001is meeting now y we are live all right all right good evening this is um a committee meeting for the facilities committee um for the brid board board of education it's February 12th um 5:00 pm and we're meeting virtually via teams um the in attendance um Jennifer Perez the chair of the committee um Albert benan and Andre Woodson are committee members uh board members Robert trabber Joseph calovic are also present um I think that's it um we're going to get started with the facility stewardship report presentation can you hear us yes okay having a little bit of technical difficulty so you have myself George Garcia Jamie mccarville Financial Manager and Mike zurl trade super uh trades manager so this evening we're going to present the stewardship report the basis of the stewardship report is to

002give everyone a good understanding of what it is the department does um you know some of the initiatives for this year uh some of the changes we've got some historical data so the board can understand how department has changed over the years um so it's a good document uh for everyone to get a good understanding of what it is that facilities does how we handle our business and and so on and so forth this document has also been uploaded to our website for the public to be able to uh go through and uh get a sense of what it is that we do here so stewardship report this is something that we do every year we try to do it in the beginning of the year just to acclimate everyone with with what's going on

003and and where we are so our mission statement bridgeboard Board of Education building operations is to efficiently utilize existing resources to create goals and Implement plans that contribute to a safe and healthy learning environment um you know with that said uh we we manage 41 facilities a total of 300 uh 3.7 million 3.7 million square feet and around 302 Acres um it was a change in an increase to the district from 2014 uh we added a 100,000 square fet when we bought on Fairchild wheeler and um you know some Square uh some a some additional acreage with that so the district has grown along with what we do so we're not going to touch on every single detail but I I'll go through some of the highlights this here is a facilities data sheet this

004gives you a sense of the year a building was built if there was a renovation done the square footage of the facility how many acres um if there's an elevator or not and then the Staffing levels so you scroll down a little bit more down let scroll down a little bit more so um for instance if you see uh we have have our staffing totals the industry standard is around 28,000 Square ft per employee um ideally to run the district and cover every and cover every shift we need around 170 custodians with that said that doesn't give us coverage in the days that is a beer minimum beer bones number to cover every single schedule um you know ideally we like to get to about 180 so we have additional day coverage because in most

005buildings we have one custodian which is a hindrance trying to do lunch uh manage bathrooms um you know uh any calls that come throughout the day so you know there is a hardship there um currently uh with the reduction uh due to layoffs of 10 maintainers our budgeted allocation is 150 uh custodial workers for the district so we go on to the next this is a quick snapshot of our staffing uh this gives you a good sense of over the years how the department has changed so for instance you know we have a 14-year perspective on um the management team as you can see in 2010 there were nine uh now there's two of us myself and Michael uh zurl that that are are the leaders of the department the support staff uh Jamie mccarville

006um Alan porzel and Penny and um no actually it's uh Mike uh Mike which is our our uh uh supervi uh what is his title special special projects coordinator uh we have our finance manager and then Penny our executive assistant as the support staff and then we have our trade staff as you can see the numbers changed from 19 uh to 17 so as you can you can see 14 years ago 25 we're at 17 now and then custodial 2010 186 currently we're at a budget of 150 and then Logistics team has has gone up and down that Logistics number of six does have the logistics manager in it um and then there's a breakdown of the trades so you get a sense of what the trades allocations have looked like over a 14-year period

007as you can see drastic decline we're at we're no longer at 19 we're at 17 uh to the two layoffs of a painter and um electrician uh apparently just to give the board a little update on the painter situation uh the one painter that we have left over is going to be on long-term leave due to a car accident while she was working so we have no painter for the district and it looks like we're going to have no painter for the district for some time on to the next so we wanted to give you a brief overview of each department I'm not going to go through all the details I'll hit the highlights but this is a great resource for for folks to understand exactly what happens in facilities uh the logistics department is

008really the backbone to the department they're the folks that uh get out do the the the inro Office Mail they do payroll deliveries uh they do the custodian supplies they deliver equipment they pick up equipment uh they do the online um inventory they manage the warehouse they also do the grounds which is Landscaping um you know to help support our outside contractors uh you know they they they maintain the school grounds they do mulching and beautification projects they deliver gas and Diesel throughout the district when needed for the equipment that's out in the field um and then you you know they also do the furniture moves they also support and snow plowing um they pick up the bulk trash which is metal and wood and stuff like that so they have a very large um

009Cadre of work that they work through on a daily basis so let me touch on snow plowing briefly um so snow plowing is done within our department uh we will call for support and a heavy snow but our department is uh the department that that does the snow so uh it's made up of managers Tradesmen Logistics everyone is all hands on deck when it comes to snow uh we all get out there we all push snow um you know these these long duration this week is going to be tough for everyone because they're early mornings long days but um you know it's done inhouse to save dollars we will call contractors in when needed uh once we're starting to hit the 6 in range you know we need to bring in some additional equipment we

010get out 14 pieces of equipment for every storm and we like to subsidize that depending on how much how much snowfall so next is the custodial custodial division uh so the Logistics Division is managed by Paul Washington the custodial division is managed by Alan porzel um you know we've had our cuts of the 10 maintainers you guys know of that um you know but this gives you a sense of everything that they that they do on a daily basis um you know they they've got a diverse amount of work to do you know there are hardships during the day due to the fact that most like I said schools have one custodian during the day and we have a lot of shortages we subsidize those shortages through overtime but that at times is problematic folks

011are getting tired that this is never changing for them and now we're adding more work to them we're actually having to have second shift folks day later so instead of leaving uh their shift from 2:30 to 11: some folks are working to 1:00 in the morning 3:00 in the morning to make sure that buildings are done uh for the for the next school day uh you know we have yearly training for them everything is managed online and we'll touch on that a little uh further on along in the program go up to trades so our trades division uh you know we took the two losses the painter and electrician um but you know we handle most everything in house we do utilize outside resources when needed as you can manage as you can man manage

012as you can imagine this District uh being 3.7 million square feet there's a lot of terrain to cover so we have to bring in outside resources when needed um with that said funding is an issue so we have to balance that um we have for instance three HVAC technicians for the entire District there's thousands of sensors and components in each of our newer buildings so as you can imagine there's not much staff to do the work we do um you know once again at subsidized with overtime trying to make up time guys are coming in at 5 in the morning to ensure buildings are prepared for the for for the students during the day and then they have a complete workload throughout the rest of the today so you know this is a dedicated staff

013and I want to take a moment to thank everyone in facilities for their hard work and dedication because these folks are really putting it on a line and believing what they do coming to work every day and making sure that we're ready and we have a healthy and safe environment for all of our students and staff so Mike is going to touch on energy conservation as you guys know we've yielded some some great Returns on Mike's efforts so I'll turn it over to Mike all right thank you George um over the last two years we've replaced 10 boilers uh throughout the district U with high efficiency condensing boilers so that is and should help us with our national gas bills and then the other major project that we're down to the last building is LED

014lighting upgrades for um 2734 buildings and when the last building is completed which is actually starts tomorrow we will have yearly Savings of about a million dollars or well maybe not savings maybe cost avoidance if Mr NOCO Miss is listening and over six million kilowatt hours which is about 15% of a power plant so there is a lot of savings there and a lot of cost avoidance that we'll we'll get um one bit of uh not so great news news is we just got this month's natural gas bills and they are up 25% from January last year but it has been a much colder year so we're H our rates we're doing what we can and rates are going up electric uh generation portion rates just went up 8% this month also but we're doing

015what we can to conserve and reduce our utilities and we continue to and next uh project I'm embarking on is replacing or updating steam traps in some of our older buildings and right now it's looking like you know the projects will have about a four to five month payback and he's working with the even Y and you know with all this we we've been working with our partner at UI and they've been funding most of the cost of these projects so that's uh our energy conservation Guru who's saving the district as much as he can although we save and then uh they increase the rates but with that said we're not going to rest on our Laurels and Michael touch on some some of his solar Concepts uh later on in the program um we're

016looking to table the nutrition piece um till next meeting um but I do have an overview like the rest of the divisions in the department that we can share with you um so nutrition there's 10 management team members in nutrition they've got a total staff of 230 uh there's 212 um folks working now there's 18 vacancies currently um there's been a 8 to 10% increase in feeding this year uh we're seeing that folks with some of the changes that we've made to the menus the kids are starting to take that food and eat it which is exactly what we want um you know and at our next facilities committee meeting we're going to give you a complete overview of some of the things that are happening we've done some Renovations the kitchens Renovations of cafeterias

017um you know there's been a host of new equipment bought in um there's new Concepts on how we're delivering our service and you know with all of that comes pain and folks having to adjust to the new normal or or the new responsibilities of the day um but with that said you know we're starting to see that that that the the youngsters are starting to gravitate towards the food which is a a good thing um one of the key notes to this is that uh We've aligned our technology in terms of work orders so um they're on the fmx system like us so now um you know supervisors can put in requests for repair um you know and then they've got a host of other technology like Titan and other things to be able to

