Verbatim source text

001e e somebody that kind of runs that place she was AP she was she was everything Shirley was everything and um what a wonderful lady was there from sun up to sun down every day did not mind working loved the Richmond Raiders um and there was there was four ladies at the high school uh shley Adcock an Martin Elaine Davenport and who all all three of them have passed and Georgia Jackson and Georgia is still living at the beach but I can just have comfort saying that the three of the lady Raider girls are still together shy passed away last week which out Jerry and I did not realize it and we just found out the other day that she had passed and all that so I just wanted to mention her what an asset

002she was to Richmond County schools for many many many years so here's to shley aot yep and Joe with that it's on you all right you just what do you want um what would you like to do about dinner uh well you want you want to eat dinner you usually you do at the beginning of the work session let's go ahead and eat some dinner why uh Kim and her staff are here so we'll just do dinner and then um we'll we'll eat in there so we don't mess this place up and then we'll come back and do it does that sound good everybody all right let's go e e e field m board tonight I have aure to show you the progession in planning we' made tonight particular this even I'm going to share

003with you scenar mainten conditions of the building I would be Crystal CLE that these are not only op suggestions based on our plan me stud caned they blessed Julian can let me stop you just a second and ask the the book that you gave us that we studied yes ma'am for two weeks if you make a change you going to tell us what the changes that you've got in that book are going to be represented in that presentation I on the the bottom of your pile is basically the same book that's this you just gave us thisday okay it should be very very similar there'll be a few things that'll be a little different um there's a few omissions a few things I pulled out changed I talk most to you about them but there's

004some things that we we want to change a little bit so the public school again you start looking at what we're trying to do or what we're wanting to do the goal for us as I see it there a look at the scenarios through Dr frell's Direction give them to you and let you guys kind of say hey this is something this the direction we want to go again you don't have to do anything but when you're sitting on three buildings you know we 70 to 75 years old on top of Rockingham Middle JY which is over 80 years old um you're going to have to do something at some Dr Carter do you have an extra cop which one get thank you all right so we can't build these buildings without right it's obvious

005you know we're not in a position to build a $40 million building so we talked about it a couple weeks ago I told you that the state has some funding sources and we're going to settle on this one at the very end it's a needs based public school funding uh Grant and we have to match some of the money it's $42 million for an elementary school $52 million for a middle school $62 million for a high school and anybody that's trying to build a middle High School can tell you $62 million is not enough money to build a high school so fortunately we got a pretty good high school it's been maintained maintained pretty well so I feel pretty good about that if you'll flip to the first page the lottery Capital funding I'm going

006to go through these quick I'm not going to spend a whole lot of time as far as funding goes because it's going to break down into one or two categories about what we're going to do as far as funding goes ADM is a corporate tax we don't have enough money in our account to build a school building um not a not a major major building the public school building Capital fund is next and that money we are paying we get from the state of North Carolina every year it's about $500,000 I think is that right and it goes to it goes to the to the district I mean the County Commissioners pay down the debt on East Rockingham school until that school bill was paid off so we can't touch that but the public school

007building repair and renovation fund that money is promis to the projects that we're doing now which is M Springs fa Heights and the high school in order to finish out paying Debt Service on that that money is got to be there we have about $1.5 million sitting at the state when D is ready to pay the bills she draws that money down we had touched it yet so that's money that we've got we don't spend it all in the projects we're building right now we'll have a little extra money the one that you really need to look at is the needs-based public school Capital fund that's at the bottom this is a joint County Lea Grant so the state of North Carolina give you if we want to build an elementary school middle school high

008school I told you the numbers a minute ago if you'll take a look at this page right here publico you can take a look and you can see what everybody has to match we are tier one wait a minute Julian you got to give us time I got to find it I'm sorry but I want to make sure I understand okay come and slow down I get excited about well I am going to he you slow down because I got to find all these sheets of paper you ready yes okay so on this sheet of paper you can see all the districts in the state North Carolina okay and you can see we're on the second page toward the bottom mid mid bottom and it says the Richmond County Schools must match 5% and whatever

009is given over to the far right it's based on the assess Real Estate Value we fall in 5% bracket so if we wanted to build a 40 let's say we want to build a $40 million I build I rounded it off to 40 to make you would have to you would have to go to your county commissioner tenant and have to request $2 million is 5% of it okay that would give us $42 million work with now actually you can get up 42 so the number would be uh 44 44 milon 100,000 if you got all the money now keep in mind you're having to match it so if you don't need $45 million or $40 million you don't have to use it I will tell you the build a school build is expensive now

