001Yep, all ready to go. I'll jump right into the presentation. So what we'll do is tonight we have Chuck Omenoli and Rob Notley from New Road Construction Management. They are on the agenda tonight for an appointment as our referendum construction management firm, so I just wanted to have an opportunity to come and say hi and say a little bit about the company and their experiences with free tech and failures. Hi everybody, I'm Chuck Omenoli. Hi everybody, Chuck Omenoli with New Road Construction Management. I'm a principal at the firm and I'm the managing partner. Rob Notley is also a partner, there's four of us. The third partner who will be really in charge of your project is Southwest on a mission this week and he'll be back shortly but I wanted to come and say hello
002and thank you all for your support and I appreciate the opportunity to work with you guys. Congratulations, you passed a really large referendum for your district and you know it involves all kind of M&R work and it's a big deal to get that kind of referendum passed without support from certain groups or anything like that or specialty type things like gymnasium or track and field or things like that that are attractive to people so congratulations on that. We'll stand with you the whole time from beginning to end. There's going to be a lot of challenges along the way so we have to work as a team and trust each other. We've been working with FBHD's firm since it was Faraday, Thorne, New Madish many moons ago. I started my career in school business in 1988
003and my first projects were with FBHD. We built Hillsboro schools back then when they were just burgeoning with the student population and we did a ton of work with FBHD then and we've been working with them on many projects throughout the years and we're currently working with them on other projects now not dissimilar to yours. In fact we're at Clearview Regional High School District and they have a $67 million referendum and it's a lot of similar type of activity. We're very experienced in it. Rob and I have been together for I don't know 25 years or so. Very long time. Like an old married couple. We have quite a few people on our team with long tenures. My partner Scott started the business 40 some years ago and we're in the same building we were
00440 years ago and we'll be there tomorrow. We're not going anywhere and we're only as good as our last references so we look forward to doing a good job for you all and hoping to get your confidence and build your confidence and have your reference at the end of the day for future clients. I look forward to working with you all. Again it's not going to be easy. We're going to have some challenges. You're doing invasive work at all of your schools so at some point or another there's going to be inconveniences. We're just going to have to work through those and we'll do our best to navigate the process and give you the best bids that you can and make sure that everything that you wanted in the referendum gets completed. That's our mission.
005I'm happy to answer any questions. You guys can have my cell phone number and call me anytime. I prefer to deal with one person in the district so that we have a specific line of communication and a chain of command that we follow. We're pretty strict with that kind of thing but the principles are all available at any time and I think one of the things that separates New Road from our competition is the involvement of our senior level management in the projects. If it's not going to be me you're going to see Scott while he's here and he'll come to your board meetings if you need him to and the presentations will come to job meetings and support our people in the field with senior level participation. Any questions? Yeah guys the floor is
006open if anyone has any questions. Chuck thank you for the introduction and we welcome you to our district and looking forward to everything you guys are going to bring to the table. Thank you. Have you had a chance to see the proposed schedule yet or is that something we would start showing them after their appointment? We have had an opportunity to look at some of the schedules and the scopes of work that are going on. We haven't been able to really look at any drawings yet or anything like that and I understand you have a number of bids going out for work starting this summer and then into next summer and we look forward to getting engaged in the coming weeks and understanding what's really going to happen in those bids and we're going to
007take a look at them and do whatever constructability review we have time to do between now and the bid and FEHD with any comments that we had they can incorporate them into an agenda. So we will have an opportunity to influence the design packages but not that much because they're already completed. It'll be great to have you as part of the team. I guess the only thing I would suggest is don't hold back. Tell us what you really think about anything you see and let's have a conversation because we've already started looking at the schedule and as we kind of pointed out there's no clock on this really for us so we'd like it to be done right the first time so anything you see that don't hold back. Let us know your thoughts and
008let the team know your thoughts. The best advice that I can give the team now is to bid your projects early. Summer projects, there's real people that go oh we can get done in the summer. Well in the summer you have ten weeks if you're lucky. There's not a lot of time. If any of you have done kitchen renovations or additions to your home things don't happen quickly and there's problems that come up daily that need to be addressed and when you're putting millions and millions of dollars worth of work into a ten week summer you have to be prepared. The best thing you can do is bid early. You're bidding in March now you're pushing the envelope to get HVAC equipment in the schools for this summer if we're not bidding until March. Oh
009we're bidding in March. So that could be a challenge but as I understand from FDHD the packages that are going out today are not only for this summer but also for the next summer so we're anxious to see what FDHD has put into the documents to be complete this summer versus next summer because we want to make sure that the contractors are bidding on the schedule that we want them to take not the schedule that they want to do. One of the things that we need to look at right away is the bids that are going out now and see what kind of influence we may have on them. Thank you. Anyone else? No I look forward to working with you guys. I'm sure we will be in contact very frequently and I'm looking forward.
