001We call the order at 6:00. Gary, can you take the roll? Scott Fischer. Here. Dennis Keeney. Here. Denise Brewster. Here. Linda Grassi. Here. Lori Carnesky. Here. Stand for the pledge, please. Pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all. So, notice of this meeting was given in accordance with the provisions of bylaws 0164B of the Riverside Local Board of Education, which was adopted in accordance with section 1.450 of the ORC and the Ohio Administrative Procedures Act. This meeting is a work session. And uh the work session is to address the uh capital improvement plan. And um I will read the policy 7100 facilities plan. The Board of Education recognizes that careful, prudent planning is
002essential to the efficient operation of the schools and that planning must be grounded on accurate data. In order to assure that future district improvement supports the educational program in response to community needs, the Board will prepare a capital improvement plan and will revise that plan periodically thereafter. So, what what the uh capital improvement plan has been known as up till now is the 5-year facilities plan. But, our policy says it should be the capital improvement plan. So, we'll we'll make that change to follow the policy. And what the Board had voted on last year was instead of the Board preparing the capital improvement plan, the Board voted to designate that responsibility to the superintendent. And part of the reason for this this meeting and and then the uh a future meeting to approve a a
003future capital improvement plan is to correct that and then operate uh according to this policy moving forward. So, I just want to make a note that I did consult with legal and we were in all we were very much in the right my uh right path to go ahead and appoint our superintendent to do that. So, although the policy says that, we do have to approve it and that's all that we needed to do. So, there was nothing wrong with the way we proceeded and I just like to point that out. Well, thank you for pointing that out. And now with the capital improvement plan, um any thoughts, ideas, uh alterations or changes do you have in mind, Ms. Carnesky? Dick, you called the meeting. I thought we ask you if you have any ideas.
004You called the meeting. I again with find what I voted on the last time. Okay. So, Ms. Grassi, do you have any thoughts or ideas that you would like to add or change? Specifically, I just think that the um plan as presented did not reflect what the community had requested and what they had and what their input and what the community survey input recommended. Okay. Thank you for that. And so, what we know is that a lot of work was done and a lot of a lot of input and a lot of work was done and and we know we're moving forward with an eight-classroom addition at Riverview and we have a Buckeye uh improvement project which includes an addition and gym and work in the Buckeye building and Mac Elridge building. So, those things
005are set. Um there are other items in the plan that that we can look at and um and possibly make some changes. And uh Mr. Keeney, would you have anything you would want to add? Uh not at this time. Okay. Ms. Brewster, do you have anything that you would want to add? Um I know um under the Buckeye addition on page what's it? 13? Yeah. Um it says that this project will include revitalized interior space of the original building with modernized classrooms, two lab spaces, media center, cafeteria, and gymnasium for elementary learning. I just want a little clarification on that because specifically, when you talk about the two lab rooms, are you talking about the '90s addition? Yes. Yes. So, those are those two rooms. That is actually taken word for word. Um I didn't
006actually give credit to it, but it came from my asking board of education from that. Right. So, that was their description of the Okay. So, the media center is the current library. center is the current library. Okay. And um the current cafeteria which also serves as a gymnasium. It's a Yeah, it's it's a multi-purpose. Multi-purpose space, correct. Okay. All right. Um so, the gymnasium as it said, you know, that they were with the addition of eight to 14 classrooms, grades 3 to 5, kindergarten specific rooms, meaning that they would mirror what Parkside and Riverview have in terms of additional square footage and they have uh bathroom in the room and a utility sink. Is that what it means, kindergarten specific? That has been the standard of our kindergarten classrooms which are larger than our typical
007elementary classrooms. Okay. All right. And then the gymnasium added at Buckeye, um with that also, cuz I'm on that committee right now, um it's my understanding that um there would be a stage in there because you're the plan to renovate the the multi-purpose room that serves as a cafeteria gym right now would um possibly have an expansion depending on I don't know. Um the way it was constructed, whether you could expand into the area of the stage. I think that's some things that we are looking into as far as whether we can take that stage out to make it more cafeteria space. Um looking into kind of what that would Is it Is it cost-efficient to do that? What it would What it would take. We know that the floor is is hot. So, we
008would assume that some other things um are also debate probably the entire floor. So, that not that that's not a recommendation. It's It's if you're going to go in and do the work, that's not a bad use of funds. Mhm. Um but I think that's uh I don't know That's something that the architect would we'd want the architect to get in and look at. Uh we've had some of those conversations. And then when you put the the stage in as the gym, uh we've taken a look at some of what that looks like and what the court looks like to be similar with the other two newer buildings. Uh similar size. That gym is much smaller. So, put a similar size gym in um Mhm. or some of the same resources as well. All right.
009Sounds good. Uh Mr. Arlessic and I had a short conversation and and um in discussing the cafeteria gym at Buckeye. And the stage right now is raised and so the idea uh is that it could possibly be cut down to floor level and have that floor continued and if you have to abate the floor, of course it would be a brand new floor anyway, either way. It would be uh the time to do that. So, Mr. Arlessic was going to have just take a a look at it to see if there's any bearing walls or things that we have to deal with and and certainly um you know, that's the thought that that would be expanded such that you would have sufficient cafeteria space over there and and then of course you'd have a new
010gymnasium. So, right now that's that's a possibility that that could handle the uh cafeteria space that would be needed. So, um yeah, so that's that's one thing that that's being looked into. So, uh another item that that we're looking at is um the the immediate needs, uh most of that work uh has been or is being done and um really what we're looking for are intermediate needs, short-term, meaning 2 3 years down the road and 4 5, maybe 6 years down the road. And so, what does that look like? And um as with any plan, as you move forward and learn more information, things change. And um so, in looking forward, you know, what are the possibilities and and um I think that um there are many possibilities, right? So, I We've presented a number
011of them. Right. So, there are options and and and different possibilities that can occur and a lot of it comes down to uh what is our wish list? What are our needs? And then how much money do we have? And um Not enough. As with most of us, It's not enough. we have to make choices, right? So, uh yeah, so looking into the future, what are we going to do? And one thing that when I came onto the Board in in talking with our former superintendent uh Cayless, uh he Jim mentioned to me that his biggest lament in leaving was he was never able to get the eighth grade out of the campus. And what I would say is everyone that I talked with said that's probably you know, the biggest thing. The eighth graders
012probably shouldn't be here. Do you agree with that? I'd say that that's um we either need to put them in their own building or treat the high school as an 8-12 building and not an 8-9 or not an 8-9 or a 9-12. We've talked about both and I think that's kind of ways to ways to look at it. There are more schools who are doing non what you would call non-traditional configurations because they're actually seeing decreased enrollment. Um where our enrollment's staying consistent. If we could uh get eighth grade out but keep them on site from an or from a efficiency standpoint, having your secondary so 7 through 12 kind of on the same in the same area makes a lot of sense. Uh you you have classes, you have students to go up uh
013travel up through a grade accelerator and you have sport. You would cut down on sports and gym spaces and all that. So that's that's one that has come out. Obviously, we can't add another grade to this facility. Um adding on to this facility, I don't necessarily other than CTE, I don't think is a is a realistic expectation by any means. Um but I think in moving them somewhere and move putting eighth grade and transitioning to somewhere with that's a either a 7-8 building or a 6-8 building or a even a five We've talked about a 5-8 building, something like that. It it does make a little bit more more sense. There's always we can weigh positives and negatives to to any plan that's out there. Um it will we'll make it work. So I think
014from a from a standpoint from an instructional standpoint, eighth grade teaming makes a lot of sense. Um I think that's something we we are looking at doing within this this section that we have. Um but Mr. Hawk had taking a look and thinking about it a little bit different. Uh we've done that We've done that prior and then we had to make some cuts and we brought them back more in the high school schedule. So it just depends. Can I can I interject? I I have two questions. So first of all, we we have this facility plan in front of us and we're we're sitting here talking about things that quite frankly, in my opinion, we should have done before we accepted the facility plan. Like we're going back and we're reviewing the facility plan
015and saying it's really not a facility plan. What do we want to do? I thought that was what this facility plan was supposed to do. Number one. Number two, we had a plan to get the eighth grade out of this campus. We had that plan when we asked the community to support a high school and a new middle school on this campus. We had that plan. We had that plan previously. So sounds like we're rehashing the ideas that we had previously. Um and that we're sitting here in a meeting going to rehash this report because now it's not good. You You just passed this. I'm confused. Okay, so we're looking for a path forward. When you say you had a plan before, I wasn't on the board at that time. Uh is that the plan
016that was put to the voters that the voters rejected? Yes. Okay. So obviously, that didn't work. So now we have to go ahead and create something that will work and that's what we're doing right now. This board is in the process of fixing things and we need to move forward and and and take care of those things that need to be fixed and that'll be one of the items. Now, of course, that's going to be years down the road. We have our hands full with three projects right now. And there's not too many school districts that have three projects going on at the same time. And so You don't even have funding for these projects yet. me for a second here. So I appreciate your your interest in interjecting but please wait till I'm finished.
