CorpusRecord 270313

School Board Meeting 1/22/2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Dexter Consolidated Schools
Date
2025-01-23
Location
Chaves County, NM
Material
Transcript
Extent
16,004 words · about 89 min
Collected
2026-10-07

Transcript

Verbatim source text

001you go right ahead we are just here for information since it's ating we do have to come in a session and well you know here's the deal though I'm seeing is we are we live we are okay I do I do not have an agenda so um it's just yeah we are just going to call this meeting to order it is um 3:49 and so we do we actually do have a quum Miss Locus is not here but miss miles is over there Mr and so um yeah we I don't know if pledge was on there or anything yeah the whole okay the go ahead and Al to flag of the United States of America and to the repic for it stands one nation indivisible with liy and Justice salute the flag of the state

002of New Mexico of United cultures thank you madam president members of the board uh superintendent thank you so much for having us here today um we are Decker and we are the selected architect working on your new Elementary Middle School uh project and so as we've been working with the design committee I'm just going to kick it off here and we'll hand it over to the rest of the design staff but as we've been working with your design committee which if we have I see a few committee members in the room just raise your hands and tell them thank you so much they've had a lot of hard work working on this project so I appreciate your guys' input but we've been meeting quite a bit going through various options and looking at the goal

003setting exercises for this project to move forward and we're happy today to present just the um current development of the project and also have an open discussion of the selected options and what those mean for your campus moving forward into the future um one sec we switch from Zoom so I'm just oh yeah we're of course moving from Zoom to teams really quick so not a problem thank you Kristen and so with that in today's agenda we would just like to welcome some open discussion we're looking to of course share the information that we presented to the design committee up to date and just talk about this as a design team and a district who is representing the community to move forward in the project together and really select the best option for your campus

004that will serve you guys for the next 50 years so with that said uh I'm going to go ahead and take a look at the agenda we're going to be going through of course the just details of the project in regards to the project award options um we've hit a bit of a um Crossroads in looking at how the design is developed to see what will best serve your campus and a lot of this is coming from the input we received at our last board present presentation update and with that we'll just talk about our programming process and the work that's gone into this the design options to date and then from there break it down to cost figures nuts and bolts and take a look at what each of these options mean for you

005guys financially going forward to select the best option together and then some site study diagrams to indicate that work and what that means graphically so before we get started are there any questions comments one I have a quick comment uh where not able to see your screen oh okay let us share on our end sorry Cindy oh no problem thank you for saying something also you guys I'm so sorry that our the cameras aren't working with zoom today for some reason so I I can see you guys so know that I I am the tool and I are here can you see the presentation Cindy yes okay thank you you're sharing the screen just going to see slide presentation okay there yes now I see the presentation that works okay perfect um and you heard

006Cindy we do have our our other extended design team members on the line as well um joining us from Albuquerque um just a few introductions before we get started but um my name is ju dado I'm the principal in charge on the project and I'm Kristen yanush I'm the project architect Damian RAR I'm the project manager perfect and joining us from our we have Cindy Terry who is also the project one of the project Architects and B begari on the phone as well okay Christ I'll turn the over to you okay than okay so again thank you so much to our design committee we've gone through a lot of different options with them which we're going to get to here in a minute but um what I want to point out in opening is that

007um there are two awards that we're going to talk about today and we're going to talk about some further options within those two Awards so the first award is a combination School award and this is the award that is in the memorandum of understanding that's been awarded to the district when the district went to the state or psoc to get an award they presented um a a PowerPoint presentation that had a case for renovations to the elementary school and then a new Middle School what was awarded from the state was a combination school now under a combination School award there can be multiple buildings and that's the part I really want to make clear here today this is seen as a small campus it can be one building it can can be multiple buildings and

008that's still under what's called a combination award um when this presentation was made to the state there were more students in the district than there are right now so um you know I'll just invite Sarah sorry to put you on the spot Sarah but you've seen a lot of a lot of presentations come through psoc um like how does this one kind of how does the award feel compared to other ones is it in line with other districts that you've seen of the size I don't I don't really think that it's in line with um what I've seen in other districts I think it's been a very generous award to Dexter and so I've been really pleased to see that come through that they've um opened up and expanded to allow for something more than

009possibly what was needed at that moment so that's what that's what I've seen and typically they wait until those schools really are practically falling apart before they'll offer a new award so so seeing that combination come together and offer more than what really was technically on the facility plan was I felt like a generous offering so or a generous award and so I've been really pleased to see that um that's just been my experience with psfa and I've been I'm stepping into my fourth year and uh so I've seen a lot of projects I have five remove and replace on my schedule right now so it's a lot of schools about 300 million so I see a lot of work and I feel like this is a a generous award and so I'm really happy

010for this community okay thanks for giving us that perspective yes the other um award that districts can receive from uh the state is a separated School award so this would typically be for separate buildings different a name you would call them an element elentary school and middle school versus a combination school but a combination school can have multiple buildings so it's a difference in name um and then the square footage award is based off a calculator um any questions on this I just wanted to note that um you know where you receive some benefits of the calculator um is p doesn't have a direct calculator for combination School award as of yet so there is a lot of discussion that happens at the state level with the district when you combine two grade levels together

011that they don't have a you know a direct number that spits out of the calculator that says this will be the size of your combo school on two separate buildings as a separated School award they'll plug in a number for your elementary students and your middle school students that both generate individual numbers for each building so those Square footages can vary based on that award language which now you have two agreements with the state for each individual school good point so in the past there's been one calculator and this is what this has been calculated based off of in the future there may be a second calculator introduced for combinations they're yeah they're going through those discussions yeah so got a one question on this on this award does that because at the meeting I

012thought I heard 19% but I'm reading here is it 27% that's left for the district to cover so and genie please chime in to um yeah go for it so um that percentage changes Ann I believe based and it's based on a lot of things bonding capacity and such so when this board was made um our portion is 19% but one two legislative sessions ago they have a waiver um it's not a waiver but the our percentage is split in half so we're paying half of that only yeah so we're paying the 8% eight 9% instead and so to also add on to that there's there's two awards that typically happen on a new school project one is an award for design funding which is the shared 19% that Genie just mentioned after we complete

013the design and you guys put the project out to bid select a contract they propose a number you go back to psoc for the construction award so that'll be the separate award that'll happen once you begin construction for the funding to be released from the state to psfa um in cooperation with the district at that point depending on the budget they'll have those negotiations again with the district at your current funding capacity and of course the square footage that we are to the allowable square footage and anything over that and those negotiations of how much you cover and how much the state covers will take place again and if the district cannot fund at the construction award their 19% then they can apply for waivers and different things to where the state funds more of

014that project um when it reaches that point then the district really has to be selective of what they can add in addition to the award language so if they have a an award for 78,000 square feet and you guys are asking for 84 85 that discussion of you paying the difference between 84 to 78 could be on the table for you guys to have to fund out of your pocket so that's why when we're talking about grow Square footages when we get to that phase of the project it becomes very critical that we are doing the math to try and get that award language approved to increase that amount if needed during design so you don't have to pay for instruction and if I can make another comment on so our design professional is one

015portion our construction is another on the construction portion of this particular award the state gave us the waiver so on the construction part the state will be putting the entire Bill within adequacy yeah on the construction within adequacy so this basically the 78 within the number that's been agreed upon yeah and um during design sometimes I'm sorry to keep going on here but during design sometimes you know if if we go back to psfa during design and we let them know we got to the end of programming the district has a direction going forward and they're going to need about 82 to 83,000 square feet if we can justify where you put that area in your new building then they can increase that number during design so when you get to the construction funding then

016that additional square footage is included within your gross allowable square footage um but they have to see that the spaces are being allocated for educational purposes they don't often fund athletic spaces or spaces that are non-educational considered so there's some caveats to the standards too that your question perfect so I had a question you said we have two Awards you have one award and it is called a combined School award another type of award that the state gives out is the second one here a SE gr at school award and so um the way that things were calculated at the time of your award it was all under one calculator there's not a calculator for a combination school and a different one for other schools so so even though this whole time we've been planning

017on it being two buildings yeah so well bear with us for a minute because we'll show you some of the options we've been looking at um there are options under this award that can be for two buildings and there's options that can be for one building there's some distinct pros and cons with what way we choose to go because we're always working within that maximum grow square footage so just because we get two buildings doesn't mean we get more square footage I understand okay does that answer your question I guess so or keep it in mind as we move through see see if we clarify yeah okay any other questions on the awards okay so we have spent um a day at your middle school going around talking to your Administration your staff um observing

018pickup and drop off at both the middle school and the elementary school and they've shared a lot of information with us about how they want to use their spaces everything from this is the brand of thermostat we want in the rooms and very specific things to some bigger picture concerns like we have a concern about elementary school and middle school students um mixing in the same building and so um we want to um make sure that we're meeting um all of the needs of the students in whatever scenario is chosen so it was important to get familiar with that and in doing that um we've brought that information into design committee discussions and gone through really a lot of different scenarios within both the combination school one building scenario and the combination School multiple building

019scenarios so Damian's gonna talk a little bit about that work yeah so here you can see uh a graphic that's just meant to demonstrate a bit of our organizational method as we move through the programming process so as as Kristen spoke about on that last slide a big part of our programming process is coming out in person seeing the spaces meeting with all of you um then we take that and we plug it into uh a master spreadsheet which goes through a lot of manipulation and we talk about each of these spaces one by one again with the design committee teachers we talk about specific Square footages for hundreds of spaces so bear in mind that we've taken all the IND count and that helps to shape the numbers that we're going to be talking

