001this is Tuesday February 4th 2025 we are the East C Board of Education business and Planning Center committee I'll introduce ourselves because um we don't usually have this dup crowd I'm kir Thompson I am the chair of the business and planning subcomittee Sean Mory also a member T J Laur white P strier chair for Dorito superintendent in C Houston never bu manager and our first agenda item is adding a volleyball marks Middle School playground you [Music] guys that's what I thought oh take your time take your time we're all parents here we appreciate your presentation and hello we are the sixth grade school group I am Ryan I'm ja I'm s I'm Al I'm Emerson I'm Logan we would like to propose add a b outside of our school Nathan how school this suggestion will

002really hour is a sport that e your play having with provide them with the opportunity to get practice and enjoy the day it it would allow students to engage in activity instead of being for might if we were to we could raise money for this with fig sales selling jits and more this net is high quality if you want we can order thank you for giving us the opport [Music] thank you so [Music] much so here's your here is the here's your basketball court this is where we are expecting [Music] to so is this on the grass then that's SP cours here the playground is here right so this is grass and this is the parking are well actually you can ask them would it remain grass um thinking the it's going to yeah we're

003going to add a sandit around the bottle that or every everything else is the area around and you guys said you were going to put this together your building sand as well um I'm pretty sure it's covered by Public Works according [Music] to take what would the costy of this sand pit area and what do you expect or hoping that Public Works is going to be able to do um they said they care they being um Mr Mr Ang said that he would take care of that so you're going to do all the site work for it take it out yeah we'll do we'll dig it out we'll bring the sand in we'll do okay will you put timers down to hold it all in and all that stuff I don't think so we're going

004to dig it down the top s fill down and then fill it in there okay so it's all one L so there's no cost we go through a jack um ni 11 the operat will cost $1,580 the net will cost $614 the sub total will be $2,194 and the tax will be [Music] $13.32 and the total would be $2,333 32 that will all be coming compl and you guys said you planned on Fund Raising I'm sorry did I interrupt what your next statement was going to uh we we [Music] could do you have to pay tax we're nonprofit so you st money there always important we're a good sa money $140 that's always important um are we have to move this to our meeting next week we have to Dove it for approval your your

005committee approves it it goes to the board well I certainly approve big volleyball I can't believe the opposition no opposition I am thrilled to add this to the agenda for the full board meeting so um if we can just with that make sure that that gets on there I'm going to ask the horrible question um I understand that you guys are interested in fundraising um certainly the budget is decided you know after the board makes those determinations it will be then up to the superintendent to see if there is extra money to go towards this which is the sad reality of how these things get built and put together so there's a concern that the board is enthusiastically supporting this but doesn't mean that that's the green one so there's steps to go through between

006us and the final outcome so hopefully fingers crossed I hope I'm not speaking over you as the chair hopefully fingers crossed it can go forward and and get the green light I ask question sure about that if they were to raise enough money would it be able to be passed so that will happen at the full board meeting so the subcommittee listens to it because they're part of facilities then it goes to the board the full board will vote upon it there'll be a motion made and then it'll be whatever that motion is okay you can't take a vote tonight um in subcommittee yeah no I got that part I just wanted to you get the green light it just comes down to unfortunately the funding that that's why I was curious put in our

007budget but if you do feel inclined to fund raise that's always helpful too because our fiscal year doesn't end till June 30 yet so your new fiscal year will be July 1st so it won't wouldn't be into that budget till then see how this budget process goes this spring unless there's any leftover funds the year right so it might be upon yeah of course I understand that part I just want to not discourage them too much either be discouraged I uh I think you'll get the green light we can't say but you'll you'll just have to figure out how to pay for it thank you thank you very much great presentation fantastic you PR of you guys I am really really proud and volleyball is my favorite sport exactly same great work up here laying

008out a blueprint do we get to or will you bring it back to the board meeting or should we take a picture well you guys would they be doing another presentation her they don't have it's not necessary and you guys can keep it okay perfect we'll bring it next week Jack it's yours want it this you sure we get it back to to get great [Music] job I agree [Music] okay so our next item is facilities General updates and future projects I'll hand it to John you got a fan crew there yeah we met a couple months ago was we walk our sidewalk it was good did a great job so do everything for this year or you just want to go let's about what's new and see how that I ran out of time

009so I just wrote notes down so um So currently we've been going through um we been working with a new company for the hbsc for the schools we doing a walk through of uh stuff upstairs doing a complete inspection which school the high school we doing a complete walk through and we get a list of everything that's should be fixed needs to be fixed is not working um it's a lot the list was a lot better than I thought it was going to be but we've been making repairs as we go but there is going to be quite a bit of stuff that needs to be done um it's not um birth shattering but it is a few dollars that's going to be spent and we should be able to do it in this year's

010budget the middle school we uh also did a walk up on the roof and we went through some many units and we found uh quite a bit of uh few broken belts and some issues with the exhaust fans that's all been fixed everything's up and working there um we've been making minor repairs hbac there also as needed nothing major but it's all been done um we do have um two circulator pumps that are bad at the elementary at the middle school Sor one is um broken and one is making a high pitch noise we tried to fix it uh one day but we have a leak coming in from the boiler to the circulator valve so we're going to wait till February 17th 16th to do it when there's a no day when there's a

011day off or we maybe able do on the 11th for the half day so that could push back until then um it like on is it is it on a pipe or is it on a connection like where's the piper what caus the leak so there's a valve inside the like from the boiler to the circulator there's a valve in there to let go pushing too much water through so they couldn't isolate and shut it off without shutting the whole boiler down it was one of the real cold days so they didn't want to shut down so uh it was going to take them longer than but where the leak is in the valve it's inside it it's not leaking out or something of that so you couldn't isolate the boiler to keep it I