017And so what we're looking at doing is we want to execute these plans. We want to execute them with great success and then we want to look forward to see what else we need to do to satisfy the needs of the district with the whole goal. The whole business that we're in here is education. We want the students to have everything that they can have that we can possibly give them so that they can have the best educational opportunity possible. So that's the goal. And so as we look forward, some of these thoughts are all on the table and I would just want to put a a basic dollar amount on that. In looking at it, depending on what's done, the size of a building or buildings or whatever it might be, um it's going
018to be a substantial amount of money. And and so I think we're looking at between 15 and 20 million dollars in the future. And the whole goal and just for everyone here in the room, anyone that might be watching or listening, uh one person on the board, myself, my thought and my idea of that goal would be to do everything out of cash flow. Very important. Don't go to the people for any more money. Everything is out of cash flow. The people voted for a permanent improvement levy, which is continuous, right? And that was in what, 2015? Yes. So with that, we get 2.7 million dollars and that will grow a little bit. Not a lot, but it'll grow a little bit to 2.8, 2.9, possibly 3 million in the future as new houses are
019are being built that aren't part of the TIF agreement. Um so anyway, as as we move forward and and we we utilize that that permanent improvement levy money that the taxpayers are already paying. Very important. Utilize that money to do all of these projects. Now, the Riverview project is being paid for with cash in our permanent improvement fund. We've already discussed that. Um the we had Mr. Purcell, right? You invited Mr. Purcell to come and offer ideas of what kind of money could be borrowed as we need it. And so we would be looking at borrowing off of that permanent improvement fund. No different than what a person does if they're going to do home improvements and they borrow off of their future earnings to to pay for those. So that will be taken care
020of in in the near future after we get all our costs together and we know exactly how much we need to borrow. So that'll be done and then we can look into the future. But right now, at least one one board member's perspective is that we are not going to be asking the people for another tax levy to do permanent improvements cuz the people have already voted for that and are giving us the money to do the things we're doing. Our job is to take that money and use it as effectively and efficiently as possible. Every dollar should be spent wisely to satisfy the needs of the district. And that's part of what we're doing here. Just taking a project that's already been developed and refining it a little bit. And so this is a
021first step. This is a work session and we put some ideas on the table. We have some discussions. We've already had some. And so that's the reason we're here. So Ms. Grassi, did you want to add to that? I sure do. So we have not yet agreed as a board. I don't believe we've ever had a resolution on this table to agree to pay 5 million dollars in cash for for the Riverview addition. We haven't had that resolution to appropriate those funds for that. Um number one. Number two, we can't leverage all of our PI funds or all of our future PI funds for things such as construction projects when we pay for things like buses, technology, band instruments and other infrastructure improvements out of our PI fund. Plus we have um if I recall,
022a field turf that's probably going to have to get replaced and we'll have to take some dollars out of the PI fund for that cuz we don't have enough set aside for that. So we can't we can't just cart blanche say that we're going to leverage our PI funds. I need for folks to understand that. We can't we can't leverage all of those funds. Well, I disagree with you cuz I've run the numbers and maybe I would like to hear from our treasurer. I'd like to hear from our treasurer. run the numbers, maybe you haven't. And and certainly, we can discuss that if you'd like. I I think it needs to be discussed at the table. It does need to be discussed. Not what like It's not an if. It's not a question. That's what
023this table is for. Okay. Well, one of the things I wanted to say is that on page 19 of this plan that was initially approved, it talked about funding the plan. And there were conversations with our treasurer, Mr. Placko, um about the permanent improvement money. And in the short term, that, you know, it talks about, you know, how we would leverage those permanent improvement funds. And it wasn't to drain the fund and use every dime. It was to use a very um like a portion of those funds and still leave money for the buses and for other things that we need. But it was to be able to make the payments over a longer period of time. And it was my understanding, Mr. Placko, weren't you meeting with him again and getting some more information?
024We're working on putting something together for the borrowing for the Buckeye So we're waiting to hear the particulars and that's the COPs Yes, certificates funding. And and just for everybody, COPs like what is that an acronym? It's It's an acronym for certificates of participation, which is the borrowing we kind of reviewed. It's basically a lease type of lease back type of borrowing arrangement that was explained during the December meeting that we're looking at for the Buckeye addition. Okay. Um you know, some of the challenges are we're, you know, we have the Career Tech and the Riverview additions underway and design ramping up on those. And we haven't gotten the true cost estimate from the estimator from the design what was all the design. So, you know, that's a concern to make sure that when those
025come in and or we can hopefully there's no surprises, but you never know until you know. And so, we're waiting for those numbers to come in, which we won't have for probably another month or so, maybe longer. Um you know, with the Buckeye addition right now there's conversations on what the scope of that truly is going to be between what we're adding and what we're doing inside, which obviously that scope thing that we ultimately land on could, you know, vary that borrowing amount a lot. So, we also had discussions about the length of time we borrow for. Obviously, the longer you borrow for the lower your annual payments are and what's the best strategy there. So, there's a lot of moving parts um to really, you know, to finalize and, you know, until we have
026those those estimates until we go out to bid and actually get those hard numbers, we don't know for sure what those numbers look like. So, there's just some caution there. Um just being cautious of we don't want to get too far down the road and go, oh no, now we need to value engineer and take things out that we you know, which is always a hard process of taking things out of what you want to do and you end up with something less desirable. And caution is also as we bandy around a figure of $20 million, that's a lot of dollars. For just a little bit more than that, you could build a whole new elementary school. So, I take issue with that. I also feel like we're not taking into account the current climate.