010Thank you very much. We look forward to it. Appreciate your confidence. Yes David. This is probably a question that's probably a stupid question but you're referring to bids so that means you're going to hire others to do some of the work? Is that what I'm hearing? Are you talking only about equipment? No we are the owners representative, we're the boards representative, your construction professionals for the project and what happens is the architect and the engineers will put out a design package will publicly bid it and bids will come in from general contractors, from paving contractors, from roofing contractors and then we'll help you all manage and navigate the projects through completion. So you sort of act as like a GC and others hire the project. We refer to us as construction manager as agent versus
011a general contractor. I'm just analogizing, I'm not saying you are, just my own understanding. There are go-between because ultimately at times there can be some discussion between the contractor and the architect so it's their role to step in and try to mediate any of those issues and to act on our behalf and for our best interest to keep the projects moving along, to assist with any issues that arise. They'll do bid reviews to make sure that things make sense, that there's nothing kind of wonky out there and also just keep the contractors on task. Part of their job is to make sure that they're keeping to their schedules and if they're not finding out why when the issues are reporting back to us, giving us updates, coming to construction meetings, we'll have periodic twice a
012month construction meetings basically until the projects are done. Our team will run those meetings and provide meeting notes from those meetings and follow up on the issue of details. When you guys go out to bid, who makes the decision on what contract the district goes with? Is it you guys? Is it the referendum people that Ryan's got on his team? I'm asking him please. So what happens is you're bidding under 18A and there are strict bidding laws in New Jersey and what you're going to do is give it to the lowest response bidder. So that's one of the other reasons why you want a construction manager because you are dealing with a low bid. You have no opportunity to negotiate a bid with somebody unless you do a co-op work. I'm sure some of this
013$150 million will be done through the co-ops. So if I understand right, you put on a bid for we say we need to get X job done and a company says we can do that for $2,000. Another company says it's $10,000 and somebody else says it's $12,000. We're stuck with the $2,000? Well is that your job to say hey this is why we can't take this $2,000 job? The team would definitely rally on that decision making process and we would publicly in an anomaly like that somebody made a mistake and that's when that contractor will raise his hand and say I can't take this bid I want out. Please allow me out of my bid. But if they're within 10% there's really not much of a question. They're going to take the bid. If somebody
014is 20% or so less than the group of bids or than another bidder it may behoove us to validate that individual's bid and make sure that they've got everything included in it and if they have everything included then we'll recommend that they take the job. But we wouldn't recommend somebody take a low bid that is ridiculously low and is going to do nothing but give us problems. So what's the magic number that says the review we don't have to do the lowest bid? Like what's the magic percentage? Is it the 20 like you said? Is it 10%? There isn't a magic number. It's really an individual thing and I'm sure we'll have these discussions along the way. Unfortunately there's so much work out there right now that we don't have a large pool of bidders
015on the project. So in the past we really liked to get six bids on a job and sometimes we're only getting two. If somebody is really much lower than somebody else they're going to ask to get out of the bid and then the discussion there is really do we keep their bid bonded on it? Do we want to argue that the point to get the bid on or do we just want to let them get out of the job? And that's where you really need a good construction attorney to be part of our team and to be able to give us advice on that. I appreciate it. I'm just trying to avoid a situation like when we went out for a bid for garbage a couple years ago and we had two drastically different ones
016and if we took one it was a possibility of a lawsuit. If we didn't take another one then there was a lot. You know what I'm saying? I'm just trying to get an understanding of by the letter of the law we had to do X even though a number might be in Y and then if we do X it can cause us to have a problem with Y. You know what I'm saying? It happens and every bid is a, forgive my language, it's a crap shoot on every bid day. Are we going to have a bid challenge or are we going to have enough bids or are we going to get a good low bid? Is somebody going to give us an anomaly price that now we have to deal with and vet the number?
017And you guys do all that, right? It doesn't fall on the district that's what we're paying you guys a percentage of the stuff for, right? Well you're paying the architecture percentage. We're just taking a fee for the services that we provide you with. It will be a team decision. It will be the architect, the construction manager, your representative and your attorney. Okay, thanks. Appreciate it. Thank you very much. The contractors who are doing the work, they guarantee their work and for what period of time or does that fall under you? No, the contractors are responsible for their work, they're responsible for the safety of their work, they're responsible for the quality and the completeness of their work. Our job is to help you guys get what you want from them and get from the contractors
018what they put out to bid. You know, it's going to be a little bit tricky but one of the things that we instituted and the architects have embraced over the years is a two year warranty period. So as far as a warranty, you'll get two years material and labor. So the contractor would be required to get a maintenance bond. Again, I haven't seen FVHD's drawings for this bid but if they don't have the two year warranty in which I think they will, we would insist on a two year warranty because what happens is you get your HVAC done right before school opens and then we have all these problems and then all of a sudden we start getting things resolved and then the heating season is over. And then we want a second heating season,