012guess so so we're coming back either the 11th or 16 17 or one of those things how much is a circulator replace two no they're going to rebuild them so you get he gets Bill take Parts 1,500 bucks for the parts and so it's not outrageous they Circ pumps tol probably so inside so it's not we have the parts for one we bought and we just never had so it's um the high school we have been spending I'm sorry if you jumped around uh we spent a lot of time cuz the BMS system is disconnected it's not working through its AG so we manually turning on valves for heat in certain areas we've had actuator pumps electric motors that literally rotted off the pumps themselves we're finding them as room doesn't have heat or room

013is too hot so they have since been repaired so we put those in they're working in and that was part of the inspection once once I found that do the inspection everything hopefully so it doesn't happen um so they're they're electrically working again so we're not Min that's kind that was a big stff Elementary all right you want hopefully no we're good start the HC so that still has this usual problem this is usual some on some off so the um that Gap in the library and the door molding underneath is getting biggeri so I had to order them on Amazon know here in town so I had to order so once so it's just a the rubber came off the L it's 9: but it's been the Middle School DMS is working but it

014should should be in the works um but other than that I think that was a big Stu that was a big [Music] yeah yeah no this is the expensive [Music] okay I still I have your one so want I guess we can start with the cameras yeah I think cameras are good we [Music] have so the sheet that kind of going around now this earlier the camera is at all three schools and the way the the uh video is stored is extremely outdated and it's going back 10 years anyway probably maybe a little bit older but the cameras are and I guess in technology time that's old um so we're looking to upgrade all the cameras and convert all the cameras to the cloud so we use them on the phone every camera has some

01530day storage to start with and uh give more uh security to better for more areas on the property that we don't have now um they were pretty expensive for three schools we were I was able to speak with uh the company has a separate option and he actually went to Motorola Motorola came out a lot cheaper than what we originally thought so for the elementary school to replace them all and kind of there's a there's a possibility to with the with the quality of new cameras that would may be not need as many or relocate any do not need are so to purchase an out for 37 cameras that M school be 8,890 but we do have to pay a license fee for the cloud Now by using the cloud putting them in there it

016gets us away from buying servers and switches also uh which the servers I believe around 15,000 each made so this way put them in the CL and store four different locations across the United States so for Met School only be $7,300 per year for the licenses for the cloud um but we they did give us an option and through Motorola of doing leases for all three Builders actually uh we go fiveyear lease with a 5year license included for um 25,000 2507 per mon for 60 months uh for 1 15,420 um there's another option with 5 year leas or a 10e license uh we will the life lifean is considered to be 10 years and there's a 10e warranty on them so we would be paying a license for 10 year time 3258 for 65,000 I

017know it's a little higher than what it would cost to purchase um but we get with this we get we get a service agreement with the company and um I think it's a little B EAS year for yearly Foss budget uh the middle school has 48 cameras now was 111,000 you want to purchase them uh Cloud licenses again that's going to be the same it's $199 per camera um for each school that's 9552 per year um if they have an option again we're doing all three leases a 5e lease for them 5e leas 3380 per month 5e license is [Music] 22,800 um I guess we can go back to M any questions yeah um you're saying that they're telling you the cameras have a 10year lifespan yes um but the technology will be obsolete short

018shortly after we get them so are we going to be able to are they going to keep upgrading us if we're on this lease to keep the technology current uh I'm not sure the time on I'm not sure the technology will be probably old 2 days after the install them so but I don't think they're going to be that bad after 5 6 or 8 years but no if we want if we have a camera that's know that we just want newer quality or better quality or we want a PTZ that we can zoom in or we can move around that's going to be add cost if the camera fails yes they'll replace that warrant that part warrant but if we want to update it's not yeah it's an upgrade compared to what we have

019now it's a significant we're trying to prioritize the Safety and Security um so we were excited to get this opportunity to um have it over a span of years when we're leaning for five year yeah so just yeah on these cameras too as I was actually doing quite a bit is they actually have internal memories so they see something odd that wasn't happening for a week it'll pick up on that it'll automatically move like it'll move to that area SE headlights of 1:00 in the morning it's never seen they actually bring over and record so they actually come along and pretty uh so yeah so after break them all down to me I I spoke with TR is that probably the best year the best option would be to lease them for the 5e um

020you see how it goes and then we can pay the license Fe after the 5 years um this seems the cheapest for Budget wise uh a little bit easier the budget so it's to least something for the license for 5 years 125,1 for per year that's with the three schools for Hamas P the license and that would 60 months the second option I mean isn't horrible it's 16,560 for the 10 year to 5e with 10e license which isn't undoable either it's probably would be probably an easier sale for the why are the prices different per camera per schol but if you take the 81,000 right I'm dividing it no I'm dividing it out 37 ID 81,000 48 ID 111,000 like the high SCH so I would go towards installation because some of them need boom

021drops okay Booms for high school the middle the AL met school is all 8ot step ladder so you're going to need boom trucks for the high school and for the middle school so that's an add cost High work what the cost what it cost more I don't so just so that you can go on the math though to lease over 5 years the expense would be $625,500 for 5 year $2,800,000 so it's a significant expense to over the $349,000 you're financing you're Lally but it's not it's not that astronomical because you have to put the license there to but so you take the 27,000 Time 5 years plus the 349 so there it's like a $60,000 difference okay between the leasing and buying them out right and which one were you recommending I would go

022with the I would recommend the first one L them for 5 years or the 5year license and kind of start go from there that's not option one though right that's that's still option two leasing is option two oh sorry yes with the five the 5e license and yeah yeah okay sorry remember back in the day when we were getting grants Craig would go out for them through EMS and we were getting cameras and everything like that for like this building money right supp so there was one that was out recently for nonprofit schools and so different got deny because it's a publico so I'm not sure what just love that I'm not I know it just really makesense there is a new one coming out she did say there's one coming out the high school

