001alrighty all of our feeds are synced up we're on YouTube Miss McMurtry the meeting is yours thanks to you Mr Gilmer so I want to welcome everyone to the January 27th facilities and operations committee meeting and we will start with our Pledge of Allegiance please I pledge allegiance to the flag of the United States of America and to the Republic for which it stands one nation under God indivisible with liberty and justice for all okay all right so first up on our agenda would be the approval of the meeting minutes from our November 25th and our December 16th virtual facilities and operations committee meetings may I please have a motion to approve moved second is that second thanks any comments or questions regarding our minutes okay hearing none all in favor please say I I
002I any opposed hearing none the motion passes thank you okay am I turning this over to Mr Schneider or to the next agenda item regarding items for work session or action Mr Schneider or Mr Slaughter please uh Mr Slaughter is going to handle tonight's meeting so good evening everyone thank you Miss McMurtry uh first thing up items recommended for work session and the Action meeting the first item we have is the permission to advertise for the radio tower demolition project at the wpvn site okay all right may I have a motion to approve um allowing for the I'm sorry for approval for placement on the work session meeting to advertise for the bid package to demo demolition of four out of five radio towers they moved second thank you any comments or questions from the
003committee uh one Qui question are we still getting income from those Towers or is the one that we get income for uh Mrs stall we don't get income excuse me from the radio towers we only get income from the cell cell phone towers okay Y and that's that's not affected by this recommendation great okay thank you sorry no worries um so Mr scy I have one question I if it's Mr Slaughter and Mr scroy I'm Cur well and I didn't pay attention to this part and I apologize four out of the five why is there five so why not five so the the one Tower needs to remain operational it's functioning right now so we're taking down four out of the five and then there will be a second project where we remove and replace
004the fifth Tower and that will be that Tower will remain in service as part of the high school what phase does that work take place Mr Slaughter that would take place during the field Renovations okay all right thanks all right any other comments or questions from the committee okay hearing none all in favor to move this to work session please say I I any opposed hearing none the motion passes thank you uh the second item is an amendment to the contract for the North Penn High School transportation center existing features contract with c and Associates uh this amendment is for additional work required by the township to do a tree survey at the W wnpv site uh during the course of the contract okay thank you Mr Slaughter so could I please have a motion
005to amend the contract um for additional work to be done for the tree survey as required or requested by the township they moved second okay great any comments or questions from the committee can you just give a little bit more information about the tree survey I know we've had like INX students and others that have come and are wanting to make sure that with the trees we do have to remove that we're replacing is this is this to kind of assess for that yes so that survey was required by the township and we have to remove some of the trees in that area uh in order to slide the new Transportation building back so we have to survey the trees the type in the size so that they can be replaced in kind or there's
006a multiplier depending on the size of the okay thank you okay all righty any other comments or questions from the committee okay hearing none all in favor please say I I I any opposed okay hearing none this motion passes as well thanks Mr Slaughter no problem thank you Miss merry um the next is an amendment to the contract for count and Associates again for additional survey Ser Services as required by Montgomery County Soil Conservation service for the existing to remain Basin areas and Dam at the lower end of the property okay so uh could I please have a motion for this um act or this would also move to um this will move to action to amend the transportation center existing features so moved SAR second second okay any comments or questions no okay Mr
007slauter it's I have a qu and I don't even know if I should ask this if it's out of procedure I have a question on these additional surveys that are okay this one is coming from the county Montgomery County Soil Conservation service yes during our and the other one from the the township so I'm curious why these were not known or what else should we anticipate um that we would Pro see down the road the original contract was for a scope of survey work these items were additional to the original contract uh asked for by the the agencies uh for additional surveys so uh for instance in the trees we were just placing a number on the trees they asked for a physical survey for the size of the trees so that we could calculate
008the correct amount of replacement trees likewise since the lower basins were existing to remain uh and we were not moving any storm water into these locations uh those were left off as part of the asilt survey uh but then Montgomery County Soil Conservation in our preliminary meeting asked for those elevations so they could verify the total storm order on site since it was existing to remain it was not included in the original contract okay so a couple more question you know what let me um I'll come back to this all right so we have a motion on the floor and my questions are more generic um so I'll um ask um all in favor please say I I I there are no opposed so this motion passes I'll come back to this Mr Slaughter I'm
009sorry no problem the last item is approval of a a quote proposal for a pedestrian study as requested by Talon Township for a pedestrian Crossing at SUNY Town Pike and Bri Bridal Path Drive for HCA Associates uh this was uh requested by the township after the submission okay all righty so we have a could I please have a motion to approve a study regarding a potential pedestrian walkway as requested by the township so moved second thank you any comments or questions no and Mr Slaughter this would not have been something that we would have anticipated in the information provided initially to the township no the original the original uh conversations with the township were around a traffic study uh this is an addition to the traffic study they're not requiring a traffic study but now
010they're asking that we provide this pedestrian study to cross SUNY toown Pike as part of their larger plan okay and so uh regarding this one I'm just curious what would the potential cost impact be um to the pro the overall project cost should this be something that they you know are requesting us um to go forward with so the the amount of this study is $4,500 however once the stud's complete we would know the scope of work and would be able to price that right now we have no idea if it's just uh a crosswalk uh is it a crosswalk with flashing pedestrian signs is it a uh metered signal crosswalk so until the stud's done uh we don't know that the actual impact something something that we anticipate that the township uh would bear
011the cost of since it has no bearing on our project we're hoping oh oh that's a good hope I like that all right but um so you obviously you'll keep us informed as we move forward in this further developed with the township correct Okie do all right thanks so much um any other comments so I have one quick followup so looking at just kind of where that location is I mean I think we're all very familiar with sunnytown Pike do we think that this is because there are that it leads into a development where there might be an interest to have people walk or yes okay this is this is part of the the Township's long range plan uh for Pathways and walkways throughout the township okay okay perfect um just be yeah because I
012think that we all also see too we see a lot of students who walk across that but not necessar anyway I think they head more over to where like the Wawa is so not something that would provide safe passage to that but something that could give access to students living in a development okay understood Mrs ramit just for clarification I don't think the motivation is for students to walk I think it's to make the township more walkable um I can't see a scenario where our students would be Walkers across Sunny toown Pike or Valley Forge Road um I just don't think that's a good situation in the morning at arrival time at that arrival time in particular that's exactly kind of what I was thinking but to have I I you know we do know
