Transcript

Verbatim source text

001I was saying welcome to everybody uh both both of all of you and in house and for those who are online uh at this time and and by the way we also have our fifth member he's on the phone here with us so We have the full board here. Um, at this time I call a meeting to order. Today is Feb is uh Tuesday, February the 10th, 2026, and the time is 6:05 p.m. Um, at this time, we're going to ask Miss uh Green to come up, and we're going to ask everybody to stand, and she's going to lead us in a pledge of allegiance, after which we have a moment of silence. I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation

002under God, indivisible, with liberty and justice for all. >> You may be seated. >> We're going to pause a moment for a moment of silence and and thank you. You may be seated. And thank you, Miss Green. U >> Mr. Bacon, if you would come down for just a second. Miss Green, I want to thank you for always serving our school district. You come over. Um this is not your first time doing the pledge. So, we definitely thank you for your service. And so, I want to present you with the certificate. There you go. Please take a picture with our awesome interim superintendent, Mr. Tyrone Bacon. >> All right. Thank you. >> Again, Miss Green. Okay. At this time, I entertain a motion to uh for the approval of the agenda for tonight. >> I

003move that motion. >> Second. >> Okay. The motion has been properly made by Miss Black Shear and second by Miss King for the approval of tonight's agenda. Is there any discussion? If not, all in favor, raise your hand. and Mr. Butler. Okay. I don't know if he's he's on, but anyway, we'll say four uh motion passes. Okay. Miss Blackshere, would you get the ethics statement? Yes sir. Thank you. In accordance with regulations set forth by the Georgia Ethics Commission, it is the duty of every board member to avoid both conflict of interest or interest of such conflict. Does any board member have any non-conlict of interest? Seeing none, Mr. Chair, we will proceed with our agenda. >> All right. Thank you, Miss Blackshere. At this time, did any of the board members do you have

004any comments or remarks? If not, uh, Mr. Bacon, Board Chair Kristoff, Vice Chair Rouse, good evening, board members, constituents, and people here in the audience. Uh first announcement is that we have an extended President's Day um vacation break. Um we'll be school will be closed Friday and Monday with an a asynchronous day on Tuesday. Students returning to class I mean on on on Tuesday with students returning to class on Wednesday. So what we have here I'm going to do this in announcement form. This is the financial briefing that I gave to all the staff members here um at the school system. So, I will do this as a as a public address um if the board's permission. But first of all, like to remind everybody that we are school district with a mission to inspire,

005challenge, and prepare all of our students to compete globally with a vision of generating excellence. One team, one goal. Why this? Why are we doing this presentation? What's the purpose? Explain why this information is being shared now. Uh acknowledge that staff and families are have been feeling the impact for some time and establish transparency as a leadership priority. Transparency is necessary to build trust and explain these difficult decisions that we're all about to make in the district. Twigs County is not new to financial hardships. Um there's little room in in our dis in our district and in our county for financial mistakes. Historically, we've had limited financial resources. We have a small tax base and limited margins for error. Discipline and long-term planning are essential if we plan on being successful. The current condition didn't

006develop over the current position situation developed uh over time and not in one year. A pattern decisions over multiple years um jeopardize our longterm our Long-term stability and projects were not prioritized. Spending favored visibility over sustainability. Our salary growth outpaced our revenue. Maintenance was deferred and there was gaps in transparency. Salary decisions created permanent structural situations. It was unsustainable. Our payroll in the district is our largest expense. 88 to 90%. Salary increases implemented across multiple years were the problem. Some positions increased up to 40% in a three-year period. Raises were not tied to reoccurring revenue and cost compounded year overyear. Deferred maintenance always cost more later. So these increased our costs affecting our facilities, the way we do our routine maintenance, preventive maintenance were replaced by emergency repairs and deferred work increased long-term costs for

007all of us. Short-term programs and spending um funds were directed to short-lived programs. Software created an ongoing subscription cost. Initiatives are lack sustain sustainability planning and core operations were weakened by these decisions. Transparency and oversight. Where was our board in this situation? The board lacked clear, timely financial information from those in charge. Budget variances were not fully visible. Cash flow stress not clearly communicated. oversight tools were limited. At some point, the board were going to seek legal intervention to get the information that it needed to make the the decisions that the the district needed restoration and outlining our path to stability and recovery. The current administration did not create the financial condition, but we will be key in making it better. Reoccurring costs incurred without long-term funding and planning will cease and we will prioritize