019that's why we want the two year warranty. We want to make sure the bugs are out of the systems. Anyone else? Your answer to her, two years is like the standard business model two year warranty? It is. The standard is one year, we've increased it and the people that we work with have embraced a two year warranty. But there's other warranties involved like for a roof you know you can get a 20 or 30 year roof and specifically FVHD drawings, they have a whole schedule of warranties for different things to floor tile and different things like that. It'll be more than two years for many of the components but the contractor who installed the work is responsible for two years. I appreciate it, thank you. And then it goes to the manufacturer I appreciate the
020clarification, thank you. I'm sorry, I need to keep you... No problem. Thank you for coming, welcome to the team. Looking forward to working with you. I just have one question. When you actually do get a moment and you do see the drawings and the plans and everything else, as a manager would you be able to give us any feedback or expectation of realistic deadlines, particularly for the upcoming projects this summer? In other words, if you can evaluate a project and take a good look at it and say, guys listen I think this is a real long shot, I think we might not make the deadline or you know, hey I think I have a lot of confidence in the architects, I have a lot of confidence in the prospective bidders, whichever one it might be
021out of the four, five, six, nine of them. But any kind of feedback, would you be able to give us any kind of feedback? Absolutely, yes. That's one of the things we want to focus on. We want to be successful. We don't want to plan for failure, we want to plan for success. If it's a six month job, we want to make sure that we have six months for it. With school districts, and I believe you were quite familiar with work with school districts, my father was a superintendent of schools for twenty years. I was on the school board in my town for eight years. I understand your roles, I understand what you're up against and the pressures you're under. We do everything we can possibly do to get schools opened on time and we
022really never have a problem opening up we have problems opening up schools but we always get them open. You know, like I said, if we're not aware of bids until the end of March you know, it's going to be a very busy end of August to wrap things up, especially with HVAC projects and that's why I'm anxious to see what FEHD's team has done with this split schedule where they're going to award a contract to somebody and they have an opportunity to do some work this summer and then an opportunity to do some work next summer. And some of the activities that doesn't really bode well. You get into it and you gotta get it done. So if I can get ten unit ventilators for a school then I can get twenty unit ventilators for
023a school. So it's just a matter of getting the equipment on the site in time to get it in place. What can you do, so to speak, without leaving the kids without some type of... We're new to the district so I don't want to be too aggressive but I can tell you that to make summers successful we often start early. You probably don't want to hear that but in many school projects when we're doing big renovations contractors will come in in the evenings, they'll tear down the ceilings in your corridors, tie up the lights, get the fire alarm system operational and we'll start roughing in piping and duct work and electrical systems so that when summer comes they're ready to go. And that is a little uncomfortable for people. People aren't accustomed to seeing that.
024It's something that your construction official would have to buy into. But most of them do and that really gives us an opportunity for success that sometimes it's difficult to have that opportunity when you're starting on June 20th and you've got to be done for September 5th or 6th or 7th whatever the date may be. So you may see us coming to you with a request to consider starting early. The contractors will be guided by their specifications requiring them to work in the evenings, work a second shift we call it. They come in at 3 o'clock, they're done at 11, they clean up we work with your custodians to make sure that there's no tools laying around or anything, that the desks are clean. It's a challenge but when you're replacing HVAC systems in the school
025in 10 weeks, that's a challenge. Planning for success is a big deal for us and that's the things that we will propose to you and then it's up to you whether or not you want to do it. There's pain points involved in implementing these construction projects. There will be pain points and I would encourage you to engage with the teachers and the staff to gain their support and their patience in what we do. Hopefully you're not into any teacher negotiations or anything during our times and we've become real targets of opportunity when there's negotiations coming along. But on that end I will say Ronnie and I did meet with the administrative team and Ronnie reiterated a lot of what you said to the administrative team. Alyssa was there I think Nicole was online. It's not
026going to be great and there's going to be times where it's not ideal for what you want your building to look like but you have to embrace it to get the job done. Yeah and the other thing that's going to be an impact to you all is how much summer activities go on in the schools. That's something that we're going to have to really consider because you're working in I guess just about every one of your schools. It's not like you're working in two schools and you have the other six schools to swing people into. If we're working in all your schools it's going to be difficult to have summer school. It's going to be difficult to have people in the building when there's noise and there's dust and there's impact to utilities and things
027like that. So there's a lot of balancing acts to consider. Once you look over everything can we talk? Sure. We can talk about that because that is something that I am concerned about and I want to go through with you especially as we start looking already now towards the summer. Yep, no doubt. Great, thank you Chuck. Alright, thanks guys. Where can you go? Have a good night. Have a good night. Thanks Chuck. Thanks Rob. And we are going into executive session. Yes. Can I get a motion? Jamie? Second? Santoro? We're going into close session at, what time is it? It is 7.50 p.m. for the purpose of discussing HIV summaries and the student matter involving student number 50, I'm sorry, 40505. We're going to go into the teacher workroom. All in favor? Any opposed? All
