CorpusRecord 79651

Waxahachie Board Meeting 1-13-2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Waxahachie ISD
Date
2025-01-14
Location
Ellis County, TX
Material
Transcript
Extent
4,442 words · about 25 min
Collected
2026-06-10

Transcript

Verbatim source text

001can get it done they feel that we can get it done through the week uh through this week they feel we can get it done then we're also working on the band hall interior football locker room we're doing some plumbing and interior framing there and all that starting to really move along back in that one we're running about 700,000 under budget on that project as of right now so there's a there's a drone picture there you can see that what you're seeing there on that is that left side that looks like a little L there that is all new built it looks just like the regular building you can see the brick and everything looks just the same but that's your new addition so it's not going to be when people pull up from the

002side go oh look that looks totally different it Blends in very well you can see over on the over on the left by the gym that's the new edition for the band hall it it Blends in very well as well so the picture on your top left there that is the actual storm shelter this storm shelter again will be classrooms it's two-story classrooms all of our our two J elementaries we've just opened both of those are gyms but this will actually be classrooms so it's a little different than what it is but it'll be treated just like it hold everything do all that picture on your right is actually one one of the science rooms in in the uh actual back part of the not the actual storm shelter but just outside of it the

003picture in the bottom is just the first floor of the storm shelter there this here is the band hall that's interior of the band hall there on the left and the exterior there on the right of where we're adding there on the front of the building any questions about the Hancock Coleman building Bley Junior High over Christmas we asked the kitchen Child Nutrition to move out out of the kitchen and now they're doing a temporary serving line out right outside there in the hallway we asked them to move out so we could get into there it takes a lot to get that kitchen to demo it and get it all up and going so they came out we have demoed the entire kitchen you'll see a picture here in a minute of that we're working

004starting to work on the plumbing underneath because all of it has to be REM removed and rerouted in different areas so that's a long process it's not just something we can do over the summer and then we're starting to put the steel up in the front the back will follow right behind it and then like I said the temporary serving line was set up over Christmas so it is actually all the food is being cooked over at Simpson and then there's carting the food over we have the warmers and everything took over the Teachers Lounge it's all in there so it's all warm and all that they have their own special menu to get through this for this semester so there's a drone picture of the of the front of the building there you can

005see where the red iron or the Steel's going up there in the front with with the new addition of the administration Suite up there there's a picture in the left of it just from the ground level of of what it looks like picture on your right that is where your kitchen is so that was your kitchen your serving line and I think there was a couple of counselors back in the back where you see that blue area are actually counselor offices you can see there's no more walls there's no more anything in there it is truly open so they're starting in a way like a a fresh you know fresh area there move on to Howard Howard will be pouring in the morning we're pouring the slabs um for the added rooms up under the

006awning back where the kids drop off or the parents drop off the CH the kids in that side um then we're going to be working it has been delayed it was ready to do last week but because of the cold we couldn't the temperature on the concrete has to be air outside has to be a certain temperature so now we're working on the cafeteria slab to get it poured this week before we run into that you'll see in the Drone picture it's ready but it is go on boxes so cardboard boxes so they can't get wet so we couldn't put them even out so they've been in an 18 wheer trailer over there they'll start pulling those out either today or tomorrow start putting them down rebaring everything and we'll pour by the end of

007the week before we hit cold temperatures next week on that framing will start adding start next week on the area we're pouring tomorrow and then Steels probably about two weeks on the cafeteria it has to cure a little bit more Steel's arriving tomorrow so we'll have it on site ready whenever it is cured so there's your a little overview of the the building you can see there on the bottom left you see that area that looks looks like a little rectangle with the little dots in it that's actually our peers it looks like a green tint because it was just sprayed for termites the day they did that so we've already got all that down everything else we covered all those kind of things this is the area in the back you're going to see

008here in a minute inside those pillars that's where the walls going to be moved out to that that pillars some of the nice things about this building is when it was built that that actually Foundation everything in there was structurally sound we didn't have to break it up put in new peers or anything like that it was structurally sound we already have the roof we just got to add the exterior wall now we are having to do some leveling up in there because there is a twft drop so when we're adding the one building you'll see here in a minute we're bringing like the drama area will stay at one grade and then the other rooms will be down at another grade just like the building does already and if you walk down that hallway

