001we will now call this meeting to order please stand and recite the Pledge of Allegiance with [Music] me aliance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and [Music] our next item on the agenda is our consent agenda do we have a motion Madam president vice president schs I move to approve the consent agenda as presented thank you do we have a second I will second second by Mr wiy in discussion all those in favor please say I I all those opposing a before we move on to the approval of the agenda we do have a short recognition video to show [Music] fr [Music] go [Music] a [Music] thank you Mrs Peterson congratulations to all of those who were

002recognized our next item is our approval of tonight's agenda do we have a motion Madam president vice president Schwarz I mooved to approve the agenda as presented thank you do we have a second I'll second a second by Mr seeks all those in favor please say I I all those oppos sign motion carries our next item is our superintendent report Dr Luton the floor is yours thank you madam president just a couple items is we have a awesome crew coming up to talk about some great things going in the district uh you saw educator of the year and classified staff of the Year miss rcra is an amazing teacher she's a stem teacher uh you know she started National Junior High uh ACC or um Honor Society thank you tireless teacher she's a coach uh

003she just does all I mean they had uh a boat RAC cardboard boat races uh at the at the uh Community Center a couple months ago just does all kinds of things to get kids excited and then Doug dukart he's done everything from cook uh uh self-perform concrete work head janitor just just goes above and Beyond so celebrating those two awesome people uh we're uh knee deep in the hiring season right now principal interviews on Thursday we have uh already interviewed and hired title teachers and some elementary teachers uh so we're moving right along bid package two for the high school goes out tomorrow uh and we'll open that up on March 6th uh you'll hear more about bid package one today uh from J dun uh applied for regional uh Workforce impact Grant uh

004if accepted we'll utilize that money to develop an Early Childhood Center at the DHS campus and that'll work hand inand with our program that we have already have there just to create an even more authentic environment for those kids who are going on to be teachers and early childhood Educators so excited about that and then Elementary parent teacher conferences are tonight uh Keith is pinch hitting that's why he's not here and most Elementary principles also are interior and as soon as they're done presenting some of their board goals they'll head back to their building so that's all I have Madam president okay thank you for the report do we have any questions for Dr see then we will move on to our business topic these are informational topics only the first one being our board

005goals and tonight we have Miss wer Miss Leo and I believe Mr Patterson is that correct yeah welcome thanks we'll get going um wanted to thank first off thank you guys for your time today and just the platform to uh to present we have some new data points and new data sets to um present to you and also um talk a little bit more about those and add some context to some patterns and some trends that we're that we're currently seeing so um on the slide there um this is that percentage of students proficient in reading by third grade um so a couple um positive Trends if you look at that kindergarten in that first grade um section those are really big significant jumps um from that fall 24 data to our our newest data

006of the winter 2025 um and especially with that kindergarten that was a big concern um after we took that that fall testing of um of it being that low and how can we fix that and what can we do even in future years to help pray our incoming kindergarteners so um seeing that 25% to that 68 um was really encouraging for us um and then just add a little bit bit of context to what that letter sound fluency is um it's a student ability to quickly and accurately produce the sounds associated with individual letters um just so you can exactly see what's being measured there um when we bounce down to first grade another um big jump in that data that 12% increase to our winter um 2025 um but then that measurement changes so

007word reading fluency U measures the accuracy and the fluency so how many words the student reads correctly and how quickly they are reading the words as well um another positive trend um in the the second grade um not as big of a jump but going up 3% of growth is growth so it's nice to see that um and then when we get to that last um indicator there that 1.5 we also do see a slight drop um in that third grade um data so overall what we wanted to highlight with this um was the Fidelity in our tier one with our new um reading curriculum in that c um and just making sure that we're using that curriculum for for how it's supposed to be used and we're being consistent with that across all grade

008levels and all classrooms um we're using all the resources that come with that the way that they're intended to be used and in meeting all of those minutes as well um when we think about the importance of that Fidelity it helps ensure the intended learning outcomes um making sure that we again have that consistent implementation across classrooms um and as a as a team when we look at data helps make sure that that data is is accurate as we're as we're comparing classes and um grade levels as well um this data also supports that we're we're strong in our foundational skills especially those early years that kindergarten and first grade data um this is kind of bonus information but um I think it ties perfectly into this I was looking at the the principles of

