CorpusRecord 67139

February 7, 2025 Board of Education Special Meeting

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Riverside Local Schools
Date
2025-02-07
Location
Lake County, OH
Material
Transcript
Extent
2,364 words · about 14 min
Collected
2026-06-09

Transcript

Verbatim source text

001yeah the phone is usually all right we call the meeting to order at 8:00 a.m. okay all right notice of this meeting was given in accordance with the provisions of bylaw 01 64b of the Riverside local School Board of Education which was adopted in accordance with section 1.45 of the orc in the Ohio Administrative procedures act Gary can you take the role Scott fishell here Dennis Keeny here Denise Brewster here blinda grass is absent Lori kiski is absent okay let's stand for the pledge I pledge allegiance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for [Music] all okay this is a board action uh a resolution waving completion of the investigation of the condition of the subject

002real property acknowledging the title exceptions shown on the title commitment for the subject property accepting the subject property in its Asis condition and directing the immediate completion of this transaction um okay so Scott you're the motion you just need to I'm sorry I make a motion to approve do I have a second second okay uh okay okay and then I believe we have uh Mrs krisy cannot be here she did send in a statement she asked that we read in for the record um so I will do that now dear members of the Board of Education since this meeting was scheduled without consultation of all board members to ensure a date that would allow full participation I regret I'm unable to attend however I have carefully reviewed the available information and would like like to

003provide my perspective on the matter I recommending that we do not approve the expedit property acquisition the primary reasons for this recommendation are as follows one no impact on construction timeline despite the arrangement that an earlier property acquisition would accelerate the construction schedule our construction manager has confirmed the target completion date for riviews Edition remains December 2025 regardless of the closing date therefore exporting this process would not provide any material benefit in terms of project timeline two owner's rep recommendation Roger rii of RFC construction has advised that key du due diligence items including the Alta survey and environmental assessment should be completed prior to closing three superintendent and treasurer's position the treasurer and superintendent each servant advisory roles providing expertise in financial management operational leadership and compliance respectively both the superintendent and Treasurer have expressed

004their professional recommendation against Expediting the purchase emphasizing the importance inhering to due diligence obligations as outlined in the land purchase agreement their fiduciary duty requires strict compliance with these terms to protect the district's financial and operational interests four legal council's clarification the district's attorney wrote the land purchase agreement to allow the district to complete the necessary due diligence including property condition investigations title reviews and governmental approvals before closing he emphasizes that this process was structured to protect the district's interest and it would not be prudent to wave these steps prematurely while the the board has the authority to proceed with the purchase at any time doing so means accepting the property as is without any unknown risks this decision ultimately rests with the board five outstanding due diligence items that are in progress several critical

005due diligence items are still in progress including soil borings completed but results are still pending with a final data expected by 24 Wetlands assessment preliminary findings indicate no Wetlands but the official report is forthcoming phase one environmental survey currently in process with hzw expected to take 20 business days from 1 to4 easements in land split process mapping is still under way and legal review remains incomplete rezoning requirements the property must be acquired before rezoning can formally proceed but the process is expected to be smooth per Township feedback there does not appear to be any benefit to proceeding with this acquisition before due diligence is completed but there could be some risk in not allowing these tests to be finalized while Cleveland construction has noted that early acquis may allow for certain Preparatory activities such as

006clearing before such as tree clearing before April 1st due to wildlife regulations the overall construction timeline will remain unchanged given this the risk of proceeding prematurely outr any potential benefit I request that we allow the due diligence activities in progress to be completed as listed above and then move forward I urge the board to uphold the agreed upon due diligence process and refrain from approving an expedited that does not provide clear advantages in cost time or risk mitigation thank you for your time and consideration Lori keski Riverside local District Board member thank you for reading that and thank you Miss krisy for your input we appreciate that okay couple items uh first is the board is purchasing this property and with all of the due diligence items the seller is not responsible ible for anything

007so if something were to come up the seller is not responsible uh to remedy it nor to pay for it the school district is 100% responsible for any items that may arise so with that piece of information uh there is absolutely no value in waiting and and whether we close today or or eight weeks from now makes no difference on who would pay for anything that would be necessary to be corrected or or paid for we're going to be paying for that okay so that's one item a second item is this Cleveland construction uh wrote their opinion and I had U through some due diligence had found out that a similar situation uh occurred in another development development which I'll I'll state after I read this by Expediting the closing of this property it would

