001slash finance committee to order. It's unsatisfactory. We will share the Pledge of Allegiance. I pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all. I am overjoyed. Hand this off to Mr. Rao. Good evening. First up on the agenda, we're gonna discuss the five-year capital plan. Using the five-year capital plan, a couple months ago we looked, we were starting to use the MySite IQ product that helps kind of organize district products, gives you a five-year, lets you model out what the cost would be. We did some work with finance committee, subcommittee, went through these projects, kind of got a starting point, so tonight we can review that capital plan. But I'm also gonna introduce Mr.
002Mike Arnold from SiteLogic. The MySite IQ is the SiteLogic product that we're using. So they've been working hand in hand with us to try to get this plan, at least to where we wanted it at this point to review. Thank you. Thank you, Brad. I did wanna start off by thanking the school district for having the confidence in us to be your ESCO provider. That doesn't get lost on us. We don't take these things for granted. We've really enjoyed the relationship and are looking forward to many more years serving Peter's Township. So to kind of build off of what Brad had said, just wanted to kind of give you an overview of where we are and maybe take a little bit of a step back as to how things are evolving in Pennsylvania public schools,
003the funding of them, the procurement of them, before I turn it back over to Brad to do a little bit of the demonstration. So if we go back to the PlanCon process, some of you are familiar with that, some that may not be, but it was a funding vehicle for the state to help districts fund some of their projects. And this was basically in effect all the way up to about 2016, but around 2016, they put a moratorium on the funding, as you guys are kind of well aware. And they really haven't had a plan to bring that back. There's been a lot of discussion about it, but that never has happened. And the state kind of changed their focus. They have now looked at more of asset protection for districts, the warm, safe and
004dry term is being used quite a bit. And part of that is because what would happen with the PlanCon process would be districts would unfortunately allow their facilities to go into a state of peril because they knew they couldn't get reimbursed. It would happen only every 20 years. And then that would cause you to take on a major project because once you were eligible for reimbursement, you would then embark on something that was a lot larger than maybe you wanted to do because you wanted to take advantage of the possible reimbursement. So as you met Rick and Garrett, they are very involved at the state level and they did have an opportunity to testify to the Senate Hearing Committee about the idea of the asset protection and the warm, safe and dry aspect of facilities.
005And the result of that has been this grant rollout that occurred this past year. And this was the first time that they had done that, the Act 34 facilities grants. Obviously, Peters Township was fortunate enough to be awarded a certain amount of money associated with all of that. But what we've heard is that they're gonna continue to do that each year. And the hope is that the total amount is going to grow. I think we ended up between the environmental grants and the Act 34 grants, we had about $175 million worth of grants that were awarded. Now that sounds like a lot of money, but when you think about Pittsburgh and Philadelphia taking a good share of that, that gets spread out quite a bit. But there's been discussions about a $300 million mark for
0062025 and then continue to move that upward. So one of the things that the MySite IQ does for you and did for you was to give you a little bit of a leg up. Because one of the things that they look for when you're telling your story to try to get a grant is that you've put the time in to come up with a plan. And we've been able to do that through the MySite IQ. And it is all about storytelling, as far as these grants are concerned. And you want to be able to do that. And I think Brad's going to show that you can kind of cobble together each year as you identify your priorities, what might be the best story to tell to try to get some grant money. Now, again, none
007of these grants are guaranteed. There's a lot of considerations. It is need, it is demographics. These are things that you definitely have to think about and level your expectations as you move into these projects. But we have spent some time recently updating the MySite IQ. It's a lot of prioritization. It's going to involve everyone here, ultimately. And what we want to get to eventually is kind of a rhythm where you meet as a group. You kind of systematically go through this and determine, okay, what are the priorities for 2025? Get those procured, get those executed, meet again in the fall. What are the priorities for 2026 going forward? Identify those, what are your funding sources? Kind of lay all that out. And at that point, we'll know what kind of grants you got, what kind
008of grants you didn't get. And then just get into that cycle. We have a few districts that do that now. And what it allows them to do is methodically move through keeping their facilities protected and warm, safe, and dry without that huge sum of money that you have to spend when something breaks down. So that's kind of where we are in the process. We are going to move into one specific project that we've developed because of the grant that was awarded, and that's the Bower Hill roof. But I think I'll turn it to you, Brad, to kind of work through. And I think this is kind of interesting because it's our product, but this will show you how we're able to set districts up so that they now become affluent at working through the MySite
009IQ. He'll probably do a better job than I can do. Melissa's really our expert, and she's not here tonight. No pressure, yeah. So when I opened it up, we did have a subcommittee meeting with the Buildings and Grounds group and the Finance Committee group. We reviewed projects, and we kind of came up with, we settled on, as a group, this would be the version one five-year plan to review publicly. So you'll see in 2025, and now the way the tool works is we could take any project and move it from year to year. I had to unlock it first, but yeah, too much. So you could see, now that it's unlocked, I could move and we could say, oh, we wanna do the paving at the stadium in 2025. It makes that adjustment. I think
010when we, as a group, did the review of the product, you could see there's an inflationary number that gets attached when you move things from year to year. You see 2.75, but then when you take it out, it jumps to 2.8, and that's just an inflationary cost that's built into the system so that it could kind of give us our best estimate, because all the estimates are based on the current year, and then it's 5% inflationary factor when you move it out. So where we fell right now is Beyer Hill roof replacement, no surprise. We know we got the grant for the Beyer Hill roof. We received $300,000 awarded from the state for the grant project, and we know the current estimates that we have is 1.35. So $300,000 from the state, a million dollars