008our maintenance and capital programs over the next several months. This is a leadership reset. Reset our priorities, reset our discipline, and make sure that we recognize immediately what the district needs and prioritize our students over adults. We'll make commitments over comfort. We created the fourprong plan. PL prong one, navigate the current year. Prong two, prepare for the upcoming year. Prong three, strengthen our financial footing. And prong four, assess our financial stress. This is all necessary to build a cohesive and financial future for the district. As part of my job, the board had directed me to get the information that they needed. So, we hired a independent certified public accountant. The conclusions were based on our verified facts. External consultants were engaged and all of this is data driven. The board had the information first. So,

009the scope of the problem has been confirmed. Year in and year out, we've had a $1.1 million we've been $1.1 million over budget. This condition has con exists from some time. Payments were based um were late for things such as insurance, TRS, taxes, and uh regular vendor payments. Although all of our critical uh bills have been paid and up to date and emergency cash controls have been implemented, we realize that stabilization alone is insufficient. We must make changes. One thing that we will do is not balance the budget off of our classrooms or our classified folks. So most of those reductions will happen here at the central office. Retirements uh will be prioritized over layoffs. We we were reorganized for efficiency and administrative overhead will be reduced significantly to meet budget goals. Protect the classroom

010and the staff first. Instruction is our priority. Instruction is what we will do first. The classroom and the students will be protected. Students will not pay for adult decisions. Classified staff will not balance the budget. Central office will absorb a majority of the re reductions. Cost controls and sacrifices. Non-essential purchases are suspended. We have a weekly meeting that we meet and we go through each and every purchase before the checks are ever written. Overtime will be significantly reduced. Professional learning and field trips restricted to those things that are co-curricular. Of course, athletics and professional learning restricted to only those things that are statemandated. multiple years deterioration over time. This will take a long time to to recover. It's not a quick fix. Financial deterioration occurred over multiple years. July 1 represents a structural reset with

011our structural budget changes and staffing. recovery would take several years by accounting estimates to get back where we have a fund balance and our cash flow without taking out a tan would take three years of discipline reset. Transparency and discipline will define the road ahead progress monitoring of our new budget will begin July 1. We'll have stronger financial reporting to all of our stakeholders and board members, regular updates to our staff and community, full transparency. The district can recover. There's a plan in place and difficult decisions to protect our students will take place. Thank you, Mr. Bacon. Um, are there any uh questions about the consent agenda? We have the minutes from the three meetings we've had as well as the district request. If not, can I get a motion to approve the consent agenda?

012>> I move that motion. >> Second. >> Okay. The motion has been properly made by Miss Blackshere. Second by Miss King to approve the consent agenda. Is there any discussion again? Okay. All in favor say I or raise your hand. Okay. The motion passes. Uh at this time we're going to move into our business agenda and I believe we have someone here to uh share with us facility planning. Oh, you want to introduce? >> Okay. Yeah. Okay. >> Good evening. I'm Sonia Spinger with SRJ Architects. >> Okay. >> And I've got some things to go over y'all today to give you some information and some things that might help you moving forward in the long run. Um, so we're going to talk a little bit about modernization, modification, renovation, all the funding that comes from

013DOE and the different ways that you can get your buildings up to standards of what we have today and some of the options that you have available to you. So, the first thing that I want to talk about is modification funding. Um, modification covers HVAC, roof, kitchen equipment. Uh, if you have some instructional units you need to modify. So, say you have six science labs that are too small, but you needed four to turn that into four that were the correct size for today, that would fall under that category. um if you need additional uh drop off canopies for bus or car pickup or if you had an elevator that needed to be replaced. I don't think y'all have that. But um modification funding, if you see to the left, I don't know how well

014y'all can see that, but um for roof, you get funding from DOE every 20 years for your roofs. Uh for HVAC, you get funding every 10 years. uh kitchen equipment. There's certain pieces of kitchen equipment, the cooler freezer, the um serving lines, the dishwasher, and the hood, the kitchen hood. Those are the things that are connected to your building. They're not just like a plug-and-play kind of thing. Those you can get replaced every 15 years or you get funding toward the replacement every 15 years. The physical changes is every 20 years, and then the canopies are every 20 years. So that's what we call modification funding. And then the next category is renovation funding. So that's the things like floor covering, painting, uh relighting, those are all listed. I won't talk about all of those,

015but that the modification funding that we just talked about, when you get funding for those, they have to go for those specific items. If you get HVAC money, it has to go toward HVAC. The renovation funding is a little bit different. We put in your needs in all of those categories. And if you get the funding for those, if you don't get enough to do it all, you can use that funding toward whichever ones you can afford to do. So, it gives you a little flexibility in that. And to make sense, we say you needed all of those things on the list and you get the funding, but when we look at the numbers, it only is enough to cover doing new floors. Then you can use all of the money that they give you

