001[Music] the United States America to the stands IND y Mr Christensen here Mrs feice Mrs Hedley here Mrs hoppy here Mrs janisac here Mr McGregor here Mr sco here Mrs Turner here Mr mojack here all present thank you sir uh we have presentation from missah please RC good evening everybody um get going here there we go all right so bad news is we have cold weather and lots of snow good news is our iron workers are exactly that they're Iron Men they they do not stop so we're trying to stay out of their way as much as we can um so just some pretty cool progress pictures here the elevator tires and stair tires are all complete and up we're going to be uh putting some temporary stairs in there so we could start accessing
002these floors safely um there's a area e um the crawl SP the ground floor steel floor steel is set the decking is not we have some uh Mechanicals that got to go in that crawl space and you know there's only maybe 3 feet below them beams in in the floor so to help facilitate getting all the 10t sticks of piping and stuff like that we we kept the floor off now they're they're done with that they're going to start decking that here soon but they are decking the first floor um area F was was our lay down area for area e but we have since uh begun in that area as well inside the ground floor in areas a C and D um the slab on grade is probably 60 70% poured there's just one
003section left the four in there uh some interior non-load bearing uh block walls are going in now where we can you can see a couple of these pictures we we um have begun tending it in to throw some heat inside there to keep to keep going and to keep pouring concrete um there there's a more of the tting there not only heating the bottom but heating the the slab on Deck as well so we could um pour the slab on Deck cuz that is integral to um bracing that concrete wall um which we can't really back fill that wall until we brace it with the slab the steel and everything's tight in into there up to the first floor so that's that's kind of what we're racing to do again shots of the crawl space
004in in area e and and the steel progress progress in there um first floor area a is completely detailed and decked um we've been trying here for like the last four or five days to try to get that pour but with the temperatures and the snow challenging so share with them that is your small gymnasium at the bottom yeah this this area ground floor this is the auxiliary gym in this corner here and above that will be your administrative office yeah just to give you some persp there there's kind of what we're doing with now so you can see why uh we're struggling to get that forward but um as soon as we get some heat thrown in there we should um another big thing here we uh are running the uh main power conduit
005um we're not close to getting our main power feed yet but we will also utilize those conduit for our temporary power too so that's why we're racing to get get that in and get that down that emotion spray yeah that black that's not the the p word it's not the p word that is abating the p word so we we if we trench through it and we are um we run into it we we have to seal the the uh the trench with that um yeah it's it's in it's in stone yeah back Stone and um just in areas we cross under pavement place but that's structural filing um upcoming work like I said we're trying to get slabs on Deck board continuing setting steel with the with those animals um beginning to set the
006uh CMU on the storm shelter which is the big the big gym the big main gy as well um and we're almost wrapped up with foundations um we got first floor a just like that corner and some interior calling for in so we're we're r on that we're about 250 days of accident free um this project schedule and it's showing pushed so then I am with the way these iron workers are set and steal a lot of that we're going to catch up a lot not all but a lot very shortly that's my that's my um Dr wal uh RC is sharing that as the steel workers as the iron workers are progressing quickly we will be at a point in February maybe late February to do the top it off whatever you want to
007call it um so for the board U will be getting to you a couple days where you can go down to sign the the last beam we'll have it painted white sign your name we'll do a ribbon cutting or whatever ceremony you want but just know sometime in mid to late February will be that that opportunity to do so and like I was asking Mark you know sometime soon next week or or you know week or 10 days we'd like to get all together and just kind of get everyone's expectations what they what they're thinking about what's going to happen that day and Okay so logistically we could get it um get it pulled together especially like you know how you want to photo op you know from which angle uh so we could pick
008an appropriate being that won't hold us up okay you know we could get the crane in where we need to get the crane in and stuff like that so there's a little bit of logistic you get to ride the crane too huh I get to ride the yeah you can ride the ball that completion wait that completion date keeps on moving back each time we meet it does are we GNA start the fall of 26 like I well let's say the beginning the beginning yeah August they have to hit that day that's their Contra it's going to happen yeah um where will they make up the most time in steel they'll make up most time setting steel and then also once we get enclosed and in controlled environment we could start um uh playing with
