Transcript

Verbatim source text

001e e e good evening everyone the purpose of this meeting is to conduct the business of the Gettysburg Area School District Board of director meetings and committee meetings are open to the public but are not public meetings all School District residents who wish to make public comment should sign in prior to the start of the meeting and request to speak during CI participation public comment is welcome and all issues will be referred to referred to the appropriate board committee or administrator comments will be summarizing the official board minutes which will be available by contacting the business office please take a moment to silence all your electronic devices everybody is present with the exception of Mr Morris and he's been excused this evening please stand for the Pledge of Allegiance pledge of allegiance to FL flag

002the United States of America and to the Republic for which it stands one nation under God indivisible with liy and justice for all well welcome everyone I'm assuming we do not have citizens participate wow we got lucky this this evening I'm just kidding that brings us right to routine approvals uh I've asked to separate or I've been requested to separate one 5 Mr President we have a uh notice and communication for an update for the comp plan before you jump into that real quick we never do but go ahead maybe that's my fault uh just wanted to give the board a quick update on the comprehensive plan after about a five Monon process we completed uh the next three-year comprehensive plan uh it is posted on the district's website tomorrow uh at some point during

003the day tomorrow we will send out communication to all district uh families letting them know that's there I'm also sending out a short Google form uh for to elicit some feedback from the community on the plan um and then the goal will be to present it as an information item to the board at the March 3D board meeting so that's just a quick update on where we are at the plan right now thank you Jeff any questions uh not a question but a comment uh Alice Alice and I recommend or uh represented the school board uh as part of the comprehensive planning committee and we did have a very representative group from the community uh in my opinion and I would like to uh just publicly thank Dr Mater and I I think Alice would

004agree with me many districts uh will hire an outside group like from the Lincoln Intermediate Unit or some other outside provider to facilitate itate uh that process Dr matzer had the courage to take that upon himself and lead the entire session I think we had six seven eight sessions that went several hours and there there was a fair amount of investment and work involved uh and in the end I think as a result of his efforts and the committee which was very committed in my opinion uh I think we have uh I think we have a really good comprehensive plan for the next few years and I think Alice will age with me with that so I just wanted to publicly thank Dr Mater for the job he did in facilitating that whole process and

005thank all the community members and the staff that were uh that gave a lot of time invested in this to to make I think a really good plan thank you yes Ken confirm thank you thank you we now go to routine approvals again we had a request to separate so we're going to do 5.1 through 5.4 5 .1 the agenda 5.2 the regular board minutes January 21st 2025 uh 5.3 um approve EP trans ENB Transportation Drivers 5.4 is the 2526 York Adams Academy budget may I have a motion please so Mo second question on the motion on the floor roll call Michelle yes Cindy yes Alice yes Mike yes Al yes Tim yes jery yes and I vote Yes that brings us to 5.5 um which is the HR Human Resources recommendation may I have

006a motion to approve so moved second question on a motion roll call Jeremy yes Tim yes Al yes Mike no Alice yes Cindy no Michelle no I vote Yes items for board action 6.1 before we move on just wanted to uh uh welcome uh Christine begins to the administrative team hope that you uh hope that you enjoy the the new role and hope that you're able to leverage the relationships you built at the high school with uh with assisting uh leading the building but congratulations items for board action 6.1 tax collector comprehension res resolution motion please I moved second question roll call Michelle yes Cindy yes Alice yes Mike yes Al yes Tim yes Jeremy yes and I vote Yes 6.2 is the Liu General operating budget for 2025 2026 motion please so move second

007roll call I'm sorry question uh not a question but a comment at some point uh Dr pin or Dr Mater uh like I said before with all the restructuring that's happening at the IU and the school districts I think taking on a fair amount more re responsibility regarding uh bringing back some of our students uh some some of our frankly I'll go ahead and say it our high maintenance students it would be good to have a presentation at some point uh just to educate the board so that we're aware and we can be proactive of some of the things that we can expect on the road thank you anything additional roll call Jeremy yes Tim yes Al yes Mike yes Alice yes Cindy no Michelle no and I vote Yes 6.3 2025 26 District academic

008academic calendar May I have a motion please moved second question can I ask a question yes you may have the floor is there a is there a better way to do professional development so that we're not taking a day from every month is that possible at all because there's some months where you know you got classes going boom boom boom and then boom the best way to do professional development is as often as you can um generally with with you know previous District calendars um you know you were pretty much you know stuck to maybe you know four or five days a school year and they might have been front loaded you might have had three in the fall like two in the spring um so you know what the research has found is that

009the more that you can do it on an ongoing basis the more you can keep up with ongoing initiatives so um so we've we've really moved this direction uh so that it can be meaningful uh for the teachers and can have the biggest impact on kind of instructional tool boxs for our teachers because they deliver the instruction to our students any additional comments or questions roll call Jeremy yes Tim yes Al yes Mike yes Alice yes Cindy yes Michelle no uh and I vote Yes 6.4 4 610 purchased uh purchase subject to bid and quotation this is in reference to a policy 610 may I have a motion so mooved second question roll call Jeremy yes Tim yes Al yes Mike yes Alice yes Cindy yes Michelle yes and I vote Yes that brings us

010to our informational items the first one is 7.1 the charter school renewal Jason yeah sure Sim similar to what we uh the process we went through uh last spring with uh with vita uh mon monu had requested a a fiveyear renewal of their Charter the current Charter expires uh June 29th of uh this year so the next 5 years would begin June 30th um through about not about but through 2030 and um so we followed the same exact process uh and that that was laid out in the document that's that was attached to the uh to the board agenda um laid out their request our request for information based on their request um we did a visit in December and then follow up conversations and requests for information so so with there is a summary

011of the visit it's um you know monu is over on Coleman Road um they uh they're currently on uh land that they they own um and uh it'd be a 5-year renewal of their Charter and if there is any information that's not in the document that the board would like when they consider a vote on February 18th um just send me a note and we'll make sure that we share that information that evening this this is also a time for questions correct yep it's your floor's open go okay um I I have quite a few um based off of what I'm looking at I feel like it you know it may be something that can be answered or it may be something that we need to seek more information on um but when I'm looking

012at the overview I see at least for the finance section some recommendations which I'm not sure if this was broken down by like the people like maybe that was yeah different different people did certain aspects of the review so um I think that the that the title page lists some so like binda did Finance Morgan did HR yeah Morgan did HR yeah so I'll direct my questions that way then um in terms of having recommendations listed there I guess I'm I'm wondering kind of what the how what what are the purpose of recommendations like how do those proceed from here until when we're voting on it is it's something that I know was presented to monor um Administration I imagine and I'm wondering if that is like actionable items we're asking of them or if

