Transcript

Verbatim source text

001[Music] n [Music] over to our colleague and from yeah so U this is just a early opportunity to look at early design stage uh of our our architectural plans for the referendum um we're not at the finish line there's a long way to go uh we wanted to show the board kind of where we're at first before we start engaging staff in the community in the process uh and so uh what we have always found is it's to put some squares on some paper um so that people have something to react to they imagine it themselves you can get a lot of kind of wild stuff that distract you from heading in a Direction that's within reason and so um when we talk to Bray and Clint you know we've got some criteria that we

002have to fit into like the size of the lot or the number of classrooms and so it's really helpful for them to kind of like sketch out what's possible up front and so Joe has been working very closely uh with uh Clon his team and we're excited to have Clint here from bray Architects to kind of present uh a slideshow that we recently got ourselves uh as our longrange facility planning uh committee that meets weekly uh and uh just to kind of talk through early stages so any early feedback ideas super excited to receive thank you Aaron uh as you said this presentation actually was from last Thursday so these are very wrong uh We've uh we got great feedback um from from the group that we met with on Thursday we've made a couple

003tweaks uh since that time but as you can imagine our team is kind of uh working uh towards uh making updates uh as we go through towards our our next meeting which will be uh not this Thursday but the following Thursday um we are set to meet with a staff group uh this coming Thursday with it's hinin and State Road uh to kind of speak a bit specifically about the the state road process I'll just say in terms of schedule I ASE they didn't bring that kind of overall outlook on schedule but we sort of have um what we're going to refer to as three bid packages that we're planning for the project uh one will be the the district office move to Central High School so that's something that we're uh moving quickly on

004uh to get out to bid so that construction can start on that with the plan that construction could be complete um sometime in the fall uh and the school district would then be able to move kind of in a October November time frame uh the next next project that will go out will be uh the state road project I believe again from memory I believe we were planning for the uh bid documents to go out to the construction Community uh roughly in August September uh of this year again so that construction can start on that project uh we'll look at plans for that in a little bit uh and then the final bid package that will go out to the construction Community will be for the new uh Elementary School it's bigger project a little

005bit more to design there so um that one will probably go out in we'll say November time frame which again allowing uh time for bidding and then uh construction will start uh basically in Spring of 26 uh so not going great great deal of agenda but just kind of a some of the topics here tonight we'll look at the the district office concept uh some design considerations that we've been uh taking to look at as we've gone through the process uh State Road and and the new elementary and then uh again for for the purposes here uh we had started to prep uh the district team for some engagement like I said on on Thursday and then we are looking to do some tours uh in the in the coming month or so uh so

006first project is again the district office move to Central um this is just a minor I'll call it snippet of the site at Central this would be the southwest corner of the site um the auditorium kind of sits right here and then the the on the cell side kind of a big entry pieces over here uh so one of our goals with moving the district office over there as is a current challenge at that building is is parking uh so what we're trying to do is capture some additional parking in that southwest corner uh as noted here uh looking roughly to try to get about 22 spots plus the handicap uh actually I think the handicap is included within that um and so uh in terms of what's wrong about this plan I think the

007district challeng just take and squeeze one or two more spots uh into this location and and try to make that fit um in addition to the parking interrupt you for a second yes okay I'm sorry so I can't see this in person I can't see the presentation myself is there a way that I can possibly get this sent to me just to review this along to everybody else sending you right now awesome thank you Laura so much I I wasn't painting a clear enough picture for you so I got it but my imagination goes so far I se something to bring my imagination down understood understood you're so good at painting a picture um again some of our other goals here are to kind of uh clean up some of the pavement make sure our

008our ramps and railings and so forth are up to Ada standards um so again this will be our Ada handicap ramp up to uh the current entrance and then once I go to the floor plan we'll see kind of the the entry sequence uh into the overall facility uh moving to the overall floor plan so to orient you this would actually be I'll call it kind of the middle floor plan for uh for the the Central High School the old offices off kind of the the Western uh entrance are are here uh again we're focused on the south side of the building south of the auditorium um the darker turquise uh color represents what we would call heavy renovation so we're moving walls kind of doing Real Construction type uh items the area in the

009lighter turquoise would be more of a finish uh updates for those types of spaces so painting ceiling lighting uh flooring those types of things um so the the bulk of our work kind of focuses again on that that southern side of the facility um I'll zoom in on this in a moment um again this is this is the the bulk of the work that we're going to be doing um moving to the other side of the building I don't have zoomed in portion of this but the goal is to take some of the large group and and staff uh workroom area that exists at the high school and and better uh utilize that space um uh for nights and weekends and so things so forth for for board meetings um but it will also again

010serve the school as a a large group kind of instruction type space so you can see again the finishes updates here um creating some uh specific storage for boardroom presentation uh you say and then this is currently uh the school uh staff um kind of work room area so it's it's pretty big and it was actually originally set up as a a me male and female side so we feel we can cut that size down a little bit more to create um some conference or smaller um meeting space within that area this is on the second floor correct yeah yeah the middle floor lower level second floor and there is a third floor above this can I just ask is there any staff resource area being lost or is it relocated we will still have

011staff space there will still be work room space we're just squeezing it a little bit we if you've ever been in there there's a side that's materially unused and there's a side that is used and so we're just creating conference space for and this isn't solely the district office this is like school conference space use foral we've engaged with the the administration over there they're actually like having offal meeting space because they're lacking um if you have this elsewhere in the presentation then just answer it but how do so we're going to have substant or potentially substantially additional traffic inside of a school building and uh how do we how is that student safety addressed that's a concern I have and may if you have that elsewhere in the presentation I'll yeah essentially there will