009right outside the cafeteria so this is the area I'm talking about is you can see that area in the back that's raised there that is at that is about a twoot difference between the area lower you won't notice it in the rooms I mean you won't know that that floor is different but in theall hway you notice there's a ramp in the hallway already from way it was built so walk aty Creek all the drawings were complet on December 20th they were turned over to PO um the only thing we are working on we're working on revising or redesigning the football locker room um we're going to sit down tomorrow with VK coach tolison coach Rogers and then an AR the head AR and an architect all going to stand on tomorrow and try to

010redesign it to where um they feel a little bit more comfortable able and how it'll how it'll function um the building is out for quote by POG we'll have two addendums to this as to somebody sends in hey the spec says this but we really think it needs to say that we'll do some investigating V will send it to some of our engineering staff and all that that that's on with them and they'll do some investigating to see where we may have Miss a spec here or there and they'll addend them so that'll make it easier for quoting those kind of things or somebody may have got left off and they want a quote and they want their name in the addendum so that we do that sometimes and then um we have submitted for

011the second review of the grading permit we do feel that'll be approved we have asked because there's so much going on there we don't know all the text dots information we don't know all the city's information on those sides and technically you can't get a grading permit till you do the whole site we're just asking for a grading permit right now just the site just the actual slab we're not worried about the road work because Tech stock can't give us theirs and the city can't give us theirs they're behind us so we're just asking for the main actual um floor plan pad site to start doing that grading and so they have agreed to start doing that then Proposition C that's the facility upgrades so over Christmas break in one day they removed 29 AC

012units and put 29 AC units up the picture you see on the left that's about 8:30 at night and that one going you see the one that's hanging on the crane that is coming off the building of the gym in the front there of Coleman JW Williams gymnasium that one's coming off and those two units there on the ground will be we're going to be we're hauled up there those are the last two units that was about a 14 to 15 hour day there of putting units on and off they wanted to get in before the bad weather came and the next day it started raining so we were able to do that um most of these units were in the tli The High School of Choice then we had four up on the gym

013area and a couple in the locker room area but most of it was in that back Wing that hadn't been replaced the rest of that building's been pretty much replaced through prior times um through the through the years the Hancock building we have started taking the original flooring that was there we're replacing it because the new the new building and a lot of the where we've added through there they had new floor but the classrooms are still going to have the old floor so we've gone through yall approved and used some of prop C money to come back in and savings we had prop C to go in so we have started that already we've not touched any of the classrooms because they're in they're teaching we're not going to disturb them in the middle

014of the year but anything that we could get ahead because when we move out and move in this summer it's going to be real tight schedule in that building so anything we could get ahead so we did all the athletic Wing the gym Lobby all that kind of stuff already got the new flooring in it only thing left are the classrooms so we'll start that soon as they move out in May like May 28th 29th we'll start actually changing that flooring out then and then the 20 you'll start seeing us come before you um with projects for 2025 summer a lot of it's going to be remodeling of Elementary bathrooms changing out ceiling tiles those kind of big projects that's going to take during the summer um we have some areas like that we're getting

015quotes and going through quotes and comparing them right now we'll start bringing them to you so they can start getting products so when soon as school's out we can hit it anything we can do at Spring break we may do the same thing but at least we can try to get be ready so as soon as school's out we can hit it and have a full summer to do that any questions thank you no but thank you thank you Mr M for everything you did on this I know it's a lot of work yes ma'am wman getting in thank you I did have someone contact me over the Christmas break saying really are the maintenance guys still working I said yeah we have a school to move while everybody is out so they couldn't believe

016we were moving a school in the middle of the year yeah so thank you for that uhhuh okay on our report c will be informational report is W's balance scorecard priority 1.3 and 1.4 student growth Sav good even board I'm happy T to be here tonight to talk to you about our update on 1.3 of the balance scorecard we are looking to um make sure every graduate is college career and Military ready and that we are increasing the ccmr numbers year-over-year our first strategy was to create Implement publish and sustain a districtwide college readiness framework to inform our students staff and parents on what these students need to do now uh with their educational opportunities through advanced academics to be prepared for college U moving forward when they leave us after 12 years and that

017framework is in place uh we are using it at a variety of family events listed on that first bullet uh you'll see us Thursday night at Guide to the tribe engaging families and students and their parents with that framework and discussions at a table there and we um are also have that in place with the six 12th grade counselors as they counsel our students so using this framework um as their guide our program advisory committee um is assisting the advanced academics team in creating an elementary and junior high specific college readiness framework as well which came about through um our parents community members and administrators who are on that committee as a a wish and want and so we're in the process of doing that and that will be implemented next school year um we