013it's just simply a recommendation globally speaking so maybe not specific to like but say say in all areas um recommendations are are either simply to align with best with best practices or to align um uh more closely with uh with Charter School law okay um thank you thank you and um then my other questions are more along the lines of looking at the human resources certification review um left me concerned to put it mildly um just that there's you know a listing there of a fair number of uncredentialed individuals for the role that they fill or lapses in professional development hours um by teachers as well as administrators in terms of what's required appears to be a general lack of documentation that is necessary to continue those staying up to date and uh has either

014resulted in or is partially to result in being lower than the percentage of credential teachers that are required by Charter School law that is correct okay um that's a lot um I I also see um that you listed that there's about six teachers for a couple of different reasons who have cr certificates validity in question and my question that I wasn't sure of is is those are those the same six as part of the nine who are missing credentials or are they different it can vary so validity and certification um reifications are two separate things in the eyes of pte so those are a little bit of overlap between those but not necessarily all correct okay so when I'm looking at that just to math it out a little bit 29 certified staff including Administration

01520 of whom right now are appropriately certified which is 68.9 % instead of the 75 required by Charter School law so in order to meet the 75 that requires 22 which is an additional two people and yet there are a few people whose certification credentials are potentially not valid correct and those are there are simple steps that they should take to rectify that um they would just need to put forth the correct documentation topd and follow those steps so a lot of those uh individuals that you see on there could be fixed relatively quickly right as long as they follow the correct process for that and we'll and we'll share that with them okay in the recommendations Alice yeah Alice the follow up there back to your your answer Jason we're going to be asked

016to vote on this correct yeah so when Alice asked the question Jason responded and I want to put words in his mouth that we'll make recommendations or in line so the question is is is it a suggestion that they can thumb their nose at us and then we have to vote one way or the other or is it a mandate because I'm not comfortable voting and an approval part of this if they're not in line with what we have to do if they're in violation of the charter why if we vote Yes then we're condoning that action I think if they're if they're committed to uh to getting those two people uh you know certified or whatever um I just I've never I've never held up a renewal in the 15 in the 15 that

017I've done but it's up to it's up to the great and I'm not suggesting we hold it up but I be real interesting I don't probably don't want to know the answer how long have they been out of certification or or were they never in certification and then we're going to take their word that they'll get it two months from now better and we vote okay based on the documentation that was provided I can't say for how long it has been going I mean some of these individuals were just recently hired when I inquired a little bit more so they're working on the process um but I can't answer how long who's a direct line of communication from this District to them who who Who's who's handling any any one of our administrators with their

018director uh my suggestion would simply be that we contact the director tomorrow and say please have two more people certified by the next board meeting so we can approve your Charter that would be a I think I would go along with your suggestion yeah however you want to do it I would appreciate I was just I'll finish what I'm saying and I see Al wants to say something too um I wanted to make sure that was correct in reading that just because that does kind of raise a red flag for me but I also know the process can can continue beyond today I guess my ask as a board member would be that we receive some update on the progress towards that or ideally if it is an easy step that that is something that

019is taken um on their end how about if we say we won't put it on the agenda for action until we've confirmed that that sounds great that's been taking care of um you can put it on but I can promise you where the board's going to vote you know so that's proba the best no problem I'm like electricity path of least resistance thank you um the the only other question that I was just curious about um based on um you know the the mission of the charter so um brick and mortar Charters provide some additional you know um method of teaching or programming that isn't provided by our brick and mortar Public Schools um in kind of a a more Niche area and this one that that philosophy is monory um so that is that

020is a teaching philosophy that includes certification of its own albeit not required necessarily by the state um it is a part of their mission that states that they are monory trained and Pa certified teachers so I would be curious to to find out if that information is available from them as well um kind of how they provide that training for teachers whether through you know through certified buying it or doing some sort of course there or if there's other kinds of ways that they help provide monory training to teachers we can provide that prior to a vote that would be great thank you so much Al yep thank you Morgan how many of the Gettysburg School District instructional staff are considered highly qualified by the Department of Education we have over 95% of our staff

021we do not have many on uh PD does not considered emergency certified teachers qualified okay we have very very few and I I anticipated that was the answer we're very close to 100% these uh Charter Schools do not have it's not an even playing field and compliance with highly qualified teachers is just one of many areas where there are compromised standards um I know I I keep beating this issue uh to death and I have a little bit in my legislative report later on but it truly is an uneven playing field I do believe that the montauri philosophy is different than the public education uh philosophy and and again I I'm supportive overall I don't know a whole lot of detail about this specific school but but there is an uneven playing field there and

022I I just think it's important for the public to know that Gettysburg school district is held to a much higher standard not just in highly qualified teachers but in many other areas that we have to be in compliance with that charter schools because uh of uh the people in Harrisburg being very liberal and friendly to them uh regarding school choice uh but but I I really think it's unfair to uh the vast majority of public schools thank you any additional comments Jeremy yeah um one thing that's a little alarming to me is that we don't have one go-to person for this or one person just looking after this that's my understanding you guys said like it's a it could be any one of the administrators so we collectively um Do It um I I arrived

023here in 17 um the district didn't have a process for renewing the charters so um actually I brought a process with me so at least since 2017 with all the renewals we've done we have followed um a pretty uh a pretty comprehensive process um which hadn't been done prior um it just got voted on every five years without a whole lot of review yeah so now we now we do much more review than was done say 10 years ago no and I appreciate that my thing is like we should have a go-to person that's that's relaying information back and forth that way they're not getting it from a couple different people or we have a few that way it's just I think it's a lot easier and it's a lot cleaner I mean it's just

024a suggestion to the administration um that whether it's Morgan or whoever if they have one direct line and then that way we don't have to worry about things getting crossed and people misunderstandings cuz like what we're talking about right now and like what Kenny was saying if we got to vote on this like they need to have it together like I'm not voting on something where they don't have it together and I don't want to just I don't want somebody telling me Oh well we're working on it because that's not good enough like if we're if we're if we're going to vote on it like they need they need we need to make sure they have it together and I'd like somebody one person from this Administration to be able to give me the information

025that says yes this is what they're doing and they will have it by this time or they're going to have it by the time we vote so yep that's what we'll do no additional brings us to 7.2 the draft Capital Improvement program 5year plan fiscal year 25 26 29 to 30 um I'm assuming you're going to take the floor yes all right will thanks Kenny you're welcome so as we typically do every year about the this time I put forth or facilities Department puts forth the uh 5-year Capital Improvement plan um and I can direct everybody's attention up to the the screen up there um this is the same handout that the uh the board of directors has um this is about 27 pages long so I'm not going to go through and and uh

026you know read every page to to um everyone here tonight but in general uh what we do is we um survey both building staff Administration uh as well as uh my staff of about 45 or 50 folks to determine what the needs are uh most immediate the next year um the next plan year that is uh which will be 2526 as part of this plan and then we develop a plan for four years after that and then we also look at uh a 10-year uh look ahead as well um which typically uh involve uh facility Improvement projects which are the larger projects um generally $2 million and above similar to the HVAC projects that we have uh just completed uh over James Getty and we're going to complete the summer at uh Lincoln Elementary and