011from the district, a million dollars, 50,000 would be the cost to cover the new roof at Beyer Hill. I'm just, go ahead. Is there a deadline by which we have to spend that $300,000 from the state, or am I asking this question too early? I believe it's the calendar year. And being that most of the grants were $5 million and less, that's very doable. Thank you. Good question. Any other questions on the Beyer Hill roof? And I guess my plan will be, I'm gonna walk through the other projects and just kind of give you, and anybody that was involved in the original, they wanna pipe in and explain some of the thought process. But I think, we wanna group projects together that kind of make sense to work together. And we wanna space things out
012so that we might be able to fund those things moving forward. So in 2020, 26, 27, the one project is the actual paving at the middle school and high school. We reviewed that. We know that both not only is the paving bad, but the lighting, when it comes to the light, the parking lot lighting, and we also have the culvert problem for the drainage. It's collapsed down, when it comes down to the driveway, that we have runoff with water and it ices in the winter because we don't have proper drainage there. You can see, we give a probability score, 4.6, immediate priority. So this would be all the paving work around the stadium, middle school, and halfway up towards PV. This would also include the lighting and the underground water. Is the middle school stadium
013used solely for middle school sports, or does rec still play baseball and things like that? Cause I'm assuming there's football, soccer, and now you have lacrosse too? Yeah, all varsity sports are still played at the stadium. Oh, we're talking, wait, okay. We're talking about, okay, sorry. I was like, old school. Okay, I was thinking old school. We also, in that same general area, we have the outdoor basketball court that sits outside the middle school. It's major cracks in the court. It is used for middle school, for the actual school, and it's used in the summer by rec that use the outdoors basketball court. Kind of falls into the paving category in relining. Current estimate that we have is 125,000. When you add the inflation, it increases that, but that's the estimate we have right now
014that they continue to do that. Continuing with paving, we would move to the PV access drive. So this is the drive actually up to the PV field. I don't know if anyone's been up there. We do have the roads heaving a little bit right before you start making your way up from the PV parent parking lot turn, but if you continue to go straight, you'll see some heaving of the road there that would need resurfaced. I'm sorry, there is a handout in your packet that actually walks through the projects too, because I know it's kind of hard to see by you. And then finally, the finish off paving. We kind of grouped all the paving projects. It's just a ceiling of the McMurray parking lot. Now we did do the McMurray. We redid the whole
015parking lot at McMurray six, seven years ago, along with around PV elementary school. This is just the ceiling of that. It's just one of those steps when we looked at it and we had Cy-Lodge come out and do an assessment of all our assets that this was recommended as a way to kind of preserve that paving and so maybe get a couple more years out of that paving. Mr. Rao, you have that. Okay, so you just, so that 20, 25 is 20, 24, 25. Yeah. Okay. I think the year represents the year that the work would be executed, would be actually put in place. But in order to ensure that you're able to do that work in that particular year, the planning process needs to start in the year before. If I'm asking this question
016prematurely, please let me know, but is it better to have that McMurray paving in 25, 26? Because it does seem to match with all the paving work, but it's also at a different location. Would it make any sense to do it a year earlier just to try to balance the total price tags more, but also to save on the inflationary increase in the cost? Probably what you're getting. So it's not worth it. Okay, well, that's why I asked. Thank you. Yeah, I'm sorry. These are great discussions because as you go through this, you do wanna try to think about how you can cobble certain things together for economy of scale, whether it be at the same facility or the same type of work like paving at every building or those type of things are very
017good discussion points to try to save as much as you can. Well, thank you. Completely different kind of question. Are buses really capital or are they just here because we need cash for them? I mean, our lifespan of buses are 10 to 12 years so we consider those capital. Okay. Just like van uniforms. Any other questions on 25, 26? Moving on to 26, 27. When we identified projects, we did the renovation at McMurray seven or eight years ago. We renovated the middle school, the old high school into a middle school and we built the new high school. So it made sense when they came out and did the review that the one building that did show up that had some equipment that was beyond its useful life was Bower Hill. So we had a, we
018grouped the Bower Hill projects into 26, 27. First with the Bower Hill automated temperature control replacements. So this is the air conditioning and temperature control upgrades. These things all kind of fall together. The actual unit vent replacements in the classrooms down to the protection from the R-22 equipment. I think Ms. Femin, you want to speak to that? That's kind of my pet thing. R-22 refrigerant is no longer allowed. It's only allowed for replenishment of existing equipment and I think it's what, up to $800 a pound or something like that. It's extremely expensive. We just presented last week at a district up north that we're replacing their handling units or their rooftop units because of this exact issue. It's ridiculously expensive because they strongly want to discourage it. So they're not generating it at the levels
019they were when it was in wide use. And that really makes us vulnerable as a system to have our 22 equipment around. So if it fails, it fails. There's no bringing it back online. That's why that's my asterisk. And then the replacement of the actual HVAC terminal equipped at Bower Hill. The total for those projects come in just over $7 million. You can see why we kind of put that off in a couple of years. That would have to be a decision. Currently, things are working at Bower Hill. We just know that everything's kind of beyond its useful life. It's coming. On the 2728, with all the work done at Bower Hill, the one thing that we didn't know is just the exterior painting. It just needs a refresh. We waited till after all the