013that there are a lot of community members who walk um and use our the campus of the high school as their walking trail so I could see as an access point okay understood thank you okay I know any comments additional comments or questions no okay hearing none may I have um a motion to approve or no I'm sorry all in favor say I sorry I I any opposed no the motion passes thank you Mr Slaughter certainly uh that is all the items we have recommended for the work session uh the next agenda item that we have is informational items uh the first information item is a high school project update and Phase One schedule update by cha Mr Jamie Lynch and Mr Colin case thank you good evening everyone and happy New Year someone's driving
014my presentation so that's great it's probably too late to say happy New Year right no it's not okay we can all use it uh Mr Linsky can you bring up the PowerPoint presentation first please there we go that looks great I don't know yep I don't know if we can shrink it a little bit so that the entire slide Mr Linsky can fit on the page there you're all over it thank you very much and then you can go right to the next slide and we'll push this away from the dock okay I apologize the format is a little um rough with the background that's not what it looked like what I sent so I will do um my best that floor plan in the background is way too bright but I've um uh commonly
015gone through upcoming and and recent events and as you can imagine with the high school project there are a lot of them so um let me run through them and I'm sure we can um answer any questions that the team may have um preliminary Land Development submission uh was originally made at the end of October comments were received back from the Planning Commission and the Consultants uh from the township the project is being prepared for uh resubmittal I think that submitt is complete and we'll be back at the March 3D planning uh meeting so as we've talked about in Prior meetings this Land Development process which starts with planning may include zoning and ultimately goes before the Township Board will take us through July of 2025 um we're also in the process of the phase
016one project uh building code review um as far as preliminary zoning efforts um we've met the team has met with zoning officials from the township numerous times at this point and many of the customary areas that are of concern from a zoning standpoint have been discussed and are continuing to be discussed that is signage on the building which is a common one the Transportation uh facility because that was an existing non-conforming use and also the work on the radio site also an existing non-conforming use we're still working with the township to confirm that any relief from zoning may be needed for these uh components and at this point in time after presenting our information we're actually awaiting a formal Township zoning letter uh coordinations ongoing with pico for Power and Gas Pico electric engineer has
017been resigned assigned to the project and you may know that we are gone out with an RFP for the pre purchase of electrical equipment Pico has been responsive we're coordinating there we've gotten the answers that we need in order to finish that procurement uh process and make uh recommendations I think next month we're also coordinating with North pen Water Authority and Sewer Authority those conversations have been ongoing and will continue on the North pen Waterfront uh we talked last time about a discussion to convey exis North pen Water Authority lines that are on School District property over to the school district for eventual ownership um we've designed the waterline Arrangement accordingly based on their uh feedback um and made some adjustments in the bid documents based on the actual details required for the meter pits
018for that uh work and our backup plan as we've designed this as a bid alternate is if for some reason uh the district is unable to come to terms with North pen Water Authority for the conveyance of those water lines we would move that work to phase two so we've got a plan B if um uh we're unable to be successful here in the next couple of months with North pen water on to the next npds permit submission has been made um for the project we've actually gotten a first review letter from the Conservation District um and so the design team is working to address those comments and make the customary resubmittal um as we mentioned last time there is no process for an expedited review and the and the review time for a Conservation
019District permit of this size is rather substantial um so the first and next Milestone that we have in front of us is a complete administrative review after which it goes to technical review we're anticipating a permit somewhere in probably the July or August time frame at this point and that's for the Lion Share of the site work for phase one we have very limited site work and it's actually under the required limit of disturbance for the npds permit and that submission has been made for an erosion and sediment control permit from the Conservation District yes real quick M MC Mery has her hand up oh sorry that's okay go right ahead that's okay thanks Mr Lynch I wanted to ask when you were discussing about the um uh work relation not the work relationship but
020the work required with North pen Water Authority and the potential to move that to phase two um would that end up being a more costly um in terms of just the work moving out and then um any changes in the schedule that would be again more costly whether it be resources or just the reschedule of of items uh thanks for the question um the the answer to that is that we've made the suggestion to do this waterline work as early as possible in the attempt of doing it next summer to avoid any disruption to school activities if we are forced to push it into phase two we'll have to do the same type of coordination in order to do the work without impacting the school the challenge is is that we'll end up having to
021do that during the school year probably instead of the summer and so that simply means that the work itself can happen in the yard it's all about the timing of when we switch the water service and so we have to Simply find a day where there's no school a weekend Etc in order to do that work so in answer your question I don't understand how it would cost more for the work except that it will be done later but done on the weekends and you're paying overtime so right the logistics behind it are more critical to maintaining School operations I understand that I I'm I understand that I'm just trying in my head I'm just thinking okay what's the potential for cost increases and if and I understand that it has to be done outside
022and it does not disrupt students and teachers in in the building so if it's done on the weekends there probably would be some cost incurred yeah I think I would agree with you okay okay so I think we're down on the next slide um phase one bids are due EX excitingly enough um this Thursday we conducted a pre-bid meeting with uh contractors on uh January 7th and had exceptional uh attendance addendums have been issued one through three I think there's one more that has been pushed out since the contractors but we're all ready to receive bids on uh Thursday this week and then start the process of reviewing the numbers with uh the school district and then bringing them to this committee phase two design development documents are continuing to be developed 50% documents were
023uh received and we're still uh working with the design team and the district on all of the end user meetings and the design effort in order to finish um phase two and I'll get back to that in just a moment the RFP for pre- purchase of electrical equipment was issued we uh as I mentioned in this presentation we were a waiting Pico input on Transformers and revisions might be necessary since I put this draft together we've received that input um from Pico and so the team is putting together their recommendations for an upcoming meeting to push that purchase effort away from the dock Transportation building design is also uh well underway another meeting was held within the past week to uh verify the final floor plan Arrangement Al and also the arrangement on uh the
024site the game plan for the transportation building is to bid that via the state contract that's a gordian um contract and so uh Mr Bradberry and his team are finishing up the design effort there so that we can put that in the state contractor's hands in order to start putting pricing together the uh the AM radio site um as was mentioned earlier we have a bid package uh prepared for the demolition of the select uh Towers we're requesting that um permission to advertise as was noted earlier the next step is to complete the design of the new am Tower which gets relocated on the site that opens the site up for those fields um so as you know the radio tower site will become the major construction staging area for construction at the school and