027then we also have um kind of a a looking further ahead than that or items for discussion if you will um that we you know kind of put things on a list so they're not forgotten about and uh can be discussed throughout the year or certainly uh once twice a year once this plan comes up um so with that said that's kind of the gist of of what this plan is all about so I will uh jump into the particulars um and there's uh obviously some call it some gingerbread some plan processes of how we get from you know point a to to point Z if you will uh the introduction with the fiveyear the 10 year the looking ahead as I just mentioned um and then uh the two spreadsheets that uh or excuse

028me three spreadsheets are really where the um title of the project proposed project and the associated dollar value come in um this first sheet here and the second sheet is The Five-Year Plan and the third spreadsheet is the um the looking ahead as well as the the 10-year uh plan that I mentioned um Beyond this uh get into whoops sorry uh a little more detail with each uh individual um project proposed for next year um so typically what we do is we have three um General funds uh if you will one is and they're all districtwide uh first being building envelope which would include uh funding to make repairs to anything we'll call it outside the building windows facade Roofing uh things of that nature uh we have about uh a little over 800,000 Square

029ft throughout the district so um the $37,000 price tag might seem uh a little high at first but taking into consideration the um area that we cover um it's it's actually U pretty low when you figure it out per square foot um so that is our building envelope repair fund then we have a building finish repair and replace fund and that could be call it anything inside um it could be painting drywall repair flooring ceiling tile um anything of that nature um kind of architectural if you will um that one's about 34,000 and then we get into Safety and Security upgrades which um certainly since I got here three three and a half years ago um the sense of urgency with making Necessary improvements relative to uh safety and security have definitely been pushed to

030the Forefront um so so we're we're further in the slides right what's up oh yeah I'm sorry yeah no worries these are my slides here sorry I was just checking myself to be honest with you I I apologize um so we have about 41,000 for Safety and Security um and again those are uh just really to take care of things as they come up um and relative to uh Safety and Security um certainly work with um the chief of police with um anything that he sees as necessary as well as building administrators uh we do a lot of camera work security camera work um access control with card readers and so forth uh changing out door hardware upgrading door hardware um repairing door hardware um there's uh quite a bit of abuse that uh use

031I should say use not necessarily of use but use that happens with with door hardware considering the the environment we're in so so um those are the first three line items that were on the uh the spreadsheet um getting into a little more detailed uh items were're hitting the high school hard this year um and that wasn't something that was necessarily uh pre-planned for for years um it just we we kind of Shuffle the deck with the list of items that we have on a yearly basis based upon priority um so at the high school we're planning on a pretty extensive uh asphalt uh repairs seal coat and striping project um nothing other than just seal coat uh from what I understand based upon records has been done since uh it was built in 1998

032um so it is it is certainly due uh and I try to throw a couple pictures in here just to give people an idea of of what we're looking at um but we have about $110,000 earmarked for that um so we should be able to capture a fair amount of the parking surface out there it'll be curb repair uh gutter repair Inlet repair um just to prevent um you know future water infiltration and degradation of the uh the asphalt areas um next item um equipment replacement and renewal for the gym um we have 18 18 basketball hoops that retracted uh up into the ceiling um they're also adjustable for elevation based upon age group and and so forth that will be the majority of the uh cost for this line item uh this one's pretty

033hefty it's 186,000 um then there is also a wrestling mat hoist uh indoor batting cage and some other miscellaneous equipment that we will uh capture with this line item as well um it'll be a combination of replacement and refurbishment um once we get into uh design we we'll hone in on the budget and obviously we'll try to uh bringing in as far below budget as we can um but uh considering 18 basketball hoops that are attached to structure uh it's just not cheap so um next item uh we have 12,000 almost 13,000 set aside to put up LED lamps at the soccer field behind the high school um should be uh relatively quick and and easy compared to some of the other ones um replacement of uh domestic hot water heaters at the high school

034um we just did an HVAC renovation about a year and a half ago completed about a year and a half ago um new hot water heaters um in the central plant actually weren't part of that scope um we picked up hot water heaters for the gym Wing um so we weren't storing uh so to speak storing all the water throughout the entire building um so we're looking to upgrade domestic water heaters um and actually put in it's called a pleate heat exchanger it um basically captures heat off of the heating hot water system U which is tied into the boilers so um it's a pretty pretty efficient way of of heating your domestic hot water since you're already paying to heat the water that heats your building so we're going to uh look into that

035and give that a uh a try there at the high school um this is kind of delves into a little bit of Safety and Security I guess or more more safety um the baseball field uh uh and sorry this is so small but actually might be able to do that so what you're looking at here is the the baseball field this is Adams County Tech um looking to put in a more than likely probably a perious pavement uh due to storm water uh considerations storm water management considerations um but an ADA accessible path that um we can get people from the um uh paved area or ACC Road or pedestrian walkway at Adams County Tech um down to the baseball field uh for the um for the games we have about a 100,000 in for

036for that one Switching gears a little bit but still at the high school uh we have a um more or less a kind of a glorified um homeowner U lawn mower that we primarily use for uh snow removal um it is at least 17 years old has uh 3,200 hours on it so we've gotten our useful life out of that one um we're looking to uh replace that with another piece of equipment to um Aid the uh the snow removal process out there at the uh the high school uh we have about 31,000 uh pegged for that one the High School auditorium so annually as part of our um just it's uh ansy requirements is what they are but we do um flame testing of all of the stage curtains at all of our buildings

037this one uh did not pass at the high school um so we have uh an estimate for I think it's was that 618 62,000 to get that one replaced um yeah I was a a little bit of a sticker shock on that one myself um but again we'll look to uh get multiple quotes on that as we always do to uh drive that price down as as much as we can to uh get us back in compliance with the uh the stage curtain um the high school um not sure probably many people probably don't know but we have a dedicated um sewage pump station that we the district own um and it's original to the high school construction from 98 um we had Maintenance and Service performed on that this year and we have some

038compromise components um control components uh electrical components as well as um some piping that are Subterranean piping that um is uh we're basically at risk right now of U some potential failures so we're looking to get uh that whole system renovated and also put in an emergency backup generator uh right now is not on emergency power uh which obviously if you lose power then we're bringing in a pump truck uh or or putting in a temporary generator to try to keep the uh the system going um so we have about 134,000 budgeted uh to get that renovated um and the last item yeah the last item um is the greenhouse at the high school so uh what we're proposing is to re roof and reside with the translucent panels uh the greenhouse itself and do