012be a set of doors here so the the challenge right now is we obviously ly we're we're up quite a bit higher here than we are at the outside of the building either in the parking lot which was in this zone or the the front of the building here which is up a series of steps um so we do need to maintain this this ramping that exists within the existing building to get our handicap accessibility into the space so we're going to locate a a set of doors here that will be locked off so any district office um movement that that occurs they would not be able to pass into the students zone of the school likewise um students will kind of be dissuaded from or or not allowed essentially to go into this area

013of the building as well could you where's the elevator located there then uh well the elevator in the existing building I believe Joe help me out right right about there right there it's right here we we have a ramp here from the exterior so that we would have accessibility in into that space without the need for an elevator and if they would if there would be an elevator need again it would be at that location good but that's on the middle floor correct there yeah thank you so again zooming in uh to this area a little bit again uh we're continuing to work on the the overall layout here but again creating um this this is our ramp coming in where we are trying to create kind of a a shorter path for people uh

014to come in uh with a set of steps here so this is kind of our our reception area uh coming through for those that are able to Traverse steps for those that are not they will have to kind of come around and then and then come through um to to again to utilize the ramping that exists along of this spine here so this will be kind of our our main reception area and then we're um subdividing uh some of the Departments Community Services uh district office superintendent our business services hi are uh we are planning to locate the foundation uh in this location here there currently is not a floor in that location so we looking to recapture some space within that that entry uh vestibule at the front of the building uh adding a

015floor uh in there so it should be kind of a cool uh unique uh space for the foundation to exist and then they would be accessible again uh Able Body people coming up the stairs here or uh again the accessible route coming uh through this way uh our tech services would then be back uh in this space right here this is currently a mechanical space so big air handling units and all that fun stuff in this space so not looking to move that um there is a secondary mechanical space right here so again there's a air handling unit within that room and we're looking to put that up on the roof so we can recapture that as a nice central location for some additional uh conference and workroom space uh in the center part of

016the building uh we're looking to um more or less maintain the bathrooms in their current location we are going to um um update the finishes within them so the uh tile toilet partitions and so forth uh we did talk about maybe a little bit more aggressive uh renovation there but if anyone's done a bathroom in their home you know that's a very expensive uh item within uh the floor plan so that's probably an area will continue to uh develop as we go through uh just pointing out there is a little area here of storage that we're uh trying to um uh take a look at and and and kind of designate that for district office storage um within the existing building and then you'll note there's a kind of a little area of display just

017again maybe looking to update that area there's been a lot of nice branding things with the doors and stuff and some of the other areas uh and maybe looking to update that that side of that lobby as well there was talk about no go ahead there was there was mentioned that not everybody or everything from this building could move here and could go elsewhere and I'm thinking about the volume of space when you've been in the balls of the it area I mean they just have a lot of stuff so are they moving over or who isn't moving over and where are they going yeah so maybe I can show you if you go into that office area right here that's the old office area where um before we moved down to the east entrance

018was and so this is really set up already we're not going to do we're not going to do anything over here we're just going to paint and some things but the instructional leadership team will go over here so this is where they will go and then we'll have some storage for it down at our shop and we also have some storage for it will be at Logan High School and so you have room at your shop for like you got a full shop yeah we're we're one of the things that's really unique that we're doing is we're looking at uh taking all of our files and we're looking at making them putting them online not online but electronically so we're doing that and then we're really assessing what we're keeping and so if you go

019down to Hogan you would notice that there the process has been huge there's stuff that's been here for 30 years and so we're getting rid of a lot of things cuz we're downsizing just like you would if you're moving so almost everybody's going to go into that other section except for you guys for us yep but you're doing work to is La Plume as well is that all part of this budget yeah we're all talking about us going to is plume and the only other people that aren't going here is nutrition and they're going to Logan High School okay nursing services will be distributed to buildings they're already in buildings 95% of the time and they'll have a central place where they can meet in that instructural res assess place I think data there's some

020spots for text when they need a place to work the data closet we move our a closet for the whole district from Hogan we're already prepared for that and now we're moving our our generator for that as well so that will be the location and this whole area will be it as well it's really trying to get people out to the schools the people that are there and so this is really a good use of space because a lot of it's been empty if you walk through there now it's there's not many students in either one of these areas that we're talking about and then you're also doing some early renovation to get classrooms ready for the teachers at Central so one of the things that we're doing as a part of that process is

021these are all temporary walls in here and it's space that's not used very well other words most of the time they're open and so they're asking for permanent wall so starting next week we're creating four classrooms within that area space they already have but they're not utilizing this four classrooms and so we're given them the capability to do that and then we're uh looking at places where we can add conference rooms that are currently storage rooms so they have more more conference rooms within the building and this is the million dollar project yeah that's what I told you was an estimate at that time we'll see we'll bid it out so we'll know exactly where where that comes in good luck I have a question about um Public Access like when the auditorium is used

022for a evening concert or something like that is this side entrance still available for that yeah we'll still be able to to to proportion those doors to allow the access we we may want to add some additional doors here if we do want to kind of lock off so I think there's some different levels we can create to for the different activities that are occurring it'll be even more obvious entrance for folks there's uh there's some brick walls in here but where the classrooms are located where all that renovation is going to happen outside that Corridor it's all drywall and so the renovation while May looks significant it's pretty low cost in terms of what it actually entails um we're not moving any brick walls we're going to keep all those things in place so

023it's not any heavy demolition or anything that was so good with the hack Edition in the90s was yeah that was a hacket Edition and there are no structural walls there's some beams that we have to work within the in the structure but it's really going to be easy to open that up looks nice you Dr angle has not insisted on the corner office it looks like not a window there's not a window on the corners there's his office right there looks good cafeteria as we uh as we kind of roll into the elementaries we've been having you know starting to have some of the conversations of you know what you know what does the school want and you know some of the things even pre- reer and we talked about is you know collaboration and