010there are some positives there's a lot of positives as far as I'm concerned um you can go back through this she I'm not going to not going to read this to you but you can see the information you can see what these different things can be the money can be spent on um if you focus on the needs based Public School Capital fund it'll give you all the ways the money can be spent from the sa Carina okay primarily building buildings last year I don't think they granted like seven projects they spent $386 million or something like that on like seven projects three four five years ago they did like 34 35 so it just depends on what the projects are projects are tending to be really when they first started they doing a lot

011of small stuff might vo pieces knock and a lot of now they're primarily big buildings um so with that said um I want you to over to jul I ask a question about East Rockingham Elementary School yes how much longer do we have to pay on that Don do we have any we had the answer to this about six weeks well can you get can you get all three of them and let give them to Dr frell so he can give it to us maybe the Friday update or some El I have them I have have them on my desk she gave them to me today I'll just include it I think the latest date Dawn was 2030 I think that's right so about so when that happens if the state is still funding that

012pro project that Grant we'd have about half a million dollars a year to spend on something upkeeping the bills putting roofs on stepen is consist ly putting roofs on builds he's fixing to spend half a million dollars at Rockingham Middle on the roof so there are a lot of things that we certainly need to look at um I'm going to skip over the email that we had from our counselor I want you to go to this page right here this Cameron is going to be my Vanna White here shortly um she's going to come up and help me draw some pictures um we're going to start El Middle School when we when we met earlier we talked about possibility of doing some different things with El Middle School school was built in 1949 it was

013added on onto in 50 57 and ' 89 it's got a full compliment of teachers CTE teachers art music media not all of her full-time because the building has gotten big for the amount of kids that we have right now we have about 98 students at El the number has dwindled there are people that say there's possibility you know that you attendance may go up at some point don't know don't know what the possibilities are one of the things I heard very loud and clear was the possibility of doing a K8 school with Mineral Springs that is certainly something that we can take a look at if you will go to the next page what's the number of children School needs to maintain the school viable uh make school viable according to economies of scale

014you as you know it's a economic principle describes how a company uh can use their average cost um or lower the average cost for its product students would be our product and so if we could combin the schools at some point in the future um you certainly I think you could save some money as far as Personnel now the state is funding most of the Personnel although you have some redundancies there the building does not cost that much to operate can you tell me Sten where we're at as far as rson good good place how about children so the building's not in a bad spot it costs roughly 77,000 to heat and cool um there are no major Big Ticket items that have to be done at this point the grounds are very very nice

015if you've been over there the athletic fields are very nice um so although it State lot the majority of the money for the labor there could be some significant savings by reducing redundant positions as I spoke to earlier should there be a study done to determine the Fe ility of making a K8 school I I've done a lot of the work on it already but I'm certainly not the foremost expert in doing this certainly something could could be done I would ask you to think about as we go through these scenarios tonight the priority what's the priority is it low is it medium is it high is it have to be done when we start looking at changing some build doing some things to buildings fixing some buildings and all that think about that now

016I also want to bring up the notion that and I mentioned in here the possibility of adding on something over at mles Spring school if we choose to go Ka the way I look at it I think we would need at least 12 classrooms plus a course room a work room you're going to need um a music room bathrooms when you start looking at what we spent at mural springs on the building with six classrooms we spent $4.5 million we're saying double that plus bathrooms plus workroom plus course room I'm I'm thinking 10 to6 million to do it now we don't have $16 million to do these so you got to start thinking about okay what's your priority do we want to get $40 million for elementary school $52 million for a middle school $62

017million for a high school or do would want to spend $16 million on the smaller structure it's up to you if you'll flip page jul let me ask a question with 189 students students Stephen you this 180 198 students like cafeteria would that would we have to expand the cafeteria or or could they fit in there I think they would fit in there fine it's going to be some really weird schedules but I think we can make it work and the gymnasium is is fine gymnasium is fine I went out and measured off the field right beside the Big Field they drive through in the mornings and all that it's big enough for a soccer field it's big enough for a football field um we have some extra land over there too and utilized all

018what we have so there is the possibility of of doing that if nothing else the facilities we have at El are really good and so they could ride a bus over there and do that until we can get something f we choose to go that way that's a question yes sir okay so Fairview Heights is next fairy Heights was constructed in 1950 and this morning myself Dr frell uh Stephen and an architect walked through the building and we we took a look at everything and just kind of got some ideas um looked at the quality of I mean the condition of the building Auditorium layout the room um where Cera okay she took off all right so we just had an addition made at the school building we just put a gymnasium up um an

019addition was made at the rear of the school in 1969 in 2009 we built a a media center so the building's in a good place it really is um Fairview Heights chiller Sten was it three years ago um the final phase of the roof replacement was completed last year there are no major Renovations or repairs necessary or planned for the foreseeable future just don't have to do it so while we're talking and you guys saw it in the booklet you got I highlighted a couple of areas that the building could potentially go if we chose to build a Fairview and again the building's in pretty good shape it's a little older than Bale but it's still in pretty decent shape do y'all see the picture y'all can see where there are several places that you