039some uh renovation work to the slab concrete slab on the inside to add some trough drains and basically renovate it to get it uh back to U usable ideal usable condition I guess to they use it to a certain extent at this point but programming has kind of outgrown what is uh currently there which is Circa 1998 I want to say um I don't think it was built necessarily right with the high school but I think it was a few years after from what I understand um so it has some age and basically the efficiency for heat gain and light uh transparency um is degreg just with the uh more or less the uh the the film or the breakdown of the uh the UV breakdown of the translucent panels that are currently on it

040so um one item that's not uh doesn't have a dedicated slide but is on the spreadsheet is we've been uh banking some money every year to fund the uh terazzo repair at the first level in the high school um so that is to the tune of 276 so that is this next year that uh is proposed I'm not going to go through year two through five um because I'll be frank with you that it's probably going to shuffle once we reprioritize things as we as we move on um and if you go through the rest of the plan just uh some general information we have facility profiles in here which provide um General Building information for each one of our buildings uh pte capacity square footage the year it was built renovated um approximate replacement

041costs um so that is on page 19 through five I believe yep and then we have some District totals here on the back so um and just as a reminder um the the fiveyear the fiveyear plan that Josh just reviewed that we do every year uh that next year's work such as the work that he just reviewed on the screen is built into the general fund budget um but uh even though we we bring The Five-Year Plan for approval every year each one of those projects ends up being another vote by the board when those individual projects are done so I just wanted to remind folks that approving The Five-Year Plan doesn't approve all of those projects to get done like the next day each one of those little projects comes back to the board

042uh for approval this just allows us to kind of outline somewhat of a budget some of those items will come in under the budgets that are listed some will come in over but on a yearly basis we try to allocate between $900,000 and a million dollar on a yearly basis for upkeep of our facilities um if you if you keep things up you tend to deal with with less significant expenditures down the road so the district's always been pretty effective at doing that so thanks for putting that together Josh I'm going to save myself hopefully some public emails that I have to answer let me just make sure I'm correct here The Five-Year Plan what you've presented to us the proposal is in addition to other projects that the district has already looked at through

043building and finance correct it's it's comprehensive yes yes and Jason just eloquently said because I don't want any misunderstanding that approving this 5-year Capital plan this board is not voting for all the items that you just went over and that each of those items would be voted on separately that's correct actually this isn't even funded until you pass the budget and then every project will come forth for information facilities and finance committee will recommend it for information that'll be information and action at the board yes I I completely understand I just want to make sure it was clear in the public because emails will follow as we get into the budget season and Mike and I responsible for answering them when the reality is is that these aren't funded these are recommendations from the from

044you all to us as to what we should be doing or not doing to keep up our property that's correct thank you I'd just like to give one more thank you for it being so comprehensive and also the way that you explain it when you do this I don't have a lot of background in a lot of these things but you're explaining in a way that I can understand and hopefully the community is learning from too um and much much thanks for the pictures sure yeah no thanks Josh um I appreciate you bringing this you know the fiveyear plan to our attention and what we need to do and also you know the taxpayers should be looking at this as a as a huge thank you too because it allows us when it comes to

045budgeting it allows us to to see what we're really up against in the future so we can plan accordingly to try and save the dollars that we can and and utilize what we have to work with you know where we need to so thank you and thank the administration for doing that I would agree but just as a side note all of this will go through building and finance which is open to the public so if there's questions and concerns or worry from the public or anybody they're welcome to attend that meeting as it gets discussed and outlined before our votes okay um and again Josh thanks I know we talk about all this stuff at The Bu of finance committee meetings but um you know I know you do a lot of due diligence

046and you know going out looking at stuff and making sure you know what we're what somebody is asking you for is really needs done so forth and bringing that information back to building of Finance to make sure that we are doing our due diligence so thanks for your efforts on that any additional can I ask a question Josh on this fiveyear plan that for next year if can you list can you tell me like the top three things that you're like NOP we absolutely are getting those three things done uh stage curtain greenhouse and I would say probably parking lot would be my top three uh without looking and going down and then certainly the uh Safety and Security money um we we need that for sure um so that that's my top four he

047asked for three there was four can I can I ask one other qu it's not on here the floor is yours but I I had asked you last year um after the musical I had mentioned about the the big white curtain the big white canvas one that's along the very back wall it would had water damage have we ever replaced it or tried to get it cleaned or I don't mean to put you on the spot but you're that's done right yeah okay I I don't have any kids so I don't I I have no kids in the musical this year so I don't know we worked together and uh Terry mcdel was instrumental uh he's the maintenance uh supervisor so he was instrumental and and working with really Jeremy staff to get that done

048thank you anything additional if not I know there's some people who been waiting through a meeting they that I normally don't see for the next informational item uh I'm actually wrong the next informational item is the Lincoln Elementary commissioning agent thank you Mike I was trying to get by sorry so this is another one of my items that I have on the agenda uh so I mentioned earlier when I was uh excuse me talking about how we put together the uh fiveyear plan 10year plan um and the I mentioned the larger HVAC project we're doing uh at Lincoln Elementary School that we're going to be finishing up at the end of this uh coming summer um so it's a it's an HVAC driven uh project um of considerable size we're getting all new uh HVAC

049related equipment and the system that we're putting in um is starkly different than the existing system that we have currently installed in in the building um and typically in my experience with a larger project like that in complex systems especially with the building automation system that we employ um typically you would um utilize a third- party commissioning agent so a commissioning agent is um a mechanical engineer that uh they'll provide basically a plan uh they'll take your plants and specs and they'll develop a commissioning plan which is basically the best way I can describe it is when the Navy builds a battleship they don't just say hey jump on this thing it's done go ahead and go out the sea um they put it through six to 12 months of commissioning where they put it

050through its Paces make sure it you know turns left turns right and does all those really complex things things that none of us would really understand well um as complicated as a battleship um may seem uh sometimes I look at our building automation system I think that uh maybe it's even more complicated right um so one would think that uh you know you hire a contractor to build it and I was was actually talking to the former facilities director earlier um but uh actually I I'll give you credit Dave I'm going to take his words but you know you hire an engineer to design it and a contractor to build it and you would think that you know everything is going to be perfect but it's not right um so typically what you do is

051hire a commissioning agent that works directly for the school district and they put together a commissioning plan to put the building through its Paces the equipment the building aut automation system to make sure that it's functioning at uh properly and Peak efficiency so the let me get this hand out pulled up here sorry I forgot I had this so I went on uh full transparency went online I didn't come up with all this stuff myself um so there's um several uh bullet points here that um obviously I'm not going to sit here and read them to you uh but the biggest uh Advantage is a cost savings right so at the end of the day we want a building that works but we want a building that's going to be cost efficient so this information