009ideas of double shifting running two two Crews you know working over time like whatever it takes at that point because at that when we're closed in we have heat in it whether it's temporary heat and temporary power you know we're a master of our own destiny at that point we're not at the mercy of the p word and we're not at the mercy of the weather so we're in a controlled environment confidence levels High then right that we will hit that my confidence level is high yeah I believe we could it's still early at there's a lot we could do to make up some time exclusive of the weather in the soil there really hasn't been any other big hiccup that uh to delay the time right no not yet not yet but you just
010JX us okay goes my fault U any other questions you want to uh I got one recommending to the board okay um so this is the has to do with the electrical um revisions that was associated with the changes to the nurs suite so we previously approved the mechanical changes uh these are the electrical changes and I'm embeding now any general um trades changes they add in the doors and stuff like that so we're we're still fighting through those numbers are these mostly due to design changes then or Hardware changes or All the Above All the Above okay and this is I mean it's $2200 so on the scale of things moving the unsuitable soil was you know you had said they would go down um is this the only one we're looking at for
011electrical or have they only gone through one phase of the process to look at the drawings and make the changes that us there could be more to come so this this one comes from a conversation that we had with the nurses after they looked at the drawings and considered operations on how things would work they asked about moving a wall or a door I forget the nature of it and we didn't think it was going to be a big deal well this is the this is the big deal these these change orders are what came from them there's really no other conversations that have happened by anybody about oh I wish the door was here or I wish that had two switches that none of that's happened so I don't foresee there being any other
012change orders particularly to the changing the design of the space so there's nobody else the everybody has seen this enough then we we went we went through a hardware uh meeting this past week and there were some uh revisions uh on recommendation by operation of the building on my part we're horse trading right now with those vendors to uh minimize anymore um we have another meeting next week for owner uh provided stuff so we're we're working on those but uh there there may be some other small change orders not related to the PW right this is ASI this is in relation to ASI number four I will say there there's been 11 ASI so we're continuing to through those pricing all those see wood chains credits and charges and stuff like that okay I hope
013I answered your question who Bears the cost for overtime and shifts that's part of the negotiations um really nobody owns the contractors don't own it overcome but they also own the end date and they own some um uh recovery schedule items that may lead to Overtime or double shifting or you know jocking some Crews maybe double Crews working in two areas at the same time stuff like that in other words if the if a contractor was going to finish on time there would be any need for them to talk overtime if there was a crew contractor that was at risk for finishing on time rather than face a penalty they may opt to go overtime yeah and I we have performance uh stipulations in there for the contractors if we so much extra day they
014have to lose so RC might initially you you answered it I understand it's a change order on our end because people looked over it and had some design changes where are we with has Meritt come in and looked at the electrical and started to bid it out so that there will not be an excessive amount of well they they bid the drawings so everything on the drawings on bid day they own okay um what they would bet out continuously as a project don't any changes if if those are kept to a minimum then we're yeah okay so yeah Str Kinski based on what you're seeing are we keeping those we are the um I can share with you that we were at a meeting last week and there was actually a word of credit back
015to us because we found some redundancies in some of our door hardware and electric and so forth and that's that horse trading that's going on that so the credit could be replacing something else than that yeah I mean we're we're working on that dollar value and it takes time but we have we we meet every two weeks on change order events just to make sure that uh we're keeping everything honest okay I think what she's I think the question she's trying to ask I'm putting words in your mouth here Mrs Walsh Turner but I think what she's trying to ask is that contractors can't substitute products a after the like from what's been specified they can't substitute without approval from Theo and draw correct somebody either Dr Kinski or Dr Walsh or somebody else would
016be informed that that substitution is happening so thus the change order would not yeah if something changes from what was speed on bid day there's a procedure that they would submit for a substitution and that would be vetted by The Architects the design team and then I'll okay thank you thank you Dr wal anybody else thank you sir all right thank you up next I want to announce that we had executive sessions on December 17th January 7th January 14th all for personnel other legal matters and to receive information at this time we'll take public comments on agenda it items uh the public is uh restricted to two minutes in their uh dialogue and I believe that LE State their name in the beginning and there's a total of 30 minutes a lot for this period
