CorpusRecord 85333

MCSD Board Meeting February 17th, 2025

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Merton Community School District
Date
2025-02-18
Location
Waukesha County, WI
Material
Transcript
Extent
13,219 words · about 74 min
Collected
2026-06-10

Transcript

Verbatim source text

001tonight's meeting to order the February 17th Board of Education meeting if they would please join me in the of Allegiance all right this meeting has been posted on a normal and customary posting places so I'm looking for a motion to approve things up okay later got okay so we're g to go right into the community Forum so all right so I'd like to turn it over to Mr ham and Mrs iwony to uh talk a little bit about our math team and you'll hear a little bit about how they did I the students here okay we good yeah you're good so um for those of you who don't know me my name is Mary I'm the talent development specialist for the district as a portion of my job responsibilities I look for additional opportunities to

002help um showcase some of our exceptional talents in the district and today we're here to talk about exceptional math students who represent at the regional math meet um at the beginning of January so every year we get to send four kids from each grade level um 5th 6th 7th and 8th to our regional math meet run by the Southern Lakes Advanced Learning Network or slain as I call it um it's a tough decision every year which four students we get to pick we have a lot of exceptional math students in the district and over the years we've done various things to kind of determine which kids to send on this year we streamline the process even a little bit more to ensure that every child who is showing some of these exceptional opportunities has um

003a moment to try to make it onto our team so our process included looking at our I ready scores and our forward scores inviting a smaller group of students from that in order to take some um qualifying tests here in the district so we invited between 15 and 20 students per grade level to take those qualifying tests let's say between 50 and 75% of the kids invited chose participate so that original or um got rid of some kids right off the bat who were like thanks are recognizing me but this is not my deal like I don't really want to go to another math competition um from there we narrowed it down I will say our toughest competition this year was in fifth grade we had to go to even additional tiebreaker round um where

004they had to come in and do some mental math problems to make the team we had very um tight competition between our fifth graders in order to make the team so coming out of that we were able to take four kids from each grade level at the beginning of January um we went to W Whitewater Mr Hanahan going to talk about what that experience was cuz he shaer on the kids into the room I sat back in the scoring room and watched their tests come in and enter number is in a giant spreadsheet that tabulates so Mr hn hand's going to share a little bit about what happens in that room I want to just kind of set the stage here of the morning the day how exciting it is um so we arrived 7

005o'clock in the morning um to jump on the bus it is January so it's dark right kids are here lights are on the parking lots uh the kids are all here look bus leads at 7:10 they're at 7 right so excited we're ready we're off to Northshore to pick up Northshore students hey they're there we we're heading to White Water we get to White Water little early and uh what do we do hey Mr hanahand can you quiz us sure this is 8 8:20 in the morning doesn't start till 9 o' hey what are Roman numerals I think right work roals we found a little fireplace we got warm and we've worked on MTH facts all kinds of stuff uh the seven eth graders went to one room fifth and sixth grade to another room

006now when I see a room the conference rooms at Whitewater are as big as our gymnasium okay tables three kids at a table couple hundred kids in each of these rooms so kind of set in the stage of how many kids how many schools this isn't just like couple little classrooms they're competing against many other schools lots of kids okay uh we do the mental math um 7 Seconds up on the screen pencil down solve it in your head write it down then they write it down they do it 10 times those scores go up get score then they do individual tests again you challenge most of us get these questions right they did a great job all individuals scored um then we have to come together seven eighth grade on a team fifth and

007sixth grade on the team and um they have to work together fifth graders don't usually work with the sixth graders but their goal is to get the best score so they kind of pair up uh what probability uh what else Al algebraic thinking there one other geometry so they kind of broke up into their strengths and did a team test and this is what I'm really proud of um whether they they take individuals medals or team score if you saw them putting their heads together and just working working working and um is fantastic so I want to congratulate them whether they got individual medals or team scores uh you should be very very proud of all your kids our district um they really really shine when we go to White Water so then it's all

008over we have wait for the results and what happens then all of a sudden we have some eth graders come and join because it's by a size of school and uh they serve start with fifth grade and they serve you know second place they only give Awards of for first and second place second place mer Intermediate School cheers hundred kids cheer first place meron School whoa right sixth grade second place buron school I mean again this is top of the top southeastern Wisconsin over White Water fantastic right so we're piling up a lot of individual Awards and then they come up with the team score first place M intermediate sco so really really good now they go through and do the seven eth gr again we got a individual award and also I believe second

009place guys think second second place for seventh and eth grade so uh they qualified to go to Madison in May um really a great bunch of kids I'm very proud of them um academically and way they showed their U teamwork at White what so congratulations to all of you I let's have a big round of applause experience I love math and love oh I forgot one thing these kids also come Wednesday morning some of them for Tuesday morning I have Wednesday Tuesday morning 8:00 they working Mrs pin just extra math extra math extra math really working hard um so they they work at their craft too so very proud of for all you for that yeah there miss P because she does she does like the Tuesdays and then exactly I asked her how to

010get to like the math team last year and he like told me how and then I stopped there this year so that she works on the skills similar to the math me right yes bring home some of the questions and kind of get the form at so like for fifth graders it's brand new brand new so it's very like eye opening but once you go as a sixth fifth grader and you're like oh I want to go back as a sixth grader it gets easier and easier I think Colin you're one of those guys you're like whoa I can't wait because it's a good competition right so they kind of eager to uh do it again the next time it is yeah the great thing bringing up Mrs pin thank you for the reminder to

011both of you um she started math oad in our district this year so beyond the math meet that we only get to take four kids from each grade level math Olympiad is an open club that anybody in the school can join so any of our students regardless of qualifying for this she can have as many students as she wants and it's just an opportunity that any kid who really wants to engage in that additional math time can come on Tuesday mornings and do those skills and then from there a lot of these kids use those skills to then qualify for a math meet team but it has given us the opportunity to have both something that you have to qualify and be a select for and then something that's open to anybody who wants to

012spend that extra time doing extra math so we really appreciate her work bringing additional math opportunities to our kids all throughout the year so that being said I last we've got some certificates for you and I know not everyone was able to make it today and we'll make sure that whoever's not here want obvious we won some team Awards but then I Mr highlighted some individual Awards too so this is than hunting other thing I want to mention is you know a lot of other schools are never heard of even where Merton's located right but when we leave they'll look and find oh I I've heard now theyve heard of Merton right so these these students put Merton on the map I will say that so one more big round of applause you got and

013then we'll shake some hands and do we have announce indidual yes if you want to invite yeah just announce the individual winner I got to pull him back up I want to make sure I don't miss shake hands all right can you come on congratulations theas come on upas Tobias took uh first place for seventh grade in the whole come on palen come on up palen was second place for six graders congratulations Sam uh carbon carbon was first place out of all the fifth [Music] graders and brayon oh and Mr has graciously been one of my chaperon on this math Beach it takes a lot for a teacher to be out of the district there's a ton of lesson planning and preparing for a sub and I really appreciate that year after year when I

014say who wants to do this Dan steps up you can tell that he loves it right it thank you very much congratulations again and families thanks for coming out to help us celebrate and hear a little story about how all wi so thank you very very much great job everyone great job Community Forum we can wait to we can do the community Forum as long as we start after 6:10 the board meeting we're good you we can open it up for Community Forum okay yep all right let the room settle in here oh okay so we're gonna move right into our community Forum doesn't look like anyone has signed up to speak would anyone like to speak to the board this evening okay seeing none we'll roll right into our uh regular meeting here so

015looking for uh approval for tonight's no you can might as well just call her to order and start at the top yep it's a little bit different for you now so we'll start at the top so hold R roll the whole R roll again y all right so we're gonna call tonight's meeting to order and we'll explain why we had to do this later on in a little bit um call this meeting to order for February 17th uh 2025 we already did the Pledge of Allegiance okay everyone comfortable with that good um this meeting has been posted in all the normal and customary posting places so looking for approval of tonight's agenda second we have Moot and a second to approve this evening's agenda any discussion all those in favor say yes yes post say