052here all of it's from American Society of mechanical engineers um which I would consider our construction a new build just because it's all brand new mechanical systems um and lighting as well so I would consider it uh new buildings which you can save anywhere from 4 to 133% on energy um so I took the last three years of natural gas and electrical cost for Lincoln Elementary and at 4% realization of savings were about 50,000 over 10 years and 100,000 over 20 years that's at 4% at the very bare minimum um and I would anticipate that obviously we'd be a little bit above the 4% um I anticipate we'd be somewhere 50 60,000 to hire a commissioning agent to commission the building um so obviously you can see over 20 years we would we would realize

053a payback um but one other thing you need to factor in as well when you look at Cost savings if the building's operating properly then we're not going to have as many maintenance costs we're not going to have as many repair costs because it's going to be functioning correctly it's going to save our our folks time um and money out of our budget because we're not going to be uh repairing equipment so uh my recommendation is considering the scope of the project there that we uh entertain putting out a request for quote to um multiple probably three or four commissioning agents and get their quotes back which will have a rough framework of what they plan on doing for commissioning and then at that point we can decide if we like any of them and

054if we do then we can um you know put that forth for a vote to contract with the commissioning agent and um and move forward with with that so um the Kenny's point to further explain what we're doing here I'm basically trying to Garner interest of the board would you like uh my department to go out and issue a request for quote to get um multiple quotes back in to then uh make a decision which will be put in front of the board again make a decision as to whether we're going to contract with one of these commissioning agents or not so Mr President um Tim sorry didn't mean to cut you off I was I was just going to say uh um I'd like to move to to vote to get uh Mr Reynolds

055to at least get the bids for that to see what comes back okay to ask a question well yeah okay so I think if and that's okay if you're going to we would make a motion just to do that and then you'll need to make sure that there's public comment before there's any vote on actually doing that just so we make sure we right and that's what I because we've gone down this path before so Tim procedurally um moving an informational item to an action item and the board's done it in the past but it's a it's a rare occasion you would make a motion to move the informational item name the informational item to action it would have to be second then it would have to be voted um by the majority of the

056board then it would be moved to public comment and then it would be moved uh for Josh or Josh is then has the authority by the board to do that so I'll entertain that motion if you want to make it if it gets second and voted we'll we'll move forward is there real quick before he makes that motion is there any time criticality that that's going to put us on some sort of a timeline um I would the solicitation would take uh about four weeks two weeks I'm just talking out louder Mike uh two weeks to evaluate um so that puts us what middle of March um I me I think if we it could go to next meeting if you'd like but I wouldn't want to go any further than that and Josh uh

057clarification a commissioning agent is that synonymous with a project manager or a clerk of the works or is there something different no a commissioning agent is a it's a registered mechanical engineer and we have no one on our staff that that could be paid an extra stien that would have the skill set and the time and ability to do something like that we we really do need to go outside how much is the stip in no I'm just kidding uh no we do not have anybody have you seen the coaches no we we do not I'm impressed if you have a mechanical engineer on your staff procedurally it probably would make sense for him to revise his motion s it's on the table I don't know if he wants to make that after Josh said

058it go to the next meeting so I'll leave that to him yeah Tim before you do that can I ask a question did you did I hear you say 50 to 60,000 you're thinking is what it's going to cost yeah that's what I'm estimating and that number came from just a square foot cost no I understand based upon what we paid Theiss I've been in other districts where they've had commissioning done and it seemed to work well my only question is um you're talking about this coming from the construction bond is there do we had did we save money in doing any of this that we have 50 or 60,000 the commissioning agent was actually in the original budget for both these jobs so it's yes it's allocated already so okay I was just going

059to R my thing all right you know what I'll just I'm gonna bring back some order I I'll recognize you Jeremy m my question is if we use a commissioning agent does that does any does that do anything for our um for our insurance do we have any savings when it comes out blinda that might be more of a question for you um you know as far as showing our due diligence so if we have a catastrophic failure but yet we went through this with a commissioning agent what does that look like you know does not relative to Insurance in my experience it is not relative to Insurance okay I'm just asking I'm just asking question Tim you have the floor uh I just changed my motion to if we can put that on the

060agenda for a vote well for next yeah it'll automatically go information yeah just for point of order for everybody if an informational item sits tonight it automatically goes on the agenda for the next meeting unless there's some opposition okay anything additional all righty then we are it is your time and I apologize I'm not sure who presenting on behalf of the middle school this evening but uh we have a collection of staff from the Middle School um that are here to present to us a proposal and as you step up if if somebody's going to talk if you could introduce yourself because we are being live streamed and our audience would like to know whenever you want to play it you know how to probably do it I don't know if you guys have seen

061this okay well first of all I just want to thank you guys for your service to the to the district and uh appreciate you guys considering this worthwhile project where we want to uh honor um Mr Steve lton for his service uh Gettysburg area Middle School um whether I and I think that probably very very few people realize the impact that Steve had and and I'll keep my comments brief by the way I and I'm assuming everybody got our our letter which was much more comprehensive and more eloquent than I'll be but um back to the point I was trying to make um I I think that unless you were in the building um The public's probably largely unaware of the influence that Steve um had on Gettysburg area Middle School in fact uh I

062would venture to say that um the middle school as you know it now was shaped by him both the building um the staff the instruction practices and and also the the culture that we have there and um so um you know I'll start off with Steve's picture if if you don't know Steve this was emblematic of him you know uh full of energy spreading enthusiasm and and uh positivity to both students and staff parents as well um he served at the middle school for 16 years um and uh I guess basically what I'm doing in addition to this letter has given you you know a voice you know of the staff um that served under him I was there the entire time and I will say that um serving uh his entire tenure under him

063um was both a blessing and a curse a blessing in that um he was a great leader and um Irreplaceable but uh a curse because he was there for so long and um I kind of got the expectation that this is the way that things are uh and they're not okay so Steve was exceptional and uh we want to recognize his exceptionality um so I'll briefly touch upon a couple of these points uh and definitely highlight his advocacy for kids I mean that that was Central in everything he did um you know he he his V visibility was unmatched U he made his way unbelievably every single day to every single classroom in the morning he served every single lunch duty took the kids out for recess um and the list goes on and on

064on how he was visible when interacting with students and staff every day all day long um and I think that that kind of was a reflection on how important the kids were to him um you know everything for him was run through I I just remember Steve's saying when everything was about how does this help kids how does this help kids over and over and over again and uh he was all about the kids and um so that also spilled over academically uh into his expectations for the kids um academics were very very important achievement was very important to him and that showed he made a big deal out of Honor rooll I mean every sing single kid that made any type of Honor or won any single award was recognized on stage for their

065achievement um he also started some programs for the kids that were struggling um after school tutoring programs he wanted to reach all the kids and um in addition um his saying the best stuff is in the middle um uh also came back to us teachers because he said don't forget about the kids in the middle so he wanted us to hit every single kid um and helped them to reach their fullest potential um and we can't forget that uh Steve spearheaded the uh transition from a junior high to a middle school and the one comment I'll make about that is I was I actually taught for a few years at James Getty's elementary school as this sixth grade teacher um we were made to move to the Middle School like forced it wasn't anything anybody