028noted. Okay, we're in close session. Alright, we're back and open. Changes and revisions? Anything else to add? Okay. Public comments? Anybody from the public who would like to speak, please come up to the mic. You have three minutes. Being that there aren't all public comments. We will move on. For board information, enrollment. Any questions, any comments? Board secretary certification. Good. Any comments, any questions? Moving on to action items. Can I have a motion and a second on H1 to H3? Jamie? And David Kane. Any questions? Anyone else? Kevin? Thank you. Mr. Berber? Yes. Mr. Green? Yes. Mrs. Hurd? Yes. Mr. Kane? Yes. Mrs. Lucas? Yes. Mrs. Berese? Yes. Mr. Santoro? Yes. Mrs. DeCetti? Yes. Dr. Waller? Yes. Motion carried. Thank you. Okay, action items business. Can I have a motion and a second on I1
029through I19? Mr. Green and Christine. Any questions? Anyone? Kevin? Mr. Green? Yes. Mrs. Hurd? Yes. Mr. Kane? Yes. Mrs. Lucas? Yes. Mrs. Berese? Yes. Mr. Santoro? Yes. Mrs. DeCetti? Yes. Dr. Waller? Yes. Mr. Berber? Yes. Motion carried. Thank you. Curriculum J1 through J6. Can I have a motion and a second please? Jesse? And can I get a second? Kelly? Thank you. Any questions anyone? Yeah, I just had a couple. First to finish up with the explanation on J13 for the difference of $0.97 between substitute teachers? I'm sorry, which one? That's K. I'm sorry, well then J2 with the Anne Frank, is that the right one right then? No problem. The J2 with the Anne Frank exhibition right in the middle of the school week, is that going to be distributed around all buildings? Are they
030going to be all teachers, administrators, like how are we going to pick the lottery of the 20 staff that get to go on that wonderful trip? If you may recall, last year we did a similar type of professional development to Ellis Island and we targeted a K5 population for that. This is actually for the middle school, specifically ELA. If we don't get enough persons interested, we will then trickle it down. We are in the process of getting sub coverage. It's an amazing experience from what we've been told and we're fortunate to have title funding, so it's not coming from local district funds, it's coming from federal funding and it aligns with our district goals and curricula as you know. But yes, we will make sure. It's at the most 15 teachers, which is not any
031different than what 20 staff were including supervisors in that as well. It would be relevant for some of our admin to go to have that background knowledge. 15 is our limit for a typical professional development day, so we are staying in alignment with that. That's typically the number we can accommodate with substitutes, give or take the absences that are also happening for other reasons, but that is something we are able typically to coverage when we have advanced notice. So 15 staff and 5 administrators? It would be 15 teaching staff and about, yeah, 5 because it's up to 20 persons is what we're aiming for. You're welcome. We're actually very excited about it. I have a motion and a second on personnel items K1 through K17. Jesse? Any second? Mark? Thank you. That's Jesse. Now we
032go back to K13. I was just trying to find out the difference like why teacher A on 13 was $9.97 different than C. I guess there's a difference when you're certificate eligible or certified for 30 credit. So if you're neither and you're a 30 credit substitute that's approved, like is that that's obviously a different rating than the 115? That's what I was asking. So the substitute rates were just waterproofed on the December 17th meeting. And on that meeting it did differentiate the substitute teacher credential. So that's the 115.36 rate and then a certified teacher is the 125.33 rate. Can I add something? I have the pay rates which you can look back on if you wanted to. So as Shannon said, the substitute credential is the 115.36. Substitute credential, if somebody has worked 60 days
033or more, there's an increase from there, correct Shannon? Okay, that rate increases to 125.33 so the more you work you then get that increase. And there's the teacher with the New Jersey instructional certificate. That jumps up to the 125.33 and after 60 days subbing there's the New Jersey Certificated Instructional Certificate and that jumps up to 170.34. That answers my question. Thank you for that. Thanks. Jody, I just have a question about the 60 days. Does it have to be consecutive or is it 60 days in general? It's a total of 60 days worked. It could be a half day or it could be a full day, but after they work 60 days. Not consecutively, correct. So when we were tight with the budget, one of the things that Shannon and I at the time looked
034at was when we decided we weren't going to put the teachers on guide, how to honor if they were in the district for enough time, and that was where we came up with the 60 days. So it was just an enticement to work in our district versus someone else's when you get 60 days. It all makes sense now. When you look at it at the 997 that's why I was like, behold. So I appreciate the clarification in the 60 day cabinet. Thank you. You're welcome. And it's nice to know that Shannon, when she does her substitute training right before school starts, she does a lot of work, which you may not even realize you get the dates of that, but she actually acknowledged the staff members who had those 60 days as an extra incentive.
035Like we do with the kids, right? A big thank you to them. You've got a big thing ahead of you on March 12th with 15 subs. I do have to say it's a team effort. Rosie and Kraus does an amazing job with the substitutes. It puts in a lot of hard work with them. Any other questions? Thank you. Mr. King, yes. Mrs. Lucas, yes. Mrs. Birdsy, yes. Mr. Santoro, yes. Mr. DeCetti, yes. Dr. Wallace, yes. Mr. Ferber, yes. Mr. Green, yes. Mrs. Hurd, yes. I get a motion and a second on L1. Jamie and Christine. Any questions anyone? Mrs. Lucas, yes. Mrs. Birdsy, yes. Mr. Santoro, yes. Mr. DeCetti, yes. Dr. Wallace, yes. Mr. Ferber, yes. Mr. Green, yes. Mrs. Hurd, yes. Mr. King, yes. Motion carried. Okay, those are our action items. Moving on.