018are doing a couple of new things this year trying to get more engagement with our families with this framework uh and this spring you'll see things uh flyers and public announcements on social media about our new coffee and chat so we'll be um available during the morning to share with this framework with our families and parents as well as a lunch and learn session from time to time and then our traditional evening sessions as well so trying to hit um as many uh families who can come and engage with us so we can help them with their um decisions now that will help them with their decisions for later for opportunities for their students We are continuing to utilize the AP potential uh through college board to inform parents teachers and counselors about what is

019the best coursework for these students to take uh while they're here with us we'll continue that this year and next year um the advanced academics team is uh still working on our campaign Advanced academics is for you which we'll be hoping to get going for the fall um or end of the school year for the fall to get kids ready and our goal is for every kid to eventually um dip into the water and try at least one Advanced course with their time with us and we have a celebration here for the strategy as well we have twice the number of students who earn college board National recognition Awards um from 23 to 24 with 38 at wachi high school and 20 um at Global High School that's a big celebration there with the same

020strategy we are um continuing to review and refine our academic counseling practices um and so our counselors across the district received training on all of our 24-25 Deep dive days that are dedicated to District professional development and then we are in constant communication through a variety of committees and um opportunities that we have opportunities that we have to work together and collaborate and both um us and that team are very thankful for that time Together We are continuing to utilize Texas College bridge to increase the number of students uh achieving ccmr met and our seniors from last year at walkside she ended with 340 students receiving that that way 32 students at Global and 34 students at the High School of Choice moving to 1.3 A2 on our scorecard uh this is to increase enrollment

021and success in advanced academics gifted and talented and sustained academic telescoping and acceleration opportunities for students in wachi ISD uh wachi High School is do a fantastic job as you can see our numbers have increased for the enrollment in AP courses from 1241 student seats um in the school year of 22 to 2023 um up into this school year with 1,818 seats um they're at the high school we have also increased our number of students taken the AP exam um from 592 exams to 970 last year and we'll be able to update you with that spring number once our exam time comes around the spring we also have um an increase in the number of students receiving a five so not just taking the course and taking the test but also being successful on the

022test but even the ultimate success with the level five score uh we went from 26 students to 45 receiving that five and we broke a record here in walk hatti ISD with uh 66 um students uh or 66 tests um coming in with a five um last spring that's something very very much to be celebrated uh the students who receive a five on that test are greeed with wace ISD Personnel at their door during the summer they receive a high five yard sign and a congratulations um bag of goodies to encourage them to continue with their efforts put into their Advanced academics into the following school year in August we celebrated 208 10th 11th and 12th grade uh students at our AP um annual celebration and that was a beautiful breakfast with about 600 people

023in attendance um our students who received a 3 four five on their AP exam as well as their teachers who uh taught those students received a monetary um incentive on that day as well moving into the Dual credit area you can see um the seats for whhs are growing um from 22 to 25 um we have 567 seats for dual credit at walki High School uh the numbers on the right hand side of the first uh table um show a decrease in global students in those seats in dual credit and there's a couple of reasons that we um have targeted why that's happening and so um one of them being that um now that that campus accepts 100% of the applicants minus students that have an IEP with who need a modified curriculum because we

024can't modify the curriculum on that campus um coupled with the fact that TSI has multi-leveled um increased the rigor and the Heart the complexity of their test in the last years um those two things we're seeing a decline in Student Success on that test that's required for them to be able to enroll in those dual credit classes so the great thing right now is we are in a good seat because we just received effective advice framework Grant last year and so we're able to use that Grant to help us now address those needs specifically for those students and now we have the ability to plan Implement and carry out several strategies um with that Grant um using personnel and money um to give these students an earlier um success rate of getting into that TSI

025success um to turn those numbers back into um an increase so those students can take those credit classes sooner another Factor uh that is a celebration for the global side of that it looks like a decrease here but a lot of our students at Global High School in their last two years are deciding to take upon themselves to take courses in the minimester outside of wach ISD as well as in summer school and that allows them to have a lighter load maybe not four five or six du credit classes which is extremely um you know a heavy load to take on as a kiddo and it allows them to have an off period where a lot of them are are engaging in the community um with a job that kind of thing and allows them

026for more study time for the classes that they are in so um applauding them for those efforts and that initiative even though it kind of makes our numbers go down here um we're still seeing the students with success there and overall that campus is still com is still very successful down there on the preap seats uh you see we've added Finley and Howard those are the number of students who are taking preap Algebra 1 at the junior high level and um you can see an uptick from last year and this year and that's mainly um in uh conjunction because we we implemented the U math um acceleration program there and so that brought in another group of kiddos to add to that um preap side there down there at the bottom you'll see that we've