009the CK instruction specifically K through 2 um and principle number one is the explicit foundational skills in language instruction um so really being inten intentional on teaching those through the organization of the instruction um CA teaches the most frequent sound spellings first in order to maximize the word students can read and then move them into engaging um decodable texts um and then also in the systematic coverage of How It's taught as well the lessons are designed to teach print and phological awareness sound letter patterns decoding and encoding um writing mechanics and writing structure and processes for 60 minutes each day so um just some extra kind of context as we're looking at that that is this data was support that our our new CK curriculum is is doing what it was intended to do which

010is really [Music] encouraging all right this slide kind of shares um a little bit share some insights regarding our nwaa map data trends that we typically see from fall to our winter assessment um we've been presenting for a while to the board on these Bo go and over the years when we take a look at our data we've observed a consistent dip in nwea from Winter or from fall to winter assessment which is not uncommon um the fall assessment really targets and looks at that critical Baseline data for us so it really um assesses students on those foundational skills what they're coming and starting each Academic Year with is what the fall assessment looks like and then nwea is an Adaptive assessment so meaning that as students progress through that assessment in the winter they

011encounter increasingly challenging um questions along the way and this adaptive approach typically shows a dip when we come to our winter data um it's comp you know compared to the fall cuz students are getting increasingly more challenging questions as the winter assessment happens with this um because we typically see that dip within any one of our elementary buildings we work with our school leadership team and our PLC teams where we really dig in and look at a comprehensive look at that NWA data which we're really looking from Fall to Spring that's where we're going to see um Trends across the whole school year of what happens with our students and then we dig in at our school level suud to individualized students to see to look at what's happening where are they falling what if

012we what do we need to intervene on those types of things um and then while the dip of NWA map scores is typical our Focus Still Remains on that continuous Improvement and supporting each student's academic Journey along the way as you can see by our percentages it's really just a dip we don't go that far below when we go from fall to winter but knowing that that's a trend and then really what happens from now until spring and then that big jump when we look across the whole school year from Fall to Spring we'll see some good growth we hope with the things that we've put in [Music] place okay so this slide shows all the students um we going to move to the next slide we see the breakdown of the um different categories

013within those grade levels so looking at second grade again as Nicole said there is a dip um but what we have really looked at is each category um and we noticed like our special ed students for example um we have been training with our special ed teachers um to develop essential skill alignment to their goals so what they're being tested on in nwaa will now be looked at a little deeper and aligned to their IEP goals so what they're learning will be assessed on this test um we've also been working with staff on some of the Proctor training um throughout a testing period many different people help Proctor the test so it's really important that that proctoring is done um in a universal way so some students aren't getting more help than others and that

014may be part of some of that dip there as well um just that enhanced training um so that we make sure across the board everyone is receiving the same help um the El area that we look at when we talk about that fall foundational skills um we see that 38 excuse me yeah 38% and then when we went down to the 33% that's looking at now where are students performing at that grade level so if we look at second grade those foundational skills that they're being tested on in the fall from kindergarten first grade it's great that they have some of foundational skills and now we just continue to work at that grade level to hopefully bulp up that percentage that we're seeing um as we talked about our El students they need that foundational

015piece so it's great to see they're coming in with that foundational piece some of them and then we can continue to build on there um depending on the deficit in English will depend on that building progression as well um and also we might see more of that in the winter than in the for the fall of winter um our free and reduced pretty much again stayed around the same um so if you look at the the bar gra or line graph here you can just see those percentages um also as Nicole said focusing on that growth so really looking at our individual students and the growth that they're making um from that fall to winter here we have our first grade um kind of similar patterns as we saw before again working on that proor

016inconsistency with that disability category um Although our El percentage only Rose a bit it is a celebration um again so we're looking at lower grades we're starting with that foundation and then we are making a little gain although it's it's 1% it went in the right direction and it's trending in the right direction um so continue just to build those foundational skills and move forward from there and then here is our kindergarten proficiency um you can see again couple dips um we did have again that increase in the eel which is is again great to see but knowing we came in very low and many of our kindergarten students that came in are level one which you would say um they speak no English so we are teaching the students the foundational skills of kindergarten