025that's why we're trying to take down those Towers to make way for a stone area where trailers and equipment and and conx boxes would be during uh construction and on the next page is just one of the bidding documents for that project it's ready to go um we've put that together and as you can see here it identifies the towers that are to be removed that's what TBR stands for it identifies that the fence and the guy wires and the structures that are uh standing out there around those Towers would be removed this is a very short um project we feel uh we're scheduled to advertise with your permission and this would probably be uh a late spring work item uh shouldn't take more than a couple of weeks in order to take these towers
026down so just wanted to share with you what the bid documents look like that have been prepared um to move ahead with this project more ongoing activities on the next slide which is simply the updated schedule of where we are with uh the phase one mentioned that we were out to bid as advertised in December did our pre-bid meeting contractors have had access to the building to come back and get in with their subs to take a look our bids are due um this week and then we would be considering these um bids beginning on February 20th work would start in the building with the natatorium work near the end of uh May and kpod after the students leave we've got uh the fuel tank removal and the site work that is included in this
027that would happen uh over the summer and the completion dates remain the same for kpod and um The Natatorium so our schedule remains unchanged and we're on track there on the next um just wanted to uh confirm for um the entire team you know how this is set set up from a maintenance of school operations uh standpoint and give you a couple of examples so as an example the bidding documents for phase one contain a site work phasing schedule that identifies interim milestones for all of the primes to meet it also identifies the staging areas for our contractors that we've been working with the district on to assure that we've got adequate parking on site you see blue lines and and dotted black lines which ident identify travel patterns for buses and for parents so
028how the school operates has been identified in the documents for the contractors along with these milestones for them to meet on the site on the next slide is a similar phasing uh that Mr Case has come up with for the renovation so in each floor of kpod for instance we have a same similar group of milestones for each of the contractors uh to meet and the phasing plans also identify temporary walls and features that the contractor needs to install in order to keep School separate from construction we've identified the access pattern for contractors to get in on each floor and all things related to construction and down in the lower left I know it's hard to read on a virtual call we've also included the standardized testing dates in the building and given the contractors
029Direction on how they need to stay away from loud and disruptive work in those time periods so that we think we've got this set up very nicely for how we proceed from floor to floor where the contractor's work site is set up how it's separate from students so that everybody understands what the rules of the game are and the final slide has to do with the work in preparation for the next phases of of work and and as we've talked before there'll be temporary classrooms set up because we'll obviously be losing classrooms while we're renovating and we've worked with Mr Nicholson and the entire team to identify 14 classrooms throughout the building that'll be constructed as a part of this phase one and so you see the locations on this sketch they're in the auditorium
030they're in COD they're in the senior calf they're also in the in the library so they're all located here and the design team has done a nice job of putting the details together based on the needs of those classrooms from an HVAC from an electric and also from a seating point of view so they've gone over this in in great detail so there's a lot of work to be done in the first summer to get these classrooms set up and ready to go so we can go from floor to floor in in a rather methodical uh Manner and then these classrooms remain during phase two to provide swing space as we go through the renovation uh just a quick summary of the schedule of phase two site and building renovation end user meetings continue with
031Sher group and the entire team uh design development drawings are being taken to 100% we anticipate being out to bid in May uh with an award in Late July or August of course that's uh at the same time that we would have an npds permit um so we have to see how that process goes total project completion anticipated at the end of 2030 or into 2031 and it's also combined with the abatement work that is being done throughout the building so we have a new abatement consultant that was uh brought on board they're working with the team to identify all areas in the building that require abatement and they'll be coordinating their documents with the phasing for the building Mr Lynch it's Kathy has have there has there been any um communication with your team
032and the npdes permit writer to give you any type of insight into how it's going so far in meeting the August date well everyone always looks to have that Miss McMurry and we kick that off by having a pre-application meeting with the folks at the Conservation District and so they provided the civil engineers with guidance on how to put the application together and what they were looking for and fortunately they've returned comments in probably less than about two weeks back to the team so that they can they can move on it from there unfortunately like it is on every other comment it or on every other application it's very difficult for them to give us any confidence in a date on which they'll be finished so all we can do is check the Milestone box
033for an administratively complete submission and then ask in a very gential manner how things are coming and you know do our best to be communicative with them without being a bother to them I'm sure that you understand yeah okay thank you so miss mcbry just to add to that real quick before Mr Lynch goes on uh we did just receive com additional comments back from Montgomery County Soil Conservation this morning uh so we'll be addressing those and resubmitting the documents as soon as possible exactly thanks Mr Slaughter now um phase two renovation and the schedule I want to keep you up to speed on what we'll call the phasing schedule for the renovation because it is um an extremely difficult renovation that we've been working on with the team in order to establish and so
034we've done some jockeying of the sequence of work as we've moved along here in the hopes of a maintaining an adequate number of classrooms throughout the building to maintain classes and B also making sure that construction uh is navigating through the building not only in the in the best interest of the district but also in what makes sense technically or how we provide Power how we provide HVAC so the the one change at the top here is we've got the apod Edition which you know goes first and what we'd like to do is move as quickly as we can to the F renovation which is the auditorium space because that's really a key space in the building and it also is key with respect to phasing and so in the course of determining the right
035phasing to maintain the classrooms we'd like to go from the aod Edition right to the F renovation and addition and what that really means very simplistically is all new construction is done effectively at once once we're done with f go back and renovate a and then go to B and you see jpod and part of Hod which we're splitting um off so this is a work in progress as we've discussed in in the past overall these are slight modifications in summary with respect to phasing one of the big features that we want to make sure that we've got correctly identified in the phasing is where the cafeteria falls in the entire renovation to try to minimize any impact on food service and also to just make sure that we can do the kitchen in a
036reasonable amount of time that doesn't add uh issue or cost to the overall project so this is a work in progress that will continue uh really right up until bid documents are released the one um thing that we've also worked on here in the past uh month is looking at how to make this very large project attractive to contractors and very competitive and so one of the other phasing ideas that I've introduced to the team is the idea to split all of these pod Renovations up into perhaps multiple bid packages so it makes for a smaller bid package for let's say area a f and then a and we get that work underway and then the next phase is a followon phase for bidding that brings another group of contractors to the site so this