036Other business. Anyone have anything they'd like to bring up? No comment today. Thank you. David and Dave. Anything? Mr. Green, no. Jamie, I apologize. No, I'm good, thanks. No. Yes, so just a question. So our next board meeting is February 4th and that's also the Monmouth County board meeting that's virtual with Senator Vopal. So is there any way to move our meeting or no? Because right now I'm looking, we had possibly the hearing, we had possibly two presentations, but it's not an action meeting. It may become an action meeting, it's a hearing, but right now it's not an action meeting, so it would just, moving all those people, I would have to make sure that they're all applicable to that. Right, because I didn't know if any board members wanted to take the opportunity to
037sit in with Senator Vopal and perhaps have some questions for him. It's a great opportunity and I'd hate anyone to have to miss out on it. Do the times align completely? Like they both start at 730? 645 Vopal. Why don't we take a look and see if it's realistic to try a little bit? With Christine bringing up the county, I know that they signed a thing for applying for official offices for the county level, so there's a reason for that. And then are we keeping the delegates the same for this year? Yeah, so Christine continued to be the county delegate. Correct. I was just talking about both, that way people would know that you're the county delegate. With that, we're going to have a meeting for negotiations in this upcoming year or something, is that
038going to be coming up or who's going to be doing what? Yeah, so we started reviewing and just didn't finish, finalize the different committee members. No, no, not at all. But that's going to get circulated, I would say probably by tomorrow. A couple of people did reach out with a couple of requests, not too much, but obviously we'd love to try to accommodate anything if anyone has any specific wishes, but otherwise I think we have it pretty well ironed out. I don't think there should be any issues. Kate? I just want to remind everyone that Melissa did send out the financial disclosure forms, so please try to get those done as quickly as possible. We actually have been making some good progress in getting them turned around by the county, so the sooner we get
039them done, the sooner we can certify the list and be moving on to other things. Thank you. I have nothing new, just wanted to say a great job by Dan earlier, it was awesome. I came in thinking that the construction company that we were hiring was sort of like the lead construction company. Like they were the company that was taking the lead on actually doing their work, but I think, I didn't understand now I'm gathering that they are just kind of like the overseers of all of this? Is that right? What does it mean? Can we explain that? Like I didn't get that even over the last few months. Can we just explain what they're doing in New York? There's actually a new state law that any construction project over a certain dollar threshold now,
040you used to be able to have one if you wanted a construction manager. And like I said, they really are an agent of the district used to settle and resolve differences between say the architect and the construction companies that are actually, you know, awarded the construction contracts. By law now we have to have one in place given the size of our referendum. So we had to engage, that's why we really waited until the referendum passed to go through the process of creating the RFP and getting it out because it didn't matter if we didn't pass. So we went through the process, we did the RFP, they are our professionals, they are our agents, they work for us. And what they do is I started to answer this earlier, we have to by law put out
041construction units. So our architects right now are in the process of putting out all these packages, these big packages, roofing, paving, beach back. Later on as we get into the construction of the addition, they'll bundle with that some more of the other trees. There's five prime trees. They'll bundle in like the electrician and things like that because some of these things are, don't touch upon everything. They don't really need to be involved when there's a roofing project. So they package them up and we have to put bids on the street. And basically what we'll do is say these are the drawings, here's the design specifications, here's all the requirements, these are plans and drawings and schematics and all kinds of front end specifications with legal requirements. We'll put that out on the street, we'll get
042bids back to us as of a certain date and time. Once those bids are returned to us, we have a public bid opening. So I will sit at the front of the table upstairs in the conference room and we'll have a bid opening. More than likely we'll have several of the contractors there. Once I open the bids I will read off their cost. Construction, unlike professionals, when we hire our professionals we have some more latitude. We can basically choose whatever we want. Cost is not always the determining factor. We can make it the determining factor but it isn't. When it comes to construction bids, cost is the requirement. It's the lowest responsible bidder. And by responsible bidder it means it meets all the criteria outlined in the bid specifications. In addition to being able to
043do the work, there's a lot of regulatory stuff. They have to have the right classifications by property management at the state level. They have to have affirmative action documentation. They have to have maybe 20 different items pre-qualified in the area of the work being done. Once they meet, I'll look at that, the architect will look at that, and if we need to we'll have Bruce's office look at that. I had a clinic called the other day and Chuck touched upon it. We may want to have a separate construction attorney just approved in the event we do have any issues with conflicts or with challenges. Because once we open the bids and go to award it, a vendor could still challenge. And we could say, well we're not going to view the lowest responsible bidder but
044we're not going to award you. That would bring on a challenge which could result in a lawsuit, which could result in a stay at work. So we want to be really careful in how we do that. I mentioned when we go Wemrock, we had a low bid for electric work. And it was fine in the beginning, there was no way under any circumstance that we could disqualify that vendor, that construction company from doing that work. Unfortunately about half a year into the project, came up belly up and just disappeared on Friday after no one ever came back. Which caused us a year's delay in the project. We had to go after their bond. All of this, there are bonds in place. There's construction bonds, bid bonds, there's maintenance bonds, a lot of insurance stuff goes