020about as we proceed through this presentation and the the costs that are associated I will add during this exercise you can see it's really small but there's several distinct columns where we're always verifying um adequacy of space minimums to make sure you guys are meeting and exceeding the state adequacy space minimums individual classroom gymnasium you know spaces shared spaces Library Etc so we are exceeding those in most categories um but we're also trying to balance that with your maximum l Pro score footage so there is a lot of checks and balances here that we go through even an examination of your existing space mention to see what is that comparable classroom size that you know and work in so we can get as close as we can or exceed that in the new design and

021I think so the um School Board is clear there are um minimums for each space we go through as well as a maximum so so we're looking for that sweet spot that meets all the program needs within those State guidelines Ming and then the final component of our programming process is uh a good amount of time spent in site studies so uh all the different influences that come together around the site whether that's site circulation um whether that's that's access or setbacks from various easements and util utilities it's it we take into account you know wind breaks and and view sheds and parking all these things as well as historical use that what works currently for the school maybe some things that don't work and we move through tons of studies this is just a

022a screenshot that shows a handful of the studies we've worked through um again these are not designs there studies and this will these will continue to be shaped uh by the conversation that we have today and we're going to show you one when we get a little further on in this presentation today where we stand currently um that we think may be um very beneficial type of arrangement to pursue and we we look forward to your input when we get there but just again an insight to some of the exercises we've moved through we try to exhaust every option to make sure that when we get into schematic design we're working with the best possible lay out that will maximize the resources you have available yeah I think um the important thing to know about

023these diagrams is they are just a capacity study of your site see if we can fit that building or buildings um we haven't gone through the exercise of laying out traffic circulation but we provided space for them schematic design is when we really dig in to come back and present to you all a site plan and diagram so the shapes of the buildings you see now if you're worried about well I don't quite like that it's nowhere near design yet until we get past this program so it's mainly just looking at what we know about wings with s double wide uh double loaded corridors for classrooms how wide your gym will be studying if that'll fit on the site yeah and it's like is this even worth considering as an option because when we get

024into schematic design we're going to have a survey and then we actually know the boundaries of what we're designing within and we have the program in hand to actually see if it works on that site but we think we have um it something that's worth looking at and considering in these options so um within um these there's three columns here and all of these columns are under that combined School award that first one the one that has been awarded to the district and that award was for 78,3 47 Square ft that First Column um this meets theou amount now we've talked through with the design committee different program options and landed on one that's working pretty well um and that one is the one you see in the second column we feel that there are

025some needs that the award just isn't capturing yet um we would have to go back to PSC in April and make a case for why we need additional spaces there's 's no guarantee um but we think we can make a pretty good case for that column B in column A then we would need to reduce what we really feel the kids need to meet that award um this award in column this award and this building option in the First Column includes a shared Library a shared administrative Suite um special education services shared computer lab nurses and a high school siiz basketball court now adequacy standards provide for different sizes for middle school and high school size basketball courts so already even in the base award we're putting in something that's a little bit extra just

026just to be clear um and that would be shared with the elementary school and again when I say shared this could be in one building or two buildings where kids walk um included in this is a base CTE so that would be 2,000 square foot shops no specialty ancillarity spaces for certain programs you would have a 500 square foot lab and just to give you an idea 800 square feet is about the size of a typical classroom and then it' have a classroom to be shared between the lab and the shops in the second column um there is an 8.6% increase over current award in terms of square footage and in dollar amount we don't know because this hasn't been bit upon in the market that will be but this is an estimate 3.17 million

027and I think the multiplier we used here was the same one that you had in your original award which was $500 per square foot now that's very likely going to be low um it's from what we've been seeing around this area lately it's probably going to be more like $700 per square foot so it's going to be more than this um hopefully the state would agree to apply that 100% match to the out but again that's something to be discussed a few months down the line I wanted to just add you can see the spaces that Kristen's going to go through now but the thing to note is that these are educational spaces so which is why you know in discussion with um our our past pH experience also the RMS in the project um

028looking at these spaces we're not saying that your gym is oversized or we're providing a special space that is used as say a a pull out space or breakout space where students aren't in during academic um uh periods of the day which is why we feel that that ask is potentially pretty pretty positive that we will receive that increase but like said there's no guarantee we have to go through the exercise of meeting with them but it does allow your project to have a direction in talking with PS yeah this would be a gym that is really a community use space and that would be an important Point um Okay so in the second column um no additional CTE as compared to the First Column and then on the third column Option 1 C we

029go to 96,6 square ft and then this would be a 23% increase over the award and that would be at least 8.71 million likely um this option includes things that would be really great for the students to have and is something that we could also bring to the state and we're going to keep them Broken Out In Another column because there's the chance that the state could say no to those things but um what this would include are some uh additional uh well expanded Wellness rooms um classrooms is listed here I think that's from the health science classroom probably the additional classroom um expanded PT Space and then within the CTE um dedicated teched computer lab with storage and build lab and that's where you do your soldering and things that you currently do dedicated

030commercial kitchen and meat processing area with ancillary space requirements and a classroom and then expanded welding and construction shops with ancillary spaces classroom so we'd love to see that all make it into the building and you know we we understand that the state is sympathetic to CTE needs so I think we can make a pretty good case for that as well um but moving forward with the design um if we were to go ahead and just design for column 1 C we'd be taking a bit of a risk in doing that because it may not be approved in April um so that's the downside we'd all like to see that one though so this is quite a bit of information as we're looking at each of these options so we can kind of pause here

031um see if anyone in the room has any questions that we can go through and respond to I'll I'll ask so just a clarifying question in a utopian situation in a perfect world right the discussion has kind of centered around option one C I think that's sort of where we've spent a lot of our time y um I was always under the impression that the CTE space because Miss Sarah is so knowledgeable and understands like the CTE want really aligns well with um a lot of State initiatives In This Moment which is why again we've spent time with that discussion but still under the understanding that even though we think we've got a solid case they could come back and say no correct yes that is always a a thing that we have to consider

032and I remember you saying though that you were really confident that we could make a really good case for the CTE space which would then add if my math is mathing like almost what 18,000 square feet but I think there might have been some misunderstanding with that with some of our other team members the CTE space isn't 100% the deal yet should we be awarded that additional square footage that's not going to take away from square footage in other spaces it would be extra on top of the 78,000 correct um and so I just want to make sure that I'm understanding and then maybe put that in some different verbiage so that everybody understands if we are blessed to be awarded that additional space it's we're not taking away from that 78 to put it

033in CTE that would be a blessing and extra square footage we would get which would service not just middle school but high school as well well done y okay thank you and and the adequacy standards do Safeguard you in that way too so specific sizes of classrooms and based on student counts things like that are we have a planning guide that says hey this is what this is what this amount of students need to have so so yeah the CTE is always in additional to that yeah for sure thank you so with it not being awarded to the high school per se are we likely to get that because primarily middle school and high school would be solely using that not Elementary correct so this is a middle school award too so so yeah we

034still have to consider middle schoolers and take care of that yeah I said middle school and high school yeah so so so yeah it's just a it's not really going to be probably used by the elementary school but because you because you have that aspect of your middle school on there that's that's the I'm saying is it likely because it's going to be centered middle school and high school that we would get that no it's likely because we're being very favorable towards CTE because we see the benefit throughout the state and what that's doing for the children that possibly don't want to go to college things like that so we've really seen a huge benefit to New Mexico children in just just yesterday you know you had the governor give her address and she spoke

035specifically on CTE being the primary focus of where education needs to go to the state yeah so we're right on that yeah yeah we're we're centered on that definitely so I have a question if the CTE is going to be used by Middle School and High School mainly then why aren't they allowing for the cafeteria to be remodeled that's a great point so we had that discussion um the award is specifically for the elementary and middle school um if it wasn't a campus designed or laid out like you alls is now and we were on let's say a different site with no adjacent cafeteria our program would have to include in that square footage total a new cafeteria and a new kitchen which would pull from some of your other spaces that you have wanted

036like a larger Library U of course the gym space some of the base CTE areas um with that said the second that we touch the um cafeteria even if we're renovating the space they have a way in psfa in the calculator that you can take what a new cafeteria would be for a middle school the square footage for that let's say it's 2500 square feet 2600 square feet and that would count against your number and then anything in excess for your existing space would grandfathered in the total that still counts that 2600 against that number there so we were able to keep that out of the award language since it's a high school building that's going to be used by your campus to increase the amount of spaces we can have for the other areas

037that you would like to get within your new school um it's a give and take so if we did touch the cafeteria then there's a good chance we would have to reduce some of the other spaces for the renovation yeah whether it's new or renovated it's counted the same within your total grow square footage so it's great you already have a cafeteria that could be used because it allows that to be used in so many other spaces so thanks to the design committee we've come to understand what spaces are priority needs and then thanks to Sarah being a part of our meetings with psfa we've come to understand what possibilities could be too to get to get more possibly so could we say that if we we um I guess I don't know how to