018track everything as you know there was a a state audit that could have yielded a loss of $10 million uh about a year ago uh you know uh Ki did a tremendous job of navigating through that he was able to answer all of the requisite questions and uh we passed the the the additional audit so there was no impact to the district so I feel like we're growing there but they do have a very young management team and with all the changes there's Growing Pains so we we will touch on that in depth along with all the different things with some of the concepts moving forward we're looking to really refine uh the cafeteras and make them an inviting place for children to want to come to every single day so we'll move on from

019nutrition um the state cost we couldn't get the updated csde uh cost per pupil for for uh for plant operations and maintenance but this gives you a sense I mean we're never we're never the top dollar Getters we're always towards the tail the tail end of uh what we get regularly to be able to manage our schools and when Jamie goes over the numbers you're going to understand how difficult it is to manage this department with the budget we currently have with the staff we currently have because uh at the end of the day there's just not enough and there's a whole host of regulatory things that we have to do that uh have an impact on our budget so uh you know we're going to get to that and I think it's going to

020be uh eye opening to say the least let's go over to initiatives and special projects as you guys know software has been a driving Factor since I've come back we finally have everything onto a system every division including nutrition is currently on uh system most systems are on the most most paths are on the same system which is fmx um you know we've automated our custodial inspections um the reason why I keep talking about this is we continue to refine it and we continue to use the data to drive the decisions which is helping us to make sure that we're managing those dollars the right way we have online ordering so we have maximum minimums now we know when we're getting low uh we're able to know what's going on in the buildings get a

021better understanding of what the needs are um when we need when we need to Pivot uh you know we have that information up front uh We've we have automated yearly training we want to make sure that the staff we do have is invested in um you know with training and certifications um you know we constantly review our work order system to understand where we are to see if we're if there's a need if we're falling behind to Bringing outside resources um we've updated our website so we're trying to make sure that there's upto-date information on the website including the stewardship report um and some of Mike's energy conservation efforts so folks understand exactly what's going on we're looking at asset tracking through fmx right so we want to understand what all of our pieces of

022equipment what their life cycle is so we could be more predictive on in terms of when we have to turn these pieces of equipment over so we're not letting them Crash and Burn and then having to to work in triage um we also manage our building and field permits to fmx which has been a home run we' we've been able to get penny back 75% of her time there's no more pen and paper um and then we're getting custom reports to fmx and that really drives what we do is we do business reviews with our top vendors and then we do internal business reviews of each trade and our head custodians so we're able to utilize this data to get a granular understanding of what's going on in their buildings what's going on within their

023trade what's going on within um the different vendors that we utilize to make sure that everyone's on their toes and understands that we're looking at everything and that we got to make sure that we're getting our best bang for our buck and is a return on our investment so Mike why don't you touch on solar yeah um few solo projects that I'm just uh starting to work on is uh at Marin school and Gerald and clater Academy where through the doe Grant where we're hoping to get solar there and I'm looking at a another different kind of solar project for Central High School and also we have new roofs being put on kiral school and the nutrition center that we will look to have solar panels installed on them to further reduce our electric usage

024and costs so let me just touch a little bit on essential Mike's being uh uh he's not he's not letting the cat out the b but I will the central project that whole walkway from the building to Madison a he wants to do a canopy of solar so folks can walk under a dry walkway um to school on a rainy day and we're able to generate a ton of uh energy to do that solar array School construction as you know we play point for the bard of v on school construction um you know when it comes to relocation inventory and storage uh returning buildings to the city um you know removing the mechanical items and I mean the the the whole Gambit uh we rewrote the decommissioning of buildings policy and process we're utilizing that

025now for bassic we had a um a decommissioning operations meeting this afternoon with the leaders of those buildings along with um central office staff to start to make sure that we have sign offs on every individual discipline within the decommissioning of that building we will not have another Harding I'll guarantee you that um we're making sure that we're itemizing every item so there's three buckets there's the what's what's going to go on to the new school what has value needs to be reallocated elsewhere and that one needs to be purged within the reallocation piece if there isn't a place for it to go we could look at either auctioning donating and other things we'll come to the board with that right um but we're doing this in a smart way we're we're making sure that

026um we leave no stone unturned when it comes to every item in the building and then how we're turning the building over to the city broom clean uh in a way that it's supposed to um this there's two parallel tracks here PJ has the operational piece for bassic and he's going through and he has his committees I'm part of that PJ's part of mine along with central office staff and and and specific folks depending on their discipline um but you know on both sides of the fence we're making sure that we're covering every aspect of the new bassic we want a successful opening we want a successful decommissioning and we want to ensure that the students get exactly what they need with this new beautiful facility uh currently the facility is trending towards lead lead

027silver I believe so that building is on track it's on budget um we're kicking off the Carry Out roof project in May uh the nutrition roof project was short 700,000 so the city's going to bond for that 700,000 and hopefully we'll be able to uh get that one done that one is a little easier because we don't have children so there's less restrictions and then and the winter project um we decided on a scheme of what the what what the building will look like and we will we're they're doing cing or boring uh April April April vacation yep April vacation they're going to be doing some coring on site um so you know we're we're actively working on that also so we've got school construction well in hand bassic is on on schedule and we've

028got a lot of things going but you know we've got our hands firmly wrapped around all of those projects then training which is the most important thing that we do and I'm not going to go through all of it but the most important thing for us is that we invest in our staff um you know these are dedicated folks and we want to make sure that the changes in the industry they have those changes in the industry and they understand them because uh things are changing rapidly when it comes to disinfection and and things like that and the fact that you know we want to make sure that they have the best product in in in the in the marketplace so you know we make a major investment we work closely with PMA um to

029have Fork forklift training scissor lift bucket truck uh ladder training we've offered the OSHA 10 CPR first aid um you know the management team has undergone training of the five behaviors uh you name we have onb boarding for our custodians now so you know we we put a premium on what it is we do with our staff because when you have a small staff you have to have a good staff so we invest in them um and briefly I'll touch on I got the report back from PMA our numbers in terms of compensation are incredibly good when I tell you we've done a tremendous job of keeping people safe and healthy our staff numbers are historically good when it comes to compensation at this point and I I'll give you guys the details at the

030next facilities committee meeting because it's outstanding the work that the managers are doing to ensure that the staff is safe so the next piece is the finances and I'll let Jamie go over the finances and I apologize that it is rot rotated again there go so um George leges data data so we collect a lot of it in our department so what I did here was look into munice our purchasing system and I looked into our operating budget for over the last 10 years so if you look at the his um the First Column shows you the account description so our first account is custodial services and you can see all the way to the right is fy15 and it's R re revised so that's what was revised over that fiscal year and you look

031at this year fy15 for custodial Services which are things like toilet paper paper towels soap um things like mops Mop Heads um floor um cleaning anything to do with our custodians this year we have $185,000 10 years ago we had $389,000 if you look at utilities and you subtract utilities from our total operating budget our operating budget this year revised is $2,575 th000 it is over $118,000 less than 10 years ago if you start looking at what we use this money for and you take out things like the lease for the building we're at vehicle maintenance the custodial Services as I talked about landscape Services we are then down this year to 1.5 million to operate our 38 facilities with it's not on this sheet but when I subtract if you look up above the

032Regulatory Compliance the 1.2 million in regulatory which are things like Environmental Testing sprinkler inspections boiler and elevator inspections Pest Control um which most are annual but then we have every 3 years and every 5 years some other things that are needed like radon testing is every five years the aera is every three years when you subtract regulatory from that 1.5 million we are down to less than $110,000 per school to repair every single year so each school has less than $10,000 for repairs for maintenance a boiler goes in a school it's over $175,000 but we only have 9,000 to repair it we just wanted to give you a snapshot of this and to show you how detailed we are in our department and how we try every way possible to save money and use the

033resources we have in house to repair and maintain our facilities so as you can see those are scary numbers right um over the 10e span it's a decrease so you think of inflation you think of the fact that in 2014 we gained 100 100,000 plus square feet and 20 plus acres right and then you start to talk about the the decreases in staff right I I gotta tip my hat and thank the folks for the work they do to keep this District healthy and safe because with these num numbers is very difficult right and we're we're robbing Peter to pay Paul but the Regulatory Compliance piece we have no control over right those are things that we have to pay no matter what the requirements that are needed and then you compound that when you

034have those three years and those five years for instance border um sprinkler inspections probably $250,000 in in repairs right for the fiveyear inspection for the five-year inspection right so we got to start looking at exactly what it is that we're doing here when it comes to the funding of this department because we're getting to the breaking point and we wanted to make sure that everyone was aware of exactly where we are these folks work very hard to give me the data so we could start to to maneuver and figure things out Esser has been a savior to the district if if we didn't get Esser which I'm gonna go over the next the next bit here um rotate let me rotate it okay thank you here we go so you know some of the things

035that that have bailed us out for instance if you score a little more we you know we were allocated 23.6 million in Esser funding we give you the total of everything that we utilized those dollars for we expended it in the window that we needed to um we can break that down even further by school by commodity by how we p i mean whatever you want we can do but that was a saving grace to the district right that gave us a little bit of um footing for us to sort of work from and it really has been transformative in terms of what we've been able to do so we take erer funding and then we figure out how we can spend that and get the utility involved and get some re some reimbursements to