037again creates greater competition allows more contractors with bonding capacity to chase the project makes the project more more attractive and I believe would be a better value overall to the school district so more to come as we go on this process process it's ever evolving Mr Lynch I have a question um regarding the kitchen cafeteria the equipment this is just a informational question is is kitchen equipment a long lead item or no it is okay so so when would we look to um be doing that um I guess ordering right so it it'll be part of the design Miss MC merry first it'll be part of the bid and then we phase the bid such that I don't want the kitchen equipment to show up on day two after notice to proceed I want it
038to show up you know somewhere in the 8 to 10 months after the notice to proceed from a kitchen standpoint most of those V ERS have the ability to store the equipment but the next thing that we have to do is get in and demo the old kitchen do the underground and under slab utility lines before we're ready to receive it and we've got all the methods in the bid documents in order to identify how the contractor has to hold on to that equipment until it's ready and that'll be part of the the phasing of how we do the kitchen so so a question so if you if the contractor or manufacturer um stores the equipment that's an additional cost to to us right if it's true well it's I should say that it's included
039in just about every project that we do that in some form or fashion that these equipment vendors have to store the equipment it's better to do that than to have the equipment come out and we have to get conx boxes and we store it on your site the risk to the district is greater in that fashion right we don't want to do that and we don't have room on we don't have room on site to store it right there's no okay I guess what I'm thinking about and again I know this is a massive project and maybe some of the things I'm asking about are minimal cost but my head is all around a number of minimal costs will add up to a large cost so I'm thinking about yes and again you know when
040something is stored you know if we go beyond the the agreed upon rental space so to speak then we start to incur a larger cost because they you know they want to free up that space so there's a great example thank you on why it would be beneficial to break up the contracts because we could put it in phase two when they start the addition of a and then they go to F and then they do the renovation of a and if it's got B pod which has the kitchen in it then we're running into that storage issue but if I bid B pods separately and you know in easy you know I'll call it shooting distance of being able to do the kitchen it would presumably reduce the storage time for the kitchen equipment
041and the contractor knows hey I don't need to worry about all those phases in front of bod I know I've got 12 months and I'm going to be putting kitchen equipment in that in that number and I can nail that number what we really want is to eliminate unknowns like the length of storage cost or that potential that you just mentioned about being asked to pay for additional cost for storage so if I can nail it and say we're going to order it in 12 months we're going to put it in that gives the contractor pricing confidence Mr Slaughter did did talk with me and explain to me um the um suggestion the idea of making this you know a more a number of more contracts or bids um I'm not saying that right Mr
042Slaughter but Mr Slaughter helped me understand that there could truly be a a cost effective Advantage for doing this oh terrific thank you Mr Slaughter um one thing one thing I'd also like to mention is that uh you know the lead when you're thinking lead times for kitchen equipment Miss McMurry it's not like switch gear or something like that but you do have to do it in advance you're probably looking at you know a four to eight month lead time depending on the piece of equipment thanks for that you know where my head was going but I also understand there's other um Ed other schools that are undertaking projects and I don't know if kitchen equipment is something that will be in demand and we'll be in some type of queue waiting great on the
043on the screen before you is um something that you can't quite read unless you look very very closely but I call it Mr Colin case calculus you didn't think that we would be doing any calculus here but it really is an exercise in calculus to determine how many rooms we're renovating at once and how many open rooms are left for instruction and so um Mr Case has come up with an ingenious spreadsheet to identify in each phase how many classrooms are renovating at any one time across all of the phases and then down at the bottom Mr Linsky if you can scroll down just a little there's a colorful uh line with yellow and green and red and that identifies the sum total of classrooms that we need during that phase and so this is
044our tool for working and saying we need more we need less or we get on our knees to Mr Nicholson and say boy in this time frame can't we squeeze some classrooms some extra classrooms out that's our last request in the end to go to Mr Nicholson and see if we can't squeeze a couple of classrooms out um happy to share with this with you as we go for the most part we're doing pretty well there are some other one some phases in here where we still have problems to resolve but uh this is a weekly process based on you know how the design process goes and and how we juggle the phases so hopefully you can understand um how challenging the phasing is here a much easier colorful diagram to look at is the
045overall game plan uh presently as to what the sequence is this is easier to look at each phase is numbered and you can see a uh the apod the apod Edition uh the the very I don't know if I call that light green or dark green for phase two which is the auditorium and the coral and U musical additions and so this is a very simplistic way way of identifying what the sequence of phases are and we have it for all three floors I've only put the one the one here for an example to so you can see how we look at the project oh we put them all in there's the second floor okay so we only did the second floor not the third floor right so there's one more floor plan for the
046top of k-pod here okay the next slide is a little bit of an expanded budget update from what you've seen before so there's our preliminary number that 259 magical number and what I broke out for the team this month is the transportation cost the k-pod and nitorum cost and then the balance of the project there are those numbers there um with bids being received on Thursday we'll assemble for uh the approval of the board the expanded kpod and Natatorium budget that shows the cost of all of the prime contractors and all of the soft costs and we'll give you an update on where we think contingency would be on that k-pod so those numbers then go firm and obviously any savings would get transferred into the rest of the project so there'll be a one
047sheet budget that has all of the costs associated with k-pod and the atorium this phase one that everybody will be able to see and that'll I'll update the team on on uh a monthly basis or however often you would need to see it so I just wanted to make one comment uh before we move off of uh the cha presentation this just happened within the last couple hours we have decided to move the bid date from Thursday January 30th to Monday febru uary 3rd in order to give the contractors a little more time to refine their numbers uh so uh we had made that change after all these presentations had been uploaded to the agenda so that was just as of probably about 4:30 or five o'clock this afternoon that we made that decision and
048and Mr Slaughter can you just explain a bit um the basis for doing so regarding those ad those large addendums please yeah certainly so uh given the amount of volume of information that was in these addendums that had been issued out we felt it best to uh you know provide the contractors with a little more time to refine their numbers uh you it's very typical for contractors to ask for an extension but when we got multiple requests and we reviewed the uh the size of the addendums we felt it best to give them a little more time to have their subc contractors refine their numbers and that have the contractors refine their numbers as well I just want to thank you for the phasing and the plan for that and for incorporating in things like
049student testing dates um I think that we probably will receive a lot of questions from the community about things like that so the impact on students so I appreciate that um and really also a shout out for bringing math into Everyday Use and making sure to point that out so I'm hoping that our students who are watching um and are questioning their decision to take calculus um understand the value and importance so um appreciate that Jamie in your presentation thank you any other questions seeing none okay the next presentation that we have is from Shader group Architects uh it's going to be a little more visual uh presentation and then please note at the end of the presentation there is a student update which rolls into item C which is Mr Gilmer's presentation so it's