023does your 37 um or actually you have 52 here I'm sorry does that include down there at the track so that's no that was the project we're trying to do this year right but that bill is coming out more than we were planed on to so that something we have to add this bu or a portion of so can we take that whatever that is down there and wire into this system so everything's on that cloud you thought about that yes we can that was the plan yeah so for I was actually surprised by this there the servers servers we need for the tech building and the Fieldhouse and the line Forin and four cameras was $78,000 and we have a budget of like 40 so we're little short so we're I'm reading with him

024probably tomorrow to see what we can do just to get I didn't switches were went from 7,000 to 15,000 course 6 months you go up even IR so nobody counted on that that was never that wasn't a so there was I got to ask you about the purchase yeah and license per year is that per school or is that dist why that's for three schools that's District wise so you're still if you buy out right Mo the 5e lease you're saving [Music] $181,100 sorry 10 years and if you do the 5year lease you're and you just buy it outright even paying 5 years wor $27,000 the buy outright would save you $14,560 over so Leasing expensive so I just want you to know that yes it's great because we're not paying as much up front

025right away and it's over time but over time it's not it still costes more Mone this is going into Capital correct right this is all capital so something that you can so all of this right really supp of finances decision at least I mean Capital she can releas it in the capital so that's really important to fin going decision we're going to give this them because we do want to prioritize security and at least let them see the numbers and we'll see what they decide but you're now being informed you're the first to have this information because this is brand new we just received it I was just curious you know on a lease so what have so so we do five years fiveyear license whatever so what happens after the five years they become

026wor so okay it's purch purch it is you're right it's a ing option so least own oh yeah it wasn't no you're absolutely right not like the car you got to give it back absolutely right over cameras have 10 year life 10e warrant for one bit goes bad they replace it I know I know but at least you know even if we do the 5year contract they're guaranteed for 10 for 10 years okay can I skip down because I just want to make sure I'm understanding so we've got three schools with three camera Cloud updates listed on this sheet as well as the explanation you've given us but way down to bottom we have systemwide security camera updates new one School per year are these internal versus the external what is the difference between this

027so this was put in here before I got this okay right so there was about duplicate I'm going I'm going to throw a number out I think it's probably I think it's about $100,000 cheaper than what's in on this Sho nice thanks for saving us I think I from memory I think it was like 4 440 on the sheet well this one says 15,000 School per year so 15 * second It Up From The Bottom yeah that's a repeat that can be cross there we go so what's the purpose of the lease if we're just going to finish it out and ow them after five years just so it's not a400 something, round the first year okay so it just makes it a little bit easier to spread over five years we end up spending

028how much you are going to spend spend any more but again that's I was just giving you the numbers again as Teresa said that's a board of Finance sure like that's where they come in they decide what they want to do they they offered that there was this financing option and we'd rather get all the information and then present it um because we really don't want to compromise security features that we're looking to get so we I've had pretty good luck at the board of Finance with the leases instead of like equipment stuff instead of dropping 40 50 60,000 they want to do 10,000 over year every year for five or six years uh and allows them to do more things so yeah more companies seem like they leasing because I think get more business

029yeah yeah making money we got Cloud update several places here for each one so um this then is the priorities list for Board of finance and this is ex this is full this is this is yes are we going to let's go through this then too so we're not going to make the decision tonight the C so let's uh camera questions questions no I don't have any questions just seems like a difficult decision to be honest because after 5 years is the camera going to be after 5 years how old are our current cameras so 10 at least so so in the past there they're still working so our current ones are really they're 10 years old and the technology to day is so much better no I have no questions on that I I'm

030looking you know after you've had a laptop for 5 years nothing thing is done for and so oh it's not like that it's oh it's not an extreme like that I'm sure cameras aren't like that but knowing that we're not like so far off from that it's still technology so we're spending so much more we have 5 years Le and after 5 lease we're looking at these cameras and we're like oh these are kind of you know not great 5 years later but now we own them and we paid $180,000 more than we would have paid if we purchased them I should get something to consider yeah yeah and they have a 10e warranty remember that so the the cler the cloud is to that'll be automatic update going yeah so Cloud license you're saying

031so they'll do automa oh into the techology here's the problem we have now so the cameras we have now are on premises only so they're on servers so if a server goes down Camas and it cost us anywhere depending on server anywhere between 15 to 30,000 place a server for switch [Music] server but it's like between 15 and 30,000 to replace that and in some cases depending on what it is I think Max we a couple weeks year it just don't happen sh when they do the cloud they can do everything from if there's a problem they they never leave their office they'll be able to do it from saying no cloud with the purchase Cloud are both CL no no we so every camera will be in the cloud so everyone will shoot up

032their Cloud we won't go back to a cfle everyone will have their own their own storage um so that way if the camera goes bad they can shoot in from they're in Berlin I believe they can do it from their office they can go in see what's if it's bad they'll just come they'll get a all come down and replace it but they can do automatic updates that way to what to do uh my truck used to do it but they can do it from where they are or Motorola could do it if there's an update or they can do it from their back that's with either option we're going no matter what we doing Cloud that's it correct the Le they the camera but if you buy it you'll have to purchase and repl

033camera is that correct correct so if the camera if we want to say all of a sudden a year from now say you know what that camera's not working anymore we need a 360 that's PTZ we got to buy it sure well that's cuz it's a different camera but what about camera what's the warranty 10 years 10 years so if the camera stops working they're going to take it out new one upgr just yeah so there there's 10 years on everything what is the security of this information shooting up into the cloud and getting hacked C uh there's nothing say it's in four spots throughout the country so we'll never be down that's that's why that's so one server goes down we still got three others but I can't guarantee it and um with let