036put back into the budget we're constantly trying to figure out a way so if you can scroll up again um you know as you know we work very hard on trying to bring in additional dollars the renew America should be HVAC um you know we got that million dollar HVAC Grant and as part of that now that we've gotten that those funds in we're going to be doing the controls over at in Walterville that control system is 13 years old we've talked about it in the past it controls six other buildings finally through a grant we're able to expend those dollars to do that the right way now that's going to help those six schools it's going to help those environments and it's going to help us drive down some cost because we're going to

037be able to control things a lot better there right so that's a win-win for us right another project that we're utilizing those dollars for is The Chiller at Roosevelt has failed once again the theory of design that I'm constantly harping on right unders sizing equipment and then these things running constant and then they're burn out in 10 years as opposed to 1520 well the Roosevelt chill is gone thank God we had grant money because if not we were going to find those dollars we're also replacing a pump at Roosevelt through these dollars and then the department of energy Grant uh it's on hold right now due to the new Administration we're hopeful that that Grant is uh bought back to life cuz that is lifeblood for us those are boilers that's solar that's control work

038that's that's a ton of things that these buildings need that'll bring them to the 21st century we need to make sure that we do not take our eyes off of exactly what's going on in our industry in Grants and any other opportunity because if we take if we lose sight we're going to fail here we're at that point the energic grant was $50,000 we're hopeful to be uh awarded another 50,000 um we utilize that to educate folks cuz one of the things that we're doing with energy conservation there's the education also right the changing of behaviors uh the the shutting of Lights is probably more impactful than the work that we do right and making sure that we're doing we're good stewards of energy conservation so we did a few different programs to do that

039that's a partnership with UI uh we did a lighthouse and learn where we took fourth grade classes in Lighthouse and and uh taught them about energy conservation they built houses and insulated their houses um you know we've done a lot of work there through UI and partnership um we bought the custodial staff and the nutrition staff together uh we educated them on what we do internally on energy conservation and how they can save energy at home right we're trying to find a way a Nexus uh some Synergy so it becomes repetitive and folks are doing things at home and here and then we're going to have another event for parents districtwide at the Discovery Museum we're going to be putting that out soon to teach them about different opportunities and educate them on what we

040do because we want folks to understand the work that the people are putting in here because because once again I want to make sure that they feel proud about the work they're doing because they are working their tails off the boiling incentives is what Mike talked about earlier um you know he uh was able to transition what we were able to do in Esser and get a reimbursement for some of those boilers at $8,000 so we don't leave a stone unturned when it comes to our ability to find dollars but we have a small staff as you can see we've been shrinking we're at a point now where we don't have we don't have any management team members um you know we're working long hours and trying to make it work Capital uh you know

041we have Reserve capital of 1.8 mil right that Reserve that Reserve Capital um was the money that we had before Esser I made a decision to put that aside expend eser so we met the uh the requirements of the Grant and now we have8 $1.8 million to do some work and then last year we were given uh 2.5 million um Capital new capital from the city so we have a foundation to continue to do work some of that work we're presenting to you this evening for approval um you know so so we're doing everything that we can uh to ensure that we're able to continue to move the ball forward um and then the final piece is um Sam do you have that other slide on the dates for facilities master plan so we're at

042the Finish Line guys at the facilities master plan finally so we're going to be giving you all of that data on the 21st first for you guys to consume um we're going to have some Community meetings uh the community meetings we're setting up are March 31st April 2nd and April 3rd we'll do that at the high schools um you know because we want to make sure that the community is well aware of exactly what's going on we're going to use start exchange um you know to ensure that we're getting the data and everyone's heard and then before that we're going to download to all of you all of that information in a in a session an informational session so like that we can have a conversation about things so there'll be two sessions that we'll

043do one is uh the initial this is the the report and then we're going to come back to you with some recommendations So within those recommendations uh we put together some transform some transformative things that I'm hopeful that you guys approve um you know so stay tuned we're not going to rest on our Laurels and the number is staggering but it doesn't mean that we can't keep fighting um so that's the presentation of George were you look here something for me um uh was there a slide that they gave you to had the dates for the uh the community forums or no uh no okay so they didn't get to on time but you guys have the dates we'll make sure you guys get a copy of those dates um so that's the presentation of

044the stewardship report I know it's a lot of information if you have any questions feel free we'll we you know we'll email the entire board with the answers um but you know we felt it was important important time for everyone to get a good understanding of exactly where we are as a department and how critical in nature this time is to us any questions um I'll ask committee members if they have questions first um Albert benan Mr benan yes thank you m chair um hello um Mike and Jamie you know good to see you guys and I see Mr Garcia you came from your vacation ready to work I'm very happy for that I was ready to stay but back trust me I will go over there and go pick you up we need you

045here um first of all I before I ask a question say than you know thank you everything guys for you do Mr Garcia I don't need to say nothing um about you and your team everything you do you know I always support you you always from the day one you trying to have everything our school update uh I always say this in every time we have meeting you know I'm very proud and I know you do the best you can you know to stress that money and be sure our schools safety something I know it's tight for you and your team when you don't have the equipment you don't have the money you don't have the people you don't have the employees but I have to take out on my hat for all your employees

046I I'm in shock I'm very proud to how your employees work doesn't they don't never tell you know they say let's do it and I know because I'm witness I see it you know um I see in the beginning you say you have 170 um um custodian they went down to 150 and I know we have uh correct me run 37 school so how many custodian you have of on each School especially the high schools when they all the school where they are very big So within the report there's a facilities data sheet which is uh it'll say facilities at the top it was a second page um that breaks down how many staff members are in each school um and it and the number is 170 is what we wish we had because that

047will cover every shift what we do have is 150 currently uh previous it was 160 minus the 10 we're laid off and now we're at 150 um you know it doesn't give us much coverage but once again you know we're doing the best we can we're going to ride out the year with the current scheduling um subsidized by overtime um I've put up a big task to the custodio manager uh Alan porzel and he's going to have some support from the team here and the head custodians we got to rewrite every single schedule in the district this is going to be an increase of potentially 10 to 20% more work for each worker um you know trying to find some Common Ground um to to support the district but it's going to be a long

048hard Road for folks and there will be some push back as I can imagine because we keep on asking for more you know and you know I'm kind of uh passionate right now with what I'm saying because I want to make sure that everybody hears us because we are at a critical juncture yeah no I I agree with you and you say something about the paint um we have four I got two but one of them get injury something like that so you don't have nobody right so so uh one of the p painters is laid off right we had two painters one got laid off one got one got hit by a bus in her vehicle Jes so she's got to have rotat cuff surgery and she's going to be out long term so

049we have no pay her for the district so when when we do a project we have a project now at JFK we had a pipe burst um you know we're not going to be able to paint those areas because all of this is protected work through the CBA which is the contract that's uh written for the trades I can't just have anyone paint you know I'd have to bring someone from the outside so you know we these are the kind of things that we're juggling now you know um but you know we wanted to get it on the record so everyone understands where we are and that you know everyone have a little patience and Grace for us we're not going to forget to get the work done when we get people back in place

050we'll get the work done that's not uh you know the work orders will pile up and we're going to have a ton of stuff to catch up on yeah um and might you say something about the boiler you know replace you know to be fited how many boilers right now um so far they were U it um over the last since I've been back we've replaced about 11 boilers um you know I think we're in a good POS good place right now um you know the renew America Grant was going to get us net us another four boilers um you know but you know that's on hold right now but I feel like we're we're in a decent place right now with Mike's efforts to work on energy conservation and uncovering the ability to do

051steam traps which is part of the heating system that's another a point of failure for us so him finding a way to get that done at no cost to us uh you know is going to help us along um and then it's about maintenance you know we've put um maintenance programs in place pre preventive maintenance programs and service contracts that helped support us but you know those things are costly uh you know so we're trying to balance where we can you said that um if I correct me U you said $175,000 for replace yeah boilers a boiler now is 175,000 uh you know together plus the environmentals so it's only one one boiler 175,000 if we're replacing a boiler that has aestus that number increases because now we have to do remediation and as you

052know most of our major work has to be done off season where most companies can stagger their work we have a two-month window um to get all of our work done which is the summer so a lot of planning goes into what we do um you know we we have a lot of emergencies and things that come up that are not negotiables for us uh you know we had a pipe burst at JFK um that pipe was behind lockers it had an effect on aestus tile which is being removed and remediated over the next couple of days into the weekend um you know we we have these issues that come up we had a glycol leak over at Fairchild wheeler um you know we're constantly dealing with the day-to-day stuff um we don't get much

053sleep or rest because these phone calls come in at all types of hours and then you add the snow that we've been dealing with right now I think everyone's tired and a bit stressed but we're going to get through this as a team and you say something about the snow right now you know some someone come support you stuff like that are these people when they come to support you and help you are there a Char charging or they doing for free yes so we bring outside Contracting uh a bid is done by the city we piggy back off of their bid um and we you know for instance you know we may we in a five or inch better snowstorm depending on what it is we have to bring an additional uh um trucks