038explain this because our cafeteria when we had we we were there at one time we had to go through a lot of manipulation and times and whatever and there was not enough room for all of us at the same time right so if we don't if we keep it the way it is we're going to go through the same problems all over again and so and I'm an advocate for elementary elementary is going to be the one that's GNA go on the Wayside and then everybody else is gonna get what yeah so we and actually and I'm sorry to interrupt we've actually kind of talked about this Dr Graves and M sis and I we would and and this is Montgomery we'd actually go in there we'd remove some of the booths uh possibly some

039of the trophy cases to actually give y'all a bigger space over there that way we could keep y'all separated like y'all are wanting to be and you wouldn't be intermingling with the others just bear in mind you can always come back to back to the table at a later date if you wanted to do a renovation project on your on your cafeteria um they would have to be under the high school because that's where it's allocated but you can definitely talk to faciliity Larry talk to him see if if the cafeteria is eligible for any um any funding as far as a remodel or so that's but that would have to be something separate thank you and I don't even know where your building is on all of those things because I don't do facility

040Master plans or right or or keep up on facility maintenance but yeah you're always welcome to have that conversation with Larry okay I been set up that meeting for you so I guess just to clarify right now we're looking at the cafeteria being all everyone in the same cafeteria and no multi-purpose room with like a warming kitchen or anything for elementary it would solely be all all in the one that's correct within within all within all three of these scenarios that is the case so we'd be looking at probably another 2600 square feet if we wanted to do that could we take it from somewhere else yes we could reprioritize and make that a priority yep where where the priority was set was getting a gym to the size that you could have two um

041a gym multiple gyms on campus of the same use right and so we combined that multi-purpose room that you would get in an elementary school into the size of your gymnasium for the Middle School to make that space bigger um if we made the gyms a little bit smaller we could separate out a multi-purpose room again and have maybe a potential warming kitchen for flexibility and kind of schedule gym and um cafeteria function simultaneously with div so what is the square footage for a typical high school size gym so what are we looking at yeah so and then what's allowable for Middle School gyms and then it's allowable for multi-purpose rooms Middle School gym um I think is 5500 and um high school gym I think is um 6,300 so to follow up that that

042response the one thing to note is that in the F feet that is your space within adequacy to lay out your building however you want so you could those are our minimums for the gym you could make your gym bigger reduce the classrooms or have some of the spaces come off the list a bit more to make your gym larger if you're within that square footage the second that we go over that then PSA wants to have the discussion of okay you're prioritizing your gym space and you're over this is non-academic space so the amount that you are over adequacy let's say it's from the 6300 to and that's off the top of my head give or take it's really close yeah so from the the six let say 6,000 so I can remember that

043number of the 6,000 number your gym is actually 8,000 you're 2,000 over in your minimum gym requirements and you are an additional 5,000 over your minimum or your grow square footage award you may be on the hook for that 2,000 additional square feet out of the district pocket so those that's the numbers you have to um what is the minimum score the multi-purpose space What the 24 I thought that's the number I can look these up but yeah I feel like I did see that sheet4 that's something that I think the elementary would need is is the multi-purpose room you know not for eating and everything but I think they would need the multi-purpose room for the PE and and things like that and I can confirm we do have 2400 in these programs for

044that but is that adequacy probably we probably w yeah I guess our concern in the elementary is because there's PE classrooms going on while we're have eating as well so we need that definitely separate space and then especially now that it's been cold um again we can't take them outside so we have three different grades two different two to three different grades in that gy and it's packed we hear you because the high school is also using that gym now um you know one thing we've seen for scheduling is we can put a divider curtain down the middle of the gym so you can schedule more classes in the same space simultaneously but are we talking about a gym size or a multi-purpose side SES that would be you know we could put the square

045footage where you want it we could either you know create the larger gym with the divider curtain or maybe create bit of a smaller what we call fullsize gym you know using a smaller quart size and then reallocate that some of that square footage to the multi-purpose space it's kind of a shell game at that point but whatever works best so that we can make sure we can schedule all the classes so to answer your question um a minimum gym size for a middle school is 5200 Square fet that's the minimum um plus you get an additional amount of square footage for seating in the gym and so that totals about 6,300 square feet so that's for your bleachers and some of those different things that we calculate based on the student population size of

046your school since it's a middle school you can use the bleacher count but for an elementary school they're not expecting to have you know um exactly Athletics so um the minimum size for a multi-purpose Elementary School is 2400 squet great and so did I hear that we were going to potentially go with a high school size gym so what's in here right now is a middle school gym plus a th000 square feet so it's not quite Middle School gym plus seaing plus a th so like 7300 it's actually at um 8,300 sare ft for High School uh for the High School Port oh high school which yeah I think I think she said yeah so we're under the high school but not but over the Middle School yes your existing school gym size for the

047middle school just in comparison is at 5,600 so it's a much larger gym your Elementary School gym is at 8,500 so it's closer to that size our current one your current one correct your current one it's a big gym so you're in a gym now that's close to the size of your current elementary [Music] school so maybe the curtain thing would work or split it up we've seen it work not just for bad weather days and having the students inside but also if you're running multiple practices you know a lot of our K12 combined facilities they have to practice two middle school teams two high school teams and with one gym they were there till 10 12 you know 11:00 at night now they have the boys and girls on opposite sides of the curtain

048using the facility and volleyball as well middle school high school so um it would fit a crosscourt size at least not a full court like a high school court but it's a reduced size court for cross courts to have practices on either side of the earth absolutely yeah and we we realize all these considerations you know are thoughts you need to consider to decide you a word work and so um at the beginning of the presentation where I had talked about those two separate Awards um again these are all under the umbrella of that first award and is there any yeah is there anybody who feels like there is a benefit to going back to the state to ask for a separate School award um now I I didn't explain earlier but if that decision

049is made you go to the bottom of a waiting list I don't know when you would get on the state's agenda for a new proposal it would delay the project in the tune of how many years I'm I'm not sure um but that would be a major drawback for what you know you'd get to call one in elementary school one in middle school maybe you'd get more square footage but I'm just thinking based off the fact that the State never approved that award to begin with for a brand new middle school and renovated Elementary School and population numbers have decreased since then I think it's unlikely the other piece to add to this which um is aay of Sarah you can jump in anytime but um for districts that are doing uh two Awards the

050likeliness of getting a waiver for both is not not happening so um if you're doing a combination School award um Genie mentioned that you would get you've already received the waiver for the construction fund at the state covering the cost at 100% where if you went back for two Awards maybe you get one covered and the other one that District's on the hook for a lot more money than than it would be at the current split um now Kristen did mention earlier you can still have two separate buildings in a combination School award but now we have to share the resources and that square footage between each individual building so yeah let me show the next one yeah kind of for what that could be just so everybody's clear when they're talking about these options

051here and they talk about money and extra and you have to add this and you know you have to go back to your pocket which would be the district's pocket for more money we don't have a pocket okay yeah just cut into the Chase and and also on psfa side if you go back to the drawing board what happens is you go um this project gets pulled away from me and it gets handed back to our program manager and what she does is she comes to look at your pocket that's the first thing she's going to do and if the pocket's empty uh like Mr gra is saying a a project doesn't populate and so that's that's the real gravity of the situation by going backwards I um I think it would be a community

052disservice for you all with as many projects as I see and all the ins and outs of the project I really um I really think that you're in a really good position right now to move forward and I think that you guys have clarified really well that it's one award that it can be two buildings I think that that was a super huge concern for many people and so thank you for clarifying that I think that that's that's alleviated a lot of I mean not to say right I mean we don't know but yeah right I mean at least it's it's in the books and square footage and all of that can be maneuvered as far as e spaces and workout spaces exactly and also keep in mind the award that we've received is excellent

053because it's based on past numbers which we'll never get to in the next Lord knows how long so we're in great shape by moving forward yeah good point okay so this diagram um we put we located on the site where you know currently your Middle School is located and that's shown in the dash line so to the west of uh Lincoln um and what we wanted to show here is that we can separate students and student traffic we've done this on other projects so we're showing Elementary School Wing Middle School wing and then a central area of shared function so there probably within the square footage allotment be some shared functions still but that's the beauty of it you can have larger spaces so long as the elementary school and middle school share them but

054classrooms they can remain separated main corridors can remain separated and however you want to link these things whether it be through secured covered walkway whether you want to detach these spaces whether you want to keep them all under One Roof we can basically do it with this diagram we can look at it when we have a survey and see if there could be one story option two story options we can still do that and keep the kids you know in separate areas and interior as well as exterior so separated play spaces as well good point separated drop offs if needed um you know we know that often uh especially you know like I always mentioned I grew up in love so I know that you know my sister was in elementary school while I was

055in Middle School and my mom wanted to drop us off at one spot and so I know you guys deal with a lot of that too and so those discussions as we get into schematic design can start to come into play but at the very onset of entering the school one grade level goes one way and then the other school goes the other and they are in their separate wings um in the combo School option and you can see there's you know the streets are drawn in a dark orange color and then there's kind of a lighter Orange Street going across there um where Clark is and that's something that we've had discussion with the design committee about um we may be able to um capture those easements uh within the property in the future

056so that can all act as one campus and there's not a street that's dividing the campus that'll help unify things are we looking at that space more than we are where the round building is just because it's a bigger space or I it's because the cafeteria is on that side of the street basically then kids don't have to cross the street as much I will say we studied both sites um and looked at the option for potentially two story across the road um when it gets into the play Space we have to really lay out the schematic level to see how that space will work with the building there but we don't want to negate the use of that site at out the gate because the survey May yield something that we want to avoid