017and also the language skills to understand and learn English categories our educators are working super hard and so in addition to some of the ongoing things that we've that we're going to continue to do as we are committed to this um Improvement for our students we've added a few next steps that we would like to share a little bit about of what that means um working with our school leadership teams and our plc's we're going to look to strengthen our tier 2 interventions obviously at tier one our educators are giving their absolute best effort so it's sometimes hard to think through what does tier 2 instruction look like I've already done my best now what do I do to provide additional support so really digging into some of that data that we just showed you

018as well as um three common Summit of Assessments they common formative assessments that teachers do along the way digging into those things and ensuring that we're looking out where do where are the gaps happening what are students failing at or where are some targeted areas that we can work on and intervene at tier 2 so just kind of strengthening that up what does that look like um providing them with some research based interventions that they can use and looking at that piece as we continue to to move forward with strengthening that piece um a second thing that we put on there is really using that common formative assessment um to guide our instruction right that's why we assess our students so that we can identify where those gaps are and then change our instruction as

019those educational leaders it's going to play a key role in helping us make those decisions especially when we're thinking back to whether it's going back in um reteaching or rethinking what happened at tier one or is it something in addition that I need to now do at tier two um that helps us again make those informed decisions and then with progress monitoring is another piece using that data to really determine the effectiveness of the interventions that we do put in place so as we're looking at our common formative assessment data our standardized assessment data that we just reported on um now we have to monitor so we put an intervention in place now we're going to progress monitor is that intervention working for that student if not let's go back and make decisions again so

020really those aren't new things that our Educators do but really focusing in on how do we enhance some of those practices that are there um teaching is so complex and we're specifically visiting with you guys around reading and reading is even more complex if you just think about that content so just strengthening up some of the things that we've already been doing or that teachers are immersed in being and day out and just celebrating the work that they are doing for our students when we um talk about teaching we also look at our responed intervention and that consists of three tiers um tier three is if there're students on an IEP or individualized plans tier two as Nicole mentioned are smaller groups that um need a little extra help on different things that are being

021taught in the classroom and tier one is the all students so another component that we looked at is embedding fluency practice in tier one um so that every student is getting more practice with reading um this would be daily structured fluency exercises that are embedded into the classroom routines so all students would get this Um this can be implemented by partner reading um repeated reading so you're not reading the story just once you're repeating it repeatedly reading it multiple times to help with the fluency accuracy comprehension and then also um implementing some time readings to improve automatically um with our Dibbles all of those assessments are timed so that's another component to um the reading piece is that now students have that time component and the pressure to read quickly um another component revisiting our

022common summative assessments and scaling our rigor appropriately uh we have developed um common summative Assessments in our district now it's the case of making sure that the rigor is there for those assessments to make sure that when we do see those questions on the standardized assessments um that we're ready for the rigorous piece and not just the the Simplicity of those questions we want to challenge our students so that they're ready for whatever comes out so after U covering those next steps um some short-term goals and long-term goals came out of that conversation um some short-term goals would be to increase that fluency and the comprehension skill by our spring testing So like um wild mentioned like getting that big jump at that spring U to see that fall the spring growth um in reference

023to that dibles data um every indicator on there mentioned fluency and that's why we wanted to to highlight it and and make some steps towards improving that and being more um intentional with that um because it's letter sound fluency and then word reading fluency and then it's oral reading fluency so that that fluency piece stays consistent through the grade levels um with the long-term goal that we want to we want to meet the board goal and ensure students meet their grade level proficiency by the end of third grade um we'll do this by continuing to refine our interventions um Based on data and best practices and um making sure that data is driving our decisions and if something's not working then let's let's make some adjustments let's have some conversations um to meet the needs

