001so we call this meeting to order for the cilities of Finance subcommittee at 4:03 PM can I get a roll call please Ernesto Mora H leest mascan Bill ma Alex Osan Yanda mcau Eric sahak the agenda good as is I think no changes no changes do we have any public comments no all right with that I'll uh I'll turn it over to M you Mr W and Mr MOA great thank you um first thing I want to pass out is the we updated the um facility projects okay and you know at the beginning when we first did this was a lot thicker but now we narrow it down to the the specific ones that we abely have to get done so with that I didn't make enough copies but we'll give you that and er
002you and I can share I'm okay okay awesome so we have one more so we're good so like I said um we narr it down we we prioritize some of these projects um based on our last discussion so we moved the high deserts for the roof placement as well as metal art as our year one priority and each of these roof Replacements um for each School site it's about $130,000 for building one and then another 130,000 approximately for building two and then year two um so the first year we're looking at $390,000 that doesn't include if we were later on um or Nest going to speak a little bit more about some of the options in in regards to getting the classroom um modernized so that way we can if board decide to um transition
003the kindergarten sections to here then we want to modernize the classs and andess will elaborate a little bit more later on or if you feel that you want to our option is to move the facility the the modular to the other school site then obviously we have to do a little bit more analysis and cause involved and I think we spoke about that earlier I think we ruled that one out pretty much as an option based on what we saw so I don't think there's any need to dive deeper into that okay perfect all right and then you agree everybody agre and then your two again continue with the roof placements as well just to get our school um in event of natural disaster happens our school so would be fine and then your three
004again um some Benes um fixing with quad area with concrete res the classroom floors new roof as well for high desert in the seven portable um and then and again 330,000 um here four we're looking at classroom furnitures these are the ones it's not critical but detrimental to the district but it's something that we should look into um especially with shade structures again at the high school there is many out there and then the Metar playground structure I know that last time we we also spoke about ways to generate Reven and you know this is an area for us to discuss and we can elaborate look at ways how we can generate Revenue ongoing sustaining revenues you know one idea was um is to look at getting donations but but will that be consistent right
005or we can start charging students for parking I don't know if we've done that you know so I would say if you want that rout you sell the spots and they can decorate them as they like every other school does the see decorate their spots they sell those spots that's a good fundraiser something similar to that we could either put signs up there and they could put whatever you want to do on the signs if you do the thing on the ground all all what they do they take the black sidewalk or asphalt paint paint it every year you let them decorate it let them do their thing re then resal it again it's cheap and it's you know you sell for a couple hundred bucks or whatever that it's a good idea so so
006allow allow the students to paint their it's generally only seniors okay so it's like a senior privilege who manag that one seen a lot of schools up a lot of schools do schol it's good idea just just provide input um or Clarity so years one through three in terms of needs the must do is about 900 ,000 and some change right year four the wants you know I'm all for fundraising but the wants you know year four with inflation will'll be bit north of 623 so fundraising it's a tough call yeah no doubt that's a good point um when you add all this my observation when you add all this up it's over quite well over a million dollars and um even though we narrow it down right to the specific needs that we need
007um but what other ideas um you can think of I know that another school district that I saw there were selling bricks yeah that's a good idea so that they can put it on the wall and they engrave their name and stuff well the park they did that where they have the bricks they just lay them in the ground like have an area you lay them in the ground yes so that that that could be an idea with the high school I think at the high school we started doing that as you walk into the main office on side you can see the family that purchase a brick with their um question on the seven portables for uh is that high desert are those leaking at this point or no at this point they they
008have all of them have patches they're not leaking so are we sure that we're going to get to year three with that I don't think we will that's a good um yeah most of them are metal roofs so okay we'll be okay they're not um metal rooms last a little bit longer yeah they're metal rooms yeah but we make sure we're not doing any interior damage little stains here and there but but is there the Bill's point is there anything that needs to be year one no the major ones are there like the main buildings building one building two in the multi-purpose room those are the ones that had big leaks in them I'm glad to see you have the painting of those portabl in one that was definitely going to be so these are
009all prioritized basically in terms of immediate maintenance looks looks good looks like what we're looking for yeah think it's perfect um and I think that essentially this is the I think as far as a recommendation to the board um I think the only thing on is talk to me about the Vasquez shade structure and the playground structure like those don't feel Mission critical basically the playground structure that one's got the metal AR element got the original one there since it built the site so it's a little bit it's faded and it's outdated be nice it's still functional I think the the shade structure is going to be critical because there's been a lot of push back I've seen a lot of stuff on different yeah forms where parents are trying to say it's not safe