024student centered spaces and Hands-On learning and those types of things so again not to go over these in a great deal of of uh detail with you tonight but just wanted to kind of talk about you know what what are we trying to create are we trying to solve for large groups are we trying to solve for medium groups um and the answer to that usually is yes uh we want flexibility we want to be able to serve a number of different functions for our students uh but again understanding that are are these spontaneous Gatherings are these Cur is a destination is it integrated again the answer to that is usually yes so it's again working with the team to try to Define uh what some of those goals are um I mentioned uh a

025bit ago we're going to plan on taking some tours so we're going to go see a number of recent elementary schools across the state um so there too the the the the group The the district team that's going to go along and and likely a few staff members uh we'll kind of get to see it in person and obviously we can always uh show lots of of great pictures to to see what those types of spaces look like as well I think one of the important things is both in the state road building project we're bringing together two schools and what we really need to work on besides just the physical building is to combine the culture not you're moving into our space but we're moving in together we're creating our space and and all

026that happens I um I kind of even wonder in the back of mind will state Road's name continue to be state is that even a discussion that could happen I don't know if it should or not but I think the people that go to school there and work there should have that discussion totally yeah and Joe you can talk about how we're bringing people together already what we've done is we've already done tours with the hinin staff we've had three tours where they've been allowed to come over actually some of the State Road teachers stayed and went through the tours with them so that was that was the first part but on Thursday when we meet together we're meeting together by grade level um and we're meeting with the hch and the state road teachers

027together and so they'll sit down with myself the architect and shelle shelle and we'll look at those spaces but we're looking Beyond um we're looking beyond the new addition we're looking at the other areas too just so doing exactly what you're talking about how can we bring in that collaboration how can we change the culture and so some of those discussions are already happening through um through the tours that we did and the teachers coming together so really encouraged by the way the first part of this has gone we'll see how Thursday goes but I think we'll be really exciting to get them together but there's been that discussion already on culture yep and then as we do professional development and Elementary activities the idea is to bring these groups together consistently over the next

028two and a half years so that just becomes part of the routine we know each other we're together We're In It Together uh to build that so it's very it'll be very intentional throughout the process then as far as names go that is something we'll have to address at some point especially the building here is it spers or emers Spence your choice um but the the school board has the right to name buildings not Administration so we'll probably propose some process and you know about how to approach it but at the end of the day probably a year out from now we'll probably be in that process of thinking about names and what that will look like there was a middle school student who addressed the board after the facility advisory committee recommendation advocating for

029engin and I remember the backstory that she gave about the school and why it was named what it was named like state or state hin it's not because you're going to hear that [Music] too I also like the questions you have presented on the previous slide regarding collaboration um I'm always curious about how how we will teach students and having that drive the conversations before we talk about what does the space look like uh and then we talk about what technology is going to help us accomplish that so I hope is that some of the conversation also be geared that way trying to figure out not only how do we combine these two cultures but also how do we want to teach for the long term what space is going to give us that opportunity

030and what technology will enhance that learning for students so I appreciate it yeah not everybody learn a 900 squf box right I we we but you can't teach group you know groups in a stadium C classroom right need that type of St as well and it's no fun to learn out in a hallway or in a VES either right so making sure we have some of those spaces for our kids feel like they're they're part still part of the school they're they're they're cared for they loved with within their their area and and in a space that that they feel comfortable are like mental health concerns being part of this I remember a number of years ago we did tours in some schools many kids come to school struggling with self-regulation and have meltdowns and

031um get pulled out and having a a soft Landing for that so they could collect themselves with different kinds of lighting different kind of tactile is that something that's being considered yeah I mean uh we're we're working through some of those we we sometimes rep call those sensory rooms um where again yeah they have the ability to change the lighting within them they might have a bean bag chair or something within them for for student to to be um so yeah I don't know that we quite have all of those exactly identified yet but we will get get to those layers um another thing that again whether it's a buzzword or or what whatever but um bi biopic design is another characteristic again our group talked about where again the building has a nice kind

032of living quality to it um again gra it's not static White Walls and and again hopefully inviting and in front Joe you're meeting with our special ed staff yeah they're coming together and that's really one of the areas where I think that beyond the addition that we're doing that you're going to see some changes at State Road school because of what they're bringing to the table together because um hinin has a very nice space and State Road does not and so there's already been some discussion and that will be a part of what we're discussing on Thursday with that staff and I think think even needs for that are are moving far beyond just special needs kids I think it's becoming a part of so many of our kids yeah and you'll see that in

033the new school kind of tely where they've kind of we've been talking a lot about that St so a just a real quick diagram uh again of of maybe some of these collaboration ideas getting implemented in State Road um this this diagram is colorcoded kind of by by by um more usage uh than addition Renovations so so uh right now this is our first floor plan addition is kind of this this part of the building with with the the gym um so we're showing four new classrooms um and then up on the second floor again uh these classrooms um but but again just trying to show some examples typically kindergarten there's a little bit less of that pull out um um type uh need in at that lower grade level but trying to show some

034of the opportunities um at the the first through fifth grade bubbles to introduce that both into the existing building uh and then where we can selectively um create it within the addition and and renovated part portions of the of the project so again this is kind of an early diagram we had quite a bit of dialogue about this last Thursday and have some things to alter and tweak with this but again trying to make sure that especially at State Road where where we're not again not entirely affecting all of the existing spaces but looking for some opportunities to to bring those collaboration ideas uh throughout the building uh again just some other things to start to think about within classrooms uh integration of technology and writing surfaces uh Cabinetry and can never have enough storage