057with the side on the left right with the adjacent railroad track there may be an easement identified that we have to be back you know so many like 100 feet yeah and that would eat up from that Middle School viability space which means we'd have to revert potentially back to the other side so um both sides are an option um but for this diagram we definitely showed it closer to the cafeteria to we're crossing Lincoln reason which makes sense for the little ones I guess you know there's thinking of like CTE spaces I know we were saying like we wanted C or I guess right would be so you could have a clear view from middle school to high school but that's still going to be blocked and I guess those are later things that

058yeah CT is something we can you know I know we're sharing it with the high school so there needs to be an easy connectivity there and we're GNA consider what is safest for the students so U one potential solution is we could have fencing with openings at certain locations so kids aren't just walking across the entire campus but they either need to cross at a crosswalk or you know at a safe a safe place in another location but kind of limiting those and those can be done with Access Control timing we do this all the time for campuses to where if you have passing periods then the gates unlock for 5 to six minutes while the kids cross During the period passing at the end of the time frame they lock again and so that

059can be extended to your site elements as well as your building and building entries but um that's another tool that once we get into the actual design of the building we can look at those um points of observation and student traffic as they move through the campus okay I did have a question just um as we observed the high school students really move up and down down that alley way that's there for that bottom horizontal line um is that something that would would potentially continue for student traffic or yes okay we've been looking at the CTE location we've talked about it as a separate building we've talked about it as a as an attached piece of the building um and looking at that thorough Fair we were just all curious about that okay um any

060other questions did we finally figure out if we're going to be using the clerk Street as to be using it so yeah great question it's under investigation right now so we've shown it as a lighter line because um in discussions at least with the design committee and Jeanie's also um talked to the county about a few spaces that we're looking to capture as part of this Annex annexation into the district site um Clark Street we'd have to just examine utilities um also with the city get the survey completed and then go from there to see if that would be a viable pedestrian Crossing um right now we think it would be because you already have a piece of it that you use as part of your District you fenced it off right with the vehicular

061Gates and so that additional piece between your Auditorium tennis Sports and your high school as a means of Crossing is is some next steps to dig into with the survey but that is still something we're looking at and um if there are utilities but you're able to Annex the property into your own those easements just have to remain with no building on top of them um we can do flat work but the county has or the city has to be able to the Village of De has to be able to dig down and repair those as needed through those utility easements so we may not be able to build a building per se if you Annex it to your campus we don't know that yet but we'll have to find out yes ma'am that's the

062next one then so um this is the information we have to share uh you know we we are here to answer any questions that you guys may have in regards the project um we know you'll probably still have to have some further discussion but we want to just be totally transparent and kind of just show you guys where we are as of today um we do want this to be a district unified decision you know your design committee has done a great job of leading us to this point um but this is this is your project and so um with you guys coming together um deciding the the best out as a board and District administration um we are ready to proceed in that in that direction so if we go with the two buildings

063under the combination award then we're going to lose stuff in each building because each building middle school has to have their own administrative Wing Elementary has to have their own administrated wi right good point so that's going to take away from both schools right y whereas if we combine them and put it all in one area now we can we've got a bigger area all right that's right correct you can still have the separated classroom wings but now that shared spaces centralized Administration for the combo school gym um potentially some shared just saying you know if if they say in the combo build we can make that admin office 400 sare foot but if you separate them now they're only be 200 square foot right something like that that could be the case correct and

064it may not you know 200 square I mean I know you thr out a number but that may not be enough we'd have to really look at the each individual ad it probably end up being between 3,000 to 4,000 square feet just by the time you get you know all of the um the nurses office um you get the administration offices the bookkeepers the attendants everyone in it does start to add up pretty quickly um but yes that would that would take away from let's say your classrooms or your gym those Library those types of spaces okay real quick and I don't I mean I don't know where the 800 number comes from with classrooms but you know we're looking at legislation that's coming up right for the 20 students is that is that playing

065a part in the amount of classrooms or classroom space as far as because I mean typically we're not we're falling for sure above 40 right I mean per grade level so that would absolutely mean we need three classrooms if that passes and so I don't know if that's been played out so where that number comes from I can kind of uh just walk back back a bit here um the state has a minimum classroom size of 650 plus 2 square ft per additional student for storage so it ends up coming out to about 2 680 675 um that's the minimum space now if classrooms are larger they have a square footage per student count that you can then increase those classrooms so sometimes they land around 700 plus um when we looked at your existing

066size um in the current adequacy standards the the new ones were just adopted I think last week right I mean yeah and so just last week the calculator still isn't out for your grow score footage but individual space is out um we were Landing about 800 as a number and that PTR ratio we're looking at 20 and it varies per grade but it's average around 23 to 24 students to have one teacher in the classroom um we had designed that 8800 for some additional bubble years but let's say you have maybe 26 27 students you bring in a teacher's aid you can still service those students in the classroom the new adequacy standards just released uh a minimum 800 classroom size so now that is not the 675 but the Baseline is 800 what we

067need to dig into still is because your project was awarded before the adequacy stands were approved we need to have a discussion with psfa if you'll fall under the old ones or the new ones either way your classrooms are at the minimum for the new adequacy standards in addition to the previous right and so yeah so let's ation they WR is they're saying k123 would be like classrooms cannot have more than 20 students per classroom oh Anders understand okay so that that's where I'm kind of trying to forward think some because that would change right we're thinking oh 800 could fit between 23 and whatever but what if this passes right then you're not allowed to have 23 you were only allowed to have 20 so that would automatically Force us to have three extra

068class you know even if we're at 45 students that still means we have to have an extra classroom correct yeah so let's let's go back into individual space now so your prek spaces as of right now we're calculating between 13 and 20 students for that one to 20 PTR range right so we always just pick 20 and so your 3y 4 Y prek and Kinder spaces are all a th000 square feet plus so they're about 1,000 square feet 40 in the program so those are larger because those programs come with more stuff right the kids have different areas and different things so those are those are larger than your current spaces now we're 918 as we go down to the first through third grade classrooms we actually add in the storage and make the classroom

069um a single space with organized storage which is like sliding marker boards and deep casework those are actually 840 Square ft right now and we use a calculation of 17 to 22 at least the times we so with those standards coming out um we've looked at that 20 student range and programmed eight classrooms for your first through third grade range and five classrooms for your fourth through fifth grade range so there is some fluff built in um for those larger student years that you'd have more classrooms or the way that we lay out the plan will account for bubble years that let's say you have a huge third grade population and you have to pull from some of those spaces the classrooms at the first through fifth grade level are non age specific there's some

070casework nuances that we'll have to talk about but you can swing a classroom from one grade level to the next to make those spaces work so there's only five classes for fourth and fifth grade the way I read this now is you have five classes program for fourth and fifth grade and the total from 1 through 3D is and these are the general classrooms but you have 13 classrooms for 1 through fifth grade you said it was 840 this one 100 so we on the for today's presentation we revised the options to get you guys the 78,000 square feet and so that's and that's something that that I want you to know that I will advocate for for Dexter is that even though this calculator is coming out now and it was after the award

071um I have no problem asking for that that's an ask on my for you all is to is when we go to council to ask for extra square footage I also want to ask Council for um for that calculator to be populated into this project because it only makes sense you're right on the cusp of it of it right I mean I don't know any classrooms one two three that are under 40 do we right now so fifth grade is at 45 but we have to keep in mind that was the co class that started kindergarten so we had a lot of students go to homeschooling and we didn't get a back all the other grade levels are 55 to 60 so that would automatically mean three classrooms if legislation passes three classrooms per grade

072level that's for my concern it does yes yeah so fourth and fifth would need six classrooms yes as of right now we can accommodate 296 students in the 13 classrooms um and that's just first through fifth That's not including preing and if something changes on that end because you know let me know let us know and then you know if it's something we have to rearrange and it's a mask I can know about it the session will start I don't know how I mean we can track that bill I guess right but oh so we'll know right when when you session and I I I foresee that one being pretty pretty hot because I mean you have they're they're spending so much money on education right paying teachers more but classroom sizes are ginormous 27

07328 kids you want you want to bring them down that's the only right a science experiment okay your P te more that didn't work so now what's the next step you got to bring class sizes down so you also have you know some I would say other classrooms right that so like your art classroom is a th000 square feet which would house some of those students and then you have the um music classroom as well that would house some of those students and so there's some there are some additional classroom spaces that are not part of that first through fifth grade total that looking at um the discussion of flexibility for those and how those program into use for students um and student population we're going through right now with the utilization studies in the

074program to see how that would work so maybe what we do in our calculation is we'll just show you guys for full School utilization how many students are in each classroom to double check these one year we have several students and need more than like oh well that this year we won't have part because we that need to be a classroom no that wasn't my intention I'm sorry I I didn't mean it like that I meant that a portion of those students in that classroom um would utilize art right and so depending how your schedules are set up and again at DeMent school they're in a home room all day so I doesn't make as much sense but okay good point so yeah maybe we could talk about that a bit okay yeah I just

075I I just wanted to make sure that that was out just because it's G to be a bill consideration it's going to be a huge consideration I mean if we only have one grade level at some years right is fine but not if we only have five costs for those does that make might Mak sense it does make sense yes yep and we always check those numbers too to make sure that everything's on the OV and up yeah if something changes at the state level for those requirements and we need to boost the classroom PSB is on board to fully negotiate of the standard change so we'll follow suit and they'll increase work it we got an influx of students yeah so when we go back to Council in what are we planning on Council