024of our students um in closing we wanted to reaffirm our commitment to the to the board's goal of reading proficiency by by third grade um but also express some some gratitude as well in your support as we as we continue to fight and F towards that goal um one specific example is providing resources for our intervention programs I know schools were able to get in phonic library to help with their tier three interventions um so we're we're we're thankful for that and the help that has been as we as we Contin fight towards that goal any questions or any feedback any questions one question under the next stepa mentions using CFA and R visiting CSA what are I don't know if those acronym so CFA is the common formative assessments and like your quick daily

025checks and then your CS are you common summative assessments and those are like your end of the chapter tests or unit tests or module test that you like get used to so to give us just an idea what's the time frame between your fall test and your spring test how much time do you have there after they've taken their fall test and then another part to that question is how does CK play into that once you see the results in the fall going into the spring and can CK do anything for D is that a lot so guess I don't know the exact weeks in between our fall assessment window and the winter assessment window I think it's to Spring September to May September to May so beginning year till the end of the year

026and then our winter is in January and so with looking at that assessment too um you know with getting that fall foundational score um our winter then has the the questions that'll get harder as you go the Adaptive piece and then the um spring test will be like the winter test so it'll be kind of comparing Like Apples to Apples when we look well winter to Spring okay so what you ask C the third question was is there any way how does that CK I know we're using I I saw the iPads and other resources which I think is great and I know any little bit we can see progress and that's I mean that's a win but I didn't know that it was possible to incorporate CK with our e so I I don't

027know if there's anything specific for El that's extra um they the El students along with caller students would get that tier one instruction so they would be getting those foundational pieces um as well as the experiences that they have in that knowledge piece throughout CA but as far as I know I I don't know if there's a extra extension piece for you thank you any other questions forgot I came remember to about this before not the data I appreciate it it's good that we set our own goals and that's really what it's all about is us trying to achieve our own goals but I'm curious in terms of like do other districts does other class A Schools are they tracking this same stuff is there any way just to kind of sense how we're doing

028in reference to others in that category or is there I don't know yeah so the question is can we compare ourselves other districts I think one of our struggles with NWA has been we're not entirely certain how correlated it is I guess to our current standards in the state of North Dakota but it's been a longitudinal piece of data for this district for many many decades in addition it gives us a placement from on the national Norm where we compare against other states you can look on insights and you can look how we compare on the NDA well ndsa now it's going to be the NDA plus uh across other districts I think you have to keep in mind though that every district is a little different in in what's occurring in their Community uh

029we have an extremely high Inward and outward migration rate compared to most districts uh matter of fact you know I like to compare ourselves to Mandan uh similar in Industry similar size uh you know we have 50% more Inward and outward migration than they do uh and so when you get a kid you might only get them for a year um you know that that's tough or they may come in the fall and they're gone in January already so uh there just different variables for different communities I think so but yes we can compare ourselves well I realize it's not apples apples and I would be careful that too but is there piggybacking what you said I don't know if this is even possible in that data is there a way to kind of collect

030the just I'm sure that has a huge impact on the transitional piece and so is there any way to kind of track that within I mean the kids been in our district from K F yeah so uh we we've tried doing that we uh uh we we did purchase a a data management system we've been unable to do that we've pulled some small samples in recent years where we just pulled a small sample of the population uh and I can share that the students um I got to be careful because I we believe every kid can learn just not the same time place and rate right it's foundation of the PLC but we know um that students that are coming to us are generally lower on the account or on the uh achievement uh compared

031to the state average so uh we're happy they're here and we're going to support them as much as we can but that's why when they talk about growth those are really the things that we look at is we want every kid to grow right does that make sense it does I mean I just think it's important to kind of name and talk about it because it's it's a it is a um it's a challenge but I know we're addressing and handling it but I mean it it does have effect on your numbers and your data if you didn't understand that you probably wouldn't come to that conclusion yep any other questions good J thank you for your report thank you thank you next item on the agenda is our superintendent sub of evaluation which that

032is due March 15th and I have asked all board members to have their completed by February 26 so that I can compile each of our evalu and I will send that out our next item is the update on the elementary buildings Remodel and DHS rebuild Mr Kramer welcome thank you [Music] okay I'll do a quick introduction first before we get started uh my name is James Kramer Client Solutions Representative uh with J dun construction also with me is Mark mmer vice president J D construction here in Dickson and most importantly with us tonight is Ella sickler Ella is a senior Dickinson High School and has been an intern in J Construction since September through the work BAS learning program out at the CTE um so I have had the experience of working with Ella um