016toward the new floors. It just means that you're not going to get any more renovation money for that period of time, which renovation money is every 20 years. So, we want to be really careful with how we're using that money since you're not going to get it again for another 20 years. So, but it does give us that flexibility to put it where the need is greatest. And then the next category is called modernization funding. Um, modernization is for when a school reaches 40 years old and then they give you $60 a square foot. And that might be changing. A lot of these numbers that I give you are changing or trying to be changed with DOE because the costs have gone up so much, but currently it's $60 a square foot toward the modernization

017of that. And once you get modernization funding, DOE want will consider your school a new school. So it'll click day one, start over with all of the funding moving forward from that. So ideally, they would like for you to when they're you're finished with modernization funding for your school to be just like a new school to have everything brought up to code, all of your insulation brought up to code, your mechanical units are all brand new, um you know, the windows are changed out with insulated glass, all those kind of things. So that it's just like a brand new school when you're finished. That's not always the case. We can't always quite get to that point, but you going into that, you need to you would need to understand that once you've gotten that money,

018then your school would be considered a new school for funding moving forward. So, you wouldn't get any renovation money or any of that. Your clock would start at zero for all of that. So just looking at the schools that you have right now, um starting with Jeffersonville Elementary School, one of the options that you have is we could do modernizations, renovations, and modifications of that school. This is just your floor plan. Um the way that DOE looks at these is um they give a building number for a school depending on the year that it was built. And so you've got actually two separate buildings here. You've got the main building which was built in 1988. So it's 38 years old currently. And then the um the gym which we helped you to do in 2020

0192017 is now nine years old. So you have a total of 33 instructional units. try to keep that number in your head moving forward, but you have 33 there. So, as you see that um those fonts are not showing up correctly, so it's a little bit hard to read up there. For some reason, it changed the fonts. Um sorry about that, but I'll try to go through this and see if I can call it out for you. Um the the items that are highlighted there are what I've included in the cost estimates in cops right now which cops is your your facility plan program on DOE. So those things are in the numbers that I have for the estimates on the left hand side which are looking a little jumbled now but that school will

020that portion of school will become eligible for modernization during this five-year period that we are doing your facility plan. So it would be eligible for the modernization funding because it will be 40 years old. So I've included that. Um so total modernization cost for the main building would be around $9.3 million. The renovations for that would be 2.1 and the modifications for both of the buildings because you do qualify for small amount of modifications about 600,000 or you qualify for some in 2027 you'll qualify for some for the for the gym. Um the total cost they'll when we add fees and costs and stuff to that to bring that up just to like a new school would be just over $19 million. The DOE funding right now as of today for that would be about

0211.376. Now that does not include the modernization for 2010 which would be an additional $60 square foot because that's not eligible till 2028 but it is during this 5year period. So keep that in mind. And then um it does not include any of the modifications for building 2020 yet because it doesn't qualify for those until 2027. But as we stand right today, DOE would give you 1,376 toward that. So if we did that today, it would be a local cost of $17,690. we move on to the middle high school and I say these are options one two you know the numbers don't really mean anything it's just different things we're talking about really so at that building we've got two buildings according to DOE we've got the building 5010 which was built in 1991 so

022it's currently 34 years old so it's getting closer to that modernization but not quite and then the building 5020 in the pack was built in 1999, so it's 26 years old. So, right now, you have a total of 51 instructional units at that school. So, similar to the way we talked about that, um you're not eligible for modernization yet. And one of the things that's kind of hurting you is because that school is so big. Um it is currently 51 instructional units, but with the number of students you have in that school, you only earn 24 instructional units from DOE. That's the number that they say the number of students you have would be the adequate number of classrooms. Um, so they only give you for things like roof, they'll give you the full square

023footage, but things like the renovations inside like the floor covering, those kind of things, they only give you the the amount based on 24 instructional units because that's what they say you need. So the numbers, they won't you don't even earn any renovation money for building 5020 because you're over the 24 instructional units with just with the other building. So that's but in total to modernize and renovate and modify that entire building with fees and contingency would be about just over $33 million. Um and today before that building gets to 40 years old the state would give you 1.7 million. So the local cost would be 31,775, but that that would go up some once you earn that modernization. So I know it sounds crazy to think about a new school, but I want you

024to look at the numbers on this. I've got a couple of different scenarios here. Because you're considered low wealth, and because of that, DOE gives you a lot of money for a new school. And so I just want you to be aware of the way they calculate their funding and the way and what you would earn. So as you're planning going forward, you understand how this works. So if we were to do a new prek through 12, now the state is funding prek. So that that helps us a little bit. Um and we only did it with 43 instructional units, which is what DOE says you earn. Uh, and that's what they say you need for the number of students that you have. And I want you to combine with the two schools. You currently