076in um Council will be after the session in April are we going to be ready for that um it depends on today's discussion but yes I think so yeah by the time we get to the end of programming that gives us being the end of January an additional two months to prepare for that okay okay you think we'll be ready by that time yeah so then we can we can take a look at numbers again let me correct I'm sorry psfa in U March and then depending on that Council in April May thank you I didn't speaking of the council not not the psf picture right yeah no no I'm talking about I'm talking about Council Council right Council because if we're going to council those all the information if we are able to wrap

077up okay March session we'll talk to those in scheduling yeah it's 60 session so it's the long session so I thought that's why April was going to be because it made January are no ISS we can continue yeah but we do have a direction to move forward then us wrapping up programming in February is very likely submission to psfa and from there um discussing the options of going to council and then lining up the dates to do that would be the next step yeah okay additional questions just clarifications I have a question so with our two one this project two buildings can we stay at the 79,000 sorry with having two buildings with this project can we keep it at the 79,000 yes without losing we have to adjust that program we really yes think

078we need though right it would include I mean though the details below there would be some gives and takes on that so if we're on column 1A which would be the close to the 70,000 Mark that you mentioned there would be some some cuts to come back to get to that amount um but you know if the comp School option is selected to move forward column two is where we'll probably Target for negotiation with psfa to get that 85250 moved into your uh awarded GSF language so then the line would essentially move with you um for state and option one we will have the middle school with the full size gym and then the elementary with the multi-purpose roomy or a gym um option one B you said sorry all the options have right now

079that middle school plus expanded gym size and then they have a multi-purpose space but that what we've been calling a multi-purpose space actually it's really just a small gym it's not going to function as a cafeteria in the current square footage so it's like an elementary school small gym and then a middle school gym Plus so that's the 2400 feet that you're speaking about correct yeah and I think the the question that we've been hearing is that could that space be used as a space for eating cafeteria or an additional exercise room is that why you're curious there's two spaces or you were just verifying that still in the I'm just wondering about the G space because of PE because we have the two classes going at one time okay on those sorry on those

080other buildings that we went to go see didn't they use the multipurpose room for cafeteria and did yes ma'am of they have the pull out tables from the wall right now they're scheduled at capacity you know um all periods a day five days a week in the elementary school gym so they need gym all the time to be scheduled so we'd have to expand that space to basically twice its size so it could also function as a cafeteria with a divider in the middle or modify the schedule and send some people to the Middle School gym got gym okay so it would be a scheduling discussion but if you opened up that period for lunch then the flooring we would use in there could be multi-purpose or you could have it kind like set up

081take down set up take down correct or fold away right you know and again these are just where we are today um if we go back to the committee and everyone decides to move forward with the combo School those spaces can push and pull a little bit still so we can add a total that we decide on reallocate some additional spaces to or from other areas if those those needs AR identified by you guys with sorry with the cafeteria um when we used when you guys were here and we had to share the high school with did we start lunch and ended lunch for I mean k through I think 11 we started at 11: and the last lunch was at 12:30 or no yes with the middle school high school 12:30 it was with

082high scho high school so elementary kids were with high school yes and I think right now this year and I could be wrong but I think High goes to lunch at 12:30 am I right 12:40 1240 12 12:40 to 1:20 so right now there wouldn't be that overlap so I so let's let's pretend that their Elementary is elementary and and they were going to get the cafeteria what size would that be and is that still a is that a possibility within the mie it it absolutely is so the minimum size would be 20 400 sare ft for the uh that multi-purpose space um and um you know as we talked about like scheduling or some different things if we could look at the full program and the full day schedule and see where those kids

083go then that space could still be utilized as a space to eat space to eat correct me if I'm wrong one um Elementary doesn't get a gym not in any award they only get a multi-purpose room right no matter what the combo school would allow you know depending on schedule again the use of that bigger gym maybe during parent nights or different things at the elementary school programs I I understand like we've got to make some big compromises just because of the situation and the war that's amounted but I feel like middle school is getting something bigger and Elementary is getting something smaller and I feel like there's got to be a compromise of of between that because I feel like we're getting short in and we're compromising at the elementary a lot of things

084to accommodate middle school and it's nothing against middle school there are students too that one time they were our students continue to you know we want better for them as well but I feel like the compromise has been happening a lot to the elementary we're comp so and and I'm just throwing this out there because I've seen schools do it where they have the gym space and bleachers and then up on top they have eating space like you know I mean it's like obviously multi-leveled I mean would that space be considered the multi the multi room space the eating space that's kind of not in a traditional uh rectangle but maybe kind of thing I have a question with the um she's using the cubic square feet you know what I me cre like like

085because I want all kids to have great things but at the same time and and to be a great community space and so how like and I don't know if you guys have been to Jal they have it that way their Elementary is and and J's different monies I mean we all know that right they they function off a lot of other things that dex's not getting but right they have the the gym they have the bleachers and then they have like I think it might even just be on one side where it's like like kind of just eating space just like little diets or little I don't know I mean I'm just trying to because I feel bad that Elementary would have to be in the same you know Elementary lunch is way different

086than middle school and high school lunch like it's just it's just a different and to be sharing those meal times with them it's it's tough to see you know it's just so Chris mentioned that Elementary doesn't get a gym is that why the schools we visited that were built um in Roswell they kept their gyms and built around it is that possible for this space over here to keep the Middle School gym remodel it and build around it keep square footage that that is an option so leave it right later because I know a lot of schools in Vos they kept their gyms like Del Norton correct they built this huge school but they kept their old gym um is that why they're doing that is that a Poss possibility here to keep the Middle

087School gym for the elementary yeah great question so um the example I can give is um we're doing a project in Springer right now and their gym is massive it's around 9,000 square fet combin k12's school but they elected to keep their gym because the new gym they would get would not be the same size as their existing gym so where that would hit on the program as we talked about earlier like the cafeteria is the grandfather space so we would take the size of your gym as if you were to build it new which is the let's just say 6,000 number was number we used earlier right we would take that amount of square footage and take a hit on the program for that and then if your gym is over that size let's

088say it's 8,000 then that other square footage a 2,000 over the six gets moved into a grandfather tool that does not count against you on adequacy so that's why schools are keeping those gyms because they can take the the hit on their program as if they were building a new one but then get a much bigger gym to a win-win because PSV now doesn't have to pay the money to build a new gym if your gym is structurally viable to last another time as your new school um plus the school gets to keep their fullsize gym so that is an option um we'd have to look at of course your existing plans to see if the gym could very cleanly be kept while we demo around it um the gym the gym is that piece

089that sticks out this way at the time but that would also take away we would get a new gym would we we would not get a new gym so your gym would be renovated so we'd be back to that one gym again my question was get their gym but the elementary keep that to keep M instead of a multi a combo so they want to keep that gym but also build Middle School another gym and turn that into the elementary gym if we're not renovating it there wouldn't be a need to like the whole thing would be grandfathered in there would be some work that could be done though because it's going to have to be pretty cleanly detached so let's let's give the real life example here so your Elementary School multi-purpose based you

090know they don't call it a gym and the adequacy standards but your multi-purpose based Elementary School is 2400 square feet and that existing gym size for the middle school is at PA for dramatic effect okay it's at 5609 yeah you got it to it I was on my way there 5609 so then of that 5609 we would count the 2400 square feet against you in your program but then you would Bank everything over that into Grandfather and so Elementary would get that full gym we would have to renovate it I think that we've seen the gym we've been through it we' have to definitely renovate it some new flooring finishes um even look at that existing um the bleachers that you have on one side and maybe replace those or demolish those to get you

091to the full gym but that is a possibility and um at the elementary school if um we were talking about Equity right now in the program the art classroom and the otpt space are located within the elementary school program um it depends how you think about this if you think about it as one combined school where everybody shares everything you know everything is everyone's but just to be clear right now in that elementary school program that there is something that's not also in the middle school program should the buildings be you know separated if they were completely separated right but with the shared space the gym is in the school so to speak and so is the multi-purpose room that's what you mean though right if elementary school or middle school that say moves across

092the street then those spaces go library is that's a shared space as well yes the library we have is shared right now so will middle school and high school still share the space or will it be middle uh elementary middle school because we had talked at one point where Middle School would share with high school yeah and I don't I think there's there's been some discussion over that and it's going to go to where middle school and Elementary School would share the library so if you separated if you did separate buildings where would you put the library we have to to chop it and oh so that that's what CHR mentioned that can share or or shareed in one building right that that's the thing but now once once population students have to go to

093the other building or you make it you can divide the square footage or put it in that Central Area so shares what's the combined currently currently of the library [Music] 41 yeah um 3,900 it could be split but we we're thinking about your book counts those different things as much space to them it would be pretty small does it does make sense to have it more inclusive doesn't it that'd be smaller than what the current Middle School library is right now tin would it feel more like you were getting the things that you needed if things together would you feel more like Elementary wasn't I think the concern is that and that shared space so elementary students are back and forth to the library all day long and so the concern has been brought up