020mechanical replacement was done and then the next year we placed the painting. Obviously, that's one that could be moved in between years if we wanted to. And then we also have the stadium upgrades. We know that the metal bleachers in the away team stands. We do have issues with those. We remember when we replaced the turf, we knew that the track, we did not do a replacement of the track. So this would be three more years out. So it'd be time for a replacement of the track. And then, including some press box renovations and then the locker rooms and quarter finish upgrades. So these would be the locker rooms that the teams use that are inside the middle school. Now, this would be just redoing what we have. So, there was talk when we talked
021that they are smaller and for some of our sports don't allow for everybody on the team to be in there. This would not fix that problem. This would just upgrade the existing that we have. Mr. Rao, I just remember when my children were playing sports that upgrading the press box was talked about all the time and things of that sort. Seeing that it's so far out, would it be beneficial for Mr. Geier to speak and start speaking to those groups now and saying, this is what we're thinking of doing. And if you want to have more bells and whistles, it would give them time to fundraise for it or something of that sort. So, I just think it might be beneficial to have a discussion and because I'm sure we're gonna have a limited amount
022of funds. And if they wanna have something different or something of that sort. I mean, at one point, remember they wanted to, quarterback club wanted to create like whole new workout rooms and everything, but then it fell through because they only wanted football to use it. But so there might be some interest with a lot of those groups to come together and make it better than we would be willing to do. A question about the exterior painting and you're gonna roll your eyes at me and that's the lightest punishment I'll get. Is that something that we can do in-house? I think we could do pieces of it, but not all of it. There's a lot of work there and a lot of it's, probably from bucket trucks and so forth. That's why I say it's
023high work. Yeah, I think the time involved in it will probably be a little bit more than we'd be able to take on and at this expensive. Okay, no, fair enough. I got notes here that says, part of the press box is rotting. We're taking care of that now, right? Yeah, that's not part of the capital plan. We do have some issues at the press box, but we just took care of that internally. So, we shored everything up. It's functional now, but it's not updated. Okay, and then the part you said about, hey, we're redoing what we have. I just wanna say it's slightly different. The current facility does not meet mission requirement. Is that a, anyone disagree with that statement? I do. You do? I do. Why? Because I don't think we need to
024do anything. I think part of it is we take everybody, right? And a lot of the kids staying on the sidelines never play. You'd be better off with a freshman team or something like that and split them up and let them get playing time. But we're trying to fit all those people that a lot of them are never gonna play. So, you're gonna spend a bunch of capital money for that doesn't make sense to them. Okay, I understand that position. Yeah, yeah, I mean, I think you're trying to build a culture and things, but fair point. I seem to remember at an earlier meeting, there was speculation about at least some of the press box wondering if maybe Western area might be able to help out with something. Is the work we're talking about here
025beyond what they might be able or willing to do? I reached out to them and I think they have a number of projects and this wasn't one that would be at the top of their list. Sounds good, thank you. In the event that you wanted to do something more for those facilities, those locker room facilities, I'm assuming that it would be extremely expensive because there's, I mean, where would you build out and make it bigger anyway? In the existing, yeah, I don't think you'd be able to do much or it would probably be cost prohibitive to do it in the existing. It would probably have to be a standalone new building somewhere in the common. Mr. Rao, how many lockers are in the locker rooms now that we have? Or how many students are they
026meant to accommodate? Yeah, I don't know that number exactly. Yeah, so they're not used for school. And I know you used the word students. So just to be clear, they're just athletic. Yeah, we can get that number. I thought we had that number. I just didn't know if the number of lockers corresponded with what occupancy was supposed to be for each individual locker room or, it's okay, I was just curious. I could follow up with that. I mean, I guess to that point and to Dan's point, without the risk of taxing you guys in the month of December, so it's not due before Christmas, but I don't know if the others would be willing or agree with this, but it'd be interesting to see what the current capacity is and what the current requirement is
027and how you define that requirement. And just so we understand the shortfall, understanding what that looks like, if you solely through the school district lens, but also as well as our kind of youth sports partners and things along like, kind of that total need and then understand, well, from there we'll, you know. And there's always the opportunity for interim approaches. For example, if we as a community could be comfortable with it, you could use the former basketball court for some portable buildings to provide supplemental locker room space, which might actually make a point if we wished to use that strategy. So there are some interim places we could go besides building an addition to the school, which is like really, really expensive. But I think what Mr. Taylor says is true. I mean, it has
028been a while since my son graduated, but you know, the way the football team runs and they've had a lot more players now than they did, you know, five years ago is I think both varsity and JV dress and they are on the sidelines. So, you know, you could come and think of all sorts of things where obviously the varsity guys get dressed, they come out, then the JV can come out or something like that. So there's a lot of solutions that could work. It's been a number of years since I've actually been in any of these spaces and I'm wondering, might it be possible for someone to take me down there and point out all this just so I can have a better understanding of what I might be asked to vote on. And
029I don't know if there's any other school directors that might appreciate the same opportunity. So I don't know about scheduling it, but I'm just gonna throw that request out there. Until 2027, 2028. But if we're gonna be making a decision any time before that, again, I'm not saying I need to be taken down there any time soon. Rolf, I think it's a good idea. What you're gonna see when you walk through those facilities, you're gonna see that they're well maintained and you're gonna see that they're well upkept. I do think this space does not meet the requirement sliced a couple of different ways. The other thing that's really concerning is that there's no HVAC or just air conditioning? Air conditioning, because if you recall, we did look at that when we were doing those upgrades.