016no motion carries all right moving forward to the approval of tonight's consent agenda motion to approve tonight's consent agenda we have a motion and a second to approve the consent agenda any discussion no no donations tonight but after we're done I do want to highlight the January ones by didn't verbalize and publicly thank them so okay I'll do that after you're done y okay uh any further discussion all those of uh in favor approving the consent agenda say yes yes yes post say no motion carries and last time I'm sorry typically we do highlight the donations and I didn't do that last time so a big thank you this was a great month for the theater company you know so uh thank you to Warden Joan apps uh again donations to the theater company uh

017thank you to the Roden family who there was some matching donations from Kevin's Bank of America so that would be from there um thank you to Doug and Elizabeth Bertrand again for some audio video equipment towards the uh uh towards our theater program and uh an AT&T matching from uh Andrea Reid so again thank you very very much to them and again I apologize for not publicly recognizing them last month no of course thank you all right we are moving forward to delegations to be heard and there are none uh this evening so we're going to go to the district administrators report yep yep so we're going to start with the principal's report uh and again if the board wanted to scoot back into the audience here anda's gon talk about teach plan uh and

018talking about uh some some staff work we've been doing around the meron values so good evening everyone my apologies for my voice I'm I'm gonna try not to cough any anybody but um going to do my best today um so um today the principal report um we're just talking about how we're working on our strategic plan with meron values with our staff on some of our Wednesday morning meeting um times so we're really looking on that employee experience aspect of our strategic goal um how do we strengthen employment Recruitment and Retention and um Employee Engagement so that's kind of um where the heart of our work has been um the last couple days hold on all right I think I got that now all right so um every as you know um in the district

019here Wednesday morning staff come in 45 minutes early um and then um that equates to three professional learning days and on our calendar it's a mix of um District professional learning days building level professional learning days we give them time to collaborate with their grade level or content teams in the morning on whatever is relevant to their work um and we kind of rotate that um on a every Wednesday basis it's not exactly every Wednesday because the days I think we have 32 32 of them that we use um that way but we started talking about um our Martin values now that the Strategic plan kind of recemented our um Mission Vision and values um because we've had a lot of turnover staff we haven't done this since I've been here for three years so

020it gave us a great opportunity to dig in so um the morning of October 23rd we did an overview of like what is a value what does that mean how do we do that and that's really important um to start talking to the um team members about because we have these values we want them to be a match Martin to be a match for the teachers that higher um because that's one of the best recruitment strategies how is this value work me to you that's who we are as meron and where do we fit in that so we covered um what the meron value is in December we did um be courageous which was to talk about our what it means to be courageous and I have a little activity we'll do with that in

021a minute um January 15th um Mary iwony gave me a break and she did be inquisitive um for former maker space because she just still loves that teaching of the maker space so um she did um be inquisitive and then you see our upcoming dates for some of the remaining goal work that we have on our calendar what's really important in this professional learning and Wednesday morning is that we really want people to leave with a strategy that they can use in their classroom so you know if Mary iwany did something um with being in quisitive we shared maybe some new software interactive things that um teachers can do um in their classroom and for be courageous um we kind of taught a strategy of how to help kids be courageous by practicing that as

022adults so that's what we did so this is a little um thing that we tried and um actually a important strategy for being uh courageous is visualizing it what do we do how what visualize it so here's an example of kind of gave it a try that we kind of did so um to think of we are thinking about something scary for you and visualize the success um and I put Marty gr here because I wanted to put up like something real for me um we're practicing a lot of vulnerability within our staff talking about our feelings which isn't always easy so I'm always right up there first putting my life my family my kids my husband um and introspect every time which I'm sure they love um but um um you know meeting new

023people is scary to me because I often feel shy a visual success like this okay maybe I made this up just a little bit because people that know me know I'm not that shy but pretend you don't know Maria and I'm shy um so I'm imagining at my husband's work party it's loud there's music some of my favorite things to eat and drink are there um we enter the party um by our happy hosts that take our coats and introduce us to some of our new people and kind of thinking about what that looks like like um we ask how long they have worked there and then other people we know kind of join us and before we know it we're laughing and enjoying ourselves so kind of taking our staff and our kids through

024like what does success look like if that's something that's scary to me right so now I'm feeling less worried you know because I kind of picture what this looks like it gives me enough courage to kind of go to this work party and try to make that visualization happen so we practiced that staff was given some time to think of some work examples cuz it is hard to be courageous sometimes in work so some things that um staff members shared um in there be um courageous um was like disagreeing with a colleague over an an Ida over instruction what do you do with those team meetings when maybe two of you are want to go one way and three want to go another way how do you have those critical conversations how do you visualize

025that and have them making a decision with a significant other right talked about that actually I think that was you know one of our team members um very vulnerable moment in that that might be our boss um and then having a critical conversation with a friend colleague or parent what does that look like so we took some time kind of visualizing to prepare them to kind of have some of those conversations and to have the courage um for what we need to do so that's kind of how our Wednesday mornings are working we're looking forward to keep working on some of those strategies things that staff can take away from um the time and um hopefully grow their toolbox and kind of also I mean when you're vulnerable you develop our relationships with your team

026members in more meaningful ways so that's also a nice thing that we've been all able to talk about and and work through on some of these days so great that's all I have the principal Mar forgot insurance we talk about fun stuff like Insurance well I'm just talking about our Wednesday morning values we do talk about insurance we have other meetings forward testing practice and protocoling not as fun as this um I know we got a lot of feedback on like the interactive engagement part to how what was working you know and then some kind of those beginning parts of little feedback it's hard to be vulnerable with that so do you develop that and keep working with that so we do that in sa safe Spaces by allowing people to pick their team their

027team members who they want to talk to and we don't make anybody speak out loud but I have a couple people that I'll just keep it going thank you Maria right and we also did have the normal there's normal open records request uh throughout the you know the last month from the last time we've met nothing big nothing big nope nothing big like how much time I spent on it probably Jim how much time under an well under an hour yeah I'm not sending a lot of emails dur holidays so doesn't take a whole lot of time to go through them right no um then also wanted to report on the human growth and development is everybody okay if we talk about that at the last in the new business we can kind of highlight

028that or I can highlight it here too as well but it is built into our presentation uh at the end of the meeting for our last agenda item I'm good with it as long as we're allowed do we need to you don't need to do anything you approve I'm just going to skip over it and it'll all be discussed yeah I'm not going to move it I'm just we just it'll all be discussed in the new business so under g under g yep we'll just highlight it under G okay okay and then for policy report reports so um the uh the first part of the uh policy and policy and Personnel committee we spent on reviewing three different policies uh again the first one was 363 education technology um after reviewing that again this was

029one of the policies that we reviewed oh would have been in the summer right we reviewed it just kind of reviewed it and kept an eye on it and then as we we were going to come back to it and then ultimately um it was discovered that that policy was all talked about teachers okay but we've got a lot of other people that work with educational technology that are not teachers so um what you'll see in those revisions and again we'll talk about it in a little bit if we want to to go in a little bit more in depth in the first read is basically we have covered everything all staff members and the big significant part is is if you are not a teacher or underneath a teaching contract uh for instance an

030instructional assistant um if you are going to show an educational video it has to be approved either by your your immediate what we' say immediate supervisor so for instance if you're special education and you want to show something to to enhance a child's education it needs to be approved by that special educator by a teacher um or by an administrator just like it is with the uh the policy there too so teachers have the ability to you know they can always ask for an administrative approval um but but again they don't have to for our instructional support staff though if you're not underneath the teaching license we are asking now that if you are going to be showing a video or some sort of educational technology um you run that through either a principal or

031your direct teacher report from that standpoint to so there's not a lot of people that this we really feel this affects um our special Educators already kind of work directly with and underneath um you know there are some areas you know when I think about Primary School Library you know there's some short video clips uh but again there's some it's very minimal on that but again it does cover all of our staff now not just teachers so just kind of cleaning some of that language up and since we implemented this um we do have kind of a bank built up a library bank and are you guys receiving a ton of requests or has it slowed down not as time consuming hello two years ago yeah yeah so that's what that 363 again we'll kind

032of some detailed questions say teacher and also says instructional staff instructional staff yep or staff correct yeah so we just cleaned it up to make sure that everybody in the district is covered uh from that standpoint too second last paragraph about people appr yes yep yep correct needs two people correct yeah yeah yeah if you got edit grammar edits we can always do that absolutely no not don't know absolutely so that's 363 um the next one is is what we would be looking for a full dialogue from the board in the first reading uh the committee just wanted to kind of bring this to the whole board to have a discussion prior to the second reading was is how do we want to handle the community Forum so last month it was brought to our