033most of the school year probably have learned more from her than she than I have taught her uh just a great student to be around and it's really been a great program to be a part of so one of Ella's responsibilities was to be a part of Ros Roosevelt Elementary from start to finish so what she will cover tonight will not only be a review of her internship but also a review of of that project so with that I will turn it over to Ella well um hello everyone as you said I'm Ella sickler um and through the work-based learning program uh at DHS I'm an intern at J and construction and with this something I've been working on as you mentioned is the broken down process of the Roosevelt Elementary project um which I

034will be sharing with you today so to start Jay is the 13th largest general contractor managing hundreds of projects Nationwide some projects they've completed in Dickinson include the hospital the public safety center and the additions to the elementary schools each project is unique but has a similar Pro process from start to finish or the design to close out and this process can be broken down into three steps the preconstruction construction management and closeout so pre construction is where we ensure that the Project's design fulfills the owner's objectives aligns with the budget and the schedule and is actually feasible for construction so to get into this there are often lot of lots of meetings to begin um they're off like online or in person and the first one is program meetings and these are usually with

035the owner and the architect and where the owner brings their general idea to the architect so for Roosevelt Elementary the problem was that the entry was not secure and that their offices were really small so the architect takes that general idea and turns it into a drawing or a schematic design and that's very rough sketch um very basic and then in design meetings they add details like they move walls they add Windows put a door there things like that and um then as the design progresses and it actually solidifies a construction document is created and that shows everything we need to build and that's what we use to build the project and as the general contractor what we do in these meetings is to use these design these different sketches and designs to um make

036estimates and price out how much it would cost to build it in this way or with this material and another role we have is the design and constructibility reviews that's us working with the architect to determine if the project is constructible look at possible constraints with like a design or things we might run into um so for example if the masonry on the exterior of the building would CA more to finish in the winter because of the weather or to get specific materials that the owner may want might be a little more pricey um also with like different problems with the specific design things like that so throughout the process we are there with the architect getting our own input and other input we put in is the schedule for the project this shows what

037building processes will be in what order um so like this will be first this is next this should take about this long um and you can see that schedule up there it shows when the design is finished when the construction Begins the different steps of construction so on and that leads us into the construction management and that's when the Design's been finalized and we can move into the actual building of the project and to do that we need a team dedic devoted to the project and for the roselt elementary Edition this was our team firstly our project executive mark melmer his job is to oversee all the Jun construction and administrative operations in North Dakota and Dustin is our project manager and that means he's constantly working with the owner the architect and the team

038to manage and oversee the progress um of the project ensuring that it meets the budget and the schedule and then our superintendent is Travis Russ he is one who's like on the site all the time he's making sure that everything's properly managed like the materials the construction progress the safety the equipment all of that our project engineer is Dylan stradling he helps design and plan the project as well as ensures that the building um is like always following the correct quality standards and building codes our project administrator is Melissa she takes care of like the formal contracts between the owner the architect and the subcontractors making sure that everything gets sent out to the right people at the right time and James Kramer is our Client Solutions Representative and what that means is that he

039goes out and talks to people makes them know who we are what we can do for them and then they come to us with a project and that ensures that we have a constant flow of projects and then obviously me um and in intern I just help with whatever but um my main task for this project was the progress reports which I'll come back to later and along with our dedicated team we also need dedicated Partners to help us execute the project so subcontractors are part of every project and is a pride of ours to make them long-term partners that we can turn to and for work for future projects uh we make we try to make local Partnerships so you may recognize some of them like TMI wind struction for ceiling and while they're

040working on the project we can show their progress to the owner by taking him him or her aun towards but even before they come to work we we plan out how we lay out the site and help them perform well so to ensure the safety and Order of our construction site we create a site Logistics map and this is this shows where the area we'll be working on the temporary fence that surrounds it the alternate routes for the public where we'll lay down material things like that so you can see up there is our Logistics plan uh it's kind of hard to see from over here but um you can see where the green is where we lay down material and there's the temporary prence around it all um and then when everyone when whoever