030We really wanted to get some air in there because it gets very, very hot and there was just no, no, no, no viable solution. Financially responsible way to make that happen. Yeah, so again, you think about the August lifts, without any AC, that's an interesting aspect of it as well. And they do a good job of trying to ventilate it with fans and open doors and things along those lines. But it does make me wonder every time, can we do a little better? Mr. Briegos, anybody else who would be interested, we can, just let me know and we can get people through. And also the benefit of having the tools that we have, everything is inventoried and we have pictures and we have condition reports just built into this system. So you actually have a
031view, you have videos, we can do that and we can also just go there. Just let me know, we'll get you through. Yeah, so the big expenses, obviously planning out, but like how much campus is set aside for unknowns, emergencies? Oh, okay. Say, I was curious, Mr. Kamalei, about like, as far as requirements, are we required, what did you mean, what requirements do we have? Well, again, I'm not the mission owner here, so I'd be at a line to say it. But from my perspective, when you can't fit the entire team in a facility and when the facilities that you do have do not allow air conditioning to be present for our student athletes lifting big weights during the summer months, that's what I mean. So you meant like the rock to accommodate our current
032roster is what you're saying? Yeah. I didn't know if you meant there was some type of occupancy issue. Again, that's, I don't know, I just know the one thing that is close to me. I think they use a weight room at the current high school as well, right? They absolutely do. Yeah, but that's not how the, that's not how the summer lifting program flows because they're not gonna bust the kids back and forth. Sometimes you're on the field, sometimes you're in the weight room, et cetera. Again, above my pay grade, I'm not arguing that, but that's for the AD. Murphy knows the schedule's inside and out. I think the football dean predominantly uses the old middle school because that's where they've, the boosters have donated all the equipment. The other sports and then students who
033just lift for recreation use at the current high school. All right, and then finally moving to 28, 29. After all the Byer Hill work, we finished it off with a Byer Hill paving and site work. So it's just a repaving of the Byer Hill property and driveways. And I think a big point that I think at the beginning, this is a living document. So, this is version one. That's why we can make changes. We know we're gonna make changes. It's just kind of a plan. And going back to what Mr. Arnold said, especially with the way the state's gonna give some funding towards projects, they kind of wanna see a plan before you apply for it. I was clearing my throat before I thought. A few points. One, first, Mr. Womer, I wanted to thank
034you. Mr. Womer did give me a tour of the first two items. We didn't go on the roof of Byer Hill, but we looked at it from the ground and we did go through the parking lot area at the middle school. So thank you, appreciate that. Just two comments looking through here on the last two items. In 27, we have all Byer Hill. 28, we have half Byer Hill in the stadium. 29, Byer Hill. Would it make sense to swap the stadium into Byer Hill Paving just to complete out all of Byer Hill? And again, as you said, it's a living document, something to be discussed. And the other thought I had in this is, should we spread this out more over the 10 years? The first one to five years, we have 18 million
035spend. In the last five years, we have 5 million spend. That doesn't make sense to spread this out a little further. I know, Ms. Bowman, to your point on the R22, just a thought I had would be, years one, two, lay out as is, year three, don't schedule anything, knowing your four is gonna be massive. And if we do get hit with, you need to do something on your R22, you can pull that back forward. So I agree with your point that we may get forced to do something on that. And that's certainly an approach, nothing wrong with that approach. What I particularly liked was obviously six, seven under this is very heavy. And I appreciated the fact that the two years following that were relatively light. So we had some elasticity there. And it
036may turn out because the R22 issue, it may turn out that the lead time for some of this equipment, even if we act at an appropriate timeframe, the lead time may kick out so far, some of it shifts anyway. And we don't know that yet. But that's a possibility too, because we've run into some lead time issues and on some other stuff where the plan said here, but it turned out to be here. Yeah, I think that the supply chain issue in general has gotten better. However, we know that that can change at any time. And switch gear, for instance, from an electrical upgrade standpoint is still almost a year out from when you order it. So we've been advising clients that if you're looking at doing an electrical upgrade, you've got to really plan
037way out in advance. But that's part of what we do with this. The nice thing about the MiSight IQ, it's not static, it's dynamic. As market conditions change, we'll feed information in here so that you're as accurate as you can be. If inflation rates start to change, Brad spoke about a percentage. Obviously, two, three years ago, that percentage, that 5%, wasn't enough. Because we had hyperinflation that was happening. And that caught a lot of us by surprise. Went to a lot of board meetings that wasn't a very popular character, because I had to say that things had increased so much. So we've learned a lot from that. And it's kind of the beauty of the tool. And hopefully, this will help make some educated decisions down the road. And I'm guessing there's some uncertainty, because
038some things like maybe paving, I'm not sure, but I would assume paving may not be affected by any tariffs or anything. But I'm assuming that a majority of the equipment that would be purchased is manufactured overseas. Would that be accurate? Yeah, I think what we understand is lumber, steel, glass, those type of things that typically, at least parts of that come from overseas, that you might see something change as we move on into January. But again, we're keeping our eye on all of that. And the computer processing chips is the real concern as far as supply chain is concerned. That's a lot of your units when you're replacing units, as we talked about in the future years. So yeah, those are things we're keeping an eye on. And you'll hear us, we have to be,
039we have to give you our professional opinion. Sometimes you may not like what we have to say. We may feel like we're pushing you a little bit, but we're trying to help avert maybe an increase here and there. We'll talk a little bit about that with the roofing project as well, so. I wanna point out one other thing when we look at the paving projects, and that is that after November, it's probably not a four-year concern, but I would anticipate in the future, there will be requirements for things like pervious pavement. So as we look at a project moving, if we're in the five to 10-year timeframe, we could be easily looking at a requirement for completely different kind of paving. And so there are things we may want to get done so they can