020could build if you look behind the school there's a circle track looks like football stadium when you're looking at it okay that is a big area where the school could be built and probably would be best built there um and where I'm talking about is right here however talking with the uh architect this morning your gymnasium is about right here okay this building right here the last spot I'm drawing potentially could be taken down and the building built while students were occupying the building that way you can connect up the media center you at the gym that's a possibility does anybody have a question about any of that I know this is a lot coming at you so I'm ready to ask whatever you need are the Alleyways there I mean obviously I see Fair

021viws built right in the middle of one is that is that just an unopened easement that is abandoned at this point so it would have no bearings on anything what are we talking about so when you look between parcel number ending in 6489 and 6227 it'll say Fairview Avenue no there there's nothing there so it's just completely abandoned no no chance okay right that's in the middle of the playground I get it I just wanted I didn't know if I didn't know if they there were still a lawful easement there was my question I and you can look right here where the x is that's all Richmond County School's land now it's across the road and it would not be advisable in my opinion to build a school building there because you have media and

022you have uh gymnasium already built on the other side of the road it's going to be a matter of thinking about where you want to put it and I'm not an architect I'm not an engineer so if you're thinking I'll be able to tell you where to put it I can't do it but there are people who can do this kind of stuff um this one block is 3.32 Acres but again that is Scotty help me out with that part I can I can line the acreage out on it while while you guys are talking and we'll take just a second are basically the entire highlighted area that we were talking about yeah I'm thinking it's going to be about five acres but the architect did say that even though we have a detached media

023center and detached gym yes a school could be built in area attaching those two items back together again what I was thinking when I was looking at it because I wasn't thinking again I don't think the way they think that it probably need to be on playground where I Dr I drove the big circle okay but what she's saying is this area right here I just did that X that is an older building was built I think in 1969 that building could come down and then how do I clear this okay that's fine all right so she's talking about wanting to put it somewhere in the neighborhood you loveology if you come to the back of the parking lot and this is count if you come to the back of that parking lot it comes

024out to about 2.3 2.5 acres just depending but there's some spots you could come up I just did a straight line but again you have that easement there and then you have the land go all the way over to the fence line behind the these houses where it says 104 1,10 112 so you have a little bit more area there to build if you choose to but what I was going to tell you was she is thinking that the building could be put somewhere around in here and then it will connect up to the gym that's just been build and the media center where I was thinking it would probably be better to put it back here that makes more sense if you can put the building in there now what the footprint would look

025like to make it happen I don't know if it's a twostory building if it's a three story building I don't know so building 74 years old quick question like that um have there been any thought about I mean we talked about potential but as far as parking so I mean I know that you know parking and and driving accessibility parents coming in and out of school have we looked at what that would look like too even with um you know what you just talking about I mean because that's some I mean that's a tight area you're absolutely right and so definitely want to make sure that we don't put parents and kids in bad situation with part I was principal there three years and the the the entrance the exit was horrible doesn't matter any

026way you do it you have some getting picked up on the back side of building some getting picked up on the front side of building it is still so it it takes a good staff which we have a great staff over there and to make it work and it will to answer that question I would have to know where the building's going and when when I knew that then I could tell okay we can change to Dr the patterns of the traffic it's not just Fairview Heights you got Hamlet right down the road and so that snarls it as well so I'd like to answer that question but until I know where the building's going I really can't answer I will tell you if you chose to build a building there then the whole other

027part of the building would come down later on and that will be your that' be an extra road to put in you could zigzag it get cars in and out of there and you know that might be your playground that so you can incorporate the media center the gymnasium into the new plan new playgrounds parking lots and pickup Lanes could be construct constructed in these areas but we'd have to know where to going so to flip the page if a decision was made to build a new Elementary classroom building at Fair Heights how it be funded there's only one way you can fund a building that big and that's an ebased Public School Capital fund the current building has 28 classrooms you probably want to FP already in there just to make sure you got

028room um cost of the project 35 42 million maybe more than that but good thing is you got a you got a gym already good thing is you've got a media center already and the other thing is Stephen and everybody we started trying to build this gymnasium set it up so if you've been in the gym and you look to the back wall that wall was designed to be taken out to build a Gori you have at some of the other school build West Rockingham got one East Rock that building be expand so that 35 to 42 million that doesn't take into account any demo potential demo it's just construction right back fon out Les spe years Sy acctim we have take is this the same technology or the same engineering that's at Fairview Heights