054or payloaders uh Sanders depending on what the situation is um these storms that we've had have been very tricky because they're very icy so you know we have we have to have staff coming at 5:00 a.m. make sure they're treating all of the all of the uh the parking lots uh custodians are treating all of the walkways we've so far we've done triple amount in in in salt for walkways and and the vehicles thank God the city allows us to utilize their stock so we don't pay for it but you know cost are up across the board for us and these are things that we can't control wherever we can control the dollar we do but you know right now with with the Regulatory Compliance and and our weather you know our numbers are up

055this year than and you said something including U can you explain me a little bit when you say um some they're going to have some meetings you're going to have some parents involved stuff like that they can know you know what's going on and do so there two things one is um through the energized CT Grant U which is $50,000 that UI graciously awarded us um you know we're we're educating now right right so through this round the you know we did the the the lighthouse and learn we did the staff and now we're doing parents cuz we want people to understand what we're doing I feel like it's very important for folks to understand the efforts that folks just aren't sitting back and and and and worrying about a a budget deficit we're just

056working every day to to do the best we can and then we want to educate them on how they can save some dollars at home and we want to make sure that the things they're doing here and at home line up that's very important changing the culture of how we do things is important to us the other piece to that is that we're going to start the community Forums on a facilities master plan so that's complete finally um you know you'll get the report the 21st we'll set up some uh informational sessions for you and then we roll into the community um you know this is an opportunity for us to all be on the same page and have a five 10 year road map that we can all agree on and work towards all

057right thank you and the only thing you know just it's sad that you guys have to go through a lot of things it's not easy it's very stressful and you I know you try to do the best but I'm very glad you do say this and for the record that parents Community leaders you know State represent you know all the city council people Everyone they know what you guys have to go through they don't know what's going on behind the scene when something's wrong with the boiler in the middle of the night a light or something like that they will call you they think that are you taking you know home you know rest that when it when it's not when I witness and I know you know that George you know I'm always there

058you know I support you guys and everything you do sometime one your employee they have to do not two job or three jobs sometimes five job for one you know one employee but I'm like I told you I take out of my have for all your employees because they are amazing they support you and the way you communicate with them the way you respect them they listen to you they are team they are not there because I have this title I got title one I got title two no what I see they work with you they want the best for bris public school and now you are great leaders because you put facility on on the top so I came volunteered and I'm tell you this for the record B because I know you short

059that if you need me so something to let's see for the snow or C something call me you know why because I know you guys are very tight and I'm very you know it's very difficult to when we get lay off and that hurt me but you you know that we don't have no choice but you know I will be here and I know I will call parents to help you gu and support you because they know I know you know how my parents you know I work very to parent they will come and help you of anything but I my had and thank you thank you so much for all of you all your amazing job um for now I don't have comment no questions Madam share so thank you guys we're gonna take

060you up on that by the way we're gonna ask for everyone to roll up their sleeves in the city of bridport let's get out there together and together we can make it happen we're g to get some volunteer days together and some things like that to help sort of stabilize things so thank you do it just do it you will come with me and I call you family that will come to help you thank you perfect Mr Woodson do you have any questions all Yes um I'm sorry I don't I don't have that that um list that you had of that lighting upgrades that you did you I didn't were um BLC Edison and Hall on that list um Edison is on that list BLC and Hall no um it just the payoff depending on

061what happens with those buildings we got to ensure that we're going to be in the building long enough for a payoff um you know for instance Hall we had two underground pipes burst about two weeks ago we repaired one we thought it was the end of the building we were able to find that pipe repair it they told us listen the infrastructure is in Dire Straits two days later another section of that pipe burst we did another repair um so you know we got to we have to balance where we make our investments but you know once again the infrastructure is failing um you know so we didn't we didn't feel that we're going to have enough runway for the pay off at BLC or Hall school but Edison we did we're we're making an

062investment we're going to do steam traps there and we're going to do lighting there and um yeah I was going to ask something about the S because you know we had we just had a um like a a judgment against us you know not it wasn't a re it wasn't for anything to happened recently but you know somebody got hurt on the property because of I just wanted to make sure that if the city like you know because I know we're down a couple of a lot of guys I ain't gonna say a couple of guys we're down a lot of guys in the city does the city have a problem with running running their assault throwers through our properties especially especially properties like um like dran Johnson and and and JFK like big properties

063with long driveways that so currently we the one thing I can say is we have a tremendous partnership uh when I was the director of Public Works I merged both departments because there's more there's more efficiencies they've got great equipment we've got great trades it was a perfect world um but we still have those um those synergies um like I said they they provide salt to us for nothing um if we need additional support they provide it to us but you know we we did make an investment um through Capital dollars for a bigger uh salt truck uh we've been able to reestablish our Fleet so we have a strong enough Fleet now that we're able to get around through everything um you know our managers are out uh we're making sure that folks are

064doing what they need to do in the field in terms of um treating sidewalks treating um driveways and then you know if if we're in operational mod today tomorrow we're still going to get out there 5 o'clock as a precaution to make sure that if there are any slippery spots we're handling them both on walkways and driveways okay too and I've been seeing like um recently not you know that there was the state had a couple of grants that they were that they were offering for HVAC like for um uh districts that you know I guess if they had like if they made if they made a request because I guess in the past a lot of the a lot of the applications were getting turned down so they were they were doing something to

065to make it a little easier do we have any um applications out there for so the million the $982,000 was one of the HVAC grants of round one that was for the work that we did at the Tis the the replacement of the Tisdale Chiller uh we also put a grant um we also put the Grant in for batala but we didn't have a substantial enough uh completion for that project so they they punted it to round two when we applied in round two they changed how the formula was for the grant we were not able to um to apply for that Grant I know I reported that to the board at one point that you know they had changed the formula we our money came directly from the FED to the board they wanted

066it to to sort of follow the school construction program there was no way for that to align we had several meetings with leadership at the Das along with their attorneys and they pretty much told us listen apply for round three because we just can't figure this out for round two well guess what there is no round three but there's $150 million of HVAC money at the state that I'm actively trying to get to uh you know the cea has Gra ious ly giving me the ability to work with their lobbyist to help Lobby for some of that money um you know I'm calling every day to see where we can free up some of those dollars so uh you know Jamie and Mike do a tremendous job along with the rest of the staff to

067have details on every aspect of our our mechanical components we have several shovel ready projects so if the state says here's $2 million we can act on that immediately uh we've got designs of several projects that can that are shovel ready that we can bid out tomorrow so we're ready to go we just you know we have to get to that point where the state starts to free up that money but we we are we are pushing hard we are pushing extremely hard and we've got some serious Partners to help us now finally yeah okay that's that's good to know because I going to say you know I I know a lot of people spend a lot of time advocating up in Harford stuff that but they you know they're that's not the we we

068can't only Advocate about one thing we could do multiple things at one time and H HB and air quality is a big big thing and it is because there's an indoor air quality mandate right that's an unfunded mandate right so we've got to do assessments of our schools well where are we getting the money that's one more thing that we're I mean you know these this is the stress right this is this is why you know folks get gray um because it's like okay here's another white right um this is another thing that we've got to figure out right so this has to happen every year and we've have to take a certain percentage of the district uh 20% 20% 20% over five years do these studies it it's it's exhausting you know uh the

069the unfunded mandates um you know but I could sit here all day and cry about that stuff yeah that's GNA be another issue we start to bring up this year got we could do multiple things at at a time absolutely thank thank you thank you for your thank you um I that's a question about the solar um so I think you said Central um was it Central Marin Central Marin Johnson Nutrition and um caral okay so um the new constructions that we're doing so um bassic and then windr will there be any um solar use there so so we're going to apply for bassic um the bassic budget as you know was an up and down struggle um so we couldn't put solar but that's something that you know uh Mike loves the PPA because

070we don't have to worry about things right um we just lease and and and take advantage of the savings um and then uh winr up I'm actively I actively have that in the project but you know like anything when budgets shake out you know we have to fight for specifics and for me I rather sign a PPA and get the true intention of our mechanical components on the interior of the building so it's a balancing act but you know we're looking at all avenues um I presented at the green Bank uh a few months ago on the things that we've done and and our efforts um it was well um attended and um you know Green Bank is leading to help uh municipalities to to to to get solar and sort of put the the

071total power of all of the consumers into it so we get better rates and and better opportunity to get solar into the district thank you Mr tror yeah to continue on solar for a moment um one of my questions was going to be uh why we don't do more solar and you know in particular I was thinking since many of us get U multiple solicitations a week uh for doing solar if you live in this uh certain uh uh postal ZIP codes um I would think there are uh there there seems to be these initiatives to get us to put solar on our roofs um in my particular neighborhood it requires cutting down a lot of trees to get them on on my roof uh and they're even willing to cut down my trees for

