permit we have to plug and abandon the wells and we actually have to put up bonds to guarantee that and then per the permit we actually have to do a post site care to monitor the CO2 and make sure that the CO2 is doing what we expect so you would seal it off we we would seal it off the wells get uh plugged with cement capped off and the land actually reverts back to the landowner we restore the well sites what

028are the expectations when you cap it off for what when you cap it off what would did your expectations do for time frame or for I mean the goal is to have this project last 30 years um have it all what would y'all's expectations be it's essentially an inert well that's actually plugged and abandoned to higher standards than oil and gas Wass so when I'm when why would they make them higher standards like gas is a little bit serious that is a quirk of the oil and gas industry the oil and gas only has to do partial cement plugs we actually have to use more robust cement and put more of it in the hole um but when we're done that well somebody could build a house on top of it and it would have

029no impact and I've actually done that where we had a power plant that had a gas well on the site and we submit we abandoned that well with cement to the surface and built the power plant on top of it and we'll do a similar process here so the expectations aren't y'all's expectations it's the expectations of the federal government is that one here he there are state requirements and federal requirements and we're required to meet both of the oil and gas board just adopted CO2 specific regulations applying all this stuff we can move pretty Clos okay Dr F question no Mr Harwell I mean Mr Harwell ain't here I'm sorry hey sorry Mr Harwell U Mr Hatcher Mr Brian we thank you very much I know you left some material here we will and I

030appreciate uh Mr Parson's being here uh we'll certainly take all of this under consideration in a future board meeting and we thank you for coming very grateful for all the time thank you for having let me ask another question before you leave uh what's the time planine time frame in which you all trying to complete this project get us to sign on this project we we expect to get our permit to to construct at the end of next of next year um so it's interesting with energy projects so you know for us to get there we got to spend you know about hundred and something million dollars but for like plant Berry or AMS Calbert to install their equipment that's about a billion dollars so we kind of naturally have to go first and so

031we expect to be ready for customer CO2 by the end of next year we we'd expect realistically to have customers by 2029 I think is is our reasonable expectation followup question to Dr Kino so I think what he's asking is when you need when do you need a yay or nay decision from us oh um end of next week good um no for for as we as in in in energy project world we for us it's a lot of it is they always use the word drisking and for us to meet certain stage Gates it's really this is such a critical piece of of of property to have an you know for the site that um we really we'd really like to get it done as soon as possible if if by the end of

032this year or by the end of the first quarter of next year we could have something signed that would be wonderful okay sure go no sir your go ask is this new technology no it's not new technology but it's being applied on a bigger Scale based off of the potential need so these Wells have been specifically in operation in Illinois for about 15 years now the technology of CO2 injections been around for 4 years the technology of injection Wells has been around for over years we have we have separated have Louis already another question is your clients is this is local clients or be from all over country so I'll break that up into uh two pieces the customers would be customers that are in the Mobile area because building pipelines is really expensive can't

033won trks it's all pipeline yeah it's by pipeline so it's the plant Berry it's the steel mills it's those kind of industries that need this technology to answer your question why people haven't done it in the past they have on small scale but it comes down to um cost where if you can just dump carbon dioxide to the atmosphere that's your cheapest option like Brian this project is over a billion dollars for them to put capture and the government's been trying to incentivize people to do it but the reality is at some point the carrots going to stop working and whether it's carbon tax whether it's regulations whatever industry needs to be prepared to capture this and do something else and there's certain industries like steel that don't have an option federal government it's it's

034been being developed for over 40 years and it is mostly from federal but for example California has passed state laws where they're going to lose cement plants in the state of California because people can't do this style of project Federal level it can also be on the state level and you're seeing Industries getting pushed out of like California looking to relocate but where they relocate to they need technology like this as a back stop if that regulation comes into that they can manage their tanas is funding this as a Bas and then we also apply to the Department of energy to get additional funding help study the area but that funding isn't required for us to all okay gentlemen thank you very much for the you don't mind oh who long tanasa tanasa owns long

035Le yes well who are y'all doing it for though we're doing it for Alabama P any customer that approaches us is there is there is this y'all's company or y'all like the shell company and then doing this for someone else to come in and take over not right no not right now but that's you in any project that's a billion dollars you potentially find Partners to help develop analogous to like denberry and Exxon like denberry was doing their thing and all of a sudden it's like hey like take 12 billion right and then all of a sudden they were for sale like we this is tanasa tanasa balance sheet this is all a tanasa project where we intend to develop it as a tanasa projects thank you have y ever had any other projects that

036y'all develop is and kept or is there other done so have yall sold any out all of the above so for example I worked on a uh combined cycle power plant in Pennsylvania it does enough electricity for just about a million people um that project was over a billion dollars tanasa owns a percentage of it we found Partners to come in um we have other power plants that we built in the late 90s That We Own 100% of it we have other power PLS that we own a smaller percentage I also worked on a w Farm in Missouri tanasa owns that 100% um I worked on solar farms in California We Own 100% of those I've worked on solar Farms that other people have bought into in our development so it's kind of an all