029is it next might have the same problem at febr Heights rightl those inv went LJ said again we will start getting some money from the renovation juli that's why why you've had certain teachers at that school that been sick on a regular basis case I think I know I've talked to several teachers think I think it's downstairs it's downstairs that they've been sick almost like a continuous several months in a row and and I know that main G over and clean stuff in those rooms but you know they were so 72y old building footprint could be on the existing [Music] I don't know configuration that would be there's also room possibly down I asked the arit we're talking today I that's strange that spot and this spot just doesn't look like a good place and

030their response was there's a reason why that building is right there very little option you to go back and put building in that same place not only one these other places kids from either have to get it's water problem on that playground in a lot of place there's a water problem there is water and we were told to possu there are some options that can be done but as they come up building will be a much more difficult place to build if we use excision made to put new elementary school at school we useo ex am again we4 million midle scho can I ask a question just about that you we we talked about you know where where would you put a school have do Stephen in your expert opinion because we're just having we're

031having dialogue right now has it ever been done where you just gut the inside of the building because the building itself is still probably a fantastic building it's brick right is it is it a could you just gut the whole thing inside you got a gymnasium already that's good got some of build at leasts that would certainly how old is the gy 201 question and again I mean it's certainly doesn't have to be done you can see that there are some concerns Mr ask very good question I was at Rockingham Middle School in 2000 when you could literally take your foot I can't tell you the veracity of statement and I'm going to tell you what I was told while I was there would cost $6 million to inter there are parts of that building

032structure there that we don't use anymore is still being used you know either side but 84 years is a long time to have a building again do you want to spend the money it will take again 10 12 million about think about what you as far as the questions you have to do something like that know proba be 300,000 600,000 West Rockingham was another one we had discussed some discussions were had and I was all about the possibility do a preol having having those kids dispersed LJ possi Wason Street Poss will after looked only a couple and that's where the majority ofj is probably miles May miles that certainly be of however there 17 classrooms at at um West Rock we take two of them at West Rock there no ways 15 maybe do May

033able here's we 11 PRS INRI two of those about build we would only send Noms kids poti you could last last one is poal build I it' be great to house you know all their events it' be great to have a place for on the inter be place to have matches had ni again that's kind of luxury we did have a rough rough out of it I did construction comp nearby 75 by 120 the project somewhere around 575 that is certainly something that's the realm of possibility especially when we start getting the Mone talking earlier that's what I have for you tonight glad to answer any question you have I two pages Pro next steps so the needs based grant it has to be for one specific project you you couldn't do an elementary school

034and then and then tack on potentially the JROTC because it's the same you absolutely can say it I like way so I was thinking about it today okay for Middle School you get $52 million okay Ro middle school and LJ Bell School TCH each other not the same campus but we're going try to get a ruling to find out so we can get the 52 million for the middle scho build gy build I don't think it's but certainly you can do those multip it's probably based on school number and there different School numbers that's what I would guess somebody because some schools they have two two schools on one campus and they have all the same number number two understands take offline old builds and end up new building here I think I didn't 50

035pages of it um I did not put that in there there is need based Public School Capital fund is a designation get points for that ability generate tax revenue our Revenue very low you can say that on the sheet that I gave you ratio of debt tax revenue uh critical deficiency something that we really got to have facility Construction complet fa so I think that puts us in a pretty decent spot to get and never applied for it either we app we have applied twice have applied twice applied tce for AI That's that's not going to replace for put million however we talked 124 applications last year in seven got now I was worried very worried about competing with the mountain who got hit by certainly they should have PRI us or anybody else but

036there is a fund of money that the state is using to fix those I don't think it's going to affect this Mone well again I'm not try to in certainly get have they said that I looked on the website today and there was a section on the needs based planning on the planning the DPI planning site and it was if you had requested money for it they had fix yeah so if you look at the criteria that of give you priority it's new or complete Renovations so an auditorium is kind of a small project like a big consolidating two or more schools into one and are you addressing critical deficiencies in serving students and so that'se building is more priori won get it used to be over County and he says that you should apply

037for something big and then maybe put a small structure in there with it because they always have a little extra money and sometimes you get some of that money I personally wouldn't want to take a chance maybe the project we talked about just a moment ago maybe something like that but I would rather kind of get I think the way you get this grant is like what you said is that you're replacing an old old school or you're combining schools and building one school yes agreed I think that's I think if we're going to try to hit a home run with this I think that's the way you go I don't think you try something small I think you go something big and replacing something and just want to use it in a way that's