017of the agenda if any our two Spectators interested in with that that being said we'll move on the curriculum Mr Scalzo okay we have two items uh first one's School sponsored overnight educational activities and number two High School course selection guide leave it open for discussion anybody have any questions about one or two I recommend that we place one and two on the consent agenda just one question on the course selection guide have we gone through again and you know reduced eliminated courses out of here that have typically we had uh low enrollment that we want to clean out I'm sorry again Mr Christensen yes you said yeah we did uh cut a number of courses this year that have historically uh been cut just to eliminate some of those selections uh in the summary
018sheet you can see some of those uh that have historically not performed well and then we have a monitoring system and one of the things we've explored too is if they start stop schedule we looked at every other year offering until they continue to get eliminated if they're not Fielding each year okay M okay so those two will be on the consent agenda thank you uh Mr McGregor if you're available the Personnel committee I am can you guys hear me yes okay here we go uh under personnel there are three items number one there's appointment of personnel number two change of assignment and number three approval of professional tuition reimbursement any discussion all right hearing none I recommend I we move one two and three to the consent agenda thank you sir uh excuse me
019Mr mid before we move on could could we make a correction to the executive sessions since we did not have one tonight oh that's right I apologize thank you so Corrections duly noted that there was not an executive session for tonight thank you in case I missed it unless I missed it or we're having you did not okay thank you all right thank you Mr J good eyes um we discussed a but Mr Christensen facility yeah there's one just that one item that engineering change order for the uh electrical components any questions on there any additional question I recommend we move that to the consent agenda thank you uh Mrs Walsh Turner with finance committee committee please yeah um there's the December 24 and January 24 salaries and bills November 24th financial report December 24th
020financial report budgetary transfers the payment of um the new elementary school um um 1 through invoices um the payment for Independence Middle School phase three to Haze Design Group and site logic um the acceptance of the Jefferson Regional Foundation Grant which congratulations Dr Walsh thank you on that Grant um it is to go towards the um Outdoor Classroom and steam um projects at the new elementary school um so that's another $110,000 towards 40,000 we already have towards the outdoor project um approval of donations the B Park High School swimming pool um donation from the to the South Park Wave Pool and then the purchase of surveillance and guest management system can I explain that one yeah so uh that is the one component um that is owner provided for the project um which means we
021are responsible for the um okay acquiring that information that equipment and then the contractors will install it um that price incompasses all of the necessary software cameras license plate readers mounts um excuse me as well as a 10-year uh license and warranty my only question is in a 10-e license warranty isn't going to like the just the contents of it and what it can do in 10 years way be out way out of date by the time we so their devices typically follow a 5 to 6ear span um in the event that one of the cameras or a component would fail it would be replaced with the newest model that's on the market yep we had had that issue before that's why I asked gotcha and um payment for independent middle school phase to I
022think ask one question on that so you know since it's over half a million dollar was that in our original estimates or is that extra above what our that's part of it yeah so we yeah so we own um all the uh furniture and the um all this surveillance equipment cameras so that's what we own for the Elementary Center we had it budgeted the reason why we're putting it on right now is because the pricing is too good to pass up for this year if we would have got it next year it would have probably been a couple hundred, more if I'm not mistaken so that's why we decided to go this route today because that is just another savings that we can have added to our fund 39 yeah so this is an this
023is another soft cost that we are in that is correct yep well we we we anticipated it we budgeted for it so this is nothing above and beyond this is actually probably through Chris's hard work a couple $100,000 savings okay thank you do we think you know any this maybe a little bit like what uh M Turner was asking but when you look at technology like that 10 years is a long time especially if it's connected technology you know do we do we think it's still going to be functional after 10 years yes the um so the software will you know consistently upgrade um the cameras that we are purchasing are the they just were released to Market so they are the latest model um I I kind of talked with the company and looked