034me just think oh um this company that you're working with from Berlin um how long have they been doing this like are they reliable to us in 5 years so they they do this building and yeah they do this building they're actually quite large they do fired the couple colleges and a lot of high schools already uh they do all the stuff for FRG VV use them on Alexan their company we do huge you know they're us to doing a million dollar project they a good company they come down they set us up they do our key cards for us our swie pads they've been very good and I like the fact that if they go into the schools they're here too so we got one company that can do Swip pads they got cameras

035that can [Music] do but you're right it's more money not I'm going to ask S after the this meeting this meeting is being recorded I'm going to ask her to stop the recording when this discussion kind of started to write before my talk right now only because some of the information that we're talking about really is Security based and what we have for cameras now how they work and what we're doing for replacing them so when there's a void in this meeting of the recording that's going to be why thank you doesn't have to be done now but I just don't no that's fine figure it out end it then start so if we go line by line Don let's take us through plus like these Cloud upgrades are they staying in [Music] here so

036this is an overall and yes I'm going to have to put it into Clear G so this is my Che need to clear them so that I know to put it in for um the long range C committee and for the business and board Finance so yes they will go in there as this of course these numbers here need be updated need to be updated cuz D got much better numbers since when we sat down the first time so the numbers will change a little bit um but yes it's going to stay in there and again the final idea of what it is what to the board of Finance as far as that goes but um but yes they on the sheet with numbers done just give us just so you can skip camera upgrades

037here and you'll see it for each school so uh Elementary School lighting upgrade so that was came from um the Police Department Security audit they like to add more lighting around the schools the Middle School is tough because there's no parking lot lights already so element sorry so the elementary schools is tough because there is there are no there's no parking lot rights now so we take trenching through the parking lot and we take the light pole bases we have to put in uh which would be expensive r a good par so we decided to put some more building lights on yeah that would shoot out around the building so that was a $25,000 request for that for we had our elementary school meeting it's dark you need more light yeah no it is tough

038to and so this this decision here is not to do any of this trenching on our new parking lot but to just put lights on the building yeah there's there minimal now uh speaking with Jeff I think this is going to uh help out MET you make it a lot better because otherwise we're going to have to trench we saw trench and get Park Lots on which would be quite [Music] expensive how was that over looked when [Music] parking front there's there there's street lights on the back side we do have a couple and by playground I two three playground this is the same account for 25,000 side over over time uh K1 playground same thing a savings account 20,500 they new kitchen kitchen serving line for the elementary school which is original uh to

039the school um I'll give you some updates there we have $30,000 in aside this year so it's a 7 half of the $3,000 so the total cost of the project if it stays the same I think we we we gave a little extra just to make sure I think they they'd be able to get something for those 60 don't you think that should uh this is kind of a the next one is kind of get the ball roll on this year and we'll ask for start the process next year for asking for it's a re access Ro to elementary school for 500,000 so I had a question on that shouldn't that go into public works did you figure out the access not going through yeah yeah no we got oh you yeah we got yeah

040it's go it goes through it's not public person but actually it is public works because it's to properly done there's some of it it's not going to be it'll be you think things are some of it's what inflation's going to get worse oh then that's definitely that's not that's Public Works that really needs to go in public works get done keep it okay we'll keep it just about that understand when we met one time when we looked at the map oh actually wer might have beening that you actually M we looked at a map no we looked at a map I think Sean happened to not be here I don't have a map with me but like you know where the soccer fields are do you know where Oak Ro where the company company 2

041is the one that's on [Music] to have an emergency access road for the element school it's the only school that doesn't have a secondary spe travel if for was catastrophic emergency I'll trails and this has been on going things CH for a number of years and it it has to get done should have done curious um next one is The Rook for element school is actually do this year but we're doing all the holes in the rof so there's no sense put new rope cutting all the holes so we're doing 27 28 done there [Music] twice only on the work once right we're only doing lowering the look at that we are saving money PR we are an efficient gr do some other duplicates on here okay um sidewalks would be 25,000 year till G

042we only got a short amount of distance left much you see the the the end you'll have to start over again after it's all done the gold gate bridge just [Music] uh the next one is expensive 194,000 439 for controllers for the high school that building has one that's no good anymore so we couldn't do this with the aack so the next one we take go Courtyard Improvement talk about this every year finally us the high school and the courtyard um the high school um same thing for 25,000 for lighting upgrades we do have the ability to do the entire property $100,000 so start with building lights a um next one we don't have a price on but do that working on that high school office carpet that was original along with the guidance office

043and assistant principal's office redo there redo their floor uh track boers I think we took that off for future M we did yes track reserving 40,000 for S account that's time how often does that need to be resurfaced uh that's a good question depends how bad we beat it up by using it um let should start looking at it after 5 years and see if it needs to be a new film put on it so 5 Years anyway to start with okay transition vehicle that's not yet um that's not until way future Middle School uh the BMS controllers again for 192 Middle School boilers uh that's futured 27 cameras we can take those off we them on but there'll be different part yeah uh the middle school and I believe the that's the high school

044on this to middle school and the high school for 66,000 together uh exterior lighting we have moves uh we're working on the final two phases of the exterior washing and sealing of the middle school for 25,000 this year and next and then that'll be done uh Middle School office carpan got ahead Middle School roof ahead Middle School Caper TI replacement foring uh that 25,0 7282 you together right what's that because one below it's the hallways y so uh to remove the lolium through the hallways and in the cafeteria L lolium is um beat up and we have a couple spots where water got underneath it and it's discoloring and a lot of the baseboard is roted dry roted it's falling off we can if both things get done at the same time there's a savings