008allow for early construction activities to commence such as clearing of the tree line that must be complete prior to April 1st this is due to Ohio fish and wildlife regulations concerning the protection of specific bat species so once you get to April 1st you can't work okay that's a big deal we need to get that done before April 1st and that's that's going to come quickly so um the other uh development that had the same issue was the Heisley Park development and they were shut down come April 1st you're shut down can't do anything so it's incumbent upon the board to understand uh and realize the situation and I find it necessary that we move forward and and direct our attorney to go ahead and close the transaction one item in the resolution as it

009was written I just want to want to clarify one thing we're not waving the investigation and the condition we will continue with the due diligence to completion okay we're not waving anything we're going to complete the whole process we will have all of the information and that's what I have to say does anyone else have anything to add yeah yeah I I would like to address some things and um uh I really appreciate all the professionals that have lent their U their expertise to this and I can't expect them to have any other view than than what they put out because that's what they have to do um in looking at these items um we've had our preliminary walkth through with the wetlands there's no issues there that's uh the soils there are Sandy LOM

010uh which go down to a depth of about 40 in below that it's grav sand so Wetlands were never going to be an issue but it's one of those boxes that need to be checked uh soil borings which we're still waiting on um there should not be any issues with those either uh due to the um soil composition in that area when we built Riverview uh the new building 5 years ago I have not heard that there was any issues there the the ground throughout that area is All Uniform and the same so we should have the same kind of uh results EXC me what other items do we have to uh look at as far as uh to clarify from that I know Roger awaiting the preliminary results and has not got them as

011of right now he will get those that's that's for the soil point so the soil do yeah the soil testing according to Roger our owner rep uh the the people that are doing that testing said they did not see anything that concerned them but it is a process the soil has to dry and and the testing has to take place so the final report won't take place for a while we typically get the result like the preliminary results and like a quick email with the final write up takes some time to process we have not received those either right so the gentleman explained to Roger that he didn't say anything that concerned him which would be consistent even if something were to happen that property that we're building the addition on is lower than the

012river riverv viiew uh school so you're already adding soil and uh it's it's almost an nonissue to begin with and when it comes to the U title commitment there's a question on some easements that uh uh that are with the existing property that we're going to purchase um our little slice that we're going to take out of that larger parcel uh is not affected by any of these easements we have some um communication and electric easements along Madison Avenue um further to the West uh by Riverside Drive where at that intersection that does not affect what we're involved with at all there's an easement access uh that allows um easement back into this you know the uh parcel that we're going to purchase from uh that encumbers uh properties that are not related to um

013the parcel that we're purchasing from that allows access across those other Parcels into the larger parsel that we're purchasing from so there's no effect whatsoever on what we're going to purchase so going through an alter survey I understand the professionals that's what they're going to say um but it's not NE Neary because it's not going to affect the portion that we're going to purchase let me add to that so just for anyone that's uh watching or listening if you have a piece of property like this we're purchasing a piece of it all of the easements are on the other portion that we're not purchasing so it has no effect on what we're purchasing so everything that Mr Keeny said U does not affect the piece that we're buying cuz taking a piece off of a

014parcel and and none of that touches the piece we're purchasing we are we are in communication with Po's title to just map those easements um should we proceed with that oh sure we want to complete all of our due diligence well I I I I well we can it's money that uh we can spend that really isn't necessary to spend but if you feel that's what you want to do then well you know I agree with you Mr Keeny but I think there are people in M kisy had a statement that she wanted read it's been read into the record and um you know she feels pretty strongly that she would like to see these things followed to completion and um and out of deference for that you know why not do it you know

015it's going to cost a little bit of money um but everyone will be able to say everything was run to completion 100% so there could be no question okay I will I will follow up with players and have those mapped I just want to ask were there any issues with Riverview and Parkside and their um site when they started building it was a surprise that would be a better question to be answer by Mr plco I was not here at the time I understand there was a car found at parks I heard the rumor I want the facts yeah there was a large area of like a Dumping Ground underneath underground but that wasn't discovered during any of the testing it was discovered during construction they're digging for the foundation so okay and it's my