072me um so is it because we have infrastructure problems in our old buildings or is it you know I would think and then it leads to the question in my mind that I think you started to touch on a minute ago in your answer to Mr Woodson's question as well as uh the chair's question um on our new new on our new construction and Renovations I would assume we're addressing the issues of structural need um I I know at blackham we used to have to repair the roof all the time we're still doing it so right that there might be structural questions but on the newer buildings I assume that we are dealing with any structural concerns about being able to throw a solar up there and I you know when you made the comment

073about building the walkway at Central I was thinking yeah but that's a relatively new building too can't we put solar on every single square foot solar there there's already solar up there we're just trying to expand on that solar array yep and then so yes you touched on it infrastructure is a big deal so we have to align when we're doing roof projects or new buildings to to do solar the other thing is that you know if you look at the management team there's not many of us and rfps for a solar project is is a big deal and a very time consuming deal I mean I can't express the Gratitude I have for Jamie and her her work and and putting together specifications for for for the bids and for things like that because

074it's exhausting right um the work that has to get done you know we try to utilize State contracts where we can because you know writing things and and having to sit down and go through the process is very time consuming well and and and under no circumstances do my does my question mean to suggest you're not doing what you can do it's more for my own edification um not tot your competence um it's my ignorance um so um yeah so that's essentially what what what do we need to do to maximize what can we do and I'm always assuming that it's a matter of us not having the resources to put into what we need to do um the other uh questions I had was uh in the area of the painter can we not

075recall the painter we just laid off we can I mean you know it's it's a it's a decision in terms of um savings or not right so um you know I haven't approached it just because I know the district's in Dire Straits you know um so I just I feel like you know if the district needs the dollars we'll we'll have to punt on some things and um you know once we uh our painter comes back we'll TR we'll do our best to catch up okay I I guess I'm I you know under most contracts there are recall rights and you know if this painter is going to be out on his extended leave and we recall the existing painter unless that painter's gone on to find other employment then we recall that painter we're

076paying unemployment for that painter is it is right now because we're self-insured um by recalling that painter it it's gonna add an additional 30% or something but meanwhile the painter that's been laid off is is uh not providing us any value for the layoff because that painter is collecting sick time so so let me uh let me let me have a conversation with Nester and and um Dr Avery see if there's an appetite I would recommend that that's I guess where I would leave it to that you and the the the powers that be should investigate that because it's of nominal savings and I you know what needs to be done you you know I respect your ability to with them decide the value of the work that needs to be done in the absence

077and how long this person's going to be out um and um uh just quickly the dates I you you went too fast for me on the facility master plan um 221 you're going to meet with us to to review21 uh we're going to deliver the the the the report to you uh we still have to set up some time for us to meet or for an informational session on that U we're working through that now but we do have dates for the community forums um 331 4243 uh 424 yes 331 4243 yes we'll do those with the high schools um there's going to be a they're going to get you something out uh in short order on the location and timing of all of that there will be a receive it George we just receive

078it okay awesome there'll be a thought exchange attached and I'm looking forward to that I'm really looking forward to having that conversation the only thing I don't know then is when the info session is going to be with us that we we're working on the details of that now so that's that's to come in short order one of our uh Consultants got into a skiing accident gonna have to have some surgery on his ribs in other areas so we're working to do that he didn't have one of those contracts where he can't go skiing should had one man tell you that um and and then on the HVAC question just to accentuate too what is a problem with that um you said there's $150 million available for the entire State y I want 100 million

079we could spend 150 million could we not absolutely right that's the problem is the state when you refer to that as an unfunded mandate the governor put 150 million to do this so the legislature and the governor when all these districts we see them up and down from Orange down to grenwich you know they all have their little mold problems that require them to do new HVAC systems and they want the state to pay for that too um so we're competing with that um you said the cea uh I assume you mean the Connecticut Education Association the union yep you're working with who Ray um I'm working with lwis Lou okay yeah I will I will contact Lou and they've been list listen the the partnership has been great you know we have no grievances

080open with with the with the ba and and for them to give us the ability to to to collaborate like this we we totally appreciate it you know having a an additional voice is very important yeah no I agree I think that's great um I was pleased to hear you say that um because they represent you know a significant a number of members up there and have their own contacts so I think that's great uh I have no more questions Madam chair okay thank you um before you go Mr SC I see Sam's hand and that's unusual so Sam do you have something yeah I just want to say after questioning um I do have those slides if Mr Garcia wants to see them you could you could pop them up um and then let

081the record show that Mr Medina has joined the call he joined a little while ago um Mr sovic yes good evening everybody uh Mr gcia and everybody great great presentation um of course my question is going to re revolve around finances I see I I see that you're doing the best job you can with what you got um i' like to ask you about what you do what what kind of budget would you need to adequately address all the shortfalls that we have in our district uh and you guys are doing a bang up job but our facilities through deferred maintenance through no fault of your own are in disrepair yep to say the least I hate to put a bad face on it positive but the the facts are the facts and I agree

082um you know there's a gap um in terms of dollars we can give you guys an estimated total of what we think um you know over the years we have not been a partner in building the budget right we're given a budget and we're told here you go work work uh work your magic um you know so we don't have input um that's that's first and I think Staffing is probably the biggest issue right because I think we can handle a lot of things with Staffing um you know so over time we're hopeful to to be able to find areas where we can save money and reinvest um you know there's two areas we like to reinvest continued energy conservation because that always yields something and then being able to take some of those savings

083and bring some of the staff back over time those are strategies that we're going to be bringing to you right now we're in uh figure it out mode of of of some of the changes that are happening policy changes Staffing changes so we're working through some of these details but you know rest assured that the team is looking at what the future looks like and how we can stabilize so over the next couple of board meeting uh facilities committee meetings we will be addressing some of these areas that we think we can make gains right yeah and as as far as the fin financial piece and the money piece and what y'all need financially and you haven't been part of the conversation I would like to correct for that and have you guys in front

084of the next finance committee to discuss the finances um because I I know I noticed that um we're gonna have people off and we're going to back up back up purchase orders and we as a board actually are the powers that be who decide the budget and we as a board always give a lot of good talk to wanting to keep up upkeep of facilities yet in the next round of cuts proposed Cuts we got $150,000 hit to your department when all this backed up work is Gonna Hurt is going to hit at the same time and I don't know how you guys are going to deal with that uh hit and maybe we could look somewhere else to that $150,000 before we hit our facilities which is already suffering and all our schools are

085already falling apart to some extent so I would much rather look elsewhere before touching that in round two and put it off to further rounds because I know there's more than $150,000 we could find somewhere else and we as a board end as the power of be should try to do that and put our match our actions to our words we appreciate that in no way are we trying to um you know stop any progress in terms of closing the budget Gap that's not the reasoning we just need we need folks to understand where we are because there's going to be hardships coming um there's going to be things that we can't avoid um you know and we just wanted to show the history you know we've always been the department that's had to give

086we've always been the department that has worked twice as hard to be able to find um you know but we're at a point now where we're running out of we're running out of moves uh you know we're we're we're looking at solar we're looking at battery we're looking at everything under the Sun but you know it there's two competing things here one is there's only so many things you could do and the other is there's only so much a person can do right so I'm asking for a lot from the management team from from the boots on the ground which you know I respect for the work but you know we we are all getting tired and and you know I just don't want to tilt the scale in terms of all the gains we've

087made in terms of compensation and keeping people healthy because this is this is a critical juncture that we're dealing with right now yeah I agree and you guys have done done an excellent job in cost savings it actually shows while there's escalating costs in the energy they're not as much the costs aren't escalating on a percentage wise basis as they would had you not been making those savings and that not even escalating as much as all the other costs I mean it looks like a very small percentage I haven't calculated it but you would you would expect it to be at least double or triple yeah Mike has done a tremendous job of of looking at energy and finding ways I mean I tell him all the time I don't know how he's gotten so

088much out of UI but um you know they they've they've given a lot to The District in terms of our ability to be able to do the work because we haven't had to come out of pocket there's no capex out of pocket for us and you know it's very difficult to be able to find yourself in a situation where able to do uh you know several hundreds if not millions of dollars worth of work without expending any any dollars right absolutely and I I appreciate you and your whole team um I would like to thank them they are basically unsung unseen just because we don't see you and we don't hear you doesn't mean that you don't matter just as much as the Frontline staff we appreciate that today you know today was about making

089sure everybody heard us all right thank you thank you thank you we're going on into the um facilities uh fiscal year 26 through 30 Capital request presentation I know this was uh Ed by Mr Nickell at the last Finance um committee but um I know George you um you wanted on this community too I want talk about it yeah I know you can probably give a little more um a little additional stuff yeah so I really wanted to bring context to everything right so um The Five-Year Capital plan is is is a revolving living plan that changes um with that said uh you know with the FCA the facilities condition assessment we're going to be re-engineering the whole entire 5year plan right so you know the plan past this year really doesn't even matter because