010for the kids to be out there eating and the whatever so that one might be something know I'd like to propose that we actually move that into year one as far as the recommendation goes would you I agree anybody because that that that could become something more if we don't get it and I think we he Mark the the new playground structure for metalarc as a fundraiser option we spend the next two to three years trying to fund raise for that instead of that was a fundraiser project now and then so out of those the only one you want to move to one would be the Las well I mean it's a group decision here so does everybody feel like that's the right I feel it's important because I you know based on my experience
011when you survey the students um from my district their top priority is it's so hot out here right they want Shades you that they have nowhere to hide right and I'm sure if you went to ask and have the same comment you would get it from everybody there oh yeah just hearing from staff over the three years that I've been here as well as students you know it's um they they don't they don't have it you know so when it gets hot it gets hot when it's raining um they're you know they're all kind of bunched up in the overhang of the classrooms um doesn't work see if we would have Tak those solar panels location yeah I tried doing that but they W having it both so how many Shake structures would we want
012up there what did you what size are they uh right now we were just guessing an estimate we really haven't gone out there in I think um right now we have four at the high school there's four structures campus I think we have four small ones small right in the middle in between the campus okay yeah so small the 160 would Encompass how many shap structures I think it would probably give us at least well you least maybe four you think that I don't think so be 36 by 40 small ones and um no I I can look at the previous quote I got from from a vendor but it's about 36x 40 and there's two and we can put out there and then obviously we had to get bleachers not bleachers but just because
013of the the ground work mhm that's where you're going to have a lot of money in concrete correct we have the picnic tables all we have to do is re put them under we have we don't have purchas I would suggest or whatever you guys want to do but get a quote couple quotes and see where we're at yeah should we consider changing the budget on that to 200,000 from 160 just so that so we have room to do it right we're going to do it might as well do it right right and something that'll last requires DSA does it yes it does which I would think would that's 15% they said additional cost for that process but I would say it's something that would be approved fairly easy you probably get a pre-approved plans
014you can buy pre-approved plans oh yeah the contractors have those already preapproved time for DSA yeah um so I think what we're we make that change then I think it's probably fair to propose to the board at least the year one through three stuff is what the recommendation is currently And We R this in 12 months and see what the other stuff would that be can we formalize that recommendation so we can put that not as a decision point but just as a get at least the the nod of see if the group will agree the board will agree that this needs to get spent and and I'm just going to just for process purposes yeah um you know as the chair for the subcommittee the subcommittee you know for the um the subcommittee report
015in terms of providing that that uh input to your peers during the board meeting and then if they want to go ahead and move on it then they could go ahead and ask for it to be agendized as a future agenda item terms of the the year one costs now we could bring a proposal for it and address it formally as an action item okay perfect Mar plants they make PSA approv shade all right well done gentlemen that was uh perfectly what we need to see him do yeah the three GR uh next we have proposals for facility assessment so we were going to look at the we brought one up the last time we were here so this time we're going to see two of them two addition correct two additional one vendor Plus
016second you see these vendors are you can see a little bit better than the one that I presented the last time they cut down in sections exactly what the work scope is and the amounts of course whatever amounts whatever we decide to do going to cut the amount um just a readers died version on them these are dramatically different in place so what is there a scope difference between these two there's a work scope is similar to it like I said both of them are giving you the actual U work scope of what they want to do the recommendations that we want basically if we want to go a full assessment it's going to cost more if it's just a basic assessment then it's going to be less so we tell them what we want
017to do if we only want to do uh getting the basically the class sizes or if you want to go all the way down to where we want to see how much lifetime we have on the AC units the plumbing electrical the whole thing just just for for for clarity um the Cordoba Corporation in terms of scope of work uh enlist three schools the elementary middle and high uh Studio Plus has um the three schools the district office site as well as um when when I see AA safe partner that will be I correct that's little bit expanded a little bit $2,000 different or Y L for yes 60,000 and uh just just for sake of discussion Mr MOA and uh Kai for the tasks and scope of work right um I know that you