024at the road mapap that was a concern of mine you know in a few years are we going to be looking at end of life or you know have to worry about um you know discontinuance of of of things um this model like I said is is new to Market um it will be on the market for the next five to six years and just to to piggyback off of that aside from the the cameras it encompasses the guest management system as well as the um the software capabilities for the school principal or the school resource officer to have a um a video wall if you will into their office or they can monitor all the cameras at once and just to give you guys an idea this is 299 cameras that are that is
025going into the facility okay wow and and components and components correct and these our Cutting Edge 4K uh resolution topnotch um the guest management system will integrate with this the cameras so at any given time if someone checks into the building um again the resource officer security principal they can pinpoint the exact location of that person in the building okay and and the difference is the 4K is so new that the next iteration will be called 8K they don't even have so we couldn't buy up in terms of that situation so we know technology will maybe outpace itself but there's nothing available beyond the 4K that we're we can we can use right okay that was my question again with the and the the technology you you'll be able to read lettering on the shirt
026you'll be able to tell if someone has braces I mean it's that different than the current stuff that we have and we're looking this is all inside and outside based on the number correct from the moment you pull off of King School Road you'll be under surveillance back side off both that's all just cuz he said yeah he yeah my apologies all entrances and to the the building yes thank you and then um finally for the consent agenda the payment for Independence Middle School phase two Renovations um to site logic and finally the financials are at everyone On's table for 31 32 and 39 um without any objections I'd move 1 to 10 to the consent agenda all thank you I did have a quick yes comment a quick comment I guess it's Sharon on
027the um Outdoor Classroom it has been a while since we looked at that and I was just wondering if we could make a note maybe as we get into the spring or the summer or whenever it sounds good to kind of like relook and take a look at the plans and and show folks um what we're hoping to do with that because it's really exciting and cool it's just been a long time since we've looked at it it actually came up at the PTO PTA council meeting this past week um it was presented again and the PTO are going back to their parents to look at what the PTO as a group from the five elementary schools can also do to help and have a spot in the outside classroom moving forward kind of as
028a homage to the five elementary schools oh that is such a wonderful idea that was all Dr Walsh I I'll give the report but that was all Dr Walsh awesome I mean I don't think we need to do it like immediately or disrupt any schedules but you know before we open the school at some point maybe we could just revisit that because it's very exciting um and lots of cool things are planned for it and I will tell tell you also Mrs Janis that and uh Mrs Hedley can also vouge for this a lot of the people when it was first presented to PTO PTA Council and then again this time decided that it would be open during non-school hours also for parts of it too so that the public can take advantage of it
029very nice thanks thing just a quick question the the grants from Jefferson that was just not a competitive obviously but just what was the process involved uh the pro so it started with a like an interview I met with their Grant's chair and the director executive director of Jefferson foundation and pitched the proposal the idea of what we're trying to do and want to sort of join the effort and create a presence for the Jefferson foundation in Beth Park and uh then it followed with a more detailed written proposal and Bud estimates and drawings that sort of thing um I believe their Foundation met in December to vote on the rest of their 2024 proposals and Grant you know make grants for the the rest of that year and we're we got ours in just
030as the end of their fiscal year is this our first no we've had we've had two with the Jefferson Regional yes yeah but we've had two other Grants awarded for this same project from the both Beth Park Community found Foundation Education Foundation and Jefferson foundation so we're we're $60,000 to the good on that project which is budgeted to be around $90,000 good thank you sir glad to hear that uh this time policy committee Mrs Hoy thank you Mr modra um we have lots on the agenda um number one revision to policies this is the third and final reading for four policies um number two revision to policy this is the policy on educational opportunity for military children um number three um I'd like to to table due to a recent court case that was um
031settled concerning Title 9 all of the policies in item number three are pertaining to Title 9 so those will go back to the 2020 versions um and so these these revisions will be um what do they call it vacated um yeah they're not necessary anymore not necessary yeah um number four we have a first of three readings for two policies for naming rights and memorials so our Fields our you know areas of our buildings these are policies pertaining into naming those and I had asked I apologize that um yesterday afternoon we pulled 72.2 off I think Mrs Greg probably uh came in today and panicked that something happened because she put them back on and I didn't notice it until just now when I clicked on that item okay so 72.2 is that policy is