035uh student displays a big one again sense of Pride and and and again having students see the great work that's happening within their buildings uh and then um lockers and Cubbies and how we're going to address that within the building lots of other things to think about so sensory uh was one of those Wellness um Acoustics making sure the the spaces uh look and feel uh appropriate I know Joe had asked about listening uh assist devices within the buildings and so a lot more uh discussion of integration of technology and what the goals are for the district uh throughout the facilities as well I have a question Joe this maybe more for you as as you've been connecting with especially the current state road staff I know there's been a lot of conversation about needs

036outside of classrooms like like shared workspace and and like that downstairs Orchestra room which also doubles as the surround care room are those going to be things that are like if the budget allows we can consider yeah those are things that what you'll see as we go through here those are things we've been talking about we think within the budget we can do some of those things so it looks like a continuation of the addition continues into the older part of the building great just a reminder we're in the like dream phase where we add all the awesome stuff eventually we will enter the value engineering phase where we cut all the stuff we love uh so it's a natural part of the process and so this is uh really exciting to look at what

037going or we the Clint's being the good cop right now and the Clint will turn into the bad cup so can can we get one of those like those like Skydive trainer wind tunnels I think that'd be a great one of the most interesting requests I ever had was I had a I think a physics or math teacher asked for a pendulum room and he wanted a a 30 foot tall room that was 5 foot by 5 foot and I'm like okay that's an interesting idea and we we did not build a p it could double for English lessons on Edgar Allen there's a lot of opportunity there situation I think as everyone knows this is the easy part really um until you start getting uh what the cost of it because I remember being

038when I was in Lacrosse Center our Dream you know expansion was pretty significant and all of a sudden reality sinks in when you really get the bids and so it's good to have a lot of these and get everyone's input and ideas but unless something drastic happens you're going you're going to have some major cuts to have to be done and that's the tough Clint also does never let us on and said like so we feel confident that what we're designing is within the realm of possibility yeah one of the things we'll also do when we do bid packages we'll do some alternate bids s for some of this so we'll even if we can't do it now we'll know exactly what that cost is and so future if we we're able to implement those

039if we can do it within the budget great but if we can't we know what we can budget for down the road in the next few years to do those things well and again we we need to have those difficult discussions way before bid time as well I mean not to say we're we it's going to be all roses and on bid day but we we obviously we we yeah we we can't go forward with a a a $70 million project when when we you know we know we have a budget we have to meet so again appreciate the focus on storage because that's always forgot and then the second is uh to Dr Engel have we set aside a portion of the budget in order to have professional development for any new technology that

040may be implemented within the school so that people know how to use the technology when they walk in uh not at this time that would be two budgets from now and so that's certainly something we'll consider as we closer to that point that's the other thing people forget is that the technolog is great but if you can't train the people to know how to use it then it's just sitting there like a paper weight and so how do we ensure that people are using technology we're fortunate somebody in this room might have written a dissertation on the use of educational space I don't know who that would be so again coming off a little bit of that discussion of you know what can we do at state road again we we know and acknowledge there's

041obviously limitations of what we can do on new construction or addition versus some of the renovation areas so again having those those conversations about what you know equity and consistency and again what we are able to achieve and what what's what we may be limited by um have had just some very very uh cursory discussions of of what uh Tech typical classrooms may or may not look like so this is would be kind of our 4K or kindergarten classroom um so taking some um some ideas from uh North Side um you know making sure we have a an individual toilet um within each of the rooms um Cabinetry uh tackboard all of that stuff within it again this is a very very early look just to get some initial feedback uh to eron's point earlier

042really just squares on on on a page to to start to have that dialogue uh then looking uh at first through fifth again typically those are around 900 square ft but um uh you know do they have to be a perfect square we've talked about you know uh one of the comments on North side is there's not a corner uh available within the the the classrooms typically to to teach so making sure we we create some of those Corner conditions where um some of that small group stuff or breakout space within the classrooms uh can sufficiently uh occur uh a number of considerations here kind of what's ultimately highlighted is is security um we didn't have didn't get into you know conversations of how much um openness and glass we're going to put from from

043some of the classrooms into those likely collaboration spaces without but how do we create some of those safe room conditions you know if we do have some degree of transparency and what this diagram is trying to show is even if a couple of these rooms maybe do have a little bit more um transparency the idea is there is a connection to the the next door room and these Corner rooms actually that end up kind of being the area where we can um uh go into the the kind of those secure locations during the lockdown um or or the the students have the ability to disperse if they're able to get out of their spaces another big part of that is is the compartmentalization of the building as we're designing a new building again really designing

044uh spots where the doors are closing and you know if an intruder does get in the building they're they're somewhat limited as to how far they can go and and obviously the the main thing is keeping them away from from the bulk of where the students are so again lots lots of things to discuss here and we're again just moving parts and pieces around but these are going to be uh discussions we continue to have as we go through the process uh so uh the initial concept uh for the new Elementary um you got a little sneak peek at State Road our initial concept here um is is uh uh potentially we we're kind of working with right now and our survey crews are are are going through the process but our our understanding or

045belief is that there's some utilities passing um uh through the site at the Middle Point here uh again once we get uh understand what the what the significance or what what's actually there um we may refine this but our initial thought is if we can avoid uh having to relocate those significantly uh and try to locate the building either on the uh this would be the north side of the site or the South side of the site would really be to our benefit so right now the the building is being shown to the north side of the site um and we believe this would also allow if if if so desired the building could be built while the current Hulan uh site uh building was still was still up so this would give us some