094that theyed with middle school kids and um like in the Ping so there's classes but then there's also back and forth where they go check out books because of AR so the staff's concern is that if there's Middle School in there the elementary would be in there at the same time and the full program is 3900 square feet when we met the last committee meeting we talked about a space for books and sacks and then an adjacent space that would be let's say a reading or instructional area that's the size plus of a classroom so then you could have potentially two means of circulation in there um what that would look like have to lay it out but we'd have to definitely address or talk about all those concerns of what if we have both

095grade levels in here at the same time vertical space count vertical space cubic volume no it doesn't unless it's um like a separated floor that was just the concern the element going back throughout the day right and I see a lot of combination throughout New Mexico we see the like the prek and the elementary schools and I think that my professionals the way I look at it I feel like and I'm a mom so I feel like they really do a good job of of making those separations you don't visually see them so much those separations but they are put together with those you know locked doors you know time doors things like that so it's like it's it's something that you don't visually see that separation but it's certainly there to keep one grade

096level away from another grade level and I've seen some really creative and ingenious ideas I mean I have little faith that Decker can pull things together to really make it to where the little kids aren't with the bigger kids and things like that I know that they can that they can make that work for you all but yeah so I can totally understand that concern um my kid you know two kindergarteners see if I'm going to taking my kindergarteners and then there's a seventh grade class in there I can see doing it that way but what we're saying is like I sent two all along little kindergarteners to the library by themselves because they needed to get me books I couldn't leave my classroom because I'm teaching it so there just those two went and

097if they're walking and and passing to you know seven graders you know whatever that's what we were saying our concern was well I think Decker could make it where there's two completely separate instances you know so Elementary come in this way and middle school can come in this way and you could set up that library to where basically run a set of bookshelves down the middle with the librarian desk in the middle so they yeah they can't get would wouldn't drive and that would also keep the collection separate yeah yeah you know we will produce several design options taking your concerns and comments and trying to address those in the design as much as possible the thing that never ceases to amaz me as many schools as we've built is that um the magic really

098happens with you guys guys right and so when you get into your new building um finding the way that it works best for you even if it was designed a certain way to have that flexibility to adapt with you and change so let's say you know we had um the library shelves laid out a certain way once you guys use it giving you the flexibility to change your library around to say you know what this works a lot better for us I think those types of things are still going to have to be vetted look at the options could we change it to this someday great um if not this works great those are the types of discussions that when we get disc ma design um envisioning yourself now in a presentable floor plan is

099going to be very much a big exercise and then you know moving in and visualizing the space we'll do 3D walkthroughs and make those changes live with you guys um to see how how the space would potentially work for what you need um but there may be some operational things that you could do in your previous school that we'll have to talk about and see how we can get as close as we can to make those decision but I think as administrators we're going to have to be willing to be out of the box thinkers and uh the fact that we're probably going to have to change some process and protocol you know that's okay we'll figure it out great discussion um any additional questions or discussion for us today we're we're here for you

100guys so so I have a question I guess um who is and I guess this is for the board who is the one that's going to decide basically what we're going to go with action item think on there's Antion on the agenda well let me let me help you out a little bit let me let me give you an analogy this is this is for everybody in the room there's a train sitting out on that track and it's leaving today and everybody here needs to get on board and give Decker the direction because that train as it leaves has got multiple stops and we can't be late for those stops so that's the decision and the guidance you need to give Decker and Sarah to move forward together and we all in on this because

101here's the bottom line there's not another train coming so the decision that needs that we need to agree on is one building work I think the decision to agree upon is if we're going to do um follow the combination School award and then with the program totals we're showing um if those numbers are are good to proceed with um we can look at again the program with the design committee and discern if we need to have just two wings with a combined building or two separated buildings at that point and I think that's a decision that you guys can speak with your design committee and lead them there knowing that if they were two completely separate buildings program would have to be allocated as such within that number but they still could be two separate

102combined buildings um with program that that wouldn't have as as easily accessibility to be shared between a single school so I think that that's the decision you know if um if we're okay with the award that we're showing at the 7847 with the expansion program expanded program that we feel is a is a good ask from the state at 85,3 um if that number feels viable to you all and the spaces that we presented in these options today within those that number feeli viable to you all then if that combo building or combo program separate buildings would work then we can proceed forward as design look at what is the program number we want to move forward with between these three we are optimistic that um option 1B could be approved by the state but

103there's no guarantee um and Option 1 c a way we could handle that within schematic design is to kind of see if there's a way where we can Dash in you know a portion of the building in case that were to get approved by the state we'd know where to move forward with it when we're laying continuing to lay out the building does that sound like a good approach y just for clarification the other option would be be denied them sto today we stopped today so I will turn in the paperwork to my director and the project will stop immediately and then you all would go back as a district reapply to the state for two separated facilities I mean completely separated facilities where you have now two gyms put us back at the bottom

104of the list and we would start all over yes and that's right now we're not taking any new um projects because we're catching up we have a lot of projects throughout the state so um if anyone was at the psoc meeting uh last week was it last week week before somewhere in there um they came to coun we came to council and let them know that we're backed up because of all of the all of the projects that forward that we're trying to get into programming and so we asked them for the for the space to take a step back and they they allowed us that so right now there isn't I don't know when that'll open back up so that's pretty much where we are it's kind of an unknown uh number when you

105would get back into programming again uh Sarah let me ask this our elementary school where is it at on the list as far as to be rebuilt because I know our our Middle School is up there that is you know if we go to PSC and ask for a new Middle School they'll give us that because we're there but where's our Elementary at um you and I could dig into that wasn't far down it wasn't much further down than the middle school I which I believe is why we we can dig into those numbers with with Larry if you'd like right no I was just wondering if you know if if for some reason it's not on my radar yet right but I just wondering you know if we did get going back to PC

106if it was up high enough on the list that we could it's not on my radar so it's probably it'll probably be a while a few years my understanding though that if we do that it doesn't matter where we're currently sitting right we go back to the bottom right and what allowed us I think to be here to begin with was the sheer age of the 200 wing and the Middle School gym is what opened up this door for us to begin with right yes and just speaking on our bond funds you know our 1B with the what 6,400 foot overage if the council doesn't approve that the district needs to come up with at least four and a half million we don't have that bonding capacity we don't determine our bonding capacity it's based

107on property taxes in our school district um and I mean you all know what's going on in our school district we have empty dairies we have it's going it could affect our bonding capacity but our next Bond sale which you or bond election you know might be for a million dollars maybe and then of those that has to last four years every year each building you know $30,000 a bond goes to the collectively to the three buildings it goes to um our technology infrastructure so we don't even have that money work so even without a waiver you you're at 18% with us right right so if you went back to the if you went back to council and asked for let's say you went back to council for the the elementary school there's a chance

108you would get the waiver for the ele the middle school but there's a high there pretty much you wouldn't get you're not going to get two waivers that's not going to happen so you wouldn't have a waiver for the elementary school a basic rough number on new schools is about 40 million so you'd be paying probably 18% of million yeah so it and we can't I mean capacity to bond out that much even if we raise taxes there's still a capacity only 6% of our assess valuation can we bond for can we borrow and that's what El that's the discussion Elise will start with with you and then that'll make or break whether a project moves forward or not and if that money isn't isn't there and she'll be looking at that she'll be making

109sure that the funds are available before it ever comes back to me as a project so she she vs all that out and then it comes to me as a project so it does take some time well you probably know how long it took to get to this point well and had this one had it not been for the waiver we could have done it yeah it's just impossible I've got a question I'm new to this whole deal and I apologize I'm trying to keep up you know just trying to listen and I appreciate everybody's work that went into it understanding the the design committee you guys um so on this that got passed is it only for a brand new bu building or can we use those funds to remodel what we currently have

110and not lose the square footage we wanted to at we we actually went to psfa so we could get the money to remodel the elementary school they told us no that is over capacity we're not g give it to you we will give you the money to build a new school Point remove and replace yeah the big part of the project that P is going through multiple doing is they're looking at your student capacity and your total square footage and most of the awards are to reduce to your square footage projections for birth rates that are coming down the line even as new as that elementary school is you know we had all kind I don't know if you around we had all kinds of problems with it a couple years ago had a bunch

111of people come in and look and just to remodel that Elementary School we're looking at about $20 million and that's whenever you know psfa psoc everybody said uhuh we're not going to do that yeah so we T we tend to do feasibility what we call feasibility studies where we we look at everything um that the building needs we'll get your student counts all those things everything comes into that into a feasibility study and then we decide whether that money is if we're chasing good money with bad or you know how that's working out and yeah we felt like at that five a number that we could we could remove and replace for a better and that would serve your community much longer so a new school is going to last you you know 40 5050

112years maybe just depending I have some schools that are that age I have some schools that are 80 years old we need to replace those ones so yeah renovation square footage it's treated like new square footage if this was if this was to stop today we goes everything goes back to business as usual for school or yeah you get shut down in a year six months or well there's still the possibility of you know we're being watched really hard right now by CID the construction industry division because of all the units and stuff all the problems we've been having with that down there at the elementary school that the whole reason why it got shut down to begin with so we had to jump through a bunch of Hoops me as maintenance Mrs Harris our

113former superintendent everything we went through all kinds of stuff just to get that building reopened and that's whenever you know part of that process them letting us back in there was we started this process of building a new building you know hey we're wanting a new building so I think that if we to stop this process right now word would get back to CID they're going to start making us start upgrading that today um to come in just for the HB back on it because it would be cheaper to start completely over than it would be to fix everything I think that came in at somewhere right around six million I don't remember exactly Miss sis do you remember whenever we had that I know it was in between five and 10 that's been a