032going back to the polic or the facilities committee for review before it comes to the board okay so ask only uh only Advance 72.3 memorials that one is not um that one is not the same it's it speaks to um a different process okay and that would um yeah so I apologize Mrs Hoy that should have been edited yesterday and she probably I never told her I did it it's probably why he's going to take away my keys to Bo dogs that is okay do Dr Walsh and Mrs hoppy yes uh if I can go back to item number three revisions with moving all that and vacating would we not keep 707 I don't think that I don't think that one applies to me 805 852 would stay school security that's in 254 yeah 20
03380 yeah yeah 80 5.2 no education of military children also was a a title 9 issue change so 707 and 85.2 we can leave on as a first reading anything in 100 and 200 were Title 9 ches okay so 707 85.2 stay on there for first reading then the second reading of 254 where is you've got 254 on the first reading no second and item number two is item number two is the second reading okay but4 and you have 24 on the first reading and item number three as well so that needs to be maybe we just need to revise this whole L yeah could you just table the whole thing except for the third reading yeah so 254 actually it it's correctly placed in the second reading we've seen this previously it was mandated
034by the state in a recent not recent but last summer when the when the school code was updated they updated that requirement that schools enroll military children even before they've moved into the district uh so that their families can have a little more continuity or stability with the amount of traveling and relocating they normally do in their lives so and it also that one doesn't belong in in a first reading it's okay and it also includes the National Guard members of the National Guard of Reserve an addition yes that's an addition as well so it really doesn't have anything to do with title 254 will stay yes as it is sense yeah it does yes and we can easily extract those other policies there's no reason why everything needs to be Consolidated together we can
035just amend it to uh to reflect this is only going to be three policies thank you okay so on to number five and these are the ARs um associated with some of those policies that's one AR it's for discussion only uh number six is for discussion only on hazing the administrative regulation and number eight is discussion only um rules for use of school facilities uh that is also an administrative regulation does anyone have any questions or I would ask that the administrative will for 234 not move forward at this time because that does have to deal with the title 9 that we're removing from the first reading yeah it doesn't the the recent changes or reversion back to 2020 rules of Title 9 doesn't really affect this it just includes the title 9 coordinator as
036a part of accommodating or or supporting a student who qualifies as uh for this condition and a reminder that ARS do not require approval of the board correct yeah correct to ref it has to correspond to the board policy it just directs the administration on how to administer policy so there's no moving forward or voting or anything on that that's for information and discussion only yeah right no I I did notice that on the AR 234 there it's left blank there's a time frame in that very first section and there are options within one school day within three school days or other but all options are in the AR I didn't know yeah that might be my fault because typically before Mrs Greg puts them on for acknowledgement by the board we check off which
037which of those options it should be and it requires me going and comparing it to the policy so we follow what the current policy is uh okay I think what we'll do here is just make those correct and bring it back to the board again for acknowledgement before we okay consider it final I saw a similar sort of thing in 707 AR there is a section about oh wait where did it go we we fixed it we fixed it you looked at it before we before all right I did look at it yeah mrsy give people an option to set up a smoking area and I was like I don't think you meant that no no okay we got we were making Corrections on that at the last minute and all right then those were
038all the comments that I had thank you so [Music] much so the AR for hazing which is let's go back up the 247 does need Corrections because does reference the August 1st 2024 Title 9 changes at the bottom of the yes so that would all need to be corrected yeah just that disclaimer would be removed yes and whatever disclaimer was in there for 2020 if there was one there wasn't no we added that disclaimer because as the policies were updated by psba Pennsylvania was part of that injunction to prevent those new rules from being implemented correct in Pennsylvania so we said well this policy still applies but we're going to follow the 2020 guidelines during the duration of that injunction or whatever the legal term is there Lee you can bail me out here but
039uh now that we have settlement at least a conclusion from that that court case we can take all those disclaimers out because they don't the original 2020 version of the policy it now applies again okay I was intrigued by the change from I was intrigued by the change from verbally to orally is there a substance difference I don't know there was a lot of that yeah I don't know it's they change ver now it's or yeah the ver it depends on who's writing it I thought there were synonymous or the police I mean they changed things like even down in this AR if the police the police is crossed out and law enforcement yeah is now the correct term so just the confirm one to two move to consent number 3 707 85.2 will stay