050kind of a combination of the two together uh so Mr Bradberry is here tonight from Shrader group architects to have his or to go through his presentation thank you Mr Slaughter um and thank you all I'll I'll start with an apology because I know Mr shider is typically at these meetings and he is an incredible presenter so I will try to keep up with his uh his lead on this um hopefully you leave this evening thinking wow I can't wait for this construction to start uh because we do have some really good images to show um uh but hopefully there's no other uh reactions other than than uh positive here so if you can scroll down Mr Linsky we're going to show some updates we're going to start with phase one um and I'll go
051through kind of floor by floor you've seen a couple of these uh kind of black and white images and now they're actually uh rendered and and something of what will be there uh after construction is complete so for all of these you can kind of see and this is k-pod the exist existing conditions down in the bottom left and then the rendering of what the space will be so we'll start in the the main office Reception Area uh with the before and after you can see what the difference will be there uh just one note there are some graphics uh you'll see throughout the presentation those are just placeholders at this point we are working with your students and your staff uh to help Define what those Graphics are going to be and I'll talk
052about that a little bit more uh later in the presentation uh this one moving through uh the first floor of kpod is the uh main office work room and you can see what the condition is before and after scrolling down again first floor one of the big changes is uh the corridors we're going to remove a lot of the lockers we're going to keep uh at least two of the banks of lockers on each floor but remove the rest and infill that with a series of benches and countertops to act as genius bars and this is another space uh using the corridors to bring uh students outside of the classroom maybe for individual uh um reading or or um studying or some small group spaces at The Genius Bar they can get together as uh
053one or two or or three or four students at a time to utilize those spaces and get rid of the lockers that no one's using anymore um another view of the k-pod corridors this would be consistent on all three floors and you can see again there's opportunities for graphics which we will continue to discuss as branding uh for the the new high school moving through the first floor there are uh several uh special ed rooms uh the pays lab and the post2 lab would take the place of what is currently I believe business classes or some sort of uh computer labs across from the administrative area uh you can see what kind of Renovations we're doing to those spaces so they all have their occupational uh spaces where they can learn how to use tools
054and POS stations and sort mail and fold laundry all the things that they would be doing as they move into their uh future uh lives outside of school and you can see on this slide and then the next one they're also the the pay lab so you can see what happens when we convert those two uh classrooms into uh those lab spaces next two slides you can see the post 12 spaces so we tried to replicate a living room a kitchen a bathroom a dining room uh for all of the uh the uses that the students would need as they graduate out from the program here into their own uh real lives this would be um typical you can see the the next slide also has a space for teaching and learning uh in that
055same lab so half of the the classroom is used for uh those those other functions and then this part of the classroom is is more of a traditional uh teaching area and the nurse's Suite is also on the first floor of kpod uh that will be completely renovated there's not a lot of moving Parts here it's really just a finishes upgrade so you can see what just a simple refresh does to a space like a nursa suite here uh it really does uh make a difference in uh the look of it and then I didn't include any of the typical classroom spaces the would be on the first and second floor uh on the third floor though we uh you can see the uh updated chemistry classroom there are six lab spaces up on the
056third floor those will all be modified as you see here uh this is all a product of multiple and user meetings with the science department uh for the district so all of this uh information that's included here is exactly what the uh the teachers and staff have uh requested as for this uh renovation so that's phase one phase two now I don't believe you've seen many of these images but we'll start on the outside and some of these exterior images are really just of the aod Edition uh with such a huge project we have some areas that are more developed than others um so we'll start back here at the addition that connects aod to Hod and encloses that courtyard space you can see on the left hand side that is the apod uh original
057structure with just the replaced Windows uh that little uh piece in between is the stair Tower so we're using that as the the piece that kind of connects the addition to the existing and then we have the the new addition so you can see it's a combination of brick and metal panel um most of the the glasses up on the second floor uh Mr Linsky if you can go down just a little bit uh this is the other side of that same addition so this would be facing Crawford stadium and the baseball field uh you can see the the main entrance and then uh sort of the the series that leads you down towards the Athletics uh area we have one more view excuse me of the exterior this is kind of a view that
058you would see from Crawford stadium so you can see that new entry Lobby classrooms on the left uh Corridor down to the Athletics on the right and there's intended to be more of a plaza area so you have an Athletics space to utilize as an outdoor uh function um to hopefully connect the existing High School to Crawford stadium and in the background you can see a little rendering of the transportation center uh the new Transportation Center moving into the building uh we have sever real quick Mrs St has her hand up great oh sorry can we go back the slide to the back um where the uh yeah right there so it it will look like that like there will be no more um equipment left outside in the back and it'll look clean and
059it will look clean all right every everything to the right uh we it's kind of out of view but there is a new mechanical compound that is uh enclosed so you will not see any of this stuff out there I can't speak to Mr Slaughter's ability to keep the equipment out of there but like the walkways and everything is that actual runer or is this this just for demonstration of the like is that actually what it's going to look like with the walkways and the grass and everything or is so I I believe the site plan is still um a little bit behind the architecture as far as our renderings go but uh we have tried to update the site plan to reflect what is actually going to be there there will be some Pathways
060it might not look exactly what like what you're seeing here okay thank you sure all right inside uh the main entrance here uh again this is intended to enclose the space and create that ring uh to connect the entire school together so there is as you can see in the background there is another entrance into the courtyard you can again connect from this apod Edition all the way through the courtyard down to the fpod uh to connect to the auditorium so hopefully the the whole idea with this uh renovation is to decrease uh student travel time create a lot more circulation uh throughout the building and uh really improve on travel time here um creating this grand entrance in the in the um the lobby space here you can see on the left hand side
061there are art classrooms I believe those are 3D and digital art and then on the right side where that graphic is those are the 2D art classrooms those are both two story spaces to match the apod and then down the hall to the right is where you would uh go down past the teched area to the gymnasium uh next slide Mr Linsky there you go uh so this is just another view again a nice Grand stair up to the second floor and kind of looking back out towards that entry Plaza through those windows um towards Crawford Stadium to the right there another view so on the second floor of this Edition uh right where underneath of that uh canopy that sticks out of the entry Lobby there's actually a space for students to gather it's
062kind of a really fun space for them uh to utilize it's an unprogrammed space at this point so it's just another flexible space for students to come as a a full classroom or as individuals or small group areas uh another place for them to uh to learn and collaborate together um keep going down this is another view you back from the top of the stairs out through that entrance so you can see the the classrooms for the art rooms on the right and uh again that Vision out to the hopefully to the athletic fields down through on the left there and I think we have one more view just uh again reiterating that we're trying to uh bring natural light into all of these interior spaces so you can see the glass into the art