033attention that and and Mr Layman was accurate we just did it we had a discussion and I apologize we did not cross reference it to our policies okay now I can tell our community the intent of it has been being followed right we want to make sure that anybody's able to speak about any topics the question is is where do we want to have it do we want to have it as its kind of separate meeting that it starts at six o'clock and it again you can have a start and end time um and then you roll into the regular meeting that's why Justin's never had to run a meeting like this this is all new to them so um or you keep it as we've had it before where it just is part of

034the regular meeting so if we have it as part of the regular meeting and that's why you'll see two different copies it does require a change okay just some logistic stuff that the community form will be part of the regular board meeting or whatever it says in there so that's kind of the intent there so uh the committee uh wanted to have a full board discussion on where they felt you will see that if we do the way it's operating now as per you know the original intent there is a start time for six o'clock and I did talk to Bob Butler real quickly our legal councel and he said Ron it's best to again just set a time you know like this evening it was 6:10 if the community Forum was done at 606

035607 we sit here until 610 just to make sure that the general public has the opportunity to come in making sure that we don't start ahead of that I asked I told him that we do not have an end time Bob you know our policy we do not have an end time he goes Ron it's very defendable very defendable that if you start at start your meeting at 6:15 or 6:20 no one can say that you started early and that everybody had the opportunity to be there on time so you can start a little bit later so uh again we'll have a full discussion with the board about which direction they would like to go that's why you see two different policies there from that standpoint okay from a year ago when we first discussed

036this I remember it primarily being Logistics making sure that everybody knew to when to watch for example was that the primary reason knew when to watch it was part of the meeting and also to understand again we highlighted since it was part of the meeting uh it was recorded y it's in the minutes now and things like that it's public record so we can continue the conversation when we when we jump into open session or into new business I'm sorry okay the other policy that we talked about was it was recommended uh that just to bring consent agenda uh as part of policy so um you will see that in 171 uh our regular board meetings did not have it uh the board back in April agreed to do it um and again WB does

037recommend that it does become part of your meeting somewhere as part of your policy that you will have a consent agenda or may have a consent agenda just we should have it documented that we are doing it again um the committee is recommending to make it part of policy that it says will be placed on the agenda and again this is just standard WB link language that you see highlighted there too so again just being brought forward for full board consideration and we discuss that in new business or we're discussing that we'll discuss it in new business yep y uh and finally the last part of it was is we did have a meet and confer session with our staff uh we invited you know sent out two to three reminders for everybody and again

038we had it after school this time to try to bolster participation um we didn't have any uh but but again doesn't mean we're not going to keep trying uh we will have another one ahead of our employ handbook uh last year that one was well attended by a couple people to uh to kind of highlight hey here's some things to maybe talk about as we start to think about changing our employee handbook is it TR morning FR afternoon Frid afternoon yep yep no attendees no attendees in this these opportunities correct the most attended said the last handb would have been in April yep when we before we bring handbook changes so you think it's possible there's less attendance now because you're doing the um what's the name of the committee I just forgot it that

039you're meeting about uh salaries and compensation compensation thank you compensation you know that's talking about different things uh but again I think every you know compensation again we just we had a Wednesday meeting speaking of Wednesday meetings and uh we had a convers it was it was part of what's on your mind right what what's on your mind what's compensation was the number one response so that I'm wondering if that's why there is perhaps less participation here because that is the number one thing on people's mind and you already have a committee that's working on it that might be affecting in a good way mean that you're addressing something that is primarily on people's minds y um now hopefully the handbook when we say hey obviously the handbook covers all sorts of things hopefully we'll

040be able to get some good participation out of that because last year I think we you know whatever three or four different things came out of there from recommendations from staff so so yeah so we'll we'll keep trying certainly will we found out that there's no great time so sure where everybody can so but thank you very much again Nicole and Troy for for your commitment on that great okay thank you Ron yep uh moving forward to new business this evening um our first topic is discussion about strategic planning around meron values discussion and potential action yep so uh last month the student achievement committee uh again we brought this as a report to the uh the board and what came out of that student achievement committee was to have a full discussion on how

041to move forward with um the meron values as part of the the Strategic plan and there were some questions that came up uh that they that you guys wanted the administration to to go and pursue a little bit you can find all the answers to those in that uh in the February memo thank you very much Maria for putting that all together uh as it relates to what our enrollment was what would be the the new cost if we did want to continue with second step from the 68 level um you can see those dollars there too as well so um so again ultimately our administrative recommendation uh again as listed in the memo would be just to continue with the K5 uh we are have the sets continue to doing doing that as we

042are right now um we are recommending to not do uh Second Step at the 68 level uh again that would require uh board action you know what we believe just to kind of cover ourselves and that would be to just uh you know make a motion not to offer second step for grades six through eight uh you know beginning in the 2025 26 school year and that would be moving forward uh and then our third recommendation is to uh put a team together just like it would be with any other curricular uh opportunity review put a team together in the district of multiple stakeholders to review and to possibly uh recommend something for the meron values moving forward um as the 25 26 school year so ultimately that would be ready for the 26 27

043school year so just open it up for a board conversation in any action that they would like to surround surrounding any of the the merchant bance conversation so Administration is making some recommendations right that we could potentially take action on correct so correct Y and it is listed as potential action so anything in the value Second Step a specific motion I don't have a specific motion yep okay so we'll open it up for uh discussion around this topic y so timeline clarification run so not renewing Second Step but putting together a committee to look at what other things we would do to achieve this part of the Strategic plan you said for which school year is the committee start now so it's ready for when we don't have step second step or would we have

044a year with nothing we would have a year with nothing for students in grades six through eight correct yep um the when we say nothing we still have again when we talk about um social otal learning Standalone Standalone curriculum we would not be offering Second Step um and and offering that opportunity for students again we had 34 students out of let's use the easy numbers 300 again less than 10% um from that offering opportunity there um not to say again this is just Second Step we're going to continue with the enhanced ACP class that's what would roll forward for the students who for the other let's just use round numbers for the other you know uh 260 students we would keep with the enhanced academic and career planning course just as it is now and

045then ultimately we would investigate for something in the 26 27 school year so we' put that team together to review between for next school year so we would start that in the fall and then ultimately bring a recommendation to the board later in the springtime of 26 so I wouldn't want to say do nothing we just didn't do the second step program reiterate we had 20 students in sixth grade that opted into the program correct 14 in seventh grade and zero correct in eighth grade at after the program yep okay right um you know I I feel it's a great time for us to evaluate the entire second step program is my opinion um since we're looking at this pillar gr values for continuity purposes probably W make sense to run two separate programs are

046you talking about for primary and intermediate correct primary what's our don't we already own it for x amount of time we we own it for it 14 version or something whatever version it is 2011 it isn't old it's it's old it is old yeah so what I I would recommend is let's say let's take second step and right put that Community together to look at our curriculum moving forward as a district that would be a motion I would make is till 26 27 for the primary so primary wouldn't use in 26 or in next year specific to second second step I would like to see them continuing with second step this year while for the primary while they are figuring out what they'd like to do next the um amount of importance to being able

047to work with one another in community and I'd also want to hear from our principles if we weren't going to be continuing something like that in the primary because that wasn't part of this discussion yeah that they that the recommendation came from I I'm I mean I think we might not have to wait for an entire school year we get a committee going sooner last time this the committee started I mean you went from it was pretty quick right I'd have to take a look at the time frames okay um probably was I think in April to December so I think we approved it in March correct or when did we approve it I no it was Summertime Summertime or whatever and I think there was a little something that might have happened in the

048worlding that time but I know this year I we don't have the capacity to take on to start that right now um with all the ACT 20 impl implications I mean I don't want to speak for Maria or I don't think right now we would have the capacity to even start something in April or May you know but I you know it's it's an issue that a lot of so how please um how much of the Second Step material is still being utilized with it being 14 years old in primary um so wrapped up in all this those these motions that were made previously on optin it was an op the op the optin is just for intermediate did save for six through eight yeah that's only an intermediate so that part is a uh