041goes on the site we ensure that they wear proper PPE or protective personal protective equipment so that's things like hard hats visibility vests safety glasses the right kind of shoes um and then when the owner visits wearing all their proper PP we show them like the whole progress the process of the construction but they can also see that through the reports through out which brings me back to um the weekly progress reports um they inform the owner the architect the team and even the public with insight about the progress and the process of the project they can see the pictures the happenings and what's coming next um of all the activities until close out and this is the most recent report um and then when you align all the pictures from month by month you

042can see how fast the progress really is so going clockwise from the top you can go August starting in August and eding in February and within months the project is done and ready for close close out and close out means exactly that we are finishing up the project and how we do that is with a punch list this is when the project is about 95% done the construction manager the architect the owner walk through the building and they point out things that need to change or things that are done wrong and you can see um how the items up there correlate with the map overview of the things that need to get done and then after the project is completed and we give the owner all the warranty and the manuals for different things like

043the plumbing the appliances electrical things like that and then after we get the project a certificate of occupancy and the building passes a city inspection we close the project meaning that everything is done that the project is complete um I would like to say that my experience as a high school student was really amazing being able to learn about like the processes of the design and the buildings like stages of a project and about my my future career prospects awesome um I really enjoyed working at Jen and working on this project with the team um and I'm excited to say that I'll be working with them throughout the to the end of the school year and into the summer before I go to college at the University of Mary first civil engineering in Hall and

044that concludes my presentation are there any questions any questions from the board this had have been a great experience for you so I do have to ask what is your what was your favorite part of the whole project what did you enjoy most um I think kind of enjoy like working and learning about um everyone working there the team and um what they all do who works harder marker [Laughter] Jam thank you for that present we appreciate the time you put into that Dr L did you want to add something not as funny as yours but I was just going to ask you if you could maybe help Mark with some of his presentations are you next I'm next I I unfortunately I have to follow that and and I will tell you that uh

045we have a lot of professional people that put together presentations and we put them through a lot of trainings and a lot of speaking and all kinds of things like that that Ella has not been through at J Dunn but she obviously got her skills somewhere and so I would uh I would guess that they came from dicket and public schools so James uh gave her a pencil outline on one sheet of paper with I think about 10 10 things that her presentation should be about and just handed it to her and said you can work with our marketing people to put together your presentation and Ella came back with this done and did not work with our marketing it did not work with anybody besides herself and so uh I I'm I'm super proud

046super impressed and and not only Ella but you know over the years we've had uh since this partnership has started we've had uh we've had Kelby gon uh we have had Ty Nelson who we we pulled on his arms to get him to continue to work for us through the summer and then he has been working for us as he's been going to DSU and is still employed with us I think we're going on like year three with with Tai and we're even uh starting to craft a program within DSU for him that would hopefully transition and we hope a full-time career either with us or or just in the industry in general we don't I mean we'd love to keep him but if he wants to do something else but just just kind of

047craft your own your own career path and Ella you know as she mentioned she has done uh here really soon and we asked her if she would continue with us through the school year and and talk during even doing it through the summer so it's a it's been a wonderful partnership and we've even taken our Dickinson Public Schools uh in Sou Career Academy uh program and hired a DSU student outside of the construction industry in soils management and he's helping us out in madora on the library and so we're really thinking outside of the box in these different programs of it's not it's not just the people who are putting Construction in place it is it is a lot of Professional Management as well and and we really have a place for students and interns

048like this and it's been wonderful so with that I have uh I have my rude and crude presentation of bid pack one I'm I'm embarrassed I didn't even have a a a a picture to show you so I talked to the Architects and got them to send me at least a picture so here is uh here is the the the front rendering uh one of the renderings I'm sure you've seen icon's presentation of of uh what we're doing and so the next uh well I can push this I guess huh that work Ella I need your help is there supposed to be a second page oh yeah you can go right into the uh right into that [Music] overall there we go so what we have here is is um you have the overall you