016understanding that the Sidle property has strictly been agricultural you know for horses and growing farming I think for as long as everyone is aware there's there's always a risk I mean anytime you're digging everybody knows that so but I think you're doing kind of the where we're at yeah and this is this property is Right adjacent I mean like connected on one side for the purpose primarily to have additional parking I mean my only concern was the like you know when they built Riverview there they kind of went up and created a site which caused a little bit of drainage into that ditch that that wasn't going to be a wetland issue but it's it it has not been found as Wetland there is um I believe the plans do have us building on to

017that as well because we are coming straight out and acqu acquiring the property is actually um does not require us to go into the building to remodel which is not only speed but also cost right we've also dealt with the uh the Indiana bat deadline of April 1st and you know Parks side we cleared the trees before we even had the zoning so you were aware of that restriction once it once it clears we can it doesn't matter what it's own it's ours right once you own the property you can clear the trees whether you have a building permit or zoning or anything that it's it's your land at that point we have we have the land split worked out and arranged as well yeah because I've been watching you know progress being made on

018the transportation center at chardan um also you know they're doing the the jail they're prepping the site through all this kind of weather I mean this is typical of trying to stay on a timeline and no one knows no one has a crystal ball on you know where there could be delays whether it's supply chain whatever but you you definitely don't want to cause your own delay and um that that was my concern because we're trying to get off probably one of the worst winners we've had um in sometime and um you know it's hard to say when we would be able to actually break ground but there are things they can do cuz I'm watching it in other sites right with the information we have it's incumbent upon the board to act be irresponsible

019not to act so with that is there any further discussion Gary can you call the role Dennis Keeny hi Denise Brewster hi Scott official I motion is carried and the next meeting announcement is curriculum and programming February 18th 7:30 a.m. finance and Personnel February 20th at 8:00 a.m. Board of Education February 27th at 600 pm. we also had a we have a work session in February was that oh that's right we have a work session thatth I think 19th 19th a week before the board meeting isn't it we also have the insurance optimization ad hoc committee uh next week on the 11th at 8:00 a.m. we have the bu Elementary committee meeting on February 13th at 9:15 a.m. and we have a Billings and grounds committee meeting on the 18th at 1:00 p.m. I believe

020right yes didn't make it on the agenda oh that's not all right it's not on here um also also that buildings and grounds is more of a progression for the building projects uh do we want to right now set uh buildings and grounds uh meeting for February 25th that would be that Tuesday before the Thursday meeting in the morning which would be typical standard typical typical Standard Time right Tuesday the 25th what time is the work session again I think it's 6 p.m. yes and your insurance committee that building we can set that 7:30 7:30 on the 25th 25th Gary that would be that Tuesday that works okay all right so we will have a buildings and grounds additional buildings and grounds meeting February 25th at 7:30 a.m um there is a CTE meeting on

021the 13th we don't have to are you planning on being there res then we would have to notice that as well uh on what date the 13th and one I'm not so sure I need to be there you don't need to be there no so the 13th and then the 20 did you get that you don't need to be there so so that will that will just be our a typical internal superintendence committee meeting so did not notice that okay and I am going to have a committee meeting um with uh Cassie small from Buckeye on the 13th yep 9:15 at 9:15 is that the one you were talking about did the we do need to speak after as to where that's going to be because it is open to the public so we need

022to find a location for that oh to just one person like in other words when I any board committee meetings oh okay I for board Comm we we would have to notice it we could do it here we could bring Cassie here to have that discussion yeah you decide where it is well I think she said she had conferences that day and the two days before she was at a tech confer conference so okay ended up on that date that which the day the day is fine the location at Buckeye might be trigger and since it's the first meeting which not much is going to go on it's unlikely to be attended by yeah but you don't know so you might I mean I'm just saying the space you need isn't going to need to

023be much so but we can we can we'll we'll we'll get a location TVD I make a motion to adjourn at 8:19 a.m. can I get a second second Thank you very call the rooll Denise Brewster hi Scott fishell hi Dennis keny hi that's it thank you for coming

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.