046flexibility the tradeoff for this comp more compact design is right now we are looking at uh potentially a three-story building for the academic side and I'll show you what that looks like right now but uh essentially we would have our our playground area uh on on this area uh just showing some initial uh our initial ideas for Hardscape playground area and then again trying to incorporate uh some degree of soccer um some uh potential parking lot down here again 45 is a starting point we know you know more is always better so we're kind of working on balancing uh the amount of green space that we have uh versus uh the the number of parking spaces and then again working through kind of where the front door of the building is and you know kind

047of given that the parking here the front door likely is is probably in this this location here uh or or or kind of along this this area here much like North Side the plan is to utilize uh some of the streets for our our drop off and pickup so uh again locating sidewalks and so forth around the building uh to accommodate that if I could just add right there we will be doing a traffic study that will be starting next month and so they'll be looking at the six six block area um six inter main intersections in that area for what would be the best way for traffic to flow on that North Side Elementary a lot of people had hope cane Street was one way is that something you're going to look at talking

048with the city to see if that's a one of the things we wanted that to happen originally in the city didn't want to do that but I think that would be a part of the much of East is yeah that little section of East leading out of here is one way in this way you know so we'll have to like think about that the traffic study will help us understand how best to approach things uh so now we're rotating the floor plan back so that North is up uh we had it the other way so we could fit a little bit more on the screen uh so again the kind of that playground parking would be down here as noted here we would have our our main entance on the first floor this would be

049our offices and then uh overlooking the the playground and parking would be our cafeteria right behind that would be our our gymnasium support spaces off to the right so the really nice thing about this plan and you can kind of see the doors located here and here is from a kind of a public side of the building versus what we kind of say the private or the classroom side of the building there's a really nice separation and kind of um kind of all of those public things are on that south side of the building so really nice and easy way to lock off the building we do that on North side right uh yeah it was a little it was a little bit funky in that the gym kind of extended through the middle I

050we were still able to achieve that but it was um and then the parking was in the back the playground was in the front so the the benefit I think here is is is the way that the site or organization and kind of keeping all that public stuff uh down it it simplifies it a little bit when I was would think that you knew what we now know that it all works at North Side don't get me wrong but we know what we could have done little little differently or or wish we would have done or not have necessarily needed and can implement it onto this one which is going to be a great L totally it's nice we don't have to work around that the building here for one thing um so again this

051this forms our our public side of the building we're working through kind of the gym size and sequence um we are trying to create a little bit bigger gym size than than we did have at North Side um this would be an exterior Courtyard so again very similar in nature to what we had at at North Side we can um try to utilize that kind of as a an outdoor space for students uh to utilize I think uh there's two versions at North Side the the one side that sort of supports the kindergarten 4K has been a little more successful so we would try to kind of um potentially replicate with the more successful version of that uh here first floor then would be our first grade kindergarten in 4k and then we are showing

052a uh one of our music spaces uh down here as well second floor would be second and third grade and then you can kind of start to see here the insinuation of some of the collaboration so we're we're doing kind of a little bit of a flipped concept uh with with regard uh to the classroom relative to the exterior so we'd still have a lot of natural light coming in um but again the idea is that from the classroom out to the collaboration or out to the locker spaces there's visibility um that's generally the kind of the best way for that space to use and function is is a teacher can send the student out uh of the classroom but still has uh visual contact of that student uh and then again a grouping of

053our third grade on one side and our second grade on the other side and then on this floor level we have um some more art and music and then uh again kind of replicating stacking that same concept uh third and fourth grade on the upper level with our library um also on that upper level are they have larger classrooms is that I noticed there's less classrooms there are they larger student I mean larger people class students in the classroom because there's not as many yep so in second Oh Oh you mean the fifth fourth it wasn't easy for me to say I was just hoping you'd catch on to that kindergarten through third grade we try and stick to 18 to one or somewhere thereabouts and then at 45 we get up to 22 to

05425 you know so there's more kids and they're bigger you know and so then you go from kind of five tracks at the lower elementary to four tracks at the upper because you can compress just a little bit uh and so uh these sizes should meet our needs at each level and the number of kids we anticipate in those classrooms so what's that red what are those red rooms along here those are B bathrooms bathrooms bathrooms uh bathrooms some special Le space Oh okay um our stairs elevator stairs and it does look like each floor has special ed space yeah that was the goal that kind of each pair of of grade levels would have access to special ed good yep special ed here El here let's see uh up here we have kind of

055a a smaller kind of space here so on the third floor way over on the right below the red the yellow space yeah what's that that's the library oh okay I can't write here I thought there was a tendency to move librar LC more of the middle of the building since center around that um I think it's again kind of the configuration generally were more efficient if we can stack you know similar type things so the classroom sort of stacking there additionally this this bar kind of representing our I'll call it our specials is you can imagine um it's sort of easier for you know a third grader to come up and and go right into the library here versus them having to Traverse kind of to the center part of the building um but

056again uh those are will change we're we're still we're still working on this so I know D brought up before about the sensory room can you kind of share where that we're thinking about the sensory room right in the main level yeah I think well I think it's kind of the reg regulation room I think right there next to left of the gymnasium left of the gymnasium right there right there yeah that's the office area yeah thinking about putting a sensory room in the behavior coach right in that area so um a regulation sensory so it looks like there's two arts and two music spaces but will there be two teachers of each um so typically we're looking at 18 to 22 sections for or music teacher to be full-time this will start to exceed

057that so we anticipate there could be a partial uh there at this building and so we may be running art and music at the same time concurrently um we had planned for that at North side it's um enrollment Dro pretty steadily and so we haven't had to to run both at the same time um sometimes you run like one music One art and then a flex and you kind of go back and forth music and art teachers hate that um you know so we're planning right now for you know kind of Max Capacity you know it's in the center of our city and it should be full when we start and so we're trying to plan for that first and if need be it could become a classroom in the future or a special education