049have the overall plan and so you can see the impact of what bid package one there's going to be two bid packages on this project project bit pack one included 12 scopes of work those 12 scopes of work are everything that you see in colors and shading and everything up there so you can see like the white box is the existing gymnasium and the 97 expansion um so you can see that there and then everything that you see in the purple is kind of hanging off to the left that's the new expansion going in the two different two different directions and then you you can see how it kind of shaded up top how the pods and everything will be demolished and come off uh eventually you can see the paving sections and really everything

050that's happening so what we bid out in bid package one was the classroom pod Demolition and it's odd because that's not obviously the first thing that will happen we'll have to build the the new portion of the school and then take that off but it made sense for us to bid the demolition pieces out with the earthw work because they go hand in hand so we have the classroom pod demolition we have the building and sight concrete we have the pre-cast concrete that is the exterior shell we have the concrete polishing and sealer for the interior we have structural steel furnish structural steel installation Dam proofing and waterproofing the elevators the earthwork and the sight demolition the structural excavation concrete Paving and site utilities we we we bit that whole chunk off in one in

051one big swap so that first piece that we'll that we're showing you is 28% of the project so you just bought down or you're going to buy down 28% of your risk on the project with the first bid package um with that 12 sections of work you got 37 you got 37 companies that bid th those scopes of work you have 57 total bids that that totaled up that 28% of the job and your bids were your bids came from North Dakota South Dakota Montana Minnesota and Utah those were those were all of the different uh areas of the country that bid so if you go to the next one you can see the result of that and so of that J dun's estimate for that for that scope of work that made up that

05220 28% of the job was 2,794 and this package this whole this whole first bid package came in at $1 19 million 82696 so you're almost $2 million under our estimate now keep in mind that our estimate for the for the total project um the designers have been pushing as tion the programming for the project they've been pushing to fill that bag up as much as they possibly can and the bag is overflowing by about a million doll right now the good thing is is Bid package one help re rele or uh relieve a lot of that stress by being under $2 million so if you take the $1 million of the total project that it was over and the $2 million that bid package won was under you're now under on the total project

053by about a million bucks what we're going to do is we're going to take that million dollars that we saved on bid package one we're going to roll that to bid package two and hope that we get really favorable results on bid Package 2 when we're buying out the 78% of the job that's remaining and with a buffer of a million dollars that'll help it even more when the when the remainder of the project gets bought out the fund will start for the school board as the project is being constructed that any any areas that where you have allowances or savings or any buyout in the construction process there's a certain set of uh alternates that are being uh designed through the project so that the school board and and administration and building committee has

054the has the ability to really add things to the project but maintain your budget um they're used as safety valves right now so that if we get some incredibly High tariffs or something like that that busts the bust the budget of the project that we have these safety valves that we can pull to make sure that the school can still afford to do the job and they can always add parts and pieces later but we have the general shell and the exterior all put together in place so that you have your functional program um the other pieces are just kind of the what I would call the sprinkles that you can still have your have your Sunday but you might not have the sprinkles but we're hoping that uh things keep coming in as as

055good as they are and you can get uh you can get everything all in one sloth so this is a really good um result for the first package and we're we're proud of it so um one last thing that I'll mention is ellaa mentioned the relationships with our subcontractors um to to receive 57 beds on 12 sections of work um is really really good we hit uh a really nice time right now and it doesn't always work like that but this this did and I I mentioned where all of the different bids came from I will say that if you look up there in parth parentheses behind each one of the sections majority of your successful contractors were Dickinson contractors and when you have a section of of work like utilities that has eight biders

056from all over the place but your local utility contractors where you're most competitive and then your local one that that that does uh a lot of your school work uh lands lands the project it's just a testament to like what what what your local subcontractors want to do for the community so your sections that weren't uh successfully local were things like pre-cast concrete well we don't do pre-cast nobody does pre-cast concrete in Dickenson North Dakota actually Nobody Does it in North Dakota period and so that's as closest we can get is Holly Minnesota and so that's where like the pre-cast concrete will come from but but really if you look across the board not only are they from Dickinson but then as you as you go out they're from North Dakota and then there's only