038right so and if you guys go back and think about why are we here doing this is because we asked the superintendent to do a facility study and we found out through this guy that nobody else knew said that we had some old buildings that need to be replaced and that our schools are under under capacity so because we're losing students according to what he's saying right nowal 16921 ft of floor space that is between 71 and 74 years I'm not so is this is this feasible just we're just throwing things out here starting conversation whether it's LJ Bell at fa Heights we know we need a new elementary school we we know that we also know that El Middle School is ex extremely old has 189 students and for $16 million $15 million we

039could probably add on to Mineral Springs make that a K8 school so this is my question let's say we apply for a needs-based grant get that for the elementary school okay which is 42 let's say say $40 million just numbers is there any way our County Commissioners we could meet with our County Commissioners and discuss how we could possibly build on to Mineral Springs because again we're not going to get two grants we're probably not going to get two grants so how do we get that our County Commissioners to figure out how we can do this because don't forget we're build we're actually building a new school for $15 million and replacing it a 70y old building so is that possible where we get the needs-based Grant and then we get our County Commissioners to

040help us with that $15 million does that make sense to y'all because we can sure we'll make an agreement tonight of what if it's LJ Bell or Fairview Heights but we could make an agreement tonight that we need to give this man permission to do it a grant needs-based grants and maybe start a conversation with somebody about doing those things things so what's actually required to apply for the need space granted do we have to have engineered drawings we have to have arital have full arit we spoke to today said absolutely not have that she's gotten three or four done in the last decade last five six years without now she have something there basic but you got to keep in mind that I talked to Eva and this is we're going to get into

041weeds here so here you kind of the process that you would use if you chose to do that so my concern was okay so say we want to build a building just like we did when we're talking about the high school okay you go get an architect or you go get an architect that you may not use to give you the basic outline of what the building looks like so you can kind of get it or follow what EV has said here can you walk through this sure so engine that's they love to see it but everyone can't invest in that knowing they be able to build so um you know what some districts do is hire an architect to essentially um and you know go far enough down the road to verify that this

042can be built in this place and here's you know sort of in general what it would cost and what it would look like um and they will essentially do your Grant and then if you get the grant you can put it out to bid for like final architectural drawings so you can hire them to do it um and then yeah so that's so it isn't you will have to invest something um you will need to hire someone to at least get your application in good shape and have a project that may not be like shovel ready but it's um doable it's we know what it is we know what it's going to look like we know where it's going to go we know who owns the land because one of the things they say is

043you can't spend this money to buy land like you need to own the land um and then you can if awarded the grant get an architect to finish you out and put it up to bid for construction um there are construction firms who would like to pitch you on like hire us now we'll do it if you get the grant you've already hired us for the rest of it but right we like them to have to work for it a little harder than that so um but yeah so and what we have had I know we had one District do was um have an agreement with the architect that essentially there's a flat fee for this work but if we get the Grant and you'll you'll keep helping us resubmit it they said for three

044cycles and if we get the grant like that sort of goes toward the final drawings but if we don't get the grant then we'll just pay your flat Fe so do you know what that looks like dollars and cents just on the prep side just an estimate please don't quote me on this I have something like 70 in my head for what that cost but that may have been I I don't have a good sense of what it would cost for your project I don't know if you gentleman do for to get up through the Grant application but we can we we can get some examples from other districts um edcom County got the grant recently and they did middle school so they hired an architect to do the drawings were awarded the Grant and

045then they put it out you know to bid for the final drawings I think they ended up hiring someone else to see it through so we can contact somebody this doesn't have anything to do with the what it does um okay so we did make a decision tonight you don't have to make I know but I'm just saying if we do or when we make our decision and and the architect takes this and works with it and he comes back and says it's not going to work you can't build a school here you can't build a school here so our plan or our thoughts are negative I think you g far enough to where you know to some extent where things can go right we know we can put them in those there are a

046lot of I can tell you and the I don't see it at LJ B that's why I'm asking I really don't work there long there's there's um problems where the um kpod is they've had to build the land up I mean I know you said it goes up to the high school that's not that I mean to the middle school it's not that far and then in the back they put pipes in I don't know how many times under that ground am I wrong I mean I've been out a while so I don't know but I'm just and I don't know about that land at FY Heights I don't know a thing about it what tell you is if it was done first time be I mean you may have to put it right where

047that building is right now you may have to put trailers in the in the up on the parking lot you may have to move those kids to another building that building is built so that is the possibility I'm just turn this this is a little contentious but fixing right it will take a year to get it ready for no if we start apply for this grant apply in in July is typically awarded September October whenever budget gets passed that right there we got the money there 10 months for the design phase now folks I don't know if you know this or not remind we did it for three months for the three structures we did three months design phas it takes about 10 to do a good job so if that was the case you