018know we've talked about internally are there any aspects of the scope of work that internally we could go ahead and either we have the information at the at our fingertips is it something that we could take care of in Terms of an assessment within the staff and teams that we have to lessen the scope of work which then will lessen the potential fiscal impact we could definitely give some of that information to the contractors to lower the amount so then we yeah we could we could take a look at internally um you know for example evaluating current conditions I'm just don't quote me but any one of these elements you know if there's things that you know we could go ahead and take a look at cross out whatever is going to be the final
019recommendation if there's a recommendation made um and approved by the board then we could go ahead and communicate that to the vendor or well prior to yeah def get want you guys to do you know we'll take care of the rest okay I mean the Studio Plus is certainly more detailed than what they're talking about providing and there's hard deliverables in this quote um if they're planning on delivering the same thing here I think we need to see the descriptive work here I mean they're talking about ADA assessment fire to fire suppression system all assessments on all those with recommendations where this is more General saying we're going to evaluate the current conditions and tell you how they are instead of Studio Plus is the one that built BHS okay yeah yeah I mean um
020CA was recommended by Michael Rona so Studio Plus knows what they did wrong who's recomm Cordoba yeah is one of our uh previous um guys that was working for the School District as well we reached out to him and he gave us a name of this company MH I think one that we can eliminate is by agback because another vendor is doing the agback assessments putting the wein take off units yes do we have a vendor currently handling our fire systems and fire yes Universal alarms those are the ones all our systems to be honest especially if it's going to equal project form same with the hbac folks yeah because they're the ones that are walking with fire department on a yearly basis so they know exactly what fire department's requiring yeah yeah they they'll
021help that with that part you could take care of the fire part as well because I'm involved with that with the uh fire dep company so maybe yeah I like some of the elements that are in here we just need to get some of that scope work into this one so that it's actually detailing out so I mean I would try to think about what you um I think you have a little more work to do on this to get it in more of a condition where we can look at something but think about what you want the actual deliverable to be and we can even brainstorm that a little bit right now so obviously we want to this evaluation whether we're subcontracted or whether of contractors obviously we're going to want to have you
022know overall of the buildings but Ada is important fire Life Safety Ada um any structural issues that sort of thing um but this is really just about more systems buildings infrastructure assessment right more fire Ada and what else you want on that work scope um I mean a lot of it's in here right so like this 3 if these guys want to build why are they giving us why are they telling us creation of as builts you should have already given us those as builts why are you uh existing soils in geological they should already have that this we shouldn't be paying for them to give us all this stuff that they already have from being contct at least foras for basz yeah what about the other buildings though right the other ones I guess
023but I mean even that good point they have that as well we're not going to get anything out of existing Geo we're not building anything we're not doing anything else there's no reason for us to have that report um we should already have existing asvs for all these buildings but if we don't at this point no we have a whole room full of them so we have that already for all SES right yeah I think they're working under the assumption on this one that we were going to put the new looking at putting the classrooms over there metal AR and that's not in the plan at the moment so that kind of I mean that would go along with that go not with this yeah um I think when we were talking about assessments as
024well I think we were thinking more of um think more we were thinking about U classroom expansion that sort of thing when we were talking about that so it's not necessarily I don't know that this part's necessary right now at least not from that was the yeah that was the whole point of getting geese put together because we were looking for floor space yeah exactly and I think we you guys have solved that with the option of for short term yeah yeah short term for sure so that I think that makes this stuff kind of go away unless there's something specific you feel like needs to be assessed beyond what you've already done if not I would I would just suggest we use our existing contractors to make recommendations for upgrades to our current systems
025that are and maybe they can do the same thing here's what you should do need do nice to have sort of thing from okay then utilize your existing subc contract I appreciate the effort thank you thanks all right now to the big one modern space maximation move class already done all of a sudden everything looks great we're almost there these are the estimates for three classrooms get them up and running at the district office 31 875 for three classrooms that's to put uh painting flooring some of them don't have ceiling tiles uh fixing the restrooms on one of the buildings that's fantastic quite a bit of work on yeah but the number is great do we have any other no this is the first one I'm going to get three quotes this is just to
026have idea how much is going to cost this is I always gather up three quot so we're going to have three quotes from and vendors so just just to clarify because you know we upload this um to to our website in terms of the subcommittee recordings just to preface that um metalarc in terms of space impact um is a top priority between the three sites for fall of 25 through 26 you know um business M you put some codes together looking at different scenarios of Portables being either leased and taken to metalart or taking the existing Portables from the ACT site moving that to metalarc and so taking a look at option three probably the you know takes care of FL space concerns at metal AR with the least fiscal impact which we're looking at