027And if something were to happen and we lose funding in some of our grant funds, we're going to be in a world of hurt. And I think we need to we can we need to consider that because if we tie up PI funds and we lose money in IDEA funds or title funds to some degree, we have to be prepared to be able to find those dollars somewhere else because it's not like we're going to cut those services. And so, as a result, like there's a lot at play here and I think we're we're we're missing a lot of information. So, permanent improvement money is for buildings and buses and things like that. Can't be used in general fund for title for this that or the other, right? We can't use that That's correct. We
028can't use We can't use permanent improvement fund for things that we would do in general instruction purposes. I understand that. However, if we're looking to put general fund dollars into these projects because we can't bandy up the amount of financing or funds that we need cuz we don't even have cost estimates on these projects yet. I I worry about that. Yeah. I worry about that. And that is something that we should be concerned about. Mr. Placko, what's the unencumbered I was looking on my reports I can't find it easily. What's our unencumbered amount in the PI fund today? The at the end of January it was it was 4.7 million because of the architect contract and owner's rep contract we signed recently. So, we're still waiting for our tax advances to come in. They're coming
029in I think today actually. So, the number will go back to probably closer to six um here in the next month or two. Right. So, thank you for for that information, Ms. Grassie. And as we look at the dollars and we look at the cash flow, one thing that we need to be clear uh is to not confuse the general operating fund and the permanent improvement fund. The permanent and on that. Excuse me while I finish. I know you want to interject, but please wait till I'm finished. So, the money in the permanent improvement fund is permanent improvement money. And so, that is not general fund money. That money is not used to pay teacher salaries and benefits and administrator salaries and benefits. Okay, that is used for permanent improvement and that's what we're talking
030about here. Okay? Those monies are not mixed. Those are two separate accounts. I'm sure you're aware of that. Yeah, I just want to make sure that I'm sorry. And Ms. Grassie, please please don't please please don't please please do not interrupt. I'm just sorry. Just wait your Just wait your turn. Just wait Just wait your turn. Why do you want to interrupt? Because you don't have to explain to her how it works. She has a treasurer. Excuse me, you can wait. Okay, my goodness. There's a protocol. Um so, anyway, those are two different funds. Okay? And so, the permanent improvement fund is used for permanent improvement. Okay? And and right now we are looking at approximately, cuz it fluctuates, but as money comes in we're looking at approximately $6 million in the permanent improvement. Right
031now it's 4.7. But it'll be $6 million in what? 45 days? Approximately. Approximately. Right. So, uh part of the projections on the cost of the Riverview addition included the uh architect's fee, right? And you're saying that's already been encumbered. Okay, and that's what 325,000? Uh jeez. It's probably somewhere around there. I don't know off the top I believe it was 325,000. So, when you're looking at an approximate in in the idea and looking at that space, the approximate number was about 5 million and in using a little bit higher estimate to try to, you know, try and make sure that you know, you're not having to reverse engineer it at the end of the day and and and take things out. Um $325,000 of that has already been encumbered. And so, and we will have
032approximately $6 million. And and so, we don't have to go through every line item right now, but uh Mr. Placko, the treasurer, we and I have had this discussion in the past. How much do we need in the permanent improvement fund to pay for Chromebooks and buses and different things like that, right? And so, we we know that we have enough in there to to do the things we're doing. And and and we're doing these things in a way that's very responsible. So, as we move forward, the next step on the Buckeye addition and and project renovation, which would include Melridge, that would be looking at getting a loan. Um it's technically the table? Mr. Placko, technically that's a bond, right? The loan. It operates like one. Yeah. So, so when you look at when
033you look at borrowing when you look at borrowing that money in the future, that money would be off of revenues and and a certain percentage of those revenues would be accounted for the payments in the future, which would leave the operating money for the buses and the Chromebooks and the other repairs we needed and the turf that we're looking at in the future. And so, we've had some of those discussions already. And and so, um as we look forward to getting finalized numbers, that's Ms. Grassie, when we will identify the exact amount of money we need to borrow and and what that looks like in our cash flow. So, have we all had conversations? Have we had a resolution to approve additions or improvements to Melridge? Did we do that? I don't recall any of
034that. I've been to every meeting. All right. So, the resolution can only be done okay, when we have the number that we need. We don't have that yet. And we haven't borrowed the money yet. So, there's no resolution yet. This is This is in process. going to ask again. Did we have a resolution to make improvements to Melridge? Let Let me May I say something? We we did give authorization to uh uh the architect to uh proceed with uh improvements to Buckeye and Melridge. So, that was approved. To both? Yes. That is one project. And so, when you say to both just to be clear, that's all rolled into one project. So, anyway, as we as we look at uh what we're doing in the future, uh we're we're looking at uh a lot of
035the work that's already been done. And and as we'll go back to what we were talking about, uh and you're right, Ms. Grassie, $20 million, that would pretty much be a whole new school. And so, that's what we're talking about here. Whether whether the options were to build it on campus, right? Or over the Lamuth. We We do have the property to do that. And so, we have opportunities. And so, what do those opportunities look like? What is the best uh What are the needs of the students and what's the best way to utilize the money and to satisfy those needs? And that's what we're looking at. So, what we're in the process here is refining refining this um capital plan, the five-year facilities plan, so that we can uh be a little bit more
036identified in what we're doing. There are a lot of options in here. And uh tonight is the first step towards that and we're having a discussion. Some items have been brought up and uh Ms. Brewster brought up some clarification over at Buckeye. And I'm I would like to talk about Lamuth a little bit. Uh so, Superintendent Rotino, if we are looking at Lamuth, uh and we're looking at what I figure might be approximately 5 years. That could be here. It could be Lamuth. But for for the sake of this conversation, if we were looking at at Lamuth and we were looking at taking the eighth grades eighth graders uh from the campus and moving them to Lamuth. And at that point in time, the most likely scenario is we're going to have enough students flowing
037into Riverview to where we're going to need the fifth grader space, which would um bring the fifth graders from Riverview and Parkside over to Lamuth, which would satisfy uh desire that people have of having the fifth graders together and that would also open up another four sections four classrooms over at Riverview for the the new students coming in from the developments. So at that point in time you would have four and four four from Riverview four from Parkside. You would have eight classrooms moving. And then and right now Lamuth is packed full. There's not one single classroom available, right? It is it is full. Right. It's sardine time. Yeah, we're it's not sardine. I mean so it's movable but it's it it's as full as it was six eight years ago. We've had some we've
038had this these numbers before. Yeah. And so we're maximizing our space, right? definitely are maximizing. That's the way to say it. We're doing a good job. So um all right. So that's good. And so if you look at the eighth grades um the eighth graders uh we have uh the needs of approximately 16 classrooms right now. Now some of them are a little bit split, right? You have you have some usage where some of the kids are split into not full classrooms right now, right? Um can you restate that a little bit? We have some of our eighth graders who are so pro- programmatically our eighth graders are taking high school courses as well as eighth grade. Uh they they have the opportunity to take it take a language. So if the language uh they
039have an opportunity to take uh coding or you know some of those So programmatically some of the programs would have to change um and what we offer as well as potentially even um graduation requirement. There's some unintended consequences potentially moving them off um algebra or eighth grade math is one that they that's a big one where our accelerated students take algebra. So there's a I think eighth graders can earn up to I don't want to say three or four high school credits. So I was talking with Mr. Hall and he said that not all of the eighth graders are in a classroom classroom. They're split up sometimes and sometimes you need other spaces. I I'll have to get more clarification. Okay. So anyway, I was just taking that at face value. So how many eighth
040graders do we have? This year it's a small class. So it's about 250. But we're closer we're I would say we to be on the safe side we want to plan for 325 kids. Right. That's what I was figuring. We were we we were 300 plus to 300 35. if you look at historically our enrollment we've always kind of settled around between 3 and 400. About 450 was our highest when we were open enrollment. But even when we were really full we were we were about 400. I would have given trends and all that I would say it's safe to say we're going to be about 350 to bank on. And so we've been steady for what about four years on enrollment now. We've got this So we've got a dip in seventh and eighth
041grade but then below that we are pretty steady number but What I'm I'm talking eighth grade Consistent Yeah, holistically we are pretty steady. 4100 or so plus or minus. Absolutely. Which is which is against the state national trend. Right. We're growing. Yeah. And and We're not growing. We're staying. We're Okay, right. We're staying. So Everyone else is shrinking. We're just staying. Right. Right. And I say growing cuz I'm looking at all these houses going to be built and we're going to have an influx of students. And so uh we're preparing for a little bit of growth. And so when we have declining enrollment and we have ascending uh enrollment because of of the developments um we have to do our best planning, right? And uh and that's what we're doing. We're we're trying to accommodate