066was happy about that was at the elementary level and um because we all loved it and we thought we had the best there and so we reluctantly went to the m middle school and uh I give Steve the credit for making that like the best move of my career I um I wouldn't go back and change anything and that's thanks to him so um you can see a long list of initiatives that he headed up um he was he always embraced change he was always on Cutting Edge he'd always be bringing programs to the district that I had never heard of and I was like what is he doing and uh he always nailed it it always was better for the kids so so uh in closing I just wanted to say you know that

067Steve's Legacy um silently and his impact um lives on unrecognized and what we're hoping is that um that we can actually bring recognition to the leader that he was thank you Mr Snider good evening uh for those of you don't know me my name is Scott Snider uh I am celebrating celebrate well celebrating I guess 25 years uh with Gettysburg School same uh same Middle School uh just from one older building into a newer one uh and the first half of my teaching career uh I've had the pleasure and privilege of serving under Steve Linton um as far as the plaque that we are looking to um purchase in honor of him we did want to keep it similar to uh the same stock and appearance as the other plaques that are in the building

068uh we are estimating a cost of about $6 to $800 for the plaque and uh Mrs Bryant will be talking to you about the fundraising efforts for that uh We've looked into Crown Trophy and Handover we've also considered possibly having it being a student project uh which would be led by Mr lachara witz at the high school and if you can picture the middle school which I'm sure you can uh we are proposing the location for the memorial plaque just right outside the gymnasium uh right that faces towards the the Ali area in the Middle School good evening I'm Karen Bryant I was hired by Steve back in 1998 and I've been at the middle school ever since so as far as getting the money and fundraising we already met with the policy committee and

069found out that we can fund raise through rev TR which is already set up for the district on the district website and we can open that rev track up to the community to former students former and current staff and our goal is to raise $800 looking at the higher end of the estimates for the plaque and um with all the support given to De Lon in the weeks the months after the accident we are confident that we can raise that money and our goal would be to be able to dedicate the gym in late spring or early fall and just in conclusion um one of the quotes that Mr Floyd alluded to was uh Steve would often say the best stuff is in the middle and I have had the pleasure and privilege of working

070in the middle for 25 years and certainly I could not have done this alone so I just wanted to say a quick thank you to our group members Karen Bryant Tony Floyd who heard from Sher Yingling Dana hassinger and Dan Zeo who could not be here tonight uh and also a thank you to uh Christy kwood who really got the ball rolling uh when we introduced the um the idea to her as well and just a thank you to those who did work with Steve we see some of those folks there in the back uh and were touched and impacted uh by his legacy at the Middle School uh who are here tonight to to support the effort so thank you very much for your time uh and thank you for your SC you may

071want to stay still for a second sure so I'm not entertaining anything other if you have questions we'll do questions only but as a disclaimer um good friend of mine so we're always transparent here so the board knows that out front as I move forward I actually thought and I expected when you came in here and I really would have loved to see it could you go back to the picture of the gymnasium see where it says gymnasium Steve Litton gymnasium that's what I expected I know you're doing it through the plaque and that's awesome but as a board member I'm not opposed to that either you're renaming a gymnasium for him um I also expected k um a portrait or something of for the people who never met him to put a face with

072said name so here would be my suggestion first to the board I'll entertain a motion move this from an information item to action item two reasons one because I believe in it second reason is those people sitting out there they get to hear what we think tonight I'll make a motion to yeah I'll second that but before a motion I I just real real quickly uh Steve and I go way back uh we were both Middle School principles together for well over a decade and and I would just tell you Steve lton was one of the most uh Progressive and most respected uh Middle School principles in the tri count area Adams York Franklin uh County and and besides all the things that you all mentioned he was just a fantastic human being uh taken

073way way too soon uh and and Deb's uh you know right there with him and and Sharon uh before that they they maintained a wonderful relationship you know even you know after losing their son tragically and so on and and I support 100% what you're doing because I think it's well deserved and and I I like Kenny and others I think maybe it's something that this is just a beginning of of where we end in the end uh whatever it ends up being but I think honoring someone like Steve lton uh he exemplifies what uh Middle School leadership is all about and what it should be and he was just fantastic and it and I think you already know this but he was extremely well respected by uh three different counties of school leaders thank

074you thank you so I know I have a motion on the floor and I we can go to a question on that and I didn't mean to jump um a fantastic the Fantastic work and idea you you all came up with I I was just trying to suggest that the board may be more than willing that you can expand that Beyond a plaque that's sitting there so if you're going to make a motion Tim I would I would ask you to amend it and Jeremy second it that would include that uh that ability for those that committee to do what we suggested within that within that parameters we're not holding you to that we're we're allowing you to use your imagination the best way to respect him um trying to figure out the best way

075to amend this um I'd say I'd mend it to allow um the Middle School teachers and administrators that have brought this idea to expand on how they would like to moralize Mr lton at the gym whatever that may be I'll second that to are there questions on the motion on the floor and so this is just a motion we just to have it on the agenda just so we can have public before we actually vote on it just remember you know you know what I got caught up in that yeah well so right now we're just making it an action item and that's fine we're voting to make it an action correct the first vote will be for an action the second vote will be to approve or disapprove based upon the substance that Tim

076made so may I have a motion to move this from an information to an action item second I think that's what I think we can count that motion I know but I got he started to make a motion and expand that yeah any questions on the motion on the floor roll call Michelle yes Cindy yes Alice yes Mike yes Al yes Tim yes Jeremy yes and I vote Yes now public comment yeah public comment for those out there watching none Kenny can I just say something yes you can Michelle um a lot of people don't know CU you you just know my my youngest child but I actually have four older kids in their 30s now um and they were there when Mr L was there and I think I can I will speak for

077my older kids he was probably the only administrator in this entire District that my kids actually liked because the best stuff really was in the middle any additional questions me no no I was just looking to see if I was going to get scolded you guys ready to vote you can vote on the substance I was trying to get to that a minute ago keep you in line keep you line is this okay for me to like for our committee does that mean then we can raise our goal that what your suggestion that we were allowed to 800 that is my uh intentions on that so and and I'll just give you idea in my head and I think same with Kenny since he's a bit more emotional I at the moment um you know

078above the gymnas if it was you know Steve Linton Memorial Gym or whatever you know what I mean uh with a portrait of him so like I said kids going there now who doesn't know him understand where that come from instead of just seeing somebody's name they don't have an attachment to but instead of just a plaque there's a big wall there use it yeah Tony I I don't want to jump or your ideas and I'm not trying to take them over what I'm trying to allow or tell you is that I believe based upon the board's vote here in a minute we're going to allow you guys to use your creative minds to Best Way roll call Jeremy yes Tim yes Al yes Mike yes Alice yes Cindy yes Michelle yes I vote Yes