049that we do have to if there's no Second Step there's nothing to opt out of for the intermediate so if that's what we're deciding that's just the intermediate part well that would be one one aspect of it obviously this encompasses an entire yeah the discussion is is about the entire K8 approach the administration's position is that the meron values pillar right that social motion learning would is encompassed in that the meron value pillar would would we would investigate those meron values and try to um either create B replicate and again that's what the committee would work for to really enhance and make sure that those are aligned with those values correct yeah but it is those values are aligned with some social emotional standards and things like that too as well so so while that

050committee is working I would want us to keep our current curriculum this next year while the committee is doing that work I would not like to see the primary school without that curriculum for a year so why do we why do we think when we get to Intermediate School that parents are saying this isn't important my student I I'm not quite sure I I think that's a little bit more nuanced question right because there it isn't just there's also the ACP so since there's two curricula or two options the um choosing to be in the ACP doesn't mean you don't thinkal is important means that there was the word career planning in it and I think that's very attractive to people so I'm not sure that that's a I didn't I didn't want them to

051have this it's there's two choices and they needed one and I chose this one for them is it an and or or can they do both when you say and or it's it's one or the other it's the same oh six oh same same so either way they're getting ACP and they can they have the option to do it ACP withal okay so it's choosing ACP or ACP plus as soon without the Second Step Edition to my question people are choosing just the ACP without the corre addition so I mean that that to me would says a lot about but yes and I will say that even when they are selecting for that some people and I am one of those parents looked at where the as a child who someone who has a child

052who needs more social benefits from more socialization I looked for more and more the kids would be and since I would have liked to him to be an ACP plus but it was such a small group that I opted him into the larger group for greater socialization purposes so there's again there's some Nuance there that might not just be people don't want I prefer that he have that but given that's where the community was or that's where people were choosing I made that selection for my child because we did survey families a year ago and that's what I was kind of pulling up because I was like I know we asked I know we asked that question and uh again main reason for opting out again was the main reason 25s my child asked not

053to participate and but I shouldn't say that that was 25% the largest was about 29% I don't want my child taught social emotional learning so then there was 25 was my child asked not to um Wanted additional study hall time and I didn't approve of the second you know teaching learning of the Second Step curriculum so it's approximately 39 plus 14 so right around over 50% uh little under 50% so right around 43 44% said they don't want their child taught or or they don't agree so it's about 44% 29 plus 14 and they CH chose one answer they chose multi one answer just the main re we asked for the main reasons so y so that's the information we have it's a year old but that's what we have yeah okay I would say

054for the intermediate portion we don't have the numbers to continue to pay for the curriculum that's a I would agree with the administration's uh recommendation to discontinue second step for the intermediate level for six through eight so as a district when we require it that's what I trying to get to we're requiring it require the participation when people have a choice they choose not to that tells me that you know maybe that we gave that choice at the primary school they would choose the same I would want to hear if I can and well they they might I would really want to hear from principles about that because the um the amount of Need for being able to learn in community has a lot to do with these Second Step skills um so I would

055want to hear from principles what would think about how they think the school would work if they did not have that added part of it and they also need that so when they get to more Independent Learning when they get to the intermediate school they have practice at that or working with others when they're not as closely supervised yeah we would we would like to see the K through 5 to continue to develop that and we do see that part of a you know and against a small amount and again just kind of a core development to the whole child from that standpoint but from a Ki level but Justin your so if we were to continue as is um when we get to this committee would the committee be determining new curriculum for both

056I don't want well we wouldn't want to have two programs necessarily right okay so we look at a Ka curriculum would that be in the scope I guess would be the question looking that the entire program would be in the scope of this committee not just six through eight okay okay um further discussion on this since I couple more things up so the second step when they they charge us for the program is that $10,000 for five years well that that's a g through eight or that just that's six through six that's digital yeah so that number yeah so continue sorry to continue at primary there's no cost 2011 right no 2020 or 20 2020 but think the K Second Step hadn't yeah they were transitioning to digital digital curriculums and but they were the

0572011 kits after 2011 so the committee the committee decided not to even do anal for six 8 grade it basically still be the same price for the K2 five oh you're not okay it's in the committee wouldn't even think about yeah so or the committee could get away from second step and come up with their like you said develop your own so the program wouldn't be linked to certain second step or so that and I guess that's where I'm coming from is you know this is a pillar of our strategic plan um but we get feedback at sixth or eth grade people are saying they don't want it I don't think they're saying they don't want the pillar I don't think they're saying they don't want the soci emotional learning curricul that that portion that's

058but we're defining Martin values this is a pretty big part of that pillar that's why we're having this discussion right it's an aspect of it's an aspect of the social emotional curriculum just like it would be for ACP and some of those it says it's found on the Strategic plan pillar goal one and strategic objective two we are to enhance student personal growth by focusing on our meron values but we have not asked people said do you not want us do you not want us to teach inquisitiveness do you not want us to teach kindness we've asked specifically about about that curriculum no understood right and there was a lot around Second Step publicly nationally that we've talked about that whole second step was a firecracker yep it was it was went through yep and

059that's why I mean it's the the the parts that were as the most and again we were using Even in our you know as as old as we could get but that's why we're asking to just separate ourselves from the 68l the the family said they thank you but no thanks that you know they feel that they either their child is ready or or whatever they want some other opportunity um and we agree with that um we would like to though continue to offer something for art Littles K through five to continue that program once a week to continue to enhance that aspect of the total child and you don't even call it social emotional learning I think we called second step is it called second step I think we just say it's second step

060time I think yeah so that's where I mean the original motion back in June of 2020 was social emotional learning curriculum and now we made motions since then specific to Second Step and that's right I'm getting a little it was specific to Second Step because it it's not saying that you can opt out of learning kindness in the classroom you can opt out of the Second Step curriculum specifically that was my understanding of the motion at the time that's 2022 motion right the opt out motion was specific to that curriculum was specific to Second Step yeah then we would allow to be put into the ACP because of certain State mandat I think Justin you're talking about the original motion though right back in 2020 which was just approving a social emotional learning curriculum right

061correct and we again at the time that curriculum was tied to the objectives uh if you take objectives to what Second Step was offering at that time so we just aligned ourselves with that okay so I'd make a motion but I need to know how to word it basically the administration would be I mean for the Second Step aspect of it for the 68 uh the administration would be making looking for the board to approve a motion that uh eliminates second step programming in grades 6 through 8 beginning in the 2025 26 school year and I'm I'm just going to ask again publicly why we have to do that why can't the district why can't use Administration just make that decision well we we feel that because we called out Second Step because there's nothing

062for those families to opt into um the motion is is for grade families to option their child into second step curriculum during the registration process it will no longer be there we're we're requesting for it to be pulled from the registration process so the board put it in We Believe The Board needs to take it out so you're you're asking for us to take the opt in out no we're asking you to just eliminate Second Step beginning in the 2025 school year put that motion still stay you add won't it be out by default because there won't be anything to opt into that was my I remember a conversation with that's yeah right now you bring it back step back well then it could be we'd have to have a again then you would have

063a new curricul curriculum that would and again we believe that there's other great as long as it's not Second Step then that motion would never apply we then we have to come back and say okay if we do choose Second Step fast forward again logistic wise would we have to say well we said we're not going to offer Second Step but we have to undo that motion may have to just for logistic stuff I think if it's not an option I kind of agree then it's a mute point I don't know why it needs to be reversed and we're not buying the new right at this point in time he's saying since we said they could opt in we need to say there won't be anything to opt into and that we like eliminating six

064right yeah we believe just to keep things clean just to as opposed to the board said you're supposed to opt in and then the administrator said oh look we don't have this curriculum anymore there's nothing doed into they want the want the board to make that decision so it does not appear they're have be on the registration we believe that we believe no policy by the direction can we didn't approve renewal of a contract for two seven or $10,000 like motion direct administra my and that happens upul at time for example science in element but materials are sing to Second Step and we just hate reing it when we're silent we deal with what is currently in place until we have something motion but it's not in policy no it's no it' be an official

065board motion so which means it's there was a direction by got okay so we would make a motion regardless of what like if I wanted to make a motion to eliminate Second Step period we'd still have to you're saying still have to reverse once it's gone once it's gone it's gone no but I think Justin's talking about from a cave if I say for the entirey make a motion to eliminate second step is the approved curriculum because I think it needs to be reevaluated just across the whole District with the age of the well I guess I was under the understanding that that was happening this spring from previous conversations because we knew that the contract was up the for 68 that contract they still had the kit to be able to use for K5