025have 84 instructional units. So that that's quite a bit smaller than what you have with the two schools combined. Um, so if we go to the numbers next for for that, before we get into that with all of the scenarios for a new school, I want to make sure you understand about what you would be required to do that. you would have to phase out is what DOE calls it the existing schools. And this is the example of the language that you would have to include in a board resolution. And part of that is that they want you to have a plan moving forward for the existing buildings and what you would do with the existing buildings. You can't just move out and leave them. You've got to either demo those or have a plan

026of something you're going to move into those, a purpose for them. You need to tell them that. Um, we we would need if you're going to demo when we run all numbers in the future, we would need to include the demolition cost into your planning if that's the plan. If you're going to use the old buildings for athletics, then we would need to put that into your plan. You may not find another use for those like a board office or something like that. A lot of times that's what people use it for. But if you leave those buildings open, empty, those could have other ramifications where other people could have uses for those buildings and kind of go after wanting to use your facilities for that. So, um it it's always good to have a

027plan, but that you would have to do this board resolution for that. And then DOE does project that you're going to have a little bit of uh project decrease in your numbers. So they're projecting right now that your numbers would be around 709 by 2030. So that's within that current um FTE. Right now you're at 713. I mean within the current five-year facility plan that we're working on. Um so going down I've I've been told I think that you have some potential industry coming in that that could change that possibly. So we need to keep an eye on that and we see it going up. we might want to make an amendment to your your plan at some point so that you can draw your money based on your actual FTE that you know it's

028projected. If you're seeing an increase then we need to account for that. Um, one of the good things is that you currently own the land that's across the street from the school and so you have that land that's already there and so that's potential for a new site. And the great thing that I see just in planning purpose of that is that that site should qualify for a site selection because you already have the schools there. I don't right off the bat don't see any dangers or anything around it. We would have to go through a site assessment pro process with DOE for that. Um looks like maybe even the potential of closing the road that kind of cuts your property in half right now because you're really the only tenant on that road. And

029then that would allow you to still use your existing athletic facilities that you have. You wouldn't have to rebuild all of those if you were to build a new school. I think another good thing with that is you have the fairly new gym at the elementary school. So you could work that into what you're doing where you're saving that using it for a purpose. Or if you wanted to use say the elementary school for a board office or something like that, that would it would still give you plenty of room on the rest of the site to do the new school. Um, so those are just some things to think about and, you know, where you could think about whether you're going to de you would demolish and demolish a portion of the existing school,

030um, repurpose any of those for a fieldhouse or anything like that. Just, you know, things to think about. But if you were to put this to DOE, you would have to give them a plan of what you plan to do with all of those. So, this we won't walk through every bit of this because it would get tedious. But this is the spaces that I've included to come up with the square footage for that minimum 43 instructional units. And that's what again DOE says for the 709 projected FTE. So, the square footage, I've done a complete plan of how our percentages for circulation and stuff usually work out and I come up to about 98,960 square feet. we go to the next page. Um, this is showing you how that breaks down that the way

031DOE calculates their money that they would give you is they take the number of instructional units that you earn and based on the highest level of grade level that's in the building. So, with this would be a preK12, they give you more per square foot, they do the whole school based on the the high school square footage, which is 28.50. If you were just doing a a K5, that number would be smaller, but they give you based on the highest grade. So, 2850 and then they multiply it by 1.1. That's a factor to cover fees and other costs that you might have. Um, and a contingency fund to set aside so that whatever happens, you know, you would have some money for that. And then they multiply that times whatever RS means, which that's a

032a book that architects and contractors use for cost estimating. And whatever the current year's RS means says the cost to build a a school in your area, which they would probably base it on making for that's the closest one that you are to. And they would multiply it by that. So currently that's $331 a square foot that that number is based on. That's going to change every year depending on what the cost is estimated for construction. So they would that comes up to a cost that they're estimating of $44 million $44,679. Then they subtract five years of your splice from that number. So the number I had for your splice was 852,272 per year. We multiply that times five and we subtract it from that cost. And then if you have received any um funding

033from DOE, they would subtract the life of that funding left from the amount that they're giving you. So right now, the only chargeback you have is some for the elementary gym. And um that's $152,000. And every year that we move away from the year that that was built, that number is going to go down because the life of that funding they gave you is is diminishing as we move away from that. So that number will go down. As it stands today, you would get about $40 million from DOE toward your new school. So that's pretty pretty awesome that they would give you that much toward the new school. um the that minimum 43 instructional units just what they said. My estimate we're we're seeing schools come in about 350 a square foot right now. And

034so when we add that, we add some soft costs which are things like fees and furniture and property. You know, we have to do any turning lanes or anything with the property, geotechnical um testing, surveying, all those extra costs that tend to pop up. I've got an estimate of one and a half million for that size school for that. And so I'm projecting the cost of the school would be about 39 million 945. So you're actually getting more state funding than what we think the school would cost. Now I have to confirm this, but I'm pretty sure that they would not let you take that full 40 million if you're only spending the 39. So, I think they require you to give that five years of splice, but that's something I need to confirm because