040be grandfathered in. The products available for pervious paving today have shorter lifespans and higher upfront cost. So there's some factors that come in there too in terms of truly planning. We have to look at not just what we know, but other things that may get laid over the top of that. So am I assuming correctly that paving probably isn't one of the items that we would get any grand funding for, or are there opportunities for? There actually are. It's called the multimodal fund, and that affects circulation for the most part, which can be part of your paving plan. So I can't say that it's connected as much to the maintenance of paving, but if you're changing circulation, if you're doing some things that might assist in the traffic control and safety of the students, then
041absolutely there's opportunities there. And we've actually been successful hunting those down for districts. What about with, for that project, I mean drainage and water management, because I mean that's a sizeable portion of why we're doing this. I mean, does that open any other doors for grants? Yes, yes, that could, absolutely. That's a different category for sure. And I think in the past, either Andrew Zwolle and Katie Hetherington, maybe some of you have met or heard the name, I know the administration has, we have on our staff two full-time lobbyists. They are actually constantly working on these grants. We worked with Brad and other districts to help tell the stories, those type of things. So any questions as it relates to that, that we are really putting an emphasis on that, because we realize, again, this
042is where this is going. This is where the funding is going in the state of Pennsylvania. It's gonna be very grant centric, aside from bond issues for the big projects and things of that nature, so. Quick question about the grants. Is there a way that you can look at our plan and say, hey, here's what we think will match up grant-wise? Yeah, yeah, we were just talking about that. Absolutely, yeah. And again, it is about telling a story. R22 is a great story to tell, because it's got its issues for sure. You know, there's things that, if you've got an asset that is unprotected because you got leaky roofs, that's obviously a good story to tell as well. So as we went through that, we'll be able to identify that and start to bundle things
043together for grants. And then you know in advance, because the grant window is gonna open late March again. So leading up to that, that's a discussion we wanna have, so that we can figure out, okay, how are we gonna write this grant? What are we gonna write it around? What projects? And the hope is, if you don't get any money, you may not wanna proceed with it, but you may wanna proceed with a couple other ones that weren't in that grant pool. But then you're ready to go, once you've got that issued and hopefully grab a few dollars. I did wanna say one last thing as it relates to my side of the queue, and that is, as the discussion went on, it was interesting how there were some items that fell under various procurement
044opportunities. For instance, the idea asking Mr. Warmer about, could he do the painting? So some of the items that are listed here could fall under maintenance, where your staff is actually going to do it. Some of it, stadium upgrades, where it's architectural or there may be some new construction, that falls under the traditional design bid build under the Pennsylvania law, that we all know very much from previous projects. And then there's projects that will fall nicely under the guise of procurement, the ESCO using the ESCO, like the roof that we're gonna talk about. So as part of the my side IQ, not only are we identifying funding sources for each of these projects, but we're also going to advise on, what's the best way to procure it? And let you decide on how you move
045forward with that. There's obviously advantages to each one of those type of procurements. And then I just wanted to, oh, I'm sorry. I was gonna say, just on the year of tackling the Bower Hill situation, I thought I'd mentioned earlier, possibly spreading this out more. One thought I did just one come up with a question I have is, we'd probably do this during the summer. Would we be able to spread that over two fiscal years then, because we'd have part occurring, I'm sure upfront payments and then part occurring after July one, or would that really matter? I would defer to Mr. Arnold, but I think that would be tough to split it. Yeah, so the way that we bid the project was as one project. So when the bidders looked at it, they looked at
046it as one project. The way that it schedule wise, it is definitely going to happen during the summer. Obviously, because we're trying to minimize the educational impact of the noise, the smells and all of that. So basically, if the board decides to move forward, it would be a procurement process. It would start immediately so that we have the materials ready and we lock in the pricing. And then we'd have everything ready to go come June and it would be done by the end of the summer. So that's kind of the plan. There's obviously enough time to do that. Okay, thank you. And I just want one other follow up question. The pricing we have shown in here and I realize there are estimates. Does that include SiteLogix piece of this or would SiteLogix be in
047addition to what Sean said? No, the pricing that I'm gonna share with you in a moment includes everything. Includes our oversight of the project, our being the controlling contractor taking on the risk, the development of the project that we did with Garland, all of that, bonds, insurance, it's a complete number. And that's a really good point because a lot of professionals in our industry, when they communicate costs, unfortunately, they say it costs this much, but what it sometimes means is that's the hard cost. That's what the contractor cost is. That's what it cost to build it. Where are all the soft costs? And they say, oh, well, we didn't figure that. And suddenly you're dealing with a different number. Whenever we communicate costs, it's total project costs. We do a ROM estimate, a rough order
048of magnitude for what Brad has been showing on the MySite IQ. We factor in all the costs. So do you have everything there for, you don't have to ask, well, does that include architect's fees? Does that include this, that? It's there. And again, at a ROM stage, we're making a lot of guesswork there. So when you take the ROM estimate, again, rough order of magnitude, I hate to overuse acronyms, but once you've said, okay, this is our priority, then we go in deeper and we develop the project and then we bid it out. So now you're dealing with actual costs, okay? And sometimes they do move up a little bit, depending on the economy, depending on if scope was added at some point. But our goal is to stay within that number. We did here