066so it's my understanding that it was only 68 that we were specifically looking at correct with the literacy lift with the in particular the primary staff because ultimately this affects all the primary teachers with the literacy lift and the seconde implementation of the Mathematics curriculum um and with the ACT 20 work um we felt that we could pause the meron values work for a year again because we had we we kind of had we going down this direction for 68 but from a K5 standpoint we had something in place that was already purchase no new money um to move forward next year and then with that and then ultimately do that curriculum adoption one year so okay I make a motion that we eliminate the Second Step curriculum for the 68 grades starting with fall

067of 25 did that cover all the parts that work we can keep discussing if it if it gets a second we can discuss all right so we have a motion we have a second I'll second it we have a motion in a second we have need more discussion so that motion by eliminated Second Step at sixth through 8th grade feel you feel suffices to address the opt in opt out you got that covers Us you got it that covers us there yep so that directive is gone if the vote approves if it if there's a majority of the bo of the of the board that means it's g go back to be approved second step is the official curriculum back in June of 2020 yep now it'll be the official curriculum from K through K

068through five right correct it'll be the official curriculum K through five because the motion is specific for six specific for six through eight yeah because we throughout all the Motions there's never been a discussion or a motion discussing K through five leading up to today that also means financially we don't have to do any of those numbers that would would be a yeah that takes care of that decision as well so we're still in discussion right yes y we're discussion so if we do that can we add to the motion put a timeline on the K through five being I think we'd want a different motion for that portion of it I think we could add we add to motion that say within this time frame yeah I do I do think it needs to

069be really or K through second step for 25 26 and then yeah they need to have a solution by the end or the beginning of the 26 27 school year yeah you could you need a Bo motion you just direct Administration to do that too as well yeah I I don't know that we need a motion for that right can in theory you could just tell Administration we expect we want to see a plan by you know what is your because it's still in the minute some very similar to you know a curricular adoption we'd like to see your plan in your time frame um to to recommend to the board a new program that replaces you know in that will suffice to the mer values for the student experience build I mean you can

070tell us to do that we wouldn't need a motion and then ultimately we just kind to keep that as updates I just have to say that 43% those six through eight parents went through K through five and when it hit sixth grade and they had the opportunity to opt out 43% said no well we don't know if they would have said no in the third grade they might have thought now that they're in middle school and we didn't we didn't ask those questions we don't have that data so it could be something to look at but we don't know that part I just I'm sorry I don't I don't see it that way I see 43% at the end of the day they were given the option and they said no thank that was from

07152 responses we had 52 response responses we had 200 and something responses when they shows correct correct from the for the reasons right because my reason wouldn't be included in there right sure and we only asked the people who opted out why so if you said yep I opted my child in you skipped that part we didn't do that part I would say it's time to update a survey 34 34 students yeah so um all right um I like the the idea of making sure that by the time we hit 26 27 second step is no longer the approved or it to be reevaluated updated something because if we're I mean things change right I'd want to hear from the committee what they think is the best option correct and Ron you're saying we just

072have to give board directive correct yeah that's a board directive everybody comfortable with that okay State your motion so my motion is that we let's see if I can remember all my words we eliminate the Second Step curriculum for sixth through e8th graders starting in the fall of 25 2025 Second Step sorry we have a motion in a second to would you mind reading would you mind can you read myot we know what goes in the meeting yeah got have we review a lot of film we have a motion a second to uh eliminate Second Step curriculum for sixth through e8th grade starting with the fall 2025 school year yes okay any further discussion all those in favor say yes yes yes post say no motion carries thank you whatever the committee yes I I

073G to recommend we put this on a next month's agenda to give that board directive you want that to be that'll be part of our strategic Plan update and work that you guys will see and stuff like that too I mean we certainly can if we wanted to make it but we can uh we can start working on that not now but we'll start working on the plan yeah sounds like we're in agreement on some of those things I think we should just clarify that so okay confusion okay job team there we thank you for your patience as that yep okay now we are moving forward to the approval of the part-time Primary School associate principal yep so uh again thank you to Mr blessington and again and thank you to the board for all

074of your consideration and you know we've been uh talking about this and having dialogue back and forth so we really appreciate the time and consideration so um again our our administrative Administration is recommending that we continue on with the part-time associate principal contract is outlined in the um is in the uh the board packet and we feel that uh the the size of primary school not only from the student standpoint but from the uh staff standpoint um where it is quite quite large and again we feel that having an administrator and a half there to handle that workload from a staff supervision standpoint to continue to be effective and continue to meet those board goals is is important there too so um again we feel that it's a vital part of Merton primary school again

075we're looking at some of the goals that we have um from a standpoint of academic achievement um behavioral and just kind of really making sure that from that staff morale standpoint too for family students and staff it continues to move forward uh in Positive Directions as we are seen so again just the administration is looking for a motion to approve the uh uh part-time administrative contract for Brinn Roy as presented it is a two-year contract limited term there is no rollover provision and uh as part of signing the contract the contract approval is waving rights to any non-renewal process as dictated in 11 1824 so um it would be twoyear though set time frame and then it would have to be Revisited after two years so move you guys I move the proposal do we

076have a second a second so we have a motion in a second to approve the part-time Primary School associate principal contract any discussion I will say that I've heard from community and from teachers that they think that this position and this person in this position is a significant ad for our district and that they're really pleased with how things are going so I agree that the workload and the amount of things we need to do especially with the number of probationary teachers that we have uh seems like the system is working well and I think that for a two-year limited contract it's a good idea to continue to grow this stability so Ron can we just recap what it was originally presented to us as the idea when it came through sure yeah the originally

077it was about a year ago leaving less than a year ago June June uh was to to assist in in in Bob's transition as Burton Primary School to assist in day-to-day activities and to assist with the uh the visibility of uh developing Bob developing the climate and culture of his building so that's really the original intent and it was a one-year um period that we were taking a look at um at that time uh to see if this was something that we wanted to but again the intent was for one year and then to um take it out so that was the the official intent so yep and now we're being projected with two more years yep asking for two more years given given the the effectiveness that we're seeing it and I understand where

078all those questions are coming from absolutely I originally um voted against the position so um again not the person right the position um you know had a lot of discussions on administrative staff and all that good stuff so I do think it takes time to rebuild the stability we had a year and a half of flux and the teachers really felt that and the families really felt that and I love to see how things are going now and I think it'll take more than one year to solidify that so I I don't know that I would see this as a forever position but I do think extending the contract for these next two years helps us to keep building on the gains they've made so far and solidify them with the community any further discussion

079uh it's approximately four hours a day for 195 days so Bob and Brin work side by side there there's some there's some flexibility there um again just working out times and dates and again it's typically 10 to two Bob is typically T to two students are here y when students are here yeah and we are I mean looking forward again if there is times where you know some professional development is needed again some some outs are flexed um that way too as well but or and just you know like like all other administrators just just work so again we do try to be as professionally uh respectful we really really do just like we would with a part-time teacher or a part-time employee um not have them here fulltime we don't we have teachers any

080this much put a whole day that's a different it's a different position you know correct any other discussion all right um we have motion a second to approve the part-time Primary School associate principal of contract all those in favor say yes yes post say no no no does not car all right moving forward to uh approving the 2025 summer school dates okay um our is required by State Statute found that out a year ago so that's why this is kind of new for the board uh so that DPI requires a board of tion to approve the summer school dates so what you have in front of you is uh the administration is recommending that uh the board make a motion to set the 2025 summer school program to run from June 9th 2025 to August

08129th 2025 that would Encompass uh Camp invention any transition activities for fourth to fifth graders any type of transition or any type of learning that would occur on our campus during that time so just looking for that motion more logistic wise so we can count it in the FTE motion to set the 2025 summer school program to run from June 9th 2025 through August 29th 2025 uh we have a motion in a second to approve the 2025 summer school dates any discussion all those in favor say yes yes yesos say no motion carries thank you moving forward to the first reading of the proposed changes to District policies 363 187 and 171 that we covered earlier earlier yep we had a little conversation so this is just a time for discussion yep yep so any