037of the above based on Market thank you appreciate that Mr CH yes sir then what's the pro uh projected date of right this matter back to the board well it would be after Mr Parsons will be swor in on Friday you'll come up probably I guess Mr Superintendent at our December meeting yes sir that would be the earliest thank you okay all right thank you very much for it I appreciate it uh by by the way if if there any further questions come up uh do you have the packet you gave do you have an email or email and phone numbers and good all of our team we Jessica has an office here in Mobile right so there may come up some others like that and this is a very complex and Technical thing so

038if you want us to come back again and go into more detail I actually have Rock for that show the kind of rock and kind of demonstrate how it works yes we can come back and answer any of your questions any time well let's see if there are any further questions that come forward after that thank you very much gentlemen for coming today okay Mr superintendent we have a number of items to go over so sir the board table is yours yes sir all right so we'll start with uh since we have several items we'll start with action item C1 our annual as we do every year our pledge revenue of 2025 it is to um have Reserve funds to meet debt services and operating expenses uh so I will ask the board to approve

039the um pledge revenue for 2025 action item C2 is Goodwill of Gul Coast it is to provide services to students who have been uh determined by the IEP uh to um have services for good for Goodwill at Spring Hill Child Development Center uh that's coming out of state preschool funds for $221,400 action item C3 is Williamson's entrepreneur ship Academy it is with the boys and girls club to provide uh CT based course offerings during out of school time uh to help students develop critical Workforce Development skills uh that amount is coming out of local funds for $154,900 action item C4 is link it is to provide a software and support for student registration called Gateway it is coming out of local school funds for $419,500 action item C5 is actually a revision uh with us

040and navigate 360 uh for Behavioral threat assessment uh there was some word changing um in that con contract that's coming out of title two funds for $100,000 C5 C6 I'm sorry it's with the Mobile County Commission uh it's with various elementary schools there's a total of 22 schools and it's discretionary funds uh ranging from 1,000 to $4,000 for various School needs for those elementary schools that are listed before you C7 action item C7 is an agreement between us and make an impact Foundation this is actually a revision with the Alabama scrap tire Environmental Quality act um it's uh to donate land to Whitley Elementary School we had to do some word changes in that con contract but it's to donate land to Whitley Elementary C8 is brain fuse for strickling Youth Center it is to

041provide 100 um 1,516 on demand online tutoring hours to students residing at Strickland youth center it's coming out of N and D funds for $50,000 C9 is an agreement between us and Holly Land Fields uh to provide counseling services to students at the specialized Treatment Center as well as the virtual learning school um that is coming out of do have a fun Source but it's for $38,000 C10 is Diane Reynolds for marville elementary it is toide to provide teacher focused support and training um for 30 days of service it's coming out of title 2 funds for $2,871 is with altero health services for Bayo residential it is to provide Transitional services um to provide students with 30 to 60 and 90day followup that's coming out of Title One funds for $118,500 C12 is with the

042Mobile County Commission and BC rain High School it is to provide funds to purchase piano lab equipment for core for the core Department again that's coming out of the County Commission funds for $1 16,7 C13 is with the Renaissance Plaza Hotel for Baker High School senior class breakfast uh that's scheduled for April the 28th that's coming out of local school funds for $1 4,862 c14 is for landmark um for uh fondi Elementary School it is to provide roundtrip transportation for 85 fourth grade students that's coming out of Title One funds for $1,634 C15 is with the County commission for Whitley Elementary School it is to provide playground security fencing uh again that's coming out of County Commission funds for $3,533 c16 is the center for advancement of study of International Education for Phillips prep it

043is to provide two sessions of onsite training on IB imp um implementation for 40 teachers and three administrators that's coming out of title two funds for $12,000 c17 is the Mobile Convention Center for Davidson High School's uh Model United Nations uh which will be scheduled April 1st and 2nd that's coming out of local schools funds for $1,116 c18 is teacher created materials it is to conduct a two-day professional development um for K5 and 612 teachers uh that's coming out of title two funds for $111,000 c19 is Rosetta Stone for Cy middle it is to provide a 100 languages learning software site Services that's coming out of Title One funds for $10,000 C20 is for Pete blank for Sam's middle it is to provide professional development for 120 participants involving uh improving leadership that's coming out