042the space that that's needed for that. And then in future, you know, what are the possibilities? And for certain sure some of these things some of these things are going to change because there's going to be more information that changes things. Um but if we could look into the future and we figure we're looking at about 325 plus or minus maybe even up to 350. How many students are in a in an eighth grade classroom right now? So it depends on the class you have anywhere between the schedule but we try to keep them around between 25 and 27. All right. On an average an average class size changes. So if you're 25 to 27 ideally okay? And we're not that we want to push it a little bit to 20 well when you have
043a larger class size like if you have a bubble class those class sizes just get larger. You know, it's just it's it's a scale of economics cuz you can't just add one teacher. You have to add a So let's say we were at 25. Okay. Okay. And let's say we're at 350. Mhm. Okay. We would need 14 classrooms. Sure. Perfectly. Yeah, perfectly. Yeah, perfectly. What's perfectly? need you may need more. So in that a little bit more I'm thinking okay if you need eight and we had 17 or even 18 uh to accommodate the eighth graders and and maybe some additional space uh for whatever it may be labs or whatever. Uh you're looking at probably 25 26 classroom. And if you looked at today's dollars at $500 a square foot um Mr. Plecko that's
044the top end right right right now, right? I mean you were back to 400 years ago then 450. Now if you want to be safe you're figuring 500, right? I would say 500, yeah. Yeah. And so if you're looking at 500 uh and bump that up to 26 then you know you're at uh 13 million already, right? And so then you're going to have other needs cafeteria and things like that. So I just wanted to give a general idea of you're looking at dollars you're probably looking at a $20 school as Mr. Grassi would put it. Certainly it's a it's you know it's almost a school. So whether you look at it as a uh an addition or a school it's it's certainly going to be a large amount of money. So in looking to
045the future I think that's probably five to six years out and uh that would be the perfect world that we would be able to accommodate that. And again the the whole idea in the planning is to not ask the people for another another dollar of taxes. Uh we'd be doing that out of cash flow and uh again getting the most out of the money every dollar. We want to get the most out of every dollar we can. So uh just wanted to put that on the table because as we look through this and we look at what the opportunities are that's one possibility. The other possibility would be doing something here. So so if we did something on campus how many classrooms would you think we'd be looking at? We would um in terms of
046to build a new school or in terms Well, if you were building something on campus how would you configure to this campus itself? Well, on the property. I to on the property I would I would look to build probably a a secondary building whether it's 7-8 or and do you keep them with more 6-7-8? Something to that aspect. That's not a $20 project. I know that. Uh cuz you have a lot more infrastructure you have to put in there. There's all that um thing goes with it but that would be from a programmatic standpoint that that would be kind of in in efficiency standpoint you can run some efficiencies through that. I also think building our campus provides us opportunities to partner with other organizations to make this more of a hub. Um it's a
047little bit more centralized than Lamuth. The pro- the concern not it's not a problem it's not a problem but I I concern we'd have to work through at Lamuth is Auburn Road um and getting the additional students and parents and traffic flow through Auburn Road um and all of what that looks like and how you pull that that traffic in and out uh as well. And then also we've partnered with like Concord Youth Baseball in a great partnership with them. They've done a lot of work to the to that side of the property. But when you look at what we've done and what we've rendered for prior bonding going back to the '90s we we found one from a middle school that was designed there that failed by I want to say it was 20
048votes or 30 votes. Uh I don't remember the exact numbers but it was because of a lack of communication of where we're going to move the baseball fields. So it is very important to partner with our you know our organizations to look at that. But I think I think putting it at at Lamuth gives you some great opportun- absolutely some opportunities to move eighth grade physically out of here and put them keep them in the middle school. I you gain some of that with a 5-year seven middle school too. We still have that 3-year span. Um but then having something up here gives you opportunities to partner with and maybe add some additional not like community facilities but also just school shared facilities in a partnership like Willoughby um you know Willoughby City will be
049the YMCA and The Willoughby South Yeah, Willoughby South complex or even the North complex with the Arts Center and what they've done. They've done some pretty good partnership with their communities. I think Painesville Township and I know Concord as well but they are both really amenable to partnerships and working together to provide opportunities for our stakeholders. And when we look at all of our non-students who attend schools um to have those availability might be a plus as well. So if you were building here on the property um how many classrooms approximately? I'd have to get back I You're putting me on the spot for that. Quick quick math. I would I would guess I think a middle school's typically approximately Yeah, we're looking at probably 32 for a middle school. And then of course you're
050looking everything that goes with it. Yeah, I mean you're looking it's expensive. They've um I think they're I think 60 million I think I've seen for one recently that was completely I'm sorry, you said how much? 60? When we were going to put up the middle school, we it was 185,000 square feet. Yeah. Do you not remember how many classrooms that was? not. All I know it was 185 square feet or 185,000 square feet. 185,000? I do I do have a question though and maybe maybe Gary or Mike can look this up well with cuz I can't find it. Um I just want the dates on when we approved Riverview and when we approved the Buckeye addition. I'm curious. We added Melridge mechanical, electrical, and plumbing, but I don't remember approving any of that at
051this table. We never had that conversation. It did get into the approval of the then design um for design services when we increased their fee to 785,000 and we did that on January 30th, but that was the first I had ever heard of anything that was going on at Melridge. I left this meeting on on that date on January 30th I questioning when when did we approve Melridge? I had never heard of Melridge. So I just want to kind of know what what our agenda item when we approved the Buckeye addition, what that said cuz at that time that did not include Melridge. So so we're asking then design to provide us with design services for something we didn't approve at this table to do. I just want to know how that process works. I've
052been on this board for 16 years. This is like I've I've never come across this before where we've actually hired a design firm to do work for us for a fee before we've agreed to even do a project. So we're adding it. Just I'm just asking. I would like clarification on that. I'll I'll throw something in. There's there's a lot of things with the original Buckeye building and the Melridge building that are unknowns. We need their professional guidance in telling us exactly what's going to be needed at those facilities. I I understand that. Before we move forward with doing anything We we are increasing their contract to 785,000 dollars and we approved that on January 30th. The board approved that. I believe I voted no. But that was approved to include Melridge mechanical, electrical, and
053plumbing improvements. So apparently there's a project down on the books that we're asking them to do something for that we didn't approve and I want to know when we approved it. All I'm saying is those studies need to be done before we can make a decision on what we are going to do. We need that professional input to let us know exactly the scope of the work and the cost of the work. I I'd like to know what the Buckeye resolution said. The Buckeye resolution was approved on December 19th. Thank you. That was a The Riverside Local Board of Education hereby approved the forward of the building approximately 12 classroom addition plus gymnasium addition on the Buckeye Elementary School. And and all right, and so all of a sudden on January 30th we we approved
054or there was a resolution on at this table for Buckeye and mechanical, electrical, and plumbing improvements at Melridge for then design services in the amount of 785,000 dollars. What are we asking them to do and when did we approve doing it and when was it discussed at this table? We didn't discuss it. We never even discussed it. It didn't even come up as a report from buildings and grounds. It was an unknown. I left this meeting utterly confused. Where did Melridge get into that picture? I'm just asking. I would like some clarification on when that that discussion happened at the board table. We could talk about all the rest of this stuff till the day is long, but we're we're not we're not actually discussing what we've already approved and projects we've already got like
055sitting here on the books that are we doing them? Are we not doing them? I don't remember a resolution to approve that. So going back to when when uh we discussed on September 3rd at the board table. Okay. Items that we were going to do and then you put out to the public that we never discussed it at the board table. And then in a buildings and grounds which you were a board member of in the committee uh a rendering was put forth. Right, at the last 5 minutes of the meeting I saw a rendering of Riverview and I remember saying where did that come from? And you said that that had never happened and then later you said you agreed that that happened, but you said there was no discussion to your memory. There
056was no discussion. There was no discussion. what what I'm saying what I'm saying is that the board table has discussed items. Um I know that you continue to refute those items. But uh we are looking at accomplishing projects that are much needed by this school district. Some of that information needs to be developed before we have a formal resolution to approve a dollar amount. And and some of that needs to be developed uh and investigated and information gathered from from parties that that would have that information. I would I would like to ask Before we could go for a an actual loan amount, okay? The members of this Board of Education and our administration, when we discussed Melridge at this table to determine whether or not we were even going to ask the architects to
057do work to design something, improvements to something, when did we talk about that at this table? Okay. So Miss Grassie, we're moving forward on items and So you're not answering. If you if you have a formal question or complaint, please send it to me by email. No I'm not sending it by email. We're doing this in open table. That's what this meeting is for. going to go back and look at months of minutes right now, okay? I would I would like I would like some on record when we discussed that at this table, Melridge. Well, thank you for that request. Thank you for that. Okay. So uh when we're looking at the possibility of doing an a school basically here on the property or we're looking at the possibility of doing something over at Lamuth.