048have one year the build ready get the plans for it theoretically thr this out and call a swing that's possible people do it now it's going to be 15 this is the best estimates I got today from the time they start building which is probably going to be 10 months after somewhere around July of 26 16 months she said 15 to 16 months now you to go Fair Heights this is going to sound completely insane but if you decide to go fairr coming up today not having to worry rning whatever it just frees things up makes G and aor I can tell you my heart was at rocking middle school did a lot of years there and when had tear that building down it like killed all of us because that was a very special

049thing to all of us and anybody that was at Rocket Jun High I tell you it was hard for came get a we have so there's no way we could build a Fairview Heights with those kids staying there you can absolutely I I don't have any doubts that you can do it I think where plac of the build is going to be different but I think you can do it she was just really not didn't like the distance from the media center and if you'll notice I don't if you guys ever notic this the media center and the gymnasium that we built look very similar we use the same colors we tried to use same bricks all that stuff so we can tie it all in got time to I [Music] think build it right

050there you can do it it's going to be very everything AR has free R come with best in that and you got another 75 8 years I can just add a couple of things real quickly um so you mentioned talking to the county um it is it is definitely time for us to get them involved um because even even if just we're going to apply for the grant the grant we complete it but it actually goes to the to the state on behalf of the county not on behalf of the board of education so that would need to happen um we were a I know you all know that when I was in Camden we got a $50 million Grant from the capital needs fund we did not have a complete set of drawings we

051had um a conceptual will it fit on this site kind of um kind of thing um and so what we did is exactly what Eva described where we contracted with an architect to do that work for us and help get the grant written and all those things and then put it out for bid now that board there did end up going with that architect to design the entire project out um but um today in our discussions with um the architect that was here um sort of as a a favor to me um she was saying that those Services typically would range in the 30 to $40,000 range that makes sense so um and she said you know so that you can you get all that done she would help get the grant written get it

052submitted and then um you all put it put it out for bids and um go from there but so regardless if we're going to do um something at Fairview Heights or at LJ Bell I think a next best step would be for me to reach out to the county manager and set up a time when he and I and maybe the the chairs and um of both boards or the vice chair you know whatever we decide we want to ask for um and just have a conversation about it to let them know where we are they're aware of course of our facility study but um and moving ninth grade and closing Monroe Avenue they're aware of all that but the next steps of course they uh would need to be glued in on because they're

053going to need to be directly involved in those and that could be the discussion about you know is it even possible for us to do something um out at Mineral Springs in the way of um making that a K8 school without tapping into the grant at the same time as we're doing a grant for either LJ Bell or a Heights what's y so we have about about six months so now is the time to start working on and then they take how long before you get a respon usually September I think well once the budget passes it's going to be September oob yeah the passing of the state budget is when they will announce it but um to make sure I guess to make sure it remains in there in in as a budget item

054that's right but that when the budget comes back and say we're we're awarded it we've got what 10 months to or year to design it but once now once you get the money I do know this um once you are are awarded the money you can take the time needed to get um um I just found out today that um the project that I started working on in my fourth year as superintendent in Camden has just been put out for bid for construction now that was you know it probably could have been done more quickly than that but um it they just they just did that so we do this thing you can't get back in for years get money you have to wait years yeah so the the tough decision for you guys is

055if you want us to build a school and go for the grant which which school are we going for yeah just I'm I'm just again thr things out there and just using my what I what I hear I would think and this is just to start conversation for y'all to get mad at me I think I know we have the problems with LJ Bell but who's to say those same problems ain't going to happen to fa Heights when we start building new LJ Bell I I think the thing that we need to look at is replacing fairie Heights first putting it on on that campus there keeping the students there and that's where our grant money goes I'm a lot like Bobby Sue I spend a lot of time on that playroom out there there's

056a lot of water problems out there and I'm not we need to get an engineer out there look at that as well but if you ask me what my opinion was is that I would like to see us build a new Fairview Heights and do the K8 at every at Mineral Springs that would be what I would suggest I think it would be easier and sometimes easier is not the best but it' be easier to do favor Heights in LJ Bel yes they're both in terrible shape and I mean you what we're is you can walk down theway know St and and see for me that's kind of where you know I'm processing all this it sounds sounds like LJ Bale is in the the most dire need as far as major issues that's going

057on between the piping and then the heating or cooling system that's in the classroom the only problem I just unclear about the Land part you know what and I me somebody had mentioned something about on the playground it being full of water I mean it's just a lot of it's just yeah so it that just that's what I where the current building sits right now so what sounds like Fairview Heights and LJ Bell are both of equal need but the the thing is is Fairview Heights does sound like the path of leas resistance at least right now which would give us more time to make a plan for LJ Bill and because both of them need to be done today I want again we that and if you want to spend that amount of money