044of federal funds for $110,000 c21 is with the County Commission uh for blunt High School it is to assist with travel lodic expenses and attire for the Future Leaders of America uh for blunt high school that's coming out of the County Commission funds for $10,000 c22 is Gerald Brooks for Griggs Elementary it is to provide professional development for 45 teachers and two administrators that's coming out of uh federal funds for $9,800 c23 is JJ and Zach for Grand Bay it is to provide a one-day professional development for 55 staff members to create Monitor and manage missing assignments uh with this powerful online tool that's coming out of Title One funds for 8,799 c24 is loving guidance for Holloway it is to provide a two-day onsite training for conscious discipline uh uh professional development it's coming

045out of Title One funds for $784 c25 is Kagan professional development for col your Elementary it is to to provide a on day professional development for approximately 46 faculty and staff at Coler it's coming out of Title One funds for $ 7,772 c26 is for Crown h for Davidson High School senior prom which will be held April Friday April the 11th it's coming out of local school funds for $7,300 c27 is Marzano resources for Pearl hasu uh will provide a one-day on-site professional development Workshop entitled new Art and Science of teaching that's coming out of local school funds for $7,100 Mr chairman yes sir to the superintendent what safety precautions are going back to that issue about uh crown and other sites for prom and stuff uh we taking any extraordinary uh safety precautions for

046these sites yeah we we requir required if I'm not mistaken for them to have certain security for those events a certain number a certain number just like we do for basketball and football games and yes okay thank you M any other questions C 28 I Exel learning for Sam's middle it is to provide a oneyear i EXL classroom license uh for the subject area of science and social studies for a, uh 175 students 6 through 8th it's coming out of Title One funds for $750 c29 is quizzy for Cy middle it is to provide teachers and students um with a one-year subscription of group license that's coming out of Title One funds for $6,750 C30 is the mobile Symphony for Kate Shepard it is to to provide a music enrichment program which will be include

047preludes for students in grades first grade and second grades coming out of local school funds for $6,200 c31 is for Kagan professional development for henin Middle it is to provide a uh one-day professional development uh which will include engagement and achievement for approximately 60 faculty and staff that's coming out of title one as well as title two funds for $574 C32 is architectural selection for various projects uh we have Baker standby generator uh from CDC Engineers that's coming out of local school funds local funds I'm sorry uh also Theo standby generator is also with CDC Engineers uh that's coming out of local funds c33 is the new video board we had two bids we went with the lowest bidder which was young blood and Engineering for $ 4,889 324 and that's com in the fund

048source is 2022 bond is that the jumbo TRS yes okay yes I noticed the other one on here the other uh bidder was like close to a million dollars less 1.6 million less what was what was the deciding factor why we didn't go with them have we tried to reach out to them and talk to him because $1.6 million ain't nothing to sneeze at was it the electrical left off yeah I think the electrical was left off that be worth taking a second look 650 yeah Brian they have but Briant don't they have they have four beams holding it up instead of three these require three um you sure cu the one I seen spec I seen show three um also the megapixels was a there a six megapixel on theirs though right 6m 6

049mm there I'm sorry and then and then the other is 16 so you're getting a far better board for less money Brian am I correct yeah it was six megapixel I just want everybody to get a you know same quality you get beond discrep yeah but this is less money for Quality you see what I'm getting that even though you don't need it you still have better quality R about what we got C that's what I mean though but you got a better product out there but we've also included some curriculum and things like which still be more though got you right all right any other questions all right action item c34 Baker High School auditorium R roof uh we had eight bids uh we went with the the lowest bidder uh Roofing solutions for

050$1,641 th000 coming out of psca funds uh action item c35 is Will Wilmer Chiller replacement change order number one we had a decrease of $3,095 brings grand total to $465,900 7562 brings the grand total to $292,450 75 coming out of psca funds c37 is with Callaway Smith fire alarm system we had one bid a bagb and Russell for $269,250 also coming out of psca funds c38 is the department head supplement that we approve every year for the starting and ending of supplements we also have at c39 athletic supplements that we do every year as well for starting and ending supplements C40 through C50 is personnel which would be listed under separate cover if there are no questions moving right along to the consent agenda D1 is Explore Learning for John will it is to provide

051reflex site lights license for students and teachers it's coming out of Title One funds as well as local funds for $4,795 D2 is the pogel project it is to conduct a one-day uh introductory fundamentals Workshop uh for science uh that's coming out of title two funds for $4,260 D3 is surge entertainment for theal high school to provide uh for 125 seniors uh coming out of local school funds for $4,185 D4 is brain pop for Cary Middle it is to provide a schoolwide site license for uh coming out of Title One funds for $4,185 D5 is quizzy for Grand Bay middle it is to provide teachers and students a one-year subscription site license uh coming out of Title One funds for $4,025 D6 is bird educational Consulting for Craig Head it is to provide external Consulting