063classrooms as you're walking down this core you can see what's happening all the exciting stuff that's happening inside of the uh the art classrooms there on the second floor onto other areas of the building uh one of the major uh conversions here is the c39 and a33 spaces those old lecture Halls that we have um so this is is showing what a renovated version of this would be um you'll notice that we are trying to open up two uh sides of the of the space so in the back of our rendering the wall is open and you can actually see the corridor there at the top of the steps that is also all open and your current space only connects um there's another set of stairs that goes up to the second floor in this
064case we're actually bringing that all the way up to the second floor um so hopefully it creates a little bit more flexible space a space where you can have two classrooms come out uh do a a larger presentation or you could have students out here all throughout the day as breakout spaces from their their General classrooms question M mcry hi thanks so and I know we've talked about it before regarding um the transition with that large open space um ADA compliance and access for all can you speak to that just a bit about what the thought process is in the design yeah that's that's a great question it's something that we are always cognizant of and it's difficult with uh stairs like this um so one thing that's not shown here but we are trying
065to develop an area that would basically uh build into the learning stair where someone in a wheelchair could access the space and be a lot more integrated into the space uh but up on the second floor level so but it it brings them in to make them feel like they're part of the learning stair Dr bar do you have a question yeah I was just going to comment that if you look at that image in the lower leftand corner there not only are the upper levels of these current spaces being c39 and a33 inaccessible meaning the second floor um but there's also a stage down on the front which is inaccessible right now um this surrendering you'll see there is no stage it's leveled so the whole Space there down in front is accessible and
066there's access now on the second floor so as Mr Bradbury pointed out hopeful hoping to find an even better solution but it is more accessible in three ways in the space currently is great than for you know and and I'm I'm really happy to hear that it's an integral part of the discussion and planning process and speaking of being in that room now it's it's incredibly tight for anyone um so it'll a huge Improvement it's gorgeous it's stunning good uh we do have a couple more images and this the next two images here basically just show what a difference it will make when you open up those walls and get light into those uh inner core spaces so you can see in the bottom left image uh just a a narrow Corridor that really uh
067is kind of uh disorienting and now you'll have this open space and you can actually see where you're going around the space uh it's really going to make it such a huge difference in these these two areas um one more slide so we mentioned that the stair would connect to the second floor there's also a space on the top of the landing there that's almost like a a little small group space but there's space outside of the corridor and connected to the learning stair that also uh allows for some flexible learning space at the top of the stair and connects to a small uh either conference room or small group instruction space you can see the glass area through the doors there uh that will kind of allow for another flexible space in the area
068that you currently don't have Dr bar do you have another question I do not I just didn't lower my hand sorry sorry all right uh the next uh two slides here I know Dr Nicholson and and Mr Gilmer will uh speak to the furniture selection piece of this and and possibly some more but we have started to integrate the students and we really love to get their feedback uh we've tried to narrow their um their ideas into certain uh categories or certain areas of the building so the first one we've started with was the furniture selection we took them on a tour to Corbett and I believe that's what the the video will show later on so I won't speak too much about that but they are involved in uh SEL ing the furniture for
069the building uh We've also had two meetings with them uh to try to get an understanding of what they want from a graphics perspective so you'll see a lot of different Graphics around to really um change the the look of the interior of this building um and really emphasize The Branding that could happen uh in the high school campus here so we've we've met with them twice in once in December and once in the new year um to kind of get their feedback we've also created these uh QR codes that will be posted around the building so any of the students any of the staff can take their phone out this will be posted so for instance it says k-pod Corridor one this would be posted in k-pod uh right at the location where you
070open up the the QR code and you can spin yourself around and see what the renovated space will look like and they can then provide their own feedback for what the the graphics or The Branding messages to be for those spaces so those will be scattered around the entire building for all the spaces that will have Graphics um hopefully it's a really exciting way to uh get the students and the staff uh involved in the process uh we are also looking for uh input from the students on the library or IMC design uh that will come probably in February the cafeteria design we're working with our kitchen consultant at the moment but we want to know what the actual cafeteria space wants to be and then the gym and Athletics we'd like some feedback from
071the students on all of those spaces so plenty of opportunities and it's really been fun so far I'm sorry did you say that those QR codes are up now or are they're going to be Dr Nicholson are they up now I don't believe they're up yet Mr gmer I'm not sure if you can confirm I know they were uh delivered Friday they were going to be lamin ated and put up around the building so I'm not sure if they're quite there yet or we'll be going up this week but I wasn't in the building today they may be up they will certainly be up by the end of this week oh yeah we'll be promoting it on our morning show for all the kids on Friday as well oh that sounds great thank you I
072love um I love that and the opportunity for students to provide feedback um I think we've you know we've done you know a lot to try to Garner the community feedback of course um School Personnel um and to allow current students to also have a a chance to weigh in with some of the graphics and some of that work will there be an opportunity for students to do the actual design or production work um and then I recall when we visited upper Maran they had Incorporated um elements from the buildings past into some of the branding there I I'll never I love I think it was they had done their school Amma Mater um using music notes music notes using the the floor from the prior gym um so will there be opportunity for us
073to bring some of the old into the new I I think that would be a great discussion to continue and really identify where we can actually grab from the existing I mean we're we're still in the existing building so it's the old is going to be there but can we incorporate some of that in the graphics I think there's definitely an opportunity to your previous question whether the students want to actually create these Graphics we would love that um otherwise we have graphic designers on our our staff as well who can take their feedback and then uh create a a separate graphic we've also talked about uh doing a digital display in some areas where it can be rotating student work uh digitally rather than you know something that's more permanent so there are certainly
074opportunities perfect thank you I think what we've heard right now the only thing from the old that is not moving forward that we could would be um Locker doors um old HVAC systems can they be turned into abstract sculptures and art um I think I you know we've got some interesting things to work with maybe this miss her old stuff any other questions great thank you all I I just need to say this presentation was stunning I loved every aspect of it I don't I me I don't know if if the other board me committee members have comments but I think that seeing this now really brings it to light about what what we can do and it clearly demonstrates the collaboration with our staff Mr Nicholson Dr Nicholson part of me and our students