049with Bauer Hill, fortunately, so. Thank you. Hey, Alex. The idea of spreading it out from five years across 10 years, I think it's a good point and committed to working with you to think through that. What I like the way of, and again, this thing, it's fairly yellow, right? Like we're gonna continue to update SiteLogic or whatever it's called, MyIQ or whatever. MySiteIQ. SiteLogic, whatever it is, the thing. But I look at 28, 29, that paving and site work program there from my notes, and I think it was up there, has a SiteLogic score of 4.1. So I think, to Sherry's point earlier, hey, how are we kind of mitigating risk and pop-ups and all that? I think you do that by a fairly tight shot group, as long as you can pay that and
050not be too much of a pain to the taxpayers, which I think we're gonna get into here soon. Is that true, Brad, or is that another meeting? That's it, yeah. So fair point, and we'll see how that, the big seven million or whatever impacts there. But my point is there's other things coming. Yeah, and if I could add, regarding the rating system that you had noted, keep in mind, as professionals, we're trying to give our snapshot of what we think is in alarm, alert, caution, and how that roughs out. But we will get, obviously, if there's input like, hey, Mike, you don't realize how important this is to us, we need to change that. Obviously, the tool is very flexible in that regard, so. Are we just in a cycle where we need a lot
051of paving? Are we just at that point in time? It just seems like everything needs to be paved. Is it like roofs? Every so many years, you change all your roofs. Is this normal? Yeah, oh yeah. Yeah, I mean, you've just pointed out two things that other than technology, which changes every minute of every day, paving and roofs, historically, you're gonna run its course. They all have guarantees. What we're gonna present today is a 30-year, which is good. But they all cycle, for sure, just like anything else. But those things, and they're exposed to the elements, too, so they're gonna possibly break down a little bit sooner than other things do. I haven't engaged in a paving project since McMurray. It's just time, and it seems like it was yesterday, but when Brad said it
052was, it's like seven, maybe seven years ago, and we haven't done a paving project. And we're definitely running, we're running big buses on a lot of our paving and putting some damage on them. I remember at prior years when we talked about paving projects, and someone, we were throwing around the idea to bid out paving projects with the township in order to get economies of scale. Is that possible, or does it make it too much, too more complicated, that sort of thing, or do they have to? We did reach out to them, and we were gonna schedule- A little expenditure, or not, for Peters? No, they will issue us an additional billing on top of our normal tuition billing that we would just pay separately. Okay, so that just becomes an expense. Okay, just wanted
053to make sure I- Any other questions on what we currently have available? Rejected? Do we need a five-minute bio break? Just saying. That's a yes? Five-minute bio break. Yep, Sherry. Give us a few more seconds. We have one missing. Oh, okay, so we have no missing. So next up on the agenda, we have just a debt service review, and I have Ms. Alicia Henry from PNC. She was the underwriter on the last bond issue we did for the high school, so she has all our historical information, so she's here to present kind of where we are, and then just kind of some examples. I know we went through the capital plan. We see that the capital plan is more than the four million we have, so we probably just have to have the discussions on
054what we would do if we needed to fund some of those other projects. Ms. Henry. Thank you, Brad. Good evening, ladies and gentlemen of the school board administration. It's a pleasure to be here. Some familiar faces, some new, but I have the fortunate- I'm very fortunate to work for Peters Township School District, and you have a wonderful team, and I'm very thankful to have this opportunity. It's very nice to get in front of the school board and be part of the planning process and to make sure you have all the tools available to you from my perspective and pick my brain as this process evolves on how to best attack some of these things. So without further ado, some of you may have never seen some of this information. I do my very best to
055make it easy to follow. I'm not sure that it always is, but page one is just a table of your existing debt service, and all the bonds are labeled by series, and the year is a calendar year in which it closed, not fiscal year, and then you can either issue general obligation notes or general obligation bonds. Regardless, general obligation means the school district has pledged a tax behind those that you'll do anything with the full-faith credit of the school district to make sure you pay these bonds. Another term that isn't maybe all that common is PAR. PAR is principal in the bond world, so original PAR means the amount of bonds we originally sold, and the next column is standard, outstanding balance, that actually means what it says. Final maturity is the last payment of
056that specific bond issue, and a call date is when the bonds may become callable and different from other debt terms. Bonds typically are sold with a non-pre-payment penalty for a certain period of time. That's just standard in our world that entices investors to hold such a long-term liability. As of today, Peters Township School District has just under $115 million of bonds outstanding. You make most of your principal payments in September, so that assumes all those payments have been made, which they have. And then down below is a nice graph for those who don't like numbers and prefer something visual, but your debt service goes out to 2041. There's a little step down that occurs in 2038, but your debt's fairly level. Your gross debt service is the tallest of the columns at about 10 and
057a half. That's what Brad has to budget. And your little blue section is the term called PlanCon that's turned into a bad word because we've now been in a moratorium to PlanCon for about a decade, but back in the good days, the state used to help districts with capital projects and there was a whole planning and processing for construction. So most of your bond issues do have some proportionate share of PlanCon, but the ones we most recently did were after the moratorium and there, you, we had the... Yeah, we actually were able to sneak in under the moratorium. The year that we did issue the new high school project, the moratorium ended on June 30th. The legislators weren't in session and it expired, so we submitted our PlanCon documents on July 1st. When they came