027grown in the area of GT students being serviced in WID from 9% to 9.77% we are uh beginning our phase uh two testing this spring so we'll be able to bring you those numbers at the end of the school year for how we're going to start the next year with that percentage there as well going along with 1. 382 We are continuing to um offer our elementary math telescoping and Junior High High acceleration Math and Science pathway opportunities for students we currently have eight elementary students who have um taken a com credit by exam passed that at 80% or greater and who have skipped an entire grade level of math and replaced in the next grade level um for math instruction on on The Daily and then of those 158 students who did move into

028phase two of this credit by exam testing 113 of those students compl that test with 40% success rate meaning they already know 40% of the content that the teachers would be teaching them in their regular math class so we went ahead and put those students those 113 students in the GT cluster classrooms to up that rigor and that time during math um on their grade level we are excited to say that at the secondary level for the math and science acceleration Pathways this year those pathways are on all three Junior High campuses um solely we're not having to bust students from Junior High to uh the high school and back to Junior High during the beginning of the day anymore because we have staff on those campuses to um teach those classes and they're all

029going well any questions thank you than I said anything than Miss thank you very much did you have something again um Miss AB um I didn't have a question about what you presented so far but I wanted to ask how we're coming along with our military uh and that's are you going to go ahead in the report with that or um I am 1.31 and two and then three and four is Mr Harrison Dr a I'm not sure who's going to come in and do this okay that's fine I can ask them thank you Mr col are you going to pinch it here so hard as uh as a side note um Mr Harrison is not here tonight because of a loss in the family and and Dr a had to step out he had

030a family emergency that uh just came up so he had he had to step out for the remainder of the meeting Miss crial I'm going to tell you right now I don't know the answer to your question but we can get that answered for you by the next meeting so In fairness if you guys would like we can do the rest of the report at our February meeting if you want to that would be fine by me if you're okay with it you okay with that okay there are notes here that I can read but that's the extent of my knowledge I understand we can do that we'll just make know that we we'll continue that report in February yes sir okay Bard we'll move to our consent agenda we have items a through L

031up for consideration as you know we can take them all in one motion or if there's one that you would like to remove for a specific discussion we can do that as well I move that we approve the consent agenda items a through L I have a motion by Mr McCutchen I second second by Mrs Timberman any other discussion all in favor say i i v say n motion carry 60 okay moving back to our action item will be action item C which is consideration with possible action to approve the memorandum of understanding between wsd and Ellis County Juvenile board K good evening board thank you so much uh this this evening I'm bringing to you uh a new mou uh memorandum of understanding that would create the Ellis County Juvenile Services Detention Center this

032is anou as you mentioned between us and the Ellis County Juvenile board and is in response to the need to provide Educational Services that are required uh to students or juveniles in Ellis County that find themselves uh facing detention um currently juveniles that would be eligible for enrollment in the center are being sent to other detention facilities outside of the County uh one this disrupts their learning and Rehabilitation but also since most of these individuals are Ellis County residents as of their family they're being removed further from their support system as they work through these these um issues so the way the process works is that juvenal are brought in uh that are facing potential detention they have a pre-adjudication hearing which happens within the first 72 hours that individual then uh it lets them

033know if they will be detained and for likely how long uh those individuals then would become eligible to enroll in the detention Center these um it may be for just a few days it may be months it could be longer than that uh the district will receive Ada allotment for their attendance just like any other student that would be enrolled in WD the Detention Center will start with eight beds um staffed primarily by the same people that have run our Juvenile Justice alternative education program uh and this mou is very similar to the one that we have with jja a the Detention Center will use uh the same curriculum platform as jja which is a genuity and there will be a great deal of communication between the detention center staff and our Pam's staff keeping

034track of entry and withdrawal and as credits are earned and needing to be transferred potentially um during this process uh Dr aett Mr Calin Miss Burkhalter Miss mlon and I met with uh the county staff several times Miss Alicia Davidson was very instrumental in working through this process and helping this um project uh we also talked with region 10 Dallas County and DISD as well as Travis County and Austin ISD who also have similar uh facilities in in their counties and districts so this is technically going to be a new District uh or sorry a new campus in our district and we've already gotten a pe's number for this school we've already set up a Skyward profile so it will act just like a district or sorry a campus in that way but it'll only