035I usually don't have people want to build it smaller than what their funding would allow. So, the next option, if we go on to the next one, is um kind of balancing that with what your fiveyear splast is that DOE would require you to put into it with the cost and trying to get those to balance out to maximize what you're getting. And that puts us at 47 instructional units. And again, you currently have 84. So still quite a bit smaller. So if we move on to that, that's about 119604 square feet to do that. That would add some music, a PE, ROC, and multi-purpose a lab that we didn't have in the other one. And then all of the spaces like kitchen, cafeteria, media center, those are bigger based on a bigger school. So

036as the school the number of instructional units grows those have to grow to accommodate bigger more students. Now sometimes we will go ahead and build those for like a thousand FTE so that if you want if you can afford to do that so that if you wanted to add on classrooms in the future your core is already big enough to support that and that's something that DOE would want to see in the future if you wanted to add on. Um, so with that scenario, um, you would come out with the same 40 million because the state only calculates what they're giving you based on the number of instructional units you earn. So they would give you the same 40, but then the cost would be about um 44 million. And so the state would give

037you 40 and then your five years of splice collection would be the match to that. And so that that would be the total cost. Um, so that's that's 47 learning units. And then as we talked through this that this option is more realistic for teaching the way that you teach now and kind of a number that talking with your administration and everything that we felt like might could work comfortably for moving forward. And it's 55 instructional units. Um, this one would be a little bit uh it would have more classrooms. It would add a K5 art, add a high school art, and go ahead and bump those core spaces up to a thousand um for a thousand students. And that option is 132,000 square feet. So, if we move to the funding of that, DOE

038calculates exactly the same way. They give you the same 40 million because they're basing on the 43 instructional units, but the cost would be more about 53 million. The soft cost would probably I bump those up to two million just because a bigger school you're going to have a little bit more of that. And then um that would make your local option that the local portion about 13 million. So that's you know more than five years. At that point you probably would need to to do some bonds to be able to get past that fiveyear mark for your your local portion. But it's not it's not out of the question from what we see other systems do um to do that that 13 million local. But that would give you a 55 learning unit school.

039And then I just added a few. We've done a lot of K12s across the the state. um those when we do those I know people are like kindergarten and we're talking pre-k now since they've started funding that but kindergarten and high schoolers together in the same building how does that work um it it works fairly well because when we design that we design them for separation so uh these are some examples we just did a pilaskis our most recent one that is an 1247 FTE 85 instructional units I put a picture of the gym. There were some questions about the gyms and how big they were. So just so you can kind of get an idea of how many seats in each of those. That Palaski gym is,00 seats. They calculate those at 18 inches

040per person. Just so you know, most of them aren't that skinny, but um that's what it's considered. Um Calhoun County is more in line with the size that that you would be looking at. That's 39 instructional units. So that's about like that first option that we were looking at. um 577 FTE and um that's a K12 and that's their gym. I think it's 986 is what that should say in their gym seating. And then another one that we did was Willox County and that one's a little bit smaller than the Palaski similar setup really in floor plan and that's,049 FTE and 80 instructional units. And then Steuart County was a little bit different. They had a fairly new elementary school and so we added the high school onto their elementary school to make it a

041K12. So we built a new high school gym, new CTA wing, added a science lab and a new admin for for the high school. And so they're all on the same campus. So, one thing I want to mention why a lot of our clients have decided to do this um and it's something for your consideration is that this has cut a lot of cost for them. Um when they have like you have these two huge schools that as we see are much bigger than what you actually need for the number of students that you have and Mr. Mr. Bacon, I'm sure, can tell you that it costs a lot to maintain in those schools and it costs a lot to heat and cool those over the years and you you don't need all that square

042footage. So, you're doing a lot of square footage that you're maintaining, heating and cooling. And then, as we looked at the numbers before with what DOE gives you toward that maintenance and stuff, it still leaves a lot in your pocket that you have to come up with to keep that going. um if you did this new school, it would cut your square footage that you're doing tremendously, you know, almost in half. Um and get it down to what you actually need. Um one kitchen staff so you're not having two kitchen staffs. There's just a lot of economy of scale by doing this. And also how much money DOE gives you because you you qualify for low wealth toward this. So, it's a lot to think about. There's a lot of options there. Um, I just