045there's a savings there if we give them both projects at once that they don't have to to uh remobilize again so there is a savings for that uh system wide Vance machine this is for all the baseball fields at three schools uh the one we have now we took up to try to get replaced and they can't replace the motor because it's too old so we put it B you to try to get us through as far as we can uh this is used every day during the softball and baseball season and throughout to keep the weeds out of out of the system the dirt so it's uh would be a priority uh grounds vehicle in the future uh system y maintenance truck um no we haveck we have uh this is a replace the

046older truck that we have that's become costly repairs uh modernization for learning for furniture um Network switches there's a thing of how much they cost I'm not sure many it's just for the high school that's yeah I'm not sure how many it is but it's 8 CR swies right uh cameras I believe that was a 15,000 placeholder if anything went bad there's 15 grand there but you told us to cross it Off plan so that's well if it doesn't pass then we go back to uh system wide VRA that's Bush also Laurel I'll ask you first you always have question I know but I think I've been talking over my turn all night tonight so I don't think I have any new questions I am super frustrated about the elementary school parking area and fact

047lighting consideration that boggles the m so new parking L the new one has we do have the old lights from the where the new parking lot is we do have the old lights still dark out there it is there is not there's two things that actually went operating that's not here I do have it on my list it's the hbac maintenance contracts that are going to be higher than the last ones switch companies better Ser different service in high school was going to 20,32 that's four times a year it's filters GRE belts everything's in every school [Music] 25,9 you to pay that four times a year no 25 four times four times sorry y w those contracts were included in yeah I didn't know of that yeah I I had it on my L yeah

048they were original they inated already yeah I'm a big advocate for the playgrounds um cont to learning environment classrooms because currently have already here you can see it over $91,000 and typically they've been giving us $1,000 every year so we're looking to outfit the kindergarten the third grade the front office at the elementary school and only recross 50,000 we try to do that and already start the um update now because we've got the funding and it was allocated for that purpose and we're not a for-profit so there's really no reason we know the need has been requested so we wanted to start to do them just make sure all they should be the end stages for the school yes right so just to make sure I understand they typically give us 100,000 is what you're

049saying and this year you only want to request 50 correct without the fear then that possibly next year we might need to go back to a00 100,000 that's what we would right we would continue but just to sort of make it balance out what's our need and have the request match the need rather than just go with oh you've always given 100,000 just keep yeah [Music] Dr are youing to our next agenda item I do have um something I'm going to pass out that mirrors what was shared at the tri board but provides a bit more context and then um happy to answer any questions and take any input as I enter into the final stages of preparing superintendent's budget to present to the full board next week if done you're I think he's okay

050to go right unless anybody needs them like I mean we're happy to have you you are more than welcome to remain yes are you sure you don't want to was part of your oh it was just Happ you just want us to have this Cofe yeah that's just it that's what was presented but here I have I think I have no no this is even more oh even more wait that one is all of them and you'll I mean there is um redundancy but I've obviously been giving a lot of thought to this for all these weeks just like many of you um so just want to take you through um the overview obviously the district vision is really important for us to have that in mind the purpose of what we do is to

051provide um high quality service to Children and Families um in the realm of Education when we turn to the next page um highlight the initiatives these are things you've heard of Science of reading um in line with state law and and very important um no one's disputing this at all um social emotional learning uh specifically restorative practices responsive classroom are new are in addition to Second Step that already exists that is part of uh teacher instruction the leader in me for all ninth graders this is has been a big Endeavor that is creating quite a positive um outcome for our ninth graders and that being the gateway to their career right it's their last stretch of four years um in education rise's Network at the high school the beer better initiative that you've heard about

052at a previous presentation the building thinking classrooms that is um at all schools um I I can definitely say the Middle School in particular has embraced this huge numbers of folks going to PD and really implementing it um and even the building principal modeling it um for uh colleagues Project Lead the Way is an industry standard um stem program and it defin itely warrants um us including it um currently in the middle school but I am looking to increase it in the future um obviously building School climate we do bring in special guests motivational speakers but kick off to the school year Ken W was an example of someone that um was an inspiration and revitalized us to start off the school year and professional development that's focused on instruction fun practices highlights of field

053experiences always important to highlight what we offer that's paid for it's not something that um falls on families the district is very generous um with complementing the curriculum in the schools with these field experiences for our students want to um do a shout out again every time I can to um the honor that's been bestowed upon the elementary school as a school of Distinction and that came directly from the um State Department of Education and then highlighting employee benefits purchase Services um which is a bulk of our fiscal responsibilities um and I have it all list LED here happy to answer any and all questions at any time regarding any of these categories and if we continue on 2026 um additional priorities neas accreditation and compliance this is new looking at a 2-year commitment so

054that we can shine and the high school can shine and do what it needs to do with with quality um as that as we prepare for that committee to come and visit us professional learning will continue um to be a priority uh you've had um me share with you all that our colleagues have participated in and that's critical and then there were additional requests and wanted to highlight these additional requests assistant principal and athletic trainer fa professional and a social worker contractual obligations as the next slide just has like a brief overview um from a previous slide But it includes Transportation electrical maintenance contracts increase in legal um and how we have now an additional cost for Food Service um because the state no longer is helping us so it all adds up as you

055know current overview that P graph we have here is just showing percentages so that you can see the both our salaries and fiscal Services that's the same pie chart that was shared at the tri in here because these are like it is in there okay good yes um then the next slide I wonder if you can see this one you can see that one the enrollment the enrollment report yeah it shows from 2000 those are actual so um the enrollment from uh 2016 forward based on projections we're now going to expect to stabilize stabilize meaning we're expecting 950 to 960 in the next 5 years each years within that range so I'm I'm referring to that as like a stabilization um where we had seen downward Trend here in enoll historical comparison I know you