114while since we got yeah so again School District doesn't have that money and that's just that you know we're not talking the lighting issues that we're having down there because that the lighting system that we have down there is ran off of a computer system and that computer system is in version like 2.1 anytime I contact Lutron who's the one that installed it I have to talk to a special person because that program is so old that that one person is the only one that knows how to work it and they're already on version like 10.9 you know I one ballast for those lights down there right now which is ridiculous is almost $300 for a ballast for like one of these lights but because it's electronic you know it's just stupid things like that

115that you know I you know can it be done yeah it can be done it's more of does the district have the money to do it you know where would we get that money S I have a question for so with that conversation said and the elementary they won't help with that how are we low on the list if element that and they won't find the two how does that work well how that works is we have we have system based projects and so if you need two or three systems based projects it puts it changes your ranking and it puts you in a ranking that allows for a system based project but it takes a lot of problems within your school to rank you high enough to get a complete new school so that's

116where it gets and it gets kind of interesting because sometimes you get to that you know that that weird balance of 20,000 and it's like and and there's districts but you've got to understand there's districts that have the money to do that so they they can do it no problem so they may main their buildings all day long all day long and their buildings last forever it's that weird balance when you don't quite have the money to maintain your building because those systems are you know six million 10 million 20 million and you're going o I can't put that new roof on we don't have the funds to do it and we don't have this and we don't have that and so that's when we come in and and help you know we want to

117help our districts that that are in those kind of weird areas and so that's how this came about is just understanding that maybe you had two or three systems pile a li on each other and it you know the money wasn't there to to do those systems but elely looked at everything and she wanted to do a you know she wanted to do something good for Dexter and um I really appreciate what she did because like I said it's not heard of to see a building that needs 20 million in systems to be like hey you're getting a new school today that is uncommon so I'm really pleased that that happened for you yes ranking last year um Middle School's 81 Elementary 13 and then something else that we was told was anytime that they

118give us more money like for the elementary if they to give us the money for a new HVAC over there they would only give us enough for our adequacy standards which is you know our elementary is sitting at 80,000 square foot right now we're we're about to build two buildings that's less than 880,000 sare foot yeah that's a yeah and then it changes your ranking so each time each time you add a new system to your to your project your ranking goes back down because your building has been upgraded so now you're down here for getting a new school again so it can be kind of weird main building take care of your building so we can move you down the ranking or don't take care of them move up and get in trouble yeah

119yeah that's where hot is they have 80y old buildings but they've maintained but their R their maintenances I think they get 90 something scores on their maintenance right funding streams there yeah and so it can be it can be weird I know it's kind of weird to understand and it seems strange but at the end of the day it's kind of like if somebody called you up and said hey I can build you a new house it's going to be a little smaller than the one you have but it's a brand new house with all the bells and whistles take the house take the house because you can add on you can add on more square footage later you know that's my thought on it is if it was your home you would you would

120take most likely take the new home well and that's the thing nobody's saying that and correct me if I'm wrong you know later on if we do grow we can always go back to psfa hey you know we've grown we need an addition built onto to this you know we need more classrooms and we could possibly get that yeah or even if the community wanted to add another gym an ex auxiliary gym later at another at a later date you know um on your own time or whatever you could do that for cheaper than you could if you went back to the back to square one so just listening to the concerns today um I'm hearing a lot of talk about Jim and Jim space right for both both programs elementary and middle um I'm

121hearing a lot of talk about the shared spaces and students Crossing from the Middle School to elementary school level and those seem to be the two I mean I know there's quite of other small ones but as far as the combo single building versus separated building those seem to be the two things that we're hearing at least in our end for our discussion today if we are okay to move forward with the square footage is shown I would say an option one a or option one B your award allows you to have those buildings either separated or together as a combo school and so if we are able to do things after investigation like keep the Middle School gym then put the elementary school winged adjacent to that gym as well as some of those

122spaces we can do that um of course the further they're separated Administration other things pull from your other square footage right so I think the discussion today is if we're okay with the square footage shown on the screen we'll go back to the committee to see if we can viably pull those spaces into separate wings or further apart and what that affects on everything else and we can move forward at least with an option for you all to understand that a combined school um would be the best route forward either as a two separate wings or two slightly separated buildings to where you can share some of those spaces and then investigate things like that middle school gym that was a great idea and we had to stru look at that if if I could

123just speak for a minute to the um the controversy that we're looking at because I think it's important to understand that we we're grateful for what's being offered we really are we I I don't want us to come across this feeling like we're not it's it's just that we're proud of the we've always been proud of the elementary building and the idea that the state would decide to discard that and build something new rather than take care of what we have is hard for our community to swallow that building is used in so many different ways over the course of time I mean I clearly remember the the day we cut the ribbon on it but it was it was built in stages we we moved into it in the fall of 97 and even

124then we didn't have all of our facilities we didn't have a library we didn't have uh we we we still had part of our kids over here we worked so hard to get that and to to complete it and take a lot of pride in it so it is hard to to think about just walking away from it or or tearing it down it's heartbreaking to think about that for for the community they don't understand it yet it's we're going to have to sell it we really are um and it's such a spacious building we we have grown into the spaces I mean just um for my part I was in the library and from the day it was open and um until I retired and we used it for so many different things you

125know it was a a marvelous space and we were able to use it in many different ways and um so it is it's just hard to to think of it not being used it's not that we're not grateful for what we're being offered and I think we have to change our mindset on it uh and I don't think we can walk away from this um opportunity because it puts us back in the starting over again so I don't I mean we don't have it as an action I today we is a board we can't vote on it but there's no action because the the architect everything was already approved through the process right so now it's just as it's expanding the committee to make decisions on which direction to take so there's no action yeah

126and just to clarify it's an offer like leas came in she made an offer and then we get something back from Dexter saying this is what we want you to do so we have the letter that asked us to do this and and I understand that I hope you understand too that not all of the board members were party today right so a lot of it comes as I know yeah I'm one of them that was right so I can say we weren't all party to the things that happened so a lot of it comes as a huge surprise and we're trying to make the best of it we really are I know this doesn't um necessarily help uh at least in the discussion of what to do with that space But I think where

127the state is concerned is that space whether it's demolished or no longer the schools just comes off of um School ownership so um the building doesn't have to be demolished I just want to clarify that if there's another party that takes that building to continue to be used for the community but I know where you're coming from right yeah you know just as a school board member I I feel that responsibility the the people of the community are looking at us and saying what are you thinking what are you doing it's really hard for for all that to filter down to our parents and our community members well enough that they understand the Dilemma way and it's not the I'm trying it's it's just you know that's that's why I want to try to figure

128out a way Mrs miles to possibly move the admin building down there that way the community can still use that building for different things you know for like the the the community basketball league you know different things like that that way we've still got the building and it's still in the community but it's we're not just disposing of it we're not walking away from yes ma'am but how would we pay for electricity water there's still maintenance so schol no longer case right it couldn't be on the school's books anymore I I students can't use stud administrative space right so we still have we couldn't use the monies that we used for the students but like the stuff that like we use for this building now we would be able to use over there so the

129bills would still be getting paid over there yes ma'am yeah we'd have to take that out of our operational budget from what um we like like the elementary school wasn't really on the roster to rebuild so that's one thing I want to clarify too it wasn't really on the roster it's just Elise was like hey I've got an idea and she was trying to think outside the box to help the community but it really wasn't necessarily on the roster as a high ranking school at this point so I think that was but we we I mean what we requested was helping taking care of it helping in maintain and yeah I guess the middle school was the one that was ranking that was in the rank for a new for replacing so it is a

130unique opportunity yeah so that's why it was kind of yeah it was kind of different how it all molded together but um but yeah have to but you don't have to you don't have to tear it down so you know and I think I think that what Chris is saying is a great OPP opportunity yeah and that's why I've been trying to do little things right now you know as we since we still have students in there we can still use student money to do different things in there you know and that's why I've been trying to do things here and there as as students were there so that way whenever we move the admin over there sorry we're not oh my God how do I come up with this money so it's too big

131for our 300 something students but it's not too big for admin it is it it is too big for admin and that's why we'd have to figure out way that's just a way for us to keep it so it's either it's either admin keep it or we tear it down I'd rather torn down the news just for admin and then as far as demolition we would have to wait until psfa offers those demolition Awards because I I don't know how many cost so and during that time that we're waiting for it to be demolished we'd have to still do the upkeep on it even though it wasn't being used that was the reason paring thought lights was because we could fund it now we could do all those things out because there's students there but

132right from what I recall was we were doing those things because once once we get these you know potentially new bills or new building then no money can be funneled that's that was what I thought was the reason we were putting money in in those regards right now so that when that time comes we can no longer dump money in there and I mean I'm I'm hearing this regulato and I'm like yeah exactly how how can we say we can't put 300 kids in there but we can put 10 people that's why and sustain that for 10 people that's well what we end up have to do is shut Wings down well wouldn't we just shut the whole building down yes until we tore it down yes ma'am and what we'd have to do is

133so even if so so only until we tear it down we can we would have to have a body or 10 or whatever until we tear it down no we I mean we could vacate it completely not put anybody over there and wait for the funding to to demolish it but during that time you know say something happens over there we're gonna have to fix it you know we'd have to keep it up to a certain standard why would we have to do that if it's not housing like I guess that's where I'm confused like if it's not housing anyone why would we have because if so say somebody goes over there and breaks into it while nobody's in there you know even even now but I mean we vacate it somebody goes over there