043hope that I've given you the the information that you need to make decisions moving forward. Either way, um, can I answer any questions for anyone? >> Thank you so much, board. I just want you to be aware that every five years we have to do a facility plan and we have to let the state know within these five years what it is that we want to do. So we can't, you know, just come up with something at the last minute. So this is several choices that we have. Um we can choose one or none um based on that and then you can do it in another five years. But it's very important that we look at this at the age of our buildings and the continuing cost of maintaining them. But as always, these are

044our architects. they've done our gym and um also our HVAC since I've been here and we appreciate them and they work with us to make sure our u cops and other platforms are up to date with estimates. So we have to stay in complian with those and they do that for us for nothing um as our as our architects and we call on them quite rarely quite often sorry and they never charge us rarely charges us. So >> thank you so much. >> Thank you. We have for information for the board tonight. Um tax anticipated note or tan once again we're school system with a vision generating excellence one team one goal with the mission to inspire challenge and prepare all of our students to compete globally. Um this specific presentation deals with strategic goals

045um one through five learning and wellness for all excellence ahead academics facility and opportunities doing things at Twig's way growing and sustaining our village and becoming a premier people first organization on last week um Miss King and Mr. Christophen were with me when we just got with the Bank of Dudley to look at our options for a TAN. We are requesting a TAN of $1.5 million and that is to um get immediate cash flow stabilization to meet those gaps before our um taxes are flowing back into the school systems coffers. So, we are preparing this for the end of February is when we'd like to have um the final paperwork from the bank. Why is this TAN necessary? The district is experiencing severe cash flow shortages. Payroll, benefits, and vendor obligations must remain uninterrupted. Prior

046year budgeting and spending decisions have left limited liquidity. A TAN provides a responsible short-term bridge while corrections are being implemented. As we talked about earlier in the briefing, those would be our financial cuts that we will see July 1. How to TAM will protect the district operations, maintain continuity of instruction and student services, ensure employees are paid on time, prevent further disruption in vendor and benefit payments, and support essential facility and operational needs during this recovery period. board oversight and our next steps. We'll be partnering with the bank. We partner with the Bank of Dudley underwriting team. Full documentation and repayment plan will be presented um for the board for approval. Um and of course board approval will be needed before we move forward once we have the paperwork and the terms. Um and I

047will provide ongoing updates and financial monitoring during this process. Our goal is to stabilize today while the long-term budget um issue is going on and we'll use that financial discipline with our TAN to make sure that we have that recovery that we so need. Are there any questions? Are there any questions? And can I get a motion to uh approve the uh >> It's just for information. Chairman Caraf. >> Okay. It's got action on here. >> I'm sorry. It's just for information. >> Oh, okay. All right. Thank you. >> We thought we would have the details and everything to guide you. >> Yes, sir. >> Um, our next our next presentation will be the four uh an update to our four-prong plan, our stabilization plan. Our our theme is recurring. Once again, our strategic goals

048are all five and we named those earlier. the status update as of uh February 4th, 2026. Uh the purpose is to provide the board with a clear progress update on the financial recovery and operation um stabilization plan. Prong one, managing the school year. Uh CPI represented uh presented an independent financial snapshot to the board on January 29th. Our TAN feasibility review is in progress with the Bank of Dudley. Certified staff contracts are underway on under legal review. So, um board members were a part of of of that as well as we updated our staff contracts. At risk staff support and accountability process was launched. Prong two, preparing for the next school year. We had our infinite campus roll over. Scheduling meetings are underway. We also are reviewing our reduction in force policy with our lawyers

049and key staff members here at the school. Administrative salary scale is being eval evaluated for affordability. Wrong three strengthening our long-term finances. We review of staffing costs now and into future years. Mapping long-term contract obligations. Cash flow planning for stability is going on. So that was part of the work that the CPI CPA did for us um on last week beginning our multi-year budgeting planning framework. So hopefully we'll have a framework together for everyone in the next uh couple weeks so that that framework will be what we follow from now on. Prong four um financial recovery 60-day plan uh the CPA findings and incorporated into a full recovery assessment. So, we got a snapshot. That snapshot was just to get us going and and know where we were. Um, we need to know how we

050got there and we need to h understand what it is that we need to do to move forward. Uh, legal and staffing uh stability reviews are underway. Um, it's causing us an expense, but we have to look at all options that are on the table, whether that's reduction in force, how our contracts read, and we've been doing that work. Um, we're looking at all of those options as well as our policies that pertain to finances and financial accountability from district and district staff members. Um, tan stress thing stress testing to understand the future impact. So, we're looking at taking our tan out this fairly early for us and um and what will it take to get us back on a regular tan schedule and then what will it take for us to not need a