058room or something you know as things happen but we're trying to plan for that full usage at maybe 1.25 FTE art music is that the uh elevator I see down at the bottom there okay for now yes yes um couple of things and this is probably up to the staff in this building but like the second and third floor I'm wondering like I'm just thinking when I taught I teach K right now but when I taught first grade you know I was in a hallway where we had four first grade classrooms in a row versus now when I'm in kindergarten we're all well there's only three but like in a corner and how much nicer that is so like I know there's a kind of an odd number but you know if it was clumped

059instead yeah so like you have two and two and I mean one would be the add one out but so it's not it makes it I'm just saying like prop time for sure or non kid times or even when we have kids just to pop out when we're all right there is really help yeah we could I mean this there's a lot of flexibility in this we could put the the collaboration down the center and basically do you know two thir grades and and and three thir grades on this side and then two and three and kind of kind of overlap them a little bit four fourth and fifth would work really well cuz we put two on this side and two on this and kind of create a little cluster zone so then it's

060a matter of like where do you want natural light or and then there's also like do we create um movable walls in these classrooms so that they could be expanded and you could fit you know if you open up the walls between two fourth grade classrooms you could potentially throw all four classes in there for a thing you know kids I mean we get together often in one space and I Al kind of on that note collaboration space we have currently in our kindergarten hallway a huge space which gets used non-stop so I know that it's not currently part of this plan but it's wonderful which building are you in North Wood yeah the green areas on the you know north and south of the classrooms are collaboration spaces but for example right is that

061the kind of place that could serve those need but it would be open air wouldn't itard yeah so that would make it difficult for I mean I don't know that that but that I'm just saying like it's something we use yeah when we get the staff together I'm I'm guessing those will be the kinds of things I think what we're trying to do is create a footprint where we can create those spaces and then that's where you start meeting with people then you kind of get do we have enough space for what we're needing and then go from there yeah like at uh State Road we had like little bump outs you know to create those spaces that's something that we could consider here between two classrooms is there a little bump out or something

062do we rearrange the Cubbies and bathrooms and toilets you know so if that becomes a priority that's a great just again like something that we use all the time and then storage St I mean that's one thing we have so much storage which I'm so grateful for but going into even north side like when I go in there I'm like oh my God there's like half as much storage here is what we have um and that's another thing we have in our kindergarten preschool rooms is a shared like between me and a kindergarten room is a shared I guess Suite per se so we can we have a table in there so we can do work with kids we've got a ton of storage there and then I have my own just in my room

063storage closet and then we have cupboards and drawers so it's built before Revenue limits back we had money so is L I'm just thinking of yeah of those little people teachers yeah absolutely that have a lot of things one thing I'm just I'm just sort of thinking back to the the full footprint is from or yeah yeah yeah no we go back to the other one so in that configuration you have the kids eating lunch and running across parking lot to get to the playground no no the parking lot would be down here this would just kind of be a a pave Plaza I'm sorry I did yep so that they yeah there's no cars coming through here you did it right one of the things we do know in talking to the city we

064do know that that the sanitary sewer runs it right through that spot so by going three stories allows us to have a footprint where we don't have to pend the money to replace the sanitary sewer because that would be huge if we had to take that somewhere else am I correct that the city has like an easement or whatever if they wanted to to connect night or uh uh they currently but we knew in the in the paperwork that we found that it's our property and if we were ever to build on it it's there but we are in the process with the city they're well aware of it and vacating that anyways and moving forward great and the this building's 2 and a half stories high you know with a higher you know height

065in the ceiling than we would maybe even build today and so you know this won't feel materially taller than this existing building so in terms of the impression of the neighbors they're already used to seeing something this height in the area hopefully be a larger footprint but hopefully it won't feel too dominating to folks in in the neighborhood if we go three stories well the Neighbors on market right now see a baseball field they're going to see a three-story building out their front yard yes this thing much better and that's been part of our discussion of making that look you know appropriately for that that street because it's a main thorough far right but what it does give us a southern exposure to the playground area to the part work lot to those things speaking

066of the playground area is there I'm sure grow across will approach the district about creating a garden here so is there a place that one could exist well what one of the I mean one of the ideas was even maybe that would be one thing we could do with with kind of the strip of land along here is you know again if we can get the setback right as maybe utilizing this for the garden again kind of soften that sou facing would be better especially restory building no definitely part of our process uh that we'll be looking at and Spence has a lot of great resources that we can transplant to this site doesn't need to be as big as Spence as is currently it's nightmare but uh there will definitely be a garden here

067somewhere get refined as we move through across this am I correct that all those spoke wheels are trees yes okay they're pendulums it's a lot of pendulums it's just pendulum all the way down possible trees also isolation pods um would you ever consider um what what would it look like to to be able to have a you know retractable temporary covering for the courtyard we' do do you like that idea better than my wind Tuttle idea I prefer yeah we'll see if that fits in the budget see that I think the problem is the heights are different there when we put in the uh Greenhouse at North Side I asked Joe if we could just put a glass top on the thing would that be easier I see do we know if we're going to

068integrate any solar or other sort of green energy yes Els with this and yeah I think the plan is to do geothermal and and then yeah likely um the solar again as you you've done on some of your other buildings so we'd have the whole gym space or the third story to fill out that Southern Exposure is good for thato totally Jeff's are expert and so what's the size we've typically done so far um the the one we did at Hamilton I think there was over and I'm I'm going off the top memory I think it was like 269 panels up on that one so it's that's our biggest array right now and then we have poly teic and as you know we're looking at doing Southern Bluffs and lot of excitement there for that