075so thank you all so much it's beautiful great it's been a a a great team effort everyone everyone on board I would just say I concur with Kathy it looks great can't wait to see it actually when it's built you know it'll be it'll be really nice so something to look forward to and I also wanted to say thank you to Mr Lynch um about maybe breaking the projects up into small into pods because I think that would be really good when you mentioned the charity bonding line and that contractors could qualify for more easily if the projects were smaller um so thank you for coming up with that create a solution there any other questions with the trader group presentation if not Mr Gilmer are you ready to roll into your Student Activity sure
076the uh you just figure uh just about two minutes here just to see and hear from some of the kids since we don't have a student rep on tonight um just to see what their visit was like there at over at Corbett where uh students had a chance to study some possible options for furniture you bab B purpose of today is really to get the students out here to see the possibilities for what the the space at North pen High School can look and feel like for student use after the renovation is done these kids have used the current space they've seen what uh our building looks like and how it operates now and it's really to get their input on what they wanted to look and feel like into the future but this whole
077like environment all the seats the new the different designs for seatings they're all just work they work well and I feel like they would work really well at North car knowing that like everyone fidgets and everyone's different and each of these chairs are meant for that and they're built for the different people the ones who like to fidget around well this building is absolutely amazing it's it's so hard not to just want to be like I want everything in this building for high school cuz it's like everything is all comfy and cozy and I would love to see a lot of these like pieces of furniture in our school for our students some of these things I think uh students would be easily focused that they'd be able to be comfortable and just enjoy being
078at school and in class I think a lot of teachers like on a day-to-day basis might want to change the way their room looks CU if they're take giving out a test or something each kid has to sit individually or working on a project you sit in the group so I think just having that versatility would be a big impact for most teachers so today we got great feedback from our students uh we heard a lot about the designs of the class room and some of the flexible seating um I was really excited to hear how much they or see the way they responded to the different options um I just see the excitement that you know you hear tables and chairs and you think it's not that exciting they really excited to see them
079and excited to hear that they're going to be in our high school a circle yeah and and I think you saw it there lots of smiles lots of Engagement we had a really great and Dr Nicholson you can talk about this too um conversation about 45 minutes of conversation I think after just walking around and touring but the kids are really excited and really it's one of those things when you get to see it and feel it a little bit they go wow this this this could be the place where I I go to school and this is what it could be like so they're really excited to provide their feedback yeah I agree it was a phenomenal day at Corbett they were such gracious hosts for the students and you know we really got
080a lot of feedback some wonderful feedback from the students I think my favorite part was after the fact um I did not go back to the high school with the students I carried on my day but later that week I was at the high school and heard from various staff members how they heard from the students how excited the students were when they returned back to the high school just having that ability to to really see what this the school can look what can feel like how can function after the renovation they were very very excited and we're just grateful that they were you know willing to give their time to help us out out and you know kind of shaped the future of North pen High School it was it was a really really
081great day and we're looking forward to the next meetings with kids because every time we sit down with them you know their expertise in using the building really shines through it I just quick ask how did those uh kids get picked did they volunteer did you pick certain ones or um Mr Hassler brought the students along um and he basically asked all of his assistant principles to to nominate some students that um they knew were active in various different roles so we had a number of backgrounds both in the the students that went on the furniture visit and the students that were continuing to work with on Graphics um and the design of the the library and the cafeteria um you know some students are in athletics some are in Performing Arts some were very
082heavy into um you know extracurriculars some are not so it was a great wide variety of students um but they all had one thing in common and that was you know really I love for North Penn and making sure that they had their their stamp on the future thank you I appreciate how the student voice and student perspective has been kind of woven through all presentations um this evening so thank you so much for that um I also just want to kind of also highlight too I think um to be able to kind of see how things will be placed in the building and how they will be used and having that voice it starts to make the project feel a little bit more real um and and so I also Mr Bradberry I also
083really appreciate it in your presentation how you had where it is now what the space looks like now and what it will look like um and then Mr Gilmer your effort to you know with your video just to bring it all together of how the students will then see themselves in that space um is it's all starting to feel very real now so we're taking it out uh from budget numbers and and um and Architectural rendering Ing and and starting to bring this to life so thank you and Mrs romage to your point it's it has been fun I've been spending quite a bit of time with the Sher group team um sitting in end user meetings with teachers and to see their faces as they see their perspective uh classrooms of the future um
084has been really fun as well so the students and the staff you know there's some excitement building around it uh we have a staff meeting coming up next week to share a lot of this with the larger staff to make sure everyone's aware but you know as the the staff get that chance to kind of um you know sculpt what they're doing and what their places and spaces will look like it's it's really been a fun process so Trader group has been phenomenal we have a great team working on this Dr Nicholson is is this presentation something that could be shown to the full board or possibly have some of the students come and just speak to it um I mean just a thought be just so everyone could see this yeah M merch if
085that's something you you know you would like to see we can put some thought into exactly what that would look and feel like and when that could when that could happen um as Mr Bradbery said we do have more student meetings coming up uh mid-February so maybe sometime after that and after you know the bids have been acted on potentially for phase one but um yeah I I think they the students would be pleased to come out and share their experiences and you know kind of be in front of the whole board that would be that would be really nice and I I agree when you were started speaking I'm thinking yes maybe in the April May time frame thank you I definitely think we can make something happen there sounds groovy are there any
086other comments or questions on the presentations okay if not we will move to the next agenda item and that is the 10e cap Plan update so uh we provided a January update to the 10-year Capital plan uh some of the projects that we're currently underway with are the districtwide building automations seamen upgrades the pendale Middle School boiler and hot water heater repairs which are currently scheduled the pendale Middle School auditorium unit replacement in progress the districtwide assem mbly area door hardware upgrades that design is 90% complete we anticipate going at the bid on that in March uh the Penfield Middle School modular classroom HVAC replacement in at least two of the classrooms that is currently being designed and the gwor gy rooftop unit replacement that is nearly complete the new rooftop uh equipment was installed
087we just need to finish pulling the wires and uh get that started that is for air conditioning only so the unit's still functioning right now uh in heat mode but we are looking to uh have that ready for the cooling season some of the projects that are upcoming are Chiller compressor Replacements at Nash York Avenue and North Wales building uh those currently are multi-stage Chiller Chiller units and one of the stages or two of the stages of compressors are out units are still running but we need get those replaced for the the high heating season when they're really running uh full steam some of the other things that we're looking at there are two schools Montgomery and Hatfield that have outdated building lighting controls they are able to be resolved with a firmware upgrade so