079there you go folks I'm going to do like I do most of the time here uh we still have some stuff going on I know what you came in for I'm going to allow you if you want to exit before we do our last one it's going to run a little bit if you want to stay and listen to the last informational item please feel free if not you can be excused they're going to miss some wonderful reports Mr President yeah that's why I let them go for the first time you guys could learn something instead of you teaching all the time that brings us folks to uh the last informational item 7.5 the football uh Cooperative sponsorship with Fairfield uh Cody's present here tonight I'm Cody if you can sit if you can stay

080right where you're at or you can come to the podium your choice I think I'll I'll stay seated but if I need to stand I'm more than happy to do that um so just I just have a short presentation um about a potential co-op with on football with Fairfield um before I get started just a little bit of background of how I've done co-ops in the past um in my previous position I was the athletic director at two separate school districts and we are co-opt in every sport we offered except for basketball and volleyball so I have gone through this process before um kind of merging two two programs together um so just before we get started on the actual Co-op just a brief statement about a little bit about Fairfield um they have 277

081students in the high school um they offer 16 Varsity Sports which is a a lot for a school their size um and the reason for the request for the co-op um they started the varsity football program they played their first three games um they determined that it was unsafe for them to continue um they shut it down for a few weeks and then I believe they played three JV games to end end the season um so that's kind of the background of how Fairfield got to this position um so if we were to do a Cooperative sponsorship with Fairfield I would propose that we do uh a setup where Fairfield would pay their percentage of the total expenses of the football program um so right here is a list um a pretty exhaustive list of

082things that we would take into consideration um when billing Fairfield after the season again they would pay their percentage and I'll get down to to numbers in a second um again quite a lot of things would go into that so just a little bit of the financials last year spent or this current year I'm sorry we spent a little under $882,000 on the football program um so the way we would estimate what Fairfield would pay per player um so I did kind of a calculation it's a little rough just because of the situation we're in but this past year our program had 53 players who are varsity and JV and 26 on the freshman team um and then Fairfield is thinking that they're going to be sending if we were to do this 15 players

083over to us next year so that'd be a total of 94 players so once you do the calculations that would come down to $872 um per player so again with this model Fairfield would have paid a little bit over 13,000,000 for their share of the football program um I can't really say the way the model works I can't really say what we're going to what they would pay every single year per player it would be based off all our expenses and our participation from both Gettysburg and Fairfield um just a little bit of a breakdown of where at number-wise um so again our I have our seniors Junior sophomore freshman and eighth graders um the freshman and eighth graders play on the freshman team and then a combination of seniors Juniors and sophomores play varsity

084and JV we have several kids who go back and forth um so our total was 79 total players um and then what PIAA ramifications this would have so every two years we get assigned a mail and not assigned we put in our numbers and we are calculated a mail and female enrollment number um so our male enrollment number is 473 fairfield's 105 um so the way we would calculate our Co-op number is we take our 473 and half of 105 which is 52 and a half we'll round it up to 53 um which would give us if we were to do a co-op a number of 526 um at the bottom of the slide there that shows what 6A football and 5A football were last year so our number alone we were toward W the

085lower end of 5A um if we were to do a co-op we would be more towards the middle but in in my opinion I don't think we would be anywhere close to potentially going into 6A um these numbers are calculated every two years we're in the first year of that um so again the numbers will change based off enrollment but I feel comfortable in saying I think even if we do the C we will stick in in 5A moving forward um and then just how a Co-op work agreement works so if we decide to do this we'd be locked in for the for year one and year two um in years three and four both schools would have to agree to ending the co-op if that's something we wanted to do um I did do

086a little bit more research and there are a few scenarios where we we could get out of the co-op in years three and four but the PIAA would have to approve that um from the standpoint of we'd have to submit uh a valid reason with evidence why we want to get out of the co-op um but after year four either school can decide that they would like to leave the co-op um if if both schools are happy we just stay up stay in the co-op until someone makes a decision to leave so we could like I like I said if both schools are happy we'd stay in the co-op um if we go this route until the end of time and then benefits to each district this is just in my opinion um for Fairfield

087it gives their St gives their players stability in a place to safely play and then the benefits to Gettysburg again in my opinion it gives us additional depth of players and it also Fairfield would pay for their percentage of the total expenses of the football program and that's all I had for presentation so I'll take any any questions uh I don't know if it's a question but for transparency purposes um three people from the board uh have met with Cody uh just preliminarily before I guess this was tabled the last meeting I missed that um it would be my uh opinion that uh those three Cody I think and I don't want to speak for the entire board just the individual board members that I've spoken to um and I might I might turn this

088over to Mike if I say it wrong Mike Mike can step in I think that it would also benefit us after talking with uh fairfield's uh leadership um from the Schoolboard perspective that we'd have a sit down with them to make sure that we're on the same page uh across the board with everything that you showed us and I'm not saying that you have it wrong but from a board perspective maybe it's a good idea if you can we can make an arrangement where we can meet with them not as a not as a voting body or something that you know not in violation of sunshine but you know almost like as a committee thing just to kind kind of make sure where all the eyes are dotted the C teas are uh crossed does

089that make sense I'm not sure what the board's feelings are on that I'm just I'm just hearing from a couple different board members that you know out of respect for both both boards maybe it's a good idea that we we schedule something with them at least two or three of our board members two or three of theirs that sounds like a plan and Cody uh I really appreciate the information that you shared tonight that it's helpful to me and also the fact that you've been through this before I I'm sure there's some unintended consequences that come as a result of some of these things and you know maybe some players taking another uh player's position that may have been there that uh had we not Co-op I guess that's always uh but but I love

090the fact that it makes it even that much more competitive I I for one am in very much support of moving forward with this and I do think the sooner we make a decision the better I I don't like leaving Fairfield kids and their parents in limbo uh so I I I I certainly support what our president is saying and our subcommittee uh working with you and the Fairfield team but I I for one would love to see us move forward thank you I would U sorry um and I would you know on toping on that I mean merging any kind of anything whether it's two companies or if it's two sport teams whatever um you know the first year is always going to have its Road bumps but usually it gets you know you

091get those worked out in the first year and then everything kind of Smooths over but uh I just didn't want anybody think this this is just going to be oh this was amazing the first year it's you know it's going to have its bumps but I think it's the end of the day I think it's the what's uh what's best for the kids involved and just going through this I can tell you that it will have its bumps um we will have Growing Pains um but I can tell you in my experience of doing this in other sports um at my previous position year two was better than year one and year three was better than year two um so again um it's going to be one of those things that issues will come and