069one so and that's got a great roof a lot of exposure no trees yeah one question that might come up that you might want to prepare himself was the conversation of carbon neutral and the cost of having a carbon neutral building that came up at Oregon yeah we've done two of them now actually one of the buildings we're going to tour with the group um uh at that time the premium for that building to go Net Zero uh we believe was about $10 million but what we would do is build this to lead standards right so but not go through the certification to say those absolutely which makes a lot of sense yeah and um next meeting um Joe's been working with a team on a climate action plan so we're looking forward to bringing

070that to the board to discuss how this fits into that uh it's been a good process and we've got a good document we thinking this will fit will help guide our process here great anything else thanks for showing us just makes it feel really real that's really exciting cool um again so uh jumping back to State Road you can see this very much kind of a um work in progress but this shows a little bit more clearly the red is our addition and then um again we're kind of showing some of the hopeful goals with some of the improvements within the existing educational spaces uh but again uh our first floor couple of a 4K and a flex and we're kind of referring to this as kind of a flex kindergarten 4K uh space um

071some added first grade classrooms on the lower level the other two first grade classrooms being here and then our Upper Floor level this this is all addition um so this would be building over the existing and then this would be part of the new twostory edition so fourth and fifth grade Jim you had a question green energy here yes that's our our goal um to well the gymnasium brand new rough will throw on solar power um not sure I don't know if we'll be able to do geothermal geothermal won't probably be an option at this point but our goal is anywhere we can put on solar the payback is pretty good These Days Seven this years are we feeling pretty confident that we won't get a historical designation placed on the building yes I think

072we're very confident here through the woods on there yeah we're we're pretty confident I think we would have seen Movement by now but I think the difference is the city's behind the new school at this location they understand the need and 61% of our public voted yes it's a mandate to move forward didn't take very many people to pass it l ging so it's not a majority vote no true but I I think the the difference is the community had an opportunity to weigh in on this as opposed to the Lincoln thing you know so I think there's a different sort of political mandate as a result sure and if we saw that going ahead we would we would try get a demo permit before they did that process because it takes a few months

073to do that then we could start that process F's only like $100 a day $1,000 a day so we have this down 30 days so $30,000 it's called risk management swing we thought about it yeah is making a rage room just tear this bad boy AP be a fundrais there you go here's a uh again as indicated we had a saw version of this earlier this is that department plan so kind of again seeing uh some of the shared spaces in red and then kind of the evolution of the blue all the way up uh to fifth grade for our classroom spaces and then some of our elective uh in the uh the yellow color uh throughout here's very crude um we'll we will start to move to a little bit more realistic looking uh

0743D representation but uh but just a little bit of a a view of what this might start to look like um we are uh we are still a bit away from the the the the the District boundary line or your property line so we are trying to not take away too many trees uh we also will not interrupt there's the Outdoor Classroom kind of uh in the trees right right about here that we're not going to interrupt um we are talking about uh where this is located there is um some pavement or playground space there so we are talking about possibly adding a little bit of playground space potentially here to account for what is lost uh but again just kind of gives you a little bit of a a sense of the of the

075massing for what this is going to look like this gets rid of that little that little cut down place with the retaining wall that is an absolute liability for the kid yeah not a level area level oh not even close yeah they'll have a little Courtyard there where that is right now that'll become a courtyard are you taking out the tunnel oh really there'll be an open space there and that's good because it provides oh great it provides natural light to those classrooms that are there do you remember all those discussions we had about having Courtyards to North Side yes we laughing they called it the Deb super Memorial cour yes uh so again kind of some look ahead so a couple tools we'll utilize um with uh with staff and and getting some of

076the the feedback from them uh as we go through that process and then again um we're planning to do some tours so Forest Edge is uh the Net Zero School in or for the Oregon school district so just south of Madison Harvest intermediate is in wanaki uh and then we're also planning to tour um uh Herman Elementary in Sparta which is a relatively new building uh pretty close to here so as you can see it's a pretty full day start uh District where we still I think have to finalize this but leaving at 7 and getting back about 4:00 moving in all of these discussions we had talked early on about having particularly in this area having the neighbor a meeting with the neighbors to kind of talk about it is that part of your

077planning in this yeah yeah well we kind of I think right now I don't know exactly when that is I think it's when we get to a point in time where we feel we have enough to show um and maybe not too much to show as there kind of a happy medium where where there's still the ability to take some feedback but uh we also want to make sure we we kind of have some of the spaces even we talked about a little bit tonight we have it a little bit better def find so yeah I think that is our plan to uh have some Community feedback as well y we're planning some Community feedback on State Road uh as well you know even though it's not there's already a building there we want you

078know people to kind of get a sense of things and to be able to offer feedback and uh this building in particular would be important to have a number of community outreach sessions we've already in contact with Hogan ween neighborhood association and um you know they've offered to provide a representative to be a part of the design committee said we'll have opportunities for engagement um and so there should be plenty of input there uh both kind of conceptually and then people will want to know specifically like where's the building located how will it affect my house you know so for those at Katie's Point like the residents who are experiencing a substantial change and their experience will want to be able to weigh in on that as well I think I don't live in the

079neighborhood but I've heard from a few people I think what you look out the window is one thing but how the traffic in front of your house is probably a bigger concern for what I've heard from people that live that live real close here there really isn't a lot of traffic right now that's why they're concerned about Market's a pretty Market's pretty fast Road I mean it's that that that traffic study that we're going to do will will help us kind of determine where where the traffic and they project so they're going to look at engine and and Spence too know I get on my driveway at 8:00 in the morning yeah totally and can I park outside in front of my house and be done by 2:30 so any final thoughts or comments for