052and evaluation services for the 21st century Grant um it's coming out of 21st century grants funds for $4,000 D7 is Ron Clark Academy for ER Dixon it is to provide a one-year subscription to the Run Clark house points app uh that's coming out of Title One funds for $3,600 d8 is notable for cusy Middle it is to provide a one-year subscription for grades 6 through 8th it's coming out of Title One funds for $3,600 D9 is Texas instrument it is to provide a one-day face-to-face professional development um coming out of title two funds for $3,200 d10 is signs for everyone for Sims Middle it is to provide a 345 minutes interactive stem program session entitled science machine that's scheduled for February the 19th coming out of federal funds for $3,000 d11 is is centas for

053burls elementary it is to provide Rug Cleaning Services uh that's coming out of local school funds for $2,942 120 D12 is with the local for Alma Bryant School prom which is scheduled March 14 that's coming out of local school funds for $2,800 D13 is brain pop for Burns Middle it is to provide a schoolwide site license for six teachers and 600 site license for students that's coming out of Title One funds for 252 D14 is Renaissance Learning for Castle dver it is to uh provide Renaissance Learning site license for accelerator reader for 220 students coming out of local school funds for $2,494 60 D15 is sence for everyone for Bright brightland Elementary to provide a 245 minutes interactive stem session entitled the science machine scheduled on February the uh 17 it's coming out of local

054school funds for $2,000 D16 kids account for Grand Bay middle it is to provide a hall pass module coming out of Title One funds for $1,900 d17 is Generation genius foran gray uh to provide instructional support for 22 teachers in science and math to help reach 500 students at N grade coming out of tital one funds for $1,795 the d8 is also with Gen generation genius for cause and middle it is to provide uh one superintendent excuse yes I want to ask one other question before we leave I thought they was standing had to be okay that's good don't someone here to ask the question later thank you okay you sure about that sir stick on okay yes it's pretty long go ahead all right uh coming out of Title One funds for $1,795 d19

055is zuban for burls to provide a one-year School uh premium license and implementation to encourage reading coming out of local school funds for $1,320 D20 is also with zooing for chastang um also to provide a one-year School premium license implementations to encourage reading that's coming out of Governor's turnaround funds for $1,320 D21 is with Renaissance uh for Baker High Schools um High School senior class breakfast that's scheduled for Monday April the 28th coming out of local school funds for $647 25 cents d22 is with generation genius for Dolphin Island it is to provide uh two classroom um science and math license for 60 students coming out of Title One funds for $598 d23 is a revision um with Music Theater uh there were some word changes uh needed uh it's coming out of local school

056funds for $590 d24 is classroom screen for Sims Elementary it is to provide 26 organizational account annual licenses uh that's coming out of Title One funds for $546 d25 is Lazelle F Dophin Island Elementary it is to provide a Ras plus site license for 60 students uh for literacy it's coming out of Title One funds for $457.92 26 is Mobile County um school system and seal of biliteracy it is to award and recognize students who have attained proficient who who are proficient in two or more languages by the high school by their High School graduation um that revision uh is for June 177 2024 there's no fund source for that d27 is out of County travel D28 is various bids if there are no questions we'll move to our flow through items uh as you

057can see we have three uh first one is speech language for our private schools and second one is for St ignation St Ignatius Catholic school forl learning and the third one is teacher um Synergy for most Pure Heart of Mary School those are our flowr items moving on to our expulsions that will be listed under separate cover uh as you can see we have 1 through 11 those are our student exposion 1 through 11 okay so we have G uh monthly financials and two purchase orders 5,000 and over and 100,000 and over Mr Mr attorney I know you've been sending us some information by email yes uh Mr chairman we have three employment agreements the subject of my emails to the board of 114 and two on 1111 that we need to address Wednesday I

058assume everybody got them if not please do we know okay scheduling of meetings Mr hack I go with you first sir yes sir we have a a couple set in December because okay all right u a reminder of course we have the this is to the board we have our annual uh meeting in November to reorganize for the uh uh leadership of the board in addition there's one agenda item on there that deals with uh additional um funding uh for the board and we'll consider it at that particular time uh and then on Friday the 2nd at 10:00 here in the boardroom we will have the swearing in Ceremonies for myself and for Mr uh Parsons who will be here and my understanding miss abam you correct me if I'm wrong any Refreshments after that

059we'll be here in the that's the that's the 22nd I mean the 22nd what did I say okay no sir you don't fact you don't even have to show up there no your contract okay so uh any further announcements Mr superintendent No Sir Mr Hatcher from you sir no sir M MC no and I just want to ask the representative sure yes sir uh in the event that this board does not um move forward with what your all propos for our track of land will you be able to go forward with the project anyway um okay I have a I have a quick quick question the the 4% royalty is that negotiable yeah but y'all are in our market now so that would be a a yes no no qualification is that a yes it's

060possible okay okay okay I appreciate that any other questions of the Jour that's all I want okay do I hear a move for adjournment motion General do I hear a second second all in favor say I I all right pleas stand jar