001is uh mechanical systems ventilation systems upgrades at Alice gra which will include replacement of the gymnasium uh air handling unit and the unit ventilators within the classrooms in the 1963 and 1968 wings uh those unit ventilators are brid to the building 60 years old um they will be replaced in kind with the capability of adding air conditioning and providing air conditioning within those spaces uh if we have the electric capacity but they will be designed for to incorporate the air conditioning if if we can um and hopefully that project will be started this summer also and uh be finish for September back to school also been working in the last year on a building condition survey and uh New York state had mandated in 2000 they developed a program requiring all school districts to uh

002take a critical look at their infrastructure um complete investigations and then as part of that program they they developed a uh checklist for building items and the rating system and then a procedure to submit that data to to the state um in 2020 they modified their program and originally started on a every fiveyear schedule in 2020 they modified it to stagger the submittal from districts throughout the state um over a 5year period Elmsford was scheduled to complete theirs in 2024 um we completed that in the summer of 2024 going through all the buildings evaluating all the systems and uh completing the checklists required by the state um that resulted in ratings qualifications and it really looked at systems and defining them as satisfactory non-satisfactory failing or critical failure um all of the buildings with in

003elmford were graded at satisfactory um all systems were functioning tically critical failures on any health or safety items or any major structural elements um there were some things we did find and working with the facilities and I will be working with um the administration to look at these items and develop them into a program for implementation within the next uh years as they fit within the the program so there there were some sidewalks that needed to prepare some retaining holes some Paving some masonry elements on any buildings of this vintage you're always going to have some repair and some some portions of the building that need repair uh there were some door elements some older doors at Brady and Dixon that are Beyond news for lives are not functioning the L that need to be

004replaced and those items um will be starting to develop and putting them into capital or maintenance plans to be uh addressed in future years there are also some larger items looking add the uh the anticipated life of certain elements that will be working into replacement timelines for instance other Roofing that has not been repl Place recently like the the 2000 we at Grady will be worked into uh future future projects and upgrade of some of the mechanical or electrical that hasn't been upgraded in the recent projects that were finished here um and great uh the district has been pretty diligent in maintaining and upgrading a lot of mechanical systems and Roofing in the last 10 years boiler systems have been replaced in the high school mechanical system have been totally refurbished within the high school

005boilers were replaced at Brady Roofing was replaced in all areas except the 58 L here at the high school and was replaced at the main building here in the gy we at the high school and now we are now moving to gran the there so most items have been kept up well obviously really resulting in that satisfactory conclusions at the completion of the building position survey another item that that's always been an issue in a lot of the older buildings is handicap accessibility throughout multiple spaces we're always looking trying to upgrade those and and provide uh equal access to all spaces within the facility um the other part of the state mandate was for districts to develop a 5-year Capital plan we're looking at items that are addressed are identified in the building condition survey

006and then putting them into a plan for implementation uh within the next five years and really forcing districts to take a critical look at at the projects and try to develop funding initiatives or funding sources to to implement those uh those projects also part of the 5year plan would be any programmatic issues or programmatic items that the district would want to look at to try and uh increase the the educational facilities and the um Library Renovations were mentioned in the superintendent's report and so we'll be looking at those items um some of the safety issues items that aren't generally part of the building addition survey but that the district will be developing into the master plan with the 5year plan we're looking at implementing those and coming up with it ation strategy to get that

007work done in the next 5 years so in the next few months we'll be working with the administration and with the board in prioritizing those items developing into the 5year plan and uh sure in some of the upcoming meetings we'll be presenting those those plans that's it for my presentation thank you turn it back over to uh thank you John um quick comment if you've been in the main office here in Alexander hton there's a poster on the wall about tell these seven habits of affected people one of those habits was begin with the end of mind so I can picture it now I can picture our facilities I can picture projects work has to go picture of everything being you know where where I am Vision but it's not just a it's a collaboration

008with board members it's with our Administration and staff and the community to forge an agreement on how to go forward uh with projects the timelines it's important to remain pragmatic about these projects because any of them can only be done in July and August and keep in mind that the community C program and sum School many other things we still Happ and um you know there's uh timelines regulations safy protocols a lot of things to take into account with projects and so just so that we're all on the same page I think we're going to move forward and I think uh this district is going to be great uh we going set the table for our children and our learning environment and u of the physical plan and the investment that the community has in