088we're looking to uh Implement that in the summertime that is a standalone proprietary system so we can only go to one source for that for Lutron so we just got updated proposals in for that that will be up soon for uh your approval then the other two building three buildings I'm sorry that we have North Wales Nash and Culp are all building lighting controls replacement so those are Antiquated they're no longer supported so we need to put a new lighting controls system in those three buildings so uh SN Hoffman is working on a proposal for that right now and uh that will go out for bids um um the current projects underway total 4,765 88 that is part of the 2024 2025 budget the upcoming projects are currently at $730,000 right now we did have
089another 4 million uh plus Dollar in the budget for other options uh we need to go through that because uh some of the playground are some of the items on there as well as some HVAC equipment so uh further discussions on that we can get that imp implemented but again that that's all all these items that are upcoming are part of the 2025 2026 uh budget any questions on the updated capital projects thanks slauter no problem uh the last item that I have uh is the update on the pre-purchased electrical gear so we we did reach out for pricing for multiple vendors on the co-star's purchasing program we received their initial bids in the meantime uh since we did choose to move forward with the solar Grant and the possibility of installing solar at the
090high school we had to reach out to Pico for the Transformer configuration uh what they had indicated to us initially was we would need a Delta y format however with the implementation and the possibility of solar that had to change to a YY format so we have um reached out to Pico they are to send us the final sheet in the next day or two we will go back out to uh all our vendors to update their pricing uh that there should be a small price change for the YY configuration and we will present that for a a board award at the February 20th meeting so we should have everything finalized within the next two weeks and get that on the agenda for that process uh just as a reminder an additional item uh we
091did move the bid we mentioned it earlier for phase one of that of the project from this Thursday to the following Monday uh February third so just just a reminder on that um we received word early in the in the meeting that the student representative was not available tonight he was uh currently on another uh project so we will not have a student representative update tonight so those are all the informational items that I have for you this evening if there's any questions M Mr Schneider what time is the bid opening on Monday again uh all the bids should be in by 1:30 we will start opening bids at 2 pm okay thank you all right thanks so much okay so uh we will move to public comment Mr gers is there anyone in the
092audience that would like to make public comment uh yes we have one hand raised okay then I'll read the um guidelines individuals attending this meeting virtually and intending to speak to the committee should be aware that they are being recorded in order to meet the requirements of Pennsylvania Sunshine Law it is necessary to record the names of all citizens who speak to the committee during the meeting to assure compliance with this requirement it is essential that those planning to address the committee raise their hand electronically and state their name and municipality members of the audience are asked to limit their questions and comments to matters being discussed at tonight's meeting or matters that may come before the facilities and operations committee members of the audience are asked to limit their questions and comments to three
093minutes and this is in reference to board policy 903 okay uh up first and last he's the only one in the room tonight is Robert McCarney Robert I have enabled your microphone so when you're ready to begin you can state your name and minutes pality for the record and you can begin your comments please rob McCarney Hatfield Pennsylvania how's everybody doing tonight thanks for taking uh the question I would like I just have I have a couple notes and kind of all related around phase one the project um so the first one is um I know there is a lot of discussion um over over the last several years um as it relates to electrical switch gear and sourcing of such I know that's uh been something that's brought up here uh for the last
094couple meetings in looking at this project and so my question Rel around that is um you know are we looking at strictly us-based switch gear um to be ordering considering there was a a very you know significant um threat if you will uh about um some backd door from foreign nations in a lot of the switch gear that has been in the marketplace over the last several years I know some of that has been um you know set aside but that's still still a thing that's out there um so that's my first thing my second um as it relates to uh the N the phase one and the natatorium um I know I see that in the schedule versus previous schedules it looks like it's now the proposed schedule I should say it's now um
095isolated to May to December without an option to go back in the summer of 26 um could anybody clarify where that is um is there anything that could delay that and um specifically once that part is is complete do we need like is there a new Uno that has to be issued before anybody can get into that space um obviously there's going to be a lot of concerns with swim water polo and then um the aquatic club using the space and um lastly as it relates to that too was there any feedback from the pool architect consultant any concerns from the uh biders that are um looking at that part of it and are those bidders different like is that a kind of a cutout from the rest of phase one meaning are those contract
096are slightly different um that's it for me thank you okay thank you Mr Carney you've asked a number of great questions and I'm not certain if we are able to answer them uh this evening but I certainly want to make sure you get answers to all of those questions um so I'm gonna ask is Mr Schneider on maybe Mr Schneider could answer I don't want to put anybody on the spot um regarding the um the switch gear um I we do not know where the vendors um got their pricing we know the manufacturers but we're not sure of the um where it's made uh around the world uh I think Mr Slaughter could probably answer uh the nitorum scheduling uh questions but I just wanted to jump on to say that you know we're we
097don't know where the gear is being being built um and and what country it's being built in that's a question would have to come from the vendors providing the pricing understand so with regard to the nitorum schedule we have that schedule to start uh after May 16th after the last event and that is scheduled to be back online by um I believe it's November but we are making plans just in case that doesn't finish on time uh in case we have to move stuff elsewhere but the goal is to get that done on time and uh get the kids back in the pool so there were a few other questions so I was going to ask if you could please email those questions directly to Mr Slaughter if that's okay for followup with you is
098that is that meet what you Mr Gilmer is he still on I um Miss McBerry I know Mr McCarney so I can put him in touch with Mr Slaughter that's no problem okay thank you because his questions were technical in nature and I think you know best to uh speak one onone at this point if that's okay thanks Dr bar okay all right so going anyone else Mr Gilmer I should ask that you said just one that's it all right thanks so Mr Slaughter I'll turn it back to you for summary of the items that are either for work session or our Action meeting please certainly so the list of list of items this this evening that we are recommending for the work session or Action meeting are the permission to advertise for the radio
099tower demolition project the second item is the amendment to the contract for C Associates for the tree survey the Third item is the amendment to the contract to count and Associates for the existing features additional surveying and the last item is the approval of the quota proposal for the traffic study from uh HCA for The Pedestrian study at suy toown Pike and Bridal Path Drive thank you Mr Slaughter so I will say our next meeting will be in a virtual format and it is scheduled for Monday February Fe February 24th at 700 p.m. so I will ask for a motion to adjourn please so moved okay thanks everyone for tonight it was a great update appreciate it very much take care