CorpusRecord 55012

Rockwood School District Board of Education Awards 12/4/25

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Rockwood School District
Date
2025-12-05
Location
St. Louis County, MO
Material
Transcript
Extent
250 words · about 2 min
Collected
2026-06-08

Transcript

Verbatim source text

001Oh, you guys match so good. [snorts] >> Okay. [laughter] Good evening. >> Good evening. I'm Cindy Bias, chief financial officer of the Rockwood School District. Before we get started with our awards program, we have a special presentation to share. One of the highest priorities uses of our Proposition Three funds is the replacement of our HVAC systems throughout the district. This past summer, we were able to fully replace the old fourpipe systems at Ellisville Elementary, Kurs Mill Elementary, and Utah Valley Elementary with new rooftop units that are integrated into our district-wide building automation system. We are replacing our HBAC systems in partnership with Amaran with systems designed to be more energy efficient for years to come. Through this partnership, we earn incentives from Amaran. These projects are led by Rockwood facilities director Eric Neman, Rockwood construction

002coordinator Mike Schneider where Mike Schneider and Rockwood maintenance coordinator Pat McCart who is not able to be here tonight. I'd now like to introduce Matthew Farwig, business development specialist with the Amaran, Missouri Bisavers program, who will present the district with our 2025 incentive payment. Thank you, Cindy. And uh good evening everyone. Thanks for having us out tonight. Uh Cindy mentioned my name is Matt Farig. I'm with the Bis Savers program. And the whole goal of the Amron Bisavers program is to incentivize Amron's commercial customers to become more energy efficient. And the Rockwood School District has done a great job of that uh over the 16 years that the program has been available. Uh but tonight, we want to focus on three recent HVAC projects that were just completed this fall. Uh, as Cindy mentioned, it

003was Ellisville Elementary, Kurs Mill, and Utah Valley all upgraded their HVAC systems to higher efficient package rooftop units.

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.