056cannot see that so what I have for you here is look I B it up when I saw it on the um on the copy from the slide I was like oh oh that would be very painful um and so this oh this is what was I know I know it's here much Dr Dorito you're welcome and yes city did the leg work we both were searching for this information so it's um what we have here are districts that are potentially similar size and districts that are are in our surrounding area so that you can see what's happening and the fiscal year 26 so the column to the far left is our current for all these districts and then you see the the history going back to 2021 I'll give you a few minutes to

057digest it those are the correct numbers for yes that is correct that is where and I'll explain how I got to that and what is not included that gets us to 8.14 no no I meant like the previous years I felt like some years got nothing that might have been before 2021 that was before oh good I did see that as well but that was before I didn't know if we wanted to go back that far in history oh would have been able to compare other districts that far back CU they don't want to keep it [Music] Alles did you for the fiscal year 25 is that their end the year how much they spend or that's how much they these are all budgeted numbers these are their budgets not their actual and what's the

058second line the first line is the budget the second line second line is the difference between so if you're looking at 21 to 22 the difference between 21 and 22 is 510,000 and that's a 1.24% increase so in 23 did $198,000 increase 7047 in 24 so it's the dollar amount that matches the percentage increase and there it goes onto the back there are a few that could have fit the front wow I wanted to include on the back the um just be interesting to see like maybe over the last 5 years or something well was the increase from you five years ago to today only because you we're looking at it from year to year you look at 2% 3% 4% but if all a sudden you you look at it and go well Cromwell

059from 5 years ago went up 10% versus I think we can get that just a calculation but it's just a good it's good visual indicators to go oh we've only averaged you know 3% from 5 years when everybody else is 8 n two seconds that's good because you have to look at some other years like look at lime old lime 188 in 2024 hard to seeon increase that's my point I so when you're looking at is it incremental as opposed to you know over a 5e plan or or whatever give me a yeah sure aive calculation and not to rag on our neighbors of the Northeast that's not their actual from last year they went over their budget too well yes no I just went with budget numbers right so so we might not have

060the inside track right take some digging and researching dollars to what you're seeing on paper here that's true thank you either way this is yeah I appreciate the information definitely good information and you have to look at the proposed numbers this that's a fiscal year 26 but if you're looking at proposed number fisal year 26 yeah every single Town other than Manfield is it's high a million plus yeah so there's definitely so calculating for just to 25 not using the 26 proposed uh Colchester had a 10.31% increase over 5 years crell had a 20.39% increase over 5 years which one was that I'm just 20.39 yeah East Adams had a 15.42% over 5 years East Hampton's had a 17.59% region 177 has a 20.13% region 18 has had a a 2.46% Mansville is at 5.68%

061wow uh North Stonington has an 8.77% Portland has an 11.3 43% he is at a 7.42% stores is at a 10.16% West West Brook has had a 6.26% and wood brish has set a 14 148 grade Y and that's over 5 years from 21 to 25 it'd be interesting to see too where they're enrollment set I know that's a whole other the enrollment that you have there is the data from right are enrollment are they are their enrollment are they comparable to the size some are we we can see the enrollment on the list they don't have that CH they there's no column like that right there's no column on that so you have to look at that separately yeah so they're far so so cool St is 216 61 this is 24 for the

062state promo is 1904 what is this I'm sorry that en how many kids are there based on October actually enrollment first 964 is our actual enrollment this year back that um East Hampton was 1742 what was T right there 964 964k HK is 1770 L lime is 1292 Mansfield is 1,002 North Stonington is 741 Portland is 12:43 he is 1162 stores is 1084 Westbrook is 597 and Woodbridge is 882 so most of these are double no no that would have to be like 1900 but not double double [Music] 1900 I mean so we Tred to get some yeah in the area and others that are small it was a combination of both who in in the area and then others that are [Music] small thank you so the next slide actually has um the percentages

063and salary and benefits are together at [Music] 76% of the budget transer R ation the top blue is 5% tuition is 6% field trips is 1% the districtwide supplies and equipment 5% District wide purchase Services 7% just in case it was too small to see that's why I trying to help out [Music] and what were the salaries and [Music] benefits I personally find that like a number you're going to so they know your budget it's literally [Music] and you know there are things here like Transportation it's not something you can cut either right so when you when you add that to salary benefits you're already over 80% then add tuition to that again um so field trips is something that I think there's value to that be value and that's why it's showing there 1%

064of the budget but it's showing up as a percentage there is not that close to to zero the overall and then um purchase services and supplies equipment is 12 we got what we what are we playing the that could and then the next slide I want to make sure that you know that every request is considered and it's very important to understand the schoolwide system and how we look at student services and the population based on Research is 1 to 5% that might need the highest level of intervention and then the green and even tier two are additional supports obviously basic construction is your tier one in the classroom and then tier two might the additional supports that the teacher is providing for the students and that graphic came from Castle which is highly regarded

065collaborative for academic social and emotional learning and they're not is not in competition with learning the L is a part of it that has to happen in the classroom that's what the research shows us when the students connect with their teachers they Thrive and so when I look at what people are asking for I weigh everything and I look at needs and we dig deeper and we dig deeper and we dig deeper so I wanted to make sure that you understood how I take things into consideration and what supports we have and what I see happening in what we can handle and what the need might be so I'm not going to cut something that we absolutely need so I just want to make sure that I provided more insight and this was a part

066of the tri board presentation no that is now an enhancement for you because tri board they didn't attend all of the business and planning meetings right like you you have seen the operational aspect from all different perspectives so this is now an opportunity to really take from you any input as I'm finalizing the budget that I'm presenting to the board next week so with that you know this uh this graph pyamid that you saying that you have brain into what every consideration you take that consideration AB absolutely it's like whatever you look at you look at it how does this benefit the schools and move forward every decision right in the future almost obviously not for this one but in the future I would assume that you'll think about this for future budgets and future

