CorpusRecord 93024

BOE Regular recurrent meeting

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / Zoom User
Date
2024-12-20
Location
Caswell County, NC
Material
Transcript
Extent
1,587 words · about 9 min
Collected
2026-06-11

Transcript

Verbatim source text

001good morning call me County Board of Education now come to order at this time I'll ask you for a moment of silence followed by the if you would thank you thank you States the stands one nation under God indivisible withy and justice for all okay first item approv of the agenda yeah motion to that effect Mr second discussion all faor raise your hand motion thank you uh new bus uh first item is propane Mr you I believe in your packets you've all got the information from Bluebird as to the cost the specs and um what what we're looking or what I'm looking for for for the district is um especially with the handicap or the EC buses this is a cleaner F cleaner F fuel a lower cost Fuel and going forward I know Green

002is a big thing in the area in the nation um I don't believe an electric bus is in our best interest to continue trying to get those especially at the exor cost a propane bus is not even it's less than half of that cost we can use it more effectively in this County than we can an electric bus um we still don't know the range that the electric bus is even going to give us because we haven't received it yet um so I would like for you to uh approve us the ability to purchase propane buses and going forward the only cost to the district right now will be the electrical when they put when they set the pumps and the tank we've got to run the electrical from our current pumping station over to

003that pumping station and it's basically conduit wire a trans or a shut off valve and a a transfer box uh I spoke with Mr petite and he said it shouldn't be more than $10,000 but he doesn't know the exact cost until we get the exact where they're going to put the tank measurements all that and we can't it's hard for him to give me an exact number couple questions MH we are do an electric bus is that correct yes the electric bus is currently at Thomas built uh being inspected uh it was there last Thursday um hopefully we'll have it by the middle of January okay now this 171,000 explain that to me okay the 171,000 is the total cost of the bus that is picked up by DPI we have zero cost in all

004right now what about going forward going forward the maintenance on the bus will drop okay um a propane bus basically has a gasoline engine right with a conversion to propane there's five Lether filters on it it doesn't have a turbo it doesn't have an EGR it doesn't have de fluid all of that over the course of 20 years which is the lifetime of a bus we've replaced on one bus we've replaced two turbos an EGR three times and the de tank once and then the extra cost with de uh fluid okay so all that cost goes away I got you okay M black a question about the electric bus I know uh we got a grant I think for getting the electric bus is that correct so you made the comment that you don't think

005we should be going toward uh electric buses um how is that compared to what Raleigh is you know sending out grants to try the electric buses so they're pushing the electric buses because they're not sure about a propane bus I have spoke with four districts um chadam district has got seven propane buses uh Durham has got uh six um cumber uh not Cumberland Charlotte meinberg County has got um I think four or five of them they prefer the propane over the electric the electric we our hands are tied on what we can do on an electric bus maintenance wise anything that's got the big orange cable hooked up to it we can't touch that will have to go back to the manufacturer the batteries on electric bus are only guarant or only warrantied for eight

006years the life of a bus in state of North Carolina is 20 years so if you go by the eight years and you're probably going to have to replace those batteries the batteries are going to cost anywhere from $250,000 to $300,000 and you're going to replace them twice so now you've got $600,000 wrapped up in batteries just to keep that bus on the road for the 20 years and DPI is going to make us buy those batteries because that bus has to be on the road okay just with a followup question um that's good information that you just gave us but I'm wondering um what is DPI thinking because the systems wouldn't be able to afford $250,000 for a battery for buses so is there Ian have we had any discussion with anyone there because

007you know this this is just based on the information there but they already know that a system would not be able to afford a $250,000 battery so so you know that's why they know that but it the word I'm getting I have not specifically talked with Mr Harrison at DPI about this specifically at the last transposome we did speak about the difference between electric and propane and their opinion that I they've asked us not to push they're pushing electric because they're electric being pushed on them okay okay it does make make sense to buy $250,000 battery bu prop doesn't make sense and the cost of a new okay and just to throw that out it's a gasoline engine the engines for the propane buses are made by Ral uh Ral Ford in Michigan um the