051tan? And once again, I'll have a formal written report to the board within 60 days of this report. So, as a summary, as of July 29th, the district has moved from early factf finding to real measurable action. The board has now received an independent CPA review of cash position, upcoming bills, payroll needs, and short-term risks. At the same time, contract reviews at and at risk employee process are on the way to reduce staffing and legal exposure. Planning for next year is active through scheduling, staffing policy review and salary scale evaluations. Together, these steps show a shift from reacting to problems toward managing them in an organized, transparent, and financially responsible way. The next steps will consolidate this work into a clear recommendations and written stabilization report within the 60-day F time framework. So, as the

052fourprong plan stated when I presented it to you and you passed it, we are on schedule with that. is where we need to be. You have the information to make the decisions. Are there any questions? >> Any questions? >> Thank you, Mr. Bacon. Mr. Reer. Good evening, board chair Karstaren, Vice Chair Rouse, Superintendent Mr. Bacon, and our constituents in person and online, and our board members. Tonight, I'm giving you a federal programs update. This is a very um high view of the uh federal some of the federal programs, the majority, the major federal programs, let me put it that way. It aligns with our vision, generating excellence, one team, one goal, and our mission to inspire, challenge, and prepare all students to compete globally. It aligns with our strategic goals, learning and wellness for all

053and excellence ahead, academics, facilities, and opportunities. What you have before you are our grant budgets, our major grant budgets, and we have federal grant budgets. Let me rephrase that. Title one we're looking at is a total of $532,510. And at this point, you see what we have expended and what we have left to spend. We have expended at this point 71 a.5% of the total budget. We have a total of 15 months to spend the budget for title one. So we are right on track to where we need to be. It is important that we get to 85% of this budget. Our carryover from last year is expected after the state board meeting which is um I think in a week. It's in early in February. So that's when we'll get our carryover in title

054one any money. But remember we have to spend a minimum of 85% of the $532,510 within that 15month cycle. Our title 2 money, what you see here, is a total of $66,939. At this point, we have expended 70.5% of this. Again, our carryover from last year is expected to be put into place after the February state board meeting. Um, this one we don't have a whole lot left from last year to be put back into here for carryover, but that's a good thing because the point is if they give it, they want us to spend it. The next thing is title five. Our title five is a combination of title four and five into one pot. Um, that's just a reminder of what that is. What you're looking at here is a total of $73,18,

055but we have already received our carryover from last year in this budget um which was a around $14,000. It's just a little over 14,000. So that gives us the um what we did have was 59,18. Now we have $73,18. So we have expended 61% of this budget. Again, we can carry over the title two and the title five. There's not a limit as to how much we can carry over. But title one, we can only carry over the 15%. So you lose it if you don't spend the 85% and there's a penalty associated with that. Then we're looking at the school-based health clinic. The school-based health clinic is what we use the vast majority of this money. That's the 535,887 that you see at the bottom. That was to build it. And then the and

056part of that has gone into the next phase of the school-based health clinic. The school-based health clinic, the remaining money, uh the majority of the remaining money that you see at the top is for payroll and that is all that we can use it for. So there is some money in this 200 uh thousand that's at the top that was left over from the building project but they froze that when the building project was finished and we cannot spend any more of that on the building project side. It's going towards salaries um for the school-based health clinic staff and that and their administrative staff. And there is $174,549 left of that to pay and we need to spend it by um the end of September. So, this money needs to be spent by the end

057of September. And I'm sure that they will. They're the ones that tell us it's their payroll. We're just the holder of the money. So the money comes to us, we pay it out, the state reimburse us. So we just hold the money, we don't spend it, they spend it. Then what you see on here is the cops grant. And this is just a reminder of where we are. Above the line, you see that there's 375,000 and then below the line is 125. And that's because we have to match with 125,000 of the 375,000. And what we are looking at doing in order to assist with our cash flow is if a um when a purchase is made, rather than wait till the end to pay all of the 125,000 at once, we're taking the percentage

058of this each time about 20% each time and putting our part with their part all at the same time. So, we end the grant with $125,000 of our money spent and it doesn't come out all at once. And that's to assist cash flow between now and the time that this grant um is expended. We talked in executive session about what we are doing and the first purchase that we are making. We're still in the process of making the first purchase. um in talking with a another district, remember only two other districts in the state have received this money and we've talked with them about what the timeline was to be reimbursed because that was a question that the board had in our executive session and they received the money when they requested it. Say it

059was today, tomorrow morning, it was in their bank account. So it was a and that was during the government shutdown. So So we know that there is a really quick turnaround to receive the money back. So, cash flow purposes, the uh purchases themselves won't interrupt our cash flow for more than a day or two, but we do have to have the $125,000 that we put in there. As we are looking at at this point in the year, uh remember the clip that I give you at the beginning of the school year, that really, really long document. Um we're in the process of putting together the things for our clip. That is what our needs are in the district. How are we going to spend this money? And we are looking at um carefully at what