134and breaks into it starts living it starts a fire in there burns down we're on the line for it um if if nobody's over there and something happens that again if the catch is on fire we're still on the hook for if if a waterline breaks while nobody's over there then and it floods the building we're we're still on the line for it I amused so we're we're kind of getting off track going that way we need to let these folks know to go obviously it's not a vote so I mean I don't know how we're going to do this write down our paper I don't know the middle school so so this what started everything was the middle school why don't we just completely focus on the middle school not mess with the elementary

135and then you don't lose you don't have to worry about five rooms versus six rooms like you were talking a bit ago and everybody's happy with Elementary right now 75,000 square feet versus 48,000 I know on the original presentation there were Foundation issues with the elementary school and mechanical issues and like Sarah was saying there system there several systems in need of found kind of high so what did we get funded for the Middle School it was funded as a combination award so where Middle School was was higher up on the list to be replaced it was in the ranking it was in the ranking and with the systems award or issues with the elementary school it sounded like from The District's master plan the decision was to combine the two schools for a single

136award is the history that we the goal was to help the community not harm the community and we thought well they're just you know right around the corner from needing needing something more especially with so many systems issues foundational is a big deal and so so with the 1A with the option 1A the demolishing is part of that is that included in there demolition is in our scope of work the Elementary Middle School sorry yeah you can keep it yeah you can keep it you can get rid of it it's your choice on that us for students transfer element I don't know that's a PS of so I was asking since right now we are budgeted to include the Middle School Demolition and the round building demolition if we aren't taking the round building out

137can that fund be shifted to the elementary demolition um maybe it could potentially I mean I think uh it would the one thing is that those are in the scope of work in that negotiation be PS a of Shifting that scope of work to the other piece because thatou agreement is what is driving the entire decision of the project so but moving those buck of numbers you know the cost of demolishing that it's going to be different but that you know depending what you guys decide to do with that school that could be part of discussion yeah and that's something that we could we could have a discussion of later I mean we can move forward now and then start talking about you know getting just some conversations about that building and what maybe the

138community could use it for possibly maybe the city even wants it I don't know I don't know what that looks like but um but yeah if we can we can certainly talk about that at another date that's toally understandable I to drag it out but I had a question up earlier and I kind of how do we what would be the method of building followers still using the building how do we how do we accommodate that yeah so like looking at this diagram and again we've been putting big Aster around this we need to survey but let's say we were going to do something like this middle school students would move into a completed Middle School building you know kind of you would you know we build this school's in session here they move into

139this building this gets demolished and then we build the elementary school there's many ways to cut this or the elementary school somehow Wing fits in that area that's behind the middle school and they're built in a single phase um that would be with the survey and different deter but that phasing discussion is very much a part of what we know is the middle school students have nowhere to go during construction so that's the remain operational despite whichever path we take okay thank you yes ma'am so we we always keep students um in their location we build their new school then we move them then we okay um so back to the square footage I know I mean for today's discussion I mean and we don't have to make the decision today um but maybe you

140guys need to talk amongst yourselves um we've kind of gone through every single option for square footage what the award means what that would impact on your your school design um if there isn't a consensus today then um you know we can pause for a brief moment until there is a consensus made um provide any additional information to make that decision but you know we feel like I mentioned earlier 1 a and 1B are are definitely viable options 1B is the one we have to get approval for for the combination School award um that you have now and in order to get that you have to wait for an April um that would be the confirmation of the square footage but for us we feel conf we feel comfortable moving with 1 a and one

141b um preferably 1 B which we feel that we could get that ask so we'll actually design the space finish programming start the schag design process and just to get some conceptual images for those discussions but the program would be vetted and discussed the psfa page Turner to see where all that square footage landed in your school and then at that time they would decide we would recommend this moving forward for added square footage to your program then they would go to the state and the official award change would be made in after the sessions but we're going to Target April um if we're able to move forward um today consensus today talk about how that affects the schedule and how far that will set us that so pcoc meets every six weeks so if

142we don't make a consensus but we take about a month to decide um of you know to give guidance to the design committee then now that puts us back to middle of May and then after that every six weeks from there so the longer that that takes to get approved your design process gets pushed down right now for our our schedule in design we have the kids moving in 2028 for that so 2028 so we try to pick Windows summer or winter for you guys to transfer to your new building because of the logistics of parent pickups and everything bus schedules um so that'll affect those chunks of moving from Summer to Winter and then back to summer so we could push 2029 so one month and delay could equal a semester delay for you

143guys into and moving in the new building correct well I'm going to start the vote I I just think you know unofficial unofficial nobody else can agree if they don't want to but right um I say we go for option 1B and if it's not approved then go to I agree good plan and I say say we I feel like we may not all agree on everything but the the details are later on and they'll work with us on that but I I feel real comfortable that we give them permission to move forward with option one B that falls through option one a that's what we can afford we know we don't want to go backwards and the train is leaving tonight so as far as MoneyWise we have what it takes to make one

144B happen no we don't because we need but if I'm able to if I'm able to negotiate that with the state for you then you'll have then you will be able to do 1B if I'm not able to get that negotiation in then we may have to step back to 1 a so that's why she was saying I want one B but if I have to take one a I will so yeah but I will I will do my best to negotiate and I feel very confident that I can negotiate 1B and we all just pray that 1B is approved so so if 1B if the council agrees to pay for the entire construction like Sarah's hoping the district will re so our design professional fees are it's a percentage that the state sets not

145not us not our Architects so that's where our costs will increase but we our bond funding in there we we know that and we know where for example there could be other you know we're going to be paying for building permits or different things like that that we do have we don't have 4 million dollar but we do have Bond money that we set aside for the design professional fees um okay and I mean you can see in that 1D column the only areas that are increasing are those spaces that are listed there um and so the space is on the left even if we had to revert back to 78,000 Square F feet plus then we would still have some of those base space that we we discussed today at the size discussed and

146we'll consider CTE space later is that right Sarah we'll put that on the expanded program Sarah for discussion I think it's it should be on the table for discussion you asked for that possibly a alternate or something I don't know how you all want we would probably what we've been discussing is show that additional expanded space on the actual something that could shrink out something that we could Lop off if we don't get okay okay sounds good so do you guys need separate building one building different Wing does that decision need to be made today and you guys just need to be honest with this it would be nice to know but I think to fully go through that if if you all together today are are comfortable with either a combined facility single building

147or separated facilities we'll take that back to the design committee and see what spaces get pushed to each program and if we don't like that then bring them together as long as you guys have that confidence and design committee to you know look at those spaces and bet them based on their knowledge of their programs then we don't need that decision to be made today that can be made later I don't feel confident in that I don't think we're there separa or combin right I would like to see options yes that's that would be our next step is to say okay this SP ends up over there the space end up over here but we can still keep pushing forward at the scort but we want to accept the reward yeah oh yeah yeah and

148that's where we we have enough guidance here to continue that's it new name it's a reward and um we'll look then as far as uh the design committee progress at the approvals once we have those diagrams in place um this was actually really great Workshop maybe we can tab this before your community board meetings for the school board that way the community feels um comfortable because you guys have seen and understood everything very detailed so once the design committee gives that direction we can bring those options back and just have the conference is not going to say we really like to go in this direction after we looked at everything does everybody feel good with that thank you guys so much thank you for your time answering all the questions I know it's a lot

149so app it I don't know if we need to circle around and say what we want know break or well I said what I [Music] want I think everybody's comfortable moving forward with option 1B at worst case scenario we get one a okay perfect that's what we needed and you know um growing up where I did you know just down south that you guys um these things come around not very often so taking the time to talk about this get it right feel comfortable about it um you know I I was in elementary school and I had to eat with high schoolers I know how that goes so I know the feelings that that come with that and so we very much understand um what you're feeling um and what decisions are going to be

150made we want to support that for you guys so thank you all so much for having us tonight I have one thing to say um I want to thank you all for taking the time to look at everything hash it all out and I really want to let you know that there's empathy there from the state in regards to the fact that people were left out at some points and so I hope that you can trust us and know that you're going to be a part of this community moving forward as we make these decisions with Decker and and with Dexter Administration and everybody all inclusive and anybody can tell you that's worked a project with me I'm highly transparent so anything I know anything I can bring to the table I bring it right

151away I think the Decker team's worked with me enough to know that as soon as something good is available on my side I'm sharing it with everybody you know we've got things that we can help um um I'm huge about advocating for the schools in New Mexico I'm a parent New Mexico is home based for me uh I'm a native New Mexican and so I visit other places frequently and I see what other school districts have what other communities have and I want that for our home base I want that for our kids I'm a mom I have a kid here too so I want you all to know that that I understand these decisions were hard and difficult and I appreciate you all taking the time and looking at it from all aspects and

152I hope that moving forward we have your trust to to bring you into this and and work together with you because that's our goal and that's what we want so thank you guys so much for for everything that you put into this tonight and and moving forward there'll be a lot of decisions for you to make it's an interesting it's an interesting uh Journey when you're building new buildings and and construction is always fun so thank you all so much for your time your consideration looking at it all inclusively we appreciate that absolutely thank you guys you thank youer thank you everyone online thank you so much um

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.