082feedback for the committee uh let's just kind of start with 363 so and again any feedback we don't have to read them all this time no no no it's just first no the next one would be again final approval would go to March 31 363 is really just clarifying teacher versus instructional staff incompass everybody yep exactly compasses everything that was a change resulting from so that happened well it was there there was some there was a a video that that was shown that we would have like to have previewed ahead of time from a from a non- teer and uh again we we we we handled that the same way we would move forward but then we realized like hey for the letter of the policy doesn't cover that that classification so all right another

083discussion at 363 all right the confusing one for me 187 187 okay and again ultimately on any of these policies if you have any other feedback to the in the committee just let me know and I can kick it out or whatever it might be there too so um 187 so again uh there is no recommendation from the committee and we just wanted that dialogue but where do we want it do we want it like it was before or do you want it like it was today so the policy currently as currently exists says what we've been doing since I joined the board is not correct for policy correct yep the policy says we set it it's to happen before the regular board meeting not in it so it would be posted like we did

084today at a start time of six o'clock and then ultimately you can we can set a time of 15 15 minutes 10 minutes whatever it might be maybe 15 is more realistic then you know every day especially if we're going to have a commute or a student showcase run through there um and if the student showcase takes eight minutes then at 6:15 we wait we sit chitchat which we did prior to last April that we I experienced that and then I've experienced this as well so prior to last April it was it was start Ron did it Ron did it correctly he placed it from six to 615 but presid back then refused to wait the I remember wait point of order on I was ignored so several times so so we would have to

085wait until the 615 615 whatever the DAT if the community for carries does not carry us to that point correct see any other downsides of making the change it's about being public record it's public record because it's a special meeting and again it wouldn't be so right now or previous to if if you spoke at public comment like all the way from the student showcase we put the student showcase we thank students for coming um you know if a Community member came and spoke to the board and dialogued around a topic that person's name is listed in the minutes and the topic that was being discussed so um again it's picker choose picker choose I'm indifferent on it you get consider of the a lot of people know talk on the off I don't feels

086comfortable and then delegations to be heard is on is on the record yes is on the rec now we we do video everything's everything's recorded whether or not it becomes official part of the minutes that are published as a class one notification in the lake you know the walk shop Freeman that all becomes searchable stuff searchable stuff yeah there would be no official record you'd have to go online and view the video and say oh Ron Russ talk to the board feel like since there's a video that there's video regardless that the the likelihood of someone not speaking because we made this changes less because there's there's video anyway right so I I I anticipate that doesn't U keep the community from coming forward as much as it might have before at time before when

087we video so I like the fact that we would recognize the students as part of the public record but we could do that separately we could do the community form engage them and then we could put something the agenda just acknowledging like we mean we could say hey congratulations to these students then that's part of or thank them yeah as part of you know just a highlight student showcase highlight because in the past we did have challenges at times with topics during the community forum and students in their room correct which we want to try to avoid and that's why we always had them go first first and then people who wanted to leave they could but ultimately from a student standpoint um then it would be you know if we were having some other

088adult conversations that families wanted to make that choice whether they wanted to participate in or all right so as long as we we go back to the way it was Prior current policy and just make sure we follow the time the stated start time that we put legally meets the expectation that would be meet the expectation legally and our policy correct we wouldn't have to do anything and you can change the time up every meeting if you know you're going to have a student showcase and there going to be one week to it you know you put it till 6:15 or 62 yeah if we say for instance in the summertime when we don't have a school we would probably say five minutes six o'clock we start the board meeting anybody want to talk no

089one does 6:05 is when we would set our time and then we would chitchat then we will yep so am I hearing that the will of the board is just to keep it as keep the current policy as is the way we did it the way we did it today yes sure sure okay so we will not be moving that forward for a second week okay all right uh 171 consent agenda any feedback around that again this policy would make it policy that you would do a consent agenda again it highlights the same way we're doing it right now uh again just a reminder for consent agenda at any time a board member can request any part of that pulled and to be discussed individually can we make it so that donations aren't a part

090of the consent agenda in general so I do think it's nice to make sure that we acknowledge the community yep because the policy doesn't outline what it policy does not outline what it ises a we've been using it we've been donations in there and there's been some confusion in the community about whether or not we actually receive some donations and that kind of thing so I think that would be if we just make it up that's good so what I'm hearing there is May before repor or during your put it in your in your rep District donations and then we also want to highlight student showcase yeah for me it was really just eliminating having to read the from what I read the only real downside to doing a consent agenda is that sometimes boards

091forget to look carefully at details and then sometimes things get missed so when we have a consent agenda we are all remembering that we need to go look at the details that don't necessarily come up here Y and all the same information is available publicly they not changing any of that everything's right there yep okay well we'll move that one forward again if there's any feedback around just uh let us know okay moving forward to approval to purchase Chromebooks for the 2025 26 school week yep uh thank you to Mr Benny uh again it's been a busy Tech world right now as you can hear with kind of the economy and some of the political things that are happening out of Washington and around the world as it relates to tariffs um so Jim and

092I have had some conversations around is maybe we want to get a jump start in some of these purchases before the potential of increases go up so um we went through our normal bidding process and and talked to three different biders and Jim feel free to jump in um but what we are finding even in the technology world now is is ultimately these companies are going to the same Distributors right and saying hey I need 110 Chromebooks at this model okay well another one is going to say the same thing and so now they've kind of gone to this kind of regional idea is that first come first serve you ask first we're going to give you our best price from that standpoint um which gets difficult for us unfortunately but because then it becomes

093a race to see who can get to their distributor first again it's a very fair bidding process we kick it out at the same time and try to get it there but our fear is is you know like we saw there's only we only got two bits uh I mean we can try to call as many people and they're going to call that person that distributor and they're going to say hey I already gave it out so uh that's just one aspect and one thing I just wanted to kind of preface as we start to talk about exactly the same amount yes for those 110 so there's not a no which is great because that way we know again that's the bidding process we want to make sure that we're not getting ripped off so

094that 199 Chromebook doesn't become 210 we'll get we'll get to the discussion portion in oh I'm sorry let's get let's get a motion I'm sorry sorry so we're just looking for a motion not to exceed the 38761 which is uh the low bid again we didn't second all right we have a motion in a second uh the approval purchase Chromebooks for the 2025 26 school year any discussion Jim go ahead on Friday because um a lot of what's been happening John is however other people were able to trade faster and so like a cwg their so low they the price by with the they were able to block inventory and price for the until after okay I was able to kind of get that there they so is this exclusive to Chromebooks or is this

095just any platform later this spr where we start talking by projects for like skill Network projects District um I'm finding that as well um usually I'll get about five or six bids by this point right now I have one because that vendor was the first one they PA off the manufacturer to distributor and they went here's our best offer we not so it limits our options um with some vendors they're have really want your business internal cuts to try it just depends on so besides a Chromebook what are our other potential options um as far as a student device yeah then you know you're looking at laptops um tablets iPads is that like cost prohibitive or iPads they don't discount for so what the price is for Consumer that's so um $189 for the same

096thing um potentially you know I'm looking at higher or frequency as well are okay and if we already are using Chromebooks or adding to our Chromebooks if we start to switch we wouldn't would we need to give all new inventory or would you transition mainly for these we're looking at this is our normal for that's um we have no grade levels that are on site this year um so if we were looking at you know that's move different device techology abely it's just a and our staff the switch to the Apple device would be a we'd have to do some PD around that will there be an increased cost for the new class coming in or we're holding cost technology fee we would bring that to the board but these devices are about the same

097as they were a year ago I wouldn't anticip and again if especially if we say hey a year ago it was 40 and they were right around 205 cheaper where I this year yeah so that $40 would be 160 so okay I'm still covering some of that cost but that's a great question we would talk about that at the finance committee and then recommending fees moving forward that's a great great great great question any other discussion all right all those in favor of approving can I just ask one more thing yes and just to be clear um because we do always ask for a minimum of the three bids we did go out to get more okay it Savvy I knew the answer I'm just for transparency sake yep because that is part of our