009their abilities so thank you very much for time and the opportunity to speak about facilities and to present to you all thank you [Applause] okay thank you for that presentation um we're on it keeping up with uh our facilities and it's never look better it really does look good it's made a last pression come up to the school flowers parment lot these are these are good for steps and we've got the other projects going so I appreciate that thank you guys for your hard work okay so we're going to move to item number 10 on the agenda which is approval of the minutes um do I have a motion to approve the minutes which takes us from 10.01 to 10.02 Second all in favor post from the January 2 okay we have one obstain on

01010.01 for Mr dintino um that being said um we have a motion in a second and all in favor correct position okay motion carries uh we're going to go to a 2minute session recognition the audience at 3 minutes each so we're going to open the mic it is now um 7:51 and uh feel free to come up one your time please good evening this is uh Mr Rogers um in response to the uh building inspection report um interesting enough almost 10 years ago to the day we went through exactly the same exercise with presentation by for IND D'Angelo uh after that a capital Improvement planning committee was formed which included members of the school district and members of the community including Mr uh I was wondering if the same courtesy will be extended to this

011community at this time again if we're talking about $9 million plus of taxpayers money and would expect the current board Administration to be able to offer that as another cap Improvement commit committee beening for the next 5 years for our children children in school so is that on the agenda to be discussed to form committee to form a committee to of the community so answer will I will I expected to receive an answer so the answer is no you're not going to form a committee so you're not going to give me an answer okay so we to see the follow okay all right very good thank you good evening everyone my name is uh Denine Robinson good to see everyone this evening and um thank you so much for the facilities recording um there have

012indeed been various things that need to get done around the school and um as uh it's already been said it's looking good so thank you um in particular we heard a lot of good things about the the parking L come back um however I have a couple of questions um said just a few minutes ago that um you all received a satisfactory evaluation on um I guess the inspections that were done in the schools so I was just wondering I know that the greedy School in the past had a problem with the gy there was absolutely no heat in the gy so I was wondering how when the inspector came whoever it was came how do we get a satisfactory um um evaluation when there was no he we were in I was in there

013briefly um when we had the phographer taking pictures for the the students for the um yearb and the kids were freezing so so I was just wondering about that um perhaps we can get um um a comment on that at some point also um I'm wondering there was a comment on um air conditions there's a lot of things that I'm hearing that are being done outside the buildings which is absolutely terrific nobody's disputing that they're needed but there are some things uh that some additional things that need to be done in the buildings and one of the things that I want about and asked previously is about air conditioning in the classrooms now I did hear somebody say the other gentleman said that it's something that's going to possibly be done um I've heard the

014kids complaining in the summer times it is brutal in those classrooms so um I would like to ask if you know further evaluation can certainly be done on that and if it can't if we can get AC's and um Central AC can we get larger unit uh window units uh just to make it more comfortable it's very hard for students to um to be able to concentrate when they're sweating um you know so uh that's my comment on that and then um my usual comment is um I love everything that's being done to the building but I really would like to see a detailed plan I'm not sure if I missed it at one of the meetings that I might not been in but what are we going to do in the classrooms uh of

015course we um we want the outside to be beautiful but we do indeed want our classrooms and the education that we're providing to be um um uh above uh average so we'd like to see that as well thank you okay there's no further we're going to move on um to number 12 um just a note for everyone who comes up to the podium that if you would like to leave your email with um superintendent young you will get a form reled response or you can email her directly um with direct questions all right um so we'll go to purchasing and finance which goes from 12.01 through 12.07 but we are going to take out 12.06 we're going to table that um for future discussion so we're not going to be making a motion on 12.6

016so okay second okay all in favor oppos motion carries so when I ask for approval it would be 12.01 through 05 and then 07 so do I have a motion to approve as am second all in favor oppos motion carries moves us to item number 13 which carries us 13.01 13 through [Music] 13.09 do I have a motion to approve second all in favor oppos motion carries and with that I would like to thank and congratulate um our two teachers uh Laura Wan and Lori Schultz who are put in for their retirement um so I just want to thank them um and wish them all the best calling forward um they'll be recognized later on in the year but since they're on the agenda I just thought it would be nice to thank them for

017their service okay so we're going to go to 14 superintendent's personal recommendations not instructional which is just 14.01 do I have any motion to approve I [Music] motion agreed second as well all in favor opposed again I agree with uh Dr philps on that Mark so we're going to move to item number 15 uh it's 15.01 through 15.06 but we are going to table 15.05 for tonight so do I have a motion to table 15.05 sove second okay all in favor okay opposed motion carries that's for future discussion um so we're going to be voting on 15.01 through 15.04 and jumping to 15.06 do I have a motion to approve second second all in favor opposed motion carries and with that um do I have a motion to adjourn tonight so second all in favor

018opposed motion Carriage we are done thank you all for coming tonight have a great evening get don't see