090uh next year it's going to look drastically different um the team's already started looking at different components of it we've already taken the facilities condition assessment and started stripping this thing down and trying to figure out where we can sort of make some gains internally where we got to look at Capital is there a grant um so you know we're already working on the next fiveyear plan so it's really this year's plan 2026 so 2026 is $8.7 million with the $8.7 million part of that is what was not funded last year um so you know uh is that first line is this line last year what was what was not funded no that's what we have um okay now that was adopted so we you know we got 2.5 m I think we requested like

0914.5 or something so the the unfunded dollars were just pushed into this year right cuz we wanted to capture it you know um and so this year's plan plus last year what was not funded it makes up to 8.7 million um we understand that the city's not going to bond for $8.7 million uh you know as a straight line especially understanding that there's going to have to be some sort of Investments moving forward um due to the uh facilities master plan so we're hopeful that we see something and the city does Bond because there has been uh conversation of potentially not bonding um but you know listen even if we get $2 million we're in a good place because we have Reserve Capital all of those dollars that we talked about the 4.6 million to

092reserve capital and last year's Capital we've already started building those projects out so that stuff is scheduled for most of it to get done this summer um and then anything that we get will be built out for next summer or for every single shutdown so that's the other piece we've got the two-month window and then we use utilize every shutdown like the two days that we have now we're doing a batement and some other things so you know we'll filter and work anytime we have an opportunity um but you know in terms of the plan it's this year next year and the following five years will be re-engineered um but you know when we look at Capital we're looking at health and life safety um is what we look at so you'll see playground you'll

093see Mery you know uh water intrusion anytime we can do something with indoor air quality um you know we don't want the slips and falls on the exterior so we do sidewalks the rof placements we try to do on a Cadence because you know that's a little bit easier there's a percentage that the state pays we pay like 21% so we keep those on a Cadence um playgrounds we we we can spend a lot of money on playgrounds cuz some of them are very old but we've we've had a program to identify those issues um you know Paving is a big deal we've been able to do a lot of lots and the city has been good enough over the last few years that we we've been given 2.5 million and uh end of the

094year spending when they they had additional dollars that they couldn't spend they gave it to us some of it was on a very short time frame but we were able to get it done they gave us a million dollars um a couple years ago for the Lots the JFK lot and the Marin lot they gave us a million dollars for the park uh the blackham lot and the Reed lot along with the roadway at readed so you know they've given us additional to the capital they've also given us end of the year spending dollars the good thing is that we always have Shel ready projects so if anybody has any money throw it our way we'll be able to spend it um you know so there's been a decent partnership in terms of making sure

095that there is at least some semblance of us being able to keep things safe and healthy um elevators is a big thing that we always spend dollars out uh modernization we've got several programs going we've done a lot of elevators um you'll see that later on in the program in terms of approval for that um and then it's spe abatement so every time we do a project we we have to touch some aestus in most cases so we've got to have some dollars there so it's not just the project cost it's also the environmental cost so any questions on that but this is a moving Target any questions from Mr benan no not this moment thank you m Mr Woodson yes yeah you can switch enough are there any plans to fix the dumbar playground

096uh yes and the dumbar playground is in um the dumbar playground I think we've put into a grant the LPS a low performance School Grant um we're trying to utilize those dollars um I think in round two or three which we're waiting for now and that would solve that problem over at the Dumar School thank you Mr Cher um can you put that back up oh sure is this up just got your initials right now Jamie yeah I'm looking there click that see if you click it click this yeah some technical difficulties running slow here better you than me take twice as take two or three times as long with me well we started half hour early to make sure we worked out the Kinks says it sharing okay well let me try and ask

097my question without the without the aid the First Column was what you're proposing no um the very first column is what we have in reserve right is um what we have for fy2 what was approved by over from the pre well this is no this is last year's allocation there's last year's allocation and then there's the uh Reserve so that comes out to 4.6 million total there it is it is okay so the 2.7 that was last year's approv that's that's was approved from last oh I see yes correct the council adopted Capital plan from last year is that the money we haven't finished spending yet that's the money in the bank that we will that that there's a Hol of projects already be spending some of it and some of it will will not

098be spent by the end of the year uh I think we're going to be able to spend all of it by the end of the our goal is to spend every end of the summer you'll have a plan for all that yeah we have a plan for every dollar already so the the 8.7 is is that that this next column yeah that's the 2026 request plus what wasn't funded in 202 small on my small screen so I it's just a so that's 8.77 or 787 87 yeah 8 million 707 okay that's the proposal for the next year yes okay okay that's all I wanted to know and that's and then now then you're saying after that really everything gets reevaluated in light of the facilities plan yeah yeah I mean we'll re-engineer this thing to

099really lay out with the with the facts and the data to support it exactly what the district needs based on the new plan based on the based on the FCA yesc after that any column after that's just going to be subject to change yes okay that's that's all I want want to make sure I understood that's fine no further questions Madam chair okay Jennifer you're muted and I and I do agree y'all do I just said a lot of stuff watch I've watched you muted I've watched the reductions in staff over 25 years and it's been a hell of a jugg act yeah it's be it's becoming painful it was painful 20 years ago all right I just said a lot of stuff but I'll try to remember um I think uh I'm pretty sure

100Mr cic's committee um the finance committee move this to a full board approval even though it's already been submitted to the city right um so we'll see this at the next uh full board meeting just for like a retro approval I guess um uh we're going to move on to the um uh discussing of possible action on various contracts so we're going to start with Fair child Willer the school HX project Jamie's gonna take that yes I you don't need that on the screen right I mean the City attorney um we we have those contracts okay so the Fairchild wheeler school project um the contract was Revis slightly because we had that glycol leak at Fairchild wheeler this week so we had to purchase 12 of The 100 coils that were in this contract so

101this contract has been revised to 88 coils but because it was an emergency purchasing allowed us to purchase the 12 coils so this project is replacing the old coils and there are 400 coils at Fairchild Wheeler School We have replaced 51 of them because they continue to leak and every time we fix one another one could or possibly will leak so um every year in capital funding we request $200,000 to replace another hundred coils and can I touch on that briefly so that's once again theory of design right so when uh we start to take away from the theory of the original design because the architect wants an undulation on the end of the building we start to have these problems so what we're doing now is fixing up the SS of the past and

102this contract um the funds are capital funds this contract we us the city's all trades bid and we also did a qualified purchase since McKinny mechanical has been the contractor that has been replacing these coils and they're most familiar with the school and the coils and the first time we went to get quotes for any coil they came in lowest thank you um committee members Mr Woodson do you have any questions no questions at this start Mr benan no no question thank you Mr chamber who is the architect um the architect on that was uh oh man you're picking my brain um AG it's just an age test Mr Garcia oh man Jack buckus was was part of that group jcj jcj there you go they won an award for that building too for being

103a a a gold Platinum lead gold lead gold building on a choke them practicality and Beauty always thank you um any further questions Mr s yeah I could get to my hand yeah I'm sorry can get to my hands um yes uh the are these Capital expenditures or they okay awesome uh another question as far as uh B Tower wheel as you know we walked around all that um sometimes we got to be careful with our green energy and our environmentalism because sometimes they don't pay off and they become more problems than they worth and fair tow wheel is a good example of that we got them W wind turbines up there have they generated any electricity this year none they haven't worked um you have the the wind turbines that were problematic the gray

104water retention system that we've replaced components of now we're replacing um you know the coils and the chill beam system which I don't know who in their right mind put a CH want to decide to put a chill beam in this region I did that in uh the middle of Dubai which made sense um and then you know we also have um green roof the green rooftop which uh you know we've had to take take out I mean so there's a balancing act I do believe in sustainability and going green but you know you have to have the Practical approach there's also aluminum feeders in the building like it's just you know they get a little carried away right don't like me now you know because right and that's absolutely why almost all of us

105whoever need whoever whoever got voting power needs to show up at the school building committees to make sure things like that aren't voted in that will not be economically feasible and help us to stop these design be basically design flaws y y all right thank you noted as a voting member um thank you let me know if you're not there because I'm your backup um all right I'm gonna entertain a motion to move this to the full board so move Mr Ben all right and sec I'll second that um committee members all in favor say I any post Mr Woodson were you I I saw your mic go off yes okay gotcha all right so that's going to go through the full board um the next project and um uh I think Jamie you said

106all these are capital funded right every project we're presenting every contract today is capital funded gotcha so the next one is JFK Administrative Building elevator project yeah so if I can speak on the JFK admin building elevator project and the Dunbar School elevator project because they're similar um the JFK admin building elevator is currently decommissioned um so this is a full modification with the cost of bonds it is $31,800 um we procured this through purchases through the Cooperative purchase with K elevator Who services all of our elevators in the district the dunar elevator school project is similar it's a full modification and with the cost of bonds included it's $339,100 with the con contractor as well um are there any questions from uh committee members when's the last time these elevators were upgraded um you

107know we we've done maintenance um minor repairs the problem is that uh they're their end of life so now they need to be um modernized so bar they can't find parts yeah you can't find parts anymore and JFK also um is the reason why we have to decom both original yeah both original elevators okay thank you all righty any non-committee members have questions all right I'll entertain a motion to move this to the full board don't move Mr benan all right moved by Mr benan I'll second that all in favor oh sorry to break it down um we're moving the JFK are which one are you moves how about that the JFK administration building elevator project okay I see a head not that's a yes yes I'll second I'll second the JFK Administrative Building elevator