067years said uh maybe we could somehow help categorize when we do future budgets I know it sounds like a lot but to be able to show when we're doing different budget from your school oh here's the green this the yellow I mean just so it's like we know cuz when we're going through lines and other people are looking at it it's like that's an absolute necessity cuz it's in the you know it's in the different categories I'm just saying that's just so it's visual indicators are important for the public for everybody so I'm going to I'm going to now based on what you just said that gives me an idea that's why professional learning is so critical because it absolutely provides the training that the teachers need so they can be at their best for

068the kids sure falls into this category which is why right and this is not a Teresa category this is research that that pyramid is not something that I invented just saying all I ever think is Vis I wish I had for the public there more reasons for the public to understand and know and any of these other charts and graphs and this stuff and stuff that the public should see okay absolutely yeah either way thank you apprciate it we're going to dive into the numbers or well you've gotten all the numbers but you have it within your packet what's right in front of you it's another overview um of all the Departments So currently the 8.14 does not have the assistant principal nor the pair of professionals nor the social worker that's how we're at

069an 8.1 tour are there no new hires just so we so consultation wise so accreditation and compliance that's the funding that can be Consulting hours however that works that that piece would be new and it's a temporary 24mth um assistance to get us to be fully prepared for Nas right that's in here that is in here that's including the 8.14 the other piece is the athletic trainer we have been subc Contracting we're trying to get a parttime person um and we still have to pay for the athletic trainer that we subcontract so it's not like it goes away we're going to try to hire a part-time but the funding is still needed because we're still going to subcontract if we can't find somebody locally who could be flexible with their hours and just because everyone

070likes to have these you know numbers that we shoot for and we have this comparison to these other districts yeah if we were to try to see if there's anybody [Music] here if so I if we were going to try sorry finish my if we were going to try to shoot to either get down to seven or 6% what kind of a cut would that work so if it's the seven you're looking at 2,000 roughly okay just that you're aware of that's that's important information for you to have and if it was 6% 6% 500 yeah you're going to now double it right you're going to start jumping that I would also look if you look at the Historical numbers here if you go by population look at like Mansfield or like you said on

071the other side stores and we're almost dollar to dollar and People to People the same just for your reference on you want to get very close comption yeah um I'll just talk just for a second I'm not going to talk about CLS tonight I have no interest because I would like to see what B of Finance does because I can't even think about what you can caught you just look at this spreadsheet here sorry was looking at the um [Music] numbers I mean I have a hard time grasping what you can really cut I mean if you look at the increases salaries benefits I mean it's almost 500,000 which is almost 25% of your increase is health insurance that's not something we can cut um I've just discussed before in that high graph your purchase

072Services is not a large portion same thing with Transportation it's almost $200,000 I can't can't I'm not willing I'm willing to personally myself go ahead with what Dr burito suggests go from there because it's going to be I look at it to be brutal what's going to happen if one it's one they what the bo liance does and I want to recognize what you're saying because the Community Values all of the employees in the school district so they do value that they get a salary and get medical benefits so you're absolutely right and we want to provide the services that the kids need should they have to go the tuition elsewhere um and provide the appropriate Transportation wherever there is that they need to go um we make conscientious decisions and we put so much

073off for so long that we really need to catch up so it's hard nothing's getting cheaper nope and nothing that's the other argument there everything's going just looking at electrical Alan it doesn't matter you have one kid in school or 1,000 you're going to have the same electrical Lo so and it's gone up at least 15% much we do about do you have any further comments I am going to propose that we present Dr deito great do you have any no I mean I just think it's important to show these visuals like the current overview you know the pie it's just like to show that well we can play with is this much so when when the Normal public is thinking some what's going on it's you know we're going to cut it's going to

074be out of this much you know because everything else stays the same so that's important trying to be very fiscally responsible right and you're right there is no place to C right important for them to know that right away that's right it's very hard every District in the state is in the same boat I mean um I think the governor was talking today about or yesterday about increasing but where is the ECS money going to go that wasn't said he was just talking about increasing the distribution of it that doesn't mean East toam will see it and it's not for another year right and East is not on the upswing of ECS we unfortunately on the down swings they feel like we were overfunded hear this in the news they think oh this amount but

075that doesn't mean not our reality our reality is that we they consider us overfunded so therefore our ECS is going down over years where there are certain districts that they felt were underfunded and theirs is going up so when you see those news articles we're not on here we're still on here so it's it's unfortun well it's still a year out so it has nothing to do with this year's budget no that has nothing to so right we're in better shape than all our places believe it or not but I think this is a big budget year hurdle a leap a pole ball there's a [Music] pillow um [Music] just I was just curious so if the contingency plan as far as if we were at if it was said to reduce by a% then

076I would go back to the administrators and we would have to work collaboratively on where can the least harm yeah be done that's that's how it works that's how it works having anything in your head already to so it's not starts from oh yeah oh definitely have lost sleep thinking about what a plan A A Plan B absolutely and I I don't want the board of Finance to think that somehow we're being right like just careless of course we're we're not but and it was a shock of a percentage too to to like recognize where we landed um without flu so yes my wheels have been turning tough decisions I think it's tough when you sit here and look at these numbers though from previous years when we've had 3% increase 2% increase and it

077was ones before that I think that's something historical you need to present as well when we present the board of Finance because might it's just very is difficult I I have lost sleep already thinking oh my goodness what do you cut I would love to see what the percentage difference is for how much Supply prices have increased within that 7% like I would think that if we were to have a conversation that didn't reflect that piece of it we would have a much a much lower percentage that the control that we have over how much unfortunately although the percentage of has gone probably up 10 15% depending on it a small that's a small part of the pie that you're not going to get your 200,000 7 numb to get I just thought that the