058pipes and again going to we have to get it done quick the kids got out of Bill we have to get teachers out Bill have to start right you got take all that out and back then you got Julian you we just heard now I'm just throwing this out Dr fail say they've just started on the project at the county he came from been five years well it doesn't sound like sounds like we need do the pipes at LJ Bel way before any five years we've been working on the Pikes been doing that for more than three years you said three years they've been doing that a long time we've been changing those ceramic those tiles for a long time no when I said 10 months 10 months from the design phase you go she

059said it'll take 10 mons to have the build dra up plan ready and then you start building and then that point 15 so what we would have to have is like it is just just like it is for 10 more months Beyond this school so about July 26 well what did you just say that fa that they were putting it out for bid but they there were some factors that delayed them I think we could probably get it superintendent change I think we could get it um moving forward a lot more quickly now it's still going to take 10 months to design and all that so say a year and then you've got a year of construction but of course the kids will be out of the building by it least eight classrooms and bathrooms

060there so that would mean if you keep the same amount of kids in that building you may have a classroom or two open you would have to have TR so tonight do we need a decision yes we want to move forward with plans to build a new school and apply for this grant or do we need to know the location so um I was just thinking about that um so what I think will happen and Eva please feel free to pump my breaks if you need to I I think what will happen is I would bring back a recommendation to the board at the February meeting for a a a company or a firm to work with us to help us write the grant so I would say that a decision would need to be

061made by the February meeting when is your February meeting two weeks two weeks from febrary 11th um because you would have to do an RFQ which is not as as complicated as bidding but you have to sort of allow multiple firms to send you their qualifications um so I leave you know a couple of weeks for that but uh but yes I think your step is two steps which could happen in the same meeting is the board or one could have anyway the board giving guidance to the superintendent on um please go forth and pursue an architect to you know draw plans for and what the superintendent is asking for is for which project and then you would come back essentially with a contract for approval or yeah with who you have selected can we

062can we get that done by the February meeting or we need to plan on bringing that to the March meeting February is tight yeah um unless the board is ready to make a decision tonight which doesn't seem likely as far as which project they want to pursue um but you could always add it to I don't know you could do a work session I guess if if you felt like March was too late so could we do this this is um R Fe that way you come back and then whoever gets gets chosen to make those let them go survey thees and come back yeah I mean I suppose you could yes and I think you could if you you don't have to know which project you're going to do to chose right so you

063could put out an RFQ tomorrow I suppose and just you know that it would be proof of concept drawings for a capital need right so do we need a motion for to a move forward with applying for the capital needs Grant and starting to prepare for that or is that just something that uh certainly a motion wouldn't hurt then you have clear marching orders to get an RFQ so what is your motion going to be what what would your MO to get an RFQ for architect to come in to look at both LJ Bell and Fairview Heights to give us their opinion on what facilties is to build it yeah so I guess it would be something like I move to ask the super or I move to direct the superintendent to seek or to

064do an RFQ and bring back a recommendation for an architect to assist with a capital need Grant that's a lot to remember I got I got some of did you get when y'all when y'all were Joe when you and Cory and going to the County Commissioners why couldn't you do like the fav Heights say say if it was the one and then also say we need pipes at LJ bail just to say this is where we are can you help us there right because we can't build two schools have to maintain one and build another one yeah but only thing you going to be asking for three things commission CU you know you just mentioned about Mineral Springs Minal Springs and then build we're bold y'all are bold say well I I I think it's

065good that we talk to them and say these are the things that we need to do because just like somebody said we have three buildings if they all go Kut the county commissioner is going to have to do something then you by law they're going to have to do something we're trying to get a needs-based grant where they only have to pay $2 million to get a $42 million school and that's why I like the conversation of having a conversation with the County Commissioners to kind of explain to them what our situation is from based on the fac facility study and what where our thinking is at as a board and kind of just kind of share with them that and and just you know I think that's a good start I mean especially if

066you're going to be asking they got to put up Max money either way and if we're asking them to assist in other facilities that's not part of the the needs brand because you think about it's 15 million it's 15 million for lrb 2 million for 15 1.5 million for the pipes right which is what 165 and then you're going to ask for El element yeah for the for the match so you're looking at you just say 1920 million dollars and I also like seeking advice from the experts about where they think is best possible solutions for the building because I don't want to choose that I want to fix all what we have a building that's going to be open to do that and then you got one school building if you choose to go

067to R you're talking about it's got it pipes it's fixed it's got a roof it's got pretty much chillers it's got whatever it needs and you got one whole one that's completely redone and then you got moves into another building so got your problem pretty much solved all right do we need to talk to County commissioners before we move any further or discuss any of this with them or we just going to assume they're gonna say yes I like and RFQ doesn't cost you anything you're just asking people to send you their proposal then you can make that decision so the RFQ would be a motion would need to be made to receive to for the superintendent to Q through a through a architect to look at both Feer Heights and LJ Bell to see