027now in terms of the estimate correct yes correct I'd like to present that as a we could ask you uh to present that at the next board meeting is that possible to present those three options with this being the option that we're recommending um I think that would be fantastic so we'll bring we typically bring forward yes so we could we typically bring forward the recommended proposal but in terms of in terms of um clarification and and and setting the stage we could talk about the three prop the three the three op we considered with the restated budgets um I think I I think you're going to find things that you don't know when you're doing this you should probably change the asked to 50,000 on this yes it's going to be we're going to
028go a little bit higher than that we were just going off of the actual prop but you know 50,000 uh definitely we are going to find stuff here we going to find stuff things are going to come up have you have you used these guys before yes we have and you know just to to provide some more shed some more light in terms of um the planning phase internally um we got the team together in terms of the planning for fall of 25 we met last Friday um including including Administration sites district office to talk about you know steps and preparation and then the usage of the classrooms uh potentially for fall 25 at the main metal art campus as well as Personnel needs here at this site to Encompass the growth so so we're
029all moving forward yeah no I think it's fantastic um and I think um I think we so we we we put forward the year through year one through three as the recommended you know Capital outlay to accomplish these projects here um and then this as well well done that's good is everybody do we need to vote on any of this or do we no anybody have any feel like that's the right step forward any dissenting remarks on that Alex Yolanda sure um that brings us to uh our next topic which is future agenda items um next steps next meeting so I think for our next meeting um we should start looking at what the wants of the community are as far as what they would like to see different with the school district what they're
030interested in having so a lot of that it's not unfunded items you I was going to mention um you know I know I know for some they're surveyed out per se yeah but it'll be you know surveying our community and um you know we always enlist the help of it um our wonderful folks it in terms of developing like a Google survey and putting that out so we could that could be a discussion point for January I think maybe we could all spend some time just um you know doing a little bit of groundwork leg work just to get the ideas of what staff may think and then we can come up with a a menu of options of things that seem to come up and then we can decide on the list of things
031that go out there you know to the world as okay well if we we had an limited budget and we could just do whatever we wanted to do like what would the community want for for the school districts then Hopkins going to go find some grant money get it all there you go I'm a see for infrastructure so doesn't mean that it's not out there is there anything else that we should be trying to accomplish I know some of the things we could probably pull from um playground structure could probably be included something like that but um if uh what do we feel like we need to tackle next in this group is there anything specific I think we got to start working on getting the uh old admin building up and running okay so
032that way we could free up Bungalows that we have out there occupied by staff right now okay that way in the future we have open space for students and I already have estimates for those as well a lot of that work we could do in house so it wouldn't cost us as much so let's talk about what that would mean for the benefits of the school district as well does that mean that we could entertain another grade level coming back here and then potentially fifth grade going back to High Desert or something like that or back probably be possible because right now it's just a waste of space it's a whole building not being occupied okay I'm already going to put a new roof on it we just have to put flooring and paint and
033furniture just based on that that that that one area topic you know I would assume you know in terms of assessing putting a survey out to the community needs that may come up in terms of you know movement you know because we're talking about movement right if we're talking about three sections of ker coming here and expanding The Early Childhood Center um I'm only anticipating that that that movement of fifth grade will come up because I've heard it at PTO and booster meetings so in the past that's all I have maybe we could um ask our friends over at the uh the other subcommittee to um consider what they would want for a long-term planning as far as you know where students are housed what cohorts stay together I think it's important that um I
034think fifth and sixth grade go well together which kind of you know you almost want to look at the possibility of keeping fifth and sixth together moving both grades back over if you were to create enough space over here for it to be like up to second grade was here or something like that just to just spitballing on it it's not but that would I know um no support for the cohorts remain together and I think it makes sense with KK kindergarten that makes sense for that cohort together and um got have some more PLS to play with be happy um as far as future meeting agenda items um in the in the area of Finance um I know that um you know the past we've been discussing internally about deficit spending and then you
035know potentially bringing the topic here in terms of deficit spending mitigation efforts I that would be a great topic to spend the next meeting on yeah yeah we can do that cost control would be a excellent topic to explore cost control well just I mean is there any sort of process we can go through to explore what we're paying for things that services that we pay for so I know there's um in my time on the board we've we've approved a lot of software expenses that create recurring Cost U maybe we can be looking at the you know the the use us of those software products make sure there's something that we should be paying for what we're paying for our phone system things like that like what are what was last time we actually