058Um I know that when I had previously looked at what the possibilities were of location over there one of the topics that was certainly at the forefront were the ball fields. Can't eliminate the ball fields. eliminate the ball fields. And and then also we have the parking and the flow of traffic. Okay. There's there's and and the neighbor in the neighborhood behind it is the ball field. And the neighbor that the driveway goes way back to that house, right? Uh not so much that one, more on the Allison Creek. That neighbor has also been a great neighbor. Okay. So you're talking about the houses really to the south. Yes. Yeah, the Allison Creek development kind of moving towards the back in some of those. Okay. And so then they that's still the same question of
059the parking lot and the flow of traffic. The the parking lot and flow of traffic has always been a with the way that Auburn Road is set up being a narrow road with lake on one side um and really steep uh culverts on the other side. There it does need it will need to be addressed in any type of expansion cuz when at drop off and pick up to some extent even here at all of our schools we struggle with that, but Lamuth is one that definitely struggles more than others and if you're going to add students, we have to at least do some studies to justify first you make changes to that. I think that's that's our prudent nature to take a look at Right. And that road is a little different. There's a
060lot of traffic different. There's a lot lot of traffic here, but it's basically flat. It yes, that's that's not a flat road. Over there you're coming up a hill going down a hill. And and so that offers its own challenges. Yeah. And so you know, these are all of the things that have to be considered when all of these things are being considered. And and um Right. And so then you have you have some opportunity in the front of the school and and to the right of the school as you're facing it. So there's some opportunity, but then the question is do you have one in and out or do you have two? And and then how much traffic control would be needed to handle that? Ideally in a school setting you have a separate
061drop off pick up for buses than you do for um cars especially in a school setting where you have a lot of bus riders. The high school we don't have as many bus riders as you do at all the other schools cuz some of our students are driving. Not that that doesn't change the danger involved with a parent of a teenage driver, but if we do have a separate we have a separate student entrance here as opposed to that. I think having a separate I think it's prudent to see if you can design a completely separate closed loop for buses and closed loop for cars if that's possible. Right. And so I think we have the opportunity to do that. There are people smarter than I am who can figure that out. So well, I
062mean what I'm saying we have land that we could probably accommodate. We do. I I think we do. I think we have that one entrance that's typically gravel that we've never paved. Um if we looked into paving that and making that our we could definitely explore into it. I think that's a that as as if we were to expand any more, uh you're increasing your staff cars, uh you're increasing ultimately everyone who is showing up. It would behoove us to definitely look at traffic patterns, traffic flow, design and improvements to not only the building but also the grounds that it sits on. Talking about Lemuth, right? Yes. Okay, so you know, I looked at just some you know, enrollment numbers latest ones and they're all pretty consistent but right now Lemuth has about 31 classrooms
063if I count correctly. I don't know but around 31 classrooms and it handles half of the fifth grade students, sixth and seventh. Third? Third and fifth grade. There's there's yeah, they're fifth graders. The way our fifth grade is set up is roughly set up in the thirds. Lemuth actually has about 100 um Parkside has about 90 and then Riverview has a larger class this year about 105. 110. So, it's about a third. In in any given year it's a third. Okay, so right now there's around um 914 students. If you add it okay. Well, right now you have around 705 students at at Melridge. And that comes out to about 22 23 per classroom. You know, if you just did straight math. And if you added fifth grades from Parkview or Parkside and Riverview that
064adds another couple hundred. So, that would take you up to close to 30 per classroom which you know, you really don't want. And so, that would require the addition of some more classrooms if you were to do that. If you added the eighth grade over there along with all the fifth grade students that would put you up to around 38 per classroom. So, if you figured up you know, go through some math you essentially you would have to add 20 more classrooms or another school. And the way you guys are talking there's a lot of issues over there with traffic and elsewhere. So, maybe all that land is not as beneficial as you may think it is. I don't know. But uh So, you know, you're almost doubling the size of the school. You would
065be. The one thing I would say about my concerns You can't just do straight math. When we have full grades you have to have specific unit classrooms, specialty classrooms. They take up They they occupy a full classroom for up to eight students. So, you have to have some of those into account. And more than you more than you would think. And then you also have other specialized subject area like your your electives and your encore classes. let me just interject for a moment. The more than you think it that has been growing. It has been. We're we are we are doing a lot of our due diligence to keep those numbers down but that's also more affordable for us to and the right thing to do for us to educate our own students in house
066instead of sending them to have our facility. saying if you go back 10 years there's more of those students today. They are. So, the trend we have just have to be aware of that. Yes, absolutely. In our planning. So, sorry to interject but I wanted to add that Mr. Keeney that there is some of that need that will probably increase. I'm just talking straight classroom. Obviously there's more. So, if you just went with sixth, seventh and eighth grade at Lemuth um you're looking around 850 students. You'd still have to to add about a dozen classrooms. So. So, no matter what is this is a circular conversation because If you were to add a grade you would If you were to add a full grade, so if we were to add all the fifth grade for
067instance, we would need between eight and 10 classrooms to truly service them the best way possible. If we were to add eighth grade it would be about the same maybe a little bit more not because not necessarily because of the number of students but because of the types of programming. Mhm. So, that when the types of programming changes you would potentially in eighth grade you may have to add on Well, I guess in both grades you probably have to look at something with the cafeteria which is truly landlocked in that building. Um Well, the cafeteria is kind of maxed. It is. I mean you can knock any wall You can knock maybe but then you're finding places for classrooms if you knock out all the walls to make other spaces. So, I I think that
068there's it it does present some challenges but some of it's doable. I think two grades is a stretch. Um To add it to that I think one grade and going making that a three grade building is a very much doable proposition and one that I think we can really can do. And the other And traditionally Riverside too we've always been flexible in what we've done with our buildings. We built spaces that can be hybrid. So, if we needed it to be five through eight we saw a surge at that point or five through sevens I'm sorry. If we saw a surge at that point we could do that. And then with the idea of eventually as things leveled out and equalized and built out leveled back down and and look at going back to a
069six through eight building putting fifth grade back in our our redesigned elementary building. So, I think that we've got the opportunities for that. Um But you know, like you said Mr. Rochelle the next five years will be very telling. Not only with all the housing starts but also looking at housing starts, prices, where those students are coming from and the families that are moving in. Um You know, those are those are a little bit those houses are I think they said the average is 400. I don't know how many the young families in 400,000 is a lot different than middle level. So, we may see a bigger need for students at the secondary level. We know our schools are are desirable for for students to move into and they look to get for high school.