040number four remove 72.2 and then number five we're putting it back on after Corrections number six remove disclaimer I believe we've got it okay all right if not we'll I'll let you know okay good M medley so I just had a question um I did notice you fix added some stuff but on the 707 AR um where it talks about let me find it about food and drinks mhm um and with the pre packaged snacks and candy would they be able to have drinks too at like concession stands for Theater events or anything or just just like chips gummy yes okay right definitely nothing in the auditorium uh this was trying to accommodate the fact that the wrestling basketball and swimming boosters do sell package snacks chips and candies and things at their concession as
041a fundraiser so they can continue that practice but selling walking tacos or Gatorades and things is not permitted so no no liquids just so because the boosters will probably ask so yeah we definitely want to get a weight because that it goes from just picking up litter to having to mop and so is that just in the auditorium or is that also in the this is just a gymnasium okay yeah that doesn't really say that specifically but um we're talking about the package snacks and candy for concessions at the gymnasium while we're on that one the next item 15 there isn't a Time filled in for evacuation of building just so yeah you know to put it in oh there is there is not because we have to uh I think it varies we can
042we can Flex it oh okay great perfect thank you it it's conditional to the activity there could be overtime we don't want to put a hard fast Rule and then I mean there there is a school district uh in where they shut the lights off at 10 p.m. because of municipality rule uh we don't want to be that we don't want to be that situation this is this is over in um the Forest Hills area right okay so you have all those Corrections Mr missionary I'm good you're good okay no other questions we'll move forward we have other Mrs hle we just have two items for other would you mind please sure um we have other we have number one student agreements the board of school directors approves the administration's recommendation to approve the resolution
043and agreements for two students do I have to read the is that okay okay and then number two um the board of school directors approves the 2024 2025 health and safety plan of the bethl Park School District I believe this will be the last time because those requirement Associated to ARP and Esther's funding and both of those have pretty much expired as of the end of that last calendar year so this will be the last time the board has to approve a updated plan and as we're seeing there is no changes to the previous plan correct there's nothing verbally changing the plan the the discussion in there the points are you know to follow follow what the CDC requirements are those change but they're not significant and so that's why we keep it a vague
044term because if not then we'd be updating the the plan every month if something changes so I mean there's there's discussion out there that this was to be gone months ago but they're just slowly got but will we will we be safe if we don't have this plan we'll continue to that he used the word orally rather than verbally verbally are you are you verbally asking or you orally are you requesting this go away yeah okay nothing else this time for public comments uh our two guests any desire to come forward and we're going to just pass right by that board comments please is anybody yes um The Fantastic Four which is the Community Foundation the Education Foundation and the historical society and the I'm missing one Library bethl Park Library are holding their bourbon
045beans and Veno February 1st 4 to8 at Community Center please buy your tickets you did say Veno this time Veno it's Veno Veno I where she said beo did anybody else hear I Orly I ought and I said it slowly so I said me know challenge we got a challenge Jim we got a challenge on this it was Boo b e a n o um so so I encourage anyone as the Community Foundation and the Education Foundation have given grants for this outdoor class room please support them I have one thing please uh Steel Center just was awarded a competitive equipment Grant from the state for 10 welders in the U in the amount of $85,000 so we'll have some new welding equipment for our students who are in the welding program at Steel Center
046we welders Joe we love itar well sign up any of our kids over there welding y good we do so very proud of the work that um the executive director Kevin rice is doing over over there he's doing a phenomenal job um acquiring all the money he can for our our kids to get them educated in the trades and the technical education so kudos to seal Center excellent on this end over here thanks Casino Darren Buffy Sharon anything no thanks and no I just want to was reading through one of in local uh papers uh one of our uh bethl Park staff members U Larry marz had passed away some of us know Larry uh Larry has been involved with our athletic department for years he's a retired Pittsburgh Public uh Schools teacher art teacher
047I believe uh but Larry's more known for all his events helping us out here and the last year he was on the Chain Gang down there at the football game so our simpathy condolences shared with the Merz family because if you got to know Larry he was a real good guy uh and he was a good Pride member of the bethle park uh School community so again our condolences to the merch family so without anything else being said talk we're ready all right this meeting is adjourned thank you we got time thank you oh my that's