045on in the background to help protect us. But once you start getting a bond company involved, they're protecting their own interests, we're protecting our interests, again the construction management firm will help negotiate with that and keep the projects moving along. We're a little better off now because we don't have individual primes. We have a general contractor now. Before you had to have one with electric, one with plumbing, one with HVAC, one with structural steel, one with general construction. They had five different contractors on every job. Now we can have one prime contractor. I'm not sure that I understand what they're doing, just real quick. I just feel like they're like a middle man to something that we could be doing. But you're saying under the law. In the past we could have an architecture firm
046that also offered construction management services. It has to be independent of the architect now. It can't be anyone that works for us, and it can't be anyone that works for the architect. It has to be independent construction management firm under the law. And they get a percentage of every bid? Monthly fee. You mentioned affirmative action data. What does that constitute? Is that what I assume it is? I don't want to assume anything. There's language they have to sign off on. They have to have an employee information report. There's several documents they have to have filed with the state that they have to give a statement of. So it's what I thought it was. As long as they have the documentation in place, they have to be I'm asking if the affirmative action data coincides with
047DEI and that type of thing. That's what I'm asking for. Because you mentioned that and then you said 20 other documents. I'm asking if the affirmative action data is what I assume it to be. I can forward you the language. It's standard. It's just a standard form. Actually, if you ever get a purchase order, if you look on the back of the front page of our purchase order, all the affirmative action language, every vendor we do business with has to have notice of that affirmative action report. Do you mean affirmative action or do you mean non-discriminatory? That's what I'm asking for the clarification between non-discriminatory and affirmative action. Is it one or the other? Is it both? I can send you the language of the program. Ronnie, can I just add, I can't believe I'm
048going to say this, but I actually think the state made the right call with the law because the construction manager, I feel like, is going to have experience. I mean, you look at Jeff Lascaux. He's fantastic. He's our maintenance guy. But is he ever our maintenance supervisor? Has he ever overseen a multi-million dollar renovation of this magnitude? Probably not. Your construction manager, I feel like, comes to the table, I should say our construction manager now, comes to the table with a skill set that I don't think anyone in the district has. And that's why I said to him tonight, be honest. He's our guy now to say to the architectural firm, there's no way this is going to get done by September. And based on his knowledge and experience, okay, what is a more realistic
049schedule? That's a hypothetical. Our architectural firm is very good as well. I personally have faith in them completely. I just like having this other independent entity that's saying, hey, we do this all day long every day for 25 years or 40 years, no matter how long you've been doing it, and this seems a little wonky. Here's what we think. To me, that's a huge benefit. What they'll do is they'll have during, when we get into the construction phase of things, they will have part of the bid specifications for the general contractors will be to provide a trailer, a construction trailer at each site. They will work out of that construction trailer and they will be here every day. They will be on site. They will bounce around between the projects. They will be looking at
050schedules. They will be checking the quality of the materials and equipment that are going to be used. They'll be verifying that they're managing their, the state requires Department of Labor, there's manning reports that have to be filed. They'll review that work. They'll make sure that that's all good because we are going to, I guarantee you, as soon as we break ground, we will have unions, the locals coming in and saying they want to see our manning reports and our labor reports because they want to make sure that their union employees are being treated fairly and that they're meeting the proper wage rate for the county, for the classification of the workers, that they have the proper foreman, the proper journeyman, they'll look at all of that. We'll have people in our office at least once
051a week looking at stuff like that. It'll be the electrician's unit. It'll be the steel workers or the sheet metal workers or structural steel. We'll have them all in at one point or other. And just a follow up on the, a possible construction attorney, would we have to do an RFP for that? We can reach out to, because it's very specialized, we can reach out to a few. I planned on talking to some of my colleagues. I have engaged them to see who they're using and that would be a starting point for us. And then we're going to bring that to the referendum committee as a suggestion. The construction manager state has a contract that we need to review. The architect had a contract that we need to review. And just having someone that's a
052specialist in this is extremely helpful. Yeah, I mean that's my initial thought you should get. I mean if it's not covered under our sort of umbrella. If it's not covered by Bruce Padula's firm, then maybe we get I mean, Bruce has people in his office that do property stuff. I mean Dante is involved in property areas, but I don't know if it's specialized in construction. Typically these are highly specialized attorneys that deal with just construction. We had to engage one when we built one rock and then the contractor defaulted. We had to work with a specialized attorney to work with the bonding company and do everything in the right order and keep everybody moving along. I'm hoping we don't need one. And it would be on kind of like an as needed basis based on
053an hourly rate. And if we engage them, we call them with a question, they're going to bill us for hours. If we don't need them, all the data. They're going to happen and never use them. Exactly. But I think it's better to be prepared. It can be quite short. Just to echo what Brian I don't know, Brian's on the line. To echo what Brian had said, I do think the state made a good call with the project manager slash construction manager application because managing the scope of work using general contractors in different categories where you're going to have projects that have to turn services on to the building done and off. There's no way that I don't think anybody on the board will be able to step on their backs and really keep their grinding
054to keep the project done on time and then tie it in with the other contractors as well. And to the second point, he actually just raised about the construction manager. Is it wise to engage them early so at least maybe we can have some input on contracts? I want to do that. That's what I just spoke to Nicole last week about getting that process started. There's contract language in there that maybe could protect us later on. In the event we do have a... Well right now, Bruce's firm is reviewing all of the contracts. I did send up Chuck's contract. I did send up the front end specifications that Bruce's firm sent me for... Ted's firm sent me for the... The bid specifications have technical specifications which is like all the design part of it. Like