035have eight beds eight to start with um we've also are in the process of applying for uh alternative education accountability designation I know that's a lot but just like High School of Choice kind of uh has a different accountability designation than um the our regular high school or uh Global it will be similar to that so the Ellis County Juvenile board has approved theou and assuming yall approved tonight uh the very optimistic possibilities of the earliest enrollment would be late February however uh there's still from what I understand quite a bit of state inspection and certification that has yet to be done so that that is uh we're uncertain about when the first students May enroll we we're hopeful it'll be this semester but but we will see what the state timeline is um so

036this is very new to all of us and uh assuming that y'all approve we have already planned another follow-up meeting in June to look at theou to look at how things have gone thus far to see if any adjustments need to be made at that time so do youall have any questions we are we are recommending the approval of this mou to move forward is this in addition to the large facility that the state approved to be built in Ellis County uh not that I know of because this is already an existing building it is where JJ is the old County Farm um so they're having to kind of retrofit that building uh to meet the needs of this Center questions for Mr K okay at this time I'll entertain a motion to approve action

037item c as presented so Mo motion by Mrs Timberman second second by Mr pittz any other discussion all in favor say I I post say nay motion carries 60 thank you very much for all right our last action item will be consideration with possible approval of the memor memorandum of understanding with Charleston State University for dual credit forces you got this one yes sir okay uh and and there are no notes so I'm going off if I paid attention this morning we talked about it board tonight we're coming to seek uh renewal of an existing mou we already have this mou with Tarlton State University to provide dual credit courses uh we're seeking your uh approval to go ahead and renew thatou uh the courses generally uh are taken advantage of by our kids in

038the CTE uh wings I believe it's mainly agroscience uh that our students are receiving dual credit opportunities through Tarlton uh State University so tonight we ask for your uh approval of renewing theou with harlton State University to continue offering these dual credit courses um Mr Cen I just had a question and you may may or may not be aware of of the answer but looking through the Fe fees and payments do we pay the fees for the CTE students or do they pay fees if they're not uh eligible Force lunch uh I don't honestly have that answer for you tonight okay I I'll have to do some uh research and get back to you on that okay um I just wondered because it appears that the district is picking it up from what I read

039but uh I just wondered if the district is picking that up or not my understanding in the past has always been that that at Global High School the district would pick up those cost uh that would be no cost to the student but at wache High School uh that was a cost that was passed on to the student uh generally at a reduced rate then they would be paying uh sticker price if they were go to that institution of Higher Learning uh but I can't tell you with 100% uh certainty that that's exactly the arrangement so let me get back with you on that one M cre okay I'd appreciate it because there has been some discussion about as a parent that had a kid last year we had to pay for it okay did

040you pay okay it was at a reduced rate okay so did you pay the $50 because that was a huge discussion this weekend on Facebook about fees but it wasn't CTE so I don't know yeah so I don't know if CT is there back from last year that as a parent we paid for that right and see I'm wondering looking at this if we should go if it'd be more uh or better for our students to look into tlon and for all of our uh um classes our U dual credit classes according to what I was reading this weekend thank you thank you Mr C any questions for Mr C okay I will entertain a motion to approve action item D so moved motion by Mr scle do I have a second second second by

041Mr McCutchen any other discussion all in favor say I I say nay motion carry 60 thank you thank you sir and our last item would be our comments from Individual board members I'll start um I had this long thing all written out now I don't have to set because everybody else did when Kate was up here talking and stepen up here talking we have such a great Community they support us so well if you drive around this community you see Jimmy Ray you see wman Stein all these things that they're doing to the buildings we wouldn't be doing that if it wasn't for the support of our community so thank you the community of wah Hatchy anyone else well I was going I'm going to Pig you back a little bit over what Miss Timberman

042said but I just want to thank everybody for their support uh from what I understand it would U the parents everybody pitched in to get wman on the ground over the holidays and I'm pretty sure that there were probably were teachers on our ice days working at wman to get everything ready but working uh it was a lot of work I can't when we said we were going to move a building in the middle of the year I was like uh that is a very very difficult task but thank you to Mr M and and the whole Community that's pitched in and helped and also I want to wish everybody a Happy New Year because it 25 is going to be the best year yet thank you anyone else I'm going to close this by

043uh asking our district to uh keep the Mulla and Harrison family in your prayers we lost a longtime educator this weekend Miss Mulla um their family is three generations of teaching in walk ISD from uh from M Mulla to her grandson who is our CTE director now they've served our district for a very very long time and I just felt like we needed to mention them tonight if there anyone else has anything I will entertain a motion to adjourn so Mo motion by Mr Timberman second by Mr McCutchen all in favor say I I motion carries 60 thank you very much

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.