057one that's not from even North Dakota so uh it's a good good uh swath of work that is staying local and we're proud of it any questions any questions from board they were all for Ella thank you for that uh we don't have any questions but we do appreciate it's exciting to see the project moving forward so thank you so much [Music] thanks moving on to our action topics our first one is considering awarding Dickinson High School bid package number one M president Mr S I move to approve the recommendation of the construction manager at risk awarding of the Dickinson High School bid pack package number one as presented thank you Mr we have a second I'll second second by vice president Schwarz any discussion hear any none we'll call for a roll call vote

058we'll start with Mr wiy hi Mr rowski I Mr SS I vice president Schwarz hi and the chair v i motion carries our next item is amending District's contribution to the classified employes retirement do we have a motion M president vice president I move to approve the recommendation of the administration to revise the district's contribution to the classified employees North Dakota public retirement system employed after January 1 2025 to 9.26% the employee will be responsible for the remaining 0% of the employees mandatory 4% contribution furthermore I move to approve the amended 2024 2025 classified salaries and benefits package as presented thank you do we have a second I have a second second by Mr Wii any discussion hearing none all those in favor please say I I I all those opposed say nay motion carries

059our next item is the 2025 2026 Dickinson public schools calendar do we have a motion Madam president Mr Wilkey I move to approve the 2025 2026 tickets of Public School calendar with the starting date of August 20th 2025 the last day of school scheduled for May 21st 2026 and graduation scheduled for Sunday May 24th 2026 thank you Mr R do we have a second I'll second second by vice president Schwarz any discussion hearing none all those in favor please say I I all those opposed say n motion carries our next item is early resignation benefit we have a motion Madam president vice president Schwarz I move to approve the early resignation benefit for Jill Nelson wetstein speech language pathologist at Lincoln Elementary Kaylee Conlin grade grade five instructor at Jefferson Elementary Christy Morlock kindergarten instructor

060at Berg elementary Ashley Asal reading interventionist at Dickinson Middle School Amanda school counselor at Dickinson Middle School Darlene hoofer assistant cook at Pur Rose Elementary sky and tillan pair of professional at Dickinson Middle School all with an effective date of May 23rd 2025 and Twila Peterson administrative assistant at the central administration offices and Schoolboard secretary with an effective date of August 1st 2021 thank you do we have a second I'll second second by Mr SE discussion F's done a lot for us and made my job very easy in the transition um to where it is today and I'm just eternally grateful for her so I'll figure out a better way to say that at another time I agree any other discussion okay none all those in favor please say I I all those oppos say

061n motion carries our next item is the board's determination of appropriate negotiating unit submitted by administrators do we have a motion Madam president vice president Schwarz I mooved pursuing to North Dakota centry code section 15.11 16-10 the school board of the Dickinson Public School District number one recognizes as the appropriate negotiating unit all administrators licensed by the North Dakota Department of Public Instruction and employee primarily as an administ thank you do we have a second I'll second second by Mr Wilkey any discussion hearing none all those in favor please say I I all those oppos say name motion carries our next item is the board's determination of appropriate negotiating units submitted by licensed Personnel M president Mr St I move pursuant to North Dakota Century code section 15161 the school board of the dickets of

062Public School District number one recognizes as the appropriate negotiation unit all licensed Personnel employed or or to be employed by the board except administrators thank you Mr we have a second I'll second second by vice president Schwarz any discussion car none all those in favor please say I I all those oppos say n motion carries our next item is open enrollment application Madam president vice president schz I mooved to approve the Open Enrollment application for a child under the guardianship of Christina D from South public School District to Dickson Public School District as for the open enroll of Poli thank you do we have a second I'll second second Mr work any discussion caring none all those in favor please say I I all those oppos say n motion carries our last one is a

063school board policy revisions first reading Mr I move to approve the revision of policy acce violent and threat Behavior first reading as presented thank you Mr do we have a second I'll second second by vice president any discussion heing none this calls for roll call vote we'll start with Mr SS hi Mr R Cy hi Mr wiy hi president schs Hi the chair v i motion carries our last item is public participation Mrs Peterson do we have any requests for public participation tonight M president have beens hearing none meeting is adjourned [Music]