055the drawings, the schematics, the layouts. And then there's also what they call front end specifications. That's all the legal stuff in the front. How many people they have to have? It's more about the documentation that I spoke about earlier. Having a New Jersey Business Registration certificate. Having proper classification. DCP&P, DC, Department of Property and whatever. Prequalifications. There's things called uncompleted contracts. The vendor can only is only allowed to have so many outgoing, outstanding contracts at one point in time. So we'll check to make sure that when we add our scope of work to that number that they're not over their allocation. So there's a lot of little nuances. But Bruce's firm has been looking at all of that. So it's not like we're just signing stuff and sending it out. But I think to have
056a specialized person might be a good idea. Just in case. So when we say we look at all these, that's you and the construction manager and Jeff, right? And Nicole? What do you mean we? You're the one that said we. When we look at the contracts, who is we? So the contract from the architect Ronnie and I looked at and we sent it to Bruce to get it back on. So when we do the bid reviews and we have the construction people and this people and that, who is the we? We keep saying we. Who is we? So all of this falls under actually Ronnie's department. I will be engaged as the superintendent. So Ronnie and I will be looking over everything with the construction manager. Most of the construction manager proposals did say like
057either monthly meeting or weekly meeting or bi-monthly meeting with the two of us. And then we will share everything we know with the referendum committee. They'll also write the summary, progress summaries of our reports. Well yeah, he said he'd give us meeting minutes. We'll have plenty of construction. I just didn't know if this was going to be like when we did the referendum committee and Ryan gave a brief to all of us, right? I'm under the, Anthony tell me if I go too far. I'm under the subject matter expert for the board being engaged and getting briefed on this stuff too to brief us. I mean there's no one that can probably answer more of these questions than Ryan can. Let's be clear, the whole board is involved. No I understand that. What I'm saying
058is are we going to continue like we got the updates from Ryan when we did the referendum committee and I know Ryan's going to stay on that new referendum committee. Like Ryan will be able to see and talk in these conversations when we say hey we are going to do this. Like Ryan gets to be part of the we group, right? Yeah, in other words I would imagine during the process, right, as Nicole and Ronnie are very engaged with the construction manager and the different contractors, something comes up mid-week, you're either going to be addressing it probably to myself or to Ryan specifically if it's related to the referendum in terms of updating him on certain changes or things happening. Updating, yes, but some of it's under the administration of the district which falls under
059Mike. No, I'm not trying to have any, that's why I said Anthony, if I'm asking for something that's way outside of our purview or nothing we need to do like things. And I'm not going to be approving the contracts, you're going to be approving the construction contracts, you're going to vote on every one of them. You're going to see, just like I had on tonight's agenda for the construction management, the scoring matrix, you're going to see the different amounts that each contractor bid and their alternates and whatever and that's what we're going to base our determination on, me, the board attorney, and the law, because the law is going to specify, we have to pick the lowest responsible bidder so in conjunction with that, that will all be on an agenda that you're going to
060vote on. It's not like we're going to be doing stuff without your knowledge or without your approval. No, I understand that. What I'm saying is, like when I go to delegate assembly and the delegate assembly talks and I come back and say, hey, this is what they said, blah blah blah, as that person on the board. Like Ryan should know this stuff, and Dave, right? I'm not completely out there, am I right now, Anthony, in what I'm asking, right? I'm not saying that I want Ryan in every negotiation, I want Ryan in this, like I want Ryan's eyes. Stop saying my name. I want people to know that this is your thing. I want to bring two things to the table. One, everything that we have done, we have shared with the referendum committee, but
061there's nothing we have shared with the referendum committee that you haven't seen. Whether it's through my weekly updates, I mean I shared with you the scope of the plans and the drawings. Didn't say there was. I want to make sure I clarify that. I didn't accuse anybody of hiding anything. I'm not saying. I'm just saying that throughout this process we've been very transparent, we've been very transparent with the public at these meetings, we've been very transparent with the referendum committee and with also my emails that I send regularly with anything that has any kinds of plans, any kind of updates. I sent you all the schedule, the proposed schedule, I sent you all the design plan for the addition, so everything that we know we have shared. I didn't say you didn't. I'm just reiterating
062that Ryan is on this committee. I understand that there's Ryan and Mark. He's chairman of the committee. He's the chairman of the committee. That's the reason I keep referring to Ryan as the chairman and you're the president. That's what I'm getting at. I'm asking, if I have a question when we say we or we have this thing here and I'm asking the questions, there is a person that's the subject matter expert that's included in these discussions so that we're not talking with all nine of them. If I have a one off I can say, hey Ryan, what does XYZ mean? Like Ryan, you're the chairman dude. That's why I keep saying Ryan. If you have any questions about the referendum, definitely call Ryan. Totally on board with that. I concur. I'm trying to see if
063you're ready to ask a question. I have a question for the managers and the attorneys that you talked about. Are those costs going to be covered by the referendum? It's called soft costs. Hard costs are your actual construction costs. Soft costs are things like your architect, your engineer, your bonding attorney, our financial advisor, that kind of stuff. Anything that we need the bond council to get the actual bonds sold. That's all part of the referendum. It's all been accounted for. Anyone else? Thank you. It is cold. There's a breeze coming down. There's a new age right here. Ryan, let's go. I just wanted to make sure that every bit spent on the page, all 100 pages of every one of them, is going to be sent to your copy. Great job tonight by the orchestra.