070So, we may see some growth with there too. So, when you look at the campus right now well, let me back up and say with the Heisley Park half of the students went to elementary and that flowed into Buckeye, right? So, that's pretty much done but if you taking what you just said if you're 400,000 dollars and maybe 400 plus possibly they're not just half of the students are coming elementary maybe it's a little bit more mature and you have more students You might see more absolutely. coming sixth through 12. And so, if that were the case um The way it finds is another example. They're they were a lower price point we saw a lot more families going to there. Um but also the housing market is in flux. So, let's let's take what
071your statement and and build on that. So, let's say that we have more sixth through 12. What opportunity space do we have available here at the campus to accommodate that right now? That's that is the crux of the issue. As big as this building is we do need to do some redesign to some of our like a space like this is not was very useful when it was built does not serve any modern day educational setting at all. We can't even test in this room because one is raised above the other and so they can look upon that. So, things like that where this was designed for originally it no longer fits. Our best our best course of solution to this would be to put heat and air in it first of all. And but
072then also level level it and kind of divide it into separate classrooms or smaller spaces and big spaces and that. So, we could make we could create space here. Okay. Okay. But as it sits Yeah, we have we have some opportunities. Yeah, as it sits right now No. As it sits right now this is a have any classroom space that's available as it sits? As As of right now our classes are full. We're full. We are full. So, right now we're full and so what we'd be looking at is if we have additional students coming in is we'd be growing class sizes. Our class sizes would grow. The numbers would grow but our class sizes are not out of control. So, here we're kind of okay. we can The larger the the number is the
073more you can absorb. We can absorb students a lot easier here than we can probably in any other building. The next then would be Lemuth because you have 300 you know, in sixth and seventh grade because you have all those students who kind of come together. So, it disperses down a little bit. Eventually you have to up your numbers and add staff but we can pretty much absorb here without adding staff. We also do creative things like we currently don't have teachers who travel. Doesn't mean we can't but we've had teachers who've taught on carts. They've gone from one room to the next and it's a little bit easier now than it was because you don't have to log in. You just plug your computer and you give them a laptop they go and plug
074in and everything projects. So, we can have teachers travel and not necessarily maybe be within that. It's not ideal. It's not ideal for for the the teacher who has kind of has their room as a home but we do see some of that. We have some traveling teachers up here too to make some of our classes work a little better. Not not a lot but that happens and ultimately the goal is to always get your own room. And that's what you know, that's saying kind of made it in in education. I don't with the state of being so competitive because we are the job market's competitive. Every advantage we can have to make people not travel, have their own space and feel comfortable is a good one. So, Right. So, we do have the ability
075to absorb some students here. I know in my initial investigations I found out to be the case here at the campus. We have the ability to absorb a little bit. So, what where we wouldn't have to make too many adjustments. The other thing I'd say, I don't mean to interrupt, the other thing I'd say is high school now and high school today looks very different than high school did 10 years ago. And then some of the programming we're even doing today and offering with our like our Auburn Academy and our flexible personalized learning or flexible learning options, CCP, online CCP. Students have a number of different options. So, they're not a high school student isn't always here throughout the entire day. In fact, if you come by at any one time when we're in class
076change, you'll see people you'll see students coming and going and transitioning and changing because they have classes other places. They have So, it it's a different look than it used to be. So, to go by street, number of students, number of seats, number of classrooms at a high school isn't as accurate as it is in an elementary school or even a middle school. Right. Well, I know I have come here around 10:30 and I have a granddaughter. She's ready to leave. It's 10:30. So, My my daughter gets here at 1:30 on one day and I think it's 12:00 the other day cuz she has other classes she's taking at different times. Right. One quick question I had was for example with five sections of fifth grade coming from Riverview and four from Parkside going next
077year to Lamuth. Um is that that a bigger number than to absorb? But then I know they can spread out over the sections. Yeah, they're going to average next year, I think we did the math about 27 So, it'll be a little higher than it has been. It's It's a little higher than it has But not a lot. I've been there where it's been 31. Okay. Um it's not ridiculous. It's not ideal, but not ridiculous. It just happens to be with that population. Yeah, and so when we say average, teachers are going to have classes of 31, 32 and they're going to have classes of 24 or 22. It just depends on where kids other electives go and how the schedule falls out and their needs. Uh but we do work to kind of average
078put it averages out. So, Right. So, these are some of the things to to think about and I know that with the work that was originally done, some of these ideas are already printed. Well, and there's there So, if you look at segment two, we put three options out there. We put the option of the new high school. Uh felt the need to put that because that's what surveyed data came back to say that some of this community wanted. Put the idea of new middle school as an economic approach. Uh new middle schools are definitely less affordable than or more affordable than a new than a new high school. And then put the idea of adding on to Lamuth. So, it it is in there as as an opportunity. Like I said, it's it's a
079lot of this year, next year as as this development starts to get rolling, it's going to really tell us or it's going to be a good indicator as to what we're getting from it. Um you know, how many students per house. I know that they talked a lot about they're building a lot of ranches and the desire of ranches is to have older families that don't necessarily have children. I grew up in a ranch with my brother. We were packed into a smaller house. Um ranches can have kids, too. So, I think that's not I don't know if it's as telling me as it Well, I grew up in a ranch, too. I mean, most of my neighborhood you know, filled with kids and they were ranches. are the new they're very desirable in the
080in the market now. And there's a whole new ranch development going to split off. So, I I understand that when you're planning, you have to go on historical data and that's sometimes the best you have, but things do change, right? Like what you're saying. They've never been able to predict enrollments. Well, when you say they, that that's a whole 'nother kind of Those are the enrollment study people. Yeah, so who were who were the they? Uh so, uh yeah, I think that our previous superintendent was saying that he kind of thought his numbers were better than the they numbers. And he turned out to be right. So, uh yeah, so we we definitely have to uh put as much time and effort into figuring that out as much as possible. I mean, again, you go
081back and you look at Fairway Pines, you look at at uh the Heisley Park developments and you get an idea of how many kids are coming per household. Um but you have to have a range. I believe I I gave you that. You can look back and see what those were. Well, yeah, I had asked for that and you gave it to me. Yeah. Yeah, we picked as many as we could. We even went into um Summerwood cuz Summerwood's finally all all developed, which is a little different as well. Yeah, and right, low right, fully developed, a little older. And right, so the Heisley Park and in in Fairway Pines. Fairway Pines is just kind of completing now. Yes. So, you know, that will be finished. And then we have the other four developments, right?