060is being spent. We are looking to restructure the way some of this is being spent to uh relieve as many um services in the district as we can as we move forward with this money. Are there any questions? >> Any questions? >> I just want to say I know you said You got a team. I guess it's going to do the spending. Can you just let us know? >> Uh give us a print out of what you're spending it on. >> What it's being spent on? >> Yes, ma'am. I can do that. Even with this money here, I can do that more specifically. This was just as a, you know, high up overhead. I haven't spoken to you for a while about where we are with this. I wanted you to get a good idea

061of where we are in the spending process with federal dollars and how we're working with that, working with cash flow and everything else within the district. Um so any expenses going forward, they're already budgeted. I cannot go outside of that budget um without an amendment to that budget and even still I have to stay within the clip that you've already received. But yes, ma'am. Anything going forward um I can make you aware in a presentation >> after we spin a little bit, I'll do it. Not every single one. >> Okay. >> Unless you want every single one. >> Thank you. >> You're welcome. >> All right. Any other questions? Thank you, Mr. Peter. >> You're welcome. >> Well, that concludes our business agenda. Um, we want to thank each one of you for your presentations.

062At this time, can I get a motion to move into executive session? >> So moved. >> Can I get a second? >> Second. >> Okay. The motion has been properly made by Miss King and second by Miss Blackshere to move into executive session. Uh, is there any discussion? Okay, all in favor raise your hand. Okay, the motion passes. Thank you. Heat. Heat. Heat. Hey, Heat. Heat. Heat. Hey. Heat. Hey, hey, hey. Heat. Hey, Heat. Heat. Heat. Hey. Heat. Heat. Ah, heat. Heat. Heat. Hey. Heat. Heat. Heat. Hey, hey, hey. Heat. Heat. Heat up here. Today, Hey, hey, hey. Heat. Heat. Yeah. Heat. Heat. Heat. N. Heat. Heat. Hey. Heat. Heat. Hey, hey, hey. Heat. Heat. Heat. Heat. Heat. Hey, hey, hey. Heat. Heat. N. Heat. Heat. Heat. Heat. Heat. Heat. Heat. Heat. N. Heat. Heat.

063Hey. Hey. Hey. Hey. Heat. Heat. Hey, hey, hey. Hey. Hey. Hey. Hey, hey, hey, hey, hey, hey, hey, hey, hey, hey, hey, hey. Happy heat. Heat. Heat. Heat. Heat. Heat. Heat. Okay. Can I get a motion to return from executive session? >> So move. >> Second. Okay. The motion to return from executive session has been properly made by Miss Blackshar and second by Mr. Rouse. Is there any discussion? Okay. All in favor raise your hand. Okay. The motion passes. Um we have several recommendations from the superintendent. Um the first is a resignation 3439. Can I get a motion to accept superintendent's rea res u recommendation for resignation 3439? I make that motion. Okay. Can I get a second? >> Second. >> Okay. A motion has been properly made uh by Mr. Rouse and second by

064Miss Blackshere to accept the superintendent's recommendation for resignation 3439. Is there any discussion? Okay, all in favor raise your hand. Okay, the motion passes unanimously. Okay. Um, next, can I get a motion to accept the superintendent's recommendation for the renewal of the uh elementary certified staff? >> So, move. >> Second. >> Okay. The motion to accept the renewal of the certified of the elementary certified staff has been properly made by Miss Blackshere and second by Mr. Rouse. Is there any discussion? Okay. All in favor, raise your hand. Okay. Finally, we have the superintendent's recommendation for the renewal of the middle high school certified staff. Uh and um well >> and non renewals. Uh can I get a motion? >> So moved. >> Well, hold let me let me just back up. Let me back up.

065Can I get a motion on the renewals of the high middle high school certified staff? >> So move second. >> Okay, that's uh m prop the motion properly made by Miss King and second by Miss Black Shear uh on the renewal of the middle high school certified staff recommendations. Is there any discussion? Okay. All in favor raise your hand. Okay. Now, can I get a motion on the superintendence recommendations for the nonrenewals in the U middle high school staff, certified staff? >> Okay. A motion to It's been made by Miss Blackshere. Can I get a second? >> Second. >> Okay. The motion has been properly made by Miss Blackshere and second by Miss King to accept the superintendent's recommendation on the nonrenewals. Uh is there um all in favor raise your hand. Okay. And none

066uh nos. Okay. Okay. So, the motion to uh accept the superintendent's uh recommendation passes 3-2. 3 4 3 two against Is there any other business? Okay, since there's no other business, can I get a motion to um adjourn? >> So move. >> Second. Okay, the motion to objourn has been properly made by Miss Black Shear and second by Mr. Rouse. Um all in favor raise your hand. This meeting is adjourned.