036maybe something's outdated that's not being utilized as much well maybe we could take a look at everything maybe we haven't put out to bid or competitively priced in the last three years and see what what the high impact items are technology changes quickly so there may be options to do things differently I I can tell you from just um you know just visually just looking around at things right I drive by The Vasquez sign and it's always on even at night it's always on right it consumes power it's going to burn up the usable life of the sign you're going to replace it far because there's number of hours those things work forh um you put a timer on it to make it turn off over amount of time sometimes Electronics don't like that very
037much but I'm sure we could at least shut off the displaying I mean they're just very small things and it's just things you notice as you're walking around yeah when I go to I'm up at I don't know if it's the right thing to do but whenever I'm over at uh you know when kids were playing soccer over there at metal Arch all the air conditioning units were running on the Portables a lot of times when you're walking around you hear them kicking off and on right so yeah usable life filters change clicker power that sort of thing so things like that that yeah I think it all adds up pretty quickly if we start looking at and we already we already took care of uh i s that email to all the uh maintenance
038guys to make sure all the AC units are programmed to turn off at a certain time back there's Access Control programs that will do all that too so yeah so right now they got they're all programmed to turn off Monday through Friday nice I me you can get an access control program they go back to your desk yep that would C doing set the when I drive to work that's how I the poers out at the school the lights are onol but I'm sure there's things like Services we're paying for um that we could probably look at changing if we wanted to I know we were we moved to a one device policy a long time ago at our our companies and now you just there's no more phone in the desk everybody either the
039city Valley did that too all their inspectors have sell they don't have desk phones everything you get one or the other you get a cell phone or you get a desk phone you don't get both anymore things like that there are all just things that we can look at Best Practices from other school districts just see if there's any space for us or room for us make changes we we could set up an internal yet another meeting but it's important uh an internal meeting with with apartment leads including it just to take a look at um the software doing software software assessment right you know usage um you know is there any efficacy at this point in time um and we could just run reports and assess internal usage usage see who's logging in when
040how long maybe we just reducing licenses on something that we're already paying for potentially yeah nowadays it's all software for service s so you know there's no more client not paying for that but you pay for upgrades anymore so that always helps but I'm sure if we look at enough of those things we could probably find ourselves some mitigate some savings and if it's you know I think um I think if we if we could right we would want to make enough you you'd want to have enough revenue and enough keep your cost limited enough the where this was like the most uh competitive place to work in the entire you know La School District if you could so if you find you can find 100 Grand a year and that sort of savings and
041it just gives us absolutely more flexibility for other stuff later we half the stre structur yeah something good point Dr s that was good to uh that's something we certainly we would certainly focus on the facility side because I think that's our that's our happy place no just yeah well you know in terms of Finance I know it's it's always on on our minds we're always discussing it and and Kai's been very very diligent in terms of putting things together so we could we could formalize that and bring it forward to the subcommittee yeah we want to look at ongoing savings and Ops through attrition through reducing software licenses like you said yeah and I think what you talked about with um you know getting rid of all those old buses now that we have
042the new ones is a great a great way to reduce cost for ones we're not doing maintenance on those vehicles and then that's a fundraiser yeah but you know getting and getting rid of them while they're still an operating condition they sit there they sit out there for two years the batteries go dead tires go flat no one's going to want to buy it but move it now while it's there all right yeah anybody have anything else we think we should try to tackle on the next meeting no I a good agenda for next yeah so is it reasonable though that we can present these items with the next board that we discussed um for the the refurbishment the refurbishment of the Portables yes um we need to get that on the agenda by tomorrow
043morning because there's the agenda review Thursday uh tomorrow and then and then we post by Monday so I mean it's already here if you could just work with Yolanda to get this on there and then this could be an action item and we could go ahead and discuss it you know the overview and then have our trustees take a vote so yeah so we'll specifically vote on on this one correct yeah okay okay yeah and then this one will get added to the we'll introduce it and get it added to the agenda for the next probably for January January there you go when is that meeting in January we have a date on January 23rd remember today's date don't ask me it's not the week of the 13th thank you um we will J this
044meeting at 441 yeah thank you thank you thank you