Special Board Meeting - February 5, 2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / MSD Board Meeting
Date
2025-02-05
Location
Canyon County, ID
Material
Transcript
Extent
868 words · about 5 min
Collected
2026-06-09

Transcript

Verbatim source text

001yep okay I [Music] think e e oh now begin the light is on I pledge algi to the flag of the United States of America and to the Republic for it stands one nation God we are holding a special board meeting so that we can work on our soccer complex but I am looking for a motion to approve the agenda I move that we approve the agenda is thank you all those in favor say I I that it was J okay all right let's just go straight to the discussion items go ahead okay um so and Jay I'm going to ask you to pipe in here as well um but we are we've been in process of reviewing the rfqs for the soccer field complex which as you remember is being um constructed with donated

002funds um we went through the process to find an engineer landscape architect um group to help put that project together along with some of the other planning of the projects around that so that when we do these fields we're not interrupting other project future projects we might have um we had four um companies that went through the RFQ process with us the companies are Breen Land Design or engineering the land group and EV studio um these go ahead Orton or Horton Orton Orton starts with an O actually um we have these four um we have a committee that was put together that was um myself Johnny hullinger the high school principal Lisa Pennington the um Andy anony the athletic director Matt Newton who formerly worked with Benetton but he's been we've been contracting with him

003for some other services um to help with our construction with his experience um and Ben mallister who's one of our soccer coaches and as we walk through the the rubric that we had um there were you know there were varying scores but there were several things after looking at all the presentations from these four companies that the um the group wanted to talk a little bit more about and so we developed another series of questions to follow up with each of these and we sent these questions to all four of the applicants um the the questions surrounded what their fee structure look like what their projected project timeline would be uh the how how flexible they were to collaboration with um us and our donor um the field what the impact of or or how

004significant of modifications to the field we would anticipate and then the impact that it might have on being a donation so those were some of the the questions that were were discussed and the when we got all of that back um again the the things were varied and would the the responses were varied and so we kind of tried to to figure out how that we were going to put all that together when it came down to it another another thing that we wanted to include was our um our donor's comfort with several of those things where the donor was is the one giving a lot of these funds especially surrounding fee structure and collaboration we wanted to make sure that that the donor felt comfortable with the um the process we were going through

005and the responses that came from these companies and when it came down to it um the committee and our donor um settled on recommending Orton in excuse me Orton engineering to the board as to be the engineer and landscape design firm for this project um I'm going to go through just a couple of things that were positive that they the committee and our donor felt um one the time and material had some there was some recognition of the donation aspect that these were coming from donated funds and the Orton um included a some discounted rates because of the fact that this was being this was a project being funded by donations from the public um the they felt like we felt like the schedule that they placed the the projected schedule was a positive um

006projected schedule they they feel like they can get that completed by our fall um sport season um starting from now uh and we felt like the their willingness to collaborate was probably the top of all of the things not that and none of the we didn't feel like any of the companies were not going to collaborate with us we really didn't we felt like though that the involvement that we felt we would be able to have as we go through this whole process with Orton was going to be the the best of of all of those um so those were some of the major things that we we felt um Jay do you w to um add to any of that conversation yes I I think that's a very accurate uh description of the process

007and and how that came about um I just wanted to emphasize that you know this wouldn't be happening without the donor at all and so I think we had I think it's only fair to give the donor some due difference here as far as his comfort level who he wanted to work with and who he felt would would basically essentially offer the best value um and and so that that's a big issue but it as it so happened you know we all felt Orton was anyway so and so I I'm very comfortable with that process okay um Lisa do you have anything you want to add to the no just very similar thoughts I think it's important to support what the donor FS is going to be best okay um so without any any questions

008from the group no how about you Derek nope I have no questions all right I think we probably can move forward with that being said I would entertain a motion to accept do we need to say Orton yeah Orton engineering Orton engineering as the landscape design firm for our soccer complex I I move that we accept Orton engineering as our land Landscaping engineer and architect firm for this project I second all right we got a second from Derek all those in favor say I I I I I all right thank you everyone for calling in evaluation and I want to just remind you to work on Mark's evaluation before our meeting Monday the survey results will come we'll be getting survey results very soon so you can review those as well we'll get them before

009the meeting like today you'll get them oh okay all right they should be coming from Gina yep all right thanks you guys we'll see you bye bye bye bye bye bye oh