064Thank you to Lucy, Mr. Mueller, Ms. Tice, Marca, thank you for having us. All of the children did a fantastic job. That was fun. That was entertaining. Thank you for that. Nicole? First, just because I have you all in one room, if we do decide to move the February 4th meeting, the next February 11th is the presentation at 6 o'clock for Ryan's story at Highbrook. If you haven't been there, I totally recommend going. I don't know if you want to do the board meeting on the same night as that presentation. Then the following week is our presentation, is our next board meeting. We'd have to go off script on a Tuesday and possibly do another day of the week. I don't know how everyone's availability or how they feel about that. That Thursday the 6th
065is the Men's Winter Sports Awards. If we were going to do it the same week, it would probably have to be Monday or Wednesday. If you want any input, I am unavailable. Me too. We may have to keep it on the boards due to... I think it's going to be tough to try to move that. That's why I wanted to do that with everybody here. That's one. That was not on my list. Two, I was asked to give update on how everything would be for the therapy dogs. We did use the therapy dogs in the ESY program for the last two years in a row. This summer, the therapy dog visited five times. His handler is actually, or his owner, I don't know what you want to call it, is actually a resident of Penelope
066and Township. Each time he visited, he met with four classes. We offer this to the individual schools as well if they're interested. For the most part, the dog lays down in the classroom with the children in return. I just want to give that update. Is there a plan to continue that? Bring them back in? To expand the program? We will continue to bring them into ESY. As far as the full class experience, only one child can read to them at a time. So, if you bring them into the classroom. Are we planning on utilizing the therapy dogs for emotional or behavioral part of the program? The agents that we're using like the reading. I think they're preferences. Do we have calming rooms or zen dens? If a student needs to either go to a calming
067room or to go to some other facility or area, like a zen den or something, are we looking to utilize a therapy dog in a situation where a child may have anxiety, for example? It would be difficult to do because then the dog would have to be on call. It's a volunteer thing. We also have consent forms. Even if you scheduled, this dog is going to be in this building, schedule appointments to make the rounds and utilize it just for reading, but for other things such as anxiety. It's what the dog wants to do. The dog wants to be read to. This member of our community who has the dog, is this what she uses the dog for outside of our district? Yes, he goes to other school districts and they read to him as
068well. I can see if he's open to other things. If he enjoys, then let him do that. She does this individually. She's not part of an organization. It is part of an organization. They all just like to be read to. I've been involved with dogs who are utilized in situations where there's either trauma involved, anxiety involved. If it's a day or scheduled monthly, it seems to have happened. Nicole, just to piggyback on what Christine said, if we know they're coming and we have the consent forms, I'm sure the guidance counselors or child studies team probably have a list of children that could benefit, that does have anxiety on the regular or whatever, could that dog not go to that classroom and let those kids read, even if they're still reading to them, get that benefit
069if we target the right kind of classrooms? I could look into that. That might be women. Dogs happy, kids are happy. I'll get to it. Negotiations, we did meet with our new board attorney for negotiations on Friday. We went over everything, got across the date with our process. At our next meeting, I should have the scattergrams ready. Shannon's telling them to make. We'll talk about negotiations. I plan on doing that probably the next session so we can start moving forward with that as well. Testimony, last Tuesday I did provide testimony on the school funding formula for New Jersey. There was about 100 people in the room for attendance. Board members, superintendents, business administrators, and just community members and other community representatives. Each person was allowed three minutes to speak. Most districts got up and discussed
070the struggles and the cuts and what they've had to eliminate and how hard it is to do their education. Some even had suggestions for the states to look at to change the school funding formula, for instance, increasing aid for special ed, increasing aid for transportation, increasing aid for security. Different areas where the costs have increased, but our funding formula has stayed flat. I did speak on how I went kind of a different approach and I did it intentionally because one of the things that I wanted to get through is that seven years ago when this came into play, our district was very creative on what it did. We did look for ways to balance the budget. We made a ton of different negotiations with staff members. We looked at everything differently and I wanted that
071to come across. I feel very often districts go up and they say, we're going to have to close, we're going to have to do this. We're out of money. But they never talked about what they did chew up into that point. And I think it's important for the state to realize that we did do our part. And that's what I said. We did our part as a staff, as a district. We did our part as a community. They passed the referendum. They did pay. Everyone on our end has done everything possible, but we're done. Every trick we had in the book is out. And it's not from lack of trying, it's from the amount that we've gotten cut. Since 2009 we have 38% of the funding that we did in 2009. Well, nope. We funded
07238% of what we were funded in 2009. So we've lost 62% of our funding from 2009. So I even mentioned the fact that gas prices have almost tripled since 2009. So when you look at someone that operates in their own fleet, if gas prices have tripled and our funding has decreased 62%, it's not sustainable anymore. And I also talked about how radar districts do it. I thought that was important to say. We've done everything that the state has. We've done grants. We've implemented mental health. Six of our seven rated schools are at the top 10% of schools in New Jersey. We're done. We have nothing left to give them. It's your turn to fix this and fund us like you should. So that's kind of the position I took. And one person got up and
073spoke and it was very interesting that they talked about how right now our districts are up there in the room where S2 districts are. Districts that lost funding at S2. Because they're seeing the biggest pick. But as long as the funding formula keeps people flat and as long as taxes increase 3% or 2%, and the health insurance, which I did mention too, is increasing by 20%, and prescription benefits are increasing by 30%. Every district in New Jersey is going to be in this situation. And I think even the construction manager was talking about how he works with a lot of school districts for similar projects. And you'll see especially this cycle of voting. There's a ton of districts locally that are going out for referendums. And that's because districts literally cannot afford the payments based
074on funding formula. And I think that was very important to get through. So that's just about the testimony. And then minor nurtured heart training, parent workshop students on January 29th at 6 p.m. If you need email again, just let me know. We can resend it to you. And just to reiterate, because I like to highlight our students when they do well, I sent you an email on Friday that we had six students that the other one honorable mention, second or first place in the New Jersey Association for Gifted Children Contest, two work for art and four work for writing. And I just want to say, you know, a few years ago we went to the board and we said we want to open up GT. We want to get rid of our academically talented program
075just at Lafayette and really get a more inclusive GT program that is at every school. We would not have had all these winners because they came from all different schools had we not done them. So these are some of the things that you see when you change things up and you implement something new that is more inclusive for every student and at every school. So it was great to see. That's all. Alright, great. Thank you for that. And thank you for attending the hearing and speaking on our behalf. That means a lot. I think that's all we got. Our next meeting is February 4th. And can I get a motion to adjourn? Jesse and Jamie. 9.42pm. Thank you. Have a great night.