098policy is that we go out it's and then we just wanted to demonstrate that we okay I'm done sorry maybe link link that to the board packet next time so that's said saying that they declined to we but like the reason why is we oh we can link that documentation we can link the email whatever we a bit because we already getting a better deal that we give you certainly strange would good C okay um any any other discussion all right um all those favor of approving the purchase of Chromebooks for the 2025 26 school year say yes oh sorry not to exceed $ 38761 uh say yes yes yes post say no motion carries all right thank you thank you and again those will be again I'll work with our Auditors about crediting that

099to the 2526 um fiscal year thank you moving forward to of new business approval of crack filling re deing restriping of District asphalt for the summer of 2025 you bet so uh again just trying to get on people's calendars again that's why we're we're trying to do this early because we do have a what I would say try to get a small window where that they can be here and they all three of these companies have committed to if you tell us by the end of February where you want to be and where you want us they certainly can too so um again this would be for a 2526 budget item obviously we're not purchasing anything until they complete the project from that standpoint but um you'll see three bids uh I did contact four

100vendors and three of them did respond to us and uh the low bid was uh PLM who has done a ton of work for the school district throughout the years at least my years here as well um so they came in at the low bid of 25,200 and then approximately 1,400 for heat patching um I'm requesting to the board in their motion to move that up to 30,000 just in case there is some heat patching that they do come across uh to be realistic and again they they have walked the property they that that's all that needs to happen but you never know with all this uh cold weather you know even things like that if anything needs to be done so just to give us a little wiggle room uh from that standpoint so

101um just looking for a board motion to approve PLM not to exceed $30,000 for district esalt crack filling resealing heat patching and restriping so we have a motion and a second uh to approve the crack filling resaling and restriping of District acts fall for summer 2025 not to exceed $30,000 any discussion Ron how often do we have to do this every three years about 10,000 a year to maintain yep just to maintain yep and this is obviously we just redid primary we did the primary that's not being done yes that'll be all resealed and things like that too as well correct yep that'll be part of it correct that two three years ago around there would have been extension of a primary really maybe two it wasn't three years ago maybe two two years ago

102probably two years ago we let's get them all in the same cycle yep and uh if we skipped it didn't do it this year cracks get bigger and cost more money yep you don't want to do that not recommending us to do that just y yep no you could say hey we're going to cut the bid and not do the mer primary school and then hav't bring them back in three years but since they're here there's a cost savings when they cost oh yeah absolutely absolutely I'm sure there's less to do over here that the crack filling part again the crack filling part we have a very nice parking lot compared to other Fe other we just want to make sure it stays that way yes and we're asking there to be paid out of

103the general fund general fund yep right now it is planned for as when we start talking about budget projections and again it was in our budget assumptions uh actually I think we put in 45,000 in those budget assumptions so um because the first bid I got was from so then the other ones came in so in uh Black Earth used to be super sealers they're the ones who did the parking lot over there super sealers is what we knew them up from because I reached out to both of them and told me no we already submitted a bid for you I like oh I didn't know you guys combined so and then PLM has always been a good good good company to work with yeah all right any further discussion all right all those in

104in favor of approving the crack filling resaling and restriping of District asphalt for the summer of 20125 not to exceed $30,000 PLM say yes yes yes both say no motion carries thank you par okay all right moving forward to our uh last under new business discussion and possible action on directing Administration to get approval from the board of education for any changes made to the human growth and development curriculum before presented to classes yep so we did in in preparation for this agenda item uh Maria not we uh Maria did create a kind of an overview of what the state statutes are as it Rel and again the reason for this is is the Board of Education again if we want to give the presentation um has very limited ability to change has no ability

105to change a curric a human growth and development because it is outlined in State Statute the process in which to go about doing or that so we just kind of wanted to give some context to that conversation again I don't probably it's up to you if that's the direction you wanted to go we just wanted to be ready for the conversation just to say hey what it you know what is the responsibility if a district chooses to do human growth and development because it is a option not to actually so um maras created a presentation for us I read I read through it I read through it yes did I did I okay yeah we I mean oh so okay maybe I'll just address a couple highlights yeah okay it was we'll save your voice

106you you definitely did a good job so um you know there was some major State Law changes in 2012 that's been the most done and a lot of districts didn't work after the um State changes and there hasn't been any go up same um at the time of 2012 um the biggest change was human growth and development used to be required to be operate in school districts and the law changed to allow school boards to deter cooperate for not and basically um at that time it was boards talked about it do you want to offer it or not offer it if you offer it there's very specific things that boards have to put within the instruction and that was our noted on there um and there's also specific things um of establishing the ad hoc

107committee um I've probably facilitated five of those they're not my favorite thing to do I kind of like to say if you don't have to open it up and the community is happy about it to kind of leave it um as it is um because the adhoc committee it's very specific who makes off percentages what it looks like um so that's kind of the legal piece of it where mertin is um a committee was done um in 2015 that developed our videos in current curriculum um cont on Concepts that we teach um I believe Dr Russ facilitated that until I was hired in 2021 at 2021 I did a lot of updating on the human growth and development curriculum I at what we had I reviewed all videos um and uh reviewed all presentations for

108them um at that time to align I also updated with web pages with some other things on how we're were managing um mostly in grades um 3D through six things directly come from me I work with the classroom teachers at setting them up it's um pretty much videos um and then our biggest thing in their health class is in the other grade levels so um really it is up to at the time of the committee there shouldn't be any changes without reopening that committee process that committee is advisory which means that the board can accept to be honest any committee's advisory to you right like you can either accept it or not accept it um but in most cases um in the past I've worked really closely with the board president at making sure we

109have a nice Collective committee so we're actually hearing and develop a program that our community wants um and then at that point in time you know we should be using the exact same things so the whatever was developed from that time whatever videos were chosen unless you re open the commit to do that I'm not recommending that for the board at this time um you know um you know we pretty much um found that that a presentation was changed in e8th grade um at some point in time it was not what was delivered this school year um I can't it was before I was here I don't I can't track everything down of when that happened um but um I did put on for professional development time on February 20th um to work with um

110our teacher who delivers human growth and development M who done a really nice job just relooking at everything in making sure everything else is accurate for the one piece part of what we were deliver because our website is not up to dat um with the change in presentation when so that's kind of a little bit overview of what the legal conversation um could be for the board and what we're recommending which is just for us to take a look and we look at what we're doing and making sure that we're all in alignment I can tell you like I said when I came we were all in alignment with what was posted when changes were done I don't know if Dr Russ has anything to add with that um the only piece would be is

111my the administrative report was to talk about that eighth grade error that was sent out we accidentally sent a link um that was to an old folder where uh families had the opportunity if they clicked on the link it opened up some old information and there was the the presentation the old presentation had some information on there was not in alignment with what the ad hoc committee recommended and the school board approved so um we're we're sorry about that we really are um again thank you to Mr pomoy and Maria for facilitating those changes and and any dialogue that had to happen there too um we are again we Maria and Mr pomoy are going to be going through on February 20th PD which is Thursday uh and making sure that um ahead of the

112next delivery of our human growth and development curriculum in eth grade and looking at everything too um is solid and tight uh and again that happens a little bit later in May I do believe Steve right that happens fourth quarter for for both of those classes um as well but again um Maria and Mr pom will be working side by side to make sure that everything is what that ad hoc committee says and what the board approved is what is being delivered and things like that too so so the link wasn't a decision it was a mistake what was yeah there was no Mal intent there no absolutely but that link was taught in 23 and 22 which did go against our policy and that's what Maria and Mr pomoy are reviewing correct right it

113was changed it was changed this year and who changed it I don't no I'm not asking you I'm asking Mr pomoy changed it to the what the add to the current ad hoc committee's recommendation in the board approv yeah but was his change made he ask for to do the change or did he just do the change on his own year yeah and what and what and what date and what date did he update that on I know you have on computer January 24th it was updated yeah updated on J updated it January 24th at 8:22 a.m. um yep and the following money thata as well so um and any y updated to this one no oh to this one correct yeah gender identity he just made the male and female yes correct yep and

114then the gender expression the gender expression is what uh they're going to make again it's I'm not sure what the ad hoc committee says but that is they're going to take a look at that too and making sure that there's the gender expression one was is you could be both yeah feemale male or what is it falness or both masculine masculine feminine feminine other of it now but it should it should say both I think our ad hoc committee gonna have to go back and take a look at it as both so making sure we're clear so in 2021 that's when this curriculum that we're currently presenting was finalized no it was created in 2015 okay it was then so 2015 until now is the same curriculum that has been happening in 3 through 8