092we'll have to work through them but that doesn't mean it's it's a bad thing it's just growing pains Alice yeah I guess I'm just curious about the process then for moving forward because um I hear that people want that I don't know that that's that I think that's fine um rather than just you know I'm sure they're talking to their athletic director as well and it would be something that would be presented in front of their board in terms of finding a way to have a committee that we're kicking this to before then it comes back as an action item is that something we can do that will that won't delay it further so what I've envisioned and this is and I mean I took the liberty three of our board members met with Cody

093so we had an internal process um prior to this coming up publicly tonight as an information item and the way I see it structure structured and this is what I represented to fairfield's uh vice president is that the same three members of our board meet with three members of their board along with Cody uh their athletic director and maybe uh our assistant superintendent and their assistant and superintendent so that we have not only the board representation we have the athletic representation and we have the administration representation for any type and I don't anticipate conflict but when you're talking about two different School LS two different ideologies um and you're merging Sports as well as academics or whatever uh I just think we have an equal representation and then those three members from and whatever Fairfield

094does is what they do but from our perspective the three members from the gatesburg board come back and they brief uh they brief our board on what the proposal is it becomes an informational item then an action item does that make sense so it would be turning ch creating a new informational item rather than this one well the only way that it would have to be an informational item for this reason if our three board members are going to represent this board again with Fairfield they need to be able to convey anything that's changed or the final product to the whole board and the only way they can do that is in a public meeting so we would have to make an informational item I think this can happen quickly this going to be an

095informational item the very next meeting and and go to an action item I'm not looking at down downplaying it but I'm also have to be mindful that I I don't want to have what the appearance of a sunshine issue or we're doing something behind the scenes so it would have to come back as informational so I would ask the three members on here now which I believe are Mike Tim and Ryan who's not present is that who it is Mike Tim and Ryan uh get with Co or meet up with Cody and Jeff and Cody Jeff uh facilitate a meeting with Fairfield as quick as possible so this is on our agenda is an informational item at our next meeting is that possible okay the only side note that I'd have on this and it

096wasn't made public here my only not I don't want to call it a concern but my only question or where I'm looking at this is not only is fairfield's football being affected but because their football program is being dis disabled you have cheerleaders and you have marching band and I don't want to see them forgotten in the process so I'm not sure if we've looked at including them in this Co-op but for me that would be an important component of this because we're to me we're saying football come on over hey folks that cheerleaded in the fall or hey band members that have worked their entire life within the music department now all of a sudden don't have a a place to display their skills I don't know if you're there yet but I'm going

097to ask you from my perspective not from a board perspective that I hope that hope that's being explored I would assume uh Mr H that if we do get that conversation those would be the kind of things we try to work out while we're there to make you know right make sure everybody's on the same page or you know if we if they had something they wanted to do it or they don't want to do it at least we know up front right I I just want to make sure because the Fairfield had their meeting Tim and we had public comment throughout not so much in the board meeting but through the paper and stuff that where were we at in this process so I don't want them to open the paper tomorrow and say

098oh yeah we're going to co-op and we forgot about those other two components of that fall sport there any Michelle uh I just wanted to say I don't really necessarily have a problem with football or kids from Fairfield coming to play football or band or cheerleading I don't really have a problem with that because we're sitting here we're supposed to do it in the best interest of kids I'm not happy that I found out about football about there being a merger from the yeb BG times oh I'm I'm not happy about that I didn't know it either I I knew nothing about it neither did and I do know people on the Fairfield board and apparently there were conversations that were being had that we were not aware of and that doesn't not make me

099happy at all if if there's going to be any talk about that then board leadership needs to know and you guys need to relate to the rest of us somehow someway I don't really care because I don't like I don't need any help looking like an idiot I can really do that all on my own as can everybody else um but I don't like people asking me hey I didn't know football I didn't know if Fairfield was coming to play because I I don't I don't like not having an answer because I don't like knowing not knowing well I would say and I'll speak for myself not any other board member was I aware that Fairfield was was possibly interested in that yes did I know to what degree or where it progressed I did

100not know and I did not know until I read The Gettysburg Times if Fairfield actually even took a vote or were even thinking of taking a vote and I'll be honest with you it did set it back but my displeasure with how it rolls out uh all that aside I'm going to evaluate the program the same as you just did well because we have we are here and we were supposed to do what's in the best interest of our students yeah and Fairfield students because they're members of our community too i' agree anything additional Cody thank you for the presentation and we look forward to uh we look forward to hearing something so we can move forward um with any questions on an informational item at the next meeting board committee reports I know Al

101you have something I promise to make it quick uh on Tuesday February 4th that's tomorrow Governor Shapiro will present his 25 26 state budget proposal uh so Belinda I'm sure you're uh just on the edge of your seat waiting for that all right uh secondly uh Believe It or Not uh and again I guess we're 25 years into the 21st century but uh the Unbound academic Institute Charter School uh was turned down by the department of education this is a fully teacher artificial intelligence Cyber Charter School that's the road that we're heading toward uh progressively in the future here and in my opinion it's scary and it's going to be a horribly substandard education in addition to what we're already experiencing with Cyber Charter Schools uh isn't it finally time for a flat Statewide Cyber

102Charter tuition rate based upon actual cost Pennsylvania taxpayers are charged 500 different tuition rates for the same service provided to the Cyber Charter students regardless of actual cost with an additional 500 different rates for special education students obviously we're being grossly overcharged uh and then just real quickly uh finishing up regular Ed cyber rates range from $7,695 and then of course when they magically leave the public school and get assessed they have some type of disability all of a sudden and now the special education cyber rates are 18,6 127 that's the least all the way through 59522 uh I'm just going to go ahead and say it it's almost criminal but uh but and we and we need reform thank you thank you Al anything else Mike no program reports Jason just a couple calendar

103items uh February 13th uh next week uh early dismissal um as with most most early dismissals secondary 11 Elementary noon and then as a reminder there's no school for students uh February 14th and February 17th that brings us to I'm sorry I have one thing from the high school oh I'm sorry go ahead um many of you probably saw in in in the news but our our wrestling team just won a district title for the fourth time in six years um just an incredible accomplishment so to be in the finals five out of the less six years and to win uh back-to-back titles you know the kids that we see walk through the halls and work hard in in classrooms and then to put in hour upon hour um a after class um in the

104weight room on the mats on the pavement running um and everything in between and it's just an incredible accomplishment from the kids the staff the community that supports them so um hats off to that team thank you jman that brings us to the conclusion of our board meeting our next meeting will be February 18th I would take note of that date because I'm when it's asct I'm believing that's going to be a Tuesday so may I have a motion to adjourn I'm sorry before I adjourn just for public information and for the people here the board's going to hold a brief executive session immediately following So for anybody that's out there if they if they could for personnel Personnel I'm sorry I didn't say that did I it's been my night um so what a

105quick executive meeting so February 18th I have a motion to adjourn we stand a journ thank you