058back in the session, they continued the moratorium, but we thought that we were in between when the moratorium, when it expired and when they reset it. We were part of, I think, five school districts that were able to get projects in at the last minute to actually get PlanCon reimbursement for the project. Yeah, thank you for clearing that up, Brad. The last bond issue I did that the 20, the cleanup issue, all of the PlanCon monies for that project was soaked into the bigger bond issues. So the last bond issue I did in 2020 has no reimbursement, but that was no fault to the district. It was just, we sunk all the PlanCon into the big bond issue. Would have to come down quite a bit for that to make sense. But if I could
059get you all the way to the very last page, outstanding debt profile nine, the very last table, as I mentioned, that totals the par or principal that you repay on an annual basis. And as I mentioned, your borrowing capacity will go up by at a minimum of that amount every year. So about five, five and a half, you can expect your borrowing capacity to grow by those amounts every year once you pay those. Your local shared debt service is just under $10 million. And Brad, your general fund budget is about 80 million. Is that still on par? So I wouldn't want to see your, I wouldn't want to see your debt service budget to be greater than 15% of your total budget. So right now you're at about 11%. In each year, that percentage will
060decrease with the increase of our budget. Now that our debt service is flat every year as the budget increases, that percentage of the debt service would decrease. I also have never, we've never had to take the debt out far. So you're still looking at debt service that's under 20 years, which is also kind of a magic number, 20 years. It's obviously based off a plan con that's in moratorium, but that was always the magic amortization year. If you could do a large project under 20 years, that was really phenomenal. So I just think for your size of school district and the growth you guys have experienced, your debt percentages in the right amount and your debt term is in the right amount. And obviously you could choose to choose a different amortization level. You don't
061have to wrap around, but with the wraparounds, you're not even going to add a million dollars for even a $20 million bond issue. So, I mean, the question would be is, I don't think there's anything associated with what you're looking at that would trigger any concerns from a debt perspective on your debt, your bond rating. What they're going to more care about is your general fund budgets and if they're structurally balanced and sound and if you're not eating into your fund balance every year, you're a AA2, so you're the cream of the crop as a rating, you're two notches from AAA. Not many districts are AA2 ratings, so that's commendable. So I think if you haven't been through a bond issue, all the right questions have been asked and it would just be, this is
062an increase to your annual budget and how would you ask Brad to best address that and add that to the budget, it would be the only concern. So what I heard was we should not be profligate, but neither do we need to be scared. Correct. And since it came up, Brad, the new money we did do in 2020, where we're supposed to spend 85% in three years, so we are past the three years, we would just want to make sure all those bond funds were gone by 2025. So I thank you, Brad, for saying that would be the first out or the next out. You're very welcome. Thank you for inviting me. Everyone have a Merry Christmas and happy holidays. Thank you. You have a couple more items on the agenda. I think they'll be
063a little quicker though. We did get, it's almost been a year ago, I think, that during the joint meeting with the township, we talked about the park entrance and the school entrance. There's always been talk about us doing a joint project to do some type of signage down on McMurray Road that would identify, I think we left the joint meeting with the township was gonna take the lead and try to get some ideas and come back to us and share those with us. They did that. So we printed those out. They should be in your folder. And when we discussed before, we have a, option one is kind of the trestle look. Just to preface this, so you're gonna think about this, the township would like us to get back to them with where we're
064leaning. Just so when you're thinking about this tonight, I'll kind of want to get a sense of where you're leaning with which one of these preferences you like. And I'll also read you the notes from the township that we got with these options from the engineer. The gateway style, and that's the style one, is really big, obviously. And it would be significant construction in both times and in both time, size, and cost. So this obviously would be the most expensive option and the biggest option. Option two is- Before you go into option two, would there be any issues getting in for any equipment that ever enters, or would you have to, you always have the back entrance, so you would never have that issue? You would have the back entrance. It looks like we have
065plenty of room for a school bus, but you're right, if it was a big crane or something like that, we would have to come in. I have a different issue with the gateway concept. We put in an electronic sign at a facility I work with, and it has been hit by incoming traffic four different times in the past two years. And we're not even in some tempting location. So I would be gravely concerned about having that kind of impact potential with something that would come down on people. If you're hitting a stationary thing that's over here, good luck. If you hit it and we've got something overhead, you could be in an F5, Florida International University situation, or something's coming down on people. That makes me twitchy. That's a legal term. No prices were given.
066They were just asking for our opinion without pricing. Option two. Yeah, I agree, I agree, yeah, yeah. Option two is just a horizontal monument sign. The concern there is once you place them and you see the renderings, the guardrail kind of blocks part of the sign if you do it that way. And then option three is a horizontal, okay. Option two. Yeah. One version of it says Rolling Hills Park and one says high school. Does that mean there'd be two separate signs? Two separate signs on each side. Blanking each side, okay. So if you look over in this direction, you'll see the high school. And if you look over at this, that makes a whole lot of visual sense to me. Option three is the same as option two, but the sign is horizontal, or
067vertical, I'm sorry. And the thought is that this works a little better when it comes where it's at towards the guardrail. All three versions would be lit. That's what we were given from the township. I agree, Mr. Taylor, I think we need pricing. Yeah, I think for people to try to make a decision, you need to understand what it's gonna cost. The other thing is I think it's a complete waste. They've been talking about this for years since we built the high school. I don't see any benefit. Why are we spending taxpayer dollars doing this? And you know what, if they want it, pay for it. I paid hundreds of thousands of dollars to move attention points for them. They can pay for the sign. I did do that while it's recording, hopefully it's recorded.