008cost of a brand new engine if we had to replace the engine on a propane bus is $88,000 the cost of an EGR is $3,000 the cost of a turbo is $4 $500 we could buy one engine in the less than we can replace the turbo and the EGR in the lifetime of both buses anything else that's I saw your I just had a couple questions uh one AC will be on the bus yeah a every it comes with everything that we currently have on the bus okay and then um just follow up to miss Blackwell you know I think we were told we got a grant for that bus but it come out of our lotman of buses so really we didn't I mean we were shorted a bus cuz we got the electric

009bus exactly so it come out of our lot for buses we were giving a little bit of bad information okay um and then the last thing is um I have no problem approving this bus I don't know that I want to give a blanketed approval for propane buses I would kind of like to see this is the only bus we're getting this year right yes so we'll have time to see how it does before we have to purchase another one yes okay so I would kind of like to see how this does before we just say we're going to go to all propane okay anybody else m v so you're saying that this is the total cost plus the Electric is that what you're saying this 171 no the 17132 is the total cost of

010the bus only then we have to pay for the electric and we don't know correct my opinion I don't like voting on nothing if I don't know what the total amount is on something not paying the 17 not paying the 71 that DPI pays out yeah but we got to pay it until they pay us back right no it come out your no yeah so but we still going to vote today and not know how much electric electric being electric hooked up GNA cost right we vot on on the propane but it's got to be yes but he just got through saying we got to pay for the electric it's the only thing it's not covered correct roughly $110,000 yeah roughly but they don't know do you have that in your budget Mr BD do

011you have that in your transportation budget yes it would not come out of any local funding we would take it out of Transportation call the only way it would come out of local funding is if it was kind of like the electric bus where we had to do the charging station we had to pay for that up front and DPI reur re that's the only way it comes out of local funding because this is a state bus okay any more discussion if not is what is your pres we move forward we move forward with the purchase Miss Smith second and more discussion if not all in favor raise your hand motion Carri 70 thank you Mr ban thank you thank you B all right item number two corrective reading and training proposal miss bie here

012good morning board members um in your pcket you should see a training proposal for corrective reading I am proposing um this as a contracted service for Denise Wright who will provide the training if approved this training would be held on January 22nd so this is just a one time work for one day yes sir um and the reason that the training has not been provided by myself or Margaret schaer is because Margaret schaer has been formally trained but I have not been formerly trained in corrective reading so my goal for this is for me to attend the training and have a train the trainer model moving forward um right now miss schaer is the only person at the district level formally trained in corrective reading all right little so why is South not included in

013there it just says northed in Creek oh I apologize so that is the people that are currently using corrective reading so South is not currently using corrective reading um but they do have people who are attending um and I think that's because they have had so much turnover at South they don't have anyone formerly trained at South um so they have not started using corrective reading this year because they have not had anybody um who's been trained and is able to get that moving um right now they may have pockets of people who have used it um but South has not been using it so far this year North Elementary uses it their tutors use it um Oakwood Elementary has tutors that are using it and their um some of their classroom teachers are using

014it in the same at Stony Creek okay I'm sure it says but this is coming out title one it is actually um I proposed for it to come out of RIS um which can be used to cover any expenses um that also cover Title One title two and title four we have $10,000 budgeted in that account and have not spent any of that this year so you so you are saying that South uh staff will be included in this Workshop yes ma'am um so actually I sent a survey out and I included this in the proposal um on October 22nd I saw feedback from the principals in regards to um the training to make sure that the training was needed um and we had quite a bit of feedback um I have sent out a

015survey to confirm participants and as of this morning we have 25 participants good all right and that and actually um for this training I opened it up to dard as well um and they have um six participants from dealers specifically that have registered to attend um it does run 312 um the corrective reading program does run grades 3 through 12 typically it's used more frequently at the elementary level but I think that's for a lack of training so we actually have six par participants from dard who have agreed to attend if approve very any other questions if not a motion to approve the contract Miss Black second Mr L any more discussion if not all in favor raise your handos thank you thank you yeah uh yeah we do that um at this time I

016moved at the C County Board of public education go the close section for the purpose of cons Personnel action that involves an officer or employee of this board NC General statute 143 211816 and for the purpose of discussing information that is privileg confidential a not of public record NC General statute 143 31811 AES one and to confirm a fraternity Mr L there second Miss night in discussion if not all fa raise your hand motion's approved let's take a five minute break uh

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.