068what facility would be the best to build that to give us some Direction like on where to build that elementary school then we then we can bring that information to the County Commissioners and to help you with the grant help us with the grant so that's what we need so move I can't make a motion you didn't so I moved to direct the superintendent to begin the process of requesting rfqs uh for potential site work at Fairview Heights and LJ Bell and do whatever he may deem necessary to bring that back to us for review I have a motion to Flo by Mr bwin I have a second second have a second by Mr Tillman is there any conversation discussion about that were we also talking about uh El Elby middle over at middle Springs

069well I think this the RFQ would be for the grant for the grant okay start the grant so that would be just a totally different project that we just y'all just get $20 million from the County Commissioners and we middle we we're good Bobby Su is done we got it we got we got y'all have l so we have a second any more conversation any more conversation all in favor of of the proposal by Mr B Mr B say I I I I'll oppos no great that passes so you know what you got to do now right I do sorry not Jenny has it recorded yeah can we take like a two three minute break so we can uh T you real quick and come back you're chairman you're sorry with e e e closing

070schools and building schools and moving schools and all that that we're on the same page is just as everybody knows superintendent's going to do an RQ um about trying to get a grant which is the best thing to do and that we are going to talk to the County Commissioners in due due time and hopefully this will be done at the March board meeting coming com com moving forward that sound good and the only thing we're applying for right now is the elementary school the things that the other things that we've talked about El Middle School the jrtc building the gymnasium at uh Rockingham Middle School those are all just other ideas that we have discussed Julian is there anything else you want to add I did want to add one thing I want to

071make sure that the community understands this nothing's beened way or another even if we do make a decision even the Ares back and says this is the [Music] last4 EXC don't like we had moread SC in a bunch of years thank you Julian thank you Steve for information tonight Dr frell um I just want to mention real quickly to you all I gave you a copy of the 2526 um calendar or calendar options and um this has been um vetted through a number of people but it has also been sent out to our staff for them to take a look at and vote on option one or two usually we bring that to you in February for a um for consideration and then March for a final vote but because of some training that has

072to be that's mandatory with um Infinite Campus we're going to need to bring this to you for a final vote in February so I've given it to you tonight to look at to study to reach out to Dr Smith or to me with any questions that you have so that we can get those answered in preparation for our February board meeting in two weeks have you had good participation with the survey so far nice yeah and this and both of these options are within the um or meet the calendar law sorry I meant I meant to mention that to you Dr Smith and I don't know about y'all but during the three to three days of snow uh you know my phone keeps on banging because people are calling you know why is it an

073optional work day for staff and you know why are we doing remote days it's just but doing schedule is very very difficult and then you have non-exempt employees who can't make the time up they've got to take the time because realis by law you're not allowed to say you can make it up some other time you know you got to work during that pay pay cycle there's a lot of things that go on in determining how people work and when they have to make it up and so forth so on so I know it's tough and it's just hard that when it snows it's difficult for everybody body and but everybody's just got to be safe and I think that's what our our team did was try to make everybody safe as they could well

074Dr far if we just if we vote for the um and the survey goes toward the the calendar that ends before they get out for Christmas can is there going to be enough time you it was controversy last time we tried to and they all they had to fit because they said they' already had vacation you remember that do y'all remember that we talked about it and the people said we we already had vacation plan for um Christmas and so are we okay there we giving them enough time um enough time to like enough yeah they had the same amount of time off okay all right that's right same amount of time off okay thanks and we actually there was we got a lot talk about phone Buzz we did okay yeah um and we've

075spent quite a bit of time um in conversation with high school teachers in particular about this calendar because High School teachers are the or high schools are the th those people are most impacted by the calendar um you know if you're a fifth grade teacher and the semester ends before Christmas or after Christmas it's not it might be a big deal but not as big a deal as it is with eoc's so and so we feel pretty confident that we have landed in a place that our um High School folks would be fine with option one or two do we have a a Target as far as um respondents you know the percentage of folks that we're we're hoping that respond do you have an idea if that's make it is there anything else for

076anybody there was questions about people getting calls and some not getting calls are we supposed to be on the list to get calls or are we not we are on the STA we are on the staff chain for those Robo calls aren't we and I commented you said you didn't get a call I didn't get a call that was the problem I knew through conversation any I didn't I got who did not get a call my phone out I had phone trouble um all kinds of troubles with my lines last week so Cameron doc Mr Ethridge B and miss miss uh Scher and then anything else for the board don't call I need a I need a motion Mr Mr uh Mr bwin to make a motion by B second by any conversation all have

077a nice night