0788% might get a little bit lower looking if it didn't include that increase in price and unfortunately I'm still nervous on electrical I mean I gave you a 15.38% increase and I you know I C members saying you're putting up 20% ELC so I mean we're being very conservative we're not there's no cushion in here there's no padding we haven't gone and done anything we've LED down to dollar to dollar and and again even though the 15% is a huge number by itself it again is just a s and there's nothing you can do about it I mean you you were in at each all the administrator like you were there so it's not like you're only getting one piece of information like when you look at all these weeks can you identify what you

079would say oh that's extra that's extra late no there are arguments we've been having every single year since I've been on the board and we always have to kind of keep sweeping it to the side sweeping it to the side Capital no no that's separate oper yeah I know correct this is everything yeah I see well I say good work everybody's worked very diligent trying to be [Music] studious the next pie is just being a sell it be to that's just as important and for thees visual indicators families for the families to say like the school system is doing right by our kids I know because I have a child in this grade and in this grade and to you know kind of rally your neighbors and relatives um I think that's important I don't

080know if that happens we hear so much negativity right people might go to Facebook and it's only you know and some of that might not even be accurate but that's what happens and people get all worked up but when do you rally to support your community right you support the schools and the community we're not in competition we're not in competition good schools make good tents it is on our sign proud of our schools drive into East ad so just throw that out there every time you will probably never see a negative intuition special education and and that existed that existed when you look at their page when you look at the overall I mean we're working really hard to be very diligent give students what they need and do right by families when you

081look at um the packet that you have any more budget questions before we move on to the calendar something a little lighter maybe so our last agenda item sorry you think this a little long but it's going to our full budget our 20 25 26 school year calendar so I want to highlight a couple of things um we we chatted for a minute about this right so we would be looking at having our staff return August 21st and 22nd for professional development students would start on the 26th this gives a breather it was shared with me that you do PD we're running running running it's like a shock to the system when you come off of a summer break as you know you have kids and you're trying to get them back to school but

082for the adults there's a lot that we do in those two days and they would actually get like a little bit of a breather and it would allow us to end hopefully on June 12th which happens to be a Friday um by starting August 21st and 22nd with our um staff returning September pretty standard Labor Day and then we have an early release day October we moved our professional development day our early release day to the 14th so that it's one week that that it's early dismissal every day we have three days you know the conference on parent conferences we have a holiday that Monday um but it was the week before year and so we're like may it justes didn't make sense um so that changed there um in November uh there was a

083request not to have it off on Election Day like we just we don't use our schools in this town for voting so there are many districts when that's not the case school is in session and so we're looking to have um the early release day the day right after veterans day it's SCH confession that day too and then we have the you know Infamous pie day 1 through the 26 there's no school for anyone I call it pie day right everybody makes pies everybody makes pies and then the next two days are holidays they're legitimate paid holidays for our 12 month employees on I got back you up to November November 11th better yes okay so that's um a mistake then that it says the 10 are you still going to do an early dismissal

084though I'm going to go back and check with my colleag so that is a Miss on our part thank you for recognizing that because normally we have functions all day all day long and I don't want to come I don't want to limit the work that we do for Veterans Day so I'm expecting we're going to change it the early release Ka thank you for catching that sorry um no no please in December another early release day and anytime that the December break on either end the beginning or the end there's like a day or a day and a half of school it just does not make sense to try to have it um because the absences are pretty high so this is a gift it's not going to happen the year after two weeks

085off it's nice but it's a gift it's a gift it really is um and then obviously January we're not coming to school on Friday the 2nd um that's where you're getting the full two weeks um Martin Luther King day is a holiday and then we're looking at having our full PD day the next day so kids and families would have a 4 day long weekend February you see the early release day on the 10th and then we have the extended break you know everybody can sort of stay home don't bring germs to school clean up and hopefully people will come back on the 19th those days we typically back into if we're getting excessive in our snow days it's April not February March we have the same type of situ where we have our early

086release day for PD um the same week as parent teacher conferences April um we have Good Friday as a holiday and I did check um neighboring communities and check their calendar because many times the week after because it's already in the into April could be break but that's not what the neighboring towns are doing they are really sticking to that third week so we kept it as well Easter would ail right and then that's why I look cuz other parts of the state that whole next week becomes a week off but that's not what happens on this side of the state so it's you know we'll do what people are used to neighboring towns have neighboring towns have the third week we did love you'll have some Happy Teachers on Monday morning all shg up

087kids at Easter oh it's just like Halloween um but Halloween's on Friday this year Halloween's on Friday this year and I'm just going to let you know that in the future when so so we expect it's going to be in the weekend right the following year but in the future they're looking to have the next day be a full PD day and give the kids the day off after Halloween just letting you know no we discuss in the past because they begged us last year or two years ago whenever it was the not yeah and they they said it's off the worst day of the year No 1 so there you go so that's fuge but November 1st will be on a Saturday yep um so it'll be good for so they get a makeup

088day Easter there you go there you go prepare them for and in may you see a full day of PD also increases the week 4 days for kids and [Music] families and that's what we have so I know the correction for November there any questions or any other input it's really thoughtful I like all the really that's the only cor I see thank you thank you for catching that it's been through many hour eyes but it's a standard that's a non-moving day the only ones it doesn't unless it's on a weekend and then you celebrate on the Friday right [Music] right and that is our 181 yes that all adds up 181 for students and 185 for our staff you triple check that yes we I did do this one so I would I'm sure

089it's we had it all CC out I'm good with it to move it for next week cuz I think we should get I know there's a summer camps are already enrolling so parents need to know this yeah I don't see a reason to delay it we'll just you know I'll talk to administrators we'll make an appropriate correction for November um and then we can talk about it if there's anything else at the board me yeah let's go next okay absolutely anything else before we have following usour at 7:36 thank you thank you [Music]