080Clint and um about the process I thank you for this discussion so early on thank you y thanks all right yeah Joe's got a few things he'd like to share just uh in addition I promise I won't take very much of your time it's been a long evening but I want to we have a lot of projects going on and just kind of want to give you kind of a picture of what they're going to look like as well should just take 10 15 minutes depending on your questions so I do have one question Clint with the critical success of the new film The brutalist are we considering returning to Raw concrete design thank you for not I went to a college campus that was the brutalist and I Milwaukee yeah yeah so I I

081don't I don't have any need for that thank goodness and I have not seen the movie yet so i' explain the Clint that the the entrance to Logan Middle School always made me feel a little uncomfortable and then he told me that was intentional like those sorts of overhangs are supposed to make you submissive to the encounter that you have like a school for a school kind of sadus design schools in the 60s you able to share this with you as well so I can send it to Adam uh I can't let me see it's on my desktop so we'll get it to next your so we have a number of projects that you have already proved and so just wanted to give you an update of where we're at uh the Logan B bleacher

082project um you approved that bid came in I think a little over a million dollars but U we were able to do some things there that we didn't think were possible and so one of those things are is storage underneath the bleachers we didn't think we were going to be able to budget that but our bids came in able to do that this is very similar to the coloring that we've picked out we'll be starting the demo of the current bleachers here this next month and so we hope to have everything in place by um August 21st when we have our first game or right around there and so the colors you see will be similar so we'll have storage in the back that will into the parking lot uh what you'll see is storage

083at the track side for all the hurdles and things that you can go into there and then the color of the bleachers in the Press Box are very similar here we'll only have 12 rows of bleachers that will seat, 1500 people that's more than we can see at that at Logan High School now so you'll see that completion date by mid August starting next week yes so where do the track people watch in the during the construction time during the construction so what we'll do is they have yes they have the visitor side that we'll be able to use and we're keeping the Press Box until after um track season's over so they'll use the Press Box and the visitor side for viewing but we'll have the demo done and we really need to do

084that so as soon as that last track Meats over we can get get everything going and we have a Wisconsin company so uh they're in town um they also use Olympic Builders who help them build Olympic Builders local so we're very fortunate when it comes to that 1500 is the number of seats you need to host WIA games and tournaments so that's a good size to have and it would really be better uh Ada accessibility as well so um you approved the the roofing projects at Logan Middle everything in Gray is the roof that's stay all the other stuff is work that's be done roof will be done um over $700,000 worth of roofing projects um they'll start these actually in April we'll need to do that to get done um before next winter um

085so you'll see those projects but we're doing 10 sections of roofing that really need to be done at Logan Middle long overdue all of these projects wouldn't exist if we didn't pass the referendum quite frankly because we wouldn't be able to afford to do that many roofs at one time when our total budget's $1.2 million a year operational oper yeah uh Central Greenhouse which you approved tonight really a state-of-the-art facility and our and our agricultural teachers were were a part of the design this is very similar to one that's in soft Prairie but the technology is amazing that we'll have in this thing so they'll be able to monitor uh the rain and wind and make adjustments to the watering automatic watering system and everything that happens there so we're really excited to see uh

086where that goes but just wanted to share that with you uh talk about uh this the climate action plan um our climate action committee really wanted us to use heat pumps in this thing we weren't originally going to put heat pumps but we are able to put heat pumps so this will be heat pumps that will will feed this along with the all the sun power solar power as well with those you can heat down to like zero I even negative degrees at some points you know so using modern technology super energy efficient ways to heat a building year round yeah they'll be able to use this year round they're really looking forward to I'm really excited to see where they take this my heat pump is good to minus 10 Central Tech Ed building

087you'll see that we started that we're just starting that now so you see some construction over there um that's going to be at the end of Green Bay Street just to show you at the end of Green Bay Street then we'll have a a concrete driveway and apron into the storage building but it's not just storage yes they will store their all all their trailers and their Tools in there because they're going on site to a lot of things but they'll be doing a lot of building out of this as well so it gives them a space to do that uh be insulated um the students are going to be a part of of this whole process so they see this being made they'll take part in that when we uh insulate that and all

088those things so they'll be involved in this whole process and then BGC you know that there was some discussion earlier what about that I'm on the design committee for that really looking at starting construction here in the next couple weeks staging for construction but just kind of wanted to show you kind of the things this is the first floor so they have a construction lab and you'll see the garage door into that a garage door into the Innovation lab collaboration space and so these are our students will have access to to this space during the school day and after school and I know brda has been in involved in this whole process of how we're going to use that space But it's it's really nice space so it's be two stories and what you see

089is up in the upper right hand corner this is the rendering of what that will look like it will be Facing East if you remember we have we had a little green space that was up there that we had our shot put area that they'll be creating a parking lot on so we'll be sharing that parking lot we already moved um our shotput area to a different location so this is all ready to go but just kind of wanted to show you what that space will look like yes this is not funded by the district correct not funded by the district completely Boys and Girls Club but since it's kind of a shared space I want to share that with you and I've been part of the design process and the construction through grants and

090local donors and uh they're breaking ground in May yeah in May yep and they'll start uh like I said they're going to be setting up for construction this next week yes you know when you say our students you know high school kids from both high schools get busted there know they find their own transportation yeah so I don't know exactly how it's going to be used Brit is using that but I know the Logan High School students will have access to that during the day and we do have students going over there periodically now and but after school primarily they're looking at programming bringing in contractors doing a lot of neat things in that space kind of a continuation of the program we already have a lot of Middle School exploratory stuff to get kids

091interested C teal education Fields open their eyes to what's possible yeah so this is $6 million addition um it's really gone really well so and that's all I wanted to share with you I just wanted to give you those updates on projects you've approved and know about so you when you see what's happening out there any questions for me it's all great no great job okay thank you busy year we J [Music] see