108project all in favor for that one say I I I all all right that one's moving and then the second one is um a motion for the Dunbar School elevator project move I'll second that um all in favor I I all right thank you um the next project is Discovery School playground project so this project is actually an outdoor classroom it'll be a new addition to Discovery School I believe in the contract um the agreement I sent you can see a rendering from the um compan contractor in that contract um this will cost $84,500 that includes the cost of bonds and compan has done playgrounds throughout the district over the years last year we used a different vendor this year we are going with compen their design and their pricing was best and this is

109also done through a Cooperative purchase and this will be although it's in a new location it's replacing their old outdoor playground which has recessed a bit into the woods and it's just we we're going to decom that clear that and then this is going to be a little bit closer to the building in a in a space that makes more sense and these are highly used wherever we put these they've actually have to schedule the usage of these outdoor classrooms all righty um any questions from Mr Woodson any questions no not at this point Mr benan no no question thank you how many outdoor classrooms do we have I know it's a different item but like black them in the courtyard two at JFK and Marin school okay and they're all like I said they're

110all highly used yeah they're really nice um I know I saw a few of them last year um all right so is there any further questions rning Joe Mr sovic I see your mic went off yes please yeah yeah thank you did I don't know I can't find my head today um yes uho how old is Discovery building is Discovery School one of stewardship stewardship report here we go 2010 14 years so about 15 years old yep how is it that they already need a replacement playground and classroom and H right and yeah and work and with all the other work needed to be done at all the other schools see this what this was in this was in a apparently in a fiveyear capital plan in the pass yes so so the discovery currently

111I I would ask this sooner so the discovery like I said the current Outdoor Classroom is recessed into the woods a bit we've had some triim fall down they haven't really been able to use it this has been a request that they've made multiple times we actually try to fundraise for it um and then finally it was um granted to us through Capital now as you know in the past we had to submit Capital specific to projects um which has been kind of problematic because we can't shift so you know in this new allocation we're looking for generalized Capital so we can make moves based on needs but this is a safety issue based on the current uh outdoor classroom they have and and there's no there's no other place you could think of and

112and that's in more di Straits than Discovery um there there're they're a need so either way we're just going to be kicking the can um right yeah my concern is where are we kicking the can and who who's not suffer who's suffering that doesn't have a voice that they raise it up to the level where it got to everybody's else these years but not ours did I'm sorry to ask these questions now so late in the game but and we do assessments so we have assessments done of all of the playgrounds yearly um and then they get rated and that's sort of how that's that's our Playbook um you know once again we always use the data to drive um so this is one that was a tier one I believe in terms of need

113um and then you know the next one is the same thing you know um you'll see another playground right after this and it's another tier one that's needed in the case of Discovery it's more of a replacement than a new install yeah right it's just a new location because of the tree liim issue that they're having they have a piece of equipment they have a playground that they can't use as opposed to another building yeah yeah yeah that's that's that's definitely UND I'm not discarding the amount that they need but um I'm thinking more Tri more triage if there someone someone else bleeding out and stuff like that well it's neither here nor there because it's already way down the road but and the in the future if we get the plans in out a

114little earlier I know don't disrespect anybody I don't want to knock anybody but we do need to start looking at these things as a board earlier in the process before it goes through the city council before all these bonds come through because these these questions could be asked and maybe we could find a more impactful use for them than a playground because we are education institution and playgrounds outside the school it's F and some of our schools got rodents running around them and stuff like that and is is is just to prioritize the funds in my mind might be better to be looked at earlier rather than later and to make sure everything's aligned with the values of the board in the community hey that that's all I got I'm just ranting I'm sorry oh

115I've no a comment myself but um would the um my question would be is part of this um contract to also uh decommission the old one would that be included or is that additional cost due to additional cost we're going to be handling that in house okay so we've got we've got equipment to be able to do it so when we looked at the cost we figured you know what let's just take it out ourself makes sense uh Mr Traer um yeah a couple of things uh one if tree limbs are falling on something you cut off the tree limbs you don't necessarily remove the playground so I I I'm not going to argue with you I trust your judgment on that that's not a viable alternative but that's an obv alternative it's a forest

116back there oh I understand there's a forest back there I mentioned earlier that when they asked me to put solar panels on my house they want to cut down my trees which I'm not willing to do um but uh you know I I I know there's options but uh you mentioned playground Assessments in my two years I've never seen a playground assessment um and I understand Mr civic's skepticism about Discovery being at the top of the list um and you too must understand our skepticism about Discovery being at the top of the list um I coached soccer up at John uh um at um uh at a school where the George you and I talked about it where the a car some idiot driver took out kids playground in the front of the school um

117Park City uh magnet and some driver took out the kids playground and a realation to to take care of that also yeah I know you were working desperately trying to figure out where to get the resources to get it back up and running and and the kids had no place to play there so it's I know it's a juggling act but I don't recall ever seeing a playground assessment and I would be curious to see that playground assessment I know at blackham over the years the the the uh primary grade teachers complaining about the need to upgrade their playground in front of blackham which didn't used to exist there because you know years 25 years ago when they had playground in the middle of blackham which were the old seesaw and there go around and

118Middle School classes were complaining about them using it before 2:30 in the afternoon so there are lots of playground problems in the city I know uh and I'd just be curious to see the list of the whole city because I don't recall ever seeing one we can definitely bring that to a facilities committee meeting well I mean we assess everything by the way we have an assessment for just about everything I'm sure we just hadn't seen it I'm I'm I'm not questioning your department I'm questioning the information that gets to the board yep um and so at the next board meeting um or if you want to have uh the superintendent share that information with us uh that would be great absolutely no further question Madam chair Mr Woodson um is is there a difference

119is this a is this a outdoor playground I mean an outdoor classroom or a playground and is there is an outdoor outdoor classroom what what's the difference um the difference is that they use this for instruction it's another instructional space for the schools so it's not a playground it's it's not a playground they actually use it for instruction every day um the schools love them it's just another option to get the kids outside as you know kids don't like to go outside too much anymore so uh it's another option for him okay Mr benan thank you uh Mr Garcia the one you said is the one is in Marine school on the on the backside s like that they did something like that right that's that's one of the outdoor playgrounds yes okay I know

120because they me I know kids they love it they enjoy and they feel you know something you know sometime kids they many hours in the room and stuff like that and it's good to go fresh and they enjoy you know the I know what you're talking about but my question for you is that because they I know Mr T talk about the tree can you give me explain if you can fast about the tree they cut the front and B in high school I believe it was one but they C the all three together at same time the trees I'll answer that quickly um the trees the trees are in front of bassic uh Trum had fell we had the tree Warden come out do an assessment of the trees the um principal had wanted

121us to assessment of all of them all of them had some deterioration so in in an effort to make sure that we maintain a sa a safe environment we took down all three of the trees all right all right thank you no more question mam chair thank you is there a motion to move this to the full board Discovery School playground project move moved by Mr benon I'll second that um all in favor I I all thank you so that'll be at the next uh regular board meeting the last one is the JFK campus playground project this project is um replacing the fiber at the current PL that the existing playground and adding an additional playground next to that playground so extending that playground um as a bigger playground yes with the cost of 237,000

122so that's the small playground right outside of um High Horizons that was a donation so they don't really have a proper playground for uh High Horizons this is something that they've requested for years um the current playground is unsafe because the fiber is torn up so you know once again these playgrounds that we replace are purely based on safety concerns so we're not trying to add something new we're trying to make sure that we stabilize I know we've had several lawsuits over the years Columbus being one that's happened over the last five um you know we we're responsible we're on a hook for these things thank you uh Mr benan any questions no no question this moment thank you Mr Woodson how old is that playground uh that playground's probably 10 15 years old it

123was a donation um they really never had a proper playground and we' got some drainage issues in that area also that we're solving uh with this with the permeable surfacing that we're utilizing and we're going to be able to pitch it to the drainage that's there is that is that the one right in front of the gym entrance yes that little one on the left like two pieces for the whole school yeah I used to play there Mr travor yeah I think Mr Garcia's not I think he's a little off there Mr Woodson because I think it's been there a long time probably you used to play there my daughter used to play there so all right you know I think Amy Amy Marie vizo pania had to do with getting that thing in when

124she was a pack parent there so you know I think it's a long time ago yeah I mean early late late 80s okay so see sorry guys I'm tired and I I also think that playground is a lot small it is a lot smaller Multicultural side oh yeah it's like I think we us mult yeah yeah and the one at Multicultural was replaced so it's like I feel terrible that we were able to do one and not do the other so this sort of and and we've made you know so you know that we when we look at buildings we try to bring them back up to their Old Glory so we've done a lot of work at JFK there's a new parking lot there's all new sidewalks you've got the Outdoor Classroom the pool's