082Three or four developments that are going to bring us a few students. You see Yeah, you see some popping up. People are selling their land and then buying new developers are popping up everywhere. And then and then the other big question, the Concord Airpark. We're not going to talk about that. We're not even going to talk about it, right? Cuz if that happens, it's it's like uh It It's I would put it that develops like it is, I would put us on the same road like some of the Columbus schools there Yeah. Yeah. Cuz that's going to bring a lot of it. But there's 99 acres next door. That's where we were going to put a school. I remember that. Yeah. Still not there. not Concord Airpark. No, there's Concord Cliffs and the Airpark. There's
083a lot of land in Concord. And Concord I just saw the good news that uh you know, UH is getting a um a cancer institute. Who Who is? UH is? UH. They're putting a Simon Cancer Institute over Todd Park. Oh, okay. Okay. That's going to That's going to bring some people this way. Well, I guess we're not we're not losing students. We are we are staying the same if not I think we're going to be consistent for a while and then I think we'll be we'll see kind of We still have some older areas that families love living here. They're not going to leave, but they they're empty nesters. So, I think we you take a look at some of the items and any thoughts or ideas or changes I think that uh we maybe
084can uh have another meeting to to take another step and I mean, like I said, a lot of the work's been done. So, any of the changes I think would be minor. A good discussion to have. So, do you have anything to add? Uh yeah, um I wanted to bring up the uh segment one and segment two. Um Are you all the way in the back? Yeah, I I might way ahead of where Well, no, no, no. I just wanted to know where you were. Okay. So, um Yeah, it talked about prioritizing. I know like for example that athletic turf replacement, money's being set aside a special fund for that. So, I understand Gary, I think when we were talking about that Rich, when we were talking about that, that was about $800,000, right? At
085the time I received that budget number, it was estimated $800,000. And we had $200,000 set aside for that. Is that right? Yeah. Plus there's a potential for an advertising deal to secure some air Right. And that's the goal, right? That there would be some participation. Yes. And if that doesn't happen, we have to plan for paying for it. Then we keep going to a different hospital. Okay. All right. Well, okay. So, it's encouraging that it's hopeful, right? Yes. Um okay. I'm sorry. So, it talked about the 24 inspection and it estimated I'm on page 14 estimated two to four years of safe surface play remaining. So, what do you realistically feel cuz we just did the track. So, I think they're spot on with two to four. We do We do use our turf a
086lot. There's a lot of play and a lot of activity. So, to say that it would it would be detrimental to our athletes and students in two years would not be a shock. Um we have done a great job to this point with working with Vasco to assure that we're grooming properly and we're testing properly, but um we did see a lot more evidence of of failure this this uh past inspection. And And so, when you say failure, that's the turf coming loose. Oh, yeah. Seams coming apart, tears from, you know, could be cleats, it could be just use over, you Yeah, cuz you you had it out here at least it's a proposed project timeline. So, this is not hard and fast. No, everything is is really just a I don't have a crystal
087ball. Things are going to change. I don't know what's Cuz right now Yeah. summer of 28 It needs to be a summer. Yeah, it won't definitely So, that's that's we put it there and then we So, you put it there for now, but Put it in 28 to kind of put it Yeah, it's Then it becomes a safety issue at some point. Yeah. Hoping our I tell you, our our maintenance department does a great job with the turf for the amount of use it gets. If you come over here, especially you would think it's the fall, but it's not. It's the spring. If you're over here in the springtime, our turf is occupied. There's a group on it from 2:00 till 10:00 between all of our sports trying to practice on it. And so, using
088all different types of things. So, to keep it as long as it has, it's you really put turf in your spring. I think it's 8 to 10 years and I think we're going to get more than that. So, we've done a Okay. We've done a nice job with it. All right. Well, I just wanted to talk about the proposed timeline because obviously we have in bold face the CTE addition and then the addition at Riverview, the multi-classroom and gym addition at Buckeye. And then it talks about some other things that are not highlighted but you know, when that might happen. There's no crystal ball. We don't know No, those are things that were kind of asked to You know, one of the things I was asked to do was incorporate some of the work of
089the Bialosky report into some of this as it would fit. So, when I put like I'll give you an example, the masonry work. As we do some work with that, we know we're going to have masons out. That could have been a alternate bid for some of our other projects to see what that would cost. So, you get economy of scale. That was my thought behind that and kind of doing it when it's not going to disrupt the educational process along the way. So, so that was really the thought in putting these days. They are all very flexible and truly financially driven. I mean, how much does it cost? How much do we have? How much can we work with some of this that's there? So, I put those numbers together and we sat down
090and we talked about what looks like and what are the most the critical. And I I worked off the real critical projects. To me, it's really important to have masonry work done so that you're not leaking cuz water is bad inside the building or whatever. And so, I think that's that's a big one but I think it's a doable one. And and some of the work was done like on the gym. Mhm. Okay. So, there's been some work. Yeah, and as we as we do a project like the gym floor, we don't just do the gym floor. We went and took the We've taken a holistic approach of doing it right. And so, doing the entire doing painting the walls, painting the ceiling, new curtains. So, it is it is turnkey ready to go. Going
091to last us another, you know, 10, 15, 20 years. Yeah, and you also I remember addressed the wall. There was some tuckpointing on that issue. We We made So, as we're in there, we're fixing some of these things. As as we're doing some of these things, we are upgrading and making sure that we do them right. I think we're looking at some of those options here at the campus with the CTE building, what we can do to address some of those smaller things along the way we have contractors. So, we asked for some We asked for a lot of um options. What are they called? They're called alt- alternates. Alternates. Have we seen a Have we seen a cost estimate for for high school? Um we have not. We have not seen cost estimates for
092the high school or Riverview. We And You can continue that. Let me ask you. So, we're We have We have projects out there with TDA that we're paying them for the high school project. We are also paying them for the Riverview project and then we're also paying them $785,000 for Buckeye and Buckeye and Melridge to the tune of that project is $12 million is what's in this I don't recall ever talking about Melridge but yet it's in here to the tune of $12 million and we're paying them $785,000 to to provide us with design services for something we haven't talked about yet. I'm still struggling with that, folks. Read the contract. Okay, is there anything else? Mr. Keaney? Cuz we'll just continue to dismiss what I have to say. I'm asking a question and I
093would like some answers at this table. When did we discuss Melridge? I'm not leaving this meeting until we we have some verification of when this board approved a project at Melridge and it ended up in TDA's contract. I would like to know. Ms. Grassy, this board has approved contracts and work and all of the contracts and work that have been approved are in process. That's not what I asked you. I asked you when did this board approve a project at Melridge Elementary School that we contracted with a design firm to actually do design work to do work that we did not talk about as a board. I want to know. So, Ms. Grassy, I know that you want absolute details on things, okay? And so, the absolute details The absolute details on things that you're
094asking for, okay? Don't exist. are not readily available right now, okay? If you want to discuss it and you want to look back through through minutes and that sort of thing and see when we approved contracts, what was discussed, what wasn't, please do so. If there's anything that was done not according to law or policy, I would ask you to please bring it to our attention. Okay, so I'm bringing it to your attention right now. I would like to know when we approved projects at Melridge. Okay, I know I know that you you know We have issue We have a approval for at the board table for project at Buckeye. We approved Riverview additions. I do not recall ever anytime ever talking about improvements to Melridge and they are in the design contract. Okay. And
095there's a cost associated an estimated cost associated with all those projects combined at Buckeye and Melridge to the tune of $12 million. I want to know when we talked about it. Okay, so these contracts have been approved and information gathering and work is being done. You're not answering me. And and I'm not answering the question because you're asking an abstract question. asking any abstract question. I'm asking for a meeting date when we approved I'm not going to argue with you about it, okay? So, if you think something is what I'm what I'm saying very clearly, if you believe something has been done to ask our treasurer and our assistant treasurer, is there any record of any vote that we took or conversation in our board minutes that has anything to do with Melridge? Okay, so