068I'm confused, you said that there were two signs, or is it gonna say Peterstownship Rolling Hills Park, and that's it? We'll say Peterstownship High School. I don't know what's with this one, not a fan. What's that? Oh, you mean the one that goes up top, oh. I don't disagree with Mr. Taylor's point at all, and I guess as far as the second sign, I like it the most. I agree the guardrail blocks it, so why not just make it taller? On both of the other signs, I do think the guardrail blocks it. You really don't see much of it. If you would do a sign, I like the first one, but I think once I see a price tag on it, I'm gonna say I don't want it, is my guess. See, I like the
069vertical one. I agree with you, yes. I almost led with that. I think whatever it is, we should get a different one. You know what, I never enter that way. What do we have down there now? Grass. Oh, there's nothing, but there's only a sign coming in the back way, and it's like about this big. But I remember when we were trying to, we're like, why do we need to spend money on a big sign, and now I go in and it looks like it's this big, and I'm like. Sorry, do we own or control the strip of grass between McMurray and I guess relocated McMurray and what was that original area where a bunch of political signs go off? I guess I'm curious there because people coming down from 19, if they get to
070that light, there's nothing there in that block. Something would go in there, you'd see it much better. It would be in the opposite side of the road, so I don't know how well that would work, but the retention pond, the hillside, putting stuff along there really doesn't make much sense. So I didn't know, do we control that or is that public? I can answer that question. We do not control that. The township may not even control that. Probably do, but we do not. Okay, all right, thank you. So what I'm hearing is we do not wish to give the township any advice, thinking, or recommendation until they come back with something concrete in terms of pricing, and we believe that that should not be on us. Is that? But then we shouldn't make them pay
071for a sign that says Peterstownship High School, though, right? Right, right, I understand that. You couldn't pretty much miss it. If anybody doesn't know where the school is, I don't think they're just gonna drive around until they see the sign. They're gonna use their GPS, and it's gonna tell them where they are. There's a big PT. It doesn't mean much else than, okay. Did I correctly summarize how we think we wanna respond to the township? Nothing until we get a price, and even after that, I'm kinda leaning toward nothing. Okay. And then our last item on the agenda, I think Dr. Fisher's gonna just give an update on EDS for next school year. So every year we budget for class sizes, and when looking at class sizes next year at PV, we're already very, very
072tight with EDS, and we're looking that we probably are gonna have to add just because of attrition with our grade levels moving up, six rounds of everything. So the one classroom remaining at PV to use is gonna be the EDS classroom. So what we're proposing, we have a meeting with EDS. We value their services. They do a great job. That's a great service for our families, but we also wanna take a look at, we have some empty space at McMurray on the second floor that it's not being used. We're gonna explore opportunities to maybe move EDS there. Bower Hill is in another position where they potentially could be out of space as well. So we're actually talking about, we're gonna go through scenarios tomorrow with EDS on moving, especially K-plus there, but potentially both EDS
073and K-plus. So Tracy's gonna be part of the conversation just to talk about the implications on busing. What's the second thing you said? K-plus is just the service they provide for our families to give full daycare. So if you're an AM kindergarten student, then when they have kindergarten afternoon service, that they will take those kindergartens for the families who want it. So if we relocate EDS, what is the transportation plan? We're gonna meet with Tracy tomorrow to see what the implications are. You did say that. Yes. Sorry. So in EDS, does Bower Hill have an EDS and PV has an EDS? Yes. Okay. Yep. There is a potential. About PV, EDS, or? We're gonna talk about both. Yes, we're gonna talk about both because there are potential implications just based on enrollment for next year
074that both could need that space. We're also gonna talk about implications that possibly the extended day portion, which is just the morning care and the afterschool care could remain in the buildings because they can just use a smaller space. So there are a lot of things on the plate, but it's just, we wanted to get it on your radar just in case community members may ask questions. What's our typical population for K plus? We have about, they gave us the number to project for. For Bower Hill is about 30 to 45 and for PV is about 25 to 35. For PV, if the issue is space there, could we use space at the middle school? I mean, could we just? We talked about that and there really isn't a lot of space. So the area,
075the location in the district where we have the space would be the second floor at McMurray. How is there no space at the middle school? Is there space for an extra grade there, right? If we have to. High school, so if we have three grades and we used to have four, I mean, I would think we'd have space somewhere. We have teachers assigned in every classroom. It would require us to push our teachers onto carts. Okay, understood, thank you. The reason that we're having this discussion, nobody likes change and we just wanna make sure that the board is informed that we, these services are, we value them. They're essential for our families. They are not district services and we have to make sure that we're not incurring taxpayer dollars to fund the program. And so
076we make sure it's a very fine line there as well as accommodating as possible but we cannot finance those programs and there will be financial costs to EDS based on these changes. We would look through where we don't wanna compromise our educational programs to provide space and we knew there was gonna be a time when we kind of are pushing the limits on our, especially our K to threes and we're at that point. So again, we wanna just bring it, we're being as accommodating as possible but we're also being very mindful that we are not gonna be spending taxpayer dollars on transportation, custodial services and all those additional things. So again, nobody likes change. We're bringing it to you now and we're gonna try to come up with the best solution for our families who
077use the program. Does EDS turn people away? Do they get billed? They do. So there are more families who would use the service. Yeah, under this scenario, they would be able to have one more classroom. So they would be able to take on additional students that a lot of our families are put on a wait list each year where there would be much less families put on a wait list. And if we added another round at both schools, you would expect the demand to increase proportionately. Potentially, yeah. Janine, I think the approach by you and your team is spot on. We do wanna be accommodating because we know this is a critical program for many of our families but we can't have the taxpayers funding it and nor impact what we are supposed to provide.
078As you, Mike, as you dig into this, I will speak for the other board members, but for me, just a little framing on the scope of the program, like what's extended day and K plus and I think it was Lisa's question, hey, how many folks get turned away? Like that context would be helpful for me. Thanks. Take a piece of that right now. It's 7 a.m. to class start at the front end and class end to six at the back end. And I used EDS every minute it was available. Every year I had a child in the district who was eligible because otherwise I couldn't work. And the benefit to it is that if a parent works three days a week and needs the service three days a week, they can opt in to only
079do it like Monday, Wednesday, Friday, whereas they don't have to commit to a full week if they don't need it. So every day when we talk about the range of students who attend it or are turned away, maybe on Tuesdays there are only 25 students there, but on Fridays there are 35. So it fluctuates. Just so I understand, you're thinking about taking the kids from PV, the kids from Bower Hill and potentially putting everyone over at McMurray? Correct. In what grade does this run through? When we age out. So the K plus only involves the K students and that's all during the daycare. The EDS care is what Mrs. Bowman referred to, the seven a.m. until start of school and the end of school until six p.m. And that is a range from K to
080five. McMurray has a portion of that. So they house their own students and then the primary buildings, the K to three students, it could be anyone K to three. Would you move the K plus students as well or would they stay in the building? So that'll be part of our conversation. We're gonna try to have at least impact on transportation and the impact on our families, the inconvenience that it could pose. So those are gonna be part of our conversations tomorrow. But for certain, it's gonna most likely be K plus that will be the one that will be served at McMurray. Okay, thank you. Do they still have a summer program? They do. Okay, I know that's not really a space issue but I just wondered if that was still in place. Yeah, we'll continue
081that. Okay, great, thanks.