125almost done with its Renovations um so this is just like the final piece of us getting that site in order [Music] again talk about JFK imagine it when I was there it was East Side Middle School so that I remember that too yeah well that was before my time but any um is there a motion to move this to the full board JFK campus playground project don't move I'll second that all in favor say I I okay that's moving um the next item we're going to um I'm going to entertain a motion to table the nutrition center report um Mr Garcia is going to present that at the next meeting too much for one night I know with that some move um that's why I try to start this Mee early for you um appreciate

126that way so we can go three hours just joking um no uh okay so that's been moved by Mr Ben I'll second that all in favor I I um and then the next item is just um this is a discussion and possible recommendation um of renaming the Harding High School auditorium this was a um brought to my attention by Mr Woodson um and um I know principal Thompson is on I believe yeah he's on um so I don't know Mr Woodson do you want to um talk a little bit about this and then I'll also have Mr Thompson share some no I uh I'll let Mr Thompson speak all right Mr Thompson go ahead good evening evening hear you yeah your volume's a little low can you guys hear me you're a little you're a

127little Rey you're a little read Mr Thompson yeah let me I know you got the pipes can you hear me it's very faint let me we don't hear you so clear like when you do the announcement in Hardy high school so so this is the 7550 policy for uh naming a facility or spaces within a facility just for the record and I was going to before he gets while he's getting himself situated um in our 3000 Series there's this so the 7550 it says new construction that are we using that for current construction as well um so I get uh you know what I don't know one Jamie Penny had given me it has uh for portions or for the whole school so I'm not sure to be honest with you because in our 3000

128Series there's 3505 but it's missing from the the packet so and I I've had I know Danielle was looking for it for me and um I've been I was searching for it um and so I know in the past or the last time we we named something we used this but it wasn't it's for thebasic facility so I just wanted you know there something we can clarify if um you know it says here revised in 1:18 2012 so U we'll we'll we'll do the due diligence and figure out where the 3500 series was and if that was replaced by this one we'll get you that information gotcha and then um you know this the part of the uh part of the policy before you start on principal Thompson is that um the superintendent will create

129like a a committee of sorts um and we can um have Community involvement in the the naming so I do want to hear your input and then we'll um you know I can make a recommendation for the superintendent to to do that but um go for it okay great so our Auditorium is currently unnamed so I think this is a great opportunity being at Harding next year Harding will be C celebrating 100 years so we do have a graduate uh by the name of Deon Kipping who graduated in 1997 who was a billboard charting gospel artist and a big part of his career was launched as a student at Harding High School underg grade teachers such as Miss Kelly at his time as a Harding student he led the Gospel Choir to a national second

130place ranking in the McDonald Gospel Fest so he's achieved at a high level so I think it's a great opportunity going into our 100th year to engage the community but also give recognition to talent that is Bridgeport groom and also products of Bridgeport Public Schools that not only achieved at a national level but also uh he is a college graduate so it's just a great product of Bridgeport Public Schools and an excellent opportunity and our Auditorium is currently unnamed so I think this is is an excellent uh opportunity going into the 100th year um I currently have the support State Rep Fred G uh Pastor McCulla from Faith acts also uh councilman Ernie Newton who's also a Harden graduate um and I know Mr Woodson I think he was a student with Dion so he's

131you know firsthand been able to see his impact and his National influence so I think it is a great opportunity to bring uh great attention to the school to our music department districtwide for someone who is a product of of the district thank you for sharing um Mr W do you want to add anything or no not really just yeah so um so per the policy like I said um we can like make a recommendation at the board level to um you know ask the superintendent to um kind of go through the steps of the policy and then um it'll be presented before the full board and then the board will like can uh decide on you know approve it um I I in my time on in the two years I've been here or

132a year and a half I guess um I haven't been a part of naming a the existing facility we did um something for bassic last year um so I know we can um you know definitely move this along I think um and I I did talk with the superintendent he's in um he's in support of anything the board decides uh Mr benan thank you m peris um I would conf um can you say the name again Mr um Thompson I didn't hear very clear the person yeah name is Dion d o n Kipping k i p p i n g he said you say he's graduated 1987 from Harding High School yes yeah 97 um I don't know if I see him Madam chair but do we have information about in a package about this

133um you know because the I didn't I didn't see in my package I don't know if no this was referred on Monday so we added in um yesterday so we don't have any in the package um Mr Thompson did send me something I could for to you on on just a background of who he is and it's just basically what he just said but I can forward that to you please I can say his you know his his parents his grandparents they all were a you know Church uh his grandfather was a bishop he actually he actually actually U went to I actually went to his church the family went to his church over and um on the south end and um they they the family's always always been supportive of bridgport his grandmother worked

134at Hall home for for a long time so she's definitely wellknown family is well known so should be no problem with this I agree um Mr travor yeah two questions uh did he interact with Miss Graham when she was there yes he is he's actually um also interacted closely with Miss Graham that would be another connection for you to to uh include uh that she's achieved notoriety um as a educator from Harding and a you know her she end up at the national teacher stuff um and then um um oh God the uh didn't I not read that he achieved some sort of national recognition uh for his professional skills he's I think he's a Grammy award winning yeah yeah Mr Mr thomp yeah P chart his album is charted on Billboard no the Grammy

135the Grammy the Grammy he got the Grammy too he also wrote a song for Mary J blaz that received a Grammy right okay yeah yeah I mean that's pretty that there's there's a lot of High Praise in there you know that's a that's that's a lot that's a lot of uh of recognition that needs to be raised so I I don't I think that's that that's worthy of a lot thank you so if there's no further questions I don't see anybody their hands up um you I could uh we could make a recommendation to um have the superintendent um you know form that it's it's I mean this could be done you know soon too um so there is a motion from a Committee Member um I would like to like to um get some

136more information it was very nice but I like the bio information in know the background you know to see who's you know who the person I believe everything you s me would like to get information I know you're going to say something Miss um Miss peris so would like to get that in the I I'll forward that to you but then also in the com in the policy there's a it the superintendent would create a a subcommittee on it um and then they it's with the uh staff members from Harding um uh administrators teachers uh students um you know and they would kind of have a dis like Community discussion on it and then refer to the board so um so yeah that that information will be forthcoming as well um I don't think it

137necessarily stops us from moving on it right now so that because that information will come on yeah sound good with me I'm okay with that okay so Mr Woodson I know you had something we could like make a motion for the superintendent to um um create a a committee yeah to appoint um I'm trying to get the motion out um trying to word it the right way uh make a motion for the superintendent to appoint um a committee uh to rename the auditorium at Harding High School M ch yeah Mr C yeah yeah I I I apologize um I believe I could be wrong I don't have the policy in front of me but um I believe it's got to be referred to the full board to have the superintendent do it do you have

138the policy still in front of you um it says the board shall appoint a committee recommended by the superintendent the board so the recommendation would be so the the the the motion would be that the the the superintendent will recommend um to the full board sorry sojust yeah yes just for yeah thank the formali yeah thank you're breaking up a little bit but so the the motion would be that the board um that the superintendent will uh what did I just say I'm so sorry did somebody hear me yes go ahead trer what what am I making a motion on well the only question was whether we refer this back to the full board or we refer this to the superintendent to ini refer to the superintendent that's what it was okay we're gonna refer

139to the superintendent to initiate the process okay so I'm gonna I'm gonna make that motion I refer this to the superintendent to begin the process of a um naming committee is there a second okay I apologize to Mr McLoud on when you when you typed that up um any further debate all right um all in favor for committees members I I I all right so we'll have um Dr Avery um work with you on on kind of getting that that committee together U Mr Thompson and then um we'll go from there okay all right thank you thank you for your time thank you for sharing than you Mr Thompson all right so that is all I have on the agenda is there a motion to ad Mr benan you have yeah um before we do

140um um join the meeting I just want to be sure and clear that everything was facility report us tonight I hope the state represented I hope the city council I hope all these people understand that the what we going through and what facility is doing because they think the budget is high and they think they don't they think that we don't know what we doing with the budget but they can understand facility is one of the big use Department we use in BRB public school and everything is expensive everything is money every and they need our help and they understand they need help too I just want to put that for the record thank you Madame chair yes and I I do appreciate Mr Garcia your whole team um and the work you're doing um

141it's it's a busy year for you guys uh Mr tror one final thought just a just a question to Mr Garcia do you know why you didn't appear before the council this year Mr Garcia uh the hearings haven't been set yet so you were there last year right yes that's why I'm asking is I sat there last year and listened to you present the entire fiveyear Capital PR budget yep and I thought it was the only thing I heard last year and I thought it was right around now yep so um the calendar should be coming out soon um in terms but I was assured that I'd be presenting again this year we really want to give him a sense of what we've done and where the where the money is um been spent and

142you know show them the return on that investment they made okay just make sure that that that gets the word to them Mr benam how thank you thank you Mr is there a motion to adjourn we move I'll second that all in favor I all all right thank you guys it's 6:59 we're Journey before 7 p.m. appreciate God bless you all thank you thank you night