096that's a request. It is a request. Okay, is there anything else in regards to the capital improvement plan right now in this process? If there are hearing none I do have a Okay, question. Moving Moving forward Statement. Moving forward. Do you need me to do anything other than change the title? Uh no, I think I think this is just a a short process. I had stated that the goal was to have this wrapped up within a couple months. I think these are really minor changes and really future changes that are probably going to change anyway or could possibly change anyway. And and so, no, I appreciate that and and right, we'll just look forward to the next step. Okay. I appreciate that. thing I would add because we just had our first meeting with the
097Buckeye committee. On page 13 when it says 8 to 14 classrooms, we're really focusing on eight classrooms to serve those needs. The board did approve 12. I I Yeah, they officially approved 12. But as we're getting into conversations on to bring in six classrooms that are full-time out in the modulars. Um obviously there's a transition plan that needs to happen next year where students are in the building that we're going to accommodate them without you know, while you know, construction is taking place. But you know, this this is saying 8 to 14. If we approve 12, do we need to I mean, I don't want to be finite cuz we're not done with our planning but our initial at yes, we have to accommodate six classrooms coming in from modulars but um you know, how
098we're utilizing the rest of that space. We're still having an on-site meeting because we want to get away from what you know, we had to do to accommodate services and things like that in makeshift rooms or having too many people in a room for instruction but yet or using spaces like a library is it temporary is it permanent? We we have a lot of discussions to take place on how many we need. But you know, at one point the thought was that there were going to be two wings and we were looking at what was going to happen with the '90s addition. Now we're looking at what an eight-room addition would look like and is that going to meet our needs? So, we we are in a state of flux. I'm just saying those conversations
099are taking place. We want to appropriately plan. We certainly aren't going to overbuild and I I don't think financing comes down to the bottom line. Well, it comes down to how much money do we have and what do we want? I would I would agree. I think that you can't number one, I think in an elementary school, you can't necessarily overbuild. I mean, you can to some extent. But adding adding 12 classrooms, I think could be very advantageous down the road. As we look to shift and what that looks like. So, I think that's a that's a plus. I think also talking with you know, with Mrs. Smolen coming in and reflecting on some of this. If we're just adding classrooms and not touching the rest of the building or not necessarily It's an opportunity
100to re-envision the building. Mhm. And I think that's if we don't do that that's a wasted opportunity. I would hate to I would hate to put up to 12 10 million plus dollars in the new building and basically have brick and mortar trailers. 12 12 classrooms is half an elementary school. Gary Mr. Placko, have we have we appropriated the funds for all three of those design contracts? Yeah. They do in the future a million and a half dollars. It If if if if it fits in with the current PI appropriation, but in the future as these projects are ready to go out to bid and we get our guaranteed maximum price, the board will need to vote on those guaranteed maximum prices, the future financings and also some appropriation adjustments because it's We didn't appropriate
101all the funds this year because we didn't know what the true scope was going to be. So we had But we have we've already appropriated like the million and a half dollars that we have to pay to TDA. Have we appropriated the money that we have to pay to Roger? And have we appropriated encumbered at this point, so it's in the appropriation. I I just like to add that um uh I think what our architects said in the meeting the other day was very important about getting uh the different people together from Buckeye and stuff and really vetting out the uses. What are their real needs? How can we you know reconfigure the existing building and add on in the most efficient and effective way for the future. And that will be a very important
102I'm going to say series of meetings cuz it certainly is going to be done at once. And that's part of our information gathering. Right. Um it it talks in here about um looking at expanding uh um What page? On uh I don't have what page here. Anyway Oh no no it isn't that. For um I'm talking about Melridge here it goes. Um Melridge is included in the vision for the district. Futures Future updates and adjustments to Melridge's role and infrastructure uh i.e. lighting and habit will be made throughout the implementation of both segments of this plan. And so all I just want to say is we are already acting on on what this plan has. And so we're we're moving forward, we're gathering the information. This this stuff with Buckeye may take a little bit
103of time, but time is of the essence. We need to you know get this all vetted out so we know what we're doing going forward. And then looking at at Melridge, you know, the um HVAC, we don't have air conditioning, we have windows that are sadly out of date. Uh a lot of heat gain in the upper south facing windows. So there's things there that you know the architect needs to look at and give us some information on. So that is all important. All I want to say is that we're already acting on many things that are in this plan and um trying to position ourselves for the next phase of what we're going to have to do then. I think part of the facility plan also said that that we could build a new
104middle school or we could possibly build a new elementary school. We haven't really decided on which path we're taking, but apparently I don't know. We've awarded contracts that are saying we're going to do what we're going to do and I'm I don't get it. 12 12 classrooms is half an elementary school. So the reason we're having our second meeting at Buckeye, I think we all agree cuz we met our first meeting was over here, is that we need to see the space. We need to see what's here, um what the floor plan is, what what are the ideas. It's important to see that and and you're better informed when you're trying to make these kind of decisions. And that meeting is set for February 27th. Yes. Okay at 1:30 at Buckeye. Yes. Okay. I I
105I would agree. I think it's really important to look at it to from a futuristic a future forward and then do some future forward kind of work with the staff and work with this to make sure that they are we are creating spaces for for future learning and not necessarily for past. Yeah. So I'm I'm not saying that we're not. I'm just saying that it's really to be purposeful with those spaces is is is a key. When we put when we put the money into redesigning elementary school, we do need to be definitely purposeful in how we those spaces. The Riverview addition is pretty straightforward. That was a that that's a simple that building's not that old. We just added in the classrooms mirrored what we had. I think Buckeye is a significantly larger challenge
106um even in CTE uh to really take a look at what we can do with that building moving forward for the dollars that we have. And are the spaces that were put on at the time they were built, are they appropriate for an education now or what can we do with new construction to build spaces and then renovate um for potentially a little or less to make it really truly useful and impactful and um ultimately give us more than what we even imagined. Right. So how does it fit into the future? Exactly. Future needs and requirements. And so that's part of all of what we're looking at too. And you know what unfortunately what we're looking at is we're trying to catch up a little bit because that Bialosky report being almost 100 million dollars
107means that we have to we talked a little bit about this and incorporate a lot of that into what we're doing and and with this work that we're doing here still needs some work and then we're going to have to capture that and really dig into that Bialosky report and start to execute things out of there and and and be able to to get as much done with the monies we have. And and so all of that when we look into the future, how does it fit as best as we can, right? We're going to make the best decisions we can and comes right back to the CTE. There's still a couple decisions that need to be made. Sure. One of the recommendations of the Bialosky report is heat in this room. I can say
108that. And today today's a good example. of that. Yes. All right. Um All right. So the next meeting announcement of finance and personnel committee meeting February 20th at 8:00 a.m., insurance optimization committee meeting February 20th 9:00 a.m., buildings and grounds February 25th 7:30 a.m., insurance optimization uh February 27th at 8:30 a.m., Buckeye elementary committee uh February 27th at 1:30 p.m., uh the Board of Education meeting February 27th at 6:00 p.m. Uh so I move to adjourn the meeting at 7:26. Can I get a second? I'll second. I'll go ahead. Uh Ms. Brewster on the second. Uh Gary, can you call the roll? Dr. Show. Aye. Dennis Keener. Aye. Denise Brewster. Aye. Lynn Gressley. Aye. Lori Fensel. Aye. Thank you everyone and have a wonderful evening.