115in 2021 Mar reviewed everything when you were hired yeah when Maria was hired I'm just this is what I heard Maria say today Maria reviewed it in 2021 and it was in alignment with the ad hoc committee okay um somewhere and again Troy to your point Yes somewhere between 2021 when Maria came on and 2025 January of 2025 it switched over it changed didn't you say it was like 2021 when you left that looked at it yeah said yeah people AR sure um but we don't believe it's a current staff member that made those changes it's actually I we don't believe so okay um so since it's a homegrown curriculum can't we just lock that down so it's not editable once it's approved like like put a password on it or something so no one

116can change it okay and that's part of the plan moving forward that is part of our administrative procedures and and that's what's happening on the 20th Maria will have complete control over it and it can't be changed cannot be changed the only person to be able to change it would be Maria not even not even me I don't want access to that nope you want access Maria thank you for all that you do no I do believe it was a total Mistake by probably send that out yeah I mean I got the link as an eighth grade parent right and I clicked on it there a lot of stuff in that folder there's a lot of stuff in that folder lot of stuff in that folder so someone dat some out dates um so I'm

117glad we are going to get this resolved and not have issue going board um you said not looking forward to doing another ad hoc committee we feel it's necessary to have that discussion and how often is that typically done years well there's some change in Heth that's what mandated yeah okay it's a fully homegrown curriculum this one is fully yeah completely yeah and I mean I don't want to delor the point too much but do we know why the decision was made to make this change this year I I think Matt reviewed it so he caught it this year but two years in the world and he didn't catch it two years ago in last year sure sure or just lock lock it down so that don't change it okay all right so our entire

118curriculum is online you can watch videos watch scripts of videos um it's pretty vanilla as I'll just say I mean this is a testament to the transparency that we do have Maria sending out the link and able to see these things parents were able to go look and um I think brought to light this situation so um let's continue on that path of more transparency the right in 2025 or 2015 it was again transparency But ultimately the the the heart of this is at the family yeah part of this is at the family and so that's kind of when we talk about why haven't we brought it up and it's still I think that priority is still there so I'm I'm going to make sure I do a better job of reviewing policies when things

119come up to make sure we're we're in compliance do we feel like we're in compliance with our our policy on human growth and development um what um is there anything that dictates changes in our policy my understanding have to go through yeah if if the committee it has to have certain levels of membership and so that's the only way to change it says the superintendent shall present any proposed significant substantive revisions to the district's human growth and development curriculum to the board for approval prior to the implementation of the culture Visions I think that's after the ad hoc committee gives their recommendations other action yeah sure I guess I'm have to put anything in our policy that says this thing's got to be locked down unedit right once we approve the curcum it cannot be

120not be changed and I fully I fully trust that right but you know this is not a right how do we make sure that this is going to be fully locked down and not happen again kind of like saying everybody's supposed to stop at a stop light but sometimes people don't stop stoplight I think everything's there you're not supposed to be able to do it and there was we don't know what happened for that part but it was eventually caught and corrected I don't since you're not allowed to change it I don't think saying again you're not allowed to change it strengthens so you're not allowed to change it it was you an error and it was caught and before anybody could change it that had right access to it right there was only one

121two people that had access to it I think three three people three people had access to it now it's just you Maria that are controlled by Mar got it yeah got it but we'll continue to send it out for people to see just oh absolutely absolutely right yeah um says possible action did somebody want action this evening have that action okay all right okay good thank you all right moving forward to Future meeting and agenda items yep so we have a little break uh until there our monthly meeting at the end of March um I am requesting if we could get the board together for a special meeting ahead of spring break um for two facility and Technology projects uh the easy one is uh Jim is we're looking at switching out Jim we're end

122of life or we're about probably one year over I think we've pushed this off as far as we can is updating the district switches um for our technology servers Jim do you want to kind of elaborate on that a little bit the network switches was that the cause of any of our problems no no no that's it's an internet provider we don't need to name them by name so meting you want to do meeting to discuss that to discuss that yep so one and the reason for the timing on that one is is we uh we can get a 40% rebate it's called eate you again and but that has to be signed and approved by March 26 and we don't have a board meeting till the 31st so we'd like to handle that we

123just move the whole board meeting then we can do that to my preference I know last time we looked at trying to get before spring break and I think we struggled with it we might have to not do it on a Monday that will be really hard for me in March it the the other one again it would be cor correct yes we're going to have we have to have a meeting in March the other one would be a facility to talk about um we are pursuing a model of our Intermediate School Library okay um again I've got four contractors giving us bids we've got some design work and would love to bring the facility committee together um and I think that's Troy and Dean no no okay yeah it is remember yeah I think

124so last time I checked to bring to bring Dean and uh and and Troy together to do a a committee meeting a facility committee to review the bids and and ultimately some design work that I'll share with the entire board obviously too but then ultimately take a look at those switches and stuff like that um again that can happen before but looking for a special meeting possibly either the week before spring break because again the bids for the contractors for is due this week so I need a week to scrub them up tight Jordan and I are going to review those so just looking for something maybe the week of March 10th or the 17th how long um probably again no more than half hour I would imagine again we're just talking about some facility

125projects that are again do we have a lot on the agenda for the 31st I do not have a lot on the 31st is a light typically a light board meeting uh we've got some second read of policies no student achievement in March no we do have a student achievement committee meeting in March too as well we would need that my preference be meeting once just SK it I could do the 10th a special meeting either I can do the 10th of full meeting I can will that give you enough time for whatever other things need to happen between now and we'll it that you need to hear from us we'll make it work I can do yeah yeah I can make that work and Mondays are typically good for Dean yeah Monday would work

126for Dean I'm again I can't speak for him but typically me make sure my Monday the 10th gotta long as you think that's enough time yeah I think we can get it scrubbed uh that I'll I'll have a facil facility committee meeting then the week before um and again I'll work with Dean and Troy to get something on the books um for that too as well so yeah I can move we've I can re we got a compensation committee meeting set but we can it's enough notice that we can reschedule that on the 10th yeah sorry sorry you're on wait a minute that's something wrong the 10th is a Monday in two months this it's March I was in February too yep yep let's try March so we're gonna move to 31st of March 10

127I can do March good good y all right J does that work for you or oh yeah oh oh pich okay okay good call good call thanks ruining the party here scratch the T okay that 11 I don't know how Dean would feel oh there B concert that night what is IT band concert schol I'm here watching the B Patrick I'm on works for me yeah I have to check probably one thing I have to make sure I don't have I can't do the 17th I might be able to call in I know it has nothing to do with patri um for the meeting for the switches does it have to be in evening can we do a it's the fast meeting can we do it in the morning no the morning we we could

128do a morning meeting for for those fac I would like to do the switches and the approval of the contract if we're going to move forward with that because we got to get on their calendar and then start ordering materials and stuff like that too what time's the thing on the do we have to wait till March for the switches do you know what time the uh forum is oh 6 then why don't we do it at 7 7 o' yeah because that's yeah it's not going to be an hour the 10th yeah we'll do the 10 was an hour what you were thinking for that yeah I think it was an hour I think that's what they were and is that in this room yep yeah because then you can do a lock and

129thing anyway yeah we can post yeah so we're back on the 10th and it's a what about student showcases is I getting too late for student showcase I don't know who's coming yeah oh on 31st okay well we can keep 31st then let's just let's not cram and jam I'll just do a morning meeting 31st I'm just opening to be back who knows oh do you not think he'll be here yet spring break are coming back from Florida so yeah let's let stick with the plan since just SP communicating the families at 31st and just do a do you want me to work with you guys and and trying to find a quum for 7 am meeting and a I mean is mornings best for people if we did it at 7 AM for a

130special board meeting typically yes usually Mondays I am a standing 8:30 we're we'll be done if it's over a half hour okay we haven't done enough prep work okay 31st 28 31st 19 Andy the next dat okay and then I will pull the board and we'll find a date in the morning Monday through Thursday sometime at 7 AM to get our rebate sometime yep yep good job Jim yep all right looking for a motion to adjourn so move second have a motion and a second to adjourn any discussion all those in favor of AD Journey say yes yes yesst no motion carries thank you

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.