001so I am going to start we have essentially three meetings this evening starting with the bond hearing um and then we'll go into the public hearing and then in to our regular school board meeting just so everybody understands how we're going to do three parts three parts um so thank you all for coming um I asked that if so I'm going to call this board the bond here to order at 5:31 um we're going to go through what the bond is um Molly's going to give us some financials we're going to go through the details and um if any of the public has questions just raise your hand and if you could just say your name um when you're speaking um we'd appreciate it and then we'll go from there so um to start um
002this project do you actually have the what are you looking for the um what was going to be written on the article if we or sample I have one but I don't know if it's up to date this is the public but that's not the no I meant the this I have it I just wanted to make sure it was the same it's dirty no wordy oh wordy oh yeah yeah it's definitely different than what I have so typically we use a very standard bom language but um Bond Council yeah can you speak up voice oh sorry director fin Bond Council recommended this wording okay all right we'll go through the wording after but um I just wanted to have it in front of me thank you um so we've been discussing this for those
003who don't know but I think everybody in this build room has been here um we've been discussing the Safety project for about 18 months now um it's a project to change the traffic pattern that goes around the currently goes around the building move the crosswalk um add a parking lot in a new entrance for parent pickup around the building I mean not around the building around the parking lot to avoid going around the building um the scope of this project has been um ever growing as we um as we find new information so in the spring of 2023 um the chief young had brought safety concerns about the current crosswalk and in August of 2023 we had a site meeting with school board select board police fire do and TF Moran who came up with
004the initial um plans to do the um the project and we presented it back in the fall of 2023 to the board um we had a number of community conversations over the last year one in the spring one this this fall um and this has been an on outstanding agenda item at all of our um school board meetings um every week for the last 18 months so the plan um if does everybody have a copy yes okay um you can see that the safety concerns are a multiple multiple things the current crosswalk the traffic pattern adding additional parking currently we don't have enough parking when there's any events or even on a day-to-day basis if we're fully staffed and there's any sort of visitors in the building um this project comes under school safety and
005um student safety one of the biggest pieces to this project is an ADA compliance um piece which any any sort of um changes that we make we have to we're currently grandfathered in we don't currently have an ADA accessibility from the crosswalk to the building other than the road or the the um parking lot ENT essentially so um in order to do this project we would have a big Ada um upgrade upgrade a new ramp um that would be up to code and get the any students who need it um to the front and back of the building into the playground safely um so in your packets um you can see this is the new the new kind of sketch it's not set in stone this is something for us to go on um a
006plan to go on just to to go forward with the bond and um it would go out to bid um if approved by the town um and and it would go out to bid with the specific stipulation that it would not to not to exceed the current proposed proposed amount of the 1. 867 565,000 exactly um so then the um there's multiple different Bond structures we could do Molly has do you want to speak to those sure so in all the big projects we typically use the enh Municipal Bond Bank the rates are much better than any other option um so the Bond Bank provides hypothetical schedules so they can't give me the exact schedule because you don't know the interest rate um in advance so they usually try to use a conservative rate based
007off of what they've seen happening in the markets so I did request a 3 five and sevene um Bond schedule so the longer the bond is the less you pay per year but the more you're going to pay overall so um we got those three different schedules based off of the total cost of the project and that's what's in the board package just the annual payment for those and so with the bonds it's always a fixed principal payment but the interest fluctuates and every payment is less because you're paying interest on a less amount that you still have bed okay um so that's kind of the overarching project in nutshell um and did you guys want to add any um I think I just wanted to uh I'm not sure if you mentioned this in
008the first couple of pages from the sequence of meetings we did have a few times where we as a board uh recommended that the sketch that you see here get adjusted and truncated to a certain degree thank you um uh in an effort to try to tighten up the scope uh as well as tighten up the budget um and so what we have here is something that has gone back and forth um at least twice believe believe to the Sketchers of this um to to include the components that you're seeing here which as jny said is Ada accessibility which I would say is not just for students but for also staff and for um anybody in the town who would access this building um who might uh require ad Ada accessible access um that was
009one thing and then the other thing I wanted to just point out is there are some pictures here although it doesn't really do best Justice there was a video I think Jenny had this posted a number of different forums yeah it's also gone out in Sue has emailed it and it's gone out online and it's it is on the website right now uh just just to be clear there are many many many times that I myself uh just utilizing the current uh system have almost gotten into I'm a very careful driver I've almost gotten into different um fender benders including I actually almost hit our chief thankfully did not happen and he was fine I was fine car was fine um but there it's the when they're um are any needs for folks to come
010to the school whether it's picking up a sick child um they're being attendance at uh a one of our monthly assemblies that we do encourage the the public to attend in addition to the parents and Guardians and family members um or um concerts Etc celebrations of learning any of those um events tonight although we don't have the kids or the buses so it's not as populated as typically um it uh presents a problem as well so I think if you're not here during the day you might not necessarily see some of those um manifestations of of the limitations of our current situation but I'm happy to opine or give more information I have not been at the public sessions that Jenny has so generously been able to um lead so I think she identified most
011of you have attended that but if there's any other questions that folks have please to share um also one of the things that was highlighted when we first met and actually throughout this whole process was the um the fact that our entrance to our driveway is right next to the fire station um and the event uh which has happened twice this year so far that there's been fire calls at the start of school um it's it's a concern that children are crossing there and they're not necessarily Crossing with an adult because maybe the chief has been pul or police have been pulled to go to that accident or fire or whatnot um so it's really not a great way to cross um so that was one thing that was brought up by um Jeff buckton
012when talking about um the entrance and having the the fire there as well so this would eliminate that because kids would come anybody would be Crossing down farther where are we over there um so yeah that's the gist of it yes yeah I have a couple questions if I may absolutely my name is Mark Styer uh is the chief here I didn't think so uh I'd like to understand better what the current crosswalk safety concern is I don't actually understand by there often I don't see a there's a couple things so the first is that um it's a if you look at this particular drawing um picture when a child comes down the stairs here or is coming here they they have to cross the actual driveway and if a car is coming this way
013they can't see the child at all you you can't see it coming from that direction have any children been injured nope but I don't want to wait for that to happen just no there have been some close calls I mean as Bobby said he take a cheep the other day um that that corner is really hard for buses to see it's really hard to make that turn um there's also this so the the view is obstructed MH based on the current layout in addition there have been concerns regarding the sun glare and whatnot at different times of the day and different times of the year to my understanding I will say personally just to answer um it's not necessarily about the crosswalk but the steps in the picture that we're saying here I actually PR
014myself have tripped a few times on these steps going down they're not the most um pedestrian friendly steps in my opinion especially during the winter um but that's not the crosswalk that's just the next step after a child does use the crosswalk to go up the stairs to access another question is what is the school safety concern the school safety it says school safety yeah so a couple things that came about is when you when you you did you drive around the building not just okay but have you before yes so our current traffic pattern goes right around the building and our current parking is along the sides of the building which is very very close to a classroom um you're within 8 ft of a classroom um the climate of schools has changed and
015having people park there that we may not know who they are or what not um is a concern concerned about a car bomb or something we're concerned about the proximity of the parking to the classrooms given the climate and culture that exists right now around school safety and school shootings that have occurred MH there's also not just that there's also concerns with the way that we park when you're pulling out this is where the kids are all walking there's there's nowhere for them to walk from the front of the building to the back of the building so when drop off is coming around their students walking back to the playground or in front of here to get to the main entrance when there's cars coming around the building so in the morning there's there's no
016there's no delineation between the actual driveway and where kids walk there's no there's no sidewalk there's no anything so unless somebody is walking they have to walk on the grass but in the snow they can't do that um if you've come around the front of the building in the morning sometimes there's kids in the middle of the road it's there's multiple different student safety issues um kids are says school safety I understand inclusive of students of students School inclusive we're using it as a more general term and I know I can touch on Bill BL Police Department she could be here tonight so um our primary concern was the crosswalk visibility the sun glare uh at certain times of the day um the configuration where parents are coming out and entering at the same time
017where the kids are the steps being right there when parents are coming in making the right turn into the parking lot um you can't see when kids are at the bottom of the stairs there that was a concern that we had when they get to the top of the stairs they're in the driveway so we've had you know there kids have been very good about being careful and parents coming around there but it's a conflict that we've seen where it's there's some close calls where cars going by and kids are trying to walk kind of in the same narrow span there around the front of the building right here around the corner so and on the sidewalk itself you kind of cross the driveway they kind of in a No Man's Land there in the
018fire department parking lot waiting to cross the street again um I mean almost been hit a few times there um that maybe whether there's a crossw there it's moved or not that's people not paying attention regardless but um but we see a significant concern with that cross Hing there in the stair configuration as it is Jen yeah also the the dimensions between the parking spot and the building right sort of at the further part where the um Park is and the the um playground it is very very narrow um I just upgraded my car to a larger truck and it is very difficult for me to make that turn I know that we've heard examples of there being challenges with our um uh emergency vehicles potentially making some of those clearances depending on um what
019cars are parked at those different areas so it's a very tight um pathway if you've ever if you've never driven around the the building it is a little bit um surprising of a narrow uh drive at least it was for me when I first made the turn and even in the front of the building I mean I've personally been on a bus that hit the front stairs um so it's it's it's just a it's a very tight turn and there's just lots of blind spots and areas where I mean our our children are all in this school are all under 5T tall um that you just can't see them um so separating where the kids are walking and the kids are getting into school versus where the the buses are in the the foot in
020the the um the traffic is um is kind of the best case scenario another question listed under safety concerns is the ADA compliance how is that a safety concern no that's well the ADA compliance portion of it it right now they have to walk in a driveway if somebody's in a wheelchair they have to go up the driveway if they're if they're walking to school they have to go up the driveway to get into school it's not a direct route it would impact the safety of someone who has disabilities to not be able to take these the safest way and the most direct way to get from the road access or a parking lot into the building how is compliance with Ada a safety concern that's what I think this says well right now we're
021not in compliance with Ada and the what the way that Jenn in we're not violating the Ada are we no we're not currently violating the Ada however we're we're technically in compliance only because we're grandfathered in we are not up to so any any changes that we make even moving the crosswalk 10 ft we will have to become ADA Compliant no matter what and it was a recommendation for us to make a change in the crosswalk hi Michael So based on this is it my understanding that the crosswalk is going to move from its current location down in the fire station up to where you consider the new driveway to the enter correct so if you are looking at the map it would go um to where the the entrance to where the quote unquote
022dirt lot is right now would be expanded and that where that white do you see the white dotted um it's like speckled speckled that would be the crosswalk would go right there because that would be the the um so it's not clear at all in the numbers but what would be the cost of just moving getting rid of the stairs moving the crosswalk and putting in that path so we asked the same thing of um TF Moran they didn't give us hard numbers but part of the the biggest piece of this project is the dirt work that needs to happen um the leveling and the um the drainage that needs to happen and that we I asked what if we just moved that um to being just a walkway and they said it would be
023at least half the project $900,000 to do that walkway they're lying to you guys come on you're not going to cost a million dollars to make whatever sidewalk you have from there so to to the school um I think what um is involved in the cost Michael is um again as Jenny said if we are modifying the current access it needs to be then become ADA Compliant and then there are very specific codes including grades and um uh certain angles that need to happen as well as there're being um leveling that has to happen we have lots of experts in the room who know a lot about that I can tell you that you're talking about disturbing 5,000 to do sidewalk you're interrupting my I understand I am but let's be clear 5,000 ft to
024do a sidewalk all your grading work is not $900,000 guys so the sidewalk is not the only issue I I'm just asking what the cost of that I don't know I'm telling you they gave us a the issue that is driving the safety concern because I if this is the issue driving the safety concern I'd like to know specifically what the cost is for that safety concern because this is what again from the police standpoint this is what triggered all this was that crosswalk and I don't I don't dispute that I actually think sure moving that makes sense M telling me it's $900,000 come on that is you guys have to know that that's garbage that just moving that sidewalk I don't know anything okay what I'm saying is is that there's there's there's costs
025in project management of it there's cost in not the unknowns of moving things there's the cost of I'm just talking about the sidewalk piece that's the thing that's driving all this you also just can't do the sidewalk piece because then you don't have then you still have the traffic pattern that's an issue then there's there's there's all kind if you touch that sideways you're it's kind of a waste of money Jenny are you arguing that we can't move we can't we have to do all of this we we can't just do the sidewalk P I'm arguing that I don't feel it's beneficial to take spend another $20,000 for somebody to tell us how much that's going to cost you're talking about spending $1.9 million I'm talking course it's worth $220,000 I'm talking about a project
026that we've been doing for 18 months that has been has brought up multiple issues not just the crosswalk you've answered that question I have more questions but I'll I'll leave it over for other people at this point if I may I think it's fair to say that the board has wanted to address the comprehensive safety concerns and that when that specific question was posed to TF Moran that their recommendation was to address all of the safety concerns in one project that it was not cost effective to parcel it out um because of the fact that the majority of the project is the earthor exactly I'd also like just as we continue please we're all neighbors I would appreciate if we didn't interupt you each other um I think we're all tired we all had a
027long day we're all passionate about things but I'd like to be able to have conversation with them sorry no go for it it's fine hi hi Kevin on met road so I was at the September 24th meeting and I know the comment came up about the $1.5 million for the earth work and that seemed outrageous that conversation came up has there been any additional research to dig into what it you know they lower amount or what there's a lot of money MH I mean a year ago we voted $2 million to buy a Town Forest M that fell through so I mean in terms of economic impact to the town and to the tax payers this is no small change I mean asked the question has been any additional work going down into that would
028you like me to speak to that sure one of the one of the pieces of information that the board has been able to get clarification on is that you know what the board is is discussing right now is to put this Safety project Bond on the warn article right as a warn article um and again it would be not to exceed this projected amount of the $1.8 million and I know it's in excess of that but for the sake of this conversation the $1.8 million price tag what we did get additional clarification on is that if it if the town were to pass the Warren article once this word to go out to bid we could get a construction manager that would provide some additional clarification as to the scope of the work so again
029this is not set in stone that that would be part of the overall process I I don't know if anyone else wanted to add to that I mean I could just say that I very much would like to not have to spend $1.8 million I said said that repeatedly if you've listened to the recordings of these meetings uh if you've attended any of these that has been my goal I'm pretty sure that's the goal of all three of us as a board to not spend um uh the amount of money that is listed as a maximum um I've also asked if there are ways for us to hire somebody or pay for somebody to give us a more factual hard um hard number detail about what certain things would cost and the answer is that
030costs money that is not budgeted currently to in our current budget um that's what I've gotten as a response we've had a previous conversations um analoges to other local towns that have done High higher cost ticket um project and it sounds like in some of those circumstances the warrant went to the town that the town passed it and then went forward in other circumstances the town the warrant went to the town it did not pass then there were conversations that happened afterwards where folks like local experts in things came and and joined committees um to uh give us more hardcore details about information but the cost of these estimates um are not currently under the budget um so I see a lot of shaking in hands apparently i' I've triggered some folks so Jen you
031want John good evening my name is John Hayden I live in town first and foremost I'd just like to say that the fact that the board is engaging in trying to correct a situation with safety is a great thing this is not the first time we've been down this path correct we went down this path before and we had a project at a cost of about $450,000 to the taxpayers and the taxpayers said no way way too much money for a parking lot now we're coming at them with $ 1.8 million what do you think the town's people are going to say no way my concern is this isn't going to happen and I and I don't understand this budget that you gave us back in September when we were here as a date of
032January of 24 from one vendor and I'm curious to know if the board ever solicited any sort of cost estimates from anyone other than the person named on this budget so no we in order to do that we would need to spend money that's not budgeted so we went out and go ahead you going to tell me if you gave this plan to a construction company they're not going to give you an estimate because I'm I'm pretty sure that that's what they do I just completed a project up on the other end of town and I had a lot of people look at it didn't cost me a nickel and they all gave me an estimate on that point I mean when we did Town Hall we renovated Town Hall you know Town went out
033for I don't know $1.5 million dollar and rejected it and then the select board basically went back to the drawing board and said okay let's go get some bids to how to renovate Town Hall we got I think four estimates didn't cost us a dime we had four contractors come in we said we want this and this and this and this and this and they said okay great one was like 435,000 one was 370,000 one was 280,000 based on that information we could then go before the town and say we have quotes for this this is what it's going to cost We'll add a little contingency in here but this is the amount of money that we want to raise and borrow I'm concerned you guys are not approaching this process the right way I
034I agree with John you put this out to a half dozen uh Earth moving companies around here you will get a half dozen quotes and it won't cost you a dime I just don't understand why in the last year and a half this is all we're getting to justify a $1.8 million warrant I we just say two things um John sorry I guess I just I'm curious when was the last time that the cuz I know you have the historical knowledge of town when it went out to to bid for that amount of money that you said about 20 years ago it was a while ago yeah but again I mean you know and that actually raises an interesting point because construction costs hav't gotten to numbers so just staggering from what they were not
035that long ago so I you know again I I look at this and and I do I asked in September about a detail for the the earth work line I think is what it says and I never was able to get that I don't know if does that exist or is it just a number they put in there does it tell you any sort of does the board slow down does the board have any detail from the person who put this proposal forward with regard to what that earthw line actually contains because there are other lines separated concrete and building improvements and so forth so what does Earth work entail because that that's a I'm just going to say and I said it in September that's a huge number for Earth and I know that
036because I de experience what Earth can cost and this seems way unre without any sort of of information to back it up I hear you I also oh sorry sorry I have it right here um they don't have they don't have specific numbers for each of the things but they do have like what is included in earthor and it's the environmental controls the removal of trees and stumps the relocation of all three sheds out there the stripping of the the LOM cut box area 2 feet install drainage structures for the plan and I do have that plan which I think I shared with you at last year's meeting um install the rain Garden area provide select gravel to bring sight to final grade less finished surface fish and install proposed retaining wall the retaining wall
037I do remember them saying with a big price tag install concrete curb um prep concrete sidewalks pave new lot driveway per plan so that does include Paving Mill and overlay of existing pavement furnish and install new signage um strip the current uh driveways and lots um one one second I will get um there was also within that is also um the removal of there's two oil tanks over there is to move those um they weren't they would they did say that that was a big piece of it however they weren't sure until you actually um do the final measurements and the um digging up whether or not they if they don't have to move them it's it's a big cost savings um so those are the that's what's included I don't have it broken out
038by individual number though thank you mhm okay so in August 15 I was a select board member it was there when we did I have spent one of my professionals careers in safety I fully appreciate the safety concerns that have been brought up by the chief that I saw and that need to be addressed that said in a previous chapter of my life I did a lot of dirt work excavation projects Etc I find the I John I find the number outes we is a town are required $5,000 in bits you have one person here come and say we'll do it for 1.8 that that to me was illogical and it doesn't Define buiness practice and I can't stand here in good faith and go what $1.8 million one person doesn't give you a detailed
039break that that to me is not acceptable I hear that I think I just want to maybe we can get clarification as I understand if this was not a bid we did not put out to bid well sorry but if you're you're going to do a project like this you need to reiterate what John said and Michael you need multip I mean there's contractors around here that would jump at the opportunity to do this guarantee it's not going to be 1.5 guarantee that's awesome to hear I I think what I would um note is much like Michael said earlier with Town Hall I I wasn't I don't think I wasn't tell when that happened it sounds like the thinking was at the time put something out to bid apparently did not pass and then there
040was um a subsequent uh return to uh the proverbial drawing board and then a put out to bid for certain things um I think part of what we wanted to do this year as a Bo I know what we did as a board this year was to educate folks in town or attempt to educate folks in town the rationale behind the why um we already identified the safety um concerns that you I agree with that I think thank you I think hopefully I was able to articulate a few more safety things that I have personally been a part of or have um observed while being a parent and a a citizen of this town driving around the school um that might not have been identified during that s sidewalk um and so I just want
041to I think that's a very important thing for the board to have done this past year and that was where we were spending most of our time um outside of the the Schoolboard meetings was to try to get um information to and from the folks in town I agree it sounds like we did not um can you explain the sa6 process in bidding yes that the process that we followed here for this Safety project is in alignment with the processes that we follow within se6 for other schools in se6 and other projects that have occurred of this nature that we you know get a number in other words it's not it's not an exact it's more of an estimate not an exact bid but we do get a general overview for a number more of
042a high level overview as to what a project would cost and then we would put it on a warn article and then it and then we would get bids from there yes can I ask question yeah absolutely how is it determined that the person giving the number is giving you accurate numbers you just pick a person and go I don't I'd like understand that a little better if you could please explain well I I think the board can add to this conversation by talking a little bit more about the process of bringing in TF Moran that then resulted in Martini Northern giving us giving us the price what were you I'm sorry hear what you're saying I didn't say anything it was cost estimate which is not TF Mor TF Mor came in and did
043the plan is that correct they did the they did the site plan and then how is it that these folks came up with the budget we went out to them and asked they actually they volunteered their time to come in and take the plan that was given by TF Moran and give an estimate and the board just felt that that was adequate enough well we went through multiple iterations of the plan um so there was I think three meetings with both um TF Mar and Martini north northern and had different iterations in different numbers to each of those until we got to a number that was more reasonable again I just want to say someone who has been through this I was involved in the planning board at the time and we did the first
044project involved with the whole budget process the fact that it got shot down as soon as it went to the numbers is when everything fell apart because we had really great plan to put parking lot in then all of a sudden I don't know who got involved if it was the district or whatever it became a $450,000 project instead of a $180,000 project and it got shot down I look at this I see the same thing happening again that's all and I'm concerned because I would like to see a parking lot out there would be great that's why we acquired the money as property was to benefit the school so I just hate to see we put a a big number out there for something and people are like yep no and then it doesn't
045happen again people get discouraged we don't do it for another who knows so many years and it's not uncommon for when there are big projects for something to be put on the warrant article and the warrant article not to pass the first year I think what this board is doing at this point in time is following the process for this project uh the purpose of this meeting just to reiterate again is for the public to provide input with regards to the bond and and I know there was a hand raised over here first what I'd like to have what I was on the board I think Jenny and I were both on the board a year ago what we would have liked to have happened is that this was put out a year ago we
046would have had an answer at the time and then we would have um potentially made adjustments uh and updates but due to timing of various things that we were not able to put this out uh and have this meeting that we're currently having now uh last year here in fact at last month's board meeting we almost didn't have this meeting and I um very much value having this conversation that we're having in this room um because I think this might I don't again I wasn't at the previous commun Community sessions but is this about the size of the community sessions is it larger smaller about the same it's pretty much the exact same people people okay so we're having it again we're having it again well great I'm glad I'm having this version of it
047uh go ahead M sorry no it's fine you're fine hope had I want to delve into the number a little bit so on on the page that you have payment options this AR those can you guys tell us what the bond payment is in let's say year two when it stabilizes the overall Bond payment with what that number is the the per house yeah the per house thing is interesting but how many I mean my impression is we're we may be paying something on the order of a million dollars a year for year and year three on this Bond payment on the three year can you can you provide year two what that is for so we have three or there's three different schedules one's a three year one's a five year a seven year
048so um the Bond Bank sells bonds twice a year in the summer and the winter winter one's actually next week um so I believe it's like July 15th would be the summer one so if we were to enter the July sale then the first interest payment wouldn't be until January of 2026 so the very first year you only have the interest payment right and then after that you pay principal and interest in the summer and then just interest in the winter so that's how it works um and so all of these Bond schedules here are directly from the New Hampshire Bond Bank and it has annually the fiscal year payment and it also has the estimated tax tax impact next to it so um we could make more copies of these if you want but
049in the first year in all three Bond schedules the the payment would be $46,800 which equates to a 10 cent per thousand tax um and then it's going to be dependent on which which duration we go with as to what the next payment will be so in the three-year one the the the seconde payment would be 6731 144 in the fiveyear one the next FIS year payment would be 432,500townhouse Bond so um here 65536 so how do we get to 1.8 million in on a three-year Bond so it's the the three years is actually the first year they count as the 25 26 year and then the second year is the 26 27 year and then the third year is what is the 27 28 year but you only have 1.3 1.35 million of payments
050on your three years so all of it with interest would be two uh $2 million because you're interest I that's what my assumption was but you gave me three years that only total about 1.3 million there there's another year there isn't there well so on the schedule here I mean they call no no no I mean on on this on this you show three years first year being 46 675 655 my assumption is here there should be another year attached to this correct yeah Sor I no no no I understand I understand again I just want to explain so we're looking at something on the order of 650 to 675,000 a year on the three-year schedule probably something between 400 and 432,000 a year on the 5year schedule and then probably something between 300 and
051325,000 a year on the seven-year schedule so the the fiveyear schedule year two fiscal year payment is what's year two but it's really year one is uh 432 but then in the last year it's 376 okay and then in the seven year the First full year is 323 the last year would be 269 okay great thank you very much um if I can going to some other numbers here so uh beyond the payment of this there going to be significant operational cost now to Main maintain that lot anybody who owns a parking lot knows it costs money to maintain plowing and everything else currently the school doesn't actually pay for any plowing that town subsidizes the school for all us plowing I don't know if most people know that but we cover that cost you
052guys don't even budget for it what is going to be the cost of the long because it's obviously another long-term cost in addition to these annual payments what's the cost that going to be of maintaining a lot of this size depends on the snow year did you guys look at the long-term operations and maintenance costs Capital cost we did discuss it yes I don't have those numbers in front of me ballpark I can't remember it was a year ago um I don't have those numbers okay you have your hand go ahead Ken I just have a question about is does the warrant article also include the term of the bond No so the how do we pick that who picks that so the warrant article specifically worded um to authorize the school board to pick
053the duration um in the if you want to read the article it actually it's right in the send sure um shall the new field field School District vote to raise an appropriate the sum of 1, 867,000 $556 for the purpose of financing the cost of a Safety project for Newfield School District 1,800 67565 of sum to be raised for the issuance of boards or notes under the compliance with the municipal Finance act RSA 33-1 as amended to authorize the school board to apply for accept expend federal state and other Aid if any which may be available for said project to comply with all laws applicable to said project to authorize the school board to issue and negotiate sell deliver said bond in notes to determine the rate of interest thereon the m in the mature
054mature and other terms thereof and authorize the school board to take any other action or to pass any other vote thereof and further raise and appropriate an additional 46,6 690 to meet the necessary financial obligation ass toed with the Project's Debt Service for the 2025 2026 fiscal year three three4 three fths ballot vote required so so so given the increase in the Assessments in our town this chart is not sufficient for many in this town right many of the homes in this town are in excess of $600,000 so if you choose that threee option you may be asking someone to pay an additional $314 in taxes year right I is that the understanding that you would choose the this sort of Fairly sub significant increase to taxes for people in our towns I I we
055haven't decided on a you get to choose that without any more input from the town technically the wording of the warrant article would allow the the school board to choose the duration of and how would you decide what the durations be as a board you would discuss it and see what makes the most sense it would be discussed at a at a public school board meeting so I would if that if that were to happen to answer your question I would want to encourage as I do for all the school boards meetings uh participation uh in the audience so we can have a relatively put out in the notice that you do for the school board with the day that you're going to discuss that so have yes yeah and we just went through this
056in Fr for project and so what happens is they have to um publicly sign all the documents in the duly posted meeting so the duly posted meeting showing that the school board meeting is happening where this is going to be discussed um and then the documents are signed at that meeting and the school district Treasurer and the school district clerk also signs shim I I have a few questions the B um what's the maximum time that the buy I mean your chart here says payment options 5710 where she gave 357 so is there 10 year bond option is or even something longer than that what's the longest um I would have to check but I would the longest I've seen is 30 years okay the bond schedule that you sent us the longest one is
05725 years the bond the email that you sent us it's like on her um the bom person's email signature it's like a little she had the bottom of her would say 25 years maybe 30 years could the warrant article be changed so that you could specify a minimum length of time for you know so you know it's not to be paid back only three years at the whim of the the school board so it's going to be at least seven years or greater I mean so there's some for the community a little u i mean I assume it could be worded differently than as it's currently stated sure the way it's worded is directly from Bond Council um but we could inquire to see if that language can be added okay I guess the third
058question I have for members of the board at the moment are what of time are you favoring I'm actually favoring longer than anything that was proposed honestly we just got I just got this um today this particular most recent draft sorry this most recent draft of the actual bond amounts um but yeah the the numbers in terms of the um yearly Delta for the three and five are um not what I would like to see um so again I would be curious to see what the changes are with the larger ones also knowing though that um and I would want to hear from folks in town when if and when that were to come to pass as a town we've had bonds before and I'm sure we've had long bonds and short bonds and there's
059probably pros and cons that I'm just going to put out there I'm not personally aware of um as it comes to large projects like this so I would want to hear inut personally but there was a h yes that's the initial because of the way that it falls the initial payment in during in the 2025 2026 budget it's basically the interest rate is your first payment and then it kicks into the next cycle that's how I understand it right Molly that we good question iting no it was the same in all of these same on all of them the first the first payment on all of these is the same Molly can give us more information about what what the first payment entail what does it entail so the first payment is just interest and
060um every so what happens is you have to vote for the entire project you have to appropriate the F entire project for them to be able to enter into a bond agreement then in then in taxation you're only raising the amount to meet that first interest payment and then in the second year in taxation you're making the amount to raise on the next the first principal that year it's the the rate is the same is that corre no the rates change uh 3 and seven might they be the same or they the rates change depending on the term of the B I do know that quite often at the Bond Bank you'll have same rates for different term okay they do do that now whether they provide that that schedule I don't know that would
061all three have rate of um 3.25 3.25 and the the note that the bond being put here this was the interest rate we received in the July 2024 sale this is subject to change from now um and I mean the bond sale happens next week so they might have a better Intel next year but that's why the interest rate is the same on every year is because despite the change in term the rate's the same for three or five7 and they just okay so we're going to um I'm I'm going to give us five more minutes on the bond um hearing and then we're going to move on to the um public um public hearing on on the budget so I'll start with hi Lyn um I just had a question have you looked into
062the potential for any federal or state assistance to help us yeah so we've looked into grant money and there was a grant last year that we missed um part of the reason that we went to tfar and um Martini North is to get some numbers so that if a gr because you have to have a plan in place some sort of plan in place you have to have some something to be able to submit for Grants um that's why we did this this way um it's part of the reason that there is only one plan is so that we had something on file um and then down the road we can tweak it or talk to like I said when we go out to bid um see what other ideas the past for this type
063of a project yes but they are not currently safs available at this time what's the potential yeah we keep asking I have no idea but I do I do know I mean I do know you have to have something in place in order to it's how we did the vestibule a few years ago we had somebody come out and we had plans drawn up and then as soon as um something became available we were able to do it so John I don't want to be a dead horse but I just did some quick bath just taking the earth work line item not including anything else so only the 1.5 million my site costs on 4 acre development including a subsurface system foundations for 17,000 feet of two bill buildings three gravel Wetlands two rain Gardens
064Guard railing about 100,000 yard of fill Cuts Lo stripping parking lot striping the whole nine yards less than half of the 1.5 million earth work number that you folks have for this parking lot that's why I'm concerned about throwing that number out to the town because the real world that number is way out of whack way out of whack and that's and I understand you're moving forward you're done your job I appreciate again the fact that you're trying to do something but I have to express that concern Michael so um you're under this plan with all this Paving you are basically doubling the impervious surface at this location which means that you're creating storm water issues which I know you're addressing through the storm water Vault that you're putting under that parking dramatically raises the
065cost of all of this storm waterers a bear okay did you guys even consider a non a a pervious surface like instead of Paving all of this putting in a gravel lot it I mean the cost of it is infinitely cheaper you don't have the storm water issues that you have with an impervious surface like the baving did you guys even look at that option we did look at um I can't think of the name of it right now um and it was more expensive um somebody brought that up in the last the last meeting um and it was cost prohibitive but it's definitely something we could look at I mean a gravel lot cost like $2 a square foot grading and dropping the gravel and packing it I mean you're you're talking about probably
066an acre here so at two a foot you're talking about $100,000 my understanding is that is something that we can include in the in the bid request to uh include like is that true you're right but this is going to John's point which is you guys are asking for $1.8 million I I'm all for addressing the safety concern of that crossw I get no quals about that want to change the traffic pattern because you think that this okay it seems to me you guys have chosen the most expensive way to approach this and I just I just don't see how this passes I I assume you guys know this is a real Ste Steep Hill to climb here to ask the town for $1.8 million like this I also know we didn't ask the town
067last year and I don't want to not ask the town this year I guess that is something that I have said at several last meetings but okay I'm going to take one more question and then we're going to close the you have a question you haven't asked one yet over there I wasn't sure if I saw your to more options on the table options MH hobby so you know again I don't have an issue with addressing the problem at all and I think it's a valid concern if I understand now what you're telling me a moment ago or a couple minutes ago the sa will come out with a budget and you say this is what we're going to bond for and then we'll go off the bids after is that a thumbnail what you
068said I not saying that I don't know how we could decide how what the what the length of the bond is prior to having a better idea of the number no no I think was just talking about the amount the amount you're just trying to summarize yeah the so you said 1.8 million and then you go out and you set it up and proceive currently at this time the town of newfields is writing a check for about $496,000 a month to the SAU that's big money and then the SAU is now and the school board is coming to the town of newfeld saying we want to spend 1.8 million but you I you know it won't get changed but I think there's a problem with the process instead of presenting the town a bottom line
069option option ABC or four biders or three bids and then we have the option of choosing which one we think is the best one or you do as our Representatives we're handed this all of fur here and say this is what we're doing and I don't feel that we're getting sufficient knowledge to be able to justify and make this decision and and I havea I have real ISS this for thisone and I don't think it's going to pass Molly can and and again we're following the process well that's what I'm I'm saying is I think there's a process problem here and I don't know how long the's been doing this way we said this and then we do all for pids I think you might now and it's another discussion for another time you might
070want to think about looking at the way you're doing business because the way it's being done this isn't working and it's not going to work and Molly can speak specifically to the process with regards to the bond versus the bids sure so and the sequencing yeah so in the past six years we have been here we've only done one other and that was over in ber it was a solar project and so the way that worked is they had one company come in and make the plan and then after it went on the warrant and it successfully passed it went out to bed and there were two people that B on it and and the person that originally did the plan and then one other company and they actually chose the other company because it
071came in significantly cheaper um and so that's the way that it happened in brenwood um in my tenure here that's the only other time that a bom like this is happened um the only other bonds that are in the entire siu6 all districts that are still active are the CMS bond which is a 30-year bond which happened before my time um as well as the exitor elementary renovation again it's a 25 or 30 year bond before my time um so since I've been here the there's only been one other Bond and it is the brunwood bond for the solar project and that's how it went that that um passed for I think it was on the warrant for $850,000 because that was what the original um person or company um proposed to that and then
072it came in at 662 th000 and so that's how it happened um again the first year was just interest payment for them um and then year then after that you have the bond for the 66200 I know you said one more question no more questions I just have to ask if I can please I know from experience that when we get to the deliberative session we're not going to be able to change any numbers is the board open to changing the number tonight so I asked that question last month the month before that and the month before that and the the I will say I was confused at um as to the answer because I was getting uh direction that um doing so might be uh not as informed as we're perly informed that was
073what I was shared uh so John I hear you I I I don't know if I asked it as eloquently as you because this is your you've done this before but um I don't know if Jenny if you want to say anything J I think I the only thing I would ask is what are you what are you suggesting for a number I mean knowing that what knowing that knowing you know what we know I love to see this be significantly less money than it is and any insight that you can provide is helpful that might might not change anything but I I'd like I'd like to at least hear set can unless doing so is going to not allow this to move forward to something to be moved forward to be on uh to
074be voted on that is my goal is to have something be voted on and my understanding was that what we got was what um we were able to get from Molly from her bond people um and I thought that was the purpose and the goal and the only option we had at these Bond meetings at the bond hearings so so tonight you can decide what you want to put on the ballot right the the that but did the preliminary work that you've done with the bond person tie our hands to that no no no all all all these are hypothetical Bond schedules so if we choose a different number tonight then what I would go back to the bond schedule and say we've now updated the number to this number and then I say I'll
075say please give me 357 10 20 year ones originally I just asked for the 3 and to reiterate the purpose of this bond hearing is for the board to receive input from the public with regards to the bond it is still on the agenda for the board to discuss this the Safety project in depth during the board meeting which is our third meeting tonight which then we will decide what's going on so would love to hear a recommendation from you as to a number that might feel more comfortable just G to say that said what I just said the board to hear my suggestion would be that the board would amend the bond amount from 1,867 565 to 750,000 can you yes I can because I feel like that's a very real no no that's
076let me finish because I think we each other um can you tell me um not what your rationale is for that because I do understand that but what you think that should be included in that you know give me your um what do you what is your what is your um what are the numbers in your head telling you that production and and are you looking at just the parking lot the entire plan the entire sidewalk to do your entire thing okay yeah cool someone coulden for and they January so someone could actually get together and subm it to not saying that's happen that's accurate that is accurate strange things have happen I have one more question maybe I miss you got one from one company so this is so we paid a company to
077create a site plan that was that's what this is then we asked a company in town to give us their numbers just so we had a ballpark of what was going on we would quote this out this this is this is yes it's number youe or not other quotes that you would provide no because other quotes could be a completely new site plan and cost us money or other quotes could there could be other costs incurred so and that's in alignment with our typical process in se6 when it has come to large scale projects and we have received input tonight indicating that folks have concerns with regards to that process nonetheless that has been AR typical consistent process here in se6 when it comes to large scale projects knowing that it will go out to
078bid for additional bids if the town passes the Bor article not to exceed right exactly we went high in right okay we are we're going to close the the the bond one last question I very simple it's a yes or no question at 1.8 million are each of you going to recommend this to the town no yes you're not you are you are well thank you for telling me what I'm doing um I'm asking um I don't I was not aware that that was even part of a formal um piece I like the information that I just heard from John that that there was possibility of um adapting that that number so I don't know the Board needs to make a motion to this hearing thank you okay I'm gonna make a motion to adjourn
079this hearing I'll second all in favor I okay 640 p.m okay so I'm going to call to order the public hearing on budget the budget at 641 p.m. um I would love a clean a fresh one that wind I to pull oh email you're [Music] right thank you leing us the same gr oh I'm sorry oh crap yep I do sorry sorry Molly stole all your stuff okay okay on to the budget um so in the last the nothing has changed on this budget from um our last school board meeting um where we met with the budget advisory committee who unanimously recommended this budget um I'll kind of Hit the highlights and take any questions um we do have some budget advisory people in the audience as well um so the overall budget is um
080looking to increase um 5.98% the major shifts are contractual the um the teacher CBA um the special ed increases um some operational costs are up and some um facilities and maintenance um cost set we did a fiveyear audit um back in October that's the November meeting we discussed it yeah okay so we discussed it and um there was some punch list items that needed to be kind of started to be budgeted for one of them being LED lights um in the buildings and there is actually a is a grant or is it yes there is a grant that will will offset some of the so it's not a let me rephrase that it a rebate a rebate that was set to expire during the next fiscal year so it is time sensitive for that LED
081lighting to be put into effect during fiscal year 26 correct so we that's one of the the bigger items that we have budgeted um and then um everything else is just needs based um for the students and yeah nothing's changed since the last time so um take a look and I you can answer any questions we had a pretty lengthy conversation with the budget advisory committee which was I think really helpful um we had three people on the budget advisory committee which might be a record since I've been on the board or involved so thank you yeah we are very grateful for the time that and you know commitment that people demonstrated with the budget to speak to the board about their concerns and provide input and again I'm a big uh proponent of making
082it really clear as to what is the purpose of each meeting especially because it's atypical that we have three meetings right so the purpose of this meeting specifically is the public hearing on the budget is for the P the board to hear input from the public with regards to the proposed budget um one of the things too um is that we also discussed at length the trust funds and the way that they would be funded um for this year if passed should there be un assigned F should there be unassigned fund balance um and one of the the over overwhelming things was um the facilities we would like to kind of cushion that because we've gone through the facilities numbers and um so instead of Molly you took my cheat you have it okay no
083it's okay um right now we have um in the school maintenance fund we have 12 almost $133,000 our goal is have 150,000 in there for any major expenses that come in the special ed trust fund balance is at 119,000 with a goal of 275,000 Safety and Security is at 52,000 um so that's actually at pretty much at the fund goal which was 50,000 and then the new um fund is for technology which is to to for us to um every few years up date the Chromebooks or things like that um so the goal for that trust fund is 30,000 and it's currently at 10,000 um so any retained amounts would be divvied up and I think we did we we talked about doing 25,000 for the building maintenance fund and 10,000 towards each of the
084rest y also the the order that they appear on the ballot is the order that they're funded so if you end the year with only $20,000 then the building maintenance would get fully per up to 20,000 yes and it goes in order so the way that they appear on the warrant would be because the bond if it shall if it goes on the warrant it would be article one article two would be the operating budget and then three four five and six would be the four different TS starting with the building maintenance fund for 25,000 and then the special ed technology followed by Safety and Security 10 and those three were just the same orders that we did last year unless the board was Chang the order questions the is the it that's the LED
085right L the maintenance wait I'm sorry go back sorry no I thought you when you said when you said 40,000 that that's how much the actual that's what that's why it was in my head 40,000 correct so that repair maintenance line so so the way you read the fund numbers 11 signifies general fund I think the 14 is food service and then the next section is a four-digit code and it starts with a 26 that signifies um maintenance and so this entire line has to cover the repairs and maintenance for the school all aspects of your so LED is part of that but it's got to cover every if if the sink breaks or if the heat we need heat call why go so 40 out of $80,000 increase what's what are you targeting that
086so that's where we did the facilities audit that the board had reviewed in the fall and the change in projects on the facilities which one of the board members has but it would be the changes in the projected facilities projects that are but the big one would be led does how about the classroom stuff is that in there also that's part of it what is your question I didn't hear your question classrooms aren usable that's part of that we need to fix those right yes I'm looking for the facilities oh I have it right here sorry oh go ahead it's very old but um so the for 2526 with the facilities um it includes the the multi-purpose the multi-purpose room door replacement 15,000 exterior paint of the building 15,000 and 40,000 for the LED lights
087on top of what is regular maintenance and our regular fonds so that's what that is the 63 gr yes increase yes yes the 40,000 of it is the LED lighting and then they detailed the other items that Encompass the additional 23,00 that was also the goal with the trust fund was to pad that so where where you have a little bit so you guys can to keep notes and next year it'll drop back down 60 you want and with the facilities plan the goal is you don't want to have a lot of facilities in one year CU then you're going to spes and Clos in your So the plan that um they have in front of them the facility structure tries to put as much in each year as possible um to spread that cost
088but not everything costs the same I think someone else had a question oh I'm sorry go ahead on page one the retirement provision is that he just retiring and pay out for vacation and Si so in the teacher uh CBA which is a collective bargaining agreement um it is voted on by the taxpayers there at the end of service is um a provision for retirement and it's typically based off of sick days teachers don't get vacation days it's sick days and in the ceration of those C days so a payment that we have to make in June 2026 the teachers don't technically have to let us know until is it November 1st I think it is of next year so we don't know exactly who's going to retire we know how old people are but
089you you can't you can't ask someone either so um we make the best projection that we can so if there's three people eligible to retire well it's going to be the change of people eligible to retire so um if in the larger districts I mean this is relatively small District like if we have five people eligible to retire are all five going retired probably not but you would want a budget for three of the five something like that so um the change would be the people eligible to retire at the end of this budget versus the people that can retire now go ahead what's the U the student population this year and what's forecasted for next year 120 right now 120 we don't know what the incoming kindergarten will be we don't know what the
090incoming kindergarten will be and so I I can't answer what we don't have those numbers what's our outgoing what's our fifth grade look like though which our outgoing class is 23 23 okay so it's one of the bigger classes and the administrative assistant at the superintendent's office does a monthly enrollment report so if you go on S6 if you just Google sa6 enrollment you will find the enrollment report for every single District within A6 by and it's published every single someone else question over hereu so the food service so the food service so there's two parts of food service there's the part that's in the general fund which is under the 11 the first two digits are 11 and then at the end there's the 14 section so the way F service programs work you
091have to have it being separate time and at the end of every year the Food Service fund cannot be in a lost position the general fund which is11 has to reimburse the Food Service fund now here at Newfield we are not part of the national school lunch program so every other school in SAU 16 gets state and federal money for its lunches here fields that does not happen parents have to pay 100% of the lunch um and so in a small school like this it's not unusual in every school every small school in C 16 there's typically a loss so meaning that the cost to operate the Food Service program is less than the revenue bringing in and so here at Newfield the only Revenue coming in is the parent paid portion but the cost
092going out is not only the cost of food it's the cost of the salary of the food service director it's the cost of the fing retirement of that person any help that that person needs the cost of the fridge the cost of the stove the cost of the to operate the kitchen so it's a lot more than just the food and so what has to happen for accounting standards we have to move the M the loss from the general fund to the Food Service you're seeing decrease because it's a plan and I don't know if it's already happened to increase the price that the parents pay so in parents pay more the loss will go down and so that's why yes can speak can speak to that that started this month we the board chose
093to raise the prices um in addition to that um both for convenience and um for Revenue there's a snack offered there are lots of parents just do not want to have anything to do with food they don't want to pack anything and so we were able to make somewhat of a profit on that because of the convenience so that's actually helping us in in that regard so our hope is that at the end of this year we actually have covered all of our costs in poop service that's what the goal is how come the sure that's a great question I don't know if you why are we not on the that's because we're not part of yeah we're not part of the the national program um we're we're honestly we're too small we would have
094to have re renovate that entire kitchen we'd have to have um you have to keep so much food on on hand we don't have the facility to do that there's certain requirements you have to have so certain amount of milk we we don't go through that much food it would be it would be cost prohi the board did look at that not too long we right looked at it um last time I was on the board and it would have been about I'm going to Ballpark numbers so don't hold me to it it would have been about $250,000 to renovate the current kitchen get it up to co make sure we had the refrigeration um all the stoves everything to be able to get it to be compliant that's just getting up to the correct
095facilities compliance forget about the inventory and everything else like that and to to Jenny's point it's not coste effective by any stretch of the imagination for us to go into that program it is much cheaper for us to buy our own local you know food um have somebody go out buy it bring it in and keep the cost as low as possible versus having um large vendors large food storage areas plus um you know renovating a whole entire portion of the building so hope that helps AR I have a question that's related to the budget but it's not exactly a budget question that is if I remember right several years ago the Newfield student the students in Newfield dropped in their standardized test scores dramatically relative to many other New Hampshire towns and I haven't
096heard what's come of that that is no longer the case sir going to say we can speak to that I would love to we have over the last five years increased our scores significantly in fact we are really proud of the fact that over this three-year period um in science which is typically one of the worst scoring um at the beginning of my tenure when I walked in the building we were at 38% probably which are we are now at 72% which is well above the average uh we are above the average in both math and are Ela so we've had a fantastic I'm really proud of that I me the teachers have done Michael uh on page one so uh line 1100 basically consolid everything regular so between the 24 budget to the 26
097budget to two years that goes up 28% and the next big one which is 1210 on the next page um for special is going up 33% in two years is that going to stop going up like that last year we um added the reading specialist which would have been that big the big jump last year um and that was required that was St mandated did that go into 1100 or 1210 that's 1100 1100 thank you um the whole 1200 section anything that starts with a 12 is related to special education so the needs of the students are going to drive that so it's going to depend on the demographic of the students that are here so I think we would have a hard time answering yes or no because okay needs of students change fair
098enough yeah on the on the on the 1100 line so the first line which is regular instruction teacher salaries how many individuals does that cover how many teachers I always answer this wrong so 24 I believe my classroom teachers 2 teachers I'm sorry I thought you were asking about my staff no no no that line how many people are covered by that line so that's actually our seven classroom teachers our um three special education teachers um our two interventionist including that reading specialist our nurse and our counselor so um but he's talking about just that one particular that first line right no special education so the special ed teachers are going to be in the specialed teacher line the nurse is going to be on the nurse line got it sorry Michael my bad um
099so I just wanted to know in that specifically in that first law the 895,000 for the proposed budget how many teachers are being paid out of that line how many individuals Michael that's our seven teachers seven teachers does that include the special and the reading specialist because that's technically not special education that would be a regular education so eight so eight so eight eight eight okay we have very tenure teacher staff here very that's that's a it's a big number and then our yeah so Michael I'm I'm gonna make an edit for you we did not include the um instructional coach so that puts it up to nine and then we have our part-time staff for all of our specials which we have five specials but does that go in that line yeah it does
100I just up the budget with notes has names on it sure this is I don't want to read names please don't well yeah let us reflect here for a second so we can make sure to give you the most accurate information that you're requesting no I appreciate that how long does the current uh teacher contract run just on the B last year so that three year yeah a three year last year and the pera was also a threeyear so they the year prior so they stagger Michael 13 13 13 thank you so my just one last question which is um on on page four towards the bottom software technology you guys budgeted 105 ended spending 26,000 uh is that a oneoff is that yes that is a oneoff sorry you're fine you got me going
101Michael that was Chromebook it was the um access it's said access points oh the access points okay instru never that I will let speak to that okay yeah yep so the instructional coach most schools have um a representative that goes to the SAU um that everything from all the new platforms that we use Alma our student based system our recoring syst system that person goes gets aligned with the other schools learns that information comes back that's one of their things they they um represent us at the SAU level and that's a full-time position they do on top of that she also um does coaching with um when we get a new curriculum she's part of of teaching getting ahead of that curriculum and teaching our teachers that on top of that she's also part of
102our mtss which is our instruction happens in three levels our Universal which is our classroom instruction that second level which is the students that we try to um give them intervention so we see whether or not they truly have special needs or they just needed some fill in some deeper understanding of the material and we can usually do that in a 6 8 12 week period that's what we want to do to keep our special education numbers down right you know that and so she's part of doing the math component of all of our school she is she does direct instruction with our students so she really has multiple um hats um which I'm impressed thank you yeah thank you all right anything else anybody anybody anybody board members anything no change from last yes
103can you talk about to the default yes so on the very last page is the default budget so when when voters go to the ballot they have a chice between the proposed and the um the proposed will be whatever comes out of the deliberative session default that so what the default is is the current year budget plus or minus any mandatory obligations by contractor by law so since we have an active teacher and Par professional CBA um I think there's only three people in the building that are not on a CBA everyone would step in track for that CBA um things um like the bus contract for example that is we have contract with first student which is actually in a negotiation year but that contract never went on the ballot as an independent item
104so the increases to First Student would not be included in the default um and so if we were to go to a default budget then we would really have to seriously consider cutting other expenses so we could provide that Transportation because legally we do have to provide um transportation to school from Kate k k through y so what we do is we go through and we calculate the default budget a lot of the special education expenses are required by law so that is going to appear in your default budget as well as your proposed budget so the last page details um the Delta which is about $53,000 between the two items someone else has a question oh I'm sorry go ahead yeah thank you how many students typically ride the bus depends on the weather
105it does depend on the weather but I would roughly say that I have 60 to 75 students riding the bus on any given day I think there's two buses there's two two more than half absolutely yeah we are pretty efficient with I I never really understood how efficient we were with the bus until last board's meeting and so that was a really impressive description um so I think I think we do a really good put it in perspective East kington and Kensington which are similar size is um each have three so do you want talk to how they do runs oh in the runs yes and so we achieve a lot of savings thank you um from other districts um so what we do is called the double run when we can so the middle
106and high school starts first and they end first and then so they do those kiddos and then they loop around and do our kiddos and so we pay half of a double run so the Cooperative pays half we pay half and so that's another way we achieve s and a lot of districts can't do that um so that's a really great yeah I I didn't know those efficiencies into last meeting either that was like sweet okay um one last question sure so just we're on number total based on the 120 student estimate we're doing $27,700 per student at this school do you know how that ranks with in the state or are there K through 5 K through6 so that so that is a very difficult conversation to have so cost per pupil published by
107the state of New Hampshire is always in AAR and it's based off of actuals it's not based off of budget so when you do a cost per people on budget it is always going to be higher than the official C calculated cost per people because you cannot exceed your budget and so that's always going to be higher um also cost for pupil calculated by the state is not just taking the total cost divided the number of students it's the cost less I'd have to pull up the website but it's a c less certain things so it's not your entire budget divided by the number of students so that's another way it's different so we would have to look on the department of Ed website which is published as to how new Fields ranks in I
108mean newfields elementary actual spend is usually pretty darn close to our budget number I mean last year we were only off I just looked at it a $30,000 a $3 million budget yeah $25,000 on a $3 million budget so I I get your point that you're going to go off actuals but what you guys are budgeting is pretty close to what we typically spend so that aside where do we fall in the state are we in the top 10% are we in the top 50% I got to imagine we're one of the highest in the state for K through five Michael I just did the division that you did with stratum for example and we're lower than Strat so if you want to I mean I think that's an exercise that might be interesting to
109do but yeah you don't know the back of the napkin but it it again I'm asking do you guys know any idea I that might be fun to do tonight we can website that's that's fine yeah I'm just on the doe website right now and they do have it listed by district and Excel so you can see it side by side but the cost it says the cost per pup represents the current expenditures less tuition and transportation costs any food service revenue is deducted from the current expenditures before dividing that number by ADM which is your average daily membership in attendance meaning the the number of kids on average here per day not ened it's um attendance ADM and attendance so there's attendance so there's two calculations of ADM there's ADM in residents the number
110of kids that live in your district and ADM and attendance and the number of kids that attend the school and the the cost for p is ADM so but that's only for the elementary school that's not the town's average per kid right because because we still have to the Middle School in correct corre would which are typically a lot lower than K through five it's a bigger it's a bigger space right I mean there's a lot of fixed expenses lot without a doubt our economy of scale here is is and at only 120 when at one point we're at 180 students in here yeah it's I got to believe we're one of the highest in the state but again I was asking just if you guys knew on in the last published cost per people
111on the doe website is fored 2223 it is less straightforward than you would think and we did speak to this at the last meeting in one capacity which was the riseing cost of special education and in addition to that throughout se6 what we have seen is that the needs of our students have changed so it's not a direct correlation necessarily between you have a decline you have a decline in your enrollment and therefore you have a reduction in your budget it it a does not equal b in a direct correlation is the way I'm explaining it because the needs of our students more complex um our students have additional social emotional needs including mental health needs that we have discussed as a board here um at our public school board meetings in depth um and
112in addition there we are still recovering from the impact of covid on our students who were in remote learning and whatnot during some of these really formative years so and I want to also speak to the fact that prior to the pandemic the needs of the students were changing and the fact that we have position positions in place such as the instructional coach you know we have moved forward with really prioritizing the multi-tiered systems of support approach so that we are gathering as much data as possible on our students needs so that we are intervening earlier and earlier as early as we possibly can hence the need for significant supports and services at the elementary level so that we can really be proactive and meet our students needs so that we are effectively not overidentifying
113students for special education when we look at the big picture so it's it it is absolutely worth noting the fact that here in 2025 the needs of a typical student are different than they were 10 years ago and also just I guess like just answer your question a little bit um the last published uh cost per people for new Fields was $ 23,522 91 cents um looking down the list the one right above it is Newcastle which is 41,000 $753 per student going down L Portsmouth is more at $4,695 per student plan field 26,000 um so it looks like it's right in the middle that's helpful data thank you okay okay I am going to um wrap up the public hearing on the budget and we are going to a motion oh we need a
114motion I'm sorry all right we need to make a motion to close yes to close the public hearing uh second all in favor I I um and we you're more than welcome to stay for our regular meeting talk can I just say this one thing really quickly every month the last Friday of the month we have open assemblies please please please if you ever want to come and see what our students are doing that's your opportunity to do it um it's always on the Marquee outside we would love to have you all um join us for that there fun music too thank you all for coming thank you okay we are going to call the school board school board meeting now to order at 7:21 p.m. and first on is minutes does anybody have I
115did not see anything I had a few but go first and I'll clean up sure no problem you we probably the same one I think so I actually was pretty liberal or generous I didn't do like little typographic stuff but I did do a couple of let's see um so which one yeah so for the non public I have something highlighted here oh sorry no for the the regular one regular yeah um for the first thing of the regular one the information in the section of non-public session I feel like shouldn't be that's not non-public that's not non part wasn't came back out right so I feel like we should move that to later on in the oh yeah yep so I don't CU that shouldn't be there the part say Miss Bishop that was
116one thing um the second part the public clear for the people who were listening I'm so sorry making the changes the where it says that we came out of nonpublic at 810 and the next sentence says Miss Bishop made a motion correct that should not be under the non-public session SE be corre that should be moved to like the end of our meeting the end of the meeting right before adjournment yes right yeah correct okay so that was the one piece the uh on section three public input uh they wrote three audience members but I think it's important to identify those were the people who were on the budget advisory committee yeah so it's going to change to the three audience members of the budget advisory committee which are Michael Mackey James liberman and Karen
117steer okay get your cred yeah we're on the same page on the new um there's that one and then she want to explain the changes um oh under old business Molly when you were talking it says she went on to quote explain the changes I feel like that was a little not clear I wrote maybe the most recent changes since our last meeting to the budget or something akin to that because um there's a statement here just says missile described the process for creating the budget each year she went on to explain the changes three and answer questions so you want to change it to what I I was proposing she went on to explain the most recent changes since our last meeting or something yeah proba I think it was probably the changes that
118we made yeah um I just felt like that is important to arly what you were changing um and then under business just the part where it's unintelligible at just the names of people no the unintelligible was made the motion to increase the maintenance fund oh the building sorry the building maintenance fund yes so mtion increase the building maintenance fund from 10,000 to 20,000 and that speaks to the need to make sure we're speaking as yes where are loudly as we can given where the yeah the microphone is IAM louder thank you thank you to those whoever is were we in the other room last time no I think it was here was it okay I thought we had a different system last time and that's the only other change that I had which I got
119you had all of my changes except for one which was under old business the last sentence the group um I wanted to clarify um to review the the group to review the the the roof issue or the two room OD the odor issue was going to meet not us group I just wanted to the grp does that group a name the gurus which part are we on 're on the last section old business so the last page of the graft business last last sentence in that old business section yes I call it our collaborative problem solving group okay so it's going to be the odor collaborative solving group odor room odor collaborative problem solving group okay I just wanted to make sure that the group was not us and that's all the that's all the
120ones that I have I didn't have any under the nonpublic know just to move that piece from non-public to public to the [Applause] end okay um I'll make a motion to approve the public and non-public as amended a second all in favor hi hi business and financials Lord have mercy I'll all thank you for signing the those are all signed in the sorry in your board pack was a current year Financial there are some UPS some Downs I did note what all of that was for did anyone have any questions on those um how do we get more of that earning investment again that was Fant so earnings on investment is you the interest you earn on the money in the bank that is not just a one month okay I was like that's amazing
121$8,000 so um so that whole section at the bottom is for the entire year um Revenue more than plan so when we set the revenues um I don't know what the interest rate is going to be if I did I would play the Futures Market but I don't um and so uh we are always relatively conservative and always have a little bit of extra earnings and investment so that's just interest that for the entire year what we're projecting so next month that will still be 8,000 or will that change unless the interest rates change yeah okay that was good on everything thank you Mom yeah was good um and so the other thing I did bring tonight is if you remember every year we have documents we have to post in advance of the deliberative
122session oh yeah so we have um four documents here um I'll do the easy ones first this is the election warrant so it says uh we have to choose one School Board member for a threeyear term a school district clerk and a school district moderator so we just have to post that you just have to sign this and this gets posted with the warrant so I'll pass that down for your signature um the next thing is we'll go to the default first so the default budget that won't change unless we change other parts of the budget that would affect it um here this is just the the dr's form that the default has to be on again it gets posted with the warrant and at the clst budget so you just have to sign your
123names on that um then we have the budget and the warrant which go hand inand so the warrant has all of the articles on it the first being the bond the second being the operating budget then three four five and six are all your trust funds where am I signing on this uh in that's um if you want to hold off actually signing that until we got it until we make the other decisions changes might impa that if you okay perfect um oh right here so article one's the bond article two is the operating budget article three four five and six are all the trust funds in the order of Maintenance then special ed and capital reserve in um Safety and Security um I did put the maintenance at the 25,000 as discussed in the
124last meeting and I also put that first in the trust funds I kept the same order as it appeared last year which then went to special ed then technology and then Safety and Security um is that the order that the board wishes wait which what's the order what's the order I thought we were doing maintenance F main first special ad then technology and then Safety and Security yes that's yep so uh maintenance you meant last year as in like last month no because last year it was special at school I kept I kept the four five and six the same the rest of them but I moved up special oh okay I moved up maintenance maintenance perfect thank you thank you we're on the same page now thank you how many main special ed Technology
125and Safety and Security so maintenance is at the 25,000 and then special ed Technology and Safety are all at the 10,000 great thank you um so that's and then on your article one for the bond is the amount as presented in the hearing of the 1,867 565 um and then article two on here is the operating budget um as presented in the packet so is now our time to discuss that so yes just one second and then the last thing on here is the 26 which is just the detailed breakout of the operating budget so now what we would want to discuss is are there any changes before we sign these do so are there any changes to the operating budget or the amount set forth in the bom that you want so can we
126start with something easy yeah I was going to say so so I think we've covered the trust funds right trust funds are good trust funds are good and then there's two things remaining which is the bond and the op budget so operating budget I don't have any proposed changes I find on the operating budget changes I want well I wanted to just make sure I gave the board the update with regards to our speaking of our room odor collaborative problem solving team yeah so and just to speak to the information that I shared with the board um prior to the break that I wanted just discuss here um in the interest of full transparency with regards to our planning for the facilities and the needs of this building so uh you know we did get
127the as discussed at the last board meeting there were concerns about you know well we have these facilities needs but what are the costs associated with these potential needs and we had yet to um receive official costs and projections as to how we would address some of the needs for example um we've been having because we've been having a an odor issue in two of the rooms the rooms are Now offline um and we've been meeting as a group and collaborating regularly for about not quite 18 months but almost to make sure that we have been figuring out how to remedy the situation so at first um you know we thought that we might need two energy recovery units for I can't see folks I'm just trying to make sure everyone can see me in
128case you have questions I can make some eye contact here um so the energy recovery units which would help to continue to diminish the smell if not fully eradicate the smell would be $30,000 so $15,000 each um the really positive update with regards to the two rooms and the odors that our collaborative problem solving team met yesterday and the smell has been eradicated now I want to really qualify that to make sure everybody is clear that as of this present moment in time we do not detect a smell in either of the two rooms that being said it's really cold out as as is evident to all of us and therefore the humidity is has also significantly decrease in the rooms so there and it's also still relatively new that the additional remedies that we
129discussed at last month's meeting to include the additional ventilation as well as the charcoal filters but those have been in effect for just about a month which when we think about data collection it's not a significant period of time so we're going to give it in another two weeks to continue to monitor the smells and then ideally if the situation remains consistent with what it is right now we'll bring the rooms back online line um and so that again is is very good news and there is the possibility that come spring when there's additional humidity that the smell could return due to the off gassing that is theorized to be the root cause of the odor so I am recommending that we still play it safe because odors are not are hard to predict as
130we've experienced over the last almost 18 months so my recommendation is to um plan to find the additional $155,000 in this year's budget so the fiscal year 25 budget and then also plan to use $155,000 from the anticipated unassigned fund balance and purchase so that we can purchase the two energy recovery units um to play it safe in case the odor were to return so that does not that would not impact the fiscal year 26 proposed budget nonetheless I still wanted to give you the update so that the board has all the information as you're considering the proposed budget and whether or not you want to make changes that is my recommendation for how to proceed um because as I discussed at the last meeting that you know the 5.98% is it is a higher
131number comparatively speaking to other budgets in in seu 16 and what we don't want is for the proposed budget to not pass and to end up in a default budget um so we want to make sure we're being as fiscally conservative as the board is comfortable being while also meeting the needs of our students um but I think that with regards to the input that we received from the public tonight I I feel positively about our overall percentage increase based on the information that we received from the public who were here tonight and the questions that they asked in addition to the input from the budget advisory committee thanks can I ask a question about the um the rooms yes um the heat is still on those rooms right even though it it's not they're
132offline so it's not like it's I know I don't think you can isolate those rooms with he or even like lower them but like it's a regular temperature it's easier if we keep everything thank um status quo except there's just no students in the rooms and the doors are shut I did actually personally I walked in there for something I and I oh I had to get the a signature from the custodian for something and um I didn't sell any so it's that's good news thank you you're welcome and I I I want to sorry I'll let you talk in a second I just wanted to also publicly thank the fact that we've had a really large team in place and we've been meeting regularly and everyone has on the team uh our various representatives
133from our facilities crew such as our electrician our general contractor um our heating ventilation air conditioning specialist Susie are our wonderful principal here um myself and Chris andisi who is our associate superintendent Rusty liser the director of facilities um John spali who's the assistant director of facilities just again publicly to thank them for all their time and energy that they have put in to truly collaborate as a team to figure out this complex dilemma that we have faced I agree what you like to say and so just to I guess just to um make sure it's clear so we're saying that 15,000 would be out of the current year budget and then we would do the second 15,000 out of the current year budget at the end of the year yes um and if it
134can't support it then it would go to the trust fund yes what again I just want to make sure that I'm clear on what where we're getting this 30k from and how we're going to fund it so we're going to take 15K out of this the current year I'll let Susie speak to the current year sure so there may be areas in which money was allotted that we won't use yep um typical whether or not that's in a special education line snow removal I mean there's lots of things that go into some variables that work within the budget y pray for no snow pray for no snow I'm fairly certain that we could probably hold out 15,000 though we do a really nice job of budgeting exactly what we need I do think that we
135could do that okay I'm less confident about doing that and do 30,000 and so the idea would be in um April when things are pretty much finalized for the year we've done them almost all of our majority of our spending say yeah we' carved it out at that point do we have another 15,000 that we can a lot to that we also have almost ,000 I know we don't want to necessarily zero that zero this but the main if you if you like we get to April and you say if there was an amazing Deal or No but no but like say you say you you could get to 25 and we need to pull five out of here there's so we need a plan B we a this is all predictive so um was
136trying to say this in a simple way um so the other thing is is so you can't over your budget right but when the trust funds are funded they're funded from fund balance fund balance is actually a combination of Revenue more than plan and expense less than plan so yet no you cannot expend that $88,000 I have on earnings on investment however if that earnings on investment is part of your fund balance at year end it could fund the trust fund because you're funding it from fund balance and then you would then go to the trust fund to get the money trying to say fund the trust fund to fund your expenditure if you can't fund it out of end of end end like April numbers April okay so we have options yeah yeah it's
137just we do want to buy them together that was kind of understood that when are we we're looking at doing this at the end of thisal not calendar year this school year so that this could potentially be done over the summer if at all is what I'm hearing correct we may not need them you need it so if coming let me I'm not sure if you were still no but yes speaking I I I would rather plan to do this and not do it but it sounds like circumspect that might not be a word um with no humidity and the smell goes away that's not going to be normal you're round so I kind of expect it to when did the smell start last year that was before May so I'm not sure October September
138October of last year 2023 okay so not in the high of summer so it wasn't so it wasn't in okay right so I mean it's it's totally circumspect on what what's causing is it humidity is it something else it's off gasing of some sort okay M so whether it's well I'm I would rather plan to do this because this has gone away and come back again many times so I I'd rather make sure that this is settled versus not planned for it not be very conservative and then we have to go down a completely new path next year and have zero budget for it um so um we can do is we can put in the purchase order right now and when we put in the purchase order that is that will that will hold
139your place in the budget but we don't actually have to order it from the vendor if you want to see how things go in the spring so next month when we I come with you with the financial it's going to show an increase because we're the purchase order will be open but if you want to see how things go it would be incumbered but if you want to wait and see how things go in the spring then you could place the order then but at least it would be encumbered in your right because the projected ending unassigned fund balance for this school year as it stands from the information we have in advance of this meeting is 156 but the unexpended appropriation is the 148 you cannot expend the earnings on investment that would thank
140you for that clarification I think that's a I think that's a reasonable financial planning thing to do unless it would hobble like hobble sort of the rest of the year's operation having that like is that a we can always open the purchase order and adjust it afterwards so if we if we open a purchase order for $30,000 we could do 30 or 15 it would just put a placeholder in there and if Susie is like no I I need this money we can reduce that purchase order and we just have to wait till another board meeting like it would be no you could do it sooner I I just wouldn't want to make you have to wait a whole month to she just need to call me okay perfect okay I don't see why we
141would do I think that makes sense I mean I think yeah I think it makes sense I just don't want to go like spend $30,000 that we find out we don't really need spend either like we will for with certainty be continuing to monitor the odor right of course um on a regular basis as we already have been doing the facilities crew here has been doing a remarkable job of maintaining their assessments and Susie as well but I mean is it is it realistic to say because last time it came back after we did some remediation but it came back pretty quickly so it never was completely ER never really gone but this right now nobody's smelling anything right it's also crazy windy out but if we're if we're talking like three four months from
142now is that yeah I mean but that's all so it's all so up in the air like could it come back what's going to happen like I'd rather have a plan for it and not happen than have a plan for no that's what I mean though yeah I I just that yeah I kind of want would like to wait to spend any money until we absolutely know we have to right so we just put in the encumberance just to hold the placeholder right but it wouldn't actually go to a vendor but we're not purchasing anything we're keeping an eye on it and then what I hope is clear is that if the odor returns I will let you know and then we will need to purchase it because we will need to put our additional
143remedy plan in place right it's really you know as someone who's not an HVAC expert but has acquired I I feel as though I have acquired a significant amount of knowledge in the last six months I think Susie could speak to this as well if anybody's interested in an introductory course um the what's really difficult to predict is not just the humidity levels and the impact on the odor but the off gassing and that cycle is something that even someone who has spent their whole career as an AGA specialist cannot predict with certainty what an off gassing schedule is MHM um I think quick question on the energy recovery units are those going to be in the classrooms or are they going to be installed on the roof what is the process for the systems
144cu the ones that I I looked at them online and there's all kinds of different solutions so I kind of want to figure out are we looking at a commercial one where we're actually putting inventing and um everything else or is it something a little bit different where it's like a system that you're kind of putting in the room or is it its own it's own V it says into the existing Outlets what he explained to me is that there are small units that would be in the classrooms one per classroom right be a standalone like AC unit yes that's my understanding like a standalone unit I think maybe what you Googled is the bigger one that we were talking about like the $1 million yeah yeah totally where we would need an extra building
145yep yep okay y yeah I think totally what I was that was a this can that so yeah so the one that I was looking at was like a roof installation and like and that didn't correspond with this number so I just wanted to clarify these are venting to out a window most likely or out something I can't speak to exactly where they're venting he did the our H person did and I can certainly let the board know that I mean that that's getting into the nitty-gritty I will TR that they are going to be systems that will do what we require them to do uh I'll leave the that piece to you guys I trust you guys um what I was just curious is to like are they commercial are they residential and you
146like their residential units they're smaller units the way he didn't use the words commercial versus residential and that's just me that's just me he did he spoke to the fact that there are smaller units that would be in the in the classrooms one per classroom um and that also this is in alignment with the recommendations from um RPF who did the full assessment of the of the odor and the data collection okay I think we have a question did you guys did you have a question sorry I did yes um how long ago did theor start again did you say 18 months and have you identified the source of the odor there's been lots and lots and lots of we replaced the roof we replaced pieces of the roof we have an interdisciplinary team we
147have a giant team of continues to assess that it's not currently being used by students it's nothing mold it's not mold it's not dangerous the air quality is fine it's just a smell has testing on the yes comprehensive testing more than you probably want but we can yes our or years ago we had an issue as well again hum we ended up having to redo all of the pores and that was actually fix the source but again just curious yeah they it's it's been like an ongoing multiple different things have been tested and fixed and didn't work and then this seems to be working give me some wood caveat with the caveat of at this present moment in time humidity so there's no there it sounds like aore growth and it could be anything it
148could just be protein somewhere you know yeah it could be so many things and it's it's just not it's not identical identifiable yet that it is 100% fixed so we can't put kids in a room that's kind of make them get a headache and we can feel like we can't use those rooms unless don't sound a solution either it is in my opion yeah I mean we did if you saw towards the tail end of the summer last year we were a portion of the roof um and that was a big expense to try to see if that not to try to see that we thought was that was going to be it because if you look at the pieces of the roof that's that smell but that didn't take the odor away so we
149were we've been doing a lot of different things to make sure that you can do it it's not the floors the floors are concrete and like there's not many spaces where this odor can off gas from you you can totally speak of way better no you're doing an excellent job but it is yeah um from all the different things that we've done like spray foam to try to isolate it um replacing the roof uh you know making sure the window is all the different things it's just not going away so that's what it has but it it has well yes it has right now it has appeared to go away I'm going to put that big caveat in there because it has appeared to go away and then all of a sudden it's back again
150so that's kind of the discussion that we're having is it appears to go away okay okay we're going to sit here and wait and look and make sure that it's actually gone although this is the first time it has disappeared that we have used the word eradicated eradicated yeah this is the first time and for the next two weeks I'm putting my office in that in that room wow so that just so that can monitor it on monit allow other people to see the Comfort level have the kids understand that this room is been always smell it too cuz I know some people weren't smelling it or Y yeah okay make sure cuz I'll come over and smell it for you I can smell everything I mean as you can imagine it's not nice it's
151not it's you know it's not no no no go ahead these first two rooms when you walk in the front door room 109 Molly do we have to do any voting to have you expend or whatever I just EMA I already emailed their account to say open a PO for you're so efficient Molly so that it's out there so res okay so on that note then so we don't need to make any changes to this article two correct unless you want to I mean it there's no recommended Chang to the no recommendation so as long as we are okay we are going to be able to find these funds if we need thank you thank you for coming I think we're fine with keeping it as it is if you guys are comfortable with with
152that yes I will I would happy not to increase the budget anymore than increase yes I would caution the board to add additional spending I'm good yep with I think it we can figure it out and in interest of full transparency article to that you're speaking to is the proposed operating budget operating budget I just wanted for the oper oh I'm sorry operating budget the article two operating budget were good as as this not making any changes not making any changes okay sorry anything else before we talk about the Bond as far as Molly stuff I'm okay okay article one to appropriate the sum of 1.86 565 can I yep anybody can I appr appr hearing the information about our Authority and ability to update the number on the bond and it sounded like the
153potential positive impact uh in terms of perspective from Folks at least in the room in doing so so I'll put that out there because I have asked versions of that before and I appreciate that at least that has not been how our process had had previously gone that's fine but it sounds like it's I don't want to do anything that's not okay like that's not legit or legal right I want to not screw things up um hearing that I actually think we might want to discuss and consider um updating that number to um a different number before I even bring anything up I do want to ask what is the process by which we do that is it going to be a vote uh or do we discuss and how does that work Molly because
154it's a bond thing um or is it J's chair so I mean we had the bond here for the amount that was proposed I mean I don't think there's anything preventing us from changing it um because you can put on the ballot what you want we've had the we've had the bond hearing for what we knew at the time um and after hearing from the public if you want to amend the number I do believe you can amend the number you don't have to do another bond hearing I don't believe so I we can double check but I don't I believe you just have to have the one Bond here I believe you're right I believe the can be changed I also believe that at the deliberative couldn't because we're uh sb2 people can change
155they can change a bond they can't change the bond they can't change the bond number no they can change the bond number they can change other things but not the bond that happened with um rug they wanted to change the bond number and you can't change the number you might be able to change some okay wording okay maybe yeah I mean I know like in a citizen's petition citizen you can't change the intent of it you can change the the value in it but I don't think with a bond article you can change yeah it's very so that's my question but we can today change the number because we are the ones setting the bond amount you guys are the ones setting what goes on the warrant that's my understanding but Molly would be though
156so to the then just to give you some information based on what John had said M which I think I wrote down 750 000 that represents a 60% decrease which to me is um not something that I would support um based on the information that I have I that being said I don't know that I um I would absolutely be I did little math here so I have different my math um so if you want I you know I was going to think about um an amount to to sort of bring up to discuss but I also want this to be since it's the three of us I don't want this to be like an uncomfortable thing I want to be a conversation no I think that's totally collaborative collaborative yes yay collaboration so what
157do you yeah so an example of something I thought might be a reasonable um reduction is a 25% decrease which would equate to 1.4 million so what are you what is your rationale for 1.4 as opposed to 1.8 yes um based on repeated pieces of information that I've heard from various folks that that number can get down that's it's it's going to be less than that um bids will be less um and the variety of other pieces of information that were said tonight and other amounts yeah um I think it's still potentially even more than what it might ultimately cost um based on the information that we had before one and then two um I would make a suggestion like that and approve something to that degree with the spirit of not wanting to change
158the overall I I want to I got your question what you were asking Dom like with that amount of money what do you envision seeing happen he said the whole thing yeah that to me was a little hard to to swallow um not I believe him I just it was hard for me to understand from the information that we have corre gotten so far that doesn't it doesn't square with what I'm numbers that we have however I'm sorry um I no and so you might be asking me what what logic do I have to um square that the 1.4 would accommodate that I don't know um but I also think that so when he was throwing out 750 because I kind of did that in my head too um he was talking earth work yeah
159John I'm sorry John was talking earth work so um so cutting the Earth so even if we said um let me do some numbers sorry let me do some quick like take everything else MH okay so I'm just I'm kind of going to round up a little bit um like the non earthwork stuff y I saw a quick type of we could add about 5,000 more plus the SE which what do you say 750 that gets us to a million that's completely cutting the earth work in half so we got I I think that is a a reasonable oh wait and that does not I'm I'm sorry I I didn't and that didn't include the contingencies Insurance the contingencies insurance and so that's an extra 100,000 so we're like 1 point and the cost of
160the bond is 177,000 so so you're kind of right there with 1.4 um if it's 75th day like for the Earth for the earth work if which so let's could be talk about M oh I I pulled this aside too because this has 120,000 for driveway to be repaved so we do know that number is 120,000 that's just around the building right right um so take that into consideration as well right and that's not in the operating budget or in nope that's in nothing that's a nothing that would have been um so I'm happy reducing it um and we're still talking about the entire project mhm what happens if you can't we get quotes back not at this first point Molly what happens we cannot get quotes that are below the do not exceed through
161this entire project we have start over right so then you wouldn't move forward with the bond project now the only this year uh this year right um we explain that yeah cuz I I that didn't seem to this year or would it have to go through a whole another bond process or would it be resed I need tell me a little bit more about that so what you put on the ballot either will go through or not go through right um this year if it goes through at the lower amount so if if you whatever you put on the ballot would be let's just say it's up to what would you put 1.4 so if you put on the ballot um that you're appropriating up to 1.4 million so remember how the warn article there's
162two parts to it there's the appropriation of the 1.4 and then there's the further raise and appropriate the um the interest this year if it's put on the ballot and it passes then the only part that's going to be raised in taxation is just that interest portion anyway um and if you can't move forward with it then that interest portion would be return in your un if and then we'd have to do it all over again you'd have to put it on the ballot again yes there's a certain timing if it fails as to how long you have to wait till it can go on the ballot again but Jane's question not how I understood Jane's question was if our original um request for bids came back and everything was U more why couldn't we
163say um slice out one tiny mini part for sure yeah you'd have you'd have to get you'd have to trim it down to be dual yeah and so if we we could do that which is things we talked about which I think it might I'm sorry if it was before you were back on the board we talked about that in some of the things like reducing some of the lighting reducing some of the prettiness the trees and maybe getting donations and stuff like that so so it's not that we can't move ahead we would just have to figure out way to get in that budget would part of that be getting quotes for piece and parceling this instead of the parking lot and the crosswalk it's we get a quote for this is what it
164would cost with the parking lot on crosswalk this would be just the crosswalk this would be just the parking lot can we do that or does the scope what I want to do is I want to honor what we just the discussion was what the what the plan is what this what we're asking the town for what whatever the number is MH I don't want to do a bait and switch and say this is just going to be for the whole thing or this is we're going to ask for this and we're going to do what we can with this whether it's going to be one or the other I I don't I want to be honorable to the process no I get to what you're saying cuz if if we go up to 1.4
165and they vote Yes gas thinking they're getting this and then we can't get it for that price yeah I he but my understanding what what what um when um Chris was here and I feel like the discussions we've had most folks will be giving a if you say we're going to pay up to this amount of money and this is what we want they're going to provide as close a product as to what you want at that amount of money right and we've heard volumes of people say that there is a way and we did have that bring up but we brought up like many times where the crosswalk is perceived should be the Catalyst and the bigger um safety issue MH is it legal for us to have a project for this entirety and
166then do a portion of it is it what what is what are our options because I don't want to if this passes at 1.4 and we get quotes in and it's still 2 million but the quote is to do the parking lot for x amount or the the walkway at a different amount yeah I S what do we do do we have more than one option do we have one option or is this just do we have to be do we have to honor the the the entirety of the project that we that this board has been proposing for the CL legally you need to honor what's on the Bor article that project plan is not on the war Artic okay so um so legally would be fine but I think you can't take these
167funds and then redo the playground right so you have to you have to you have to honor what's put on the war article and yeah and so like um go ahead so let me interpret that and make sure that I understand it this proposal even if we do part of it not all of it even though the P everything in there is that still honoring it I know that's a very thin line I mean the way I interpreted nothing that this it's a Safety project on the war we will be improving the safety we will be improving the safety right safety and so in order to move forward with the bond I'm just using bwood as an example and it's I know it's a totally different project but to put in so Brentwood authorized a
168solar project for solar panels on the roof they had um company a quoted they quoted something Company B came in and quoted company A and B didn't necessarily quote the same thing right um they ended up going with Company B which was still offering the solar array a different solar array that was bed yeah um then what happens is we move forward with Company B but there was an issue with the utility because there's something that has to happen with the utility and so a bond cannot be issued until Bond Council signed off on the project so if you don't have a project plan in place to the 1.4 you won't be able to get Bond council's approval sorry so yeah so in order to move forward you'd have to get Bond council's approval and
169so Happ in brenwood is we didn't have that before the July deadline so they missed it and that's why they had to do a bond anticipation note to get them to January and yes we did eventually get the utility approval so Bond Council signed off and we went through the process um but I don't think Bond Council will sign off on a bond that you don't have a solid gr to the 1.4 thank you that was very helpful just has to follow the spirit of the warn article which okay just to give you more of the math 1.5 is 20% reduction cuz again I I I chose 1.4 25% based on but oh yes I also wanted to make sure it's clear that included in the request for proposal would be the cost for construction
170manager to help really clarify the scope of the project and I think that yes as Molly helped us thank you very very much Molly that was really helpful to understand the legality of it all and I think as long as the board is continuing to be transparent which we are which you are really wonderful at with the public about where you're at in the process and what numbers are coming in and what the project will look like based on those numbers I think that's that's the most important thing to keep at the Forefront is the transparency we might have already recruited some bids from all of our discussion about this no so that's I thrusted to think about I don't know so and so for moving forward for the warrant we would either need to
171decide on a number or um for for tonight so we don't have to decide on terms of the bond yet right okay we just need to decide on the number terms won come until we pass or till we pass or not right correct now the original Bond Council she originally had a spot with the terms on there but um I took that out and we didn't do that with brenwood with brenwood it happened much okay I am I'm comfortable going to 1.4 I am based on discussions I'm hoping that people in the community that do this for a living will will bid on it and as has been said by the public come in a lot less um I just wanted to see the scope stay the same because from the start my it it's
172not just about the crosswalk it's about the entire traffic pattern the entire entirety of the parking situation um not just how you you park but the kids Behind vehicles um and just in general and um so I just I just want that to be clear um yeah that's my do we have any preference um again that's 25% reduction B would we be feel more comfortable with the 20% would you want to go 30 I mean that's something that I'm perfectly willing to discuss having come into this partway through it um I mean I had I have had some of the same exact concerns of everybody here um and I think even I I really do appreciate the 1.4 but I it's a lot it's still a lot that's um I would understand if you guys
173want to move forward but it's still a big number um and it is still something that I think is the same concerns are still are still valid at least in my mind we don't have to agree that's fine um I need to mull it over I also kind of think we're at a point where we're guessing at numbers when we haven't talked to any other um companies and gotten any quotes you know we talked about doing that a while ago we decided not to um and so we're kind of giving ourselves a big swag and being able to say yeah we could we could probably shave this amount of money off of it and without actually knowing what this anymore I just want to clarify I did not decide not to I thought we weren't
174allowed to I thought it wasn't part process my recollection and anyone else chy and we were all here at that meeting that Chris came again and presented the comprehensive information that he had and what my take away from that meeting was is that given the time constraints that we had we did not have the we did not have the time available to us to go out and get additional um bids with regards to this project and still be able to have a bond here it was based on all of the dates well I mean I don't understand the urgency of doing it without due diligence which includes having the appropriate information making informed decision so okay here's my thing we have numbers we have numers speaking I just wanted to honor I don't think I
175mean I I mean I think that's what if you take a bigger picture what the people were saying here I think there is General support there's a lot more support than that was in this room yeah right so but I think the there's a lot of apprehension about the price and honestly I don't think the board has done a sufficient job in due diligence despite whatever you know the typical process is for seu 16 I don't think you you know so other people get the town's gotten multiple bids you could you could do that you'd have an informed opinion for various different um people who might be interested in the project with actual numbers that you can share with the public and then you could get more people on board by seeing you will have
176done your due diligence you come up with realistic numbers you're not winging it make you know certain negotiating yourselves making it up and then you have something sub substantive to provide to the people and really you know hopefully get the support that you like it it's just I mean it's just the most sensible Common Sense thing any anyone in a similar process would probably get boarded one bid from one person that's you know a year old the board does need to make a decision tonight but you don't have to you don't have to vote a a war a warrant article have to be decided on and I know it's not ideal but it does seem to me that that's the most appropriate uh for the board to do and just common sense due diligence would
177satisfy a lot of concerns it still might get voted down because the money is more than what the town wants to spend but at least you you're based on a rational decision and inform all right now finished my statement thanks for your comment I think it's inappropriate to say that the board has not done their due diligence considering we have met with multiple professionals that are above my pay grade and above my expertise in this area and as a board member it is our it's a purview of this board to gather the information and then put something forward we have gathered information for 18 months may not be exactly how everybody wanted us together or the information may not have come you can shake your head all you want you haven't you haven't sufficiently gathered
178information by any reasonable standard of the community I'm sorry one bid that's over your is insufficient you know talk to people who have expertise in building lots and and doing projects you know you you have an anchor bias what do you mean by an anchor bias you had a number that you were um given and you're sort of attached to it I had a number in I had to at the beginning of this it was $500,000 I was shocked but I was also shocked by the amount that it cost me to P my own driveway but the bias is that you haven't gotten opinions or or um actual numbers from other other providers and if everyone comes in and it's all around 1.8 million okay I me that's the cost but you know until you
179have that information you know I don't you're sort of guessing at it and I really I don't I don't I mean personally I imagine a lot of people think well we come in the number and hope then we get the bids then comes in lower I mean that seems like the the horse you know in front of the wagon um and it's not an emergency to have this done this this has been this way for many years just get more um fids or request for proposal what whatever you have to term it and and have a more process I you really be serious about that I know it's take a year to do that because you know the timing of the elections but I think it would satisfy a lot of concerns of members of
180the community and ultimately you might actually you know get the thing passed rather than throwing something out there getting rejected and then you know I don't know what the time constraints are and when you you know make proposal Jim I respect your your opinion um but my we as a board have discussed and we're not all exactly on the same page and that's okay but my priority is to make sure that um I decided that I would like the town to have some sort of um ability to to vote on this in March um I wanted it to be not delayed another year before a discussion and a decision was made um is it a perfect um presentation of um everything the way that you would want it to be or that the other folks
181in the attendance tonight want it to be not necessarily I also think that we've gotten some great feedback from tonight I am proposing a 25% decrease from what we originally had based on the the feedback and I personally um would like to to go ahead with doing that Jenny it sounds like you were in support of of making that um adjustment yeah I'm going to make a motion to change article one to be 1.4 um million versus the 1.86 7 and I'd like to move this along I second that all in favor I I no okay Molly is that something that we can so I can make that update tomorrow I can ask the Bond Bank for the new hypothetical schedules again the first year is probably going to all be the same but I'll
182ask for more more um options um so I am going to revise this and we'll need to sign it and then we'll sign it we'll have to sign it um when do we need to sign it back um so it has to be posted in the next few weeks um do all of us need to sign it or just the chair uh the quum with the board need sign um or I could also if knowing that you have the motion tonight if you want to sign the cover page I can email it to you all afterwards if you want that's reason fine with that um since you already made the motion to what what to do um so the default and the ms26 won't change um so I think you have the default over there
183Jenny somewhere strong about so you just all need to sign these documents um so there should be four documents Al together and they still need to make a motion to and I would just I would you for the proposed budget and Oh I thought we already did that well um I don't think we made an official motion but if you could you could say um make a motion to move the proposed warrant article or I should say move the amended Warren articles to the to the deliberative I'll make a motion to move the amended warrant articles to the deliberative session I second all in favor I I sorry I decided to right Board number so just to be clear we discussed the the proposed budget discussed the trust fund allotments and then the bond amount
184okay very productive tonight we're not done you still have so much money I know we'll be efficient do you guys need me for anything else I don't think so thank you Mom I don't think so because we're we're done with school safety we're done with the facilities update the Manifest and financials included the budget so why don't we let Susie give her report I'm just G to collect the sign else December month we did have our first thank you for your time we did have our first celebration of learning in the month of December um and in that our third graders spoke in front of 70 adults um individually I think we really pride ourselves on giving our students opportunities to be able to stand behind the podium and speak um about their depth of
185knowledge um and they certainly did that when it came to um their module of the sea um so that was a huge highlight in December of course we had a fabulous assembly um the door over vacation was created if you go out you'll see the door um the external door to the bathroom now is in place which allows for there to be an office right next to Jane's office which will eventually become my office oh so if you remember if you recall um that small space at one point was the teachers room where they had lunch yes and you went into the bathroom thank you very much M what we did was we put a door on the external hallway so that now that's a that's a um office or learning space we will once
186the rooms are back online that will become my office which will be right next to the school secretary that's great yeah it was a really it was a great move um and then just to highlight um some things that happened today Wednesdays are some of my favorite days um with our module in first grade they have five books that they'll be studying and they did a book Cafe where um k DC Hamilton the classroom teacher was in an apron and on a silver platter where the five books at each um Center the students sat down and previewed the books and tasted them and decided what they um they made some projections on which would be their favorite book uh during this module it was amazing so so we're just diving deep we're doing our second
187round of Diagnostics right now in I ready um so we'll have those results and of course this is progress report time so um at the end of the month parents will be receiving um their students progress reports um January is a fantastic January and February this is one of our big push times um we get a lot of academic work done during the six weeks period a question for you of course when are we going to get another kind of academic update mhm so after this I ready assessment which we're in this is a two we window that it's open I'll come back and give you that midyear score thank you that's really uh what's happening right now y thanks thank you are we okay with Susie departing oh thank you yeah go eat I
188appreciate yall of course okay um strategic plan um we meet oh wait no I'm sorry that's you that's me um we don't meet again um for another month however I did post um something on both of the two field sites this is essentially the flyer that went out I'll probably post it more maybe as often as I can whenever I think about it to be able to get um the community of new Fields meaning everybody not just parents um but all community members all on their feedback for the Strategic plan so the next step for this is just really getting this done um and then we'll meet again um to prepare for the um planning sessions in March but no real updates other than to please uh let people know to go and fill out
189the survey cool thanks well thank you um did Safety and Security meet no we don't meet again until February so we don't even need to talk about that one same with super evalu superintendent evaluation committee we meet Friday so I don't have an update so oh by the way we don't meet until late February so I'm not going to have a another like Safety and Security until March so we're good for that for a little bit sorry okay all right policy so I'll start with that similar news analogous news we will not meet in January does that mean we don't have no policies next month um if we get through to the this month PA says yes I was thinking are we going get through these months yeah um and our next meeting is going
190to be on February 20th so it actually might not be until oh we're in January now I'm so tired it's March yeah so it's March March excuse myself to go fill my water really quickly does anyone else need anything we'll be right back um okay so that's the caveat or the piece there um the other caveat is I actually showed up a little bit tardy to our policy meeting this time dear I was very embarrassed um I got it wrong on my schedule but I did meet with Heather this morning um or this afternoon and she updated me in addition to the summary that we have here in short there are four um revisions uh that are being propos two um removals and no new policy so that's good um most of them have to
191do with updates to either uh the law um in terms of requirement or a uh audit that we did or that we had um as far as recommendations and that was the one piece for the ehab As far as the Cyber secur so that's sort of the global piece um we can start one by one if you want actually or what do you I looked through all these and I have zero comments they're pretty and no like I wouldn't Rec I mean they all are pretty much to the law but I don't Jenny I don't know what you want to I don't know have anything okay great so I was waiting to see what kind of like if you had any was there any discussion that was like there was one discussion but actually um
192there's a few but part of the fact of me showing up late was that I missed most of it because um it happened really quickly okay that's good there wasn't that much okay um but what I did bring up at the end before I left was changed before it got presented so you we have the most updated we have the most updated okay and there was nothing that was like stood out to you as like our smaller School being this all was so you know how sometimes though there's like weird idiosyncrasies because we're new fields and I looked at some of the stuff that we did online too like to see what the correlation was because this is just the recommended it's not off of what new Fields prior policy was and there's nothing nothing
193glaring in summary for folks who are watching or just um in general the retention schedule for like how long each record needs to be retained m is being removed as a policy at um ad Jun or um uh appendex appendex thank you um and but it's still being used and it's housed sort of in the sa that is ref procedures and stuff instead okay that makes sense each category so there's business records there's um there's so many personnel um student and internal um they are I asked hether this morning or this afternoon who's in charge of what and basically it's Department specific so like the cyber security things are are specific to the IT person so I guess my only question on that and I guess it doesn't really matter if that that schedule is
194coming out of the actual policy was because is um and these going to be reviewed regularly okay is to just make sure that this um the retention schedule at uh matches with set what's in the CBA it well I will say it's to be reviewed regularly and I think much of the stuff that would be relevant to the CBA would fall into our the personel record so be HR and suie us so it makes sense since it's being pulled from yeah okay is this in the CV there was language in the CBA about referencing I don't know if it referenced this I can't remember it referenc personel record maybe yes because it talked about expunging certain things from there was language in the CBA about in in Personnel files but I don't think it necessarily
195has to but as a reminder this is not being proposed as a policy it's being removed so okay so that's why I said I don't think it matters it's just I was good what policy are you currently on well we're talking about all of them in general but the we're talking about record retention schedule being pulled out the policy and it's now going to be housed in the like procedures or like client hand whatever handbook right staff handbooks yes um so so I would propose that we adopt a policy ehb ehab gbj and J as I will second that say I I all in favor I and then we just need to withdraw the others so those are all passed without amendments yep correct and then Jane had not one Amendment you missed it I
196know you filled up your water bottle you filled up your water bottle and she like 10 seconds maybe that's what you should do that's the trick I'm just kidding you had more comments than I did that's excellent do we do we need to um do a motion on the policy to withdraw um can I make a motion to withdraw policies eh b-r and GB j-r I'll second that it works for me all favor hi perfect that is the fastest policy ever I do think it really helps to have them um themed mon it really does right I think that Heather I give Heather a lot of credit for that hands down is way better cont cuz when you're like jumping between it's like what yeah no this is so much so much easier to go
197through that's brilliant stroke on Rene's so our next meeting is February 6 it's the deliberative session and with a snow date of February 7th um is it our normal time at 6 yes yes I think it is I I have it down at 6 but I it's not on is it at 6 on the 6 um February 6th is a Thursday if I'm on the right calendar the right year yeah we had to change it right because of all the other boards that's right okay I that's the deliberative yeah I might be bringing our children and we said 6 p.m. 6 p.m. okay over it's a Thursday yeah some um so I I guess just out about the deliberative session like last year we kind of split these up yep uml them yeah I think
198it would be good to just have spread the spread the wealth of talking points let you guys do the bond spare one one of you guys sure I'll stick with the bond it's fine you want to do the budget sure and with the bond I think it'll be a very relevant time to rec recognize the feedback that we had at the bond yeah and I'll do the um you want to do the um yes those y I'll do the I'll do the funds yeah and I think the key the biggest the change that people are going to Noti is the 25 so just some context to that and reminder of what the technology was because that's new this year so so I'm happy to present and read the operating budget if there's questions about it
199that I don't have at my disposal can you all come Ellen can you send us a fresh copy of the worn articles as they are going to be presented absolutely yes she's G not because we already signed I know but I I want to I have our old one with like exactly like you did this is the first one this is the second one and I I don't have the new verbage right no that that's why Molly was going to send it anyway yep right okay yeah and I'll make sure you all have it and also John Hayden sto me on my way out to make sure he needs it he need it yes he does Mr moderator moderator needs so you're doing the safety Bobby's doing the proposed budget yeah do so we did
200good we just had like talking points about each and you know present it and then that's it um okay is there anything else we don't need to go into nonpublic for anything we do not okay perfect it's nothing else other than to say the whole MLK thing oh I forgot thank you for bringing that up I'm sorry I forgot yes um just to say that typically um we had um done an annual new Fields MLK day of um event um service and I have been able to typically be um the leader of that I am not this year I'm a little bit overworked um but I do want us to at the very least consider maybe having um a space to do either some sort of drive or something where folks can drop stuff off
201at the school um during the day some window if it at all works for anybody I'm on call that day and I think I have to go into work but I can make myself probably available later on in the afternoon so what are your I'm so I can I have that day off I don't know what your schedule is Jenny I can maybe just figure out an hour a window that might be a good um window of time to be in the multi-purpose room and welcome folks yeah cuz we usually collect like cans and cans or Jack whatever we think maybe this year might be something relevant or donations to something yeah and we can how do we normally promote this just on the social medias uh Sue usually throws it out there it's it's
202in to or it's coming up 20 is quick yeah 10 days but actually people work generally pretty well with like a week and a half yeah they do the better the later the more they um as long as I have have an idea of what I'm doing and where I'm going I can definitely I'm working that day so you are okay I can I can definitely be there um would it be easier later on the day it does not matter I have the day off I weirdly have the day off from work can Jane and I communicate about time of this um we're not making board decisions we're not making board decisions no yeah so Jan and I will communicate and then we'll figure out the time and then we'll promote it and I'll just
203get su's General okay but I feel like yeah I'll give her the heads up that yeah that you will you both Circle back to me to let me know yes the plan and then I'll let Susie know yes yeah we can probably Circle back to you and Susie at the same time just like that's cut the middleman out you're a middleman but that's helpful yeah Circle back I just didn't want to not do anything I felt I did it even during Co I know we did something but I just wasn't able to get my act together in time so I don't have anything on the schedule I it's great it's a weird weird day off so awesome thank you yeah no problem uh just figure it out okay that's thank you for bringing that up
204I forgot about it sorry that I'm going to to adjourn us